A dynamic design method for drainage system based on tunnel water inflow prediction
Through dynamic design method, the blind pipe spacing of the tunnel drainage system is adjusted according to the tunnel prediction water inflow and correction value, which solves the drainage system design problem caused by the difference in water enrichment of surrounding rocks across different areas, and achieves a more accurate and safe tunnel Drainage system layout.
Patent Information
- Application Number
- CN202111449657.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-11-30
AI Technical Summary
The design of the existing tunnel drainage system has failed to effectively deal with the differences in the surrounding rock water enrichment in different areas, resulting in a lack or interference in the drainage system design, affecting the durability and operational safety of the tunnel structure.
Using a dynamic design method based on tunnel prediction water inflow, the functional relationship between head height and section mileage is fitted through geological survey and isogenetic circle processing, the predicted value of water inflow is calculated and corrected, the blind pipe parameters and spacing are determined, and the tunnel is dynamically adjusted. The longitudinal circumferential blind tube is arranged to ensure the adaptability of the drainage system.
It effectively avoids the design deficiency or interference of drainage system caused by the same standard, and is especially suitable for situations where the water-rich amount of the surrounding rock in the front and rear sections is large, improving the design accuracy and safety of the tunnel drainage system.
Smart Images

Figure CN114065362B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a design method for a tunnel drainage system, and in particular to a dynamic design method for a drainage system based on predicted water inflow in the tunnel. Background Art
[0002] A tunnel is a linear structure buried below the ground surface, and its service life needs to withstand the effects and influences of the groundwater environment for a long time. Engineering practice shows that when constructing tunnels in areas with developed groundwater, the following problems often occur around tunnel drainage: Since tunnel excavation destroys the balance of groundwater circulation, the tunnel becomes a channel for nearby groundwater to gather. When the tunnel drainage facilities are not perfect, it will cause water leakage, affecting the structure and operational safety; due to the discharge of groundwater in the tunnel, a large amount of regional groundwater is lost, causing the water resources near the tunnel to dry up, and causing environmental hazards such as surface collapse and sinking, affecting residents' lives and social stability. Therefore, setting up a reliable drainage system is the basic requirement to meet the durability and use function of the tunnel structure under such environmental conditions. The tunnel body drainage system mainly includes lining back drainage systems such as rings and longitudinal blind pipes (ditches) and in-hole trench drainage systems such as side ditches and central ditches (pipes).
[0003] However, the working environment of the tunnel body drainage system generally changes with time and seasons, and most of them are concealed projects. If the drainage system function is reduced and does not meet the drainage requirements, it will cause difficulties in reconstruction, repair and maintenance. The current tunnel drainage system generally uses the same system along the longitudinal direction of the tunnel, without considering the different water-rich surrounding rocks in different sections of the tunnel, resulting in a deficit or surplus in the drainage system design. Summary of the invention
[0004] In order to solve the deficiencies in the above-mentioned prior art, the present invention provides a dynamic design method for a drainage system based on the predicted water inflow of a tunnel. The method is suitable for the design of a drainage system when a tunnel passes through surrounding rocks with different degrees of water richness, and is particularly suitable for when the water richness of the surrounding rocks in the front and rear sections differs greatly.
[0005] In order to achieve the above technical purpose, the technical solution adopted by the present invention is:
[0006] A method for dynamic design of drainage system based on predicted water inflow in tunnel, the specific steps are as follows:
[0007] S1: Based on the geological survey data, the tunnel section data is processed by isotropic processing, and the functional relationship between the water head height and the section mileage is fitted. i =h(x i );
[0008] Among them, H i is the distance from the static water level of section i to the center of the equivalent circle of the tunnel cross section (m); h(xi ) is H i About the mileage position x of section i i The fitting function of
[0009] S2: Select the prediction section i and calculate the predicted value Q of the water inflow of section i i ;
[0010] S3: Prediction value of water inflow Q i Correction is made to obtain the predicted correction value Q of the water inflow at section i ic ;
[0011] S4: Determine the blind pipe parameters used and predict the correction value Q based on the water inflow ic The blind pipe spacing D is calculated;
[0012] S5: Arrange the drainage system. From the section n meters forward to the next section, the annular blind pipe is arranged with a spacing of D / γ, where γ is the safety factor;
[0013] S6: Determine the next predicted section and repeat S2 to S5. Determine whether to modify the drainage system based on the change value z between the actual spacing calculation data and the last spacing data. In this way, the annular blind pipe spacing is continuously designed along the longitudinal direction of the tunnel until it is penetrated.
[0014] Furthermore, in step S2, the water inflow prediction value Q i Calculated according to Goodman's empirical formula;
[0015]
[0016] Where: Q i is the predicted value of water inflow per meter at section i (m 2 / d); r is the radius of the equivalent circle of the tunnel cross section (m); K is the permeability coefficient of the formation.
[0017] Furthermore, in step S3, the predicted water inflow value is corrected, including the following steps: ir Correct the predicted value of water inflow with a correction factor of α;
[0018]
[0019] Where: Q ir is the measured water inflow at section i, Q i is the predicted value of water inflow at section i.
[0020] Furthermore, in step S3, the predicted value of water inflow is corrected, which also includes correcting the predicted value of water inflow according to local hydrological and meteorological conditions, and the correction coefficient is β;
[0021]
[0022] Where: L m is the local maximum annual precipitation; L is the local precipitation in that season.
[0023] Further, in step S4, the blind pipe spacing D is calculated based on the Bernoulli equation for short pipe hydraulic calculation. i ;
[0024]
[0025] Where: δ is the lining water pressure reduction coefficient; λ is the resistance coefficient along the annular blind pipe; ξ 进 , 出 , 弯 is the local resistance coefficient of the annular blind pipe; l is the drainage relative to the annular blind pipe length (m), which is simplified to πr; υ is the water outlet velocity of the blind pipe (m / s); d is the diameter of the blind pipe (m); D i is the spacing of each ring of blind pipes (m); A is the outlet area of each linear meter of blind pipes (m 2 ).
[0026] Preferably, in step S5, the safety factor γ is set to be 1.2 to 1.4.
[0027] Furthermore, in step S6, the calculation method of the change value z is:
[0028]
[0029] Furthermore, if the obtained spacing D and the calculated change value z of the previous section are smaller than the preset value, the spacing n of the next section is increased, and the blind pipe spacing D is not corrected.
[0030] Furthermore, if the obtained distance D and the change value z calculated in the previous section are greater than the preset value, the section distance n is reduced and D is corrected at the same time.
[0031] Preferably, the preset value is 30%.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] The method of the present invention adopts a dynamic design method when arranging the drainage system along the longitudinal direction of the tunnel, takes into account the different water-rich contents of the surrounding rocks in different sections of the tunnel, calculates different annular blind pipe spacings, and avoids using the same standard to cause a deficiency or excess in the design of the drainage system. The method is particularly suitable when the water-rich contents of the surrounding rocks in the front and rear sections differ greatly. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0035] Figure 1 is a flow chart of the steps of the present invention;
[0036] Figure 2 This is a schematic diagram of the blind pipe design of the drainage system of the present invention;
[0037] Figure 3 is the cross-section of the tunnel;
[0038] Figure numerals: 1-annular blind pipe of drainage system; 2-longitudinal blind pipe of drainage system; 3-tunnel section equal circle; 4-advance drilling. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians of the art without making creative work are within the scope of protection of the present application.
[0040] A method for dynamic design of drainage system based on predicted water inflow in tunnel, the specific steps are as follows:
[0041] S1: Based on geological survey data, and Figure 2 As shown in the figure, the tunnel section data is processed by isotropic processing, and a better functional relationship between the static water level height (water head height) and the section mileage is fitted (1). At the same time, the permeability coefficient K of the formation is obtained through indoor tests, and it is assumed that the permeability coefficient K of the formation is a constant.
[0042] H i =h(x i ) Formula (1)
[0043] Among them, H i is the distance from the static water level of section i to the center of the equivalent circle of the tunnel cross section (m); h(x i ) is Hi About the mileage position x of section i i The fitting function of .
[0044] S2: Select the prediction section i and calculate the predicted water inflow value Q of section i according to Goodman's empirical formula (2) i ;
[0045]
[0046] Where Q i is the predicted value of water inflow per meter at section i (m 2 / d); r is the radius of the equivalent circle of the tunnel cross section (m); K is the permeability coefficient of the formation.
[0047] S3: Prediction value of water inflow Q i Make corrections.
[0048] S3.1 Obtain the measured water inflow Q through drilling ir The predicted value of water inflow Q i make corrections;
[0049] At the same level as the center of the tunnel section equal circle 3, advance drilling 4 is excavated to test and calculate the measured water inflow Q ir and the water head height h at that depth i ;
[0050] Since there is a certain error between the predicted water inflow and the measured water inflow, the correction coefficient α is introduced, that is, when excavating a certain section, the water volume test is carried out by using the advance drilling, and the predicted water inflow value is corrected based on formula (3) by the measured water inflow;
[0051]
[0052] α is the correction coefficient; Q ir is the measured water inflow at section i, Q i is the predicted value of water inflow at section i.
[0053] S3.2: Prediction of water inflow Q using meteorological data i make corrections;
[0054] Because the tunnel drainage system needs to maintain normal working conditions all year round, the meteorological correction coefficient β is introduced according to the local hydrological and meteorological conditions, and it is assumed that the meteorological correction coefficient β of the water inflow prediction value of each section along the longitudinal direction of the tunnel is constant. The calculation formula is shown in formula (4);
[0055]
[0056] Where β is the meteorological correction coefficient; L m is the local maximum annual precipitation; L is the local precipitation in that season.
[0057] S3.3: Calculate the predicted correction value of water inflow, the calculation method is shown in formula (5);
[0058] Q ic =αβQ i Formula (5)
[0059] Where Q ic is the predicted correction value of water inflow per meter of section i (m 2 / d).
[0060] S4: Determine the blind pipe diameter d and λ used, and calculate the blind pipe spacing D based on the Bernoulli equation for short pipe hydraulic calculation i .
[0061] According to Bernoulli's equation,
[0062]
[0063] in:
[0064]
[0065]
[0066] The blind pipe spacing D can be obtained by reverse calculation i :
[0067]
[0068] Where: δ is the lining water pressure reduction coefficient; λ is the resistance coefficient along the annular blind pipe; ξ 进 , 出 , 弯 is the local resistance coefficient of the annular blind pipe; l is the drainage relative to the annular blind pipe length (m), which is simplified to πr; υ is the water outlet velocity of the blind pipe (m / s); d is the diameter of the blind pipe (m); D i is the spacing of each ring of blind pipes (m); A is the outlet area of each linear meter of blind pipes (m 2 ).
[0069] S5: Arrange the drainage system annular blind pipe 1 and the drainage system longitudinal blind pipe 2. From the section n meters forward to the next section, the drainage system annular blind pipe 1 is arranged with a spacing of D / γ, where γ is the safety factor. The drainage design needs to have a margin, so the value of γ is 1.2 to 1.4.
[0070] Due to the difference in water abundance in each section, advance drilling is carried out every n meters. The change value z between the actual layout spacing calculation data and the last layout spacing data is used to determine whether the drainage system should be corrected.
[0071]
[0072] If the calculated change value z of the spacing D and the previous section is less than the preset value, for example 30%, the spacing n of the next section can be increased, and the blind pipe spacing D is not corrected; if z is greater than the preset value, the section spacing n is reduced and D is corrected at the same time.
[0073] S6: Determine the next predicted section, repeat S2 to S5, and continuously design the annular blind pipe spacing along the longitudinal direction of the tunnel until it is penetrated.
[0074] The correctness of this method is verified by combining actual cases below.
[0075] Taking the Qilianshan Tunnel Project as an example, according to the drilling data shown in Table 1, the geology is mainly sandstone, and the permeability coefficient K is 0.005m / d. The diameter d of the drainage system annular blind pipe is planned to be 105mm, the resistance coefficient λ along the way is 0.1; the local resistance coefficient ξ 进 =30,ξ 出 =5,ξ 弯 =1; the safety factor γ is taken as 1.3, and the water pressure reduction factor δ is taken as 0.7.
[0076] Table 1 Drilling data of Qilianshan Tunnel
[0077]
[0078] The functional relationship between the static water head height (unit: m) and the cross-section position (unit: km) obtained by fitting a quartic polynomial is:
[0079] h(x)=0.347x 4 -54.806x 3 +3230x 2 -84168x-818333(R 2 =0.9162)
[0080] Note: R 2 Represents the degree of fit of the formula to the existing data. The larger the value, the better the fit effect, and the more it can represent the real prediction, and there is always R 2 ≤1.
[0081] The static water head height H of a certain section is 51.8m, the radius r of the equivalent circle of the tunnel section is 5.6m, and the diameter is 11.2m. The Goodman empirical formula is used to predict the water inflow of the section, and we have:
[0082]
[0083] The actual water inflow measured by the advance drilling next to the tunnel section is 0.7157m 2 / d, and the water head height h at the lining is 1.58m, so the correction coefficient α=0.7157 / 0.5574=1.284.
[0084] According to the meteorological data of the area where the tunnel is located, the highest precipitation occurs in July and August, which is about 90 mm. The geological data was obtained in September, and the precipitation was 62 mm. Therefore, the meteorological correction coefficient β = 90 / 62 = 1.452.
[0085] Therefore, the revised predicted water inflow of this section is Q ic =1.0392m 2 / d.
[0086] According to the Bernoulli equation, the blind pipe spacing D is calculated to be 9.2 m, and the actual blind pipe spacing is D / γ=7.1 m.
[0087] The next predicted section is 100m away from this section. The required blind pipe spacing D is calculated to be 6.3m. The actual blind pipe spacing is D / γ=4.8m. The difference between the actual spacing and the previous section is 32.4%>30%. The difference is too large, so the blind pipe spacing is corrected from 7.1m to 4.8m.
[0088] The method of the present invention adopts a dynamic design method when arranging the drainage system along the longitudinal direction of the tunnel, takes into account the different water-rich contents of the surrounding rocks in different sections of the tunnel, calculates different annular blind pipe spacings, and avoids using the same standard to cause a deficiency or excess in the design of the drainage system. The method is particularly suitable when the water-rich contents of the surrounding rocks in the front and rear sections differ greatly.
[0089] Of course, the present invention may have many other embodiments. Without departing from the spirit and essence of the present invention, technicians familiar with the field may make various corresponding changes and deformations based on the present invention, but these corresponding changes and deformations should all fall within the scope of protection of the claims attached to the present invention.
Claims
1. A method for dynamic design of drainage system based on tunnel water inflow prediction, characterized in that: The specific steps are: S1: Based on the geological survey data, the tunnel section data is processed by isotropic processing, and the functional relationship between the water head height and the section mileage is fitted. i =h(x i ); Among them, H i is the distance from the static water level of section i to the center of the equivalent circle of the tunnel cross section (m); h(x i ) is H i About the mileage position x of section i i The fitting function of S2: Select the prediction section i and calculate the predicted value Q of the water inflow of section i i ; S3: Prediction value of water inflow Q i Correction is made to obtain the predicted correction value Q of the water inflow at section i ic ; S4: Determine the blind pipe parameters used and predict the correction value Q based on the water inflow ic The blind pipe spacing D is calculated; S5: Arrange the drainage system. From the section n meters forward to the next section, the annular blind pipe is arranged with a spacing of D / γ, where γ is the safety factor; S6: Determine the next predicted section, repeat S2 to S5, and judge whether to modify the drainage system by the change value z between the actual measured spacing calculation data and the last spacing data, so as to continuously design the annular blind pipe spacing along the longitudinal direction of the tunnel until it is penetrated; the calculation method of the change value z is: If the calculated change value z of the spacing D and the previous section is less than the preset value, the spacing n of the next section is increased, and the blind pipe spacing D is not corrected; if the calculated change value z of the spacing D and the previous section is greater than the preset value, the section spacing n is reduced and D is corrected at the same time.
2. The method for dynamic design of drainage system based on predicted water inflow in tunnel according to claim 1, characterized in that: In step S2, the water inflow prediction value Q i Calculated according to Goodman's empirical formula; Where: Q i is the predicted value of water inflow per meter at section i (m 2 / d); r is the radius of the equivalent circle of the tunnel cross section (m); K is the permeability coefficient of the formation.
3. The method for dynamic design of drainage system based on predicted water inflow in tunnel according to claim 1, characterized in that: In step S3, the predicted water inflow value is corrected, including the actual water inflow Q ir Correct the predicted value of water inflow with a correction factor of α; Where: Q ir is the measured water inflow at section i, Q i is the predicted value of water inflow at section i.
4. The method for dynamic design of drainage system based on predicted water inflow in tunnel according to claim 1, characterized in that: In step S3, the predicted value of water inflow is corrected, which also includes correcting the predicted value of water inflow according to local hydrological and meteorological conditions, and the correction coefficient is β; Where: L m is the local maximum annual precipitation; L is the local precipitation in that season.
5. The method for dynamic design of drainage system based on predicted water inflow in tunnel according to claim 1, characterized in that: In step S4, the blind pipe spacing D is calculated based on the Bernoulli equation for short pipe hydraulic calculation. i ; Where: δ is the lining water pressure reduction coefficient; λ is the resistance coefficient along the annular blind pipe; ξ 进 , 出 , 弯 is the local resistance coefficient of the annular blind pipe; l is the drainage relative to the annular blind pipe length (m), which is simplified to πr; υ is the water outlet velocity of the blind pipe (m / s); d is the diameter of the blind pipe (m); D i is the spacing of each ring of blind pipes (m); A is the outlet area of each linear meter of blind pipes (m 2 ).
6. The method for dynamic design of drainage system based on predicted water inflow in tunnel according to claim 1, characterized in that: In step S5, the safety factor γ is set to a value of 1.2 to 1.
4.