Preparation layer layout method and layout structure for downward single-entry stratified filling mining

By arranging the preliminary layer vertically in non-ferrous mines and combining it with anchor nets, anchor cables and steel arch supports, the problem of low construction stability and safety in the downward single-pass layered filling mining method has been solved, and high efficiency has been achieved. , low-cost mining effect.

CN113833497BActive Publication Date: 2024-10-18BEIJING JINCHENGXIN MINING TECH RES INST CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202111228624.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-21
Publication Date
2024-10-18
Estimated Expiration
2041-10-21

AI Technical Summary

Technical Problem

In non-ferrous mines, the downward single-pass layered filling mining method is prone to instability, high cost, low safety and difficulty during the construction process due to the crushing of ore rocks and the development of joint fissures, and the support strength is high, which affects Construction efficiency.

Method used

The preparation layer is arranged perpendicular to the direction of the ore body, and short cross-vein connection lanes and short cross-veins are constructed from the segmented tunnel openings outside the vein, and a reinforced concrete artificial false bottom is constructed and filled with paste, combined with anchor mesh spraying, anchor cables and steel arches. Frame support to form a stable approach structure.

Benefits of technology

It simplifies the construction process, improves the stability and safety performance of the surrounding rock, reduces the support cost, ensures the stability of the approach structure and construction efficiency, and achieves efficient mining of "one mining, one charging".

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113833497B_ABST
    Figure CN113833497B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for arranging a preparatory layer for downward single-entry stratified filling mining, comprising the following steps: S1. After constructing a segmented connecting tunnel from the segmented tunnel opening outside the vein to the lower plate of the ore body for a distance, a short through-vein connecting tunnel is constructed along one side of the ore vein; S2. A short through-vein is excavated from the short through-vein connecting tunnel to the upper plate of the ore body, and then a reinforced concrete artificial false bottom is constructed in the short through-vein; S3. After the strength of the reinforced concrete artificial false bottom meets the requirements, a retaining wall is constructed on the reinforced concrete artificial false bottom, and the paste is filled to connect the top; S4. The next short through-vein is constructed and step S2 is repeated. The present invention is simple to construct, has good stability during excavation, and has better safety performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nonferrous mining, and in particular to a method and structure for arranging a preparation layer for downward single-access stratified filling mining. Background Art

[0002] The downward single-entry layered filling mining method is a relatively mature mining method. The recovered ore body is unstable, easy to break, and of high value. It is widely used in non-ferrous mines in my country with unstable ore rocks.

[0003] The joints and fissures of the ore rock in a certain mine are very developed and extremely unstable. The ore body is distributed in layers with a dip angle of 65° to 87° and an average dip angle of 75°. The average thickness of the ore body is about 6m and the average grade is 2.35%.

[0004] The single-entry downward layered filling method is adopted for mining. When the preparatory layer is arranged along the vein, due to the broken ore rock and the well-developed joints and fissures along the vein, the approach is prone to instability and collapse during excavation. In addition, the support strength is high, the cost is high, the operation safety is low, the difficulty is high, the construction speed is slow, and sometimes it even collapses during excavation, making it difficult to form a lane.

[0005] Therefore, technical personnel in this field are committed to developing a method and structure for arranging a preparation layer for downward single-access layered filling mining, which is simple to construct, has good stability during excavation, and has better safety performance. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a method and structure for arranging a preparation layer for downward single-access layered filling mining, which is simple to construct, has good stability during excavation, and has better safety performance.

[0007] The technical solution of the present invention to solve the above technical problems is as follows: a method for arranging a preparation layer for downward single-entry stratified filling mining, characterized in that it comprises the following steps:

[0008] S1. After constructing the segmented connecting tunnel from the segmented tunnel opening outside the vein to a certain distance from the footwall of the ore body, a short cross-vein connecting tunnel is constructed on one side along the direction of the ore vein;

[0009] S2. Excavate the short vein from the short vein connecting tunnel to the upper wall of the ore body, and then build a reinforced concrete artificial false bottom in the short vein;

[0010] S3. After the strength of the reinforced concrete artificial false bottom meets the requirements, a retaining wall is constructed on the reinforced concrete artificial false bottom and filled with paste to connect the top;

[0011] S4. Construct the next short through-vein and repeat step S2.

[0012] The beneficial effects of the present invention are as follows: when the present invention adopts the downward single-route layered filling method to mine a soft, broken, medium-thick and thin ore body, the preparatory layer project is arranged step by step perpendicular to the direction of the ore body. Compared with the arrangement method along the vein and in layers, it is easier to construct, and the surrounding rock stability on both sides of the route is better, and the working environment of workers is safe; secondly, the arrangement is perpendicular to the direction of the ore body, the route length is short, and the "one mining and one filling" method is implemented, the roof exposure time is short, the stability of the route structure can be guaranteed, the formation reliability of the preparatory layer project is high, and the support cost is lower during the construction process.

[0013] Based on the above technical solution, the present invention can also be improved as follows.

[0014] Furthermore, when constructing the short-penetrating connecting tunnel in step S1, anchor mesh spraying, anchor cables and steel arch support are used during the excavation process;

[0015] When constructing a short penetration in step S2, anchor mesh spraying, anchor cables and steel arch support are used during the excavation process.

[0016] The beneficial effect of adopting the above-mentioned further scheme is that during the excavation process, the short-vein connecting tunnels and short-veined tunnels are supported by anchor mesh spraying, anchor cables and steel arch frames, thereby strengthening the supporting strength of the short-vein connecting tunnels and short-veined tunnels and preventing collapse during excavation or work, which would affect the construction progress and personnel safety.

[0017] Furthermore, in step S1, the short vein connecting tunnel is located at 5m to 6m below the ore body footwall.

[0018] The beneficial effect of adopting the above further scheme is that the short-vein connecting tunnel is located 5m to 6m below the ore body, ensuring that the length of the short-vein is 5m to 6m, facilitating rapid access to the ore layer for mining and improving operational efficiency.

[0019] Further, in step S3, the curing time of the reinforced concrete artificial false bottom is not less than 24 hours;

[0020] In step S1, the segmented connecting tunnel outside the central vein is also connected to a chute.

[0021] The beneficial effect of adopting the above further scheme is that the curing time of the reinforced concrete artificial false bottom is not less than 24 hours, ensuring that the reinforced concrete artificial false bottom has sufficient supporting strength, and then after filling with paste, it has sufficient bearing capacity to avoid the collapse of broken surrounding rock.

[0022] The present invention also provides a downward single-entry stratified filling mining preparation layer layout structure, comprising a first chute and a second chute, the first chute and the second chute are connected by a first outer-vein segmented tunnel and a chute connecting tunnel, at least one segmented connecting tunnel is arranged between the first outer-vein segmented tunnel and the lower plate of the ore body, a short-vein connecting tunnel is connected along the segmented connecting tunnel, a plurality of short-veins are arranged between the short-vein connecting tunnel and the lower plate of the ore body, and the short-veins are connected to the ore body.

[0023] The beneficial effect of adopting the above-mentioned further scheme is that the preparatory layer is arranged perpendicular to the ore rock stratification surface, the roof exposure time is short, the construction technology difficulty is greatly reduced, and the construction efficiency can be effectively guaranteed; secondly, the through-vein arrangement form has a short access length, the structural stability is easy to ensure, and the working environment of workers is safer.

[0024] Furthermore, a plurality of groups of the short veins divide the ore body into a plurality of mining areas, and safety pillars are arranged at the ends of the ore body to separate the ore body from the goaf.

[0025] The beneficial effect of adopting the above-mentioned further scheme is that multiple groups of short veins separate the ore body into multiple mining areas, which not only ensures the structural stability of the mining area, but also allows each mining area to operate in parallel, implementing the "one mining and one filling" policy, greatly improving construction efficiency; safety pillars isolate adjacent goaf areas, which can effectively ensure the stability of the mining area structure and achieve safe mining.

[0026] Furthermore, the short-vein and the short-vein connecting tunnel working faces are both provided with anchor net support, anchor cables and steel arch support.

[0027] The beneficial effect of adopting the above-mentioned further scheme is that during the excavation process of short veins and short vein connecting tunnels, the supporting strength of short veins and short vein connecting tunnels is improved through anchor net support, anchor cables and steel arch frames while advancing, ensuring the stability of the surrounding rock and accelerating the construction efficiency.

[0028] Furthermore, a reinforced concrete artificial false bottom is provided in the short through-vein, and the upper part of the reinforced concrete artificial false bottom is filled with paste and connected to the top;

[0029] The paste side wall is provided with a hanging rod, the upper part of the hanging rod is connected with a long anchor cable, the lower part is connected with a steel mesh, and the long anchor cable extends into the ore rock;

[0030] The bottom of the reinforced concrete artificial false bottom is also provided with an ore cushion layer.

[0031] The beneficial effect of adopting the above further scheme is that the hanger bars and long anchor cables strengthen the bearing capacity of the reinforced concrete artificial false bottom, and the long anchor cables extend into the ore rock to prevent the reinforced concrete artificial false bottom from sliding sideways; at the same time, when the lower layer is mined, the ore cushion layer can play a good buffering role to avoid damage to the artificial false bottom.

[0032] Furthermore, the first outer segmented tunnel is also connected to a wind shaft connecting tunnel, and the wind shaft connecting tunnel is also connected to a return air shaft.

[0033] The beneficial effect of adopting the above further scheme is that the air shaft connecting tunnel and the return air shaft will discharge the polluted air after cleaning the working surface, creating a good working environment for the workers.

[0034] Furthermore, it also includes a second off-vein segmented lane, and a ramp is arranged to connect the first off-vein segmented lane and the second off-vein segmented lane.

[0035] The beneficial effect of adopting the above further scheme is that the use of multiple off-vein segmented tunnels can realize synchronous stepped mining in multiple locations, improve mining efficiency, and multiple off-vein segmented tunnels are connected to each other, which can strengthen the connection between various mining areas.

[0036] Furthermore, the connection between the segmented connecting tunnel and the short-through-vein connecting tunnel is arranged in an L-shaped opening.

[0037] The beneficial effect of adopting the above further scheme is that the connection between the segmented connecting tunnel and the short-vein connecting tunnel is L-shaped, different from the T-shaped or cross-shaped, so that the exposed area of ​​the roof at the connection between the segmented connecting tunnel and the short-vein connecting tunnel is small and not easy to collapse.

[0038] Furthermore, the length of the anchor rod in the anchor net support is greater than 2.4m, and the support mesh of the anchor rod is 1.0m*1.0m.

[0039] The beneficial effect of adopting the above further scheme is that the anchor rod length is greater than 2.4m, ensuring that the surrounding rock of the tunnel forms a stable rock belt of sufficient range, and cooperating with the anchor net support to further strengthen the support and prevent the broken surrounding rock from falling and causing safety accidents.

[0040] Furthermore, a concrete support layer is sprayed on the anchor net, and the thickness of the concrete support layer is 30 mm to 50 mm.

[0041] The beneficial effect of adopting the above further solution is that the thickness of the concrete support layer can effectively bridge the joints and cracks and prevent the loosening of the broken surrounding rock.

[0042] Furthermore, the length of the anchor cables is not less than 6.5 m and the spacing is not greater than 3 m.

[0043] The beneficial effect of adopting the above further solution is that the anchor cable is of sufficient length and the tension of the anchor cable is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 This is a plan layout diagram of a through-vein preparation layer construction project according to a specific embodiment of the present invention;

[0045] Figure 2This is a cross-sectional view of a construction project of a vein-penetrating preparation layer according to a specific embodiment of the present invention;

[0046] Figure 3 This is a schematic cross-section diagram of two adjacent short veins according to a specific embodiment of the present invention.

[0047] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0048] 1. The first chute; 2. The second chute; 3. The second vein outer segmented tunnel; 4. The ramp; 5. The first vein outer segmented tunnel; 6. The segmented connecting tunnel; 7. The short through-vein connecting tunnel; 8. The short through-vein; 9. The safety pillar; 10. The first mining area; 11. The second mining area; 12. The third mining area; 13. The fourth mining area; 14. The drainage hole; 15. The return air shaft; 16. The air shaft connecting tunnel; 17. The rock drilling road; 18. The middle gravel; 19. The bottom gravel; 20. The ore body; 21. The caving goaf; 22. The reinforced concrete artificial false bottom; 23. The paste; 24. The ore cushion; 25. The steel mesh; 26. The suspension rod; 27. The long anchor cable. DETAILED DESCRIPTION

[0049] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0050] In the description of the present invention, it is necessary to understand that the terms "center", "length", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "inside", "outside", "peripheral", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred system or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0051] In the description of the present invention, “plurality” means at least two, for example, two, three, etc., unless otherwise clearly and specifically defined.

[0052] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0053] like Figure 1 , Figure 2 , Figure 3 As shown, a method for arranging a preparatory layer for downward single-entry stratified filling mining is provided. The preparatory layer is the first mining layer for downward stratified filling mining, that is, the first layer, and its direct roof is unstable ore rock. The short-entry preparatory layer engineering through vein is perpendicular to the direction of the ore body. A segmented connecting road is constructed from the segmented tunnel opening outside the vein to a certain distance from the lower wall of the ore body, and then a short through-vein connecting tunnel is constructed along the vein on one side. Then, a rectangular cross-vein is excavated from the short through-vein connecting tunnel to the upper wall of the ore body. After the excavation is completed, a false bottom is made and the upper empty area is filled. The excavation, filling and other processes can be cyclically operated in multiple mining areas. Specifically, the following steps are included:

[0054] S1. Arrange the chute. The segmented connecting tunnels outside the vein are connected with chute. After constructing the segmented connecting tunnel from the opening of the segmented tunnel outside the vein to a certain distance from the lower wall of the ore body, construct a short vein connecting tunnel on one side along the direction of the ore vein. The short vein connecting tunnel is used to connect various short veins. During the specific excavation process, the short vein connecting tunnel is located 5m to 6m from the lower wall of the ore body to facilitate the subsequent arrangement of short veins.

[0055] Among them, when constructing short-vein connecting tunnels, anchor net spraying, anchor cables and steel arch frames are used for support during the excavation process, and anchor net spraying, anchor cables and steel arch frames are used for support on the working face of the short-vein connecting tunnel to strengthen the support strength of the short-vein connecting tunnel to prevent collapse during excavation or work, which will affect the construction progress and the personal safety of operators.

[0056] S2. Excavate the short through vein from the short through vein connecting tunnel to the upper plate of the ore body. After the short through vein construction is completed, build a reinforced concrete artificial false bottom in the short through vein. The curing time of the reinforced concrete artificial false bottom shall not be less than 24 hours. If the curing time is too short, the bearing capacity of the reinforced concrete artificial false bottom will be insufficient, which is not conducive to subsequent advancement.

[0057] S3. After the strength of the reinforced concrete artificial false bottom meets the requirements, a retaining wall is constructed on the reinforced concrete artificial false bottom and filled with paste to connect to the top. The retaining wall is used to close the access mining area and fill it with paste.

[0058] S4. Construct the next short vein and repeat step S2, that is, construct the next short vein. The excavation, filling and other processes can be cyclically operated in multiple mining areas, thereby increasing the mining rate.

[0059] like Figure 1 , Figure 2 , Figure 3 As shown, the present invention also provides a downward single-entry type layer filling mining preparation layer arrangement structure, including a first chute 1 and a second chute 2, and multiple chutes are arranged in different ore bodies 20 according to actual conditions. The first chute 1 and the second chute 2 are connected by a first vein outer segmented lane 5 and a chute connecting lane, and the chutes are interconnected by the vein outer segmented lane 5 and the chute connecting lane, so as to facilitate timely and reasonable ore and slag discharge from each working face.

[0060] At least one segmented connecting tunnel 6 is arranged between the segmented tunnel 5 outside the first vein and the lower wall of the ore body 20. A short-vein connecting tunnel 7 is connected along the segmented connecting tunnel 6. The short-vein connecting tunnel 7 is used to connect each short-vein to achieve intercommunication. The connection between the segmented connecting tunnel 6 and the short-vein connecting tunnel 7 is arranged in an L-shaped opening, which is different from the T-shaped or cross-shaped opening. This makes the exposed area of ​​the roof at the connection between the segmented connecting tunnel 6 and the short-vein connecting tunnel 7 small and not easy to collapse. In the specific construction process, the segmented connecting tunnel 6 will pass through the middle gravel 18 and the bottom gravel 19. During the construction process, the production water and the fissure water in the ore body 20 are discharged to the bottom water tank through the drainage hole 14, and then pumped to the surface.

[0061] Multiple groups of short veins 8 are arranged between the short vein connecting tunnel 7 and the lower wall of the ore body 20, and the short veins 8 are connected to the ore body 20. Multiple groups of short veins 8 separate the ore body 20 into multiple mining areas, and a safety pillar 9 is arranged at the end of the ore body 20. The safety pillar 9 is used to isolate adjacent goaf areas. Different ore bodies 20 are provided with multiple groups of short veins. In this embodiment, the first goaf 10, the second goaf 11, the third goaf 12 and the fourth goaf 13 are respectively arranged. Each goaf is independent of each other and does not affect each other. The upper part of the ore body 20 is the caving goaf 21 and the rock drilling road 17 constructed for caving mining.

[0062] During the excavation process, the working faces of the short-through vein 8 and the short-through vein connecting tunnel 7 are equipped with anchor net support, anchor cable and steel arch support. The length of the anchor rod in the anchor net support is greater than 2.4m, the support mesh of the anchor rod is 1.0m*1.0m, the length of the anchor cable is not less than 6.5m, and the spacing is not greater than 3m. If the anchor rod mesh is too low, the support strength is high, resulting in material waste; if the mesh is too high, the support strength is insufficient, the surrounding rock's own bearing capacity is low, and it is easy to collapse. The anchor rod combined with the anchor net support can effectively prevent the broken surrounding rock from falling and avoid safety accidents. A concrete support layer is sprayed on the anchor net, and the thickness of the concrete support layer is 30mm~50mm, which can effectively bridge the joints and cracks and prevent the surrounding rock from loosening and collapsing.

[0063] A reinforced concrete artificial false bottom 22 is provided in the short through vein 8, the thickness of the reinforced concrete artificial false bottom 22 is not less than 0.4m, and the upper part of the reinforced concrete artificial false bottom 22 is filled with a paste 23 and connected to the top, the slurry concentration of the paste 23 is 69%, and the lime-sand ratio is 1:24. The side wall of the paste 23 is provided with a hanging rod 26, the upper part of the hanging rod 26 is connected to a long anchor cable 27, and the lower part is connected to a steel mesh 25, and the long anchor cable 27 extends into the ore rock, and the long anchor cable 27 can effectively enhance the tension of the reinforced concrete artificial false bottom 22 to prevent side sliding, etc. The bottom of the reinforced concrete artificial false bottom 22 is also provided with an ore cushion layer 24, the thickness of the ore cushion layer 24 is 50mm-200mm, and the ore cushion layer 24 can play a good buffering role to prevent the artificial false bottom from being damaged.

[0064] The first segmented lane outside the vein 5 is connected to the return air shaft 15 through the air shaft connecting lane 16. Fresh air reaches the working face through the ramp 4 and the first segmented lane outside the vein 5. After cleaning the working face, it is discharged to the upper segmented return air lane through the return air shaft 15. It also includes the second segmented lane outside the vein 3. A ramp 4 is set between the first segmented lane outside the vein 5 and the second segmented lane outside the vein 3. The ramp 4 connects multiple segmented lanes outside the vein to strengthen the production connection between the segmented lanes outside the vein.

[0065] Embodiment 1

[0066] A copper mine is divided into 770-878mL sections, and the average inclination of the ore body between the 2040-2700 exploration lines is 70°. The thickness of the ore circle is 6m according to the grade of 1.5%, and the Cu geological grade is 2.81%. There is a rich ore about 2m thick in the footwall of the ore body, with a Cu grade of 3%-6%. Generally, three to four dominant joint groups are developed in the ore body, and the quality is poor and easy to collapse. There is an extremely unstable and weak rock layer of 0.5-2m thick adjacent to the footwall of the ore body. The design adopts the reinforced concrete false roof downward layered filling mining method for mining, and the preparatory layer project is arranged along the vein. During the construction process, due to the crushing of the ore rock, the roof and the side wall surrounding rock are very easy to collapse, and the workers' working environment cannot guarantee safety; in addition, the preparatory layer project is arranged along the vein, the support strength is large, the support cost is very high, and sometimes advanced support measures need to be taken, which seriously restricts the construction efficiency. In order to solve these engineering and technical problems, the arrangement method of the preparatory layer project is improved, and the preparatory layer project is arranged by the method of the present invention to ensure safe and efficient construction.

[0067] Arrange the mining project in the lower plate of the ore body, construct the ramp 4 upward from the original 800mL segmented road to the preparatory layer segmented level (i.e. 788mL), arrange a chute every 120m in 788mL, and arrange two ventilation shafts in the middle of the two plate areas and the west end of the west plate area. According to the division of the preparatory layer stope, a stope connection road is arranged every 40m from the 788mL segmented road opening. The end of the stope connection road is constructed to the east when it is 5m away from the lower plate of the ore body. The intersection of the short-through-vein connection road 7 and the stope connection road is arranged in an "L" shape to avoid "T" and "cross" openings. After that, the short-through-vein 8 (cross-section specifications of the road: width × height = 4m × 3.5m) can be constructed step by step from the opening of the short-through-vein connection road 7 to the upper plate of the ore body 20.

[0068] During the construction of the short access through the vein, the main support methods used are anchor net support, anchor cable support, shotcrete support and U-shaped steel arch support. Among them, the length of the anchor rod in the anchor net support is 2.4m, and the support mesh is 1.0m×1.0m; the metal mesh starts from the waistline on one side of the access and ends at the waistline on the other side. After the anchor net support is completed, shotcrete support is carried out, and the thickness of the shotcrete is 30-50mm, so as to ensure that the concrete completely covers the steel mesh 25 at least. The anchor cable support adopts 6.5m anchor cable reinforcement support, with a row spacing of 3m, 3-4 cables per row, and the openings of the short-through-vein connecting tunnel 7 and the short-through-vein 8 access are densely supported. After the access is supported by the anchor net and anchor cable, a group (2 frames) of steel arch frames are supported every 10m. In areas with poor rock stability, the steel arch frame support is densely supported as appropriate.

[0069] After the construction of the short-through vein 8 access road is completed, the ore cushion layer 24 is laid to build the reinforced concrete false bottom 22, and then the paste 23 is filled and connected to the top to maintain the stability of the stope structure. When mining and filling, strictly follow the principle of "mining one and filling one", and a single stope is mined in sequence from east to west until it retreats to the stope connection road at the other end of the stope. Multiple stopes can be operated in parallel in an orderly manner in sequence.

[0070] The downward layered filling mining method is adopted to mine the ore body with particularly developed structural surfaces such as crushing, bedding, and joints along the veins. The method of the present invention is used to arrange the preparation layer project. Compared with the arrangement along the ore layer, the construction technology and difficulty are greatly reduced, which can effectively ensure the construction efficiency; secondly, the vein-crossing arrangement has a short access length, the structural stability is easy to ensure, and the working environment of the workers is safer; in addition, the support strength is lower than that of the arrangement along the vein, the support effect is good, and the cost is low.

[0071] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0072] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for arranging a preparation layer for downward single-entry stratified filling mining, characterized in that: The following steps are involved: S1. After constructing a segmented connecting tunnel from the segmented tunnel opening outside the vein to the footwall of the ore body (20) for a certain distance, a short inter-vein connecting tunnel is constructed along one side of the vein strike direction; In step S1, the short-vein connecting tunnel is located at 5m to 6m below the lower wall of the ore body (20); the connection between the segmented connecting tunnel and the short-vein connecting tunnel is arranged in an L-shaped opening; When constructing the short-penetrating connecting tunnel in step S1, anchor mesh spraying, anchor cables and steel arch support are used during the excavation process; When constructing a short penetration in step S2, anchor mesh spraying, anchor cables and steel arch support are used during the excavation process; S2. Excavate the short-veined connection tunnel from the short-veined connection tunnel to the upper wall of the ore body (20), and then construct an artificial false bottom of reinforced concrete in the short-veined connection tunnel; S3. After the strength of the reinforced concrete artificial false bottom meets the requirements, a retaining wall is constructed on the reinforced concrete artificial false bottom and filled with paste to connect the top; In step S3, the curing time of the reinforced concrete artificial false bottom is not less than 24 hours; In step S1, the segmented connecting lane outside the middle vein is also connected to a chute; S4. Construct the next short vein and repeat step S2; The upper part of the ore body (20) is a block cave mining area (21) and a rock drilling tunnel (17) constructed for block cave mining.

2. A downward single-entry stratified filling mining preparation layer arrangement structure, characterized in that: The method for arranging the preparation layer for downward single-entry stratified filling mining as described in claim 1 is adopted; it comprises a first chute (1) and a second chute (2), the first chute (1) and the second chute (2) are connected by a first off-vein segmented tunnel (5) and a chute connecting tunnel, at least one segmented connecting tunnel (6) is arranged between the first off-vein segmented tunnel (5) and the lower plate of the ore body (20), a short-vein connecting tunnel (7) is connected along the segmented connecting tunnel (6), a plurality of short-vein connecting tunnels (8) are arranged between the short-vein connecting tunnel (7) and the lower plate of the ore body (20), and the short-vein connecting tunnel (8) is connected to the ore body (20).

3. The downward single-entry stratified filling mining preparation layer arrangement structure according to claim 2 is characterized by: A plurality of groups of short penetrating veins (8) separate the ore body (20) into a plurality of mining areas, and a safety pillar (9) is provided at the end of the ore body (20) to separate it from the goaf.

4. The downward single-entry stratified filling mining preparation layer arrangement structure according to claim 2 is characterized by: The working faces of the short-penetrating tunnel (8) and the short-penetrating tunnel (7) are both provided with anchor net support, anchor cable and steel arch support.

5. The downward single-entry stratified filling mining preparation layer arrangement structure according to any one of claims 2 to 4, characterized in that: The short through-vein (8) is provided with a reinforced concrete artificial false bottom (22), and the upper part of the reinforced concrete artificial false bottom (22) is filled with a paste (23) and connected to the top; The paste body (23) is provided with a hanging rod (26) on the side wall, the hanging rod (26) is connected to a long anchor cable (27) at the top and to a steel mesh (25) at the bottom, and the long anchor cable (27) extends into the ore rock; A mineral cushion layer (24) is also provided at the bottom of the reinforced concrete artificial false bottom (22).

6. The downward single-entry stratified filling mining preparation layer arrangement structure according to claim 5 is characterized by: The first outer segmented tunnel (5) is also connected to a wind shaft connecting tunnel (16), and the wind shaft connecting tunnel (16) is also connected to a return air shaft (15).

7. The downward single-entry stratified filling mining preparation layer arrangement structure according to claim 6 is characterized by: It also includes a second off-vein segmented lane (3), and a ramp (4) is arranged between the first off-vein segmented lane (5) and the second off-vein segmented lane (3).