A supercritical steam huff and puff well insulated steam injection string and gas injection method
By using supercritical packers and insulated steam injection strings made of high-temperature and high-pressure-resistant materials during the steam injection operation of supercritical steam huff and puff wells, the safety and environmental problems caused by improper setting are solved, and the steam injection operation under supercritical conditions is achieved. A safe and reliable steam injection process.
Patent Information
- Application Number
- CN202111342283.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-12
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-11-12
AI Technical Summary
During the steam injection operation of the existing insulated steam injection pipe string in the supercritical steam huff and puff well, the setting seal is not set or is not set in place, causing high-pressure and high-temperature steam to return to the wellhead, posing safety hazards and environmental pollution risks.
A supercritical steam huff and puff well insulated steam injection string is designed, including a supercritical packer, a blast valve and a screen tube. By first injecting normal temperature pressure water to set the pressure packer, the annular gap is divided to ensure steam injection. The packer is set smoothly under high pressure and high temperature, and the main parts are made of high temperature and high pressure resistant materials.
It achieves safe operation and effective sealing of the insulated steam injection pipe string under supercritical conditions of pressure ≥ 22.05MPa and temperature ≥ 374.3°C, eliminating safety and environmental pollution hazards and ensuring the safety, reliability and economy of the steam injection process. Efficiency.
Smart Images

Figure CN114135261B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to heavy oil thermal recovery equipment and application fields, and in particular to a supercritical steam huff and puff well insulation steam injection pipe column and a gas injection method. Background Art
[0002] In the oil field, the primary task of heavy oil reservoir exploitation is to dilute the heavy oil to increase the fluidity of the oil body and create conditions for subsequent exploitation of the oil reservoir. So far, the most economical and effective and most widely used method for diluting heavy oil is the "steam injection method". This method includes the following steps: insert the insulated steam injection column, i.e. Figure 5 The components of the heat-insulating pipe, telescopic pipe and steam injection packer shown are installed in the casing cavity of the oil well; the pressure steam generated by the ground steam boiler is injected into the oil well through the pipe string, so that the steam injection packer is set and the heavy oil in the well is diluted until the predetermined steam injection amount is reached; the well is soaked, so that the pressure steam in the oil well diffuses through the pores of the reservoir and penetrates into the oil body to fully dilute it until the soaking cycle ends. At the same time, when the wellhead pressure is zero, the heat-insulating steam injection pipe string is lifted out of the well. This oil well that uses the steam huff-and-puff method to exploit heavy oil reservoirs is called a "steam huff-and-puff well".
[0003] According to the relevant technical standards in this field, the main physical parameter values of the above-mentioned pressure steam are: pressure ≤ 17MPa, temperature ≤ 350℃. The preset values of the working environment pressure and temperature parameters of the components of the above-mentioned insulated steam injection pipe string are: pressure resistance ≤ 17MPa, temperature resistance ≤ 350℃. Since the implementation of this standard, the insulated steam injection pipe string designed and manufactured according to this standard has played an extremely important role in the heavy oil production process. However, in the past two years, with the emergence of a new type of heavy oil reservoir, the application of the insulated steam injection pipe string has encountered a bottleneck. The focus is that compared with the previous heavy oil reservoir, the outstanding characteristics of this new type of reservoir are low porosity, low steam permeability, and great difficulty in reservoir dilution. Experiments have shown that in order to use the "steam huff and puff method" to dilute this "low porosity and low permeability" reservoir, it is necessary to inject pressure steam with a pressure of ≥ 22.05MPa and a temperature of ≥ 374.3℃ to achieve the purpose. Since this temperature exceeds the "critical temperature" of water vaporization, which is 374.3℃, people call this high-temperature and high-pressure steam "supercritical steam", and the oil wells that use "supercritical steam" to dilute "low porosity and low permeability" oil reservoirs are called "supercritical steam wells", or "supercritical wells" for short. Since the steam pressure and temperature indicators of supercritical wells are much higher than the preset values of the working environment pressure and temperature of the existing insulated steam injection pipe string, the following problems have occurred when people use this insulated steam injection pipe string to implement supercritical well steam injection operations: the insulation pipe made of N80 material, the telescopic pipe made of 45# steel and the components of the packer are excessively deformed, have functional problems, and even fall off the well; the working environment pressure of the thermal energy driven steam injection packer has exceeded the set value of the packer's setting drive pressure before it is fully softened, resulting in its inadequate setting or basically no setting, so that the annular gap between the outer circle of the insulated steam injection pipe string and the inner hole of the oil well casing cannot be closed, causing the high-pressure and high-temperature steam sent into the well through the steam injection pipe string to return to the wellhead through the annular gap, causing the steam and liquid near the surface casing to boil and splash everywhere, posing serious personal safety and environmental pollution risks. In response to this, the construction unit had to build a special wellhead protection cover and liquid trough in the form of a metal plate house to protect and collect the splashing gas and liquid, and arranged special personnel to supervise. However, this remedial measure is not only labor-intensive and costly, but also has unsatisfactory results. Summary of the invention
[0004] In order to solve the defect that the high-pressure and high-temperature steam returns to the wellhead due to the failure of the setting seal to be set or to be set in place when the existing insulated steam injection pipe string implements the supercritical well steam injection operation, the present invention provides a supercritical steam huff and puff well insulated steam injection pipe string and a gas injection method. In the supercritical steam huff and puff well steam injection operation, the steam injection sealer can be ensured to be set smoothly, the safe operation of each component can be ensured, and the safety hazards and environmental pollution hazards existing in the prior art are eliminated.
[0005] The technical solution adopted by the present invention to solve the technical problem is: an insulated steam injection pipe string for a supercritical steam huff-and-puff well, comprising an insulated pipe and a telescopic pipe connected to each other, and also comprising at least one supercritical packer connected to the insulated pipe, a bursting valve and a screen pipe; the supercritical packer, the bursting valve and the screen pipe are arranged in sequence from top to bottom, the bottom end of the insulated pipe is connected to the top end of the bursting valve, the bottom end of the bursting valve is connected to the top end of the screen pipe, and a thread plug is arranged at the bottom end of the screen pipe; the supercritical packer is composed of a steam injection packer and a pressure packer connected as a whole from top to bottom.
[0006] Furthermore, the steam injection packer and the pressure packer are independent of each other, and the lower end of the central pipe of the steam injection packer is threadedly connected to the upper joint of the pressure packer to form a supercritical packer.
[0007] Furthermore, the steam injection seal and the pressure seal share a central tube, the top of the central tube is connected to an upper joint, and the heat-driven sealing mechanism of the steam injection seal and the pressure-driven sealing mechanism of the pressure seal are sequentially sleeved on the shared central tube from top to bottom.
[0008] Furthermore, the heat-driven setting mechanism and the pressure-driven setting mechanism share a cylinder head, which is sleeved on the center tube, and has a closed end in contact with the center tube on the inner side of the cylinder head.
[0009] Furthermore, the thermal energy driven sealing mechanism also includes an expansion fluid, a thermal energy sealing sleeve and a thrust head. The thermal energy sealing sleeve is sleeved on the center tube and is located between the cylinder head and the upper joint. A cavity located on the upper side of the closed end is formed between the inner wall of the cylinder head and the center tube. The cavity is filled with expansion fluid. A thrust head is also embedded in the cavity and is connected to the center tube and can move axially along the center tube. The thrust head is located on the upper side of the expansion fluid and in contact with the thermal energy sealing sleeve.
[0010] Furthermore, the pressure-driven sealing mechanism also includes a sealing sleeve, an upper tray, a lower tray, and a fixed locking ring. A pressure storage chamber located at the lower side of the closed end is formed between the inner wall of the cylinder head and the center tube. The pressure storage chamber is connected to the water injection hole opened on the center tube. A push rod connected to the center tube and movable along the axial direction of the center tube is also embedded in the pressure storage chamber. The push rod is in contact with the upper tray located at the lower side thereof and movably connected to the center tube; the sealing sleeve, the lower tray, and the fixed locking ring are sequentially connected to the center tube from top to bottom, and the sealing sleeve is located between the upper tray and the lower tray.
[0011] Furthermore, the rated working pressure of the insulated pipe, expansion pipe, supercritical packer, burst valve and screen pipe is ≥22.05MPa, and the rated working temperature is ≥374.3℃.
[0012] A supercritical steam huff and puff well insulation steam injection method, using the supercritical steam huff and puff well insulation steam injection pipe string, comprises the following steps:
[0013] S1: Run into the pipe string:
[0014] Lower the heat-insulating steam injection pipe string into the predetermined position in the oil well casing and fix it;
[0015] S2: Pressurized sealing:
[0016] Connect the water injection and pressure equipment, inject water into the insulation pipe to pressurize it, so that the pressure packer of the supercritical packer is set, and then continue to inject water and pressurize it until the pressure relief port of the bursting valve is fully opened, and stop injecting water;
[0017] S3: Connect the boiler:
[0018] Remove the water injection and pressure equipment, seal and fix the upper end of the insulation pipe to the steam injection pipeline of the steam boiler set on the ground, and make the interfaces of the two sealed and connected;
[0019] S4: Downhole steam injection:
[0020] The supercritical steam produced by the ground steam boiler is injected into the oil layer in the well through the insulated pipe, so that the steam injection packer of the supercritical packer is set under the action of steam heat energy and the oil layer is heated until the set steam injection amount is reached, and then the steam injection is stopped;
[0021] S5: Pull out the pipe string:
[0022] After the steam injection is completed, the well is shut down. When the wellhead pressure reaches zero, the well is shut down and the insulated steam injection string is lifted out of the oil well.
[0023] Furthermore, step S2 comprises: a bursting valve located below the pressure seal forms a blockage on the inner cavity of the thermal insulation pipe, and the injected pressure water enters the pressure storage chamber through the water injection hole of the pressure seal, and when the pressure reaches the rated sealing pressure of the pressure seal, the water pressure drives the push rod and then drives the upper tray to move downward, so that the sealing sleeve located between the upper tray and the lower tray is squeezed and expanded outward until the sealing is completed, that is, the sealing sleeve forms a complete blockage on the annular gap between the outer wall of the thermal insulation pipe and the inner wall of the oil well casing at its position; then, water injection and pressurization are continued to reach the rated opening pressure of the bursting valve, that is, until its bursting disc bursts and the pressure relief port is opened; when the pressure relief port is opened, the pressure water injected into the thermal insulation pipe cavity is discharged through the pressure relief port of the bursting valve through the slit of the screen tube, and the explosive of the bursting valve falls into the screen tube with a wire plug, and at the same time, the injected water will no longer be pressurized, and the water injection is stopped at this time.
[0024] Furthermore, step S4 includes: during the steam injection process, the expansion fluid of the heat-driven sealing mechanism expands when it encounters heat, pushing the thrust head upward, causing the thermal energy sealing sleeve to radially expand under the action of the thrust head until it completes the sealing, that is, the thermal energy sealing sleeve completely seals the annular gap between the outer wall of the insulation pipe and the inner wall of the oil well casing at its location.
[0025] The beneficial effects of the present invention include: setting a supercritical packer, setting a steam injection packer on the upper part of the pressure packer, and before the steam injection operation begins, injecting normal temperature pressure water into the insulated steam injection pipe column of the present invention to seal the pressure packer first, so that the annular gap between the outer circle of the insulated steam injection pipe column and the inner hole of the oil well casing is divided into two upper and lower sections, so that in the subsequent steam injection operation, the external environment of the steam injection packer located on the upper part of the pressure packer can be protected from the influence of steam pressure, thereby ensuring that the steam injection packer is smoothly sealed, which can not only make the steam injection packer with excellent sealing performance fully play its role, but also avoid its defect of not being able to withstand high pressure, thereby obtaining an ideal use effect. The main parts of the heat-insulating steam injection pipe column of the present invention can ensure safe operation under the action of supercritical steam with a pressure of ≥22.05MPa and a temperature of ≥374.3°C. In the steam injection operation of the supercritical steam well, various predetermined tasks can be successfully completed, thereby eliminating the safety hazards and environmental pollution hazards existing in the prior art. Not only can the steam injection process of the supercritical well be realized, but it is also safe, reliable, economical and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the overall structure of the heat-insulated steam injection column of the present invention;
[0027] Figure 2 It is a schematic diagram of the structure of the telescopic pipe of the heat-insulating steam injection pipe column of the present invention;
[0028] Figure 3 1 is a schematic diagram of the structure of a supercritical packer for an insulated steam injection pipe column according to Example 1 of the present invention;
[0029] Figure 4 It is a schematic diagram of the structure of the heat-insulated steam injection column bursting valve of the present invention;
[0030] Figure 5 The present invention is a schematic diagram of the structure of the heat-insulated steam injection pipe column in the prior art.
[0031] Explanation of the reference numerals in the figure: 1. Insulation tube, 2. Telescopic tube, 3. Supercritical packer, 4. Burst valve, 5. Screen tube, 6. Sealing assembly, 7. Center tube, 8. Fixed locking ring, 9. Lower tray, 10. Sealing sleeve, 11. Upper tray, 12. , 13. Cylinder head, 14. Expansion fluid, 15. Thermal sealing sleeve, 16. Upper joint, 17. Thermal energy driven sealing mechanism, 18. Pressure driven sealing mechanism, 19. Burst disc, 20. Steam injection packer, 21. Pressure packer. DETAILED DESCRIPTION
[0032] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] In the description of the present invention, it should be noted that the terms "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used to distinguish components, and cannot be understood as indicating or implying relative importance.
[0034] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0035] Example 1
[0036] A supercritical steam huff-and-puff well insulated steam injection pipe string, comprising a basic insulated pipe 1, a telescopic pipe 2, a steam injection packer 20, a pressure packer 21, a burst valve 4 and a screen pipe 5 with a wire plug;
[0037] The steam injection packer 20 and the pressure packer 21 are arranged vertically and connected in series to form a supercritical packer 3;
[0038] The pressure packer 21 is a packer used with a water injection and pressure column, and is set by water pressure;
[0039] The telescopic pipe 2 , supercritical packer 3 , and bursting valve 4 are distributed from top to bottom and are sequentially connected in series on the thermal insulation pipe 1 . The screen pipe 5 with a wire plug is connected to the bottom end of the bursting valve 4 .
[0040] Preferably, in this embodiment, the number of supercritical packers 3 is 2, and they are connected in series adjacent to each other on the insulation pipe 1. However, in actual application, when the number of supercritical packers 3 is 1, the insulation steam injection string of the present invention can also be used normally. The main parts of the insulation steam injection string are made of materials that can enable it to work safely under environmental conditions of pressure ≥22.05MPa and temperature ≥374.3℃.
[0041] In this embodiment, the heat-insulated pipe 1 is made of P110 petroleum pipe.
[0042] The structure of the telescopic tube 2 is as follows Figure 2As shown, it is composed of a combined tubular cylinder, a telescopic rod arranged in the cylinder cavity, and a sealing assembly 6 arranged in the cylinder cavity. Among them, the sealing assembly 6 is a combined tubular member, which is composed of two steel pressure rings, two copper wire braided pressure rings, and a plurality of graphite pressure rings and modified tetrafluoroethylene pressure rings located between the two copper wire braided pressure rings. The manufacturing material of the sealing assembly 6 has the performance of temperature resistance ≥374.3℃ and pressure resistance ≥22.05MPa, and is suitable for the present invention. The metal parts of the components of the telescopic tube 2 are all made of 35CrMo material that can ensure its safe operation under the action of supercritical steam.
[0043] The structure of supercritical packer 3 is as follows Figure 3 As shown, the structure is as follows: the steam injection packer 20 and the pressure packer 21 share a central tube 7, the top of the central tube 7 is connected to an upper joint 16, the heat energy driven setting mechanism 17 of the steam injection packer 20 and the pressure driven setting mechanism 18 of the pressure packer 21 are sleeved on the shared central tube 7 from top to bottom in sequence, the heat energy driven setting mechanism 17 and the pressure driven setting mechanism 18 share a cylinder head 13, the cylinder head 13 is sleeved on the central tube 7, and the inner side of the cylinder head 13 has a closed end in contact with the central tube 7;
[0044] The heat-driven setting mechanism 17 also includes an expansion liquid 14, a heat-energy sealing sleeve 15 and a thrust head. The heat-energy sealing sleeve 15 is sleeved on the center tube 7 and is located between the cylinder head 13 and the upper joint 16. A cavity located on the upper side of the closed end is formed between the inner wall of the cylinder head 13 and the center tube 7. The cavity is filled with the expansion liquid 14. A piston and a thrust head are also embedded in the cavity. The piston and the thrust head are sleeved on the center tube 7 and can move axially along the center tube 7. The piston and the thrust head are located on the upper side of the expansion liquid 14 and the thrust head is in contact with the heat-energy sealing sleeve 15.
[0045] The heat sealing sleeve 15 is a bowl-shaped component made of modified polytetrafluoroethylene material and has the performance of temperature resistance ≥ 374.3°C and pressure resistance ≥ 22.05MPa.
[0046] The pressure-driven sealing mechanism 18 also includes a sealing sleeve 10, an upper tray 11, a lower tray 9, and a fixed locking ring 8. A pressure storage chamber located at the lower side of the closed end is formed between the inner wall of the cylinder head 13 and the center tube 7. The pressure storage chamber is connected to the water injection hole 12 opened on the center tube 7. A push rod is also embedded in the pressure storage chamber. The push rod is connected to the center tube 7 and can move axially along the center tube 7. The push rod is in contact with the upper tray 11 located at the lower side and movably connected to the center tube 7; the sealing sleeve 10, the lower tray 9, and the fixed locking ring 8 are sequentially connected to the center tube 7 from top to bottom, and the sealing sleeve 10 is located between the upper tray 11 and the lower tray 9; the fixed locking ring 8 is used to lock the position of the lower tray 9 to ensure that the sealing sleeve 10 expands outward under the pressure of the upper tray 11 and the lower tray 9.
[0047] The sealing sleeve 10 consists of a tubular sealing body and a bowl-shaped auxiliary sealing sleeve located at both ends of the sealing body and in contact with the sealing body. The sealing body is made of a composite material of asbestos, graphite and nickel wire, and the bowl-shaped auxiliary sealing sleeve is made of copper material. Both have the performance of temperature resistance ≥374.3℃ and pressure resistance ≥22.05MPa.
[0048] In addition, the sealing rings of the steam injection packer 20 and the pressure packer 21 are all standard parts that can work safely under the pressure and temperature of supercritical steam.
[0049] The structure of the burst valve 4 is as follows Figure 4 As shown, it is composed of an upper and lower joint and a bursting disc 19 fixedly arranged therebetween. The bursting disc 19 is a component that can be broken under a set water pressure, thereby connecting the inner holes of the upper and lower joints. In this embodiment, the upper and lower joints are preferably made of 35CrMo material.
[0050] The screen pipe 5 with a wire plug is made of 35CrMo material, can be used together with a water injection and pressure pipe column, and is arranged at its bottom to prevent debris from falling into the well.
[0051] To sum up, among the components of the insulated steam injection pipe column of the present invention, its main parts, that is, all parts except the bursting disc 19 of the bursting valve 4, the sealing sleeve 10 of the pressure packer 21, the thermal energy sealing sleeve 15 of the steam injection packer 20, and the sealing assembly 6 of the telescopic tube 2, are made of materials that can enable them to work safely under the action of supercritical steam.
[0052] It should be noted that the manufacturing material of the main parts given in this embodiment is not the only one. As long as the selected material can ensure that the parts made therefrom can work safely under the action of supercritical steam with a pressure ≥22.05MPa and a temperature ≥374.3°C, it is allowed.
[0053] It should also be explained that when manufacturing the supercritical packer 3, the reason why the steam injection packer 20 is emphasized to be arranged on the upper part of the pressure packer 21 is to ensure that the steam injection packer 20 is smoothly set during the application of the insulated steam injection pipe column of the present invention. The principle is as follows: before the steam injection operation begins, normal temperature pressure water is first injected into the insulated pipe 1 to set the pressure packer 21 first, so that the annular gap between the outer circle of the insulated steam injection pipe column of the present invention and the inner hole of the oil well casing is divided into two sections, upper and lower, so that in the subsequent steam injection operation, the external environment of the steam injection packer 20 located on the upper part of the pressure packer 21 is not affected by the steam pressure, thereby ensuring its smooth setting. Such a setting can not only make the steam injection packer 20 with excellent sealing performance fully play its role, but also avoid its defect of not being able to withstand high pressure, so that the present invention can achieve an ideal use effect.
[0054] Example 2
[0055] Another composition mode of the supercritical packer 3: the steam injection packer 20 and the pressure packer 21 are independent of each other, and the lower end of the central pipe of the steam injection packer 20 is threadedly connected with the upper joint of the pressure packer 21 to form the supercritical packer 3.
[0056] Compared with the supercritical packer described in Example 1, the supercritical packer 3 of this structural form increases the material length of the central pipe 7, the number of upper joints 16 manufactured, and the connection points of the pipe string. The possibility of steam leakage is slightly higher, and the safety factor is slightly lower than that of Example 1.
[0057] Example 3
[0058] A supercritical steam huff and puff well insulation steam injection method, using the supercritical steam huff and puff well insulation steam injection string described in Example 1 or 2, comprises the following steps:
[0059] S1: Run into the pipe string:
[0060] Lower the heat-insulating steam injection pipe string into the predetermined position in the oil well casing and fix it;
[0061] S2: Pressurized sealing:
[0062] Connect the water injection and pressure equipment, inject water into the insulation pipe 1 to pressurize it, so that the pressure packer 21 of the supercritical packer 3 is set, and then continue to inject water and pressurize it until the pressure relief port of the burst valve 4 is fully opened, and stop injecting water;
[0063] Specifically, the bursting valve 4 located below the pressure packer 21 forms a blockage on the inner cavity of the thermal insulation pipe 1, and the injected pressure water enters the pressure storage chamber through the water injection hole 12 of the pressure packer 21. When the pressure reaches the rated setting pressure of the pressure packer 21, the water pressure drives the push rod and then drives the upper tray 11 to move downward, so that the sealing sleeve 10 located between the upper tray 11 and the lower tray 9 is squeezed and expanded outward until the setting is completed, that is, the sealing sleeve 10 forms a complete blockage of the annular gap between the outer wall of the thermal insulation pipe 1 and the inner wall of the oil well casing at its position; then, water injection and pressurization are continued to reach the rated opening pressure of the bursting valve 4, that is, until its bursting disc 19 bursts and the pressure relief port is opened; when the pressure relief port is opened, the pressure water injected into the cavity of the thermal insulation pipe 1 is discharged through the pressure relief port of the bursting valve 4 through the slit of the screen pipe 5, and the explosive of the bursting valve 4 falls into the screen pipe 5 with a wire plug. At the same time, the injected water will no longer be pressurized, and the water injection is stopped at this time.
[0064] S3: Connect the boiler:
[0065] Remove the water injection and pressure equipment, seal and fix the upper end of the insulation pipe 1 to the steam injection pipeline of the steam boiler arranged on the ground, and make the interfaces of the two sealed and connected;
[0066] S4: Downhole steam injection:
[0067] The supercritical steam produced by the ground steam boiler is injected into the oil layer in the well through the insulated pipe 1, so that the steam injection packer 20 of the supercritical packer 3 is set under the action of steam heat energy, and the oil layer is heated until the set steam injection amount is reached, and then the steam injection is stopped;
[0068] Specifically, during the steam injection process, the expansion fluid 14 of the sealing mechanism 17 driven by heat expands when it encounters heat, pushing the piston and thrust head assembly upward, causing the thermal sealing sleeve 15 to expand radially under the action of the piston and the thrust head until it is sealed, that is, the thermal sealing sleeve 15 completely seals the annular gap between the outer wall of the insulation pipe 1 and the inner wall of the oil well casing where it is located.
[0069] S5: Pull out the pipe string:
[0070] After the steam injection is completed, the well is shut down. When the wellhead pressure reaches zero, the well is shut down and the insulated steam injection string is lifted out of the oil well.
[0071] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A supercritical steam well insulation steam injection method, using a supercritical steam well insulation steam injection pipe string, the pipe string comprising a connected insulation pipe (1) and a telescopic pipe (2), characterized in that: It also comprises at least one supercritical packer (3) connected to the insulation pipe (1), as well as a bursting valve (4) and a screen pipe (5); the supercritical packer (3), the bursting valve (4) and the screen pipe (5) are arranged in sequence from top to bottom, the bottom end of the insulation pipe (1) is connected to the top end of the bursting valve (4), the bottom end of the bursting valve (4) is connected to the top end of the screen pipe (5), and a threaded plug is provided at the bottom end of the screen pipe (5); the supercritical packer (3) is composed of a steam injection packer (20) and a pressure packer (21) which are connected as a whole from top to bottom; The telescopic tube (2) is composed of a combined tubular body-shaped cylinder, a telescopic rod arranged in the cylinder body cavity, and a sealing assembly (6) arranged in the cylinder body cavity; wherein the sealing assembly (6) is a combined tubular body-shaped component, which is composed of two steel pressure rings, two copper wire braided pressure rings, and a plurality of graphite pressure rings and modified tetrafluoroethylene pressure rings located between the two copper wire braided pressure rings, which are symmetrically distributed from the outside to the inside at both ends of the telescopic tube (2); the metal parts of the components of the telescopic tube (2) are all made of 35CrMo material; The steam injection packer (20) and the pressure packer (21) share a central tube (7), the top end of the central tube (7) is connected to an upper joint (16), and the heat energy driven setting mechanism (17) of the steam injection packer (20) and the pressure driven setting mechanism (18) of the pressure packer (21) are sequentially sleeved on the shared central tube (7) from top to bottom; The heat energy driven setting mechanism (17) and the pressure driven setting mechanism (18) share a cylinder head (13), the cylinder head (13) is sleeved on the center tube (7), and the inner side of the cylinder head (13) has a closed end in contact with the center tube (7); The thermal energy driven setting mechanism (17) further comprises an expansion fluid (14), a thermal energy sealing sleeve (15) and a thrust head. The thermal energy sealing sleeve (15) is sleeved on the center tube (7) and is located between the cylinder head (13) and the upper joint (16). A cavity located on the upper side of the closed end is formed between the inner wall of the cylinder head (13) and the center tube (7). The cavity is filled with the expansion fluid (14). A thrust head is also embedded in the cavity and is sleeved on the center tube (7) and can move axially along the center tube (7). The thrust head is located on the upper side of the expansion fluid (14) and is in contact with the thermal energy sealing sleeve (15). The heat energy sealing sleeve (15) is a bowl-shaped body component, which is made of modified polytetrafluoroethylene material; The pressure-driven sealing mechanism (18) further comprises a sealing sleeve (10), an upper tray (11), a lower tray (9), and a fixed locking ring (8); a pressure storage chamber located at the lower side of the closed end is formed between the inner wall of the cylinder head (13) and the center tube (7); the pressure storage chamber is communicated with a water injection hole (12) provided on the center tube (7); a push rod which is sleeved on the center tube (7) and can move axially along the center tube (7) is also embedded in the pressure storage chamber; the push rod is in contact with an upper tray (11) which is located at the lower side thereof and movably sleeved on the center tube (7); the sealing sleeve (10), the lower tray (9), and the fixed locking ring (8) are sleeved on the center tube (7) in sequence from top to bottom; the sealing sleeve (10) is located between the upper tray (11) and the lower tray (9); The sealing sleeve (10) is composed of a tubular sealing body and bowl-shaped auxiliary sealing sleeves located at both ends of the sealing body and in contact with the sealing body, the sealing body is made of a composite material of asbestos, graphite and nickel wire, and the bowl-shaped auxiliary sealing sleeve is made of copper material; The rated working pressure of the insulation pipe (1), the telescopic pipe (2), the supercritical packer (3), the bursting valve (4) and the screen pipe (5) is ≥22.05 MPa, and the rated working temperature is ≥374.3°C; The adiabatic steam injection method comprises the following steps: S1: Run into the pipe string: Lower the heat-insulating steam injection pipe string into the predetermined position in the oil well casing and fix it; S2: Pressurized sealing: Connecting a water injection and pressurizing device, injecting water into the insulation pipe (1) to pressurize the pressure packer (21) of the supercritical packer (3), and then continuing to inject water and pressurize until the pressure relief port of the burst valve (4) is fully opened, and then stopping the water injection; S3: Connect the boiler: The water injection and pressurizing equipment is removed, and the upper end of the heat-insulating pipe (1) is sealed and fixedly connected to the steam injection pipeline of the steam boiler arranged on the ground, and the interfaces of the two are sealed and connected; S4: Downhole steam injection: The supercritical steam produced by the ground steam boiler is injected into the oil layer in the well through the insulated pipe (1), so that the steam injection packer (20) of the supercritical packer (3) is set under the action of the steam heat energy and the oil layer is heated until the set steam injection amount is reached, and then the steam injection is stopped; S5: Pull out the pipe string: After the steam injection is completed, the well is soaked. When the wellhead pressure reaches zero, the soaking is completed and the insulated steam injection string is lifted out of the oil well. The step S2 comprises: a burst valve (4) located below the pressure packer (21) forms a seal on the inner cavity of the insulation pipe (1), and the injected pressure water enters the pressure storage cavity through the water injection hole (12) of the pressure packer (21). When the pressure reaches the rated setting pressure of the pressure packer (21), the water pressure drives the push rod to drive the upper tray (11) to move downward, so that the sealing sleeve (10) located between the upper tray (11) and the lower tray (9) is squeezed and expanded outward until the setting is completed, that is, the sealing sleeve (10) is 0) to completely seal the annular gap between the outer wall of the heat insulation pipe (1) and the inner wall of the oil well casing at the location thereof; then, continue to inject water and pressurize it to the rated opening pressure of the bursting valve (4), that is, until the bursting disc (19) bursts and the pressure relief port opens; when the pressure relief port opens, the pressurized water injected into the cavity of the heat insulation pipe (1) is discharged through the pressure relief port of the bursting valve (4) and the slit of the screen pipe (5), and the bursting material of the bursting valve (4) falls into the screen pipe (5) with a wire plug, and at the same time, the injected water will no longer be pressurized, and the water injection is stopped at this time; The step S4 comprises: during the steam injection process, the expansion fluid (14) of the heat-driven sealing mechanism (17) expands when heated, pushing the thrust head upward, causing the thermal energy sealing sleeve (15) to expand radially under the action of the thrust head until the sealing is completed, that is, the thermal energy sealing sleeve (15) completely seals the annular gap between the outer wall of the insulation pipe (1) and the inner wall of the oil well casing at its location.