A method and device for resource management

By obtaining resource usage data for local and cloud devices, generating trends and conducting forecast management, the problem of confusing device resource management in smart cities is solved and operation and maintenance efficiency is improved.

CN114091843BActive Publication Date: 2025-01-17ZHUHAI DAHENGQIN TECH DEV CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111280040.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-29
Publication Date
2025-01-17
Estimated Expiration
2041-10-29

AI Technical Summary

Technical Problem

In the construction of smart cities, the chaos in equipment resource management leads to the inability to be rationally configured and used, which in turn affects operation and maintenance efficiency, especially the problem of unpredictable equipment losses and early replacement of scrapped equipment.

Method used

When receiving the resource management request, obtain the current and historical resource usage data from the local storage to determine whether it supports the management request. If it does not support it, obtain the historical data of the associated device from the cloud storage, generate resource usage trends, and combine it with the current Data is managed in resource, predicting that the equipment reaches saturation or early warning status, and reasonably configured and configured.

Benefits of technology

It realizes the prediction management of local equipment resources, rational configuration and use, improves resource management efficiency, and avoids inefficiency caused by equipment scrapping.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114091843B_ABST
    Figure CN114091843B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention provides a method and device for resource management, which is used for an operation and maintenance platform, and the operation and maintenance platform is connected to multiple device resources. The method includes: when receiving a resource management request for a local device resource, obtaining the current resource usage data and the first historical resource usage data of the local device resource from the local storage; judging whether the first historical resource usage data supports the resource management request; when the first historical resource usage data does not support the resource management request, obtaining the second historical resource usage data of the foreign device resource associated with the local device resource from the cloud storage; generating a resource usage trend according to the first historical resource usage data and the second historical resource usage data; and performing resource management on the local device resource in combination with the current resource usage data and the resource usage trend. Through the embodiment of the present invention, it is realized to manage the local device resources and reasonably configure and use the device resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and in particular to a method and device for resource management. Background Art

[0002] In the process of smart city construction, when smart city construction enters a stage of rapid development and change, it is necessary to develop different scientific and technological industries and services. As a result, the technological requirements for smart city construction are becoming increasingly strong and showing diversified characteristics.

[0003] In order to meet the requirements for operation and maintenance services in smart city construction, it is urgent to build a cross-domain operation and maintenance platform to achieve unified management of urban operation and maintenance in different regions.

[0004] In the process of smart city construction, a large number of equipment resources are involved, which may lead to chaotic equipment resource management, and then lead to the inability to reasonably configure and use equipment resources, as well as low equipment resource management efficiency. For example, in actual applications, since it is impossible to predict the loss of a certain type of equipment resources, it is unclear when the equipment resources will be scrapped, and then the operation and maintenance personnel cannot purchase or deploy equipment resources in advance to replace the scrapped equipment resources in time, that is, there is no new equipment to replace the scrapped equipment resources, which leads to low work efficiency; further, when the local equipment data is small, it is also impossible to preset the equipment resources. Summary of the invention

[0005] In view of the above problems, a method and device for resource management are proposed to overcome the above problems or at least partially solve the above problems, including:

[0006] A resource management method is applied to an operation and maintenance platform, wherein the operation and maintenance platform is connected to a plurality of device resources, wherein the plurality of device resources include local device resources and external device resources, and the method comprises:

[0007] Upon receiving a resource management request for the local device resource, obtaining current resource usage data and first historical resource usage data of the local device resource from local storage;

[0008] determining whether the first historical resource usage data supports the resource management request;

[0009] When the first historical resource usage data does not support the resource management request, obtaining second historical resource usage data of a foreign device resource associated with the local device resource from a cloud storage;

[0010] generating a resource usage trend according to the first historical resource usage data and the second historical resource usage data;

[0011] The local device resources are managed in combination with the current resource usage data and the resource usage trend.

[0012] Optionally, the performing resource management on the local device resources in combination with the current resource usage data and the resource usage trend includes:

[0013] In combination with the current resource usage data and the resource usage trend, predict the time information when the local device resources reach a preset resource saturation state or a preset resource warning level;

[0014] The local device resources are managed according to the time information.

[0015] Optionally, the cloud stores associated information of device resources, and the step of obtaining second historical resource usage data of external device resources associated with local device resources from the cloud storage includes:

[0016] Acquire first identification data of the local device resource;

[0017] Based on the first identification data, determine the second identification data of the foreign device resource associated with the local device resource from the associated information stored in the cloud;

[0018] Acquire second historical resource usage data corresponding to the second identification data.

[0019] Optionally, the performing resource management on the local device resources according to the time information includes:

[0020] According to the time information, alarm information is configured for the local device resources.

[0021] Optionally, the performing resource management on the local device resources according to the time information includes:

[0022] Generate a device deployment work order for the local device resources according to the time information.

[0023] Optionally, the performing resource management on the local device resources according to the time information includes:

[0024] Generate an equipment inspection work order for the local equipment resource according to the time information.

[0025] Optionally, the current resource usage data, the first historical resource usage data, and the second historical resource usage data include any one or more of the following:

[0026] Quantity information of equipment resources and consumption information of equipment resources.

[0027] A resource management device is applied to an operation and maintenance platform, wherein the operation and maintenance platform is connected to a plurality of device resources, wherein the plurality of device resources include local device resources and external device resources, and the device comprises:

[0028] A first historical resource usage data acquisition module, configured to acquire current resource usage data and first historical resource usage data of the local device resource from a local storage upon receiving a resource management request for the local device resource;

[0029] A determination module, configured to determine whether the first historical resource usage data supports the resource management request;

[0030] A second historical resource usage data acquisition module, configured to acquire second historical resource usage data of a foreign device resource associated with a local device resource from a cloud storage when the first historical resource usage data does not support the resource management request;

[0031] A resource usage trend generating module, configured to generate a resource usage trend according to the first historical resource usage data and the second historical resource usage data;

[0032] A resource management module is used to manage the local device resources in combination with the current resource usage data and the resource usage trend.

[0033] A server comprises a processor, a memory and a computer program stored in the memory and capable of running on the processor, wherein the computer program implements the resource management method as described above when executed by the processor.

[0034] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the resource management method described above is implemented.

[0035] The embodiments of the present invention have the following advantages:

[0036] The embodiment of the present invention obtains current resource usage data and first historical resource usage data of local device resources from local storage when a resource management request for local device resources is received, determines whether the first historical resource usage data supports the resource management request, and obtains second historical resource usage data of external device resources associated with the local device resources from cloud storage when the first historical resource usage data does not support the resource management request, generates a resource usage trend based on the first historical resource usage data and the second historical resource usage data, and performs resource management on the local device resources in combination with the current resource usage data and the resource usage trend, thereby realizing predictive management of local device resources in combination with external device resources, thereby rationally allocating and using device resources and improving resource management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solution of the present invention, the accompanying drawings required for use in the description of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.

[0038] Figure 1 is a flow chart of steps of a resource management method provided by an embodiment of the present invention;

[0039] Figure 2 is a flowchart of another resource management method provided by an embodiment of the present invention;

[0040] Figure 3 It is a structural diagram of a resource management device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Reference Figure 1 , showing a step flow chart of a resource management method provided by an embodiment of the present invention, the method is applied to an operation and maintenance platform, the operation and maintenance platform is connected to multiple device resources, and the multiple device resources include local device resources and external device resources.

[0043] The embodiment of the present invention may specifically include the following steps:

[0044] Step 101, upon receiving a resource management request for a local device resource, obtaining current resource usage data and first historical resource usage data of the local device resource from a local storage;

[0045] In an embodiment of the present invention, the current resource usage data and the first historical resource usage data may include any one or more of the following:

[0046] Quantity information of equipment resources and consumption information of equipment resources.

[0047] The cross-domain operation and maintenance platform needs to have the capabilities of outdoor facility and equipment asset management, indoor facility and equipment asset management, fiber optic network asset management, office environment asset management, inventory reserve asset management, and information asset management. By establishing a unified and extensible asset configuration library, it can achieve the management of different attributes of the above-mentioned different categories (including but not limited to basic attributes (ID, location, value, appearance model, etc.), status (pending maintenance, in operation, faulty, abandoned, etc.), owners, upper and lower links and topology, transfer records, etc.), and provide corresponding processes to achieve full life cycle management of assets.

[0048] The local storage of the cross-domain operation and maintenance platform can save the usage data of all local device resources, including current resource usage data and historical resource usage data.

[0049] Among them, the current usage data and historical resource usage data can be the quantity information of equipment resources (e.g., according to the equipment type, determine how many pieces of each type of equipment there are in total, how many pieces are in use, how many pieces are idle, etc.), and the wear and tear information of equipment resources (e.g., the degree of wear and tear of each piece of equipment, the service life, etc.). It should be noted that in the embodiments of the present invention, the current usage data and historical usage data are not limited to the above examples, and can also be other data generated during the use of equipment resources.

[0050] When the cross-domain operation and maintenance platform receives a resource management request for local device resources, in order to achieve better management of local device resources, the current resource usage data and the first historical resource usage data of the local device resources can be obtained from the local storage to analyze the local device resources, thereby achieving reasonable configuration of device resources.

[0051] Step 102, determining whether the first historical resource usage data supports the resource management request;

[0052] After receiving the resource management request, the type of the resource management request may be confirmed, and whether the resource management request matches the first historical usage data may be determined based on the type, that is, whether the first historical resource usage data supports the resource management request.

[0053] For example, a resource management request can be used to request maintenance management of equipment resources, which requires relevant data such as the degree of wear and tear of the equipment resources and their service life. However, if the first historical usage resource obtained is merely data associated with the quantity of equipment resources, it is impossible to determine the frequency of equipment maintenance, etc. based on the first historical usage resource. In this case, the first historical resource usage data does not support the resource management request.

[0054] In another example, when the acquired first historical resource usage data amount is less than the preset data amount, the data amount is too small and may have a large deviation, thereby failing to support corresponding resource management according to the resource management request.

[0055] Step 103, when the first historical resource usage data does not support the resource management request, obtaining second historical resource usage data of the external device resources associated with the local device resources from the cloud storage;

[0056] In one embodiment of the present invention, the second historical resource usage data may include any one or more of the following:

[0057] Quantity information of equipment resources and consumption information of equipment resources.

[0058] The cross-domain operation and maintenance platform can not only manage local equipment resources, but also manage equipment resources in other areas (i.e., external equipment resources). Local equipment resources can be associated with other equipment resources. For example, equipment resources of the same model are basically the same in use, so they can refer to each other during equipment use and maintenance. Therefore, equipment resources of the same model can be associated, and during the operation and maintenance process, the relevant data of equipment resources of the same model can be referred to to operate and maintain the equipment.

[0059] When the first historical resource usage data cannot support resource management requests, the cross-domain operation and maintenance platform can obtain second historical resource usage data of external device resources associated with local device resources from cloud storage to manage local device resources through the second historical resource usage data.

[0060] The second historical resource usage data may be the quantity information of equipment resources (e.g., according to the equipment type, determining how many pieces of each type of equipment there are, how many pieces are in use, how many pieces are idle, etc.), and the wear and tear information of equipment resources (e.g., the degree of wear and tear of each piece of equipment, the service life, etc.). It should be noted that, in the embodiment of the present invention, the first historical usage data is not limited to the above examples, and may also be other data generated during the use of equipment resources.

[0061] Step 104, generating a resource usage trend according to the first historical resource usage data and the second historical resource usage data;

[0062] After obtaining the second historical resource usage data, a resource usage trend can be generated based on the first historical usage data and the second historical usage data, wherein the resource usage trend can be the number of equipment resources required in different time periods, or the degree of loss of different equipment resources on a daily or monthly basis.

[0063] Step 105 , performing resource management on local device resources in combination with current resource usage data and resource usage trends.

[0064] After obtaining the resource usage trend, the local device resources can be predicted in combination with the current resource usage data and the resource usage trend, so that the local resources can be managed according to the prediction results.

[0065] In an embodiment of the present invention, when a resource management request for local device resources is received, the current resource usage data and the first historical resource usage data of the local device resources are obtained from the local storage, and then it can be determined whether the first historical resource usage data supports the resource management request. When the first historical resource usage data does not support the resource management request, the second historical resource usage data of the foreign device resources associated with the local device resources is obtained from the cloud storage, so that a resource usage trend can be generated based on the first historical resource usage data and the second historical resource usage data, and resource management of the local device resources is performed in combination with the current resource usage data and the resource usage trend, thereby realizing the management of local device resources, reasonably allocating and using device resources, and improving resource management efficiency.

[0066] Reference Figure 2 , showing a step flow chart of another resource management method provided by an embodiment of the present invention, the method is applied to an operation and maintenance platform, the operation and maintenance platform is connected to multiple device resources, and the multiple device resources include local device resources and external device resources.

[0067] The embodiment of the present invention may specifically include the following steps:

[0068] Step 201, upon receiving a resource management request for local device resources, obtaining current resource usage data and first historical resource usage data of the local device resources from local storage;

[0069] The cross-domain operation and maintenance platform needs to have the capabilities of outdoor facility and equipment asset management, indoor facility and equipment asset management, fiber optic network asset management, office environment asset management, inventory reserve asset management, and information asset management. By establishing a unified and extensible asset configuration library, it can achieve the management of different attributes of the above-mentioned different categories (including but not limited to basic attributes (ID, location, value, appearance model, etc.), status (pending maintenance, in operation, faulty, abandoned, etc.), owners, upper and lower links and topology, transfer records, etc.), and provide corresponding processes to achieve full life cycle management of assets.

[0070] The local storage of the cross-domain operation and maintenance platform can save the usage data of all local device resources, including current resource usage data and historical resource usage data.

[0071] Among them, the current usage data and historical resource usage data can be the quantity information of equipment resources (e.g., according to the equipment type, determine how many pieces of each type of equipment there are in total, how many pieces are in use, how many pieces are idle, etc.), and the wear and tear information of equipment resources (e.g., the degree of wear and tear of each piece of equipment, the service life, etc.). It should be noted that in the embodiments of the present invention, the current usage data and historical usage data are not limited to the above examples, and can also be other data generated during the use of equipment resources.

[0072] When the cross-domain operation and maintenance platform receives a resource management request for local device resources, in order to achieve better management of local device resources, the current resource usage data and the first historical resource usage data of the local device resources can be obtained from the local storage to analyze the local device resources, thereby achieving reasonable configuration of device resources.

[0073] Step 202, determining whether the first historical resource usage data supports the resource management request;

[0074] After receiving the resource management request, the type of the resource management request may be confirmed, and whether the resource management request matches the first historical usage data may be determined based on the type, that is, whether the first historical resource usage data supports the resource management request.

[0075] For example, when the resource management request is a request for maintenance management of equipment resources, and the first historical usage resource obtained is merely data associated with the quantity of equipment resources, it is impossible to determine the equipment maintenance frequency based on the first historical usage resource. At this time, the first historical resource usage data does not support the resource management request.

[0076] Step 203, when the first historical resource usage data does not support the resource management request, obtain the first identification data of the local device resource;

[0077] When the first historical resource usage data does not support the resource management request, first identification data of the local device resource may be acquired, and the first identification data may be a unique identification for distinguishing the local device resource.

[0078] Step 204, based on the first identification data, determine the second identification data of the foreign device resource associated with the local device resource from the associated information stored in the cloud;

[0079] The cloud may store an association relationship between external device resources associated with local device resources. After obtaining the first identification data, the second identification data of the external device resources associated with the local device resources may be determined from the association relationship.

[0080] Step 205, obtaining second historical resource usage data corresponding to the second identification data;

[0081] After the second identification data is determined, the second historical resource usage data corresponding to the second identification data may be acquired according to the second identification data.

[0082] Step 206, generating a resource usage trend according to the first historical resource usage data and the second historical resource usage data;

[0083] In one example, a visual trend analysis chart (resource usage trend) can be formed based on the resource usage history to more intuitively display the usage of device resources.

[0084] Step 207, combining the current resource usage data and resource usage trends, predicting the time information when the local device resources reach a preset resource saturation state or a preset resource warning state;

[0085] In the cross-domain operation and maintenance platform, corresponding preset resource saturation states or preset resource warning states can be set for different device resources. Global thresholds can be set according to the classification of management objects, or they can be set separately for specific management objects.

[0086] Therefore, after obtaining the resource usage trend, the local device resources can be predicted by combining the current resource usage data and the resource usage trend, and the time information when the local device resources reach the preset resource saturation state or the preset resource warning state can be obtained through prediction. Specifically, the prediction method can refer to the commonly used mathematical prediction models such as the moving average method, the exponential smoothing method, and the trend extrapolation method.

[0087] In one example, the predicted resource saturation state may be a state in which all available device resources are in use, or a state in which a certain device resource is consumed to the point where it can no longer be used; the preset resource warning state is set compared to the predicted resource saturation state, and when the device resources reach the preset resource warning state, a warning may be issued to the user.

[0088] Step 208: Perform resource management on local device resources according to the time information.

[0089] After obtaining the time information, local device resources can be managed based on the time information.

[0090] For example, if it is predicted that a certain device resource will be worn out and can no longer be used at a certain point in time, a new device resource can be determined to replace the device resource before this point in time. If there is no device resource available in the current inventory that can be used for replacement, it is necessary to purchase a new device resource before the specified time point.

[0091] In addition, in order to avoid premature scrapping of equipment due to other reasons, the inspection frequency can be increased to monitor the operating status of equipment resources before the scrapping point.

[0092] In one embodiment of the present invention, step 208 may include:

[0093] Configure alarm information for local device resources based on time information.

[0094] In actual applications, after determining the time information, when the local device resources do not have an associated warning, the alarm information can be configured according to the time information. The alarm information is used to prompt the relevant user of the usage status of the device resources; when the local device resources are set with an associated warning, the alarm information of the local resources can be adjusted according to the device's warning and time information.

[0095] In an embodiment of the present invention, step 208 may further include:

[0096] Generate a device deployment work order for local device resources based on time information.

[0097] In actual applications, after determining the time information, in order to maintain the normal operation of the equipment resources, an equipment deployment work order for the local equipment resources can be generated. The deployment work order can be to replace an idle equipment resource with a certain equipment resource, or to purchase new equipment resources.

[0098] In an embodiment of the present invention, step 208 may further include:

[0099] Generate an equipment inspection work order for local equipment resources based on time information.

[0100] In actual applications, after determining the time information, when equipment resources are consumed excessively or are approaching the scrapping time, the equipment inspection work order of the local equipment resources can be adjusted, for example, increasing the inspection frequency or adding inspection items.

[0101] In an embodiment of the present invention, when a resource management request for local device resources is received, the current resource usage data and the first historical resource usage data of the local device resources are obtained from the local storage, and then it can be determined whether the first historical resource usage data supports the resource management request. When the first historical resource usage data does not support the resource management request, the second historical resource usage data of the foreign device resources associated with the local device resources is obtained from the cloud storage, so that a resource usage trend can be generated based on the first historical resource usage data and the second historical resource usage data, and resource management of the local device resources is performed in combination with the current resource usage data and the resource usage trend, thereby realizing predictive management of local device resources, rationally allocating and using device resources, and improving resource management efficiency.

[0102] It should be noted that, for the sake of simplicity, the method embodiments are described as a series of action combinations, but those skilled in the art should be aware that the embodiments of the present invention are not limited by the order of the actions described, because according to the embodiments of the present invention, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions involved are not necessarily required by the embodiments of the present invention.

[0103] Reference Figure 3 , showing a structural diagram of a resource management device provided by an embodiment of the present invention, which is applied to an operation and maintenance platform, wherein the operation and maintenance platform is connected to multiple device resources, and the multiple device resources include local device resources and external device resources.

[0104] In the embodiment of the present invention, the following modules may be specifically included:

[0105] A first historical resource usage data acquisition module 301 is used to acquire the current resource usage data and the first historical resource usage data of the local device resource from the local storage when receiving a resource management request for the local device resource;

[0106] A determination module 302 is used to determine whether the first historical resource usage data supports the resource management request;

[0107] A second historical resource usage data acquisition module 303, configured to acquire second historical resource usage data of a foreign device resource associated with a local device resource from a cloud storage when the first historical resource usage data does not support the resource management request;

[0108] A resource usage trend generating module 304, configured to generate a resource usage trend according to the first historical resource usage data and the second historical resource usage data;

[0109] The resource management module 305 is used to manage the local device resources in combination with the current resource usage data and the resource usage trend.

[0110] In one embodiment of the present invention, the resource management module 305 may include:

[0111] A prediction submodule, configured to combine the current resource usage data and the resource usage trend to predict the time information when the local device resources reach a preset resource saturation state or a preset resource warning level;

[0112] The management submodule is used to manage the local device resources according to the time information.

[0113] In an embodiment of the present invention, the cloud stores associated information of device resources, and the second historical resource usage data acquisition module 303 may include:

[0114] A first identification data acquisition submodule, used to acquire first identification data of the local device resource;

[0115] A second identification data acquisition submodule, configured to determine, based on the first identification data, second identification data of a foreign device resource associated with the local device resource from associated information stored in the cloud;

[0116] The second historical resource usage sub-data is used to obtain second historical resource usage data corresponding to the second identification data.

[0117] In one embodiment of the present invention, the management submodule may include:

[0118] An alarm management unit is used to configure alarm information for the local device resources according to the time information.

[0119] In one embodiment of the present invention, the management submodule may include:

[0120] The deployment management unit is used to generate a device deployment work order for the local device resources according to the time information.

[0121] In one embodiment of the present invention, the management submodule may include:

[0122] The inspection management unit is used to generate an equipment inspection work order for the local equipment resources according to the time information.

[0123] In an embodiment of the present invention, when a resource management request for local device resources is received, the current resource usage data and the first historical resource usage data of the local device resources are obtained from the local storage, and then it can be determined whether the first historical resource usage data supports the resource management request. When the first historical resource usage data does not support the resource management request, the second historical resource usage data of the foreign device resources associated with the local device resources is obtained from the cloud storage, so that a resource usage trend can be generated based on the first historical resource usage data and the second historical resource usage data, and resource management of the local device resources is performed in combination with the current resource usage data and the resource usage trend, thereby realizing the management of local device resources, reasonably allocating and using device resources, and improving resource management efficiency.

[0124] An embodiment of the present invention further provides a server, which may include a processor, a memory, and a computer program stored in the memory and capable of running on the processor, and the computer program implements the above resource management method when executed by the processor.

[0125] An embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the resource management method as described above is implemented.

[0126] As for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0127] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0128] Those skilled in the art will appreciate that the embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the embodiments of the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the embodiments of the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0129] The embodiments of the present invention are described with reference to the flowcharts and / or block diagrams of the methods, terminal devices (systems), and computer program products according to the embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing terminal device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing terminal device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0130] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing terminal device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0131] These computer program instructions can also be loaded onto a computer or other programmable data processing terminal device so that a series of operating steps are executed on the computer or other programmable terminal device to produce a computer-implemented process, thereby providing instructions for executing on the computer or other programmable terminal device to implement the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0132] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present invention.

[0133] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.

[0134] The above is a detailed introduction to a method and device for resource management provided. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A method for resource management, characterized in that: Applied to an operation and maintenance platform, the operation and maintenance platform is connected to a plurality of device resources, the plurality of device resources include local device resources and external device resources, the method includes: Upon receiving a resource management request for the local device resource, obtaining current resource usage data and first historical resource usage data of the local device resource from a local storage; determining whether the first historical resource usage data supports the resource management request; When the first historical resource usage data does not support the resource management request, obtaining second historical resource usage data of a foreign device resource associated with the local device resource from a cloud storage; generating a resource usage trend according to the first historical resource usage data and the second historical resource usage data; Perform resource management on the local device resources in combination with the current resource usage data and the resource usage trend; The cloud storage has associated information of device resources, and the step of obtaining second historical resource usage data of external device resources associated with local device resources from the cloud storage includes: Acquire first identification data of the local device resource; Based on the first identification data, determine the second identification data of the foreign device resource associated with the local device resource from the associated information stored in the cloud; Acquire second historical resource usage data corresponding to the second identification data.

2. The method according to claim 1, characterized in that The combining the current resource usage data and the resource usage trend to manage the local device resources includes: In combination with the current resource usage data and the resource usage trend, predict the time information when the local device resources reach a preset resource saturation state or a preset resource warning state; The local device resources are managed according to the time information.

3. The method according to claim 2, characterized in that The performing resource management on the local device resources according to the time information includes: According to the time information, alarm information is configured for the local device resources.

4. The method according to claim 2, characterized in that: The performing resource management on the local device resources according to the time information includes: Generate a device deployment work order for the local device resources according to the time information.

5. The method according to claim 2, characterized in that: The performing resource management on the local device resources according to the time information includes: Generate an equipment inspection work order for the local equipment resource according to the time information.

6. The method according to any one of claims 1 to 5, characterized in that: The current resource usage data, the first historical resource usage data, and the second historical resource usage data include any one or more of the following: Quantity information of equipment resources and consumption information of equipment resources.

7. A resource management device, characterized in that: Applied to an operation and maintenance platform, the operation and maintenance platform is connected to a plurality of equipment resources, the plurality of equipment resources include local equipment resources and external equipment resources, the device includes: A first historical resource usage data acquisition module, configured to acquire current resource usage data and first historical resource usage data of the local device resource from a local storage upon receiving a resource management request for the local device resource; A determination module, configured to determine whether the first historical resource usage data supports the resource management request; A second historical resource usage data acquisition module, configured to acquire second historical resource usage data of a foreign device resource associated with a local device resource from a cloud storage when the first historical resource usage data does not support the resource management request; A resource usage trend generating module, configured to generate a resource usage trend according to the first historical resource usage data and the second historical resource usage data; A resource management module, configured to manage the local device resources in combination with the current resource usage data and the resource usage trend; The cloud storage has associated information of device resources, and the step of obtaining second historical resource usage data of external device resources associated with local device resources from the cloud storage includes: Acquire first identification data of the local device resource; Based on the first identification data, determine the second identification data of the foreign device resource associated with the local device resource from the associated information stored in the cloud; Acquire second historical resource usage data corresponding to the second identification data.

8. A server, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and capable of running on the processor, wherein the computer program implements the resource management method according to any one of claims 1 to 6 when executed by the processor.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for resource management according to any one of claims 1 to 6 is implemented.

Citation Information

Patent Citations

  • Hospital logistics equipment life cycle management cloud platform, method and system

    CN109065135A