Base station maintenance method and device, readable storage medium, and electronic device
By calculating the power supply, transmission optical path and environmental stability index of the base station site, targeted maintenance measures are formulated, and the problem of low maintenance efficiency of base station site is solved, and efficient maintenance and rapid decision-making are achieved.
Patent Information
- Application Number
- CN202111490258.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-08
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2041-12-08
AI Technical Summary
In the prior art, the maintenance efficiency of base station sites is low and cannot be carried out in a comprehensive evaluation and maintenance.
By obtaining the power interruption time, battery pack data, optical collection power, optical cable data, radio frequency stretching unit single board temperature and site type of the target site, we calculate the relative power supply stability index, relative transmission optical path stability index and relative environmental stability index of the target site, and calculate the relative power supply stability index, relative transmission optical path stability index and relative environmental stability index of the target site , and then determine the evaluation factors and formulate maintenance measures.
It improves the efficiency of base station site maintenance, reduces data acquisition costs, enables rapid calculation and decision-making, and achieves rapid deployment.
Smart Images

Figure CN114186701B_ABST
Abstract
Description
Background Art
[0002] With the rapid development of mobile Internet technology, people have higher and higher requirements for the quality of wireless network services provided by operators. In the entire wireless communication system, the base station system mainly provides access services for users and occupies an extremely important position.
[0003] In the prior art, the evaluation of base station sites mainly occurs before the construction of base stations. The benefit value of the base station to be built is determined by evaluating the original base station sites, but the base station sites cannot be comprehensively evaluated, which reduces the maintenance efficiency of the base station sites.
[0004] Therefore, a new base station site maintenance method needs to be provided.
[0005] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention
[0006] The purpose of the present disclosure is to provide a base station site maintenance method, a base station site maintenance device, a readable storage medium and an electronic device, thereby at least to a certain extent overcoming the problem of low base station site maintenance efficiency caused by the limitations and defects of related technologies.
[0007] According to one aspect of the present disclosure, a base station site maintenance method is provided, including:
[0008] Obtaining a power outage time and battery pack data of a target site, and determining a relative power supply stability index of the target site according to the power outage time and the battery pack data;
[0009] Acquire the received optical power and the distribution optical cable data of the target site, and determine the relative transmission optical path stability index of the target site according to the received optical power and the distribution optical cable data;
[0010] Acquire a board temperature and a site type of a radio remote unit of the target site, and determine a relative environmental stability index of the target site according to the board temperature and the site type;
[0011] An evaluation factor of the target site is determined according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and maintenance measures for the target site are determined according to the evaluation factor.
[0012] In an exemplary embodiment of the present disclosure, obtaining a power outage time and battery pack data of a target site, and determining a relative power supply stability index of the target site according to the power outage time and the battery pack data includes:
[0013] Acquire a preset time period and a power outage time within the preset time period, and determine a power availability rate of the target site according to the preset time period and the power outage time within the preset time period;
[0014] Acquire the battery pack data, wherein the battery pack data includes the number of battery packs, battery capacity, and operating current;
[0015] Obtaining a relative endurance index of the target site according to the number of battery packs, the battery capacity, and the operating current;
[0016] A relative power supply stability index of the target site is determined according to the power supply availability and the relative endurance index.
[0017] In an exemplary embodiment of the present disclosure, obtaining the relative endurance index of the target site according to the number of battery packs, the battery capacity, and the operating current includes:
[0018] Determine, according to the number of battery packs, the battery capacity, and the operating current, an absolute endurance index of the target site when the power supply of the target site is interrupted;
[0019] Determine a reference critical value of the battery continuous working time of the target site;
[0020] The relative battery life index of the target site is obtained according to the reference critical value of the battery continuous working time and the absolute battery life index.
[0021] In an exemplary embodiment of the present disclosure, obtaining the received optical power and the distribution optical cable data of the target site, and determining the relative transmission optical path stability index of the target site according to the received optical power and the distribution cable data, includes:
[0022] Obtaining the received optical power of the target site uplink baseband processing unit side and the critical value of the received optical power;
[0023] Obtaining a relative optical cable effective connection index of the target site according to the received optical power and a critical value of the received optical power;
[0024] Acquire the number of distribution optical cables of the target site, and obtain a relative route allocation rationality index of the target site according to the number of distribution optical cables;
[0025] The relative transmission optical path stability of the target site is obtained according to the relative optical cable effective connection index and the relative route allocation rationality index.
[0026] In an exemplary embodiment of the present disclosure, obtaining the number of distribution optical cables of the target site, and obtaining the relative route allocation rationality index of the target site according to the number of distribution optical cables includes:
[0027] According to the number of the distribution optical cables, a reasonable reference value of the absolute route allocation of the target site is obtained;
[0028] Obtaining the total number of sectors of the target site and the minimum number of sectors remaining and available when a distribution optical cable in the target site is disconnected;
[0029] Obtaining an absolute route allocation rationality index of the target site through the total number of sectors and the remaining minimum number of sectors that can be used;
[0030] The relative route allocation rationality index of the target site is obtained according to the absolute route allocation rationality index and the absolute route allocation rationality reference value.
[0031] In an exemplary embodiment of the present disclosure, obtaining a board temperature and a site type of a radio remote unit of the target site, and determining a relative environmental stability index of the target site according to the board temperature and the site type includes:
[0032] Acquire a maximum value of a board temperature of a radio remote unit of the target site and a reference critical value of a board temperature index;
[0033] Determining a relative temperature suitability index value of the target site according to the maximum value of the single board temperature and the critical reference value of the single board temperature index;
[0034] Determining a site type of the target site, and determining a stability factor of the target site type according to the site type;
[0035] According to the relative temperature suitability index value and the target site type stability factor, a relative environmental stability index of the target site is obtained.
[0036] In an exemplary embodiment of the present disclosure, determining an evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and determining maintenance measures for the target site according to the evaluation factor include:
[0037] Determine a first weight factor, a second weight factor, and a third weight factor corresponding to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, respectively;
[0038] Obtaining an evaluation factor of the target site according to the relative power supply stability index, the first weight factor, the relative transmission optical path stability index, the second weight factor, and the relative environmental stability index and the third weight factor;
[0039] Based on the evaluation factors, the target sites are classified, and maintenance measures corresponding to the target sites are determined according to the classification levels of the target sites.
[0040] According to one aspect of the present disclosure, a base station site maintenance device is provided, including:
[0041] A power supply stability index calculation module, used to obtain the power supply interruption time and battery pack data of the target site, and determine the relative power supply stability index of the target site according to the power supply interruption time and the battery pack data;
[0042] A transmission optical path stability index calculation module, used to obtain the received optical power and the wiring optical cable data of the target site, and determine the relative transmission optical path stability index of the target site according to the received optical power and the wiring optical cable data;
[0043] An environmental stability index calculation module, used to obtain a board temperature and a site type of a radio remote unit of the target site, and determine a relative environmental stability index of the target site according to the board temperature and the site type;
[0044] A maintenance module is used to determine an evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and determine maintenance measures for the target site according to the evaluation factor.
[0045] According to one aspect of the present disclosure, a readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the base station site maintenance method described in any of the above exemplary embodiments is implemented.
[0046] According to one aspect of the present disclosure, there is provided an electronic device, including:
[0047] Processor; and
[0048] A memory, configured to store executable instructions of the processor;
[0049] The processor is configured to execute the base station site maintenance method described in any of the above exemplary embodiments by executing the executable instructions.
[0050] A base station site maintenance method provided by an embodiment of the present disclosure obtains the power interruption time and battery pack data of a target site, and determines the relative power supply stability index of the target site according to the power interruption time and the battery pack data; obtains the received optical power and wiring optical cable data of the target site, and determines the relative transmission optical path stability index of the target site according to the received optical power and the wiring cable data; obtains the single board temperature and site type of the radio frequency remote unit of the target site, and determines the relative environmental stability index of the target site according to the single board temperature and the site type; determines the evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index , determine the maintenance measures for the target site according to the evaluation factors; on the one hand, before maintenance, first obtain the relative power supply stability index through the power interruption time and battery pack data of the target site, obtain the relative transmission optical path stability index through the received optical power and wiring cable data of the target site, and obtain the relative environmental stability index through the board temperature and site type, and then obtain the evaluation factor of the target site through the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and maintain the target site according to the evaluation factors, thereby improving the efficiency of base station site maintenance; on the other hand, there is no need to spend a lot of manpower and cost to collect the data of the site evaluation factors, the use cost is low, and it can be quickly calculated, decided, deployed and implemented.
[0051] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] The accompanying drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification are used to explain the principles of the present disclosure. Obviously, the accompanying drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.
[0053] Figure 1 The following schematically shows a flow chart of a base station site maintenance method according to an exemplary embodiment of the present disclosure.
[0054] Figure 2 A block diagram of a base station site maintenance system according to an exemplary embodiment of the present disclosure is schematically shown.
[0055] Figure 3 A flowchart of a method for determining a relative power supply stability index of a target site according to an exemplary embodiment of the present disclosure is schematically shown.
[0056] Figure 4A flowchart of a method for obtaining a relative endurance index of a target site according to the number of battery packs, battery capacity, and operating current according to an exemplary embodiment of the present disclosure is schematically shown.
[0057] Figure 5 A flowchart of a method for determining a relative transmission optical path stability index of a target site according to an exemplary embodiment of the present disclosure is schematically shown.
[0058] Figure 6 A flowchart of a method for obtaining a relative route allocation rationality index of a target site according to the number of distribution optical cables according to an exemplary embodiment of the present disclosure is schematically shown.
[0059] Figure 7 A flowchart of a method for determining a relative environmental stability index of a target site according to a board temperature and a site type according to an exemplary embodiment of the present disclosure is schematically shown.
[0060] Figure 8 A flowchart of a method for determining an evaluation factor of a target site according to a relative power supply stability index, a relative transmission optical path stability index, and a relative environmental stability index, and determining maintenance measures for the target site according to the evaluation factors is schematically shown according to an example embodiment of the present disclosure.
[0061] Fig. 9 A block diagram schematically shows a base station site maintenance device according to an exemplary embodiment of the present disclosure.
[0062] Fig.10 An electronic device for implementing the above-mentioned base station site maintenance method according to an exemplary embodiment of the present disclosure is schematically shown. DETAILED DESCRIPTION
[0063] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as being limited to the examples set forth herein; on the contrary, these embodiments are provided so that the present disclosure will be more comprehensive and complete, and the concepts of the example embodiments are fully conveyed to those skilled in the art. The described features, structures, or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced while omitting one or more of the specific details, or other methods, components, devices, steps, etc. may be adopted. In other cases, known technical solutions are not shown or described in detail to avoid obscuring various aspects of the present disclosure.
[0064] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.
[0065] With the rapid development of mobile Internet technology, people have higher and higher requirements for the quality of wireless network services provided by operators. In the entire wireless communication system, the base station system mainly provides access services for users and occupies an extremely important position. The operation of the base station site has a very important impact on the service perception of the entire wireless network and is an important guarantee object for operators.
[0066] In this exemplary embodiment, a base station maintenance method is first provided, which can be run on a device terminal, which can include a PC terminal, a mobile terminal, etc. Of course, those skilled in the art can also run the method disclosed in this disclosure on other platforms as required, which is not specifically limited in this exemplary embodiment. Figure 1 As shown, the base station site maintenance method may include the following steps:
[0067] Step S110. Obtain the power outage time and battery pack data of the target site, and determine the relative power supply stability index of the target site according to the power outage time and the battery pack data;
[0068] Step S120. Obtain the received optical power and the distribution optical cable data of the target site, and determine the relative transmission optical path stability index of the target site according to the received optical power and the distribution optical cable data;
[0069] Step S130: obtaining the board temperature and site type of the radio remote unit of the target site, and determining the relative environmental stability index of the target site according to the board temperature and the site type;
[0070] Step S140: Determine an evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and determine maintenance measures for the target site according to the evaluation factor.
[0071] The above-mentioned base station site maintenance method obtains the power interruption time and battery pack data of the target site, and determines the relative power supply stability index of the target site according to the power interruption time and the battery pack data; obtains the received optical power and wiring optical cable data of the target site, and determines the relative transmission optical path stability index of the target site according to the received optical power and the wiring cable data; obtains the board temperature and site type of the radio frequency remote unit of the target site, and determines the relative environmental stability index of the target site according to the board temperature and the site type; determines the evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and determines the relative power supply stability index according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index. The evaluation factors determine the maintenance measures for the target site; on the one hand, before maintenance, the relative power supply stability index is obtained through the power interruption time and battery pack data of the target site, the relative transmission optical path stability index is obtained through the received optical power and wiring cable data of the target site, and the relative environmental stability index is obtained through the single board temperature and site type, and then the evaluation factor of the target site is obtained through the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and the target site is maintained according to the evaluation factors, thereby improving the efficiency of base station site maintenance; on the other hand, there is no need to spend a lot of manpower and cost to collect data on the site evaluation factors, the use cost is low, and it can be quickly calculated, decided, deployed and implemented.
[0072] Hereinafter, each step involved in the base station site maintenance method according to the exemplary embodiment of the present disclosure is explained and illustrated in detail.
[0073] First, the application scenarios and purposes of the exemplary embodiments of the present disclosure are explained and illustrated. Specifically, the exemplary embodiments of the present disclosure can be applied to wireless base station sites, mainly studying how to evaluate the health of base station sites and determine maintenance methods for different sites according to the health of base station sites.
[0074] In the present disclosure, based on the power interruption time, battery pack data, received optical power, wiring cable data, single board temperature of the video remote unit and site type of the acquired base station site, the relative power supply stability index of the target site is obtained according to the power interruption time and the battery pack data, and the relative transmission optical path stability index of the target site is obtained according to the received optical power and the wiring cable data; the relative environmental stability index of the target site is obtained according to the single board temperature of the radio frequency remote unit and the site type of the target site. On the one hand, the acquisition of power interruption time, battery pack data, received optical power, wiring cable data, single board temperature and site type is based on the network management system and daily maintenance data, without spending a lot of manpower and cost resources, thereby reducing the cost of base station maintenance; on the other hand, the evaluation factor of the base station site can be obtained according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, the classification level of the base station site is determined according to the evaluation factor, and the maintenance measures of the base station site are determined according to the classification level of the base station site. It has wide applicability and improves the maintenance efficiency of the base station site.
[0075] Next, the base station maintenance system involved in the exemplary embodiment of the present disclosure is explained and illustrated. Figure 2As shown, the base station site maintenance system may include a base station data acquisition module 210, a site health evaluation module 220 and a site maintenance module 230. The base station data acquisition module 210 is used to obtain evaluation data of the target site, wherein the evaluation data may include: power outage time, battery pack data, optical reception power, wiring cable data, board temperature of the radio frequency remote unit and site type of the target site. The power outage time in the evaluation data can be obtained from the network management system; the battery pack data includes the number of battery packs, battery capacity and operating current of the target site; the optical reception power is the optical reception power of the baseband processing unit side of the site; the wiring cable data includes the number of wiring optical cables, and the board temperature of the radio frequency remote unit includes the reference critical value of the board temperature index and the maximum value of the board temperature. The maximum value of the board temperature can be obtained from the network management system; the site health evaluation module 220 is connected to the base station data acquisition module 210 and is used to obtain the target site sent by the base station data acquisition module 210. Evaluation data of the site, obtaining the relative power supply stability index of the base station site according to the power interruption data and the battery pack data in the evaluation data; obtaining the relative transmission optical path stability index of the base station site according to the received optical power and the wiring cable data; and obtaining the relative environmental stability index of the base station site according to the single board temperature and the site type; and obtaining the evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and sending the obtained evaluation factor to the site maintenance module 230; the site maintenance module 230 is connected to the site health evaluation module 220 network, and is used to receive the evaluation factor of the target site sent by the site health evaluation module 220, classify the target site according to the evaluation factor of the target site, obtain the classification level of the target site, and determine the maintenance measures corresponding to the target site according to the classification level of the target site.
[0076] The following will be combined Figure 2 Steps S110 to S140 are explained and illustrated in detail.
[0077] In step S110, the power outage time and battery pack data of the target site are obtained, and the relative power supply stability index of the target site is determined according to the power outage time and the battery pack data.
[0078] The power outage time of the target site within a preset time period may be obtained, which may be the power outage time within one year to the present time or the power outage time within half a year to the present time, which is not specifically limited in the present example embodiment.
[0079] In this example embodiment, reference Figure 3As shown, obtaining the power outage time and battery pack data of the target site, and determining the relative power supply stability index of the target site according to the power outage time and the battery pack data may include steps S310 to S340:
[0080] Step S310. Obtain a preset time period and a power outage time within the preset time period, and determine the power availability of the target site according to the preset time period and the power outage time within the preset time period;
[0081] Step S320. Acquire the battery pack data, wherein the battery pack data includes the number of battery packs, battery capacity, and operating current;
[0082] Step S330. Obtaining a relative endurance index of the target site according to the number of battery packs, the battery capacity, and the operating current;
[0083] Step S340: Determine a relative power supply stability index of the target site according to the power supply availability and the relative endurance index.
[0084] In the following, step S310 to step S340 will be explained and illustrated. Specifically, first, a preset time period for calculating the power outage time of the target site and a time unit of the preset time period can be determined; then, according to the determined preset time period, the power outage time of the target site within the preset time period is obtained from the network management alarm based on the preset time period, and the power availability I of the target site is determined according to the preset time period and the power outage time within the preset time period. 11 , the calculation of power availability can refer to equation (1)
[0085]
[0086] Next, the battery pack data of the target site can be obtained, wherein the battery pack data may include: the number of battery packs, the battery capacity, and the operating current of the battery when working, and the relative battery life index of the target site can be obtained based on the number of battery packs, the battery capacity, and the operating current of the battery when working included in the battery pack data; finally, the relative power supply stability index of the target site can be obtained based on the power availability rate and the relative battery life index of the target site.
[0087] Further, in this exemplary embodiment, reference is made to Figure 4 As shown, obtaining the relative endurance index of the target site according to the number of battery packs, battery capacity, and operating current may include steps S410 to S430:
[0088] Step S410. Determine the absolute endurance index of the target site when the power supply of the target site is interrupted according to the number of battery packs, the battery capacity and the operating current;
[0089] Step S420: Determine a reference critical value of the battery continuous working time of the target site;
[0090] Step S430: Obtain a relative battery life index of the target site according to the battery continuous working time reference critical value and the absolute battery life index.
[0091] Specifically, first, according to the number of battery packs, the battery capacity, and the working current of the battery, the absolute working time of the battery of the target site when the power supply is interrupted is determined, that is, the absolute endurance index of the target site, wherein the absolute endurance index of the target site is I 12 The calculation of ′ is as follows:
[0092]
[0093] Then, the reference critical value η of the battery continuous working time of the target site is determined, and the absolute endurance index I is calculated based on the reference critical value η of the battery continuous working time and the absolute endurance index I 12 ′Get the relative endurance index of the target site. The absolute endurance index can be converted into a relative endurance index by referring to the critical value η of the battery continuous working time, where the percentage system can be processed and the converted relative endurance index is mapped within [0,100]. The calculation of the relative endurance index is equation (3)
[0094]
[0095] Among them, I 12,i is the relative battery life index of the i-th base station site battery that needs to be rated, I 12,i ′ is the absolute battery life index of the i-th base station site battery that needs to be rated, (I 12 ′) max is the maximum value of the absolute battery life index of all base stations to be evaluated, and η is the reference critical value of the continuous working time of the base station battery. 12,i When the value of ′-η) is negative, the value of the relative endurance index of the base station is 0.
[0096] After obtaining the power availability of the target site and the relative battery life of the base station site, the relative power supply stability index of the base station site can be obtained according to the power availability and the relative battery life. The calculation formula of the relative power supply stability index can refer to equation (4) as shown in
[0097] I 1,i =I 11,i I 12,i (4)
[0098] Among them, I 1,i is the relative power supply stability index of the i-th base station site to be rated, I 11,i is the power availability of the i-th base station site with the required rating, I 12,i is the relative endurance index of the battery of the i-th base station site that needs to be rated.
[0099] For example, when the preset time period is 365 days and the time unit of the preset time period is minutes, the total time interval is 365*24*60=525600 minutes, and the power outage times of the 10 base station sites are obtained as shown in Table 1.
[0100] According to equation (1), the power availability of the 10 base station sites can be obtained. The power availability of the 10 base station sites is shown in Table 2.
[0101] Table 1 Power outage schedule for each base station
[0102] Site number Power interruption time (minutes) 1 80640 2 28800 3 146880 4 67680 5 14400 6 0 7 0 8 11520 9 1440 10 4320
[0103] Table 2 Power availability of each base station
[0104]
[0105] Wherein, power available time = total time interval - power interruption time. When the battery continuous working time in the area where the 10 sites are located refers to the critical value η = 3*60 = 180, the battery group data of the 10 base station sites can refer to Table 3:
[0106] Table 3 Battery data of each base station
[0107] Site number Number of battery packs Battery capacity (Ah) Working current (A) 1 2 38 25 2 1 100 25 3 1 150 25 4 2 100 30 5 2 150 25 6 1 300 30 7 2 160 30 8 2 150 20 9 2 200 25 10 2 200 30
[0108] According to the reference critical value of the battery continuous working time in the area, the battery group data of the 10 base station sites and the calculation equation (3), the absolute endurance index and the relative endurance index of the 10 base station sites can be obtained as shown in Table 4:
[0109] Table 4 Absolute endurance index and relative endurance index of each site
[0110] Site number Absolute battery life index (minutes) Relative battery life index (-) 1 182.40 0.31 2 240.00 7.69 3 360.00 23.08 4 400.00 28.21 5 720.00 69.23 6 600.00 53.85 7 640.00 58.97 8 900.00 92.31 9 960.00 100.00 10 800.00 79.49
[0111] According to the power availability of each base station in Table 2 and the relative endurance index in Table 4, the relative stability index of power supply of each base station can be obtained. The relative stability index of power supply obtained according to equation (4) can be shown in Table 5:
[0112] Table 5 Relative stability index of power supply at each site
[0113]
[0114] When a base station site has multiple supporting power supplies and batteries, the relative power supply stability indexes of the multiple supporting power supplies and batteries can be calculated, and the minimum value of the multiple relative power supply stability indexes is used as the relative power supply stability index of the base station site.
[0115] In step S120, the received optical power and the distribution optical cable data of the target site are obtained, and the relative transmission optical path stability index of the target site is determined according to the received optical power and the distribution optical cable data.
[0116] The received optical power is the received optical power of the BBU (Building Base band Unit) side of the base station site, and the wiring cable data may include the number of wiring cables and the total number of sectors of each base station site. In a cellular communication network, the area covered by each antenna of a base station site is a base station sector.
[0117] In this example embodiment, reference Figure 5 As shown, obtaining the received optical power and the distribution optical cable data of the target site, and determining the relative transmission optical path stability index of the target site according to the received optical power and the distribution optical cable data may include steps S510 to S540:
[0118] Step S510. Obtain the received optical power of the baseband processing unit on the target site and the critical value of the received optical power;
[0119] Step S520. Obtaining a relative optical cable effective connection index of the target site according to the received optical power and the critical value of the received optical power;
[0120] Step S530. Obtain the number of distribution optical cables of the target site, and obtain a relative routing allocation rationality index of the target site according to the number of distribution optical cables;
[0121] Step S540: Obtain the relative transmission optical path stability of the target site according to the relative optical cable effective connection index and the relative route allocation rationality index.
[0122] In the following, step S510 to step S540 will be explained and illustrated. Specifically, first, the received optical power of the uplink baseband processing unit side of the target base station site and the critical value of the received optical power are obtained, wherein the critical value of the received optical power can be used as the critical value λ of the absolute optical cable effective connection index of the base station site, and the received optical power of the uplink baseband processing unit side can be used as the absolute optical cable effective connection index I of the target site. 21 ′, after obtaining the critical value of the absolute optical cable effective connection index and the absolute optical cable effective connection index, the absolute optical cable effective connection index can be processed into a percentage according to the critical value of the absolute optical cable effective connection index to obtain the relative optical cable effective connection index. The calculation equation of the relative optical cable effective connection index can refer to equation (5):
[0123]
[0124] Among them, I 21,i is the relative optical cable effective connection index of the i-th base station site that needs to be rated, I 21,i ′ is the absolute optical cable effective connection index of the i-th base station site to be rated, (I 21 ′) max is the maximum value of the absolute optical cable effective connection line index of all base station sites to be evaluated, and λ is the critical value of the absolute optical cable effective connection index of the base station site. 21,i When the value of ′-λ) is negative, the relative optical cable effective connection index value of the base station site is 0.
[0125] After obtaining the relative optical cable effective connection index of the target base station site, the number of distribution optical cables of the target site can also be obtained, and the relative route allocation rationality index of the target site is determined according to the obtained number of distribution optical cables; finally, the relative transmission optical path stability index of the target site is obtained according to the relative optical cable effective connection index and the relative route allocation rationality index of the target site.
[0126] Further, refer to Figure 6 As shown, obtaining the number of distribution optical cables of the target site and obtaining the relative route allocation rationality index of the target site according to the number of distribution optical cables may include steps S610 to S640:
[0127] Step S610. Obtain a reasonable reference value for absolute route allocation of the target site according to the number of the distribution optical cables;
[0128] Step S620. Obtain the total number of sectors of the target site and the minimum number of sectors remaining and available when a distribution optical cable in the target site is disconnected;
[0129] Step S630. Obtain the absolute route allocation rationality index of the target site through the total number of sectors and the remaining minimum number of sectors that can be used;
[0130] Step S640: Obtain the relative route allocation rationality index of the target site according to the absolute route allocation rationality index and the absolute route allocation rationality reference value.
[0131] In the following, step S610 to step S640 will be explained and illustrated. Specifically, first, the number of distribution optical cables of the target site can be obtained, and the absolute route allocation reasonable reference value θ of the target site can be obtained according to the number of distribution optical cables of the target site. The calculation formula of the absolute route allocation reasonable reference value can refer to equation (6):
[0132]
[0133] Then, the total number of sectors of the target site and the minimum number of sectors that can be used when any distribution optical cable in the target site is interrupted are obtained, and the absolute route allocation rationality index I of the target site is determined according to the total number of sectors of the target site and the minimum number of sectors that can be used 22 ′, where the calculation formula of the absolute routing allocation rationality index can refer to equation (7)
[0134]
[0135] Finally, the absolute route allocation rationality index of the target site can be processed into a percentage according to the absolute route allocation rationality index of the target site and the absolute route allocation rationality reference value to obtain the relative route allocation rationality index of the target site. The calculation formula of the relative route allocation rationality index of the target site can refer to equation (8):
[0136]
[0137] Among them, I 22,i Assign a reasonable index to the relative routing of the i-th base station site with the required rating, I 22,i ′ is the absolute routing allocation rationality index of the i-th base station site with the required rating, θ i Assign a reasonable reference value to the absolute route of the i-th base station. i When it is 0, the value of the relative routing allocation rationality index of the base station site is 0.
[0138] After the relative optical cable effective connection index and the relative route allocation rationality index of the target site are obtained, the relative transmission optical path stability index of the target site can be obtained according to the relative optical cable effective connection index and the relative route allocation rationality index of the target site. Specifically, first, the first weight factor ω1 of the relative optical cable effective connection index and the second weight factor ω2 of the relative route allocation rationality index are determined according to the target site, where ω1+ω2=1, and then the relative transmission optical path stability index of the target site is obtained according to the first weight factor and the second weight factor. The calculation formula of the relative transmission optical path stability index can refer to equation (9)
[0139] I 2,i =ω1I 21,i +ω2I 22,i (9)
[0140] Among them, I 2,i is the relative transmission optical path stability index of the i-th base station site that needs to be rated, I 21,i is the relative optical cable effective connection index of the i-th base station site that needs to be rated, I 22,i Assign a reasonableness index to the relative routing of the i-th base station site of the desired rating.
[0141] For example, the critical value of the absolute optical cable effective connection index λ=-13dbm, and the absolute optical cable effective connection indexes of 10 base station sites are obtained as shown in Table 6:
[0142] Table 6 Absolute optical cable effective connection index table of each base station site
[0143] Site number Absolute optical cable effective connection index (dbm) 1 -5 2 -12 3 -10 4 -7 5 -9 6 -19 7 -12 8 -16 9 -8 10 -11
[0144] According to the absolute optical cable effective connection index in Table 6 and equation (5), the relative optical cable effective connection index of each base station site can be obtained. The relative optical cable effective connection index of each base station site can be shown in Table 7:
[0145] Table 7 Relative optical cable effective connection index of each base station site
[0146] Site number Absolute optical cable effective connection index (dbm) Relative optical cable effective connection index (-) 1 -5 100 2 -12 12.5 3 -10 37.5 4 -7 75 5 -9 50 6 -19 0 7 -12 12.5 8 -16 0 9 -8 62.5 10 -11 25
[0147] At the same time, the number of distribution optical cables in each base station site is shown in Table 8. According to the number of distribution optical cables in each base station site in Table 8 and equation (6), the reasonable reference value of absolute route allocation of each base station site can be obtained. The obtained reasonable reference value of absolute route allocation of each base station site is the reasonable reference value θ of absolute route allocation in Table 8.
[0148] Table 8 Reasonable reference value table for absolute route allocation of each base station
[0149] Site number Number of distribution optical cables Reasonable reference value θ for absolute routing allocation 1 2 0.5000 2 1 0.0000 3 2 0.5000 4 3 0.6667 5 1 0.0000 6 2 0.5000 7 3 0.6667 8 3 0.6667 9 3 0.6667 10 3 0.6667
[0150] Furthermore, the total number of sectors of each base station site and the minimum number of sectors remaining available when a distribution optical cable in each base station site is terminated are shown in reference Table 9. According to equation (7) and the total number of sectors in each base station site and the minimum number of sectors remaining available when a distribution optical cable is disconnected in Table 9, the absolute routing allocation rationality index of each base station site in Table 9 can be obtained.
[0151] When the absolute route allocation reasonable reference value θ in Table 8 and the absolute route allocation reasonable index in Table 9 are obtained, the relative route allocation reasonable index of each base station site can be obtained according to equation (8), as shown in reference Table 10.
[0152] Table 9 Reasonable index of absolute routing allocation of each base station
[0153]
[0154] Table 10 Relative routing allocation rationality index table of each base station site
[0155]
[0156] After obtaining the relative optical cable effective connection index in Table 7 and the relative route allocation rationality index in Table 10, with the first weight factor ω1 of the relative optical cable effective connection index = 0.5 and the second weight factor ω2 of the relative route allocation rationality index = 0.5, the relative transmission optical path stability index of each base station site can be obtained as shown in Table 11:
[0157] Table 11 Relative transmission optical path stability index of each base station
[0158]
[0159] In step S130, a board temperature and a site type of a radio remote unit of the target site are obtained, and a relative environmental stability index of the target site is determined according to the board temperature and the site type.
[0160] In this example embodiment, reference Figure 7 As shown, obtaining the board temperature and site type of the radio remote unit of the target site, and determining the relative environmental stability index of the target site according to the board temperature and the site type may include steps S710 to S740:
[0161] Step S710: Obtain the maximum value of the board temperature of the radio remote unit of the target site and the reference critical value of the board temperature index;
[0162] Step S720: Determine the relative temperature suitability index value of the target site according to the maximum value of the single board temperature and the critical reference value of the single board temperature index;
[0163] Step S730. Determine the site type of the target site, and determine the target site type stability factor according to the site type;
[0164] Step S740: Obtain a relative environmental stability index of the target site according to the relative temperature suitability index value and the target site type stability factor.
[0165] Specifically, first, the reference critical value α of the board temperature index of the remote radio unit (RRU) of the base station site can be obtained, and the maximum value I of the board temperature of the remote radio unit of the target site can be obtained through the alarm information of the network management system. 31 ′; Then, the maximum value of the single board temperature is processed into a percentage by using the single board temperature index reference critical value to obtain the relative temperature suitability index value of the target site. The calculation of the relative temperature suitability index value of the target site can refer to equation (10):
[0166]
[0167] Among them, I 31,i is the relative temperature suitability index value of the i-th base station site to be rated, I 31,i ′ is the maximum value of the board temperature of the RRU of the i-th base station site to be rated, (I 31 ′) min is the minimum value among the highest values of the board temperature of multiple base station sites RRUs that need to be rated, and α is the reference critical value of the board temperature index. 31,i ′) is negative, the relative temperature suitability index value of the base station site is 0.
[0168] After obtaining the relative temperature suitability index value of the target site, the target site type stability factor can also be determined according to the site type of the target site. Specifically, different site types have different effects on the environmental stability of the base station site, wherein the site type can be a computer room type site, a cabinet type site, or a wall-mounted site. In this example embodiment, the site type is not specifically limited. The value of the site type stability factor of sites of different site types is not greater than 1. After obtaining the site type stability factor of the target site and the relative temperature suitability index value of the target site, the relative environmental stability index of the target site can be obtained according to the site type stability factor and the relative temperature suitability index value of the target site. Among them, the calculation of the relative environmental stability index of the target site can refer to equation (11)
[0169] I 3,i =I 31,i *I 32,i (11)
[0170] Among them, I 3,i is the relative environmental stability index of the i-th base station site to be rated, I 31,i is the relative temperature suitability index value of the i-th base station site to be rated, I 32,i is the site type stability factor of the i-th base station site that requires rating.
[0171] For example, the maximum values of the board temperatures of the radio remote units of 10 base station sites are shown in Table 12. When the reference critical value of the board temperature index of the RRU is 70 degrees Celsius, the relative temperature suitability index values of the 10 base station sites can be obtained according to equation (11). The relative temperature suitability index values of the 10 base station sites are shown in Table 12:
[0172] Table 12 Relative temperature suitability index values of each base station site
[0173]
[0174] When the site type stability factor value of the computer room site in the site type is 1, the site type stability factor value of the cabinet site is 0.9, and the site type stability factor value of the wall-mounted site is 0.9, the relative environmental stability index of each site can be obtained according to the values of the site type stability factors of different sites shown in Table 13, the relative temperature adaptability index values in Table 12, and equation (11). The relative environmental stability index of each site can be shown in Table 13:
[0175] Table 13 Relative environmental stability index of each site
[0176]
[0177] In step S140, an evaluation factor of the target site is determined according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and maintenance measures for the target site are determined according to the evaluation factor.
[0178] In this example embodiment, reference Figure 8 As shown, determining the evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and determining the maintenance measures for the target site according to the evaluation factor may include steps S810 to S830:
[0179] Step S810. Determine a first weight factor, a second weight factor, and a third weight factor corresponding to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, respectively;
[0180] Step S820. Obtain an evaluation factor of the target site according to the relative power supply stability index, the first weight factor, the relative transmission optical path stability index, the second weight factor, the relative environmental stability index, and the third weight factor;
[0181] Step S830: Classify the target site based on the evaluation factor, and determine the maintenance measures corresponding to the target site according to the classification level of the target site.
[0182] In the following, step S810-step S830 will be explained and illustrated. Specifically, after obtaining the relative power supply stability index, relative transmission optical path stability index and relative environmental stability index of the target site, the first weight factor corresponding to the relative power supply stability index, the second weight factor corresponding to the relative transmission optical path stability index, and the third weight factor corresponding to the relative environmental stability index can be determined, and the evaluation factor of the target site is determined according to the first factor, the second factor and the third factor, and the target site is classified according to the evaluation factor of the target site, and the maintenance measures for the target site are determined according to the classification level of the target site. When classifying the target site, the sites ranked in the top 30% can be classified as first-level sites, the sites ranked in 30%-70% can be classified as second-level sites, and the sites ranked in the bottom 30% can be classified as third-level sites. In this example embodiment, the classification of the target site is not specifically limited. The sum of the first weight factor n1, the second weight factor n2 and the third weight factor n3 is 1. In this example embodiment, the values of the first weight factor, the second weight factor and the third weight factor are not specifically limited.
[0183] For example, when n1=n2=n3=1 / 3, and the base station classification rule is to classify the sites ranked in the top 30% as first-level sites, the sites ranked between 30% and 70% as second-level sites, and the sites ranked in the bottom 30% as third-level sites, the evaluation factors of the 10 base station sites and the classification levels of the 10 base station sites can be obtained through the relative power supply stability index shown in Table 5, the relative transmission optical path stability index shown in Table 11, and the relative environmental stability index shown in Table 13, as shown in Table 14:
[0184] Table 14 Evaluation factors and classification levels of each site
[0185]
[0186] In Table 14, sites with site numbers 7, 8, and 9 are first-level sites with the best health and little impact on business perception. No special maintenance and management are required, and routine inspection and maintenance work can be performed. Site numbers 1, 4, 5, and 10 are second-level sites with moderate health and slightly greater impact on business perception. They should be given appropriate attention and management, monitor the operating status of the equipment, and allocate inspection and maintenance resources as needed. Site numbers 2, 3, and 6 are third-level sites with the greatest impact on business perception. They should be given special attention and management, closely monitor the operating status of the equipment, and perform inspections and maintenance operations in a timely manner.
[0187] The base station site maintenance method provided by the example embodiments of the present disclosure has at least the following advantages: on the one hand, before maintenance, a relative power supply stability index is obtained through the power interruption time and battery pack data of the target site, a relative transmission optical path stability index is obtained through the received optical power and wiring cable data of the target site, and a relative environmental stability index is obtained through the temperature of the single board and the site type; then, an evaluation factor of the target site is obtained through the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and the target site is maintained based on the evaluation factors, thereby improving the efficiency of base station site maintenance; on the other hand, there is no need to spend a lot of manpower and cost to collect data on the site evaluation factors, the use cost is low, and it can be quickly calculated, decided, and deployed for implementation.
[0188] The exemplary embodiment of the present disclosure also provides a base station site maintenance device, referring to Fig. 9 As shown, it may include: a power supply stability index calculation module 910, a transmission optical path stability index calculation module 920, an environmental stability index calculation module 930 and a maintenance module 940. Among them:
[0189] The power supply stability index calculation module 910 is used to obtain the power supply interruption time and battery pack data of the target site, and determine the relative power supply stability index of the target site according to the power supply interruption time and the battery pack data;
[0190] The transmission optical path stability index calculation module 920 is used to obtain the received optical power and the wiring optical cable data of the target site, and determine the relative transmission optical path stability index of the target site according to the received optical power and the wiring optical cable data;
[0191] An environmental stability index calculation module 930 is used to obtain a board temperature and a site type of a radio remote unit of the target site, and determine a relative environmental stability index of the target site according to the board temperature and the site type;
[0192] The maintenance module 940 is used to determine the evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and determine the maintenance measures for the target site according to the evaluation factor.
[0193] The specific details of each module in the above-mentioned base station site maintenance device have been described in detail in the corresponding base station site maintenance method, so they are not repeated here.
[0194] In an exemplary embodiment of the present disclosure, obtaining a power outage time and battery pack data of a target site, and determining a relative power supply stability index of the target site according to the power outage time and the battery pack data includes:
[0195] Acquire a preset time period and a power outage time within the preset time period, and determine a power availability rate of the target site according to the preset time period and the power outage time within the preset time period;
[0196] Acquire the battery pack data, wherein the battery pack data includes the number of battery packs, battery capacity, and operating current;
[0197] Obtaining a relative endurance index of the target site according to the number of battery packs, the battery capacity, and the operating current;
[0198] A relative power supply stability index of the target site is determined according to the power supply availability and the relative endurance index.
[0199] In an exemplary embodiment of the present disclosure, obtaining the relative endurance index of the target site according to the number of battery packs, the battery capacity, and the operating current includes:
[0200] Determine, according to the number of battery packs, the battery capacity, and the operating current, an absolute endurance index of the target site when the power supply of the target site is interrupted;
[0201] Determine a reference critical value of the battery continuous working time of the target site;
[0202] The relative battery life index of the target site is obtained according to the reference critical value of the battery continuous working time and the absolute battery life index.
[0203] In an exemplary embodiment of the present disclosure, obtaining the received optical power and the distribution optical cable data of the target site, and determining the relative transmission optical path stability index of the target site according to the received optical power and the distribution cable data, includes:
[0204] Obtaining the received optical power of the target site uplink baseband processing unit side and the critical value of the received optical power;
[0205] Obtaining a relative optical cable effective connection index of the target site according to the received optical power and a critical value of the received optical power;
[0206] Acquire the number of distribution optical cables of the target site, and obtain a relative route allocation rationality index of the target site according to the number of distribution optical cables;
[0207] The relative transmission optical path stability of the target site is obtained according to the relative optical cable effective connection index and the relative route allocation rationality index.
[0208] In an exemplary embodiment of the present disclosure, obtaining the number of distribution optical cables of the target site, and obtaining the relative route allocation rationality index of the target site according to the number of distribution optical cables includes:
[0209] According to the number of the distribution optical cables, a reasonable reference value of the absolute route allocation of the target site is obtained;
[0210] Obtaining the total number of sectors of the target site and the minimum number of sectors remaining and available when a distribution optical cable in the target site is disconnected;
[0211] Obtaining an absolute route allocation rationality index of the target site through the total number of sectors and the remaining minimum number of sectors that can be used;
[0212] The relative route allocation rationality index of the target site is obtained according to the absolute route allocation rationality index and the absolute route allocation rationality reference value.
[0213] In an exemplary embodiment of the present disclosure, obtaining a board temperature and a site type of a radio remote unit of the target site, and determining a relative environmental stability index of the target site according to the board temperature and the site type includes:
[0214] Acquire a maximum value of a board temperature of a radio remote unit of the target site and a reference critical value of a board temperature index;
[0215] Determining a relative temperature suitability index value of the target site according to the maximum value of the single board temperature and the critical reference value of the single board temperature index;
[0216] Determining a site type of the target site, and determining a stability factor of the target site type according to the site type;
[0217] According to the relative temperature suitability index value and the target site type stability factor, a relative environmental stability index of the target site is obtained.
[0218] In an exemplary embodiment of the present disclosure, determining an evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and determining maintenance measures for the target site according to the evaluation factor include:
[0219] Determine a first weight factor, a second weight factor, and a third weight factor corresponding to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, respectively;
[0220] Obtaining an evaluation factor of the target site according to the relative power supply stability index, the first weight factor, the relative transmission optical path stability index, the second weight factor, and the relative environmental stability index and the third weight factor;
[0221] Based on the evaluation factors, the target sites are classified, and maintenance measures corresponding to the target sites are determined according to the classification levels of the target sites.
[0222] It should be noted that, although several modules or units of the device for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present disclosure, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into multiple modules or units to be embodied.
[0223] In addition, although the steps of the method in the present disclosure are described in a specific order in the drawings, this does not require or imply that the steps must be performed in this specific order, or that all the steps shown must be performed to achieve the desired results. Additionally or alternatively, some steps may be omitted, multiple steps may be combined into one step, and / or one step may be decomposed into multiple steps, etc.
[0224] In an exemplary embodiment of the present disclosure, an electronic device capable of implementing the above method is also provided.
[0225] Those skilled in the art will appreciate that various aspects of the present disclosure may be implemented as systems, methods or program products. Therefore, various aspects of the present disclosure may be specifically implemented in the following forms, namely: complete hardware implementation, complete software implementation (including firmware, microcode, etc.), or a combination of hardware and software, which may be collectively referred to herein as "circuits", "modules" or "systems".
[0226] Refer to the following Fig.10 The electronic device 1000 according to this embodiment of the present disclosure is described. Fig.10 The electronic device 1000 shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.
[0227] like Fig.10 As shown, the electronic device 1000 is in the form of a general computing device. The components of the electronic device 1000 may include, but are not limited to: the at least one processing unit 1010, the at least one storage unit 1020, a bus 1030 connecting different system components (including the storage unit 1020 and the processing unit 1010), and a display unit 1040.
[0228] The storage unit stores program codes, which can be executed by the processing unit 1010, so that the processing unit 1010 performs the steps according to various exemplary embodiments of the present disclosure described in the above “Exemplary Method” section of this specification. For example, the processing unit 1010 can perform the following steps: Figure 1 The steps S110 shown in the figure are as follows: obtaining the power interruption time and battery pack data of the target site, and determining the relative power supply stability index of the target site according to the power interruption time and the battery pack data; S120: obtaining the received optical power and distribution optical cable data of the target site, and determining the relative transmission optical path stability index of the target site according to the received optical power and the distribution cable data; S130: obtaining the board temperature and site type of the radio frequency remote unit of the target site, and determining the relative environmental stability index of the target site according to the board temperature and the site type; S140: determining the evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and determining the maintenance measures for the target site according to the evaluation factor.
[0229] The storage unit 1020 may include a readable medium in the form of a volatile storage unit, such as a random access storage unit (RAM) 10201 and / or a cache storage unit 10202 , and may further include a read-only storage unit (ROM) 10203 .
[0230] The storage unit 1020 may also include a program / utility 10204 having a set (at least one) of program modules 10205, such program modules 10205 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0231] Bus 1030 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
[0232] The electronic device 1000 may also communicate with one or more external devices 1100 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 1000, and / or may communicate with any device that enables the electronic device 1000 to communicate with one or more other computing devices (e.g., routers, modems, etc.). Such communication may be performed via an input / output (I / O) interface 1050. Furthermore, the electronic device 1000 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 1060. As shown, the network adapter 1060 communicates with other modules of the electronic device 1000 via a bus 1030. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 1000, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0233] Through the description of the above implementation, it is easy for those skilled in the art to understand that the example implementation described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the implementation of the present disclosure can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, including several instructions to enable a computing device (which can be a personal computer, a server, a terminal device, or a network device, etc.) to execute the method according to the implementation of the present disclosure.
[0234] In an exemplary embodiment of the present disclosure, a computer-readable storage medium is also provided, on which a program product capable of implementing the above method of the present specification is stored. In some possible implementations, various aspects of the present disclosure may also be implemented in the form of a program product, which includes a program code, and when the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps according to various exemplary implementations of the present disclosure described in the above "Exemplary Method" section of the present specification.
[0235] According to the program product for implementing the above method in the embodiment of the present disclosure, it can adopt a portable compact disk read-only memory (CD-ROM) and include program code, and can be run on a terminal device, such as a personal computer. However, the program product of the present disclosure is not limited thereto. In this document, a readable storage medium can be any tangible medium containing or storing a program, which can be used by or in combination with an instruction execution system, an apparatus or a device.
[0236] The program product may use any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. The readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0237] Computer readable signal media may include data signals propagated in baseband or as part of a carrier wave, in which readable program code is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Readable signal media may also be any readable medium other than a readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.
[0238] The program code embodied on the readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wired, optical cable, RF, etc., or any suitable combination of the foregoing.
[0239] Program code for performing the operations of the present disclosure may be written in any combination of one or more programming languages, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In cases involving a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., through the Internet using an Internet service provider).
[0240] In addition, the above-mentioned figures are only schematic illustrations of the processes included in the method according to the exemplary embodiments of the present disclosure, and are not intended to be limiting. It is easy to understand that the processes shown in the above-mentioned figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.
[0241] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. This application is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary technical means in the art that are not disclosed in the present disclosure. The specification and examples are to be considered as exemplary only, and the true scope and spirit of the present disclosure are indicated by the claims.
Claims
1. A base station site maintenance method, characterized in that: include: Obtain a preset time period and the power outage time within the preset time period, and determine the power availability of the target site according to the preset time period and the power outage time within the preset time period Obtain battery pack data, wherein the battery pack data includes the number of battery packs, battery capacity, and operating current; obtain the relative endurance index of the target site based on the number of battery packs, the battery capacity, and the operating current Among them, I 12,i ′ is the absolute battery life index of the i-th base station site battery that needs to be rated, (I 12 ′) max is the maximum value of the absolute battery life index of all base station sites to be evaluated, and η is the reference critical value of the continuous working time of the base station site battery; the relative power supply stability index I1 of the target site is determined according to the power supply availability and the relative battery life index, i =I 11,i I 12,i , where I 11,i is the power availability of the i-th base station site that needs to be rated; Obtain the received optical power and the critical value of the received optical power on the uplink baseband processing unit side of the target site; obtain the relative optical cable effective connection index of the target site according to the received optical power and the critical value of the received optical power Among them, I 21,i ′ is the absolute optical cable effective connection index of the i-th base station site to be rated, (I′ 21 ) max is the maximum value of the absolute optical cable effective connection line index of all base station sites to be evaluated, and λ is the critical value of the absolute optical cable effective connection index of the base station site; the number of distribution optical cables of the target site is obtained, and the relative route allocation rationality index of the target site is obtained according to the number of distribution optical cables in, Assign a reasonable index to the absolute route of the i-th base station site with the required rating, Assign a reasonable reference value to the absolute route of the i-th base station site; obtain the relative transmission optical path stability index I of the target site according to the relative optical cable effective connection index and the relative route allocation reasonable index 2,i =ω1I 21,i +ω2I 22,i , ω1 is the first weight factor, ω2 is the second weight factor, ω1+ω2=1; Obtain the maximum value I' of the board temperature of the radio remote unit of the target site 31,i and a reference critical value α of the single board temperature index; and determining the relative temperature suitability index value of the target site according to the maximum value of the single board temperature and the reference critical value of the single board temperature index Among them, I′ 31,i is the maximum value of the board temperature of the RRU at the i-th base station site to be rated, (I′ 31 ) min The minimum value among the highest values of the single board temperature of the RRU of multiple base station sites that need to be rated; determining the site type of the target site, and determining the target site type stability factor according to the site type; obtaining the relative environmental stability index I of the target site according to the relative temperature suitability index value and the target site type stability factor 3,i =I 31,i *I 32,i , where I 32,i is the site type stability factor of the i-th base station site that needs to be rated; An evaluation factor of the target site is determined according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and maintenance measures for the target site are determined according to the evaluation factor.
2. The base station site maintenance method according to claim 1, characterized in that: The obtaining, according to the number of battery packs, the battery capacity, and the operating current, a relative endurance index of the target site includes: Determine, according to the number of battery packs, the battery capacity, and the operating current, an absolute endurance index of the target site when the power supply of the target site is interrupted; Determine a reference critical value of the battery continuous working time of the target site; The relative battery life index of the target site is obtained according to the reference critical value of the battery continuous working time and the absolute battery life index.
3. The base station site maintenance method according to claim 1, characterized in that: Acquiring the number of distribution optical cables of the target site, and obtaining a relative route allocation rationality index of the target site according to the number of distribution optical cables, including: According to the number of the distribution optical cables, a reasonable reference value of the absolute route allocation of the target site is obtained; Obtaining the total number of sectors of the target site and the minimum number of sectors remaining and available when a distribution optical cable in the target site is disconnected; Obtaining an absolute route allocation rationality index of the target site through the total number of sectors and the remaining minimum number of sectors that can be used; The relative route allocation rationality index of the target site is obtained according to the absolute route allocation rationality index and the absolute route allocation rationality reference value.
4. The base station site maintenance method according to claim 1, characterized in that: Determining an evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, and determining maintenance measures for the target site according to the evaluation factor, including: Determine a first weight factor, a second weight factor, and a third weight factor corresponding to the relative power supply stability index, the relative transmission optical path stability index, and the relative environmental stability index, respectively; Obtaining an evaluation factor of the target site according to the relative power supply stability index, the first weight factor, the relative transmission optical path stability index, the second weight factor, and the relative environmental stability index and the third weight factor; Based on the evaluation factors, the target sites are classified, and maintenance measures corresponding to the target sites are determined according to the classification levels of the target sites.
5. A base station site maintenance device, characterized in that: include: The power supply stability index calculation module is used to obtain a preset time period and the power outage time within the preset time period, and determine the power availability of the target site according to the preset time period and the power outage time within the preset time period. Obtain battery pack data, wherein the battery pack data includes the number of battery packs, battery capacity, and operating current; obtain the relative endurance index of the target site based on the number of battery packs, the battery capacity, and the operating current Among them, I 12,i ′ is the absolute battery life index of the i-th base station site battery that needs to be rated, (I 12 ′) max is the maximum value of the absolute battery life index of all base station sites to be evaluated, and η is the reference critical value of the continuous working time of the base station site battery; the relative power supply stability index I1 of the target site is determined according to the power supply availability and the relative battery life index, i =I 11,i I 12,i , where I 11,i is the power availability of the i-th base station site that needs to be rated; The transmission optical path stability index calculation module is used to obtain the received optical power and the critical value of the received optical power on the uplink baseband processing unit side of the target site; and obtain the relative optical cable effective connection index of the target site according to the received optical power and the critical value of the received optical power. Among them, I′ 21,i is the absolute optical cable effective connection index of the i-th base station site to be rated, (I′ 21 ) max is the maximum value of the absolute optical cable effective connection line index of all base station sites to be evaluated, and λ is the critical value of the absolute optical cable effective connection index of the base station site; the number of distribution optical cables of the target site is obtained, and the relative route allocation rationality index of the target site is obtained according to the number of distribution optical cables in, Assign a reasonable index to the absolute route of the i-th base station site with the required rating, Assign a reasonable reference value to the absolute route of the i-th base station site; obtain the relative transmission optical path stability index I of the target site according to the relative optical cable effective connection index and the relative route allocation reasonable index 2,i =ω1I 21,i +ω2I 22,i , ω1 is the first weight factor, ω2 is the second weight factor, ω1+ω2=1; The environmental stability index calculation module is used to obtain the maximum value I' of the board temperature of the radio remote unit of the target site 31,i and a reference critical value α of the single board temperature index; and determining the relative temperature suitability index value of the target site according to the maximum value of the single board temperature and the reference critical value of the single board temperature index Among them, I′ 31,i is the maximum value of the board temperature of the RRU at the i-th base station site to be rated, (I′ 31 ) min The minimum value among the highest values of the single board temperature of the RRU of multiple base station sites that need to be rated; determining the site type of the target site, and determining the target site type stability factor according to the site type; obtaining the relative environmental stability index I of the target site according to the relative temperature suitability index value and the target site type stability factor 3,i =I 31,i *I 32,i , where I 32,i is the site type stability factor of the i-th base station site that needs to be rated; A maintenance module is used to determine an evaluation factor of the target site according to the relative power supply stability index, the relative transmission optical path stability index and the relative environmental stability index, and determine maintenance measures for the target site according to the evaluation factor.
6. A readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the base station site maintenance method according to any one of claims 1 to 4 is implemented.
7. An electronic device, characterized in that: include: processor; as well as A memory, configured to store executable instructions of the processor; The processor is configured to execute the base station site maintenance method according to any one of claims 1 to 4 by executing the executable instructions.
Citation Information
Patent Citations
Iron tower base station evaluation method and device and electronic device
CN109978372A
Base station maintenance grade determination method and device, storage medium and electronic equipment
CN112785012A