Integrated energy system planning method considering pipeline network dynamics and equipment variable efficiency characteristics
The particle population algorithm optimizes the input mass flow rate and equipment capacity of the heat source point, and solves the problem of failure to consider the dynamics and equipment change efficiency characteristics of the heating pipeline network in the prior art, and achieves efficient operation and cost savings of the heating pipeline network.
Patent Information
- Application Number
- CN202110703513.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-06-24
AI Technical Summary
In the prior art, the comprehensive energy system planning fails to fully consider the dynamics and equipment change efficiency characteristics of the heating pipeline network, resulting in insufficient model accuracy and increased optimization difficulty, and fail to effectively save costs.
The particle population algorithm is used to optimize the input mass flow rate and equipment capacity of the heat source point, minimize the difference between the temperature and the reference temperature of the heat flow pipeline through the upper layer objective function, combine the dynamic heat transfer model and hydraulic calculation model to optimize the input mass flow rate of the heat source point, and in the The equipment capacity is optimized in the lower-level objective function to minimize cost.
The reliable operation of the heating pipeline network is achieved, costs are reduced, equipment utilization efficiency is improved, and the goal of optimal economicality is achieved by optimizing equipment capacity.
Smart Images

Figure CN113704931B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of energy research, and in particular to a comprehensive energy system planning method that takes into account pipeline network dynamics and equipment variable efficiency characteristics. Background Art
[0002] In the field of international energy research, the cascade utilization of energy can greatly improve energy utilization, absorb more renewable energy, and improve the operational stability and safety of the energy system. Nowadays, the planning and operation of integrated energy systems has become an important direction in the field of energy research. With the deepening of research, the equipment and network models considered in the integrated energy system are no longer simple equivalent models. The refinement of the model can improve the accuracy of the research on the planning and operation of the integrated energy system, but this will also increase the difficulty of solving the optimization model. As an important component of the integrated energy system, more and more research is focusing on the research of the heating network of the integrated energy system.
[0003] In the prior art, there are general models of heating and cooling pipelines that have been established using heat transfer theory. However, these studies have not really taken into account the comprehensive energy planning and optimized operation. In addition, the efficiency of the equipment models established in the prior art is constant. On the one hand, the accuracy of the model needs to be improved, and on the other hand, the variable efficiency characteristics of the equipment during operation are not considered. Summary of the invention
[0004] The technical problem to be solved by the present invention is to address the deficiencies of the above-mentioned prior art and to provide a comprehensive energy system planning method that takes into account the dynamics of the pipeline network and the variable efficiency characteristics of the equipment. The comprehensive energy system planning method that takes into account the dynamics of the pipeline network and the variable efficiency characteristics of the equipment optimizes the mass flow rate of the heat source point and the equipment capacity while taking into account the variable efficiency characteristics of the equipment, thereby saving costs while ensuring the reliable operation of the heating pipeline network.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0006] A comprehensive energy system planning method considering pipeline network dynamics and equipment variable efficiency characteristics includes the following steps.
[0007] Step 1: Solve the optimal input thermal power: Take the input mass flow rate of the heat source point as the optimization variable, and the minimum sum of the difference between the heat flow pipe temperature and the reference temperature as the upper objective function. Use the particle swarm algorithm to solve the upper objective function to obtain the optimal input thermal power.
[0008] Step 2: Solve the optimal capacity allocation: Use the optimal input thermal power solved in step 1 as a constraint for capacity planning to obtain the optimal capacity allocation.
[0009] In step 1, the heating network includes a heat source points and b load points, forming a+b network nodes in total; the heat source points and the load points as well as the load points are connected by a heat flow pipe, the total number of heat flow pipes is P, and each heat flow pipe is divided into c equal parts at intervals of △x along the water flow direction; then the temperature of the xth equal part of the i-th heat flow pipe at the current time t is T i pipe (x, t); where 1≤i≤P, 1≤x≤c; the expression of the upper objective function is:
[0010]
[0011] Among them, F sec Represents the sum of the differences between the heat flow pipe temperature and the reference temperature.
[0012] T standard Indicates the reference temperature, which is the set value.
[0013] T represents the total heating time of the heating network.
[0014] The method of using particle swarm algorithm to solve the upper objective function includes the following steps:
[0015] Step 11: Based on the hydraulic calculation model under steady state, establish a relationship model between the input mass flow rate of the heat source point and the mass flow rate of the heat flow pipeline.
[0016] Step 12: Under the condition that the hydraulic characteristics of the heating network remain unchanged, according to the dynamic heat transfer model of the heating network, establish the T of the mass flow rate of the heat flow pipeline i pipe (x,t) calculation model:
[0017] Step 13: Combine the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow established in step 11 and the T i pipe (x, t) calculation model, the heat source point input mass flow rate is used as a random particle population, the upper objective function is solved, and the optimal heat source point input mass flow rate and the optimal input thermal power corresponding to the optimal heat source point input mass flow rate are obtained.
[0018] In step 11, the method for establishing the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow includes the following steps:
[0019] Step 11A, select a thermal relaxation node: arbitrarily select one of a heat source points as a thermal relaxation node. Assume that the ath heat source point is selected as the thermal relaxation node.
[0020] Step 11B: Establish the network node mass flow set at time t without thermal relaxation nodes as follows:
[0021]
[0022] Where: is the mass flow rate of the first heat source point, the variable to be optimized; is the mass flow rate of the second heat source point, the variable to be optimized; is the mass flow rate of the third heat source point, the variable to be optimized; is the mass flow rate of the a-1th heat source point, the variable to be optimized; is the mass flow rate of the first load point; is the mass flow rate of the second load point; is the mass flow rate of the bth load point.
[0023] Step 11C: Establish the heat flow pipeline mass flow set at time t as follows:
[0024]
[0025] Where: is the mass flow rate of the first heat flow pipe; is the mass flow rate of the second heat flow pipe; is the mass flow rate of the third heat flow pipe; is the mass flow rate of the i-th heat flow pipe; is the mass flow rate of the Pth heat flow pipe.
[0026] Step 11D: Establish the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow:
[0027]
[0028]
[0029]
[0030] Where k is the number of iterations; J is the Jacobian matrix of hydraulic calculation; ΔF is the hydraulic mismatch vector; A r is the basic correlation matrix after removing the relaxed nodes; B is the basic loop matrix; K is the heat flow pipeline resistance coefficient vector.
[0031] In step 11D, the number of iterations k is determined according to the following convergence formula:
[0032]
[0033] Where ζ is the given convergence coefficient value; is the mass flow rate of the ith pipe network node at time t; when the ith pipe network node is a heat source point, When the i-th pipe network node is a load point, Among them, the initial mass flow rate of the load point is calculated based on the design supply and return water temperatures and the required thermal power.
[0034] In step 11D, The following mass flow constraints must also be met:
[0035]
[0036]
[0037] represents the maximum mass flow rate allowed to pass through the i-th heat flow pipe; v max It is the maximum flow rate of hot water in the heating network.
[0038] In step 12, T i pipe The calculation model formula of (x, t) is:
[0039]
[0040] Where: T i pipe (x, t-△t) represents the temperature of the xth equal part of the ith heat flow pipe at the time t-△t before.
[0041] Represents the mass flow rate of the i-th heat flow pipe at the current time t.
[0042] △t represents the time interval.
[0043] ρ represents the density of hot water in the heating network.
[0044] c p Represents the heat capacity of hot water in the heating network.
[0045] A i represents the cross-sectional area of the i-th heat flow pipe.
[0046] T i pipe (x-△x, t) represents the temperature of the x-△xth part of the ith heat flow pipe at the current time t.
[0047] R i represents the thermal conductivity of the i-th heat flow pipe.
[0048] T e Indicates the ambient temperature at the heating network.
[0049] In step 2, during capacity planning, the optimal capacity allocation of heat source equipment is obtained by establishing a lower-level objective function with equipment capacity as the optimization variable and solving the lower-level objective function; in the heating network, each heat source point has at least one set of heat source equipment, and the total number of heat source equipment is n; where n≥1; then the lower-level objective function minF eco for:
[0050] min F eco =F inv +F om +F fuel (7)
[0051]
[0052]
[0053] Among them: F eco is the total investment cost of equipment in the heating network; F inv is the equipment installation cost; F om is the equipment maintenance cost; F fuel is the equipment operating cost; j is the unit capacity cost of the jth heat source equipment; γ j is the discount rate of the jth heat source equipment; α j is the service life of the jth heat source equipment; x cap,j is the equipment capacity of the jth heat source equipment.
[0054] O om,j is the maintenance cost of the jth heat source equipment; d j is the number of operating days of the jth heat source equipment; It is the output power of the jth heat source device at time t after considering the variable efficiency characteristics.
[0055] V gas,j is the natural gas consumption of the jth heat source equipment; E lectricity,j is the power exchange between the jth heat source device and the external power grid; P gas is the natural gas price; P electricity It’s the price of electricity.
[0056] In step 2, when solving the lower objective function, the following constraints must be met:
[0057]
[0058] and are the upper and lower limits of the equipment capacity of the jth heat source equipment respectively; It is the maximum channel capacity of the planned regional power grid.
[0059] The calculation formula is:
[0060]
[0061] in, is the optimal heat input power of the jth heat source device at time t; η j,t (δ j,t ) is the operating efficiency of the jth heat source equipment at time t, which is a function of the load rate; δ j,t is the load rate of the jth heat source equipment at time t.
[0062] The present invention has the following beneficial effects:
[0063] 1. This application adopts two-layer optimization planning and design, namely, upper layer and lower layer. First, through the upper layer optimization, the optimal input thermal power at the heat source of the pipeline network is obtained with the high efficiency of the pipeline network operation as the objective function. Secondly, the upper layer optimization results are transferred to the lower layer as the constraint conditions of capacity planning to obtain the optimal equipment capacity allocation.
[0064] 2. This application optimizes the mass flow rate of the heat source point through upper-level optimization, thereby ensuring the reliable operation of the heating network and preventing the heating network from failing.
[0065] 3. While considering the variable efficiency characteristics of the equipment, the equipment capacity is optimized at the lower level, with the optimal economy as the objective function, thereby saving costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 The schematic diagram of the layout of the heating network in this embodiment is shown.
[0067] Figure 2 A schematic diagram showing the physical representation of the temperature calculation method in a heat flow pipeline.
[0068] Figure 3 A schematic diagram showing the temperature changes at the outlets of various heat flow pipes before the mass flow rate at the heat source point is optimized in the prior art is shown.
[0069] Figure 4 A schematic diagram showing the change in outlet temperature of each heat flow pipeline after the mass flow rate of the heat source point is optimized in this embodiment.
[0070] Figure 5 A schematic diagram showing the results of heat source equipment capacity optimization in this embodiment is shown. DETAILED DESCRIPTION
[0071] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific preferred embodiments.
[0072] In the description of the present invention, it should be understood that the terms "left side", "right side", "upper part", "lower part" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. "First", "second" and the like do not indicate the importance of the components, and therefore cannot be understood as limiting the present invention. The specific dimensions used in this embodiment are only for illustrating the technical solution, and do not limit the scope of protection of the present invention.
[0073] The heating network includes a heat source points and b load points, forming a+b network nodes in total; the heat source points and the load points as well as the load points are connected by a heat flow pipeline, and the total number of heat flow pipelines is P.
[0074] In this embodiment, if Figure 1 As shown, preferably a=2, b=3, and P=5.
[0075] The two heat source points are heat source point 1 and heat source point 2; the first heat source point is recorded as EH1 or source1, and the corresponding network node number is node4; the second heat source point is recorded as EH2 or source2, and the corresponding network node number is node5.
[0076] The three load points are load point 1, load point 2 and load point 3; the corresponding load numbers are Load1, Load2 and Load3; the corresponding network node numbers are node1, node2 and node3.
[0077] A comprehensive energy system planning method considering pipeline network dynamics and equipment variable efficiency characteristics includes the following steps.
[0078] Step 1: Solve the optimal input thermal power: Take the input mass flow rate of the heat source point as the optimization variable, and the minimum sum of the difference between the heat flow pipe temperature and the reference temperature as the upper objective function. Use the particle swarm algorithm to solve the upper objective function to obtain the optimal input thermal power.
[0079] The method of using particle swarm algorithm to solve the upper objective function specifically includes the following steps:
[0080] Step 11: Based on the hydraulic calculation model under steady state, establish a relationship model between the input mass flow rate of the heat source point and the mass flow rate of the heat flow pipeline.
[0081] The method for establishing the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow comprises the following steps:
[0082] Step 11A, select a thermal relaxation node: arbitrarily select one of a heat source points as a thermal relaxation node. Assume that the ath heat source point is selected as the thermal relaxation node.
[0083] In this embodiment, the second heat source point is selected as the heat relaxation node.
[0084] Step 11B: Establish the network node mass flow set at time t without thermal relaxation nodes as follows:
[0085]
[0086] Where: is the mass flow rate of the first heat source point, the variable to be optimized; is the mass flow rate of the second heat source point, the variable to be optimized; is the mass flow rate of the third heat source point, the variable to be optimized; is the mass flow rate of the a-1th heat source point, the variable to be optimized; is the mass flow rate of the first load point; is the mass flow rate of the second load point; is the mass flow rate of the bth load point.
[0087] In this embodiment, The preferred expression is: in, is the variable to be optimized, and it is obtained by initial random particle population assignment and iterative optimization through the particle population algorithm.
[0088] Step 11C: Establish the heat flow pipeline mass flow set at time t as follows:
[0089]
[0090] Where: is the mass flow rate of the first heat flow pipe; is the mass flow rate of the second heat flow pipe; is the mass flow rate of the third heat flow pipe; is the mass flow rate of the i-th heat flow pipe; is the mass flow rate of the Pth heat flow pipe.
[0091] In this embodiment, The preferred expression is:
[0092] Step 11D: Establish the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow:
[0093]
[0094]
[0095]
[0096] Where k is the number of iterations; J is the Jacobian matrix of hydraulic calculation; ΔF is the hydraulic mismatch vector; A r is the basic correlation matrix after removing the relaxed nodes; B is the basic loop matrix; K is the heat flow pipe resistance coefficient vector, which is a known parameter set input in advance.
[0097] In this embodiment, it is preferred that Ar=[1 1 0 0 0; 0 -1 1 0 0; 0 0 0 1 1; 0 0 -1 -1 0]; and B=[1 -1 -1 1 -1].
[0098] The above iteration number k is determined according to the following convergence formula:
[0099]
[0100] Where ζ is the given convergence coefficient value; is the mass flow rate of the ith pipe network node at time t; when the ith pipe network node is a heat source point, When the i-th pipe network node is a load point,
[0101] The initial mass flow rate of the above load points is calculated based on the design supply and return water temperatures and the required thermal power. The specific calculation formula is:
[0102]
[0103] In the formula, Enter the thermal power required for the hth load point, where 1≤h≤b; is the mass flow rate of the hth load point; and are the supply and return water temperatures of the hth load point, respectively, and the initial value is a stable set value.
[0104] In this embodiment, the water supply temperature is set The return water temperature is 80℃ is 50℃, and by the above formula, we get The initial values are shown in Table 1.
[0105] Table 1 Load node flow (kg / s)
[0106] Time (h) Node1 Node2 Node3 1 4.265305 5.687074 4.265305 2 4.187079 5.582773 4.187079 3 4.162826 5.550435 4.162826 4 4.071126 5.428169 4.071126 5 4.127185 5.502913 4.127185 6 4.116031 5.488042 4.116031 7 4.225753 5.634337 4.225753 8 4.898968 6.531958 4.898968 9 8.188019 10.91736 8.188019 10 10.52441 14.03254 10.52441 11 27.72547 36.9673 27.72547 12 27.95584 37.27446 27.95584 13 27.73006 36.97341 27.73006 14 27.58502 36.78003 27.58502 15 27.53338 36.71116 27.53338 16 26.93208 35.90945 26.93208 17 26.96128 35.94837 26.96128 18 28.43933 37.91911 28.43933 19 29.36727 39.15636 29.36727 20 30 40 30 21 29.78769 39.71691 29.78769 22 26.89232 35.85643 26.89232 23 9.964476 13.28597 9.964476 24 5.257926 7.010568 5.257926
[0107] Furthermore, the above calculation results in The following mass flow constraints must also be met:
[0108]
[0109] represents the maximum mass flow rate allowed to pass through the i-th heat flow pipe; v max The maximum flow rate of hot water in the heating network is the economic flow rate of 1.4 m / s, which is commonly used in engineering.
[0110] Step 12: Under the condition that the hydraulic characteristics of the heating network remain unchanged, according to the dynamic heat transfer model of the heating network, establish the T of the mass flow rate of the heat flow pipeline i pipe (x,t) calculation model.
[0111] like Figure 2 As shown, each heat flow pipe is divided into c equal parts along the water flow direction at intervals of △x; then the temperature of the xth equal part of the i-th heat flow pipe at the current time t is T i pipe (x, t); where 1≤i≤P, 1≤x≤c.
[0112] The above T i pipe The calculation model formula of (x, t) is:
[0113]
[0114] Where: T i pipe (x, t-△t) represents the temperature of the xth equal part of the ith heat flow pipe at the time t-△t before.
[0115] Represents the mass flow rate of the i-th heat flow pipe at the current time t.
[0116] △t represents the time interval.
[0117] ρ represents the density of hot water in the heating network.
[0118] c p Represents the heat capacity of hot water in the heating network.
[0119] A i represents the cross-sectional area of the i-th heat flow pipe.
[0120] T i pipe (x-△x, t) represents the temperature of the x-△xth part of the ith heat flow pipe at the current time t.
[0121] R i represents the thermal conductivity of the i-th heat flow pipe.
[0122] T e Indicates the ambient temperature at the heating network.
[0123] Step 13: Combine the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow established in step 11 and the T i pipe (x, t) calculation model, the heat source point input mass flow rate is used as a random particle population, the upper objective function is solved, and the optimal heat source point input mass flow rate and the optimal input thermal power corresponding to the optimal heat source point input mass flow rate are obtained.
[0124] Among them, the expression of the upper objective function is:
[0125]
[0126] Among them, F sec Represents the sum of the differences between the heat flow pipe temperature and the reference temperature.
[0127] T standard Indicates the reference temperature, which is the set value.
[0128] T represents the total heating time of the heating network.
[0129] Step 2: Solve the optimal capacity allocation: Use the optimal input thermal power solved in step 1 as a constraint for capacity planning to obtain the optimal capacity allocation.
[0130] In the above capacity planning, the optimal capacity allocation of heat source equipment is obtained by establishing a lower-level objective function with equipment capacity as the optimization variable and solving the lower-level objective function; in the heating network, each heat source point has at least one set of heat source equipment, and the total number of heat source equipment is n; where n≥1; then the lower-level objective function minF eco for:
[0131] min F eco =F inv +F om +F fuel (7)
[0132]
[0133]
[0134]
[0135] Among them: F eco is the total investment cost of equipment in the heating network; F inv is the equipment installation cost; F om is the equipment maintenance cost; Ffuel is the equipment operating cost; j is the unit capacity cost of the jth heat source equipment; γ j is the discount rate of the jth heat source equipment; α j is the service life of the jth heat source equipment; x cap,j is the equipment capacity of the jth heat source equipment.
[0136] O om,j is the maintenance cost of the jth heat source equipment; d j is the number of operating days of the jth heat source equipment; It is the output power of the jth heat source device at time t after considering the variable efficiency characteristics.
[0137] V gas,j is the natural gas consumption of the jth heat source equipment; E lectricity,j is the power exchange between the jth heat source device and the external power grid; P gas is the natural gas price; P electricity It’s the price of electricity.
[0138] When solving the above lower-level objective function, the following constraints must also be met:
[0139]
[0140]
[0141]
[0142] and are the upper and lower limits of the equipment capacity of the jth heat source equipment respectively; It is the maximum channel capacity of the planned regional power grid.
[0143] The calculation formula is:
[0144]
[0145] in, is the optimal heat input power of the jth heat source device at time t; η j,t (δ j,t ) is the operating efficiency of the jth heat source equipment at time t, which is a function of the load rate; δ j,t is the load rate of the jth heat source equipment at time t.
[0146] The variable efficiency functions of the combined heat and power unit (CHP) and the electric heating boiler (EB) are given below:
[0147]
[0148]
[0149] η eb (t) = 0.18·δ eb (t)+0.82 (14-3)
[0150] in: is the operating efficiency of the combined heat and power unit CHP- at time t; is the operating efficiency of the CHP unit II at time t; δ chp (t) is the load rate of the CHP2 cogeneration unit at time t; η eb (t) is the operating efficiency of the electric heating boiler EB at time t; δ eb (t) is the load rate of the electric heating boiler EB at time t.
[0151] Specific example verification
[0152] 1. Optimizing the operation of the heating network
[0153] exist Figure 1 In the study, each pipeline is 1 km long and 0.15 m in diameter. The heating period is mainly in winter, and a typical winter day is selected as the research representative. The heating system includes three load points and two heat sources. The types of heat source devices include cogeneration units, electric boilers, wind turbines, and photovoltaic generators.
[0154] According to the upper objective function, combined with the heat network model in Part 1, the heat source point flow and the flow distribution of each heat flow pipeline are optimized. For the convenience of comparison, a group of input mass flow of heat source points is randomly generated. The unoptimized pipeline operation results are shown in the figure below. Figure 3 As shown in the figure, the upper objective function value is 20.8609℃. After calculation, the mass flow rate in pipe 2 is very small, resulting in a large temperature drop. The temperature of pipe 2 is about 53℃ in 0-10h, which is close to the set return water temperature of 50℃. Pipe 2 faces the problem of operation failure.
[0155] On this basis, the mass flow rate of the heat source point was optimized, and the objective function was 13.9576℃. The optimization results are shown in Figure 4 As shown. Figure 4It can be seen that the temperature changes of pipe No. 1 pipe1 and pipe No. 5 pipe5 are small, mainly because the two pipes are directly connected to the second heat source point, the mass flow rate is large, and the temperature change is small. The mass flow in pipe No. 3 pipe3 is obtained by mixing the mass flow of pipe No. 4 pipe4 and the mass flow of the first heat source point, so the flow rate is large and the temperature change is small. Since most of the flow is consumed in nodes 1 and 3, the mass flow in pipes 2 and 4 is reduced, and the temperature drops more. However, the lowest temperature of pipes 2 and 4 is only 76.7℃, which is much higher than the return water temperature, and there is no problem of pipeline operation failure.
[0156] 2. Capacity Optimization Results Analysis
[0157] After obtaining the mass flow of the two heat sources, capacity optimization is performed in combination with the lower-level optimization objectives. The equipment to be optimized in this article consists of a combined heat and power unit (CHP), an electric boiler (EB), a wind turbine (WT) and a photovoltaic generator (PV), and the system is connected to the power grid. Since there is no heat storage device involved, the regulation capacity of the heating system is relatively poor, so an operation strategy of determining electricity based on heat is adopted. For the convenience of analysis, two schemes are set up at the two heat sources as controls. In Scheme 1 (case 1), the variable efficiency of the equipment is considered; in Scheme 2 (case 2), the equipment efficiency remains unchanged, the CHP electrical efficiency is 0.35, the thermal efficiency is 0.55, and the EB thermal efficiency is 0.9. The optimization results are shown in the figure below. Figure 5 shown.
[0158] At heat source point 1, the capacity of WT, PV and CHP of Scheme 1 is smaller than that of Scheme 2. Only EB has a larger capacity, and WT and PV are the main power supply equipment. This is because the heat load at heat source 1 is low, and the main load is the power load. Only small-capacity CHP and EB are needed to meet the heat load demand, while large-capacity WT and PV are needed to meet the power load demand. At heat source point 2, compared with Scheme 2, Scheme 1 has smaller CHP and EB capacities, and larger WT and PV capacities.
[0159] 3. Analysis of economic results
[0160] At heat source point 1, due to the small capacity of the equipment, the investment cost of Scheme 1 is 43.45% lower than that of Scheme 2. The operating cost of Scheme 1 is higher, 22.5% higher than that of Scheme 2. This is because the capacity of CHP, WT and PV equipment is small, while the capacity of EB is large, so the power consumption is large, resulting in the system needing to purchase more electricity from the grid, and the corresponding power sales are also reduced. Similarly, the maintenance cost of Scheme 2 is 2.47% lower than that of Scheme 1, and the total cost of Scheme 2 is 3.37% higher than that of Scheme 1.
[0161] At heat source point 2, the investment cost of Scheme 1 is 5.28% higher than that of Scheme 2. Although the capacity of CHP, EB and WT in Scheme 1 is smaller, the PV capacity is much larger than that in Case 2, and the installation costs of these two devices are higher than those of CHP and EB, so the investment cost is slightly higher. The operating cost of Scheme 1 is 5.6% higher than that of Scheme 2. The main reason is that Scheme 1 purchases more electricity and sells less electricity, and the maintenance cost is 4.42% higher than that of Scheme 2, and the total cost is 4.14% lower.
[0162] The preferred embodiments of the present invention are described in detail above; however, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, various equivalent transformations can be made to the technical solutions of the present invention, and these equivalent transformations all belong to the protection scope of the present invention.
Claims
1. A comprehensive energy system planning method considering the dynamic characteristics of the pipeline network and the variable efficiency characteristics of the equipment, characterized by: The steps include: Step 1, solving the optimal input thermal power: taking the input mass flow rate of the heat source point as the optimization variable, taking the minimum sum of the difference between the heat flow pipe temperature and the reference temperature as the upper objective function, using the particle population algorithm to solve the upper objective function to obtain the optimal input thermal power; The heating network includes a heat source points and b load points, forming a+b network nodes in total; The heat source point is connected to the load point and the load point is connected to the load point through a heat flow pipe. The total number of heat flow pipes is P, and each heat flow pipe is divided into c equal parts at intervals of △x along the water flow direction; then the temperature of the xth equal part of the i-th heat flow pipe at the current time t is T i pipe (x, t); where 1≤i≤P, 1≤x≤c; the expression of the upper objective function is: Among them, F sec It represents the sum of the difference between the heat flow pipe temperature and the reference temperature; T standard Indicates the reference temperature, which is the set value; T represents the total heating time of the heating network; The method of using particle swarm algorithm to solve the upper objective function includes the following steps: Step 11: Based on the hydraulic calculation model under steady state, a relationship model between the input mass flow rate of the heat source point and the mass flow rate of the heat flow pipeline is established; Step 12: Under the condition that the hydraulic characteristics of the heating network remain unchanged, according to the dynamic heat transfer model of the heating network, establish the T of the mass flow rate of the heat flow pipeline i pipe (x,t) calculation model: Step 13: Combine the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow established in step 11 and the T i pipe (x, t) calculation model, taking the heat source point input mass flow rate as a random particle population, solving the upper objective function, and obtaining the optimal heat source point input mass flow rate and the optimal input thermal power corresponding to the optimal heat source point input mass flow rate; Step 2, solve the optimal capacity allocation: take the optimal input heat power solved in step 1 as the constraint condition of capacity planning to obtain the optimal capacity allocation; during capacity planning, establish a lower-level objective function with equipment capacity as the optimization variable, and solve the lower-level objective function to obtain the optimal capacity allocation of the heat source equipment; in the heating network, each heat source point has at least one set of heat source equipment, and the total number of heat source equipment is n; where n≥1; then the lower-level objective function is: min F eco =F inv +F om +F fuel (7) Among them: F eco is the total investment cost of equipment in the heating network; F inv is the equipment installation cost; F om is the equipment maintenance cost; F fuel is the equipment operating cost; j is the unit capacity cost of the jth heat source equipment; γ j is the discount rate of the jth heat source equipment; α j is the service life of the jth heat source equipment; x cap,j is the equipment capacity of the jth heat source equipment.
2. The integrated energy system planning method considering the pipeline network dynamics and equipment efficiency characteristics according to claim 1 is characterized by: In step 11, the method for establishing the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow includes the following steps: Step 11A, select a heat relaxation node: select any one of a heat source points as a heat relaxation node, assuming that the ath heat source point is selected as the heat relaxation node; Step 11B: Establish the network node mass flow set at time t without thermal relaxation nodes as follows: Where: is the mass flow rate of the first heat source point, the variable to be optimized; is the mass flow rate of the second heat source point, the variable to be optimized; is the mass flow rate of the third heat source point, the variable to be optimized; is the mass flow rate of the a-1th heat source point, the variable to be optimized; is the mass flow rate of the first load point; is the mass flow rate of the second load point; is the mass flow rate of the bth load point; Step 11C: Establish the heat flow pipeline mass flow set at time t as follows: Where: is the mass flow rate of the first heat flow pipe; is the mass flow rate of the second heat flow pipe; is the mass flow rate of the third heat flow pipe; is the mass flow rate of the i-th heat flow pipe; is the mass flow rate of the Pth heat flow pipe; Step 11D: Establish the relationship model between the heat source point input mass flow and the heat flow pipeline mass flow: Where k is the number of iterations; J is the Jacobian matrix of hydraulic calculation; ΔF is the hydraulic mismatch vector; A r is the correlation matrix after removing the relaxed nodes; B is the loop matrix; K is the heat flow pipeline resistance coefficient vector.
3. The integrated energy system planning method considering the pipeline network dynamics and equipment variable efficiency characteristics according to claim 2 is characterized by: In step 11D, the number of iterations k is determined according to the following convergence formula: Where ζ is the given convergence coefficient value; is the mass flow rate of the i-th pipe network node at time t; When the i-th pipe network node is a heat source point, When the i-th pipe network node is a load point, Among them, the initial mass flow rate of the load point is calculated based on the design supply and return water temperatures and the required thermal power.
4. The integrated energy system planning method considering the pipeline network dynamics and equipment variable efficiency characteristics according to claim 3 is characterized by: In step 11C, The following mass flow constraints must also be met: represents the maximum mass flow rate allowed to pass through the i-th heat flow pipe; v max is the maximum flow rate of hot water in the heating network; ρ represents the density of hot water in the heating network; A i represents the cross-sectional area of the i-th heat flow pipe.
5. The comprehensive energy system planning method considering the pipeline network dynamics and equipment variable efficiency characteristics according to claim 1 is characterized by: In step 12, T i pipe The calculation model formula of (x, t) is: Where: T i pipe (x, t-△t) represents the temperature of the xth equal part of the ith heat flow pipe at the time t-△t before; represents the mass flow rate of the i-th heat flow pipe at the current time t; △t represents the time interval; ρ represents the density of hot water in the heating network; c p Indicates the heat capacity of hot water in the heating network; A i represents the cross-sectional area of the i-th heat flow pipe; T i pipe (x-△x,t) represents the temperature of the x-△xth equal part of the i-th heat flow pipe at the current time t; R i represents the thermal conductivity of the i-th heat flow pipe; T e Indicates the ambient temperature at the heating network.
6. The integrated energy system planning method considering the pipeline network dynamics and equipment variable efficiency characteristics according to claim 5 is characterized by: In step 2, when solving the lower objective function, the following constraints must be met: and are the upper and lower limits of the equipment capacity of the jth heat source equipment respectively.
Citation Information
Patent Citations
Regional comprehensive energy device and network dual-layer optimization configuration method
CN108446809A
A two-stage capacity allocation method of an integrated energy system considering node heat price
CN109447323A
A multi-energy system optimization planning method considering a heat supply network and a heat load
CN109740824A