A substation operation and maintenance optimization planning method and system
By setting up wireless transceivers and operation and maintenance robot communications on the operation and maintenance path of the substation and timely adjusting the deviation path, the problem of operation and maintenance robot deviation is solved, the patrol efficiency and information accuracy are improved, and the operation stability of the substation is ensured.
Patent Information
- Application Number
- CN202111322154.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-11-09
AI Technical Summary
Operation and maintenance robots are prone to deviate from the preset path during the operation and maintenance of the substation, resulting in a decrease in patrol efficiency and the inability to accurately obtain operation information, affecting the operation stability of the substation.
Set up wireless transceivers at equal distances on the preset path, communicate with wireless transceivers on the operation and maintenance robot, judge the deviation situation and adjust the path in time, use ultrasonic detectors to obtain obstacle information, collect terminals to obtain equipment operation information, and control The center re-plans the path.
It improves the working efficiency of the operation and maintenance robot and ensures the accuracy and stability of the operation information of the substation.
Smart Images

Figure CN114018259B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of substation operation and maintenance, and in particular relates to a substation operation and maintenance optimization planning method and system. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] The substation operation and maintenance station is responsible for the management of the unmanned substations and substations with few staff on duty under its jurisdiction, and is fully responsible for the operation and maintenance, switching operations, accident and abnormality handling, equipment inspections, regular equipment testing and rotation, and other operation management work of the substations under its jurisdiction.
[0004] Among them, the operation and maintenance robot is an indispensable part of the substation operation and maintenance process. When the operation and maintenance robot performs operation and maintenance operations on the substation, the operation and maintenance robot will deviate from the preset path, resulting in a decrease in the operation and maintenance inspection efficiency of the operation and maintenance robot, and it is unable to accurately obtain accurate operation information of the substation, resulting in untimely operation and maintenance of the substation, affecting the basic stability of the substation operation. Summary of the invention
[0005] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a substation operation and maintenance optimization planning method and system, which determines whether the operation and maintenance robot deviates from the preset path by setting wireless transceivers at equal distances on the preset path and communicating signals with the wireless transceivers on the operation and maintenance robot, so as to adjust the path in time and ensure the working efficiency of the operation and maintenance robot.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] A first aspect of the present invention provides a substation operation and maintenance optimization planning system, comprising an operation and maintenance robot and a control center, wherein first wireless transceivers are preset at equal distances on an optimal path from the control center to a sub-substation;
[0008] The operation and maintenance robot includes an operation and maintenance robot body, a controller and a second wireless transceiver; the controller is connected to the control center for communication and is used to obtain the operation and maintenance path of the control center;
[0009] When the operation and maintenance robot is walking, it obtains the signal of the first wireless transceiver through the second wireless transceiver at equal time intervals. When the signal of the first wireless transceiver is not detected within the equal time interval, the control center plans the operation and maintenance path according to the distance information between the operation and maintenance robot and the first wireless transceiver.
[0010] Furthermore, the operation and maintenance robot also includes an ultrasonic detector, which is fixed on both sides of the operation and maintenance robot body to obtain obstacle information.
[0011] Furthermore, the operation and maintenance robot also includes a collection terminal, which is used to collect equipment operation information of the sub-substation;
[0012] The controller determines the equipment operation status of the sub-substation according to the equipment operation information of the sub-substation collected by the collection terminal, and if a fault occurs, sends the location information of the sub-substation where the fault occurs to the control center;
[0013] The control center determines the operation and maintenance path of the operation and maintenance robot according to the operation fault information of the sub-substation equipment.
[0014] Furthermore, the control center includes a map construction module, which is used to construct a map of the entire substation before the operation and maintenance robot conducts an operation and maintenance inspection, including location information of the sub-substation and location information of the first wireless transceiver on the operation and maintenance path of the operation and maintenance robot.
[0015] Furthermore, the robot further comprises a positioning mechanism, the positioning mechanism comprises an inertial navigation unit and a locator, the locator and the inertial navigation unit are respectively connected to the controller;
[0016] Furthermore, the inertial navigation unit is used to obtain the running direction of the operation and maintenance robot; and the locator is used to obtain the position information of the operation and maintenance robot.
[0017] Furthermore, the first wireless transceiver is communicatively connected to the second wireless transceiver, and whether the operation and maintenance robot deviates from the correct operation and maintenance path is determined through the communication between the first wireless transceiver and the second wireless transceiver.
[0018] Furthermore, the acquisition terminal includes a binocular camera arranged at the front end of the operation and maintenance robot body.
[0019] A second aspect of the present invention provides a substation operation and maintenance optimization planning method, which adopts a substation operation and maintenance optimization planning system described in the first aspect, comprising:
[0020] Step S1: Obtain the operation and maintenance path sent by the control center;
[0021] Step S2: Start operation and maintenance inspection according to the operation and maintenance path;
[0022] Step S3: Detect the signal of the first wireless transceiver, and determine whether the signal of the first wireless transceiver is detected within the equal time interval, if yes, proceed to step S6, if not, proceed to step S4;
[0023] Step S4: Obtain the current location information of the operation and maintenance robot and send it to the control center through the controller;
[0024] Step S5: The control center maps the location information of the operation and maintenance robot onto a map, and replans the operation and maintenance path of the operation and maintenance robot and the next first wireless transceiver in the moving direction;
[0025] Step S6: The operation and maintenance inspection robot continues to move until it reaches the sub-substation to be inspected;
[0026] Step S7: Complete the operation and maintenance inspection.
[0027] Furthermore, it also includes:
[0028] Obtain sub-substation equipment operation information collected by the collection terminal;
[0029] Determine whether substation equipment fails;
[0030] If a fault occurs, the controller sends the location information of the faulty substation to the control center;
[0031] The control center determines the operation and maintenance path of the operation and maintenance robot based on the location information of the sub-substation where the fault occurs.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] The present invention determines whether the operation and maintenance robot deviates from the preset path by equidistantly setting wireless transceivers on the preset path of the operation and maintenance robot and whether or not signal communication is performed with the wireless transceiver on the operation and maintenance robot, so as to adjust the path in time. Since the wireless transceivers are set at equal distances and the travel speed of the operation and maintenance robot is certain, the signal of the first wireless transceiver on the preset path will be detected within the same time interval. Once the signal of the first wireless transceiver is not detected within the same time interval, it is proved that the operation and maintenance robot deviates from the preset route, and the path of the operation and maintenance robot can be adjusted in time, thereby improving the working efficiency of the operation and maintenance robot. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0035] Figure 1 It is an overall framework diagram of the substation operation and maintenance optimization planning system in the first embodiment of the present invention;
[0036] Figure 2 It is a flow chart of the substation operation and maintenance optimization planning method in the second embodiment of the present invention. DETAILED DESCRIPTION
[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0038] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0039] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0040] It should be noted that the flowcharts and block diagrams in the accompanying drawings illustrate the possible implementation architecture, functions and operations of the methods and systems according to various embodiments of the present disclosure. It should be noted that each box in the flowchart or block diagram can represent a module, a program segment, or a part of a code, and the module, program segment, or a part of a code may include one or more executable instructions for implementing the logical functions specified in each embodiment. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in an order different from that marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, or they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the flowchart and / or block diagram, and the combination of boxes in the flowchart and / or block diagram can be implemented using a dedicated hardware-based system that performs a specified function or operation, or can be implemented using a combination of dedicated hardware and computer instructions.
[0041] Embodiment 1
[0042] like Figure 1 As shown, this embodiment provides a substation operation and maintenance optimization planning system, including an operation and maintenance robot and a control center, wherein first wireless transceivers are preset at equal distances on an optimal path from the control center to the sub-substation;
[0043] The operation and maintenance robot includes an operation and maintenance robot body, a controller and a second wireless transceiver; the controller is connected to the control center for communication and is used to obtain the operation and maintenance path of the control center;
[0044] When the operation and maintenance robot is walking, it obtains the signal of the first wireless transceiver through the second wireless transceiver at equal time intervals. When the signal of the first wireless transceiver is not detected within the equal time interval, the control center plans the operation and maintenance path according to the distance information between the operation and maintenance robot and the first wireless transceiver.
[0045] In some embodiments, the operation and maintenance robot also includes an ultrasonic detector, which is fixed on both sides of the operation and maintenance robot body to obtain obstacle information.
[0046] Specifically, the operation and maintenance robot also includes a collection terminal, which is used to collect equipment operation information of the sub-substation;
[0047] The controller determines the equipment operation status of the sub-substation according to the equipment operation information of the sub-substation collected by the collection terminal, and if a fault occurs, sends the location information of the sub-substation where the fault occurs to the control center;
[0048] The control center determines the operation and maintenance path of the operation and maintenance robot according to the operation fault information of the sub-substation equipment. The acquisition terminal includes a binocular camera arranged at the front end of the operation and maintenance robot body. The acquisition terminal includes a binocular camera arranged at the front end of the operation and maintenance robot body.
[0049] In some embodiments, the control center includes a map construction module for constructing a map of the entire substation before the operation and maintenance inspection by the operation and maintenance robot, including location information of the sub-substation and location information of the first wireless transceiver on the operation and maintenance path of the operation and maintenance robot.
[0050] Specifically, the robot further includes a positioning mechanism, the positioning mechanism includes an inertial navigation unit and a locator, and the locator and the inertial navigation unit are respectively connected to the controller;
[0051] The inertial navigation unit is used to obtain the running direction of the operation and maintenance robot; the locator is used to obtain the position information of the operation and maintenance robot. The first wireless transceiver is connected to the second wireless transceiver for communication, and the communication between the first wireless transceiver and the second wireless transceiver is used to determine whether the operation and maintenance robot deviates from the correct operation and maintenance path.
[0052] Embodiment 2
[0053] This embodiment provides a substation operation and maintenance optimization planning method, which adopts a substation operation and maintenance optimization planning system described in Embodiment 1, including:
[0054] Step S1: Obtain the operation and maintenance path sent by the control center;
[0055] Step S2: Start operation and maintenance inspection according to the operation and maintenance path;
[0056] Step S3: Detect the signal of the first wireless transceiver, and determine whether the signal of the first wireless transceiver is detected within the equal time interval, if yes, proceed to step S6, if not, proceed to step S4;
[0057] Step S4: Obtain the current location information of the operation and maintenance robot and send it to the control center through the controller;
[0058] Step S5: The control center maps the location information of the operation and maintenance robot onto a map, and replans the operation and maintenance path of the operation and maintenance robot and the next first wireless transceiver in the moving direction;
[0059] Step S6: The operation and maintenance inspection robot continues to move until it reaches the sub-substation to be inspected;
[0060] Step S7: Complete the operation and maintenance inspection.
[0061] In some embodiments, the method further comprises:
[0062] Obtain sub-substation equipment operation information collected by the collection terminal;
[0063] Determine whether substation equipment fails;
[0064] If a fault occurs, the controller sends the location information of the faulty substation to the control center;
[0065] The control center determines the operation and maintenance path of the operation and maintenance robot based on the location information of the sub-substation where the fault occurs.
[0066] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of hardware embodiments, software embodiments, or embodiments combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) containing computer-usable program code.
[0067] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0068] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A substation operation and maintenance optimization planning system, characterized in that: It includes an operation and maintenance robot and a control center, wherein a first wireless transceiver is preset at an equal distance on an optimal path from the control center to the sub-substation; The operation and maintenance robot includes an operation and maintenance robot body, a controller and a second wireless transceiver; the controller is connected to the control center for communication and is used to obtain the operation and maintenance path of the control center; During the walking process, the operation and maintenance robot obtains the signal of the first wireless transceiver through the second wireless transceiver at equal time intervals. When the signal of the first wireless transceiver is not detected within the equal time interval, the control center plans the operation and maintenance path according to the distance information between the operation and maintenance robot and the first wireless transceiver; The first wireless transceiver is communicatively connected with the second wireless transceiver, and whether the operation and maintenance robot deviates from the correct operation and maintenance path is determined through the communication between the first wireless transceiver and the second wireless transceiver; The travel speed of the operation and maintenance robot is fixed.
2. A substation operation and maintenance optimization planning system according to claim 1, characterized in that: The operation and maintenance robot also includes an ultrasonic detector, which is fixed on both sides of the operation and maintenance robot body and is used to obtain obstacle information.
3. A substation operation and maintenance optimization planning system according to claim 1, characterized in that: The operation and maintenance robot also includes a collection terminal, which is used to collect equipment operation information of the sub-substation; The controller determines the equipment operation status of the sub-substation according to the equipment operation information of the sub-substation collected by the collection terminal, and if a fault occurs, sends the location information of the sub-substation where the fault occurs to the control center; The control center determines the operation and maintenance path of the operation and maintenance robot according to the operation fault information of the sub-substation equipment.
4. A substation operation and maintenance optimization planning system according to claim 1, characterized in that: The control center includes a map construction module, which is used to construct a map of the entire substation before the operation and maintenance robot conducts an operation and maintenance inspection, including location information of the sub-substation and location information of the first wireless transceiver on the operation and maintenance path of the operation and maintenance robot.
5. A substation operation and maintenance optimization planning system according to claim 1, characterized in that: The robot further comprises a positioning mechanism, which comprises an inertial navigation unit and a locator, and the locator and the inertial navigation unit are respectively connected to the controller.
6. A substation operation and maintenance optimization planning system as claimed in claim 5, characterized in that: The inertial navigation unit is used to obtain the running direction of the operation and maintenance robot; the locator is used to obtain the position information of the operation and maintenance robot.
7. A substation operation and maintenance optimization planning system as claimed in claim 3, characterized in that: The acquisition terminal includes a binocular camera arranged at the front end of the operation and maintenance robot body.
8. A planning method using a substation operation and maintenance optimization planning system according to any one of claims 1 to 7, characterized in that: include: Step S1: Obtain the operation and maintenance path sent by the control center; Step S2: Start operation and maintenance inspection according to the operation and maintenance path; Step S3: Detect the signal of the first wireless transceiver, and determine whether the signal of the first wireless transceiver is detected within the equal time interval, if yes, proceed to step S6, if not, proceed to step S4; Step S4: Obtain the current location information of the operation and maintenance robot and send it to the control center through the controller; Step S5: The control center maps the location information of the operation and maintenance robot onto a map, and replans the operation and maintenance path of the operation and maintenance robot and the next first wireless transceiver in the moving direction; Step S6: The operation and maintenance inspection robot continues to move until it reaches the sub-substation to be inspected; Step S7: Complete the operation and maintenance inspection.
9. A planning method for a substation operation and maintenance optimization planning system according to claim 8, characterized in that: Also includes: Obtain sub-substation equipment operation information collected by the collection terminal; Determine whether substation equipment fails; If a fault occurs, the controller sends the location information of the faulty substation to the control center; The control center determines the operation and maintenance path of the operation and maintenance robot based on the location information of the sub-substation where the fault occurs.