An offshore wind farm operation and maintenance simulation method based on AnyLogic platform

By establishing an offshore wind farm operation and maintenance simulation model on the Anylogic platform, decomposing the operation and maintenance process, monitoring and allocating resources in real time, and combining environmental and meteorological parameters, the problem of high operation and maintenance costs of offshore wind farms is solved, and low operation and maintenance costs are achieved. High reliability.

CN113806915BActive Publication Date: 2024-10-25CHINA THREE GORGES UNIV +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202110954686.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-19
Publication Date
2024-10-25
Estimated Expiration
2041-08-19

AI Technical Summary

Technical Problem

The operation and maintenance costs of offshore wind farms are high. Affected by factors such as bad weather and poor ship accessibility, resulting in long downtime, it is difficult to formulate effective maintenance strategies to improve the reliability and availability of wind farms.

Method used

Establish an offshore wind farm operation and maintenance simulation method based on the Anylogic platform, decompose the operation and maintenance process into sub-modules, build a simulation model, monitor SCADA data in real time, issue work orders, allocate resources, set operation and maintenance resources and time constraints, simulate wind turbines, ships and Personnel status, simulation analysis combined with environmental and meteorological parameters.

Benefits of technology

It realizes the shift from single post-maintenance to systematic operation and maintenance, reduces operation and maintenance costs, improves reliability and accessibility, provides a basis for operation and maintenance decision-making, and supports data collection, processing and diversified display.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113806915B_ABST
    Figure CN113806915B_ABST
Patent Text Reader

Abstract

The present invention discloses an offshore wind farm operation and maintenance simulation method based on AnyLogic platform, comprising the following steps: 1) establishing a simulation model of a parameter dialog box for inputting simulation parameters for offshore wind farm operation and maintenance based on AnyLogic platform; 2) designing the overall structure of operation and maintenance simulation, building corresponding submodule models, and then using time series for simulation analysis; 3) designing the operation and maintenance operation business logic, real-time monitoring of SCADA data, and issuing a dispatch order for the type of wind turbine failure that has failed, combined with weather conditions; 4) designing the operation and maintenance personnel, maintenance ship, and spare parts business logic, monitoring the status of the three, and dispatching corresponding resources according to the dispatch order; 5) setting operation and maintenance resources and operation and maintenance work time constraints; 6) performing initial replication of environmental parameters, wind turbine parameters, and meteorological parameters, and the system can output the real-time status of wind turbines, operation and maintenance ships, and operation and maintenance personnel. The present invention provides an offshore wind farm operation and maintenance simulation method under the action of constantly changing wind speeds and wave heights.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind farm operation and maintenance, and in particular to an offshore wind farm operation and maintenance simulation method based on an AnyLogic platform. Background Art

[0002] Operation and maintenance costs are a key factor in determining the overall economic feasibility of offshore wind power projects. The operation and maintenance of offshore wind turbines face many challenges, mainly reflected in the impact of offshore wind speed and wave height on the operation and maintenance of wind turbines. Under severe weather conditions, ship accessibility is poor and fault downtime is longer. The impact of wind speed and wave height on the seaworthiness of maintenance ships and other means of transportation, constraints on unit landing, and restrictions on expected extravehicular operations during offshore lifting have all made the operation and maintenance costs of offshore wind farms high for a long time. How to formulate appropriate maintenance strategies to reduce operation and maintenance costs and investment risks, improve the reliability and availability of wind farms, and achieve greater social and economic benefits are important issues facing the further development of the offshore wind farm industry. In view of this, studying the simulation method of offshore wind farm operation and maintenance is of great significance to improving the economic benefits of offshore wind farm operation and maintenance. Summary of the invention

[0003] The purpose of the present invention is to provide an offshore wind farm operation and maintenance simulation method based on the AnyLogic platform to solve the above technical problems:

[0004] To achieve the above object, the present invention provides the following technical solution: an offshore wind farm operation and maintenance simulation method based on AnyLogic platform, comprising the following steps:

[0005] 1) Establishing an offshore wind farm operation and maintenance simulation model based on the AnyLogic platform, wherein the simulation model includes a parameter dialog box for inputting simulation parameters;

[0006] 2) Design the overall structure of operation and maintenance simulation, decompose the complex operation and maintenance process into several independent and interrelated sub-modules, study the internal operation mechanism of each sub-module, build the corresponding sub-module model, and then use time series to integrate the sub-modules into a complete operation and maintenance model for simulation analysis;

[0007] 3) Design the business logic of operation and maintenance, monitor SCADA data in real time, monitor the operation status of offshore wind farms, and issue work orders based on the operation status of wind turbines and the fault type of the faulty wind turbines in combination with weather conditions;

[0008] 4) Design the business logic of operation and maintenance personnel, ship repair, and spare parts. The system can monitor the status of the three in real time and dispatch corresponding resources according to the work order;

[0009] 5) Set operation and maintenance resources and operation and maintenance work time constraints;

[0010] 6) When conducting offshore wind power operation and maintenance simulation, the environmental parameters, wind turbine parameters, and meteorological parameters are initially copied, and the system can output the real-time status of wind turbines, operation and maintenance ships, and operation and maintenance personnel.

[0011] Preferably, in step 1), the input environmental parameters include the geographical location of the port and the wind farm; the wind turbine parameters include basic information, technical parameters, performance parameters, cost parameters and operation and maintenance parameters of the wind turbine unit; and the meteorological parameters include basic parameters such as real-time wind speed and wave height.

[0012] Preferably, in step 2), the wind turbine is divided into two states: normal operation and shutdown. When the wind speed exceeds the wind speed corresponding to the rated power, the wind turbine stops running; when the wind speed is less than or equal to the corresponding wind speed threshold, the wind turbine automatically returns to normal operation; the operation and maintenance personnel will perform regular shutdown maintenance on the wind turbine every two weeks. After the maintenance is completed, a "repaired" message will be triggered, and the wind turbine that receives the message will also resume normal operation; there is a certain probability that the wind turbine will fail and shut down every month. When a wind turbine fails and shuts down, it will automatically report the location and fault type of the wind turbine to the dispatch center, waiting for the operation and maintenance ship and operation and maintenance personnel to come for repair. When the repair is completed and the "repaired" message is triggered, the wind turbine returns to normal operation.

[0013] Preferably, in step 3), the operation and maintenance center monitors the operating status of the entire system. When a new maintenance request is received, an operation and maintenance order is dispatched according to the resource status and weather accessibility. The dispatch center checks the type of wind turbine failure in the work order, and gives corresponding processing solutions according to different types of failures. It checks the weather forecast information, makes a dispatch plan based on the weather accessibility, and dispatches the operation and maintenance ship. After the operation and maintenance problem is resolved, the work order will be set to a resolved status.

[0014] Preferably, in step 4), the business logic of operation and maintenance personnel, maintenance ships, and spare parts is as follows:

[0015] (1) The operation and maintenance personnel are divided into two states: resting and working. When the operation and maintenance personnel are in the working state, they receive the maintenance order sent by the maintenance center, and then they wait for the order to go out to sea. When they receive the "setout" command, they go out to sea for offshore operations. When the maintenance is completed, the "back" message is triggered, and the operation and maintenance personnel return to the maintenance center. When the operation and maintenance personnel return to normal working state, it means that they have completed a complete offshore operation and maintenance operation.

[0016] (2) First, the ship is in a moored state. When a new maintenance order is received, the ship will enter the spare parts stage and determine whether it needs to carry the corresponding spare parts according to the type of wind turbine failure. After the spare parts and the ship are ready, it will determine whether the current weather conditions are suitable for going out to sea. If the wave height at this time point is less than the travel height threshold, the personnel will be notified to go out to the wind farm for maintenance. After the maintenance is completed, the dispatch center will be asked whether there are other maintenance task requests. If so, the ship will continue to sail to a new location for maintenance, otherwise the ship will return to the maintenance center. When the ship returns to the moored state again, it means that a complete sea maintenance task has been completed.

[0017] (3) The spare parts business logic is included as part of ship preparation. After receiving the maintenance order, the operation and maintenance center checks the fault type and prepares spare parts according to the fault type. If there are no spare parts or they are insufficient, the waiting time for spare parts needs to be calculated. If the spare parts are sufficient, the spare parts status is set to ready. After the spare parts and the ship are ready, the accessibility is determined.

[0018] Preferably, in step 5), the maintenance ship departs from the onshore port, completes the maintenance task, and then sails back to the port. Each unit is maintained by only one maintenance ship and one group of personnel every day. The personnel and spare parts on the maintenance ship meet the maximum load requirements, and the working hours of the maintenance ship meet the working hours requirements. Then the number of maintenance ships and the unit maintenance sequence need to meet the following conditions:

[0019] (1) The number of repair ships cannot exceed the maximum number of ships k=1,2,…,m means that at most m repair ships are used;

[0020] (2) The formula for the unit maintenance sequence is: i,j=1,2,…,n,k=1,2,…,m means the time of maintenance unit j is after the time of maintenance unit end and driving time, is the time when ship k arrives at unit i on the dth day, T i is the time the ship stays at the unit, including the time for personnel pick-up and maintenance of the unit, t ij It is the time from unit to unit;

[0021] (3) The formula for limiting the effective daily working hours of a maintenance ship is: Indicates the limit of working hours. is the time it takes for ship k to return to the port after repairs, T max The maximum daily working hours for the vessel;

[0022] (4) Maintenance downtime and delayed maintenance time need to meet y i ,z i ≥0,i=1,…,n

[0023] (5) Each unit shall be maintained by only one maintenance vessel per day. The number of times the vessel can maintain the unit per day shall meet the following requirements:

[0024]

[0025] (6) The maintenance route needs to meet the following requirements:

[0026]

[0027] It means that every maintenance ship departs from the port every day and returns to the port after completing the mission.

[0028] Preferably, in step 6), the system outputs the real-time power P of the i-th wind turbine at time t according to the wind speed-power curve during the simulation of wind turbine operation. t i , as well as the wind turbine’s failure downtime DT, weather downtime WOT, and maintenance time MT.

[0029] Preferably, it is used to simulate various possible states of wind turbines and operation and maintenance resources during the operation of an offshore wind farm, so as to provide a basis for operation and maintenance decisions.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] 1. The present invention combines preventive maintenance and fault repair, transitions from a single post-maintenance mode to a systematic operation and maintenance mode, establishes a systematic monitoring platform, and achieves low operation and maintenance costs, high reliability and high accessibility;

[0032] 2. The present invention can realize equipment data collection, data processing, visual analysis, statistical calculation and diversified display; provide an open data interface, support data import, support multiple data screening methods and a convenient human-computer interaction interface;

[0033] 3. The present invention uses environmental parameters, wind turbine parameters, meteorological parameters, etc. as input data to simulate the operation and maintenance environment, providing a decision-making basis for the operation and maintenance strategy of the offshore wind farm; BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0035] Figure 1 Offshore O&M processes based on accessibility;

[0036] Figure 2 Preventive maintenance dispatching business flow chart;

[0037] Figure 3 Fault maintenance dispatching business flow chart;

[0038] Figure 4 Top-level logic diagram of offshore wind farm operation and maintenance;

[0039] Figure 5 Offshore wind turbine maintenance business logic diagram;

[0040] Figure 6 Business logic diagram for operation and maintenance personnel;

[0041] Figure 7 Logic diagram of ship operation and maintenance business. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] See also Figure 1-7 The present invention provides a technical solution: an offshore wind farm operation and maintenance simulation method based on the AnyLogic platform, comprising the following steps:

[0044] 1) Establishing an offshore wind farm operation and maintenance simulation model based on the AnyLogic platform, wherein the simulation model includes a parameter dialog box for inputting simulation parameters;

[0045] 2) Design the overall structure of operation and maintenance simulation, decompose the complex operation and maintenance process into several independent and interrelated sub-modules, study the internal operation mechanism of each sub-module, build the corresponding sub-module model, and then use time series to integrate the sub-modules into a complete operation and maintenance model for simulation analysis;

[0046] 3) Design the business logic of operation and maintenance, monitor SCADA data in real time, monitor the operation status of offshore wind farms, and issue work orders based on the operation status of wind turbines and the fault type of the faulty wind turbines in combination with weather conditions;

[0047] 4) Design the business logic of operation and maintenance personnel, ship repair, and spare parts. The system can monitor the status of the three in real time and dispatch corresponding resources according to the work order;

[0048] 5) Set operation and maintenance resources and operation and maintenance work time constraints;

[0049] 6) When conducting offshore wind power operation and maintenance simulation, the environmental parameters, wind turbine parameters, and meteorological parameters are initially copied, and the system can output the real-time status of wind turbines, operation and maintenance ships, and operation and maintenance personnel.

[0050] Specifically, in step 1), the input environmental parameters include the geographical location of the port and the wind farm; the wind turbine parameters include basic information, technical parameters, performance parameters, cost parameters and operation and maintenance parameters of the wind turbine unit; and the meteorological parameters include basic parameters such as real-time wind speed and wave height.

[0051] Specifically, in step 2), the wind turbine is divided into two states: normal operation and shutdown. When the wind speed exceeds the wind speed corresponding to the rated power, the wind turbine stops running; when the wind speed is less than or equal to the corresponding wind speed threshold, the wind turbine automatically returns to normal operation; the operation and maintenance personnel will perform regular shutdown maintenance on the wind turbine every two weeks. After the maintenance is completed, a "repaired" message will be triggered, and the wind turbine that receives the message will also resume normal operation; there is a certain probability that the wind turbine will fail and shut down every month. When a wind turbine fails and shuts down, it will automatically report the location and fault type of the wind turbine to the dispatch center, waiting for the operation and maintenance ship and operation and maintenance personnel to come for repair. When the repair is completed and the "repaired" message is triggered, the wind turbine returns to normal operation.

[0052] Specifically, in step 3), the operation and maintenance center monitors the operating status of the entire system. When a new maintenance request is received, an operation and maintenance order is dispatched based on resource conditions and weather accessibility. The dispatch center checks the type of wind turbine failure in the work order, and gives corresponding treatment plans based on different types of failures. It checks the weather forecast information, makes a dispatch plan based on weather accessibility, and dispatches the operation and maintenance ship. After the operation and maintenance problem is resolved, the work order will be set to a resolved status.

[0053] Specifically, in step 4), the business logic of operation and maintenance personnel, repaired ships, and spare parts is as follows:

[0054] (1) The operation and maintenance personnel are divided into two states: resting and working. When the operation and maintenance personnel are in the working state, they receive the maintenance order sent by the maintenance center, and then they wait for the order to go out to sea. When they receive the "setout" command, they go out to sea for offshore operations. When the maintenance is completed, the "back" message is triggered, and the operation and maintenance personnel return to the maintenance center. When the operation and maintenance personnel return to normal working state, it means that they have completed a complete offshore operation and maintenance operation.

[0055] (2) First, the ship is in a moored state. When a new maintenance order is received, the ship will enter the spare parts stage and determine whether it needs to carry the corresponding spare parts according to the type of wind turbine failure. After the spare parts and the ship are ready, it will determine whether the current weather conditions are suitable for going out to sea. If the wave height at this time point is less than the travel height threshold, the personnel will be notified to go out to the wind farm for maintenance. After the maintenance is completed, the dispatch center will be asked whether there are other maintenance task requests. If so, the ship will continue to sail to a new location for maintenance, otherwise the ship will return to the maintenance center. When the ship returns to the moored state again, it means that a complete sea maintenance task has been completed.

[0056] (3) The spare parts business logic is included as part of ship preparation. After receiving the maintenance order, the operation and maintenance center checks the fault type and prepares spare parts according to the fault type. If there are no spare parts or they are insufficient, the waiting time for spare parts needs to be calculated. If the spare parts are sufficient, the spare parts status is set to ready. After the spare parts and the ship are ready, the accessibility is determined.

[0057] Specifically, in step 5), the maintenance ship departs from the onshore port, completes the maintenance task, and then sails back to the port. Each unit is maintained by only one maintenance ship and one group of personnel every day. The personnel and spare parts on the maintenance ship meet the maximum load requirements, and the working hours of the maintenance ship meet the working hours requirements. Then the number of maintenance ships and the unit maintenance sequence need to meet the following conditions:

[0058] (1) The number of repair ships cannot exceed the maximum number of ships k=1,2,…,m means that at most m repair ships are used;

[0059] (2) The formula for the unit maintenance sequence is: i,j=1,2,…,n,k=1,2,…,m means the time of maintenance unit j is after the time of maintenance unit end and driving time, is the time when ship k arrives at unit i on the dth day, T i is the time the ship stays at the unit, including the time for personnel pick-up and maintenance of the unit, t ij It is the time from unit to unit;

[0060] (3) The formula for limiting the effective daily working hours of a maintenance ship is: Indicates the limit of working hours. is the time it takes for ship k to return to the port after repairs, T max The maximum daily working hours for the vessel;

[0061] (4) Maintenance downtime and delayed maintenance time must be met

[0062] y i ,zi ≥0,i=1,…,n

[0063] (5) Each unit shall be maintained by only one maintenance vessel per day. The number of times the vessel can maintain the unit per day shall meet the following requirements:

[0064]

[0065] (6) The maintenance route needs to meet the following requirements:

[0066]

[0067] It means that every maintenance ship departs from the port every day and returns to the port after completing the mission.

[0068] Specifically, in step 6), the system outputs the real-time power P of the i-th wind turbine at time t according to the wind speed-power curve during the simulation of wind turbine operation. t i , as well as the wind turbine’s failure downtime DT, weather downtime WOT, and maintenance time MT.

[0069] Specifically, it is used to simulate various possible states of wind turbines and operation and maintenance resources during the operation of offshore wind farms, providing a basis for operation and maintenance decisions.

[0070] In the description of the present invention, it is necessary to understand that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0071] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.

[0072] While embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes may be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. An offshore wind farm operation and maintenance simulation method based on AnyLogic platform, characterized by: The following steps are involved: 1) Establishing an offshore wind farm operation and maintenance simulation model based on the AnyLogic platform, wherein the simulation model includes a parameter dialog box for inputting simulation parameters; 2) Design the overall structure of operation and maintenance simulation, decompose the complex operation and maintenance process into several independent and interrelated sub-modules, study the internal operation mechanism of each sub-module, build the corresponding sub-module model, and then use time series to integrate the sub-modules into a complete operation and maintenance model for simulation analysis; 3) Design the business logic of operation and maintenance, monitor SCADA data in real time, monitor the operation status of offshore wind farms, and issue work orders based on the operation status of wind turbines and the fault type of the faulty wind turbines in combination with weather conditions; 4) Design the business logic of operation and maintenance personnel, ship repair, and spare parts. The system can monitor the status of the three in real time and dispatch corresponding resources according to the work order; 5) Set operation and maintenance resources and operation and maintenance work time constraints; 6) When conducting offshore wind power operation and maintenance simulation, the environmental parameters, wind turbine parameters, and meteorological parameters are initially copied, and the system can output the real-time status of wind turbines, operation and maintenance ships, and operation and maintenance personnel; In step 1), the input environmental parameters include the geographical location of the port and the wind farm; the wind turbine parameters include the basic information, technical parameters, performance parameters, cost parameters and operation and maintenance parameters of the wind turbine unit; the meteorological parameters include basic parameters such as real-time wind speed and wave height; In step 4), the business logic of operation and maintenance personnel, repaired ships, and spare parts is as follows: (1) The operation and maintenance personnel are divided into two states: resting and working. When the operation and maintenance personnel are in the working state, they receive the maintenance order sent by the maintenance center, and then they wait for the order to go out to sea. When they receive the "setout" command, they go out to sea for offshore operations. When the maintenance is completed, the "back" message is triggered, and the operation and maintenance personnel return to the maintenance center. When the operation and maintenance personnel return to normal working state, it means that they have completed a complete offshore operation and maintenance operation. (2) First, the ship is in a moored state. When a new maintenance order is received, the ship will enter the spare parts stage and determine whether it needs to carry the corresponding spare parts according to the type of wind turbine failure. After the spare parts and the ship are ready, it will determine whether the current weather conditions are suitable for going out to sea. If the wave height at this time point is less than the travel height threshold, the personnel will be notified to go out to the wind farm for maintenance. After the maintenance is completed, the dispatch center will be asked whether there are other maintenance task requests. If so, the ship will continue to sail to a new location for maintenance, otherwise the ship will return to the maintenance center. When the ship returns to the moored state again, it means that a complete sea maintenance task has been completed. (3) The spare parts business logic is included as part of ship preparation; after receiving the maintenance order, the operation and maintenance center checks the fault type and prepares spare parts according to the fault type; If there are no spare parts or they are insufficient, the waiting time for spare parts needs to be calculated. If spare parts are sufficient, the spare parts status is set to ready. After the spare parts and the ship are ready, the accessibility is determined. In step 5), the maintenance ship departs from the onshore port, completes the maintenance task, and then returns to the port. Each unit is maintained by only one maintenance ship and one team of personnel every day. The personnel and spare parts on the maintenance ship meet the maximum load requirements, and the working hours of the maintenance ship meet the working hours requirements. The number of maintenance ships and the unit maintenance sequence need to meet the following conditions: (1) The number of repair ships cannot exceed the maximum number of ships Indicates that at most m repair ships are used; (2) The formula for the unit maintenance sequence is: Indicates that the time of maintenance unit j is after the end time of maintenance unit j and the travel time. is the time when ship k arrives at unit i on day d, T i is the time the ship stays at the unit, including the time for personnel pick-up and maintenance of the unit, t ij It is the time from unit to unit; (3) The formula for limiting the effective daily working hours of a maintenance ship is: Indicates the limit of working hours. is the time it takes for ship k to return to the port after repairs, T max The maximum daily working hours for the vessel; (4) Maintenance downtime and delayed maintenance time need to meet y i ,z i ≥0,i=1,…,n (5) Each unit shall be maintained by only one maintenance vessel per day. The number of times the vessel can maintain the unit per day shall meet the following requirements: (6) The maintenance route needs to meet the following requirements: It means that every maintenance ship departs from the port every day and returns to the port after completing the mission.

2. The offshore wind farm operation and maintenance simulation method based on AnyLogic platform according to claim 1, characterized in that: In step 2), the wind turbine is divided into two states: normal operation and shutdown. When the wind speed exceeds the wind speed corresponding to the rated power, the wind turbine stops running; when the wind speed is less than or equal to the corresponding wind speed threshold, the wind turbine automatically returns to normal operation; the operation and maintenance personnel will perform regular shutdown maintenance on the wind turbine every two weeks. After the maintenance is completed, a "repaired" message will be triggered, and the wind turbine that receives the message will also resume normal operation; there is a certain probability that the wind turbine will fail and shut down every month. When a wind turbine fails and shuts down, it will automatically report the location and fault type of the wind turbine to the dispatch center, waiting for the operation and maintenance ship and operation and maintenance personnel to come for repair. When the repair is completed and the "repaired" message is triggered, the wind turbine returns to normal operation.

3. The offshore wind farm operation and maintenance simulation method based on AnyLogic platform according to claim 1, characterized in that: In step 3), the operation and maintenance center monitors the operating status of the entire system. When a new maintenance request is received, an operation and maintenance order is dispatched based on the resource status and weather accessibility. The dispatch center checks the type of wind turbine failure in the work order, and gives corresponding treatment plans according to different types of failures. It checks the weather forecast information, makes a dispatch plan based on weather accessibility, and dispatches the operation and maintenance ship. After the operation and maintenance problem is solved, the work order will be set to a resolved status.

4. The offshore wind farm operation and maintenance simulation method based on AnyLogic platform according to claim 1, characterized in that: In step 6), the system outputs the real-time power P of the i-th wind turbine at time t according to the wind speed-power curve during the simulation of wind turbine operation. t i , as well as the wind turbine’s failure downtime DT, weather downtime WOT, and maintenance time MT.

5. An offshore wind farm operation and maintenance simulation method based on AnyLogic platform according to any one of claims 1 to 4, characterized in that: It is used to simulate various possible states of wind turbines and operation and maintenance resources during the operation of offshore wind farms, providing a basis for operation and maintenance decisions.

Citation Information

Cited By

  • Method for introducing multiple physical field dimensions in AnyLogic software environment and carrying out physical-logic hybrid simulation

    CN121615542A