A ship transfer device, a ship transfer platform and a ship transfer method

The four-zone controlled hydraulic trolley system solves the problem of rail gnawing caused by inconsistent speed of hydraulic trolleys in large ship transportation, realizes the synchronous operation of hydraulic trolleys, and improves transportation flexibility and safety.

CN113788289BActive Publication Date: 2024-11-19SHANGHAI ZHENHUA HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111122677.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-24
Publication Date
2024-11-19
Estimated Expiration
2041-09-24

AI Technical Summary

Technical Problem

During transportation, large ships have caused rail gnawing problems due to inconsistent speed of hydraulic trolleys, which increases transportation difficulty and safety risks.

Method used

The four-zone control hydraulic trolley system is adopted, and the independent oil circuit and oil quantity control device ensures that the oil supply in each hydraulic trolley area is consistent, achieving the synchronous operation of the hydraulic trolley.

Benefits of technology

It effectively reduces the occurrence of rail gnawing, improves the flexibility and safety of ship transfer, and reduces the risk of failure during transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113788289B_ABST
    Figure CN113788289B_ABST
Patent Text Reader

Abstract

The present invention provides a ship transfer device, a transfer platform and a transfer method, the transfer method comprising: step S1, parking the ship on a support; step S2, moving the hydraulic trolley part along the track to the bottom of the support; step S3, lifting the support and the ship by the hydraulic trolley part; step S4, controlling the connection of the first oil circuit, the second oil circuit, the third oil circuit and the fourth oil circuit in the oil supply device based on the direction to be transferred, so as to respectively connect the hydraulic trolleys in the first zone, the second zone, the third zone and the fourth zone; step S5, the hydraulic trolley part carries the support and the ship and moves to a designated position along the track. The device enhances the flexibility of ship transfer by four-zone control, and effectively reduces the occurrence of rail gnawing caused by different speeds of the hydraulic trolley.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of port machinery manufacturing, and in particular to a ship transfer device, a transfer platform and a transfer method. Background Art

[0002] Transportation needs to be considered during the manufacturing and maintenance of ships. Traditionally, the transportation of small ships or split ships can be completed by a few flatbed trucks. However, if large ships are also transported by a combination of multiple flatbed trucks, the difficulty of synchronous control will increase, safety and reliability will decrease, and the risk of failure will be greater. Once an accident occurs, the loss of the shipowner will be very large, so this method is usually not chosen. Therefore, a transfer system for large ship transportation was created.

[0003] The transfer system for large ship transportation uses many trolleys to transport medium and large ships. The number of trolleys can be selected according to the size of the ship. The hydraulic station with self-driving function provides the oil source to realize the ship's off-ground lifting and walking operations.

[0004] Since large ships are large in size and long in length, and the weight of various parts is different, hydraulic trolleys with the same oil supply may have inconsistent speeds when traveling, resulting in track gnawing problems. Summary of the invention

[0005] In view of this, the present invention provides a ship transfer device, which enhances the flexibility of ship transfer through a four-zone control method and effectively reduces the occurrence of rail gnawing caused by different speeds of the hydraulic trolley.

[0006] The present invention also provides a transfer platform having the transfer device of the ship.

[0007] The present invention also provides a transshipping method based on the transshipping platform of the ship.

[0008] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0009] The ship transfer device according to the first embodiment of the present invention comprises:

[0010] Tracks, the tracks comprising a transverse track group and a longitudinal track group, the transverse track group and the longitudinal track group being arranged crosswise;

[0011] A bracket, the bracket is arranged on the track and used to support the ship;

[0012] A hydraulic trolley unit, which is arranged on the track and comprises:

[0013] A hydraulic trolley frame, wherein the hydraulic trolley frame comprises a bow portion and a stern portion, wherein the bow portion comprises a first area and a second area, and wherein the stern portion comprises a third area and a fourth area, wherein the first area and the third area are located on the same side of the hydraulic trolley frame.

[0014] A hydraulic trolley, wherein the first area, the second area, the third area, and the fourth area are each connected to a plurality of the hydraulic trolleys;

[0015] A hydraulic station, comprising:

[0016] a carrier, the carrier being arranged at the track,

[0017] an oil supply device, the oil supply device being arranged in the carrier,

[0018] an oil quantity control device, the oil quantity control device being connected to the oil supply device,

[0019] The first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit, one end of the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit are connected to the oil supply device through the oil quantity control device, and the other end is respectively connected to the plurality of hydraulic carts on the first area, the second area, the third area, and the fourth area.

[0020] Furthermore, the oil supply device also includes a connecting device, which is connected to the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit, and is used to control the connection / separation between the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit, thereby connecting / separating the first area, the second area, the third area, and the fourth area.

[0021] Furthermore, the hydraulic trolley comprises:

[0022] A hydraulic trolley body, wherein the hydraulic trolley body is connected to the hydraulic trolley frame;

[0023] A hydraulic lifting unit, the hydraulic lifting unit comprising:

[0024] An upper hydraulic jack, which is arranged at the upper end of the hydraulic trolley body and is used to lift up the bracket;

[0025] A lower hydraulic jack is rotatably arranged at the lower end of the hydraulic trolley, and the lower hydraulic jack is used to lift the hydraulic trolley.

[0026] Furthermore, the hydraulic trolley body comprises:

[0027] A connecting portion, the connecting portion being connected to the hydraulic trolley frame;

[0028] The vehicle body is rotatably connected to the lower end of the connecting portion.

[0029] The transfer platform of a ship according to the second aspect of the present invention comprises:

[0030] A fixed frame, the fixed frame is used to be set at a port;

[0031] A driving mechanism, wherein the driving mechanism is arranged on the fixing frame;

[0032] A lifting platform, wherein the lifting platform is arranged on the fixing frame;

[0033] A traction rope, one end of which is connected to the driving mechanism, and the other end of which is connected to the lifting platform;

[0034] The above-mentioned ship transfer device is arranged on the lifting platform.

[0035] The transport method of the third embodiment of the present invention comprises:

[0036] Step S1: parking the ship on the support;

[0037] Step S2: moving the hydraulic trolley along the track to below the bracket;

[0038] Step S3: lifting the support and the vessel by the hydraulic trolley;

[0039] Step S4: controlling the connection between the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit in the oil supply device based on the direction of transfer, so as to connect the hydraulic carts in the first area, the second area, the third area, and the fourth area respectively;

[0040] Step S5: The hydraulic trolley carries the support and the ship and moves to a designated position along the track.

[0041] Furthermore, before step S3, the following steps are also included:

[0042] The first oil circuit is connected to the second oil circuit through the connecting device, or the third oil circuit is connected to the fourth oil circuit through the connecting device.

[0043] Furthermore, the step S4 comprises:

[0044] When the direction to be transported is lateral movement, the first oil circuit is connected to the second oil circuit through the connecting device, and the third oil circuit is connected to the fourth oil circuit through the connecting device;

[0045] When the direction to be transported is longitudinal movement, the first oil circuit is connected to the third oil circuit through the connecting device, and the second oil circuit is connected to the fourth oil circuit through the connecting device.

[0046] Furthermore, the step S5 comprises:

[0047] When the hydraulic trolley part changes from lateral movement to longitudinal movement, the method comprises the following steps:

[0048] The hydraulic trolley unit lowers the vessel;

[0049] The hydraulic trolley is transferred from the transverse track group to the longitudinal track group;

[0050] Connecting the first oil circuit with the second oil circuit through the connecting device or connecting the third oil circuit with the fourth oil circuit through the connecting device;

[0051] Lifting the support and the vessel by means of the hydraulic trolley;

[0052] The first oil circuit is connected to the third oil circuit via the connecting device, and the second oil circuit is connected to the fourth oil circuit via the connecting device;

[0053] When the hydraulic trolley part changes from longitudinal movement to lateral movement, the method comprises the following steps:

[0054] The hydraulic trolley unit lowers the vessel;

[0055] The hydraulic trolley is transferred from the longitudinal track group to the transverse track group;

[0056] Connecting the first oil circuit with the second oil circuit through the connecting device or connecting the third oil circuit with the fourth oil circuit through the connecting device;

[0057] Lifting the support and the vessel by means of the hydraulic trolley;

[0058] The first oil circuit is connected to the second oil circuit through the connecting device, and the third oil circuit is connected to the fourth oil circuit through the connecting device.

[0059] Further, when the first oil circuit is connected to the third oil circuit, and the second oil circuit is connected to the fourth oil circuit, the oil quantity control device is adjusted so that the initial value of the total oil supply flow of the first oil circuit and the third oil circuit: the initial value of the total oil supply flow of the second oil circuit and the fourth oil circuit = the total number of the hydraulic carts in the first area and the third area: the total number of the hydraulic carts in the second area and the fourth area;

[0060] When the first oil circuit is connected to the second oil circuit and the third oil circuit is connected to the fourth oil circuit, the oil quantity control device is adjusted so that the initial value of the total oil supply flow of the first oil circuit and the second oil circuit: the initial value of the total oil supply flow of the third oil circuit and the fourth oil circuit = the total number of the hydraulic carts in the first zone and the second zone: the total number of the hydraulic carts in the third zone and the fourth zone.

[0061] The above technical solution of the present invention has at least one of the following beneficial effects:

[0062] The present invention enhances the flexibility of ship transportation by means of four-zone control, and effectively reduces the occurrence of rail gnawing caused by different speeds of the hydraulic trolley. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 A schematic structural diagram of a ship transfer device according to an embodiment of the present invention;

[0064] Figure 2 It is a simplified schematic diagram of the oil circuit arrangement of the transfer device of a ship according to an embodiment of the present invention;

[0065] Figure 3 A schematic structural diagram of a hydraulic trolley of a ship transfer device according to an embodiment of the present invention;

[0066] Figure 4 A schematic diagram of a process flow of a ship transshipment method according to an embodiment of the present invention;

[0067] Figure 5 The diagram is a schematic diagram of the oil circuit arrangement of a transfer device of a ship according to an embodiment of the present invention.

[0068] Figure numerals: 1. bracket; 2. transverse track group; 3. longitudinal track group; 4. ship; 5. hydraulic trolley; 6. first zone; 7. second zone; 8. third zone; 9. fourth zone; 10. carrier; 11. oil supply device; 12. oil quantity control device; 13. first oil circuit; 14. second oil circuit; 15. third oil circuit; 16. fourth oil circuit; 17. connecting device; 18. upper hydraulic top; 19. connecting part; 20. vehicle body; 21. lower hydraulic top; 22. first proportional directional valve; 23 second proportional directional valve; 24. first two-way cartridge valve; 25. second two-way cartridge valve; 26. third two-way cartridge valve; 27. fourth two-way cartridge valve; 28. fifth two-way cartridge valve; 29. ​​sixth two-way cartridge valve; 30. seventh two-way cartridge valve; 31. eighth two-way cartridge valve. DETAILED DESCRIPTION

[0069] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0070] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one" or "one" do not indicate quantity restrictions, but indicate the existence of at least one. Words such as "connect" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship also changes accordingly.

[0071] The following first describes in detail the ship transfer device according to the first aspect of the present invention in conjunction with the accompanying drawings.

[0072] like Figure 1-2 As shown, Figure 2 This is a simplified schematic diagram of the oil circuit layout of the transfer device. The specific structure is shown in Figure 5 The ship transfer device according to the first embodiment of the present invention comprises a track, a bracket 1, a hydraulic trolley, and a hydraulic station.

[0073] The track comprises a transverse track group 2 and a longitudinal track group 3, and the transverse track group 2 and the longitudinal track group 3 are arranged crosswise.

[0074] The bracket 1 is arranged on a track and is used to support a ship 4 .

[0075] The hydraulic trolley part is arranged on the track, and includes a hydraulic trolley frame and a hydraulic trolley 5. The hydraulic trolley frame includes a bow part and a stern part, the bow part includes a first area 6 and a second area 7, and the stern part includes a third area 8 and a fourth area 9. The first area 6 and the third area 8 are located on the same side of the hydraulic trolley frame, and the first area 6, the second area 7, the third area 8, and the fourth area 9 are all connected with a plurality of hydraulic trolleys 5.

[0076] The hydraulic station includes a carrier 10, an oil supply device 11, an oil quantity control device 12, a first oil circuit 13, a second oil circuit 14, a third oil circuit 15, and a fourth oil circuit 16. The carrier 10 is arranged on the track; the oil supply device 11 is arranged in the carrier 10, and the oil quantity control device 12 is connected to the oil supply device 11; the first oil circuit 13, the second oil circuit 14, the third oil circuit 15, and the fourth oil circuit 16, one end of the first oil circuit 13, the second oil circuit 14, the third oil circuit 15, and the fourth oil circuit 16 are connected to the oil supply device 11 through the oil quantity control device 12, and the other end is respectively connected to a plurality of hydraulic trolleys 5 on the first area 6, the second area 7, the third area 8, and the fourth area 9.

[0077] The hydraulic trolley frame of the ship transfer device of the present invention is divided into four zones, the first zone 6 and the second zone 7 are located at the bow, the third zone 8 and the fourth zone 9 are located at the stern, the hydraulic trolleys 5 in the four zones are supplied with oil by four different oil circuits, the number of hydraulic trolleys 5 in each zone is determined by the weight of the ship 4 at the location, and the initial value of the oil supply in each zone is determined by the number of hydraulic trolleys 5. During the walking process, each zone continuously adjusts the oil supply through the oil quantity control device 12 according to the specific situation. The device enhances the flexibility of the ship 4 transfer through the four-zone control method, and effectively reduces the occurrence of rail gnawing caused by the different speeds of the hydraulic trolleys 5.

[0078] Furthermore, if Figure 2 As shown, the oil supply device 11 also includes a connecting device 17, which connects the first oil circuit 13, the second oil circuit 14, the third oil circuit 15, and the fourth oil circuit 16, and is used to control the connection / separation between the first oil circuit 13, the second oil circuit 14, the third oil circuit 15, and the fourth oil circuit 16, thereby connecting / separating the first area 6, the second area 7, the third area 8, and the fourth area 9.

[0079] The transfer device of the ship of the present invention can also merge regions according to the transfer process. For example, before the jacking operation is required, the first oil circuit 13 is connected to the second oil circuit 14 through the connecting device 17, or the third oil circuit 15 is connected to the fourth oil circuit 16 through the connecting device 17, thereby becoming a three-zone control mode. This jacking control mode not only ensures the flexibility of multi-zone control but also reduces the control difficulty compared with the four-zone control mode. For another example, when a lateral travel operation is required, the first oil circuit 13 is connected to the second oil circuit 14 through the connecting device 17, and the third oil circuit 15 is connected to the fourth oil circuit 16 through the connecting device 17. When a longitudinal travel operation is required, the first oil circuit 13 is connected to the third oil circuit 15 through the connecting device 17, and the second oil circuit 14 is connected to the fourth oil circuit 16 through the connecting device 17. These two travel control modes ensure the flexibility of multi-zone control and further reduce the difficulty of multi-zone control through the two-zone control mode.

[0080] Furthermore, if Figure 3As shown, the hydraulic trolley 5 includes a hydraulic trolley 5 body and a hydraulic jacking part. The hydraulic trolley 5 body is connected to the hydraulic trolley frame; the hydraulic jacking part includes an upper hydraulic jack 18, which is arranged at the upper end of the hydraulic trolley 5 body and is used to lift the bracket 1.

[0081] The hydraulic trolley 5 lifts the support 1 and the ship 4 through the hydraulic lifting part. The hydraulic lifting part of each zone is supplied with oil through the oil circuit of the zone. The initial value of the total oil supply of each zone is determined by the number of hydraulic trolleys 5. During the lifting process, each zone continuously adjusts the oil supply according to the specific situation, effectively reducing the side tilt of the ship 4 caused by inconsistent lifting height during the lifting process.

[0082] Furthermore, if Figure 3 As shown, the hydraulic jacking part further includes a lower hydraulic jack 19. The lower hydraulic jack 19 is rotatably arranged at the lower end of the hydraulic trolley 5, and the lower hydraulic jack 19 is used to jack up the hydraulic trolley 5.

[0083] The hydraulic trolley usually needs to change its direction of travel during the transportation process. When changing the direction of travel, first retract the upper hydraulic jack 18 to make the hydraulic trolley 5 separate from the bracket 1, then lift the hydraulic trolley 5 through the lower hydraulic jack 19, and then rotate the hydraulic trolley 5 to the direction to be traveled, and finally retract the lower hydraulic jack 19 and lift the bracket 1 again through the upper hydraulic jack 18 to continue moving.

[0084] Furthermore, if Figure 3 As shown, the main body of the hydraulic trolley 5 includes a connecting portion 20 and a body 21. The connecting portion 20 is connected to the hydraulic trolley frame; the body 21 is rotatably connected to the lower end of the connecting portion 20.

[0085] During the process of changing the traveling direction of the hydraulic trolley, the hydraulic trolley 5 needs to rotate with the lower hydraulic jack 19 as the axis. Since the hydraulic trolley 5 is connected to the hydraulic trolley frame, if the hydraulic trolley 5 is disassembled from the hydraulic trolley frame and then rotated, it will increase the workload greatly. However, by connecting the hydraulic trolley 5 to the hydraulic trolley frame through a rotating mechanism, the steering can be completed without disassembly, which effectively reduces the workload and improves work efficiency.

[0086] Furthermore, if Figure 1-2 As shown, the hydraulic trolley frame is formed into a U shape, and one side of the U-shaped hydraulic trolley frame close to the opening is the stern part, and the other side is the bow part.

[0087] The bracket 1 is arranged on the longitudinal track group 3. After the ship 4 is parked on the bracket 1, the hydraulic trolley frame moves along the longitudinal track group 3 with the opening facing the ship 4 to the bottom of the bracket 1; after the transfer is completed, the hydraulic trolley frame returns to the original position in the opposite direction.

[0088] Furthermore, if Figure 1-2As shown, the carrier 10 is a transport vehicle, which is connected to a hydraulic trolley frame and is used to run synchronously with the hydraulic trolley frame.

[0089] The transport vehicle runs together with the hydraulic trolley frame, which can reduce the laying of the oil circuit between the hydraulic station and the hydraulic trolley 5, and can avoid the problem of the oil circuit being pulled or entangled during the movement of the hydraulic trolley frame.

[0090] Preferably, Figure 1 As shown, the longitudinal track group 3 includes two groups, each longitudinal track group 3 includes four longitudinal tracks, and the transverse track group 2 includes thirty transverse tracks.

[0091] The four longitudinal rails of each longitudinal rail group 3 are used to place two rows of hydraulic trolleys 5 of the hydraulic trolley unit. A certain distance is set between the two longitudinal rail groups 3. The transverse rail group 2 is perpendicular to and crosses the two longitudinal rail groups 3. The hydraulic trolley unit can move between the two longitudinal rail groups 3 through the transverse rail group 2.

[0092] Combine the following Figure 5 The oil circuit layout of the transfer device is introduced in detail.

[0093] like Figure 5 As shown, the oil quantity control device 12 includes a first proportional directional valve 22 and a second proportional directional valve 23, and the connecting device 17 includes a first two-way cartridge valve 24, a second two-way cartridge valve 25, a third two-way cartridge valve 26, a fourth two-way cartridge valve 27, a fifth two-way cartridge valve 28, a sixth two-way cartridge valve 29, a seventh two-way cartridge valve 30, and an eighth two-way cartridge valve 31.

[0094] When all the two-way cartridge valves are closed, the first directional proportional valve only controls the first oil circuit 13 , and the second directional proportional valve only controls the fourth oil circuit 16 .

[0095] When the first two-way cartridge valve 24 and the second two-way cartridge valve 25 are opened and the third two-way cartridge valve 26 and the fourth two-way cartridge valve 27 are closed, the first oil circuit 13 and the second oil circuit 14 are connected, and the first proportional directional valve 22 uniformly controls the first oil circuit 13 and the second oil circuit 14; when the first two-way cartridge valve 24 and the second two-way cartridge valve 25 are closed and the third two-way cartridge valve 26 and the fourth two-way cartridge valve 27 are opened, the first oil circuit 13 and the third oil circuit 15 are connected, and the first proportional directional valve 22 uniformly controls the first oil circuit 13 and the third oil circuit 15.

[0096] When the fifth two-way cartridge valve 28 and the sixth two-way cartridge valve 29 are opened and the seventh two-way cartridge valve 30 and the eighth two-way cartridge valve 31 are closed, the fourth oil circuit 16 and the third oil circuit 15 are connected, and the second proportional directional valve 23 uniformly controls the fourth oil circuit 16 and the third oil circuit 15; when the fifth two-way cartridge valve 28 and the sixth two-way cartridge valve 29 are closed and the seventh two-way cartridge valve 30 and the eighth two-way cartridge valve 31 are closed, the fourth oil circuit 16 and the second oil circuit 14 are connected, and the second proportional directional valve 23 uniformly controls the fourth oil circuit 16 and the second oil circuit 14.

[0097] The ship transfer platform of the second embodiment of the present invention comprises a fixed frame, a lifting platform and the ship transfer device of the first embodiment. The fixed frame is used to be arranged at a port; the lifting platform is arranged on the fixed frame; and the ship transfer device is arranged on the lifting platform.

[0098] Furthermore, the transfer platform of the ship also includes a driving mechanism and a traction rope. The driving mechanism is arranged on the fixed frame; one end of the traction rope is connected to the driving mechanism, and the other end is connected to the lifting platform.

[0099] The transfer method of the transfer device according to the third aspect of the present invention comprises:

[0100] Step S1: Parking the vessel 4 on the support 1;

[0101] Step S2: Move the hydraulic trolley along the track to below the bracket 1;

[0102] Step S3: Lifting the support 1 and the vessel 4 by means of the hydraulic trolley;

[0103] Step S4: Based on the direction of the transport, the first oil circuit 13, the second oil circuit 14, the third oil circuit 15 and the fourth oil circuit 16 in the oil supply device 11 are controlled to connect to each other, so as to connect the hydraulic trolley 5 in the first zone 6, the second zone 7, the third zone 8 and the fourth zone 9 respectively;

[0104] Step S5: The hydraulic trolley carries the support 1 and the vessel 4 and moves to a designated position along the track.

[0105] The port is provided with a ship transfer platform, a ship transfer device is provided on the lifting platform of the ship transfer platform, the track of the ship transfer device is laid on the lifting platform, the bracket 1 is placed on the track, and the hydraulic trolley is parked at a position of the track away from the bracket 1.

[0106] Before the ship 4 docks at the port, the lifting platform of the ship's transfer platform and the ship's transfer device are located below the sea level. After the ship 4 docks at the sea surface above the support 1, the lifting platform rises above the sea level and lifts the ship 4, and the ship 4 is now parked on the support 1. Then the hydraulic trolley unit travels from the original position along the track to the bottom of the support 1, and lifts the support 1 and the ship 4 through the upper hydraulic jack 18. Then the support 1 and the ship 4 need to be transferred to the designated position by the hydraulic trolley unit, but because the hydraulic trolley unit has four zones, in order to keep the hydraulic trolleys 5 in the four zones running synchronously to avoid the occurrence of rail gnawing, the hydraulic station needs to simultaneously control the oil supply of the four zones. This control method is relatively complex and difficult to implement. Therefore, the present invention adds a combined zone control scheme before transportation to reduce the difficulty of control.

[0107] The preferred scheme for combined zone control is as follows:

[0108] When the direction of transfer is horizontal, the first oil circuit 13 is connected to the second oil circuit 14 through the connecting device 17, and the third oil circuit 15 is connected to the fourth oil circuit 16 through the connecting device 17. At this time, the oil supply of the first area 6 is consistent with that of the second area 7, and the oil supply of the third area 8 is consistent with that of the fourth area 9.

[0109] When the direction of transportation is longitudinal, the first oil circuit 13 is connected to the third oil circuit 15 through the connecting device 17, and the second oil circuit 14 is connected to the fourth oil circuit 16 through the connecting device 17. At this time, the oil supply of the first area 6 is consistent with that of the third area 8, and the oil supply of the second area 7 is consistent with that of the fourth area 9.

[0110] That is to say, after the combined zone control scheme is implemented, when the hydraulic trolley unit transfers the bracket 1 and the ship 4 to the designated location, the hydraulic station only needs to adjust the oil supply of the two zones at the same time.

[0111] Furthermore, before step S3, the following steps are also included:

[0112] The first oil circuit 13 and the second oil circuit 14 are connected through the connecting device 17 , or the third oil circuit 15 and the fourth oil circuit 16 are connected through the connecting device 17 .

[0113] Similarly, before the hydraulic trolley lifts the support 1 and the ship 4, the first zone 6 and the second zone 7 are merged or the third zone 8 and the fourth zone 9 are merged, and the hydraulic station only needs to adjust the oil supply of the three zones at the same time, which not only ensures the stability of the three points and one surface, but also reduces the difficulty of multi-zone control.

[0114] Further, step S5 includes:

[0115] When the hydraulic trolley part changes from lateral movement to longitudinal movement, the steps include:

[0116] The hydraulic trolley unit lowers the vessel 4;

[0117] The hydraulic trolley 5 is transferred from the transverse track group 2 to the longitudinal track group 3;

[0118] The first oil circuit 13 is connected to the second oil circuit 14 through the connecting device 17 or the third oil circuit 15 is connected to the fourth oil circuit 16 through the connecting device 17;

[0119] Lift the support 1 and the vessel 4 by means of a hydraulic trolley;

[0120] The first oil circuit 13 is connected to the third oil circuit 15 through the connecting device 17, and the second oil circuit 14 is connected to the fourth oil circuit 16 through the connecting device 17;

[0121] When the hydraulic trolley part changes from longitudinal movement to lateral movement, the steps include:

[0122] The hydraulic trolley unit lowers the vessel 4;

[0123] The hydraulic trolley 5 is transferred from the longitudinal track group 3 to the transverse track group 2;

[0124] The first oil circuit 13 is connected to the second oil circuit 14 through the connecting device 17 or the third oil circuit 15 is connected to the fourth oil circuit 16 through the connecting device 17;

[0125] Lift the support 1 and the vessel 4 by means of a hydraulic trolley;

[0126] The first oil circuit 13 and the second oil circuit 14 are connected through the connecting device 17, and the third oil circuit 15 and the fourth oil circuit 16 are connected through the connecting device 17;

[0127] The hydraulic trolley portion usually needs to be converted between the longitudinal track group 3 and the transverse track group 2. When the hydraulic trolley portion needs to be transferred from the longitudinal track group 3 to the transverse track group 2, the upper hydraulic jack 18 is first retracted to disengage the hydraulic trolley 5 from the bracket 1, and then the lower hydraulic jack 19 is operated to lift the hydraulic trolley 5 and the hydraulic trolley frame. The body 21 of the hydraulic trolley 5 of the present invention and the lower hydraulic jack 19 and the hydraulic trolley frame can be pivoted, so it is only necessary to rotate the body 21 and retract the lower hydraulic jack 19, and the hydraulic trolley 5 is transferred from the longitudinal track group 3 to the transverse track group 2, and then the above-mentioned merging plan is completed; when the hydraulic trolley portion needs to be transferred from the transverse track group 2 to the longitudinal track group 3, the same applies, which will not be repeated here.

[0128] Further, when the first oil circuit 13 is connected to the third oil circuit 15, and the second oil circuit 14 is connected to the fourth oil circuit 16, the initial value of the total oil supply flow of the first oil circuit 13 and the third oil circuit 15: the initial value of the total oil supply flow of the second oil circuit 14 and the fourth oil circuit 16 = the total number of hydraulic trolleys 5 in the first zone 6 and the third zone 8: the total number of hydraulic trolleys 5 in the second zone 7 and the fourth zone 9;

[0129] When the first oil circuit 13 is connected to the second oil circuit 14 and the third oil circuit 15 is connected to the fourth oil circuit 16, the initial value of the total oil supply flow of the first oil circuit 13 and the second oil circuit 14: the initial value of the total oil supply flow of the third oil circuit 15 and the fourth oil circuit 16 = the total number of hydraulic carts 5 in the first zone 6 and the second zone 7: the total number of hydraulic carts 5 in the third zone 8 and the fourth zone 9.

[0130] Before starting the transfer, the number of hydraulic trolleys 5 in each zone of the hydraulic trolley frame can be adjusted according to the weight distribution of the ship 4; when starting the transfer, the initial value of the oil supply in the combined zone or single zone is determined by the number of hydraulic trolleys 5 to ensure that the hydraulic trolleys 5 can keep synchronized as much as possible during the initial movement or jacking process; during the transfer process, the oil supply in the combined zone or single zone is continuously adjusted according to the specific situation.

[0131] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A ship transfer device, characterized in that: include: Tracks, the tracks comprising a transverse track group and a longitudinal track group, the transverse track group and the longitudinal track group being arranged crosswise; A bracket, the bracket is arranged on the track and used to support the ship; A hydraulic trolley unit, which is arranged on the track and comprises: A hydraulic trolley frame, wherein the hydraulic trolley frame comprises a bow portion and a stern portion, wherein the bow portion comprises a first area and a second area, and wherein the stern portion comprises a third area and a fourth area, wherein the first area and the third area are located on the same side of the hydraulic trolley frame. A hydraulic trolley, wherein the first area, the second area, the third area, and the fourth area are each connected to a plurality of the hydraulic trolleys; A hydraulic station, comprising: a carrier, the carrier being arranged at the track, an oil supply device, the oil supply device being arranged in the carrier, an oil quantity control device, the oil quantity control device being connected to the oil supply device, A first oil circuit, a second oil circuit, a third oil circuit, and a fourth oil circuit, wherein one end of the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit are connected to the oil supply device through the oil quantity control device, and the other end is respectively connected to the plurality of hydraulic trolleys on the first area, the second area, the third area, and the fourth area; The oil supply device further includes a connecting device, which is connected to the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit, and is used to control the connection / separation between the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit, so as to connect / separate the first area, the second area, the third area, and the fourth area; The hydraulic trolley comprises: A hydraulic trolley body, wherein the hydraulic trolley body is connected to the hydraulic trolley frame; A hydraulic lifting unit, the hydraulic lifting unit comprising: An upper hydraulic jack, which is arranged at the upper end of the hydraulic trolley body and is used to lift up the bracket; A lower hydraulic jack, which is rotatably disposed at the lower end of the hydraulic trolley and is used to lift the hydraulic trolley; The hydraulic trolley body comprises: A connecting portion, the connecting portion being connected to the hydraulic trolley frame; The vehicle body is rotatably connected to the lower end of the connecting portion.

2. A ship transfer platform, characterized in that: include: A fixed frame, the fixed frame is used to be set at a port; A driving mechanism, wherein the driving mechanism is arranged on the fixing frame; A lifting platform, wherein the lifting platform is arranged on the fixing frame; A traction rope, one end of which is connected to the driving mechanism, and the other end of which is connected to the lifting platform; The ship transfer device according to claim 1, wherein the ship transfer device is arranged on the lifting platform.

3. A method for transferring based on the ship transfer platform according to claim 2, characterized in that: include: Step S1: parking the ship on the support; Step S2: moving the hydraulic trolley along the track to below the bracket; Step S3: lifting the support and the vessel by the hydraulic trolley; Step S4: controlling the connection of the first oil circuit, the second oil circuit, the third oil circuit, and the fourth oil circuit in the oil supply device based on the direction to be transported, so as to respectively connect the hydraulic carts in the first area, the second area, the third area, and the fourth area; Step S5: The hydraulic trolley carries the support and the ship and moves to a designated position along the track.

4. The transport method according to claim 3, characterized in that: Before step S3, the following steps are also included: The first oil circuit is connected to the second oil circuit through the connecting device, or the third oil circuit is connected to the fourth oil circuit through the connecting device.

5. The transport method according to claim 3, characterized in that: The step S4 comprises: When the direction to be transported is lateral movement, the first oil circuit is connected to the second oil circuit through the connecting device, and the third oil circuit is connected to the fourth oil circuit through the connecting device; When the direction to be transported is longitudinal movement, the first oil circuit is connected to the third oil circuit through the connecting device, and the second oil circuit is connected to the fourth oil circuit through the connecting device.

6. The transport method according to claim 3, characterized in that: The step S5 comprises: When the hydraulic trolley part changes from lateral movement to longitudinal movement, the method comprises the following steps: The hydraulic trolley unit lowers the vessel; The hydraulic trolley is transferred from the transverse track group to the longitudinal track group; Connecting the first oil circuit with the second oil circuit through the connecting device or connecting the third oil circuit with the fourth oil circuit through the connecting device; Lifting the support and the vessel by means of the hydraulic trolley; The first oil circuit is connected to the third oil circuit via the connecting device, and the second oil circuit is connected to the fourth oil circuit via the connecting device; When the hydraulic trolley part changes from longitudinal movement to lateral movement, the method comprises the following steps: The hydraulic trolley unit lowers the vessel; The hydraulic trolley is transferred from the longitudinal track group to the transverse track group; Connecting the first oil circuit with the second oil circuit through the connecting device or connecting the third oil circuit with the fourth oil circuit through the connecting device; Lifting the support and the vessel by means of the hydraulic trolley; The first oil circuit is connected to the second oil circuit through the connecting device, and the third oil circuit is connected to the fourth oil circuit through the connecting device.

7. The method for transporting according to any one of claims 3 to 6, characterized in that: When the first oil circuit is connected to the third oil circuit, and the second oil circuit is connected to the fourth oil circuit, the oil quantity control device is adjusted so that the initial value of the total oil supply flow of the first oil circuit and the third oil circuit: the initial value of the total oil supply flow of the second oil circuit and the fourth oil circuit = the total number of the hydraulic trolleys in the first area and the third area: the total number of the hydraulic trolleys in the second area and the fourth area; When the first oil circuit is connected to the second oil circuit and the third oil circuit is connected to the fourth oil circuit, the oil quantity control device is adjusted so that the initial value of the total oil supply flow of the first oil circuit and the second oil circuit: the initial value of the total oil supply flow of the third oil circuit and the fourth oil circuit = the total number of the hydraulic carts in the first zone and the second zone: the total number of the hydraulic carts in the third zone and the fourth zone.