An assembled emergency combined bridge
Through modular design and simple structure, the prefabricated emergency combination bridge uses I-beams, square tubes, steel plates and other general profiles for on-site welding and assembly, which solves the problems of insufficient reserves and complicated installation of prefabricated bridges in the emergency repair of small and medium-span bridges. It achieves rapid and economical bridge erection and meets the emergency support needs of small and medium-span bridges.
Patent Information
- Application Number
- CN202111422043.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-26
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-11-26
Smart Images

Figure CN114016379B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rapid construction and erection of emergency bridges, and in particular to an assembled emergency combined bridge. Background Art
[0002] With the development of national economy and transportation, the number of highway bridges with small and medium spans is increasing. Once a large-scale natural disaster occurs, it will inevitably become a major factor affecting transportation. Building temporary emergency passages and quickly erecting emergency bridges will become an important research and development topic at present and in the future.
[0003] At present, the common method is to use the reserved prefabricated highway steel bridges. Prefabricated highway steel bridges are special equipment, composed of trusses, beams and connectors. The equipment has many components and requires a large amount of manpower to carry and install. The installation and erection personnel must also have professional technical capabilities. In order to meet the needs of bridge repair, the country reserves special bridge repair equipment, but for the increasing number of small and medium-span bridges, there are still some problems that need to be solved: first, the reserve quantity cannot meet the actual needs, especially for remote mountainous areas, it is difficult to be fast and efficient; second, the long-term reserve is not economical, which brings a heavy burden to the country; third, the natural disaster situation is complicated, and the pertinence of the reserve bridges may not meet the needs of the site. Therefore, it is of great practical significance and socio-economic value to propose an economical, practical and easy-to-erect steel assembly emergency steel bridge. Summary of the invention
[0004] In order to solve the related problems involved in the background technology, the purpose of the present invention is to provide an assembled emergency composite bridge suitable for small and medium spans and a method for erecting the same, which adopts a modular design, has a simple structure, is easy to process, and is easy to assemble quickly on site.
[0005] The present invention adopts the following technical scheme: an assembled emergency composite bridge, including a main beam structure, the main beam structure has a main beam frame and a plurality of supporting structures, the main beam frame includes a plurality of parallel I-beams, the upper wing plates of the I-beams are provided with a plurality of fixed blocks at intervals, the web plates of the I-beams are provided with a plurality of transverse connecting holes at intervals; the supporting structure includes a cross brace, a threaded steel bar and an anchor, the cross brace is provided on the lower wing plates of the I-beams and is vertically distributed with the I-beams, the ends of the cross brace are aligned with the transverse connecting holes, the threaded steel bar passes through the cross brace through the transverse connecting holes, and the anchors are provided at both ends of the threaded steel bar; A plurality of bridge deck structures are arranged above the main beam structure, including a bridge deck steel plate, and two transverse square steels and two longitudinal square steels located at the bottom of the bridge deck steel plate, the transverse square steels are vertically distributed with the longitudinal square steels, and are engaged with the fixed stopper; the bridgehead plates located at both ends of the bridge deck structure include a bridgehead steel plate, a plurality of reinforcing tubes, a connecting tube and a plurality of connecting pins, a plurality of the reinforcing tubes are longitudinally distributed on the bottom surface of the bridgehead steel plate, the connecting tubes are transversely arranged at the front end of the bottom surface of the bridgehead steel plate, a plurality of the connecting pins are located on the side walls of the connecting tubes and are spaced apart along the axial direction thereof, and the connecting pins are engaged with the pin holes arranged on the side surfaces of the bridge deck steel plate.
[0006] As an optimization solution, it also includes a guardrail structure located on both sides above the bridge deck structure, the guardrail structure includes a plurality of vertical poles and a protective rope, the plurality of vertical poles are arranged in a straight line and are spaced apart on the bridge deck steel plate, a through hole is provided at the upper end of each vertical pole, the protective rope passes through the through hole and is connected between the vertical poles.
[0007] As an optimization solution, except for the two fixed blocks located at the head and tail ends which are T-shaped three-way structures, the remaining fixed blocks are cross-shaped four-way structures. Each port of the three-way structure and the four-way structure is provided with an opening, and the transverse square steel and the longitudinal square steel can be clamped in the opening.
[0008] As an optimization solution, the connecting pin is in an L-shaped structure.
[0009] The present invention also provides a method for erecting an assembled emergency combined bridge, comprising the following steps:
[0010] According to the span of the bridge to be repaired and the load of passing vehicles, determine the main parameters of the main beam structure, bridge deck structure, and bridgehead slab, determine the specifications and detailed dimensions of the required I-beams, square tubes, and steel plates, and perform preliminary processing such as cutting and grinding on various profiles according to the designed dimensions. After processing, classify and bundle them and hoist them onto transport vehicles for delivery to the repair construction site;
[0011] Near the location where the emergency combined bridge is to be erected, use excavators and other engineering machinery to level the site where the installation is to be carried out, and reinforce the foundation where the emergency combined bridge is to be located;
[0012] Check the performance of various machining equipment, prepare all steel equipment for unloading, and arrange the processing site;
[0013] Align the two ends of the I-beam required for the main beam structure, weld and connect them in sequence to form a single-sided main beam, weld the fixed block on the upper wing plate of the single-sided main beam, drill the transverse connection hole on the web plate of the single-sided main beam, and complete the processing of all single-sided main beams in the same way;
[0014] Place the cross brace between the multiple single-sided main beams, align the end of the cross brace with the transverse connection hole, weld the cross brace firmly to each single-sided main beam, and weld multiple cross braces in sequence in the same way. After the cross brace welding is completed, insert the threaded steel bar into the transverse connection hole, connect the two ends of the threaded steel bar with anchors, and after all the installation is completed, anchor and pre-tighten them in sequence to complete the assembly of the entire main beam structure;
[0015] By means of a large-tonnage crane, the assembled main beam structure is hoisted, and the two ends of the main beam structure are placed at the preset bridge seat positions on both sides, so that the main beam structure is placed in place;
[0016] Two transverse square steels and a longitudinal square steel are welded at the bottom of the bridge deck steel plate, and the welded bridge deck steel plate is hoisted to the top of the main beam structure, fixed with buckles, and then positioned and welded, and the bridge deck installation is completed in sequence;
[0017] A plurality of longitudinally arranged reinforcing tubes are welded at the bottom of the bridge head steel plate, a connecting tube perpendicular to the plurality of reinforcing tubes is welded at the bottom of the bridge head steel plate, and a plurality of L-shaped connecting pins are welded on the side wall of the connecting tube, and the bridge head bridgehead cladding is hoisted and transported so that the connecting pins are inserted into the pin holes on the side of the bridge deck steel plate;
[0018] Vertical poles are welded on the bridge deck steel plate, and protective ropes are inserted between the vertical poles.
[0019] Compared with the prior art, the advantages of the present invention are:
[0020] The present invention adopts on-site steel assembly, selects general profiles such as I-beams, square tubes, and steel plates, adopts modular design, has a simple structure, is easy to process, and is easy to weld and assemble on site. The emergency steel bridge can be welded, assembled, and erected on site with a small amount of manpower and mechanical equipment, reducing personnel support requirements, improving installation and erection efficiency, and can better meet the emergency support requirements of small and medium span bridges.
[0021] The steel material used in the present invention is easy to purchase on the market, which is different from the prefabricated steel bridge that needs to be produced and stored in advance. The significant feature is that it does not require early reserves and daily maintenance, reduces manpower and capital investment, and has good economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of an embodiment of an assembled emergency combined bridge of the present invention;
[0023] Figure 2 It is a schematic diagram of a single side structure of an embodiment of an assembled emergency composite bridge main beam frame of the present invention;
[0024] Figure 3 It is a structural schematic diagram of an embodiment of an assembled emergency composite bridge main beam structure of the present invention;
[0025] Figure 4 It is a structural schematic diagram of an embodiment of an assembled emergency combined bridge deck structure of the present invention;
[0026] Figure 5 It is a structural schematic diagram of an embodiment of an assembled emergency combined bridge head slab of the present invention;
[0027] Figure 6 It is a structural schematic diagram of an embodiment of an assembled emergency combined bridge guardrail structure of the present invention;
[0028] Among them, 1-main beam frame, 2-bridge deck structure, 3-support structure, 4-bridge head slab, 5-guardrail structure,
[0029] 101-I-beam, 102-transverse connection hole, 103-fixed stopper,
[0030] 201-bridge steel plate, 202-transverse square steel, 203-longitudinal square steel,
[0031] 301-cross brace, 302-rebar, 303-anchor,
[0032] 401-bridge steel plate, 402-reinforcement pipe, 403-connecting pipe, 404-connecting pin,
[0033] 501-pole, 502-protective rope. DETAILED DESCRIPTION
[0034] In order to facilitate those skilled in the art to understand the technical solution of the present invention, further description will be given below with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention.
[0035] In the following detailed description, for ease of explanation, many specific details are set forth to provide a comprehensive understanding of embodiments of the present invention. However, it is apparent that one or more embodiments may be implemented without these specific details. In addition, in the following description, descriptions of known structures and techniques are omitted to avoid unnecessary confusion of concepts of the present invention.
[0036] See also Figure 1 , is a structural schematic diagram of an embodiment of an assembled emergency composite bridge of the present invention, including a main beam structure, a plurality of bridge deck structures 2, a bridgehead slab 4 and a guardrail structure 5, wherein the main beam structure includes a main beam frame 1 and a plurality of support structures 3. The emergency composite bridge of the present invention can withstand a wheel load of 13t, the bridge length does not exceed 24m, the bridge width is 5m, and it meets the requirements of highway, railway and waterway transportation of small and medium spans. The main beam structure is the main load-bearing component of the emergency composite steel bridge, and the main beam frame 1 is arranged longitudinally along the entire bridge. The bridge deck structure 2 directly bears the load of passing vehicles and transfers the load to the main beam structure. The bridge deck structure 2 is mainly made of square tubes and steel plates processed and welded on site, and is directly erected above the main beam frame 1 and welded and fixed. The support structure 3 is to connect the main beam frame 1 as a whole to form a main force-bearing frame and provide lateral stiffness, and is mainly composed of square tubes, threaded steel and anchors. The bridgehead slab 4 is directly connected to both ends of the steel bridge to provide a ramp for vehicles to get on and off the steel bridge. Guardrail structures 5 are arranged on both sides above the bridge deck structure 2 to protect passers-by.
[0037] See also Figure 2 , is a schematic diagram of the unilateral structure of the embodiment of the assembled emergency composite bridge main beam frame of the present invention. In this embodiment, the main beam frame 1 adopts I-beam 101, and the specific model and arrangement spacing can be determined according to the span of the highway bridge to be built and the load of the passing vehicles. In order to quickly connect the bridge deck structure 2 with the main beam frame 1, a fixed stopper 103 is set on the upper flange of the I-beam of the main beam frame 1. In order to penetrate the transversely connected threaded steel, transverse connecting holes 102 with fixed spacing are set on the web of the main beam frame 1. In this embodiment, except for the two fixed stops 104 at the head and tail ends, which are T-shaped three-way structures, the remaining fixed stops 103 are all cross-shaped four-way structures. An opening is set at each port of the three-way structure and the four-way structure, and the transverse square steel and the longitudinal square steel can be just clamped in the opening. The fixed stopper 103 can limit the transverse square steel 202 and the longitudinal tube 203 of the bridge deck structure 2, which is convenient for limiting during the assembly process. The fixed blocks 103 use the same longitudinal and transverse spacing to facilitate the machining and assembly of the transverse square steels 202 and the longitudinal tubes 203 in the bridge deck.
[0038] See also Figure 3, is a structural schematic diagram of an embodiment of the assembled emergency composite bridge main beam structure of the present invention. The support structure 3 includes a cross brace 301, a threaded steel bar 302 and an anchor 303. The support structure 3 is used to connect the main beam frame 1 as a whole to form an integral bridge main beam structure. The cross brace 301 is placed on the lower flange of the I-beam of the main beam frame 1, and the two side ports of the cross brace 301 are aligned with the position of the transverse connecting hole 102. The threaded steel bar 302 passes through the cross brace 301 through the transverse connecting hole 102, and the two ends of the threaded steel bar 302 are inserted into the anchor and pre-tightened. The support structure 3 of the present invention adopts a combined structure of the cross brace 301 and the threaded steel bar 302, which not only ensures the lateral stiffness of the overall structure of the bridge, but also facilitates rapid assembly on site. The form of this transverse support structure has the characteristics of simple structure, convenient processing, reasonable force, and convenient assembly and disassembly, and is suitable for popularization and use.
[0039] See also Figure 4 , is a structural schematic diagram of an embodiment of an assembled emergency combined bridge deck structure of the present invention, the deck structure 2 is mainly composed of a deck steel plate 201, a transverse square steel 202 and a longitudinal square steel 203, and the transverse square steel 202 and the longitudinal square steel 203 are welded below the deck steel plate 201. When assembling, the transverse square steel 202 and the longitudinal square steel 203 are first aligned and placed in the fixed block 103 position of the main beam frame 1, and then the upper deck steel plate 201 is laid after being welded and fixed. The length and specification of the transverse square steel 202 and the longitudinal square steel 203 in the deck steel plate 201 are mainly based on the size of the fixed block and the distance between the blocks.
[0040] See also Figure 5 , is a structural schematic diagram of an embodiment of an assembled emergency combined bridge bridge of the present invention. The bridgehead cladding 4 is mainly used for vehicles to go up and down the emergency bridge, providing a ramp for vehicles to pass. The bridgehead cladding 4 includes a bridgehead steel plate 401, a plurality of reinforcing tubes 402, a connecting tube 403 and a plurality of connecting pins 404. The plurality of reinforcing tubes 402 are longitudinally distributed on the bottom surface of the bridgehead steel plate 401, and the connecting tube 403 is transversely arranged at one end of the bottom surface of the bridgehead steel plate 401. In order to facilitate the fixing of the bridgehead steel plate 401 to the main structure of the bridge at a certain angle to the horizontal plane, a plurality of connecting pins 404 are arranged on the side wall of the connecting tube 403 and along the axial interval of the connecting tube 403. In this embodiment, the connecting pin 404 is arranged in an L shape, and of course it can also be other shapes to meet the needs. During assembly, the connecting pin 404 is clamped with the pin hole arranged on the side of the bridge deck steel plate 201, and the position is limited and fixed. It is simple and convenient, and the assembly can be completed quickly.
[0041] See also Figure 6, is a structural schematic diagram of an embodiment of an assembled emergency combined bridge guardrail structure of the present invention. The guardrail structure 5 mainly includes a plurality of vertical poles 501 and a protective rope 502. The vertical poles 501 can be rectangular steel pipes. All vertical poles 501 are arranged in a straight line and are spaced apart on the bridge deck steel plate 202. A through hole is provided at the upper end of each vertical pole 501. The protective rope 502 can be a flexible rope. The protective rope 502 passes through the through hole and is connected between two vertical poles 501. Then the two ends of the protective rope 502 are fixed.
[0042] The erection method of the present invention comprises the following steps: the first step: according to the span of the emergency repair bridge and the load conditions of the passing vehicles, the main parameters of the main beam structure 1, the bridge deck structure 2, and the bridge head cladding 4 are determined, the specifications and detailed dimensions of the required I-beams, square tubes, and steel plates are determined, and various profiles are cut, polished, and other preliminary processing is performed on them according to the designed dimensions. After the processing is completed, they are classified, bundled, hoisted to the transport vehicle, and delivered to the emergency repair construction site.
[0043] Step 2: Use an excavator to level the site of the installation area near the emergency combination bridge erection location, and reinforce the foundation of the emergency combination bridge location.
[0044] Step 3: Check the performance of various machining equipment, prepare all steel equipment for unloading, and arrange the processing site;
[0045] Step 4: Align the two ends of the I-beam 101 required for the main beam structure, weld them in sequence to form a single-sided main beam, weld a fixed block 103 on the upper wing plate of the single-sided main beam, drill a transverse connecting hole 102 on the web of the single-sided main beam, and complete the processing of all single-sided main beams in the same way.
[0046] Step 5: Place a cross brace 301 between multiple single-sided main beams, align the end of the cross brace 301 with the transverse connection hole 102, and weld the cross brace 301 to each single-sided main beam firmly. Weld multiple cross braces 301 in sequence in the same way. After the cross brace 301 is welded, insert the threaded steel bar 302 into the transverse connection hole 102, connect the two ends of the threaded steel bar 302 to the anchor 303, and after all the installation is completed, anchor and pre-tighten them in sequence to complete the assembly of the entire main beam structure 1.
[0047] Step 6: With the help of a large-tonnage crane, hoist the assembled main beam structure 1 so that both ends of the main beam structure 1 are placed at the preset bridge seat positions on both sides, completing the placement of the main beam structure 1.
[0048] Step 7: Weld two transverse square steels 202 and a longitudinal square steel 203 at the bottom of the bridge deck steel plate 201, and hoist the welded multiple bridge deck steel plates 201 to the top of the main beam structure, fix them with buckles, and then perform positioning welding to complete the installation of the bridge deck structure 2 in sequence.
[0049] Step 8: weld multiple longitudinally arranged reinforcing tubes 402 at the bottom of the bridge head steel plate 401, weld a connecting tube 403 perpendicular to the multiple reinforcing tubes 402 at the bottom of the bridge head steel plate 401, and weld multiple L-shaped connecting pins 404 on the side wall of the connecting tube 403, hoist and transport the entire bridge head cladding 4, so that the connecting pins 404 are inserted into the pin holes on the side of the bridge deck steel plate 201, thereby clamping the bridge head steel plate 401 on the bridge deck steel plate 201 to form a ramp for vehicles to go up and down the emergency bridge.
[0050] Step 9: Weld the vertical poles 501 on the bridge deck steel plate, and insert the protective rope 502 between the vertical poles 501.
[0051] At this point, the assembled emergency combined bridge of the present invention has been erected and can be put into use after reasonable testing and adjustment, which is efficient, convenient, safe and reliable.
[0052] In summary, the present invention adopts on-site assembly of steel sections, selects general-purpose sections such as I-beams, square tubes, and steel plates, adopts modular design, has a simple structure, is easy to process, and is easy to weld and assemble on-site. The emergency steel bridge can be welded, assembled, and erected on-site with a small amount of manpower and mechanical equipment, which reduces personnel support requirements, improves installation and erection efficiency, and can better meet the emergency support requirements of small and medium-span bridges. The steel section material used in the present invention is easy to purchase on the market, which is different from the prefabricated steel bridge that needs to be produced and reserved in advance. The significant feature is that no early reserves are required, no daily maintenance is required, and manpower and capital investment are reduced. It has good economic benefits and is suitable for market promotion.
[0053] The above embodiments are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. An assembled emergency combined bridge, characterized in that: include: A main beam structure, comprising a main beam frame (1) and a plurality of supporting structures (3), wherein the main beam frame (1) comprises a plurality of I-beams (101) arranged in parallel, a plurality of fixed blocks (103) being arranged at intervals on the upper wing plates of the I-beams (101), and a plurality of transverse connecting holes (102) being arranged at intervals on the web plates of the I-beams (101); the supporting structure (3) comprises a cross brace (301), a threaded steel bar (302) and an anchor (303), wherein the cross brace (301) is arranged on the lower wing plates of the I-beams (101) and is vertically distributed with respect to the I-beams (101), an end of the cross brace (301) is aligned with the transverse connecting hole (102), the threaded steel bar (302) passes through the cross brace (301) through the transverse connecting hole (102), and the anchors (303) are arranged at both ends of the threaded steel bar (302); A plurality of bridge deck structures (2) arranged in parallel above the main beam structure, comprising a bridge deck steel plate (201), and two transverse square steels (202) and two longitudinal square steels (203) located at the bottom of the bridge deck steel plate (201), wherein the transverse square steels (202) and the longitudinal square steels (203) are vertically distributed and are clamped with the fixed stopper (103); The bridgehead cladding (4) located at both ends of the bridge deck structure comprises a bridgehead steel plate (401), a connecting pipe (403), a plurality of reinforcing pipes (402) and connecting pins (404), wherein the plurality of reinforcing pipes (402) are longitudinally distributed on the bottom surface of the bridgehead steel plate (401), the connecting pipe (403) is transversely arranged at the front end of the bottom surface of the bridgehead steel plate (401), and the plurality of connecting pins (404) are located on the side wall of the connecting pipe (403) and are spaced apart along the axial direction thereof, and the connecting pins (404) are engaged with pin holes arranged on the side surface of the bridge deck steel plate (201); the connecting pins (404) are in an L-shaped structure; It also includes a guardrail structure (5) located on both sides above the bridge deck structure, the guardrail structure (5) including a plurality of vertical poles (501) and a protective rope (502), the plurality of vertical poles (501) are arranged in a straight line and are arranged at intervals on the bridge deck steel plate (201), each vertical pole (501) is provided with a through hole at the upper end, the protective rope (502) passes through the through hole and is connected between two vertical poles (501); except for the two fixed blocks (103) located at the head and tail ends, which are T-shaped three-way structures, the remaining fixed blocks (103) are all cross-shaped four-way structures, each port of the three-way structure and the four-way structure is provided with an opening, and the transverse square steel (202) and the longitudinal square steel (203) can be snapped into the opening.
2. A method for erecting an assembled emergency composite bridge as claimed in claim 1, characterized in that: The following steps are involved: S1: According to the span of the emergency bridge and the load of passing vehicles, determine the main parameters of the main beam structure, bridge deck structure (2), and bridgehead cladding (4), determine the specifications and detailed dimensions of the required I-beams, square tubes, and steel plates, and perform preliminary processing such as cutting and grinding on various profiles according to the designed dimensions. After processing, classify and bundle them and hoist them onto transport vehicles for delivery to the emergency construction site; S2: Near the location where the emergency composite bridge is erected, use excavators and other engineering machinery to level the site of the installation area, and reinforce the foundation of the location where the emergency composite bridge is located; S3: Check the performance of various types of machining equipment, prepare all steel equipment for unloading, and arrange the processing site; S4: aligning the two ends of the I-beam (101) required for the main beam structure, welding and connecting them in sequence to form a single-sided main beam, welding the fixed block (103) on the upper wing plate of the single-sided main beam, drilling the transverse connection hole (102) on the web of the single-sided main beam, and completing the processing of all single-sided main beams in the same way; S5: placing the cross brace (301) between multiple single-sided main beams, aligning the end position of the cross brace (301) with the transverse connection hole (102), and welding the cross brace (301) to each single-sided main beam firmly, and welding multiple cross braces (301) in sequence in the same way; after the welding of the cross brace (301) is completed, inserting the threaded steel (302) into the transverse connection hole (102), connecting the two ends of the threaded steel (302) to the anchors (303), and after all the installation is completed, anchoring and pre-tightening are carried out in sequence to complete the assembly of the entire main beam structure; S6: With the help of a large-tonnage crane, the assembled main beam structure is hoisted, and the two ends of the main beam structure are placed at the preset bridge seat positions on both sides, so that the main beam structure is placed in place; S7: Two horizontal square steels (202) and longitudinal square steels (203) are respectively welded at the bottom of the bridge deck steel plate (201), and the welded multiple bridge deck steel plates (201) are hoisted to the top of the main beam structure, and then positioned and welded after being fixed with buckles, and the installation of the bridge deck structure (2) is completed in sequence; S8: A plurality of longitudinally arranged reinforcing tubes (402) are welded at the bottom of the bridge head steel plate (401), a connecting tube (403) perpendicular to the plurality of reinforcing tubes (402) is welded at the bottom of the bridge head steel plate (401), and a plurality of L-shaped connecting pins (404) are welded on the side wall of the connecting tube (403), and the entire bridge head clasp (4) is hoisted and carried, so that the connecting pins (404) are inserted into the pin holes on the side of the bridge deck steel plate (201); S9: welding upright poles (501) on the bridge deck steel plate, and inserting protective ropes (502) between each pair of upright poles (501).
Citation Information
Patent Citations
Modular box-type beam-slab structure and bridge erection method based on box-type beam-slab structure
CN106592434A
Artificial assembled single-layer road express bridge
CN106758757A
Quickly-assembled movable pedestrian overpass
CN107366222A
Prefabricated beam structure, fabricated temporary bridge and mounting method thereof
CN111254802A
Efficient and fast-splicing foot bridge
CN112095436A