Power quality evaluation method and device, server, and computer-readable storage medium

By calculating the basic indicators and over-limit indicators of the power quality indicators, combined with the characteristic weight or assessment weight, the problem that traditional methods cannot accurately reflect the degree of over-limited electricity quality indicators is solved, and the accuracy of the evaluation of power quality is improved.

CN113837520BActive Publication Date: 2024-11-01SHENZHEN POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110648832.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-10
Publication Date
2024-11-01
Estimated Expiration
2041-06-10

AI Technical Summary

Technical Problem

The traditional linear weighted comprehensive method cannot accurately reflect the degree of overrun of the power quality index and affect the accuracy of the power quality evaluation.

Method used

By calculating the basic indicators and overlimit indicators of the power quality indicators, combined with the characteristic weights or assessment weights, comprehensive power quality evaluation indicators can be calculated to improve the accuracy of power quality evaluation.

Benefits of technology

It effectively improves the accuracy of power quality evaluation, can accurately reflect the degree of overrun of a single power quality index, and enhances the accuracy of power quality evaluation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113837520B_ABST
    Figure CN113837520B_ABST
Patent Text Reader

Abstract

The present application relates to a power quality evaluation method and device, a server, and a computer-readable storage medium, including: obtaining the basic indicators and over-limit indicators of various power quality indicators of each monitoring point within a unit time for each monitoring point. Among them, the over-limit indicator is used to indicate whether the power quality indicator is over-limit. Therefore, based on the over-limit indicator, the over-limit degree of a single power quality indicator can be reflected. Then, the characteristic weight or assessment weight of each power quality indicator is obtained. For each power quality indicator of the monitoring point, based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weight or assessment weight of the power quality indicators, the comprehensive power quality evaluation index of the monitoring point within a unit time is calculated. The comprehensive power quality evaluation index calculated based on the basic indicators and over-limit indicators can improve the accuracy of the power quality evaluation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of electric power engineering technology, and in particular to a method and device for evaluating power quality, a server, and a computer-readable storage medium. Background Art

[0002] As a secondary energy source that is economical, practical, clean, convenient, easy to control and convert, electric energy has become an important foundation for economic development and people's lives around the world. Among them, power quality refers to the quality of electric energy in the power system. Ideal electric energy should be a perfectly symmetrical sine wave, but some factors can cause the waveform to deviate from the symmetrical sine, thus causing power quality problems. And with the increasing popularity of various complex, sophisticated, and power quality-sensitive electrical equipment, people's requirements for power quality are getting higher and higher.

[0003] Traditionally, the linear weighted comprehensive method is used to evaluate the power quality. However, the linear weighted comprehensive method cannot reflect the degree of exceeding the limit of a single power quality indicator, thus affecting the accuracy of the power quality evaluation. Summary of the invention

[0004] The embodiments of the present application provide a power quality evaluation method, device, server, and computer-readable storage medium, which can improve the accuracy of power quality evaluation.

[0005] In one embodiment, a method for evaluating power quality is provided, the method comprising:

[0006] For each monitoring point within a unit time, the basic index and the over-limit index of each power quality index of the monitoring point are calculated; the basic index is used to indicate the power quality level of the power quality index, and the over-limit index is used to indicate whether the power quality index exceeds the limit; the unit time is the time interval for collecting the power quality index of the monitoring point once;

[0007] Calculate the characteristic weight or assessment weight of each power quality indicator;

[0008] For each power quality indicator of the monitoring point, based on the basic indicators and over-limit indicators of the power quality indicators, and the characteristic weights or assessment weights of the power quality indicators, the comprehensive power quality evaluation indicators of the monitoring point within the unit time are calculated.

[0009] In one embodiment, the step of calculating the basic index and over-limit index of each power quality index of each monitoring point within a unit time includes:

[0010] Obtain various power quality indicators of each monitoring point within a unit time period;

[0011] For each of the power quality indicators, based on the power quality indicator and the average value of the power quality indicator within a first preset time period, calculate a basic indicator of the power quality indicator;

[0012] An over-limit indicator of the power quality indicator is determined according to a basic indicator of the power quality indicator.

[0013] In one embodiment, the power quality indicators of the monitoring point are calculated based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weights or assessment weights of the power quality indicators, and the comprehensive power quality evaluation indicators of the monitoring point within the unit time, including:

[0014] For each power quality indicator of the monitoring point, based on the basic indicator of the power quality indicator and the assessment weight of the power quality indicator, calculate the first basic indicator of the comprehensive power quality evaluation indicator of the monitoring point within the unit time; the assessment weight of each power quality indicator is the same;

[0015] Based on the first basic indicator among the comprehensive power quality evaluation indicators of the monitoring point within the unit time length and the over-limit indicator among the comprehensive power quality evaluation indicators of the monitoring point within the unit time length, the first comprehensive power quality evaluation indicator of the monitoring point within the unit time length is calculated.

[0016] In one embodiment, the calculating the characteristic weights of the various power quality indicators includes:

[0017] The subjective weights of the various power quality indicators are calculated using the analytic hierarchy process and the scaling construction method;

[0018] The objective weights of the various power quality indicators are calculated using the entropy weight method;

[0019] For each of the power quality indicators, the characteristic weight of the power quality indicator is calculated according to the subjective weight of the power quality indicator and the objective weight of the power quality indicator.

[0020] In one embodiment, the power quality indicators of the monitoring point are calculated based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weights or assessment weights of the power quality indicators, and the comprehensive power quality evaluation indicators of the monitoring point within the unit time, including:

[0021] For each power quality index of the monitoring point, based on the basic index of the power quality index and the characteristic weight of the power quality index, calculate the second basic index of the comprehensive power quality evaluation index of the monitoring point within the unit time;

[0022] Based on the second basic indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time length and the over-limit indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time length, the second comprehensive power quality evaluation index of the monitoring point within the unit time length is calculated.

[0023] In one embodiment, the method further comprises:

[0024] Within the second preset time length, calculating the basic indicators of the comprehensive power quality evaluation indicators of the monitoring point according to the unit time length;

[0025] Calculate the average value of the basic index in the comprehensive power quality evaluation index within the second preset time length, and generate the basic index in the comprehensive power quality evaluation index of the monitoring point within the second preset time length;

[0026] Within the second preset time period, calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point;

[0027] Based on the basic indicators in the comprehensive power quality evaluation indicators of the monitoring point and the over-limit indicators in the comprehensive power quality evaluation indicators of the monitoring point, the comprehensive power quality evaluation indicators of the monitoring point within the second preset time period are calculated.

[0028] In one embodiment, the preset monitoring area includes a plurality of monitoring points, and the method further includes:

[0029] Calculate the power quality index of each monitoring point in the preset monitoring area within the unit time length, and calculate the preset power quality index of each monitoring point in the preset monitoring area; the preset power quality index includes minimum short-circuit capacity, agreed power supply capacity, and subjective importance of substation;

[0030] Calculate the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time length based on the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time length, the characteristic weights or assessment weights corresponding to the basic indicators of the comprehensive power quality indicators, and the preset power quality indicators;

[0031] Calculate the over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time length;

[0032] Based on the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time length and the over-limit indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time length, the comprehensive power quality evaluation indicators of each monitoring point in the preset monitoring area within the unit time length are calculated.

[0033] In one embodiment, a power quality evaluation device is provided, the device comprising:

[0034] A basic index and over-limit index calculation module is used to calculate the basic index and over-limit index of each power quality index of each monitoring point for each monitoring point within a unit time; the basic index is used to indicate the power quality level of the power quality index, and the over-limit index is used to indicate whether the power quality index exceeds the limit; the unit time is the interval for collecting the power quality index of the monitoring point once;

[0035] A weight calculation module, used to calculate the characteristic weight or assessment weight of each power quality indicator;

[0036] The comprehensive power quality evaluation index calculation module is used to calculate the comprehensive power quality evaluation index of the monitoring point within the unit time period based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weights or assessment weights of the power quality indicators for each power quality indicator of the monitoring point.

[0037] A server includes a memory and a processor, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the processor executes the steps of the above method.

[0038] A computer-readable storage medium stores a computer program, which implements the steps of the above method when executed by a processor.

[0039] The above-mentioned power quality evaluation method, device, server, and computer-readable storage medium obtain the basic indicators and over-limit indicators of various power quality indicators of the monitoring point for each monitoring point within a unit time. Among them, the over-limit indicator is used to indicate whether the power quality indicator is over-limit. Therefore, based on the over-limit indicator, the over-limit degree of a single power quality indicator can be reflected. Then, the characteristic weight or assessment weight of each power quality indicator is obtained. For each power quality indicator of the monitoring point, based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weight or assessment weight of the power quality indicators, the comprehensive power quality evaluation index of the monitoring point within a unit time is calculated. The comprehensive power quality evaluation index calculated based on the basic indicators and over-limit indicators can improve the accuracy of the power quality evaluation. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 is an application environment diagram of a power quality evaluation method in an embodiment;

[0042] Figure 2 is a flow chart of a method for evaluating power quality in one embodiment;

[0043] Figure 3 for Figure 2 A flowchart of the method for calculating the basic indicators and over-limit indicators of various power quality indicators of each monitoring point within a unit time;

[0044] Figure 4 for Figure 2 A flowchart of a method for calculating comprehensive power quality evaluation indicators of monitoring points within a unit time period based on basic indicators and over-limit indicators of power quality indicators, characteristic weights or assessment weights of power quality indicators for each power quality indicator of the monitoring point;

[0045] Figure 5 for Figure 2 Flow chart of the characteristic weighting method for calculating various power quality indicators;

[0046] Figure 6 is a flow chart of a power quality evaluation method in another embodiment;

[0047] Figure 7 A flowchart of a method for evaluating power quality in yet another embodiment;

[0048] Figure 8 is a structural block diagram of a power quality evaluation device in one embodiment;

[0049] Fig. 9 for Figure 8 The structural block diagram of the basic index and over-limit index calculation module;

[0050] Fig.10 FIG. 1 is a schematic diagram of the internal structure of a server in an embodiment. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0052] It can be understood that the terms "first", "second", etc. used in the present application can be used in this article to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from another element.

[0053] The traditional method uses a linear weighted synthesis method to evaluate the power quality. Specifically, the linear weighted synthesis method uses a linear method to compensate between various indicators, that is, the increase (decrease) of certain indicator values ​​can be compensated by the decrease (increase) of other indicator values. Therefore, when the linear weighted synthesis method is used to evaluate the power quality, some indicators will exceed the limit to a high degree, while the overall power quality level is good. The reason for the above situation is that a linear method is used to compensate between various indicators. Therefore, the linear weighted synthesis method cannot reflect the over-limit situation of each indicator.

[0054] Moreover, the traditional method assigns fixed weights to different power quality indicators when evaluating power quality. Therefore, it cannot well reflect the differences between different power quality indicators when calculating the comprehensive power quality evaluation index.

[0055] In order to solve the above technical problems, the present application provides a new power quality evaluation method, which obtains the basic indicators and over-limit indicators of various power quality indicators of each monitoring point for each monitoring point within a unit time. The basic indicators are used to indicate the power quality level of the power quality indicators, and the over-limit indicators are used to indicate whether the power quality indicators are over-limit; the unit time is the time interval for collecting power quality indicators at the monitoring point. The characteristic weights or assessment weights of various power quality indicators are obtained, and for each power quality indicator of the monitoring point, the comprehensive power quality evaluation index of the monitoring point within the unit time is calculated based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weights or assessment weights of the power quality indicators. The comprehensive power quality evaluation index calculated based on the basic indicators and over-limit indicators can improve the accuracy of power quality evaluation.

[0056] like Figure 1 As shown, Figure 1It is an application scenario diagram of the power quality evaluation method in an embodiment. The application environment includes a server 120 and multiple monitoring points 140, wherein the monitoring point 140 is a monitoring point for monitoring power quality indicators. For each monitoring point within a unit time, the basic indicators and over-limit indicators of various power quality indicators of the monitoring point are obtained; the basic indicators are used to indicate the power quality level of the power quality indicators, and the over-limit indicators are used to indicate whether the power quality indicators are over-limited; the unit time is the time interval for the monitoring point to collect power quality indicators once. The characteristic weights or assessment weights of various power quality indicators are obtained, and for various power quality indicators of the monitoring point, the comprehensive power quality evaluation indicators of the monitoring point within the unit time are calculated based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weights or assessment weights of the power quality indicators. Among them, the server 120 can be a single server or a server cluster composed of multiple servers, and the embodiment of the present application does not make specific limitations on this.

[0057] Figure 2 FIG. 1 is a flow chart of a method for evaluating power quality in one embodiment. Figure 2 As shown, a method for evaluating power quality is provided, which is applied to a server. The method includes the following steps 220 to 260.

[0058] Step 220, for each monitoring point within a unit time, calculate the basic indicators and over-limit indicators of various power quality indicators of the monitoring point; the basic indicators are used to indicate the power quality level of the power quality indicators, and the over-limit indicators are used to indicate whether the power quality indicators are over-limited; the unit time is the time interval for collecting power quality indicators at the monitoring point once.

[0059] Multiple power quality indicator monitoring points are set up in the power grid, and the power quality indicators at the monitoring points can be obtained through sensors at each monitoring point. Among them, power quality indicators generally include voltage deviation, voltage fluctuation and flicker, harmonics, three-phase imbalance, etc., which are not limited in this application.

[0060] The monitoring point collects power quality indicators once every unit time interval, and uploads all collected power quality indicators to the server, and the server calculates the basic indicators and over-limit indicators of each power quality indicator based on the various power quality indicators. The unit time here is the time interval for the monitoring point to collect power quality indicators once. For example, if the power quality indicators are collected once every 3 minutes, then the unit time at this time is 3 minutes. Of course, this application does not limit this. For example, for a certain monitoring point, the collected power quality indicators such as voltage deviation, voltage fluctuation and flicker, harmonics, and three-phase imbalance are uploaded to the server. The server calculates the basic indicators and over-limit indicators of power quality indicators such as voltage deviation, voltage fluctuation and flicker, harmonics, and three-phase imbalance respectively. That is, the basic indicators and over-limit indicators of voltage deviation, the basic indicators and over-limit indicators of voltage fluctuation and flicker, the basic indicators and over-limit indicators of harmonics, and the basic indicators and over-limit indicators of three-phase imbalance are obtained.

[0061] Among them, the basic indicator is used to indicate the power quality level of the power quality indicator, and the over-limit indicator is used to indicate whether the power quality indicator is over-limit. For the over-limit indicator, a restriction condition can be preset, for example, a preset standard is set for each power quality indicator. If the power quality indicator exceeds the preset standard of the power quality indicator, then the power quality indicator is over-limit at this time. At this time, the over-limit indicator of the power quality indicator is set to the first value. On the contrary, if the power quality indicator does not exceed the preset standard of the power quality indicator, then the power quality indicator is not over-limit at this time. At this time, the over-limit indicator of the power quality indicator is set to the second value. Through the first value or the second value, it is possible to intuitively determine whether the power quality indicator is over-limit.

[0062] Step 240, calculating the characteristic weight or assessment weight of each power quality indicator.

[0063] After the server calculates the basic index and over-limit index of each power quality index based on each power quality index, it calculates the characteristic weight or assessment weight of each power quality index. Among them, the characteristic weight refers to the weight of each power quality evaluation index calculated based on the combination of subjective weight and objective weight according to the characteristics of multiple electrical parameters such as load and voltage level in different regional power grids.

[0064] However, in actual application, it is difficult to calculate a reasonable and accurate characteristic weight at some monitoring points in the power grid, so the assessment weight is introduced. The assessment weight is to give the same weight to each power quality indicator.

[0065] Step 260, for each power quality index of the monitoring point, based on the basic index and over-limit index of the power quality index, the characteristic weight or assessment weight of the power quality index, calculate the comprehensive power quality evaluation index of the monitoring point within a unit time.

[0066] After the server calculates the basic indicators and over-limit indicators of various power quality indicators of the monitoring point, as well as the characteristic weights or assessment weights of various power quality indicators, the server can calculate the comprehensive power quality evaluation indicators of the monitoring point within unit time based on the basic indicators and over-limit indicators of the power quality indicators and the characteristic weights or assessment weights of the power quality indicators.

[0067] Specifically, for each power quality indicator of the monitoring point, based on the basic indicator of the power quality indicator, the characteristic weight or assessment weight of the power quality indicator, the basic indicator of the comprehensive power quality evaluation indicator of the monitoring point within the unit time is calculated. In step 220, the over-limit indicator of the power quality indicator of the monitoring point within the unit time is obtained.

[0068] Based on the basic index of the comprehensive power quality evaluation index of the monitoring point within the unit time and the over-limit index of the comprehensive power quality evaluation index of the monitoring point within the unit time, the comprehensive power quality evaluation index of the monitoring point within the unit time is calculated. Among them, the comprehensive power quality evaluation index within the unit time can reflect the comprehensive situation of each power quality evaluation index within the unit time.

[0069] In an embodiment of the present application, for each monitoring point within a unit time, the basic indicators and over-limit indicators of various power quality indicators of the monitoring point are obtained. Among them, the over-limit indicator is used to indicate whether the power quality indicator is over-limit. Therefore, based on the over-limit indicator, the over-limit degree of a single power quality indicator can be reflected. Then, the characteristic weight or assessment weight of each power quality indicator is obtained. For each power quality indicator of the monitoring point, based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weight or assessment weight of the power quality indicators, the comprehensive power quality evaluation index of the monitoring point within a unit time is calculated. The comprehensive power quality evaluation index calculated based on the basic indicators and over-limit indicators can improve the accuracy of the power quality evaluation.

[0070] In one embodiment, Figure 3 As shown, step 220, for each monitoring point within a unit time, calculates the basic index and over-limit index of each power quality index of the monitoring point, including:

[0071] Step 222, obtaining various power quality indicators of each monitoring point within a unit time period;

[0072] Step 224, for each power quality indicator, based on the power quality indicator and the average value of the power quality indicator within the first preset time period, calculate the basic indicator of the power quality indicator;

[0073] Step 226, determining an over-limit indicator of the power quality indicator according to the basic indicator of the power quality indicator.

[0074] Specifically, for example, for each monitoring point within a unit time, various power quality indicators of the monitoring point are selected. Then, for each power quality indicator, the average value of the power quality indicator within the first preset time is calculated. i T The first preset time period may also be referred to as monitoring period T. Then, for each power quality indicator, the basic indicators of the power quality indicator can be calculated based on the power quality indicator and the average value of the power quality indicator within the first preset time period. Specifically, the basic indicators of the power quality indicators of the monitoring point a i The calculation formula is as follows:

[0075]

[0076] in, is the average value of the measured value of the ith power quality indicator in the monitoring period T. The monitoring period T can be hours, days, weeks, months or years. The minimum monitoring period is the unit time, i.e., the time for one data return (generally set to 3 minutes in the monitoring system).

[0077] L i is the limit value of the corresponding ith power quality indicator; the limit value is specified by the standard, for example, for power grid harmonics, the limit value is generally 5%;

[0078] a i It is the basic indicator obtained after processing the i-th power quality indicator.

[0079] Secondly, after calculating the basic indicators of various power quality indicators, the over-limit indicators of power quality indicators can be determined based on the basic indicators of power quality indicators. i ∈[-∞,1], if a i ≥0, it is determined that the power quality index is within the limit; if a i <0, it is determined that the power quality index exceeds the limit.

[0080] In order to better evaluate the power quality of a single monitoring point and facilitate the power quality assessment and management of the power grid company, it is required that the comprehensive evaluation index of power quality can directly reflect whether there is an over-limit situation. Therefore, the single power quality index of a single measuring point I i The calculation formula is:

[0081] I i =a i +b i j (2)

[0082] Among them, I i is the single measurement point indicator of the ith power quality indicator. i , b i is a real number, a i is the basic indicator, which represents the basic indicator of the ith power quality indicator at the single monitoring point and is used to reflect the power quality level of the ith power quality indicator at the monitoring point. i Lower values ​​indicate lower power quality levels.

[0083] Among them, b i is the over-limit index, representing the over-limit index of the ith power quality index at the single monitoring point, and is used to reflect the over-limit situation of the ith power quality index at the monitoring point.

[0084]

[0085] Among them, j is just a label for the uncertain quantity.

[0086] In an embodiment of the present application, for each monitoring point within a unit time length, various power quality indicators of the monitoring point are obtained. Then, for each power quality indicator, based on the power quality indicator and the average value of the power quality indicator within the first preset time length, the basic indicator of the power quality indicator is calculated. The basic indicator of the power quality indicator calculated based on the average value of the power quality indicator within the first preset time length can reflect the average power quality level of the power quality indicator. Finally, combined with the basic indicator of the power quality indicator, the over-limit indicator of the power quality indicator is determined. The over-limit indicator is used to evaluate the power quality independently of the basic indicator, so that the over-limit situation of the power quality indicator can be accurately obtained.

[0087] In one embodiment, Figure 4 As shown, when calculating the comprehensive power quality evaluation index of the monitoring point within the unit time, if the assessment weight is taken into account, step 260, for each power quality index of the monitoring point, based on the basic index and the over-limit index of the power quality index, the characteristic weight or the assessment weight of the power quality index, calculates the comprehensive power quality evaluation index of the monitoring point within the unit time, including:

[0088] Step 262, for each power quality indicator of the monitoring point, based on the basic indicators of the power quality indicators and the assessment weights of the power quality indicators, calculate the first basic indicator of the comprehensive power quality evaluation indicator of the monitoring point within a unit time; the assessment weights of the power quality indicators are the same.

[0089] Specifically, in the above step 220, the basic indicators and over-limit indicators of various power quality indicators of the monitoring point are calculated. Then, based on the basic indicators of the power quality indicators and the assessment weights of the power quality indicators, the first basic indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time can be calculated. For example, steady-state data is generally uploaded once at intervals of a unit time, assuming that the unit time is T (generally 3 minutes, of course, this application does not limit this). If the monitoring period is a unit time T, the first basic indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time is calculated, then the first basic indicator σ T for:

[0090]

[0091] Among them, (a i ) T is the basic indicator of the i-th power quality indicator in the monitoring point in unit time T; at this time, α i Here is the assessment weight of the ith power quality indicator. Since the assessment weights of the power quality indicators are the same, and n is the number of selected power quality indicators, there are a total of n power quality indicators at this monitoring point, and the assessment weight of each power quality indicator is 1 / n. Assuming n = 5, there are a total of 5 power quality indicators at this monitoring point, and the assessment weight of each power quality indicator is 0.2, that is, α1 = α2 = α3 = α4 = α5 = 0.2. The assessment weight is applicable to situations where it is difficult to calculate a more reasonable and accurate characteristic weight at certain monitoring points in the power grid during actual application.

[0092] Step 264, based on the first basic indicator in the comprehensive power quality evaluation index of the monitoring point in the unit time length and the over-limit indicator in the comprehensive power quality evaluation index of the monitoring point in the unit time length, calculate the first comprehensive power quality evaluation index of the monitoring point in the unit time length.

[0093] Specifically, in the above step 220, the over-limit indicators of various power quality indicators of the monitoring point are calculated. For example, if the monitoring period is a unit time length T, a group of power quality indicators are collected within the unit time length T, wherein the over-limit indicator of the i-th power quality indicator is (b i ) T If it is expressed as, then the over-limit index ζ in the comprehensive power quality index of the monitoring point within the unit time is calculated T The formula is as follows:

[0094]

[0095] Similarly, n is the number of selected power quality indicators.

[0096] After calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length, the first basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length calculated in step 262 is combined. Then, based on the first basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length and the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length, the first comprehensive power quality evaluation index I of the monitoring point within the unit time length can be calculated. T The specific calculation formula is as follows:

[0097] I T =σ T +ζ T gj (6)

[0098] Among them, j is just a label for the uncertain quantity.

[0099] In the embodiment of the present application, after calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length, combined with the first basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length calculated in step 262. Then, the first comprehensive power quality evaluation index of the monitoring point within the unit time length can be calculated. The first comprehensive power quality evaluation index obtained here is a comprehensive power quality evaluation index calculated based on the assessment weight, which can take into account both the basic index and the over-limit index, so that the basic quality level and over-limit situation of the power quality index can be accurately obtained.

[0100] In one embodiment, Figure 5 As shown, step 240, calculating the characteristic weights of various power quality indicators, includes:

[0101] Step 242, using the analytic hierarchy process and the scaling construction method to calculate the subjective weights of various power quality indicators.

[0102] In view of the problem of consistency detection in the traditional analytic hierarchy process (AHP), the scale construction method is used to generate the judgment matrix in this application. The scale construction method can achieve that no matter which scale is used, the constructed judgment matrix has complete consistency. Therefore, the scale construction method is used to generate the judgment matrix, which realizes that consistency detection is not required during the operation process, thereby greatly reducing the amount of calculation.

[0103] Specifically, we first establish a judgment matrix based on the AHP method, which satisfies the following conditions: ij >0, that is, every element is positive; r ij =r ik rkj ,i,j,k=1,2,…,n.(n is the number of indicators). ij Indicates the scale for comparing elements i and j. The specific meanings are as follows:

[0104] Table 1 Scale r ij Meaning

[0105]

[0106]

[0107] Then, the scale construction method is used to compare the evaluation indicators in pairs according to the requirements of experts or users, and the indicators are ranked from large to small according to their importance. If the importance of the n indicators in the evaluation indicator system is ranked as x1>x2>…>x n , compare every two indicators and get the corresponding scale t i , the judgment matrix is ​​obtained as:

[0108]

[0109] Since the judgment matrix R is consistent, the subjective weight ω of each indicator can be calculated based on the judgment matrix i for:

[0110]

[0111] Step 244, using the entropy weight method to calculate the objective weight of each power quality indicator.

[0112] The entropy weight method is to determine the weight of the indicator according to the definition of entropy, and reflect the importance of each indicator by the degree of difference between the indicators. By calculating the entropy value of each indicator, the information size of the indicator can be evaluated, thereby ensuring that the established indicator system can reflect most of the original information.

[0113] Assume that the index set for comprehensive evaluation of power quality is I = {I1, I2, ..., I n}, which is a set of n basic power quality indicators selected. In addition, the evaluation indicators can be divided into 5 levels according to the standard, that is, the evaluation set Q = {poor, qualified, good, high quality, excellent}, where the first level is poor, the second level is qualified, the third level is good, the fourth level is high quality, and the fifth level is excellent.

[0114] Then, by evaluating each indicator in the indicator set I, we can get the evaluation indicator I i Fuzzy mapping p to the judgment set Q:

[0115] I i →p(I i ) (9)

[0116] According to the fuzzy transformation theory, the fuzzy relationship can be determined by the fuzzy mapping, and the fuzzy evaluation matrix F can be obtained;

[0117]

[0118] Among them, m is the number of evaluation levels.

[0119] Then, according to the fuzzy evaluation matrix, the entropy value e of the i-th index can be obtained: i :

[0120]

[0121] Among them, m is the level number of the evaluation index, p ij is the probability of the i-th indicator at the j-th level.

[0122] Finally, based on the principle that the larger the entropy weight, the smaller the contribution of the evaluation index, that is, the objective weight value is inversely proportional to the entropy value, we can introduce 1-e i To weigh the weight of the indicator, therefore, the objective weight v i The calculation formula is as follows:

[0123]

[0124] Step 246, for each power quality indicator, calculate the characteristic weight of the power quality indicator according to the subjective weight of the power quality indicator and the objective weight of the power quality indicator.

[0125] After the subjective weight of the power quality index and the objective weight of the power quality index are calculated in the above steps 242 and 244, the characteristic weight α of the power quality index is calculated for each power quality index according to the subjective weight of the power quality index and the objective weight of the power quality index. i . Feature weight α i The calculation formula is as follows:

[0126]

[0127] Among them, ω i is the subjective weight, v i is the objective weight, and n is the number of selected power quality indicators.

[0128] In the embodiment of the present application, the analytic hierarchy process and the scaling construction method are used to calculate the subjective weights of various power quality indicators, which eliminates the need for consistency detection during the calculation process, thereby greatly reducing the amount of calculation. The entropy weight method is used to calculate the objective weights of various power quality indicators. Finally, for each power quality indicator, the characteristic weight of the power quality indicator is calculated based on the subjective weight of the power quality indicator and the objective weight of the power quality indicator. The characteristic weight is calculated from two dimensions, namely, the subjective weight and the objective weight, to improve the accuracy of the characteristic weight. This improves the accuracy of the second comprehensive power quality evaluation indicator of the monitoring point within a unit time period that is subsequently calculated based on the characteristic weight.

[0129] In one embodiment, for each power quality indicator of the monitoring point, based on the basic indicator and over-limit indicator of the power quality indicator, the characteristic weight or assessment weight of the power quality indicator, the comprehensive power quality evaluation index of the monitoring point within a unit time is calculated, including:

[0130] For each power quality index of the monitoring point, based on the basic index of the power quality index and the characteristic weight of the power quality index, the second basic index of the comprehensive power quality evaluation index of the monitoring point within unit time is calculated.

[0131] Specifically, in the above step 220, the basic indicators and over-limit indicators of various power quality indicators of the monitoring point are calculated. Then, based on the basic indicators of the power quality indicators and the characteristic weights of the power quality indicators, the second basic indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time can be calculated. For example, steady-state data is generally uploaded once at intervals of a unit time, assuming that the unit time is T (generally 3 minutes, of course, this application does not limit this). If the monitoring period is a unit time T, the second basic indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time is calculated, and the second basic indicator σ T for:

[0132]

[0133] Among them: (a i ) T is the basic indicator of the i-th power quality indicator in the monitoring point in unit time T; at this time, α i Here, it is the characteristic weight of the ith power quality indicator. The characteristic weight of each power quality indicator is calculated based on the subjective weight of the power quality indicator and the objective weight of the power quality indicator.

[0134] Secondly, based on the second basic indicator of the comprehensive power quality evaluation index of the monitoring point within unit time and the over-limit indicator of the comprehensive power quality evaluation index of the monitoring point within unit time, the second comprehensive power quality evaluation index of the monitoring point within unit time is calculated.

[0135] Specifically, in the above step 220, the over-limit indicators of various power quality indicators of the monitoring point are calculated. For example, if the monitoring period is a unit time length T, a group of power quality indicators are collected within the unit time length T, wherein the over-limit indicator of the i-th power quality indicator is (b i ) T If it is expressed as, then the over-limit index ζ in the comprehensive power quality index of the monitoring point within the unit time is calculated T The formula is as follows:

[0136]

[0137] Similarly, n is the number of selected power quality indicators.

[0138] After calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length, the second basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length calculated in step 262 is combined. Then, based on the second basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length and the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length, the second comprehensive power quality evaluation index I of the monitoring point within the unit time length can be calculated. T The specific calculation formula is as follows:

[0139] I T =σ T +ζ T gj (16)

[0140] Among them, j is just a label for the uncertain quantity.

[0141] In the embodiment of the present application, after calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length, combined with the second basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length calculated in step 262. Then, the second comprehensive power quality evaluation index of the monitoring point within the unit time length can be calculated. The second comprehensive power quality evaluation index obtained here is a comprehensive power quality evaluation index calculated based on the characteristic weight, which can take into account both the basic index and the over-limit index, so that the basic quality level and over-limit situation of the power quality index can be accurately obtained.

[0142] In one embodiment, when the comprehensive power quality evaluation index of a single measuring point (single monitoring point) within a period of time is counted, as Figure 6 As shown, a method for evaluating power quality is provided, comprising:

[0143] Step 620, within the second preset time length, calculate the basic indicators of the comprehensive power quality evaluation indicators of the monitoring points according to the unit time length;

[0144] Among them, the second preset time length is the time period for monitoring in this embodiment. For example, the second preset time length includes one hour, one day, one week, one month, one year, etc., and this application does not limit this. For example, taking the second preset time length as one day as an example, when counting the comprehensive power quality evaluation index of a single measuring point within one day, first, the basic indicators in the comprehensive power quality evaluation index of the monitoring point are calculated according to the unit time length. For example, assuming that the unit time length is 3 minutes, a day can be divided into 480 unit time lengths, and the basic indicators in the comprehensive power quality evaluation index of the monitoring point within each unit time length are calculated respectively. Specifically, the basic indicators in the comprehensive power quality evaluation index of each monitoring point within each unit time length can be calculated according to the method of steps 220-260, which will not be repeated here. Among them, (σ T ) n It is the basic indicator of the comprehensive power quality evaluation index corresponding to the nth unit time T of a single measuring point.

[0145] Step 640, calculating the average value of the basic index in the comprehensive power quality evaluation index within the second preset time length, and generating the basic index in the comprehensive power quality evaluation index of the monitoring point within the second preset time length;

[0146] After calculating the basic index of the comprehensive power quality evaluation index of the monitoring point in each unit time, the average value of the basic index of the comprehensive power quality evaluation index in the second preset time is calculated to obtain the basic index of the comprehensive power quality evaluation index of the monitoring point in the second preset time. For example, taking the second preset time as one day as an example, the basic index τ of the comprehensive power quality evaluation index of a single measuring point in one day is d The calculation formula is as follows:

[0147]

[0148] Among them, (σ T ) n is the basic index of comprehensive power quality evaluation index corresponding to the nth unit time length T of a single measuring point, T d Indicates the number of times data is returned within a unit time T in a day.

[0149] Step 660: Calculate the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the second preset time period.

[0150] Then, within the second preset time d, a total of M d For the ith power quality indicator, the limit-crossing ratio (COUNT i ) d for:

[0151]

[0152] Among them, N d-i M d The number of data with the ith indicator exceeding the limit in the collected data. For example, when the monitoring point of the power grid system returns a set of data according to the unit time (3 minutes), then a total of 20 sets of data are returned in one hour. Assuming that the power quality indicator (three-phase imbalance) data in 3 sets of these 20 sets of data exceeds the standard, then COUNT i =3 / 20=0.15.

[0153] For the i-th power quality index, the over-limit coefficient (β i ) d Reflects the exceeding of the limit within the second preset time d. When the exceeding limit ratio exceeds 10%, it is judged that the indicator exceeds the limit within the second preset time d, and the exceeding limit coefficient is 1. When the exceeding limit ratio does not exceed 10%, it is judged that the indicator does not exceed the limit within the second preset time d, and the exceeding limit coefficient is 0. Coefficient (β i ) d The specific calculation formula is as follows:

[0154]

[0155] (β i ) d It reflects the over-limit situation of each single power quality indicator. By accumulating the over-limit situation of each power quality indicator, the over-limit indicator ζ within the second preset time length d can be calculated. d Assuming that the over-limit index is calculated for a total of 5 power quality indicators, then the over-limit index ζ within the second preset time length d is calculated at this time. d The formula is as follows:

[0156]

[0157] Step 680, based on the basic index in the comprehensive power quality evaluation index of the monitoring point and the over-limit index in the comprehensive power quality evaluation index of the monitoring point, calculate the comprehensive power quality evaluation index of the monitoring point within the second preset time period.

[0158] Finally, for the second preset time, the basic index τ in the comprehensive power quality evaluation index of the monitoring point can be used. d , The over-limit index ζ in the comprehensive power quality evaluation index of the monitoring point d , calculate the comprehensive power quality evaluation index ζ of the monitoring point within the second preset time d .

[0159] I d =τ d +ζ d gj (21)

[0160] In an embodiment of the present application, when counting the comprehensive power quality evaluation index of a single measuring point (single monitoring point) within the second preset time length, first, within the second preset time length, the basic indicators in the comprehensive power quality evaluation index of the monitoring point are calculated according to the unit time length. Then, the average value of the basic indicators in the comprehensive power quality evaluation index within the second preset time length is calculated to generate the basic indicators in the comprehensive power quality evaluation index of the monitoring point within the second preset time length. Secondly, within the second preset time length, the over-limit indicators in the comprehensive power quality evaluation index of the monitoring point are calculated. Finally, based on the basic indicators in the comprehensive power quality evaluation index of the monitoring point and the over-limit indicators in the comprehensive power quality evaluation index of the monitoring point, the comprehensive power quality evaluation index of the monitoring point within the second preset time length is calculated.

[0161] The comprehensive power quality evaluation index calculated based on basic indicators and over-limit indicators can improve the accuracy of power quality evaluation.

[0162] In one embodiment, when the comprehensive power quality evaluation index of all monitoring points in a preset monitoring area (hereinafter referred to as the regional comprehensive power quality evaluation index) is counted, if Figure 7 As shown, a method for evaluating power quality is provided, which also includes:

[0163] Step 720, calculate the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within a unit time, and calculate the preset power quality indicators of each monitoring point in the preset monitoring area; the preset power quality indicators include minimum short-circuit capacity, agreed power supply capacity, and subjective importance of the substation.

[0164] The regional comprehensive power quality evaluation index is the comprehensive power quality evaluation index of all monitoring points in a certain area divided according to a certain division principle (such as administrative area, load type or voltage level, etc.). After the preset monitoring area is obtained by dividing the area according to the preset division principle, the comprehensive power quality evaluation index of all monitoring points in the preset monitoring area is calculated.

[0165] Specifically, first, calculate the basic index σ of the comprehensive power quality index of each monitoring point in the preset monitoring area A within the unit time T For example, (σ T ) k It is the basic indicator for comprehensive power quality evaluation index of the kth monitoring point in the preset monitoring area within unit time.

[0166] Secondly, calculate the minimum short-circuit capacity, agreed power supply capacity, and subjective importance of the substation at each monitoring point in the preset monitoring area. k is the minimum short-circuit capacity of monitoring point k, B k is the protocol power supply capacity of monitoring point k, C k is the subjective importance of the substation at monitoring point k.

[0167] Step 740, based on the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time, the characteristic weights or assessment weights corresponding to the basic indicators of the comprehensive power quality indicators, and the preset power quality indicators, calculate the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time;

[0168] Specifically, first, consider the basic index σ of the preset power quality index for the comprehensive power quality index T The influence of the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation on σ T The influence of is recalculated, and the basic index e of the comprehensive power quality index is recalculated. The formula for calculating the basic index e of the comprehensive power quality index is as follows:

[0169]

[0170]

[0171]

[0172] Among them, A k is the minimum short-circuit capacity of monitoring point k, B k is the protocol power supply capacity of monitoring point k, C k is the subjective importance of the substation at monitoring point k. e1 is the minimum short-circuit capacity for σ T The impact of the recalculated comprehensive power quality index is the basic index; e2 is the impact of the power supply capacity of the agreement on σ T The influence of the substation on σ is the basic index of the recalculated comprehensive power quality index; e3 is the subjective importance of the substation to σ T The impact of recalculation is the basic index of comprehensive power quality index. n is the number of monitoring points in area A.

[0173] In an optional embodiment, after considering the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation, the characteristic weights w corresponding to the basic indicators e of the recalculated comprehensive power quality indicators are calculated. i Here, the feature weight w is calculated i The process is also to use the analytic hierarchy process and the scaling construction method to calculate the subjective weights of various power quality indicators; to use the entropy weight method to calculate the objective weights of various power quality indicators; for each power quality indicator, according to the subjective weights of the power quality indicators and the objective weights of the power quality indicators, calculate the characteristic weights of the power quality indicators. The specific process is not described here.

[0174] Then, based on the recalculated basic index e of the comprehensive power quality index and the characteristic weight w i , calculate the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within a unit time The specific calculation formula is shown in the figure below:

[0175]

[0176] Among them, w i The characteristic weights corresponding to the basic indicators e are calculated after considering the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation. i In order to consider the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation T The impact of the recalculated basic indicators of comprehensive power quality indicators.

[0177] In another optional embodiment, after calculating the basic index e of the recalculated comprehensive power quality index, the basic index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time can also be calculated in combination with the assessment weight. Among them, the assessment weights of various power quality indicators are the same. The specific calculation formula is shown in the figure below:

[0178]

[0179] Step 760, calculating the over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within a unit time.

[0180] Then calculate the over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time length, and return a set of data within the unit time length T. For multiple monitoring points in area A, the over-limit index of the power quality evaluation index is

[0181]

[0182] Among them, there are n monitoring points in area A. is the number of indicator violations at the kth monitoring point within the unit time T. The substation with the largest number of violations is selected to represent the violation situation in the area.

[0183] Step 780, based on the basic indicators in the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time length and the over-limit indicators in the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time length, calculate the comprehensive power quality evaluation indicators of each monitoring point in the preset monitoring area within the unit time length.

[0184] Finally, the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time can be used to calculate the power quality of each monitoring point in the preset monitoring area. The over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time Calculate the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area within a unit time

[0185]

[0186] In the embodiment of the present application, when the comprehensive power quality evaluation index of all monitoring points in the preset monitoring area is counted, the influence of the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation are considered to update the basic indicators in the comprehensive power quality evaluation index of the single measuring point. And when calculating the characteristic weights, the influence of the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation are also considered. Finally, based on the basic indicators, characteristic weights or assessment weights in the updated comprehensive power quality evaluation index of the single measuring point, and the over-limit indicators in the comprehensive power quality evaluation index of the single measuring point, the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area within a unit time length is calculated. Because the influence of the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation are considered in the calculation process, the accuracy of the evaluation of the power quality in the area can be improved through the comprehensive power quality evaluation index.

[0187] Continuing from the previous embodiment, after calculating the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area within a unit time length, the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area within a second preset time length can be further calculated, and the method includes:

[0188] First, within the second preset time period, the basic indicators of the comprehensive power quality evaluation indicators of each monitoring point in the preset monitoring area are calculated according to the unit time period;

[0189] Calculate the average value of the basic index in the comprehensive power quality evaluation index within the second preset time length, and generate the basic index in the comprehensive power quality evaluation index of the monitoring point within the second preset time length;

[0190] Within the second preset time period, calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point;

[0191] Based on the basic indicators in the comprehensive power quality evaluation indicators of the monitoring points and the over-limit indicators in the comprehensive power quality evaluation indicators of the monitoring points, the comprehensive power quality evaluation indicators of each monitoring point in the preset monitoring area within the second preset time period are calculated.

[0192] Specifically, first, the basic indicators of the regional comprehensive power quality evaluation index within the second preset time period (monitoring period d) are calculated, and the specific calculation formula is as follows:

[0193]

[0194] in, is the basic index of regional comprehensive power quality evaluation index in the nth unit time, T d Indicates the number of times data is returned within a unit time T in a day.

[0195] Secondly, within the second preset time (monitoring period d), the limit-crossing index in the regional comprehensive power quality evaluation index is calculated. Within the monitoring time d, the limit-crossing frequency ratio should be considered when calculating the limit-crossing index of the comprehensive power quality evaluation index of region A. Assume that within the monitoring time d, the collected For the i-th indicator, the limit-crossing ratio in this time period is for:

[0196]

[0197] in, is the total number of data monitored by n monitoring points in area A within the monitoring time d; It is the total number of times the ith power management indicator exceeds the limit at n monitoring points in area A within the monitoring time d.

[0198] For the i-th index, introduce the limit-crossing coefficient

[0199]

[0200] Taking all power quality indicators into consideration, the over-limit indicator

[0201]

[0202] In summary, within the monitoring time d, the comprehensive power quality evaluation index of area A is for:

[0203]

[0204] In an embodiment of the present application, when calculating the comprehensive power quality evaluation index of each monitoring point in a preset monitoring area within a second preset time length, first, within the second preset time length, the basic indexes in the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area are calculated according to the unit time length. Secondly, the average value of the basic indexes in the comprehensive power quality evaluation index within the second preset time length is calculated to generate the basic indexes in the comprehensive power quality evaluation index of the monitoring point within the second preset time length. Within the second preset time length, the over-limit indexes in the comprehensive power quality evaluation index of the monitoring point are calculated. Finally, based on the basic indexes in the comprehensive power quality evaluation index of the monitoring point and the over-limit indexes in the comprehensive power quality evaluation index of the monitoring point, the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area within the second preset time length is calculated.

[0205] The comprehensive power quality evaluation index calculated based on basic indicators and over-limit indicators can improve the accuracy of regional power quality evaluation.

[0206] In one embodiment, Figure 8 As shown, a power quality evaluation device 800 is provided, the device comprising:

[0207] The basic index and over-limit index calculation module 820 is used to calculate the basic index and over-limit index of each power quality index of each monitoring point for each monitoring point within a unit time; the basic index is used to indicate the power quality level of the power quality index, and the over-limit index is used to indicate whether the power quality index is over-limited; the unit time is the interval for collecting the power quality index of the monitoring point once;

[0208] The weight calculation module 840 is used to calculate the characteristic weight or assessment weight of each power quality indicator;

[0209] The comprehensive power quality evaluation index calculation module 860 is used to calculate the comprehensive power quality evaluation index of the monitoring point within a unit time based on the basic indicators and over-limit indicators of the power quality indicators, the characteristic weights or assessment weights of the power quality indicators for each power quality indicator of the monitoring point.

[0210] In one embodiment, Fig. 9 As shown, the basic index and over-limit index calculation module 820 also includes:

[0211] The power quality index acquisition unit 822 is used to acquire various power quality indicators of each monitoring point within a unit time period;

[0212] A basic index calculation unit 824, for calculating a basic index of the power quality index based on the power quality index and the average value of the power quality index within a first preset time period for each power quality index;

[0213] The over-limit index calculation unit 826 is used to determine the over-limit index of the power quality index according to the basic index of the power quality index.

[0214] In one embodiment, the comprehensive power quality evaluation index calculation module 860 includes:

[0215] A first basic indicator calculation unit is used to calculate the first basic indicator of the comprehensive power quality evaluation index of the monitoring point within a unit time length based on the basic indicators of the power quality indicators and the assessment weights of the power quality indicators for each power quality indicator of the monitoring point; the assessment weights of the power quality indicators are the same;

[0216] The first comprehensive power quality evaluation index calculation unit is used to calculate the first comprehensive power quality evaluation index of the monitoring point within the unit time length based on the first basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length and the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length.

[0217] In one embodiment, the weight calculation module 840 includes:

[0218] A subjective weight calculation unit is used to calculate the subjective weights of various power quality indicators using the analytic hierarchy process and the scaling construction method;

[0219] An objective weight calculation unit, used to calculate the objective weights of various power quality indicators using an entropy weight method;

[0220] The characteristic weight calculation unit is used to calculate the characteristic weight of the power quality indicator according to the subjective weight of the power quality indicator and the objective weight of the power quality indicator for each power quality indicator.

[0221] In one embodiment, the comprehensive power quality evaluation index calculation module 860 includes:

[0222] A second basic indicator calculation unit is used to calculate the second basic indicator of the comprehensive power quality evaluation index of the monitoring point within a unit time based on the basic indicators of the power quality indicators and the characteristic weights of the power quality indicators for each power quality indicator of the monitoring point;

[0223] The second comprehensive power quality evaluation index calculation unit is used to calculate the second comprehensive power quality evaluation index of the monitoring point within the unit time length based on the second basic index in the comprehensive power quality evaluation index of the monitoring point within the unit time length and the over-limit index in the comprehensive power quality evaluation index of the monitoring point within the unit time length.

[0224] In one embodiment, a power quality evaluation device is provided, which is used to calculate basic indicators in the comprehensive power quality evaluation index of the monitoring point according to unit time within a second preset time; calculate the average value of the basic indicators in the comprehensive power quality evaluation index within the second preset time to generate the basic indicators in the comprehensive power quality evaluation index of the monitoring point within the second preset time; calculate the over-limit indicators in the comprehensive power quality evaluation index of the monitoring point within the second preset time; calculate the comprehensive power quality evaluation index of the monitoring point within the second preset time based on the basic indicators in the comprehensive power quality evaluation index of the monitoring point and the over-limit indicators in the comprehensive power quality evaluation index of the monitoring point.

[0225] In one embodiment, a preset monitoring area includes a plurality of monitoring points, and a power quality evaluation device is provided, which is also used to calculate the power quality index of each monitoring point in the preset monitoring area within a unit time length, and calculate the preset power quality index of each monitoring point in the preset monitoring area; the preset power quality index includes the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation;

[0226] Based on the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time, the characteristic weights or assessment weights corresponding to the basic indicators of the comprehensive power quality indicators, and the preset power quality indicators, the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within the unit time are calculated;

[0227] Calculate the over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within a unit time;

[0228] Based on the basic indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within unit time and the over-limit indicators of the comprehensive power quality indicators of each monitoring point in the preset monitoring area within unit time, the comprehensive power quality evaluation indicators of each monitoring point in the preset monitoring area within unit time are calculated.

[0229] The division of the various modules in the above-mentioned power quality evaluation device is only for illustration. In other embodiments, the power quality evaluation device can be divided into different modules as needed to complete all or part of the functions of the above-mentioned power quality evaluation device.

[0230] Fig.10 FIG. 1 is a schematic diagram of the internal structure of a server in an embodiment. Fig.10 As shown, the server includes a processor and a memory connected via a system bus. The processor is used to provide computing and control capabilities to support the operation of the entire server. The memory may include a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The computer program can be executed by the processor to implement a power quality evaluation method provided in each of the following embodiments. The internal memory provides a cached operating environment for the operating system computer program in the non-volatile storage medium. The server can be a mobile phone, a tablet computer, a personal digital assistant, a wearable device, etc.

[0231] The implementation of each module in the power quality evaluation device provided in the embodiment of the present application may be in the form of a computer program. The computer program may be run on a terminal or a server. The program modules constituted by the computer program may be stored in the memory of the terminal or the server. When the computer program is executed by the processor, the steps of the method described in the embodiment of the present application are implemented.

[0232] The embodiment of the present application also provides a computer-readable storage medium, which is one or more non-volatile computer-readable storage media containing computer-executable instructions, and when the computer-executable instructions are executed by one or more processors, the processors execute the steps of the power quality evaluation method.

[0233] A computer program product comprising instructions, when the computer program product is run on a computer, enables the computer to perform a power quality evaluation method.

[0234] Any reference to memory, storage, database or other media used in the embodiments of the present application may include non-volatile and / or volatile memory. Suitable non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM), which is used as an external cache memory. As an illustration and not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM) and memory bus dynamic RAM (RDRAM).

[0235] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for evaluating power quality, characterized in that: The method comprises: For each monitoring point within a unit time, the basic index and the over-limit index of each power quality index of the monitoring point are calculated; the basic index is used to indicate the power quality level of the power quality index, and the over-limit index is used to indicate whether the power quality index exceeds the limit; the unit time is the time interval for collecting the power quality index of the monitoring point once; The basic indicator a i The expression is: is the average value of the measured value of the ith power quality indicator in the monitoring period T, L i is the limit value of the corresponding i-th power quality indicator; The limit-crossing indicator b i The expression is: Calculate the characteristic weights or assessment weights of the various power quality indicators; the characteristic weights are calculated based on the characteristics of multiple electrical parameters in different regions, based on a method combining subjective weights and objective weights; the assessment weights are given the same weight to each power quality indicator, which is suitable for situations where it is difficult to calculate reasonable and accurate characteristic weights at certain monitoring points in the power grid; For each power quality index of the monitoring point, based on the basic index and over-limit index of the power quality index, and the characteristic weight or assessment weight of the power quality index, calculate the comprehensive power quality evaluation index of the monitoring point within the unit time; The comprehensive power quality evaluation index of all monitoring points in the preset monitoring area is counted; the preset monitoring area includes multiple monitoring points; the power quality index of each monitoring point in the preset monitoring area within the unit time is calculated, and the preset power quality index of each monitoring point in the preset monitoring area is calculated; the preset power quality index includes the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation; based on the basic index of each power quality index of each monitoring point in the preset monitoring area within the unit time, the characteristic weight or assessment weight corresponding to the basic index of each power quality index, and the preset power quality index, the third basic index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time is calculated; the over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time is calculated; based on the third basic index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time and the over-limit index of the comprehensive power quality index of each monitoring point in the preset monitoring area within the unit time, the third comprehensive power quality evaluation index of each monitoring point in the preset monitoring area within the unit time is calculated.

2. The method according to claim 1, characterized in that: The calculation of the basic index and over-limit index of each power quality index of each monitoring point within the unit time includes: Obtain various power quality indicators of each monitoring point within a unit time period; For each of the power quality indicators, based on the power quality indicator and the average value of the power quality indicator within a first preset time period, calculate a basic indicator of the power quality indicator; An over-limit indicator of the power quality indicator is determined according to a basic indicator of the power quality indicator.

3. The method according to claim 1 or 2, characterized in that: The comprehensive power quality evaluation index of the monitoring point within the unit time is calculated based on the basic index and over-limit index of the power quality index, the characteristic weight or assessment weight of the power quality index for each power quality index of the monitoring point, including: For each power quality indicator of the monitoring point, based on the basic indicator of the power quality indicator and the assessment weight of the power quality indicator, calculate the first basic indicator of the comprehensive power quality evaluation indicator of the monitoring point within the unit time; the assessment weight of each power quality indicator is the same; Based on the first basic indicator among the comprehensive power quality evaluation indicators of the monitoring point within the unit time length and the over-limit indicator among the comprehensive power quality evaluation indicators of the monitoring point within the unit time length, the first comprehensive power quality evaluation indicator of the monitoring point within the unit time length is calculated.

4. The method according to claim 1, characterized in that The calculation of the characteristic weights of the various power quality indicators includes: The subjective weights of the various power quality indicators are calculated using the analytic hierarchy process and the scaling construction method; The objective weights of the various power quality indicators are calculated using the entropy weight method; For each of the power quality indicators, the characteristic weight of the power quality indicator is calculated according to the subjective weight of the power quality indicator and the objective weight of the power quality indicator.

5. The method according to claim 1 or 4, characterized in that: The comprehensive power quality evaluation index of the monitoring point within the unit time is calculated based on the basic index and over-limit index of the power quality index, the characteristic weight or assessment weight of the power quality index for each power quality index of the monitoring point, including: For each power quality index of the monitoring point, based on the basic index of the power quality index and the characteristic weight of the power quality index, calculate the second basic index of the comprehensive power quality evaluation index of the monitoring point within the unit time; Based on the second basic indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time length and the over-limit indicator of the comprehensive power quality evaluation index of the monitoring point within the unit time length, the second comprehensive power quality evaluation index of the monitoring point within the unit time length is calculated.

6. The method according to claim 1, characterized in that The method further comprises: Within the second preset time length, calculating the basic indicators of the comprehensive power quality evaluation indicators of the monitoring point according to the unit time length; Calculate the average value of the basic index in the comprehensive power quality evaluation index within the second preset time length, and generate the basic index in the comprehensive power quality evaluation index of the monitoring point within the second preset time length; Within the second preset time period, calculating the over-limit index in the comprehensive power quality evaluation index of the monitoring point; Based on the basic indicators in the comprehensive power quality evaluation indicators of the monitoring point and the over-limit indicators in the comprehensive power quality evaluation indicators of the monitoring point, the comprehensive power quality evaluation indicators of the monitoring point within the second preset time period are calculated.

7. A power quality evaluation device, characterized in that: The device comprises: A basic index and over-limit index calculation module is used to calculate the basic index and over-limit index of each power quality index of each monitoring point for each monitoring point within a unit time; the basic index is used to indicate the power quality level of the power quality index, and the over-limit index is used to indicate whether the power quality index exceeds the limit; the unit time is the interval for collecting the power quality index of the monitoring point once; The basic indicator a i The expression is: is the average value of the measured value of the ith power quality indicator in the monitoring period T, L i is the limit value of the corresponding i-th power quality indicator; The limit-crossing indicator b i The expression is: A weight calculation module is used to calculate the characteristic weights or assessment weights of the various power quality indicators; the characteristic weights are calculated based on the characteristics of multiple electrical parameters in different regions, based on a method combining subjective weights and objective weights; the assessment weights are equal weights given to each power quality indicator, which is suitable for situations where it is difficult to calculate reasonable and accurate characteristic weights at certain monitoring points in the power grid; A comprehensive power quality evaluation index calculation module is used to calculate the comprehensive power quality evaluation index of the monitoring point within the unit time length for each power quality index of the monitoring point based on the basic index and over-limit index of the power quality index, the characteristic weight or assessment weight of the power quality index; to count the comprehensive power quality evaluation index of all monitoring points in a preset monitoring area; the preset monitoring area includes multiple monitoring points; calculate the power quality index of each monitoring point in the preset monitoring area within the unit time length, and calculate the preset power quality index of each monitoring point in the preset monitoring area; the preset power quality index includes the minimum short-circuit capacity, the agreed power supply capacity, and the subjective importance of the substation; based on the comprehensive power quality evaluation index of each monitoring point in the preset monitoring area in the unit time length According to the basic indicators of each power quality indicator within the unit time length, the characteristic weights or assessment weights corresponding to the basic indicators of each power quality indicator and the preset power quality indicator, calculate the third basic indicator of the comprehensive power quality indicator of each monitoring point in the preset monitoring area within the unit time length; calculate the over-limit indicator of the comprehensive power quality indicator of each monitoring point in the preset monitoring area within the unit time length; based on the third basic indicator of the comprehensive power quality indicator of each monitoring point in the preset monitoring area within the unit time length and the over-limit indicator of the comprehensive power quality indicator of each monitoring point in the preset monitoring area within the unit time length, calculate the third comprehensive power quality evaluation indicator of each monitoring point in the preset monitoring area within the unit time length.

8. The device according to claim 7, characterized in that The basic index and over-limit index calculation module also includes: A power quality index acquisition unit, used for acquiring various power quality indicators of each monitoring point within a unit time period; A basic index calculation unit, configured to calculate a basic index of the power quality index based on the power quality index and an average value of the power quality index within a first preset time period for each of the power quality indicators; The over-limit index calculation unit is used to determine the over-limit index of the power quality index according to the basic index of the power quality index.

9. A server comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the computer program is executed by the processor, the processor is caused to perform the steps of the power quality evaluation method according to any one of claims 1 to 6.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the power quality evaluation method according to any one of claims 1 to 6 are implemented.