A monitoring method and system for smart city power system
By constructing power maps and real-time monitoring, determining alarm levels and selecting reasonable transmission methods, the problem of tight power system operation in old urban areas and high-voltage areas has been solved, abnormal response speed and data transmission reliability have been improved, and the smart city power system has been improved. stability and user experience.
Patent Information
- Application Number
- CN202111035125.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-05
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-09-05
AI Technical Summary
The power system in old urban areas or high-voltage areas in the city is running tight and prone to failure, and emergency strategies cannot respond in time, affecting people's life experience.
By constructing a power map, old areas and high-voltage areas are identified, available gateways and fire protection systems are obtained, power system nodes are monitored in real time, the alarm level of early warning information is determined, and reasonable data transmission methods and response methods are selected.
It improves the timeliness and response speed of abnormal information transmission, enhances the monitoring intensity of the system and the reliability of data transmission, ensures the normal operation of the smart city power system, and enhances people's smart experience.
Smart Images

Figure CN113809824B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a monitoring method and system for a smart city power system. Background Art
[0002] The monitoring of power systems has always been a key research topic. With the increasing intelligence of cities and the improvement of people's living standards, there are more and more high-power devices in cities. This has put forward higher and higher requirements on urban power systems; the degree of urban intelligence has increased, but the transformation of power systems in cities, especially in some old urban areas, has not been able to keep up with the pace, which has led to the power system in old urban areas or high-voltage areas being tense and prone to failures; at the same time, various emergency strategies cannot respond in time, which has brought a bad experience to people. Summary of the invention
[0003] In order to solve the problems existing in the prior art, the present invention provides a monitoring method and system for a smart city power system. By monitoring the power system and various types of information, a reasonable transmission strategy is set to ensure the timeliness of abnormal information transmission, and real-time response is performed in combination with the characteristics of each area to improve the abnormal response speed.
[0004] The present invention provides a monitoring method for a smart city power system, the monitoring method comprising:
[0005] Step 1: Build a power map based on the power system and identify old areas and high-voltage areas;
[0006] Step 2, obtaining the available gateways and fire protection systems on the power map; wherein the gateways include home gateways and commercial gateways;
[0007] Step 3: Monitor the nodes in the power system in real time to obtain early warning information;
[0008] Step 4: determine the alarm level according to the warning information so as to select an alarm method, wherein the alarm method includes a warning information transmission method and a warning information response method.
[0009] Wherein, the step 1 further comprises:
[0010] Calculate the obsolescence level W of the obsolete area according to the equipment status S, wiring time T and abnormal alarm frequency P in the obsolete area, and mark it according to the obsolete level;
[0011] The high voltage level Q of the high voltage area is calculated based on the historical load H of the area, the density K of high voltage equipment, the remaining life M of the high voltage equipment and the number of abnormal alarms N in the high voltage area, and the area is marked according to the high voltage level.
[0012] The step 2 also includes: obtaining a gateway on the power map, calculating the reliability of the gateway according to the network type L, data transmission accuracy G, RSSI, and optimal transmission distance R supported by the gateway; grading the gateway according to the reliability, and selecting an available gateway according to the grading result.
[0013] The step 3 specifically includes: monitoring the status information of each area in real time, and determining whether to issue an alarm according to the status information and the area information; wherein the status information includes the load level of the area, the load level = current load / maximum allowable load*equipment density, and the area information includes the old level of the old area and the high-voltage level of the high-voltage area;
[0014] Determining whether to alarm specifically includes: calculating a regional status value, and determining whether an early warning is required according to the regional status value;
[0015] Among them, the regional status value = load level * level information * 1.5; wherein the level information is the old level and / or high voltage level.
[0016] The data transmission methods include: 1) normal data is transmitted through the power grid; 2) normal data is transmitted through the gateway according to the alarm level; 3) data is transmitted to the power system and / or fire protection system according to the alarm level;
[0017] The warning information response method includes: determining a processing method according to the alarm level, and the processing method includes fire response, power system response, and dispatch of a manpower work order;
[0018] The method further includes: determining a data transmission mode and a warning information response mode according to the area identifier and the alarm level.
[0019] The present invention also provides a monitoring system for a smart city power system, the monitoring system comprising:
[0020] The identification module builds a power map based on the power system and identifies old areas and high-voltage areas;
[0021] A collection module, for acquiring available gateways and fire protection systems on the power map; wherein the gateways include home gateways and commercial gateways;
[0022] Early warning module, which monitors nodes in the power system in real time and obtains early warning information;
[0023] The response module determines the alarm level according to the early warning information so as to select an alarm mode, wherein the alarm mode includes an early warning information transmission mode and an early warning information response mode.
[0024] The beneficial effect of the present invention is that the monitoring method and system of the smart city power system provided by the present invention can identify old areas and high-voltage areas by constructing a power map, and determine the available network equipment and emergency systems in each area; then, each area is monitored in real time to obtain early warning information to confirm the early warning level, and then the data transmission method and the early warning response method are selected, thereby improving the monitoring strength of the system, the reliability and timeliness of data transmission, ensuring the timely handling of anomalies, providing support for the normal operation of the smart city power system, and improving people's smart experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0026] Figure 1 is a flow chart of a preferred embodiment of the present invention;
[0027] Figure 2 It is a structural block diagram of a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0028] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0029] In order to solve the problems existing in the prior art, the present invention provides a monitoring method and system for a smart city power system. By monitoring the power system and various types of information, a reasonable transmission strategy is set to ensure the timeliness of abnormal information transmission, and real-time response is performed in combination with the characteristics of each area to improve the abnormal response speed.
[0030] like Figure 1 As shown, the present invention provides a monitoring method for a smart city power system, the monitoring method comprising:
[0031] Step 1, construct a power map based on the power system, and mark the old areas and high-voltage areas. In order to improve the intensity of monitoring, the present invention constructs a power map and marks each area in the map, where each area includes but is not limited to ordinary areas, old areas, high-voltage areas, etc. Areas with special needs can also be marked, such as special area marking, where the special area marking can be based on the requirements of the area when submitting an application, and individual parameters can be marked and monitored, such as when the environment interferes, etc. At the same time, some existing areas still have problems of stealing electricity, stealing electricity, and leakage. Customized monitoring strategies can also be carried out according to the above needs, that is, the voltage and current are marked and paid attention to.
[0032] Step 2, obtain the available gateways and fire protection systems on the power map; wherein the gateways include home gateways and commercial gateways. With the improvement of urban intelligence, more and more families and businesses have set up gateways, and have enhanced the reliability and stability of these networks to ensure the stability of information transmission and the experience; generally speaking, the safety factor and stability of commercial gateways are higher than those of home gateways. The present invention also associates the power system with the fire protection system to respond to various abnormalities in a timely manner.
[0033] Step 3: Monitor the nodes in the power system in real time to obtain early warning information;
[0034] Step 4: determine the alarm level according to the warning information so as to select an alarm method, wherein the alarm method includes a warning information transmission method and a warning information response method.
[0035] Through real-time monitoring of the power system, the power status of each area can be obtained in time, and early warnings can be issued according to the differences in each area and the corresponding methods of each area, and the alarm level can be determined, so as to select the transmission method and response method of the early warning information in a targeted manner, thereby improving the timeliness and reliability of the transmission of early warning information and improving the efficiency of abnormal response.
[0036] Preferably, the step 1 further includes setting the level of each area in combination with the characteristics of each area, and performing different visual identifications according to different levels:
[0037] Calculate the obsolescence level W of the obsolete area according to the equipment status S, wiring time T and abnormal alarm frequency P in the obsolete area, and mark it according to the obsolete level;
[0038] in, , is the current time, the wiring time T refers to the wiring time; the abnormal alarm frequency P refers to the number of abnormal alarms in the past period of time (such as one week, 10 days, 15 days, etc.) in the area; the state S of the device is the product of the average power of the devices in the area whose power exceeds the specified value (such as 1000W, 2000W, etc., which can be set by the wiring time. For example, if the wiring time is more than 10 years ago, 2000W is selected, and if it is more than 15 years ago, 2000W is selected. The specific age and power can be confirmed by engineers according to the actual environment) and the number of devices whose power exceeds the specified value; with the improvement of the degree of intelligence, each device can obtain the power state of each device after being connected to the power network, thereby calculating the state S of each area; according to the different range intervals into which the value of W falls, different identification methods are selected for identification; wherein, the range interval can be set by relevant engineers according to the environmental characteristics of the area and historical abnormal data, etc., and the setting of the interval is a common technology for those skilled in the art and will not be repeated here.
[0039] The high voltage level Q of the high voltage area is calculated based on the historical load H of the area, the density K of high voltage equipment, the remaining life M of the high voltage equipment and the number of abnormal alarms N in the high voltage area, and the area is marked according to the high voltage level.
[0040] in, , where H refers to the average historical load in the past period of time (such as a week, ten days, a month, etc.); K is the ratio of the number of high-voltage equipment in the area to the area of the area; N is the number of abnormal alarms in the area in the past period of time (such as a week, 10 days, 15 days, etc.); where high-voltage equipment refers to equipment with a rated power exceeding a specified value, which is set by relevant engineers based on the actual environment. Finally, different identification methods are selected for identification based on the different range intervals that the value of Q falls into; where the range interval can be set by relevant engineers based on the environmental characteristics of the area and historical abnormal data, etc. The setting of this interval is a common technology for those skilled in the art and will not be repeated here.
[0041] The step 2 also includes: obtaining a gateway on the power map, and determining the reliability of the gateway according to the gateway load L (whose value is the number of devices currently connected to the gateway / the maximum number of devices allowed to be connected to the gateway), data transmission accuracy G (expressed by bit error rate), RSSI, and optimal transmission distance R; specifically, selecting a gateway whose RSSI is greater than a specified value, and then calculating the reliability according to L, G, and R;
[0042] in, ; Wherein, a and b are constant coefficients, which are determined by technicians in this field based on the historical data of the gateway.
[0043] The gateways are graded according to the reliability, and available gateways are selected according to the grading results. Preferably, the gateways are graded from 1 to 5, i.e., 5 levels, from low to high, and then a suitable gateway is selected for data transmission according to the warning level. This can not only ensure the reliability of data transmission, but also effectively avoid the emergence of gateway hot spots, and prevent the problem of reduced user experience due to data transmission.
[0044] The step 3 specifically includes: monitoring the status information of each area in real time, and determining whether to issue an alarm according to the status information and the area information; wherein the status information includes the load level of the area, the load level = current load / maximum allowable load*equipment density, wherein the equipment density can be the number of equipment in the area whose power exceeds a specific value (such as 1000w, 2000w, etc.), and the area information includes the old level of the old area and the high voltage level of the high voltage area;
[0045] Determining whether to alarm includes: calculating a regional status value, and determining whether an early warning is required according to the regional status value;
[0046] Among them, the regional status value = load level * level information * 1.5; wherein the level information is the old level and / or high voltage level. For some special areas, they can be old areas or high voltage areas. For these special areas, their level information is the higher of the old level and the high voltage level.
[0047] In the present invention, the characteristics of each area can be combined with the information obtained in real time to issue an alarm. The solution provided by the present invention can be extremely applicable to various areas, ensuring the stability of operation in each area and improving people's intelligent experience.
[0048] The data transmission method includes:
[0049] 1) Normal data is transmitted through the power grid;
[0050] 2) The abnormal data is transmitted through the gateway according to the alarm level. In the process of selecting the gateway, for gateways of the same level, commercial gateways are preferred for communication.
[0051] 3) Determine the transmission to the power system and / or fire protection system according to the alarm level;
[0052] The warning information response method includes: determining a processing method according to the alarm level, and the processing method includes fire response, power system response, and dispatch of a manpower work order;
[0053] The method further includes: determining a data transmission mode and a warning information response mode according to the area identifier and the alarm level, specifically including: selecting a data transmission mode according to the area status value and the level of the gateway.
[0054] The method of selecting a data transmission method according to the regional identifier, the regional status value, and the level of the gateway specifically includes: obtaining the regional identifier and the regional status value in real time, determining the gateway to be selected when an abnormality occurs according to the regional identifier; then determining whether redundant transmission is required and whether the information needs to be transmitted to the power system and / or the fire protection system according to the regional status value; the power system and / or the fire protection system determines the response method according to the early warning information. For example, when the regional identifier is divided into red, yellow, and green from high to low, when the regional identifier is red, the gateway needs to select the highest two levels, and then determine the degree of abnormality according to the regional status value. When the regional status value is greater than the preset threshold, the two gateways of the highest level are selected to redundantly transmit the early warning information; and redundantly transmit to the power system and the fire protection system at the same time; when the power system and the fire protection system receive the early warning information, at least one of them needs to respond to the early warning information. At this time, the power system and the fire protection system respectively determine whether a response to the early warning information is required. When a response is required, an emergency work order is generated for processing, wherein the work order includes: a power system work order and / or a fire protection system work order; when it is not greater than the preset threshold, it is transmitted through the power grid. When the mark is yellow, a gateway of level 3 or above is required to perform data transmission, and at the same time transmit it to the power system and the consumer system for early warning information response; when the mark is green, you can first select the power system, and then the power system determines whether it is necessary to synchronize the early warning information to the fire protection system based on the regional status value. When necessary, synchronization is performed, and then the power system and the fire protection system simultaneously generate human work orders for response.
[0055] Through the above method, not only can the existing network resources be fully utilized, but also the reliability of data transmission can be improved, the achievements of urban intelligence can be fully utilized, the monitoring strength of the system can be improved, the timely handling of abnormalities can be ensured, and support can be provided for the normal operation of the smart city power system, thus improving people's smart experience.
[0056] Based on the above method, the present invention also provides a monitoring system for a smart city power system, which is used to implement the above method, and the monitoring system includes:
[0057] The identification module builds a power map based on the power system and identifies old areas and high-voltage areas;
[0058] A collection module, for acquiring available gateways and fire protection systems on the power map; wherein the gateways include home gateways and commercial gateways;
[0059] Early warning module, which monitors nodes in the power system in real time and obtains early warning information;
[0060] The response module determines the alarm level according to the early warning information so as to select an alarm mode, wherein the alarm mode includes an early warning information transmission mode and an early warning information response mode.
[0061] Among them, the identification module is also used for:
[0062] Calculate the obsolescence level W of the obsolete area according to the equipment status S, wiring time T and abnormal alarm frequency P in the obsolete area, and mark it according to the obsolete level;
[0063] The high voltage level Q of the high voltage area is calculated based on the historical load H of the area, the density K of high voltage equipment, the remaining life M of the high voltage equipment and the number of abnormal alarms N in the high voltage area, and the area is marked according to the high voltage level.
[0064] Among them, the acquisition module is also used to: obtain the gateway on the power map, calculate the reliability of the gateway according to the network type L supported by the gateway, data transmission accuracy G (bit error rate), RSSI, and optimal transmission distance R; classify the gateway according to the reliability, and select the available gateway according to the classification result.
[0065] The warning module is used to monitor the status information of each area in real time, and determine whether to issue an alarm according to the status information and the area information; the status information and the area information determine whether to issue an alarm; the status information includes the load level of the area, the load level = current load / maximum allowable load * equipment density, and the area information includes the old level of the old area and the high-voltage level of the high-voltage area;
[0066] Determining whether to alarm includes: calculating a regional status value, and determining whether an early warning is required according to the regional status value;
[0067] Among them, the regional status value = load level * level information * 1.5; wherein the level information is the old level and / or high voltage level.
[0068] The data transmission method includes:
[0069] 1) Normal data is transmitted through the power grid;
[0070] 2) The abnormal data determines whether to be transmitted through the gateway according to the alarm level;
[0071] 3) Determine the transmission to the power system and / or fire protection system according to the alarm level;
[0072] The warning information response method includes: determining a processing method according to the alarm level, and the processing method includes fire response, power system response, and dispatch of a manpower work order;
[0073] The response module is also used to determine the data transmission mode and the warning information response mode according to the area identification and the alarm level.
[0074] Through real-time monitoring of the power system, the power status of each area can be obtained in time, and early warnings can be issued according to the differences in each area and the corresponding methods of each area, and the alarm level can be determined, so as to select the transmission method and response method of the early warning information in a targeted manner, thereby improving the timeliness and reliability of the transmission of early warning information and improving the efficiency of abnormal response.
[0075] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A monitoring method for a smart city power system, characterized in that: The monitoring method comprises: Step 1: Build a power map based on the power system and identify old areas and high-voltage areas; Step 2, obtaining the available gateways and fire protection systems on the power map; wherein the gateways include home gateways and commercial gateways; Step 3: Monitor the nodes in the power system in real time to obtain early warning information; Step 4, determining an alarm level according to the warning information so as to select an alarm mode, wherein the alarm mode includes a warning information transmission mode and a warning information response mode; Wherein, the step 3 specifically includes: real-time monitoring of the status information of each area, and determining whether to issue an alarm according to the status information and the area information; wherein, the status information includes the load level of the area, and the load level = current load / maximum allowable load*equipment density, wherein the equipment density is the number of equipment in the area whose power exceeds a specific value, and the area information includes the old level of the old area and the high-voltage level of the high-voltage area; Determining whether to alarm specifically includes: calculating the area status value, and determining whether to alarm according to the area status value; Among them, the regional status value = load level * level information * 1.5; among them, the level information is the old level and / or high voltage level; for special areas that can be both old areas and high voltage areas, the level information is the higher one of the old level and the high voltage level.
2. The monitoring method according to claim 1, characterized in that: The step 1 also includes: The obsolescence level W of the obsolescence area is calculated according to the equipment status S, wiring time T and abnormal alarm frequency P in the obsolescence area, where: T now is the current time, identified according to the age level; The high voltage level Q of the high voltage area is calculated based on the historical load H of the area, the density K of high voltage equipment, the remaining life M of the high voltage equipment and the number of abnormal alarms N in the high voltage area, and the area is marked according to the high voltage level.
3. The monitoring method according to claim 1, characterized in that: The step 2 also includes: obtaining a gateway on the power map, calculating the reliability of the gateway according to the network type L, data transmission accuracy G, RSSI, and optimal transmission distance R supported by the gateway; grading the gateway according to the reliability, and selecting an available gateway according to the grading result.
4. The monitoring method according to claim 1, characterized in that: Data transmission methods include: 1) normal data transmission via the power grid; 2) The abnormal data determines whether to be transmitted through the gateway according to the alarm level; 3) Determine the transmission to the power system and / or fire protection system according to the alarm level; The warning information response method includes: determining a processing method according to the alarm level, and the processing method includes fire response, power system response, and dispatch of a manpower work order; The method further includes: determining a data transmission mode and a warning information response mode according to the area identifier and the alarm level.
5. A monitoring system for a smart city power system, characterized in that: The monitoring system comprises: The identification module builds a power map based on the power system and identifies old areas and high-voltage areas; A collection module, for acquiring available gateways and fire protection systems on the power map; wherein the gateways include home gateways and commercial gateways; Early warning module, which monitors nodes in the power system in real time and obtains early warning information; A response module, which determines an alarm level according to the warning information so as to select an alarm mode, wherein the alarm mode includes a warning information transmission mode and a warning information response mode; The early warning module is specifically used to: monitor the status information of each area in real time, and determine whether to issue an alarm based on the status information and area information; wherein the status information includes the load level of the area, the load level = current load / maximum allowable load*equipment density, wherein the equipment density is the number of equipment in the area whose power exceeds a specific value, and the area information includes the old level of the old area and the high-voltage level of the high-voltage area; Determining whether to alarm specifically includes: calculating the area status value, and determining whether to alarm according to the area status value; Among them, the regional status value = load level * level information * 1.5; among them, the level information is the old level and / or high voltage level; for special areas that can be both old areas and high voltage areas, the level information is the higher one of the old level and the high voltage level.
6. The monitoring system according to claim 5, characterized in that: The identification module is also used to: Calculate the obsolescence level W of the obsolete area according to the equipment status S, wiring time T and abnormal alarm frequency P in the obsolete area, and mark it according to the obsolete level; The high voltage level Q of the high voltage area is calculated based on the historical load H of the area, the density K of high voltage equipment, the remaining life M of the high voltage equipment and the number of abnormal alarms N in the high voltage area, and the area is marked according to the high voltage level.
7. The monitoring system according to claim 5, characterized in that: The acquisition module is also used to: obtain the gateway on the power map, calculate the reliability of the gateway according to the network type L, data transmission accuracy G, RSSI, and optimal transmission distance R supported by the gateway; classify the gateway according to the reliability, and select the available gateway according to the classification result.
8. The monitoring system according to claim 5, characterized in that: Data transmission methods include: 1) normal data transmission via the power grid; 2) The abnormal data determines whether to be transmitted through the gateway according to the alarm level; 3) Determine the transmission to the power system and / or fire protection system according to the alarm level; The warning information response method includes: determining a processing method according to the alarm level, and the processing method includes fire response, power system response, and dispatch of a manpower work order; The response module is also used to determine the data transmission mode and the warning information response mode according to the area identification and the alarm level.
Citation Information
Patent Citations
Urban power grid abnormal state analyzing method and system
CN106447227A
Electric power monitoring system with fault position detection function
CN112946417A