A transmission line construction decision-making method for power grid companies under spot market environment
By optimizing the construction of transmission lines based on market clearance and DC trend models in the spot market environment, the problem of unreasonable allocation of power resources in traditional methods is solved, and the rational construction of transmission lines and efficient utilization of power resources is achieved.
Patent Information
- Application Number
- CN202111111158.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-09-23
AI Technical Summary
Traditional power transmission line construction decision-making methods cannot detect line blockages in a timely manner in the spot market environment, resulting in unreasonable allocation of power resources, inefficient efficiency, and may lead to waste of resources.
Based on the operating status of each unit after the market is cleared, the location and number of transmission lines are analyzed and the location and quantity of transmission lines are decided, and by building a DC current model as a transmission network planning model, the operating status of the transmission network is optimized, the number of new lines and unit operating conditions are limited, and the number of new lines and unit operating conditions are ensured. Rationality of line capacity and voltage phase angle.
Effectively reduce transmission line blockage, optimize power resource allocation, improve grid operation efficiency, and avoid resource waste.
Smart Images

Figure CN113869693B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of electrical engineering, and more specifically, relates to a transmission line construction decision-making method of a power grid company in a spot market environment. Background Art
[0002] The traditional decision-making method for transmission line construction is committed to improving power supply reliability to ensure stable power supply for users. However, on the one hand, this decision-making method cannot detect line blockage in time, resulting in unreasonable allocation of power resources and inefficient operation of the power system; on the other hand, it is easy to lead to excessive construction of transmission lines, and the capacity utilization rate of some transmission lines is not high, resulting in a huge waste of resources. With the gradual implementation of spot market reform in my country, the contradiction between the traditional decision-making method for transmission line construction and the market environment has become increasingly prominent. Therefore, it is urgent to establish a transmission line construction decision-making method that is compatible with the spot market environment to reduce transmission line blockage and optimize the allocation of power resources. Summary of the invention
[0003] In view of the defects of the prior art, the purpose of the present invention is to provide a transmission line construction decision-making method for a power grid company in a spot market environment, aiming to solve the problem that the transmission line construction decision-making scheme of the power grid company in the prior art does not match the spot market environment.
[0004] In order to achieve the above object, the present invention provides a transmission line construction decision-making method for a power grid company in a spot market environment, comprising:
[0005] Based on the operating status of each unit after market clearing, analyze and decide the location and quantity of transmission line construction;
[0006] Market clearing is performed according to the line construction situation to obtain the corresponding unit operation status; the unit operation status includes the start and stop status, output and load loss of each unit;
[0007] Based on the operating status of the units, a DC power flow model is constructed as a transmission network planning model to represent the operating status of the transmission network.
[0008] Among them, the location and number of transmission line construction are determined by formula (1);
[0009]
[0010] Where l is the transmission corridor number; x l is the number of new lines in the transmission corridor l, which is an integer; C l is the construction cost of a line in the transmission corridor l; i is the generator group number; t is the time period number; m is the quotation period number; C i,t,m is the price quoted by unit i in the mth period of time t; P i,t,mis the winning power of unit i in the mth bid during period t; is the startup cost of unit i in period t; d is the load number; penalty is the penalty factor for load loss; LL d,t is the load loss size of load d in time period t.
[0011] Among them, due to objective conditions such as environmental protection or physical space, the number of new lines is also limited:
[0012]
[0013] in An upper limit on the number of new lines to be built for transmission corridor l.
[0014] The unit operation status includes the start and stop status, output and load loss formula of each unit:
[0015]
[0016] The output power of the unit has upper and lower limits when it is turned on, and the unit output is 0 when it is turned off:
[0017]
[0018] where α i,t is the start / stop status of unit i in period t, 1 means start, 0 means stop; are the minimum and maximum power of unit i in time period t respectively.
[0019] Among them, for the safe operation of the unit, the climbing rate of the unit is also limited, that is, the difference in the output power of the unit at two moments before and after has an upper limit:
[0020]
[0021] Where ΔP i U ,ΔP i D are the maximum up and down climbing rates of unit i, respectively.
[0022] Among them, due to the physical properties of thermal power units and actual operation needs, thermal power units are required to meet the minimum continuous start / stop time:
[0023]
[0024] Where T U 、T D The minimum continuous start time and minimum continuous shutdown time of the unit; are the time that unit i has been continuously started and stopped in time period t, respectively, which can be expressed by the state variable αi,t (i=1~N, t=1~T) to express:
[0025]
[0026] The total output of the unit is the sum of the outputs of each quotation range:
[0027]
[0028] in They are respectively the upper and lower bounds of the mth output range declared by unit i.
[0029] Among them, the DC power flow model formula is expressed as:
[0030] f l,t =B l (θ ns(l),t -θ nr(l),t ) (25)
[0031] -M l ·(1-X l )≤Nf l,t -x l ·B l (θ ns(l),t -θ nr(l),t )≤M l ·(1-X l ) (26)
[0032] Constraint (9) is the DC power flow model of the existing line, and constraint (10) is the DC power flow model of the new line. l,t is the power flow of line l in period t; B l is the admittance of line l; θ ns(l),t is the voltage phase angle of the sending node of line l in period t; θ nr(l),t Nf is the voltage phase angle of the receiving node of line l in period t; l,t is the power flow on the newly built line l; M l is a large number, which relaxes the constraint;
[0033] The power flow of a line is limited by the line capacity:
[0034] -f l max ≤f l ≤f l max (27)
[0035] -Nf l max ·X l ≤Nf l ≤Nf lmax ·X l (28)
[0036] where f l max is the capacity of line l; Nf l max is the capacity of the new line l;
[0037] The voltage phase angle of each node has a limited range:
[0038] -θ max ≤θ n ≤θ max (29)
[0039] where θ n is the voltage phase angle of node n; θ max is the maximum value of the voltage phase angle, which is 180°;
[0040] The voltage phase angle of the relaxed node is 0:
[0041] θ slack =0 (30)
[0042] Each node in the system must meet power balance:
[0043]
[0044] Among them G n is the set of all generators at node n; L|nr(l)=n is the set of all lines with node n as the receiving end; L|ns(l)=n is the set of all lines with node n as the sending end; D n is the set of all loads at node n.
[0045] Among them, the spare capacity is set to prevent emergencies and ensure safe and reliable operation; the spare capacity formula is expressed as:
[0046]
[0047] Where R D The percentage of spare.
[0048] Compared with the prior art, the present invention provides a decision-making method for power grid companies to build transmission lines in a spot market environment. The decision-making method consists of two parts. The first part analyzes and decides the location and quantity of transmission line construction based on the operating status of each unit after market clearing. The second part performs market clearing according to the line construction situation of the first part and transmits the corresponding unit operating status to the first part. The present invention can effectively assist power grid companies in decision-making analysis of transmission line construction in a spot market environment, which is conducive to reducing transmission line congestion and optimizing the allocation of power resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 A flow chart of a method for decision-making in transmission line construction of a power grid company in a spot market environment provided by the present invention.
[0050] Figure 2 A logical schematic diagram of a transmission line construction decision-making method for a power grid company in a spot market environment provided by the present invention. DETAILED DESCRIPTION
[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0052] like Figure 1 and Figure 2 As shown; the present invention provides a transmission line construction decision-making method for a power grid company in a spot market environment, comprising:
[0053] Based on the operating status of each unit after market clearing, analyze and decide the location and quantity of transmission line construction;
[0054] Market clearing is performed according to the line construction situation to obtain the corresponding unit operation status; the unit operation status includes the start and stop status, output and load loss of each unit;
[0055] Based on the operating status of the units, a DC power flow model is constructed as a transmission network planning model to represent the operating status of the transmission network.
[0056] The first part analyzes the operating status of each unit after market clearing and decides on the location and quantity of transmission line construction: the location and quantity of transmission line construction are determined by formula (1);
[0057]
[0058] Where l is the transmission corridor number; x l is the number of new lines in the transmission corridor l, which is an integer; C l is the construction cost of a line in the transmission corridor l; i is the generator group number; t is the time period number; m is the quotation period number; C i,t,m is the price quoted by unit i in the mth period of time t; P i,t,m is the winning power of unit i in the mth bid during period t; is the startup cost of unit i in period t; d is the load number; penalty is the penalty factor for load loss; LL d,t is the load loss size of load d in time period t.
[0059] Among them, due to objective conditions such as environmental protection or physical space, the number of new lines is also limited:
[0060]
[0061] in An upper limit on the number of new lines to be built for transmission corridor l.
[0062] The second part clears the market according to the line construction situation in the first part and obtains the corresponding unit operation status. The unit operation status includes the start and stop status, output and load loss formula of each unit:
[0063]
[0064] The output power of the unit has upper and lower limits when it is turned on, and the unit output is 0 when it is turned off:
[0065]
[0066] where α i,t is the start / stop status of unit i in period t, 1 means start, 0 means stop; are the minimum and maximum power of unit i in time period t respectively.
[0067] Among them, for the safe operation of the unit, the climbing rate of the unit is also limited, that is, the difference in the output power of the unit at two moments before and after has an upper limit:
[0068]
[0069] Where ΔP i U ,ΔP i D are the maximum up and down climbing rates of unit i, respectively.
[0070] Among them, due to the physical properties of thermal power units and actual operation needs, thermal power units are required to meet the minimum continuous start / stop time:
[0071]
[0072] Where T U 、T D The minimum continuous start time and minimum continuous shutdown time of the unit; are the time that unit i has been continuously started and stopped in time period t, respectively, which can be expressed by the state variable αi,t (i=1~N, t=1~T) to express:
[0073]
[0074] The total output of the unit is the sum of the outputs of each quotation range:
[0075]
[0076] in They are respectively the upper and lower bounds of the mth output range declared by unit i.
[0077] Among them, the DC power flow model formula is expressed as:
[0078] f l,t =B l (θ ns(l),t -θ nr(l),t ) (41)
[0079] -M l ·(1-X l )≤Nf l,t -x l ·B l (θ ns(l),t -θ nr(l),t )≤M l ·(1-X l ) (42)
[0080] Constraint (9) is the DC power flow model of the existing line, and constraint (10) is the DC power flow model of the new line. l,t is the power flow of line l in period t; B l is the admittance of line l; θ ns(l),t is the voltage phase angle of the sending node of line l in period t; θ nr(l),t Nf is the voltage phase angle of the receiving node of line l in period t; l,t is the power flow on the newly built line l; M l is a large number, which relaxes the constraint;
[0081] The power flow of a line is limited by the line capacity:
[0082] -f l max ≤f l ≤f l max (43)
[0083] -Nf l max ·X l ≤Nf l ≤Nf lmax ·X l (44)
[0084] where f l max is the capacity of line l; Nf l max is the capacity of the new line l;
[0085] The voltage phase angle of each node has a limited range:
[0086] -θ max ≤θ n ≤θ max (45)
[0087] where θ n is the voltage phase angle of node n; θ max is the maximum value of the voltage phase angle, which is 180°;
[0088] The voltage phase angle of the relaxed node is 0:
[0089] θ slack =0 (46)
[0090] Each node in the system must meet power balance:
[0091]
[0092] Among them G n is the set of all generators at node n; L|nr(l)=n is the set of all lines with node n as the receiving end; L|ns(l)=n is the set of all lines with node n as the sending end; D n is the set of all loads at node n.
[0093] Among them, the spare capacity is set to prevent emergencies and ensure safe and reliable operation; the spare capacity formula is expressed as:
[0094]
[0095] Where R D The percentage of spare.
[0096] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined in the present invention may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown in the present invention, but will conform to the widest scope consistent with the principles and novel features disclosed in the present invention.
Claims
1. A transmission line construction decision-making method for a power grid company in a spot market environment, characterized in that: include: Based on the operating status of each unit after market clearing, analyze and decide the location and quantity of transmission line construction; Market clearing is performed according to the line construction situation to obtain the corresponding unit operation status; the unit operation status includes the start and stop status, output and load loss of each unit; Based on the operating status of the units, a DC power flow model is constructed as a transmission network planning model to represent the operating status of the transmission network; The location and number of transmission line construction are determined by formula (1); (1) in l Numbering transmission corridors; x l Transmission Corridor l The number of newly created lines in is an integer; C l Transmission Corridor l The construction cost of one of the lines; i Number the generator set; t Number the time period; m Number the quotation segment; C i,t,m For the crew i In the period t No. m Segment quotation; P i,t,m For the crew i In the period t In the m The power of the winning bid in the segment quotation; For the crew i In the period t Start-up costs; d Number the load; penalty is the penalty factor for load loss; LL d,t For load d In the period t The size of the lost load; The unit operating status includes the start and stop status, output and load loss of each unit. The formula is: (2) The output power of the unit has upper and lower limits when it is turned on, and the unit output is 0 when it is turned off: (3) in α i,t For the crew i In the period t The start and stop status, 1 is on, 0 is off; For each unit i In the period t The minimum and maximum power; The DC power flow model formula is expressed as: (4) (5) Constraint (4) is the DC power flow model of the existing line, and constraint (5) is the DC power flow model of the new line. For line l In the period t The power flow of B l For line l The admittance of For line l In the period t The voltage phase angle of the sending node; For line l In the period t The voltage phase angle at the receiving node; For new lines l Power flow on is a number used to relax the constraint; The power flow of a line is limited by the line capacity: (6) (7) in For line l Capacity; For new lines l Capacity; The voltage phase angle of each node has a range limit: (8) in For Node n The voltage phase angle; is the maximum value of the voltage phase angle, which is 180°; The voltage phase angle of the relaxed node is 0: (9) Each node in the model must satisfy power balance: (10) in For Node n The collection of all generators on the premises; Is the node n is the set of all lines at the receiving end; Is the node n is the set of all lines at the sending end; For Node n The collection of all loads at a location.
2. The power transmission line construction decision-making method of a power grid company under a spot market environment according to claim 1, characterized in that: The number of new lines is also limited due to environmental protection or physical space: (11) in Transmission Corridor l The upper limit of the number of new lines to be created.
3. The power transmission line construction decision-making method of a power grid company under a spot market environment according to claim 1, characterized in that: For the safe operation of the unit, the climbing rate of the unit is also limited, that is, the difference in the output power of the unit at two moments before and after has an upper limit: (12) in For each unit i The maximum up and down climbing rate.
4. The power transmission line construction decision-making method of a power grid company under a spot market environment according to claim 1, characterized in that: Due to the physical properties of thermal power units and actual operating requirements, thermal power units are required to meet the minimum continuous start / stop time: (13) in T U , T D The minimum continuous start time and minimum continuous shutdown time of the unit; For each unit i In the period t The time of continuous startup and shutdown is calculated using the state variable To express: (14) The total output of the unit is the sum of the outputs of each quotation range: (15) in , For each unit i The report m The upper and lower bounds of an output range.
5. The power transmission line construction decision-making method of a power grid company under a spot market environment according to claim 1, characterized in that: Set up spare capacity to prevent emergencies and ensure safe and reliable operation; the spare capacity formula is: (16) in The percentage of spare.