Gas Heating Hot Water Boiler
By introducing auxiliary heat exchangers and switching devices into the gas heating hot water furnace, combining independent heating sources of heating and bathroom systems, the problem of heat waste is solved, the synchronous utilization of heat and multiple working modes are realized, and the system efficiency and reliability.
Patent Information
- Application Number
- CN202111484679.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-07
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-12-07
AI Technical Summary
When the existing gas heating hot water furnace provides both bathroom hot water and heating hot water, the heat between the two affects each other and cannot be effectively utilized, resulting in waste of heat.
A gas heating hot water furnace including heating system, bathroom system and auxiliary heat exchanger was designed. The heating system was heated by gas, and the bathroom system was heated by electric water heater, and heat exchange was realized through auxiliary heat exchanger, combining switching devices and water pumps. , ensure effective use of heat between the two systems.
The simultaneous utilization of heat from bathroom and heating is achieved, which avoids heat waste, and provides four working modes to meet different needs, including heating, bathroom, heating-bathroom and zero-cold water mode, improving the efficiency and reliability of the system.
Smart Images

Figure CN114198904B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of fuel appliances, and in particular to a gas heating hot water boiler. Background Art
[0002] In the related art, some gas heating water heaters stop heating when heating the bathroom, while other gas heating water heaters can provide bathroom hot water and heating hot water at the same time, but the bathroom hot water temperature and heating hot water temperature will not only affect each other, but also the heat generated by the bathroom and heating cannot be effectively utilized, resulting in heat waste. Summary of the invention
[0003] Based on this, it is necessary to provide a gas heating hot water boiler to address the above technical problems, so as to reduce the impact between bathroom hot water and heating hot water when the two are used at the same time, and to effectively utilize the heat generated by the bathroom and heating.
[0004] The embodiment of the present application provides a gas heating water heater, comprising:
[0005] A heating system, the heating system comprising a main heat exchanger and a first heating return pipe and a first heating outlet pipe respectively connected to the main heat exchanger;
[0006] A bathroom system, the bathroom system comprising an electric water heater and a first bathroom water inlet pipe and a bathroom water outlet pipe respectively connected to the electric water heater; and
[0007] an auxiliary heat exchanger, the auxiliary heat exchanger having a first water inlet end and a first water outlet end connected to each other, and a second water inlet end and a second water outlet end connected to each other;
[0008] Among them, the first water inlet end is connected to the first heating water outlet pipe, the first water outlet end is connected to the first heating return pipe, the second water outlet end is connected to the first bathroom water inlet pipe, and the second water inlet end is connected to the second bathroom water inlet pipe, so that the heating system and the bathroom system can exchange heat with the help of the auxiliary heat exchanger.
[0009] In the above-mentioned gas heating water heater, the gas heating water heater at least includes a heating system, a bathroom system and an auxiliary heat exchanger. The heating system includes a main heat exchanger, a first heating return pipe and a first heating outlet pipe, and the bathroom system includes an electric water heater, a first bathroom inlet pipe and a bathroom outlet pipe. Since the heating system uses gas for heating and the bathroom system uses an electric water heater for heating, the heating system and the bathroom system have different heating sources, and synchronous warming and bathing can be achieved. In addition, since the heating system and the bathroom system can exchange heat through the auxiliary heat exchanger, the heat generated when running any system of the heating system and the bathroom system can be used by the other system, avoiding heat waste.
[0010] In one of the embodiments, the gas heating water heater further includes a first switching device;
[0011] The first switching device is provided with a first switching port, a second switching port and a third switching port;
[0012] The first switching port is communicated with the outlet of the first heating water outlet pipe, the second switching port is communicated with the inlet of the first water inlet end, and the third switching port is communicated with the inlet of the second heating water outlet pipe;
[0013] The first switching device has a first state, a second state and a third state; when the first switching device is in the first state, the first switching port is connected to the second switching port; when the first switching device is in the second state, the second switching port is connected to the third switching port; when the first switching device is in the third state, the first switching port is connected to the third switching port. In this way, by setting the first switching device, any two of the first heating water outlet pipe, the first water inlet end and the second heating water outlet pipe can be connected. The three states of the first switching device can be switched according to actual conditions to achieve further effective utilization of the heat generated when running any system in the heating system and the bathroom system.
[0014] In one embodiment, the second heating water outlet pipe is provided with a first temperature detection unit for detecting water temperature. Thus, by providing the first temperature detection unit in the second heating water outlet pipe, the water temperature in the second heating water outlet pipe can be obtained, and the gas heating water heater is selected to be in a suitable operating state according to the water temperature, so as to realize the effective use of heat.
[0015] In one of the embodiments, the gas heating water heater further includes a second switching device;
[0016] The second switching device includes a fourth switching port, a fifth switching port and a sixth switching port;
[0017] The fourth switching port is connected to the inlet of the first heating water return pipe, the fifth switching port is connected to the outlet of the first water outlet, and the sixth switching port is connected to the outlet of the second heating water return pipe;
[0018] Among them, the second switching device has a fourth state, a fifth state and a sixth state; when the second switching device is in the fourth state, the fourth switching port is connected to the fifth switching port; when the second switching device is in the fifth state, the fifth switching port is connected to the sixth switching port; when the second switching device is in the sixth state, the fourth switching port is connected to the sixth switching port. In this way, by setting the second switching device, the connection between any two of the first heating return pipe, the first water outlet and the second heating return pipe can be achieved, and the three states of the second switching device can be switched according to actual conditions, so as to achieve further effective utilization of the heat generated when running any system in the heating system and the bathroom system.
[0019] In one embodiment, the second heating water return pipe is provided with a first water pump, so that the water flowing from the second heating water return pipe can be provided with operating power to meet the operating requirements under different operating states.
[0020] In one embodiment, a second water pump is provided on the first heating water return pipe, so as to provide operating power for the water flowing in from the first heating water return pipe, so as to meet the operating requirements under different operating states.
[0021] In one embodiment, the bypass of the second bathroom water inlet pipe is connected to the bathroom water return pipe;
[0022] The inlet of the bathroom return pipe is connected to the outlet of the bathroom outlet pipe. In this way, by setting the bathroom return pipe, the bathroom water in the bathroom system can be circulated, the function of zero cold water can be achieved, and the heat generated by running the bathroom system can be further effectively utilized.
[0023] In one embodiment, a third water pump is provided on the bathroom return pipe, so as to provide operating power for the water flowing in from the bathroom return pipe, thereby meeting the operating requirements under different operating states.
[0024] In one embodiment, the first heating water outlet pipe is provided with a second temperature detection unit for detecting water temperature. Thus, by providing the second temperature detection unit in the first heating water outlet pipe, the water temperature in the first heating water outlet pipe can be obtained, and the gas heating water heater is selected to operate in a suitable state according to the water temperature, so as to achieve effective use of heat.
[0025] In one embodiment, a third temperature detection unit for detecting water temperature is provided in the first bathroom water inlet pipe. Thus, by providing the third temperature detection unit in the first bathroom water inlet pipe, the water temperature in the first bathroom water inlet pipe can be obtained, and the gas heating water heater is selected to operate in a suitable state according to the water temperature, so as to realize the effective use of heat.
[0026] In one embodiment, a fourth temperature detection unit for detecting water temperature is provided on the second bathroom water inlet pipe. Thus, by providing the fourth temperature detection unit in the second bathroom water inlet pipe, the water temperature in the second bathroom water inlet pipe can be obtained, and the gas heating water heater is selected to operate in a suitable state according to the water temperature, so as to realize the effective use of heat.
[0027] In one embodiment, a flow detection unit for detecting water flow is provided on the second bathroom water inlet pipe. Thus, by providing the flow detection unit on the second bathroom water inlet pipe, it is possible to know whether water flows into the second bathroom water inlet pipe, and select a suitable operating state of the gas heating water heater to achieve effective use of heat.
[0028] Additional aspects and advantages of the embodiments of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the embodiments of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a schematic diagram of the structure of a gas heating water heater in one implementation of an embodiment of the present application.
[0030] Brief description of component symbols:
[0031] Heating system 100;
[0032] Main heat exchanger 110, first heating water return pipe 120, first heating water outlet pipe 130, second heating water outlet pipe 140, second heating water return pipe 150, burner 160, fan 170, expansion water tank 180;
[0033] Bathroom system 200;
[0034] Electric water heater 210, water storage tank 211, magnesium rod 212, temperature measuring tube 213, heating tube 214, first bathroom water inlet pipe 220, bathroom water outlet pipe 230, second bathroom water inlet pipe 240, bathroom water return pipe 250;
[0035] Auxiliary heat exchanger 310, first water inlet end 311, first water outlet end 312, second water inlet end 313, second water outlet end 314;
[0036] A first switching device 410, a first switching port 411, a second switching port 412, and a third switching port 413;
[0037] A second switching device 420, a fourth switching port 421, a fifth switching port 422, and a sixth switching port 423;
[0038] A first water pump 510, a second water pump 520, and a third water pump 530;
[0039] A first temperature detection unit 610, a second temperature detection unit 620, a third temperature detection unit 630, and a fourth temperature detection unit 640;
[0040] Flow detection unit 710. DETAILED DESCRIPTION
[0041] In order to make the above-mentioned purpose, features and advantages of the present application more obvious and easy to understand, the specific implementation of the embodiment of the present application is described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the embodiment of the present application. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. The embodiment of the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention. Therefore, the embodiment of the present application is not limited by the specific embodiments disclosed below.
[0042] It is understood that the terms "first", "second", etc. used in this application can be used in this article to describe various professional terms, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. However, unless otherwise specified, these professional terms are not limited by these terms. These terms are only used to distinguish one professional term from another professional term. For example, without departing from the scope of this application, the first water pump, the second water pump and the third water pump are different water pumps, and the first temperature detection unit, the second temperature detection unit, the third temperature detection unit and the fourth temperature detection unit are different temperature detection units. In the description of the embodiments of the present application, the meaning of "multiple" and "several" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0043] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly limited. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0044] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the horizontal height of the first feature is higher than the horizontal height of the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the horizontal height of the first feature is lower than the horizontal height of the second feature.
[0045] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.
[0046] Unless otherwise defined, all technical and scientific terms used in this application have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used in this application and in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0047] A gas-fired heating water boiler is a hot water device used for indoor heating and providing domestic hot water. The gas-fired heating water boiler and bathroom hot water dual-purpose heating water boiler in the related art can provide heating hot water and bathroom hot water, but cannot provide heating hot water and bathroom hot water at the same time. For example, it cannot provide heating hot water when the bathroom is heated, and it cannot provide bathroom hot water when heating is performed, and it cannot provide bathroom hot water and heating hot water at the same time. Some other gas-fired heating water boilers in the related art can provide bathroom hot water and heating hot water at the same time, but they are all heated by the same heating source, namely gas, and the bathroom hot water temperature and heating hot water temperature will affect each other, and the bathroom hot water temperature and heating hot water temperature are not easy to control. At the same time, the heat generated by the bathroom and heating cannot be effectively utilized, resulting in heat waste.
[0048] Figure 1 A schematic diagram of the structure of a gas heating water heater in one implementation of an embodiment of the present application is shown.
[0049] like Figure 1As shown, the embodiment of the present application provides a gas heating water heater, which includes a heating system 100, a bathroom system 200 and an auxiliary heat exchanger 310. The heating system 100 includes a main heat exchanger 110 and a first heating return pipe 120 and a first heating outlet pipe 130 respectively connected to the main heat exchanger 110. The bathroom system 200 includes an electric water heater 210 and a first bathroom water inlet pipe 220 and a bathroom water outlet pipe 230 respectively connected to the electric water heater 210. The auxiliary heat exchanger 310 has a first water inlet end 311 and a first water outlet end 312 connected to each other, and a second water inlet end 313 and a second water outlet end 314 connected to each other. That is, the first water inlet end 311 and the first water outlet end 312 constitute a first fluid channel, the second water inlet end 313 and the second water outlet end 314 constitute a second fluid channel, and the fluid in the first fluid channel and the fluid in the second fluid channel can perform heat exchange. Among them, the first water inlet end 311 is connected to the first heating water outlet pipe 130, the first water outlet end 312 is connected to the first heating return water pipe 120, the second water outlet end 314 is connected to the first bathroom water inlet pipe 220, and the second water inlet end 313 is connected to the second bathroom water inlet pipe 240, so that the heating system 100 and the bathroom system 200 can perform heat exchange with the aid of the auxiliary heat exchanger 310.
[0050] Therefore, since the heating system 100 is heated by gas and the bathroom system 200 is heated by the electric water heater 210, the heating system 100 and the bathroom system 200 have different heating sources, and synchronous warming and bathing can be achieved. In addition, since the heating system 100 and the bathroom system 200 can exchange heat through the auxiliary heat exchanger 310, the heat generated when running any one of the heating system 100 and the bathroom system 200 can be used by the other system, avoiding heat waste.
[0051] In some embodiments, please refer to Figure 1, the gas heating water heater also includes a first switching device 410. The first switching device 410 is provided with a first switching port 411, a second switching port 412 and a third switching port 413. The first switching port 411 is connected to the outlet of the first heating water outlet pipe 130, the second switching port 412 is connected to the inlet of the first water inlet end 311, and the third switching port 413 is connected to the inlet of the second heating water outlet pipe 140. The first switching device 410 has a first state, a second state and a third state. The first switching device 410 is in the first state, the first switching port 411 and the second switching port 412 are connected, that is, the outlet of the first heating water outlet pipe 130 is connected to the inlet of the first water inlet end 311 of the auxiliary heat exchanger 310. At this time, the main heat exchanger 110, the first heating water outlet pipe 130, the auxiliary heat exchanger 310 and the first heating return water pipe 120 form a circulation loop, and the bathroom system 200 can use the heat generated by the heating system 100 with the help of the auxiliary heat exchanger 310. The first switching device 410 is in the second state, and the second switching port 412 is connected to the third switching port 413, that is, the inlet of the first water inlet end 311 of the auxiliary heat exchanger 310 is connected to the inlet of the second heating water outlet pipe 140, and the second heating water outlet pipe 140 can be connected to the device required for heating at the user end. At this time, the device required for heating at the user end uses the heat generated by the bathroom system 200 with the help of the auxiliary heat exchanger 310 for heating, and electric heating is used. The first switching device 410 is in the third state, and the first switching port 411 is connected to the third switching port 413, that is, the outlet of the first heating water outlet pipe 130 is connected to the inlet of the second heating water outlet pipe 140, and the second heating water outlet pipe 140 can be connected to the device required for heating at the user end. At this time, the device required for heating at the user end directly uses the main heat exchanger 110 for heating, and gas heating is used. Optionally, the first switching device 410 can be a three-way valve, which can be used to change the flow direction of the fluid. In this way, by setting the first switching device 410, the connection between any two of the first heating water outlet pipe 130, the first water inlet end 311 and the second heating water outlet pipe 140 can be achieved. The three states of the first switching device 410 can be switched according to actual conditions to achieve further effective utilization of the heat generated when operating any of the heating system 100 and the bathroom system 200.
[0052] For specific embodiments, please continue to refer to Figure 1, a first temperature detection unit 610 for detecting water temperature is provided in the second heating water outlet pipe 140. In this way, by providing the first temperature detection unit 610 in the second heating water outlet pipe 140, the water temperature in the second heating water outlet pipe 140 can be obtained, and the gas heating water heater is selected to be in a suitable operating state according to the water temperature, so as to achieve effective use of heat. For example, when the aforementioned heating device required by the user end is used to heat the heat generated by the bathroom system 200 with the aid of the auxiliary heat exchanger 310, if the water temperature obtained in the second heating water outlet pipe 140 cannot meet the user's use requirements, it means that the heat generated by the bathroom system 200 obtained by heat exchange in the auxiliary heat exchanger 310 cannot meet the user's use requirements. At this time, the first switching device 410 will switch from the second state to the third state, and change from electric heating to gas heating.
[0053] In some embodiments, please refer to Figure 1, the gas heating water heater also includes a second switching device 420. The second switching device 420 includes a fourth switching port 421, a fifth switching port 422 and a sixth switching port 423. The fourth switching port 421 is connected to the inlet of the first heating return pipe 120, the fifth switching port 422 is connected to the outlet of the first water outlet 312, and the sixth switching port 423 is connected to the outlet of the second heating return pipe 150. The second switching device 420 has a fourth state, a fifth state and a sixth state. The second switching device 420 is in the fourth state, and the fourth switching port 421 is connected to the fifth switching port 422, that is, the inlet of the first heating return pipe 120 is connected to the outlet of the first water outlet 312 of the auxiliary heat exchanger 310. At this time, the main heat exchanger 110, the first heating outlet pipe 130, the auxiliary heat exchanger 310 and the first heating return pipe 120 form a circulation loop, and the bathroom system 200 can use the heat generated by the heating system 100 with the help of the auxiliary heat exchanger 310. The second switching device 420 is in the fifth state, and the fifth switching port 422 is connected to the sixth switching port 423, that is, the outlet of the first water outlet 312 of the auxiliary heat exchanger 310 is connected to the outlet of the second heating return pipe 150, and the inlet of the second heating return pipe 150 can be connected to the device required for heating at the user end. At this time, the device required for heating at the user end uses the heat generated by the bathroom system 200 with the aid of the auxiliary heat exchanger 310 for heating, and electric heating is used. The second switching device 420 is in the sixth state, and the fourth switching port 421 is connected to the sixth switching port 423, that is, the inlet of the first heating return pipe 120 is connected to the outlet of the second heating return pipe 150. At this time, the device required for heating at the user end directly uses the main heat exchanger 110 for heating, and gas heating is used. Optionally, the second switching device 420 can be a three-way valve, which can be used to change the flow direction of the fluid. In this way, by setting the second switching device 420, the connection between any two of the first heating return pipe 120, the first water outlet end 312 and the second heating return pipe 150 can be achieved. The three states of the second switching device 420 can be switched according to actual conditions to achieve further effective utilization of the heat generated when operating any system of the heating system 100 and the bathroom system 200.
[0054] For specific embodiments, please continue to refer to Figure 1 , a first water pump 510 is provided on the second heating water return pipe 150. In this way, it is possible to provide operating power for the water flowing in from the second heating water return pipe 150, and meet the operating requirements under different operating states. For example, when the second switching device 420 is in the fifth state or the sixth state, the second heating water return pipe 150 is used, and operating power is provided for the water flowing in from the second heating water return pipe 150, and the water circulation under the corresponding operating state can be met.
[0055] In some embodiments, please refer to Figure 1 , a second water pump 520 is provided on the first heating return water pipe 120. In this way, it is possible to provide operating power for the water flowing in from the first heating return water pipe 120 to meet the operating requirements under different operating states.
[0056] In some embodiments, please refer to Figure 1 , the bypass of the second bathroom water inlet pipe 240 is connected to the bathroom return pipe 250, and the inlet of the bathroom return pipe 250 is connected to the outlet of the bathroom outlet pipe 230. In this way, by setting the bathroom return pipe 250, the bathroom water in the bathroom system 200 is circulated, the function of zero cold water is realized, and the heat generated by the operation of the bathroom system 200 can be further effectively utilized. In some embodiments, the bathroom return pipe 250 is provided with a third water pump 530. In this way, the water flowing in from the bathroom return pipe 250 can be provided with operating power to meet the operating requirements under different operating conditions. For example, when the temperature of the water in the electric water heater 210 is lower than the user set value, the third water pump 530 starts to run, heats the bathroom system 200, so that the water in the bathroom system 200 is maintained within a certain temperature range, realizes the function of zero cold water, and achieves the purpose of instant heating of bathroom water.
[0057] In some embodiments, please refer to Figure 1 , a second temperature detection unit 620 for detecting water temperature is provided in the first heating water outlet pipe 130. Thus, by providing the second temperature detection unit 620 in the first heating water outlet pipe 130, the water temperature in the first heating water outlet pipe 130 can be obtained, and the gas heating water heater is selected to be in a suitable operating state according to the water temperature, so as to realize the effective use of heat.
[0058] In some embodiments, please refer to Figure 1 , a third temperature detection unit 630 for detecting water temperature is provided in the first bathroom water inlet pipe 220. In this way, by providing the third temperature detection unit 630 in the first bathroom water inlet pipe 220, the water temperature in the first bathroom water inlet pipe 220 can be obtained, and the gas heating water heater is selected to be in a suitable operating state according to the water temperature to achieve effective use of heat. For example, when the bathroom system 200 is obtaining heat generated by gas heating, if it is detected that the water temperature in the first bathroom water inlet pipe 220 cannot meet the user's use requirements, the electric heating mode will be turned on at the same time to meet the user's use requirements of the bathroom system 200. At this time, the circulation loop in the gas heating water heater will change accordingly, and the details can be referred to the contents of some of the aforementioned embodiments, which will not be repeated here.
[0059] In some embodiments, please refer to Figure 1, a fourth temperature detection unit 640 for detecting water temperature is provided on the second bathroom water inlet pipe 240. In this way, by providing the fourth temperature detection unit 640 in the second bathroom water inlet pipe 240, the water temperature in the second bathroom water inlet pipe 240 can be obtained, and the gas heating water heater is selected to be in a suitable operating state according to the water temperature to achieve effective use of heat. For example, when the bathroom system 200 is obtaining heat generated by gas heating, if it is detected that the water temperature in the second bathroom water inlet pipe 240 cannot meet the use requirements, the electric heating mode will be turned on at the same time to meet the user's use of the bathroom system 200. At this time, the circulation loop in the gas heating water heater will change accordingly, and the details can be referred to the contents of some of the aforementioned embodiments, which will not be repeated here.
[0060] In some embodiments, please refer to Figure 1 , a flow detection unit 710 for detecting water flow is provided on the second bathroom water inlet pipe 240. In this way, by providing the flow detection unit 710 on the second bathroom water inlet pipe 240, it is possible to know whether water flows into the second bathroom water inlet pipe 240, and select a suitable operating state for the gas heating water heater to achieve effective use of heat. In other words, when it is detected that water flows into the second bathroom water inlet pipe 240, some circulation pipelines on the auxiliary heat exchanger 310 will be switched according to the actual situation. The specific switching process can refer to the contents of some of the aforementioned embodiments, which will not be repeated here.
[0061] In some embodiments, please refer to Figure 1 The heating system 100 further includes a burner 160 and a fan 170. The burner 160 is used to heat the hot water in the main heat exchanger 110, and the fan 170 is used to discharge the exhaust gas generated by the burner 160 to the outside.
[0062] In some embodiments, please refer to Figure 1 The electric water heater 210 includes a water tank 211 and a magnesium rod 212, a temperature measuring tube 213 and a heating tube 214 arranged in the water tank 211. The magnesium rod 212 is used to prevent corrosion in the water tank 211, the temperature measuring tube 213 can detect the water temperature in the water tank 211, and the heating tube 214 is used to heat the water in the water tank 211.
[0063] In some embodiments, the auxiliary heat exchanger 310 is a plate heat exchanger, which can be used for heat exchange between water in the heating system 100 and water in the bathroom system 200 in the implementation of the present application.
[0064] In some embodiments, please refer to Figure 1The heating system 100 also includes an expansion water tank 180. Due to the thermal expansion and contraction of water in the heating system 100, when the hot water is heated, the water volume in the heating system 100 increases. When there is no place to accommodate this part of the expansion of the water, the water pressure in the heating system 100 increases, which will affect normal operation. The expansion water tank 180 can accommodate the expansion of the water in the heating system 100, which can reduce the water pressure fluctuation caused by the expansion of the water in the heating system 100, and improve the safety and reliability of the operation of the heating system 100. When the heating system 100 leaks for some reason or the system cools down, the water level in the expansion water tank 180 drops to replenish the heating system 100. The expansion water tank 180 can also stabilize the pressure of the heating system 100 and remove the air released by the water during the heating process. Therefore, the expansion water tank 180 can be connected to the first heating return pipe 120 to accommodate the expansion of the system water in the heating system 100, while also playing the role of constant pressure and replenishing water for the heating system 100.
[0065] It should be noted that, in some embodiments, the gas heating water boiler also includes a controller (not shown in the drawings), which can obtain the water temperature detected by each temperature detection unit and whether the flow detection unit 710 detects water passing through, to control the switching of the states of each water pump and each switching device, so as to realize the operation of different circulating water circuits in the gas heating water boiler, so as to effectively utilize the heat generated by each system while meeting the user's usage needs.
[0066] Therefore, the gas heating water boiler in the embodiment of the present application has four working modes for users to choose from, namely heating mode, bathroom mode, heating-bathroom mode (i.e., a working mode that provides both heating hot water and bathroom hot water) and zero cold water mode.
[0067] The following further describes the four working modes provided in the embodiments of the present application with reference to the implementation methods of some of the aforementioned embodiments.
[0068] Please refer to Figure 1When the user selects the heating mode, the mode has two states: using gas heating and using electric heating. When using gas heating, the first switching device 410 is in the third state, the first switching port 411 is connected to the third switching port 413, the second switching device 420 is in the sixth state, and the fourth switching port 421 is connected to the sixth switching port 423. The outlet of the first heating outlet pipe 130 is connected to the inlet of the second heating outlet pipe 140, and the second heating outlet pipe 140 can be connected to the device required for heating at the user end, and the inlet of the first heating return pipe 120 is connected to the outlet of the second heating return pipe 150. The device required for heating at the user end directly uses the main heat exchanger 110 for heating. At this time, the flow direction of the heating water is: main heat exchanger 110→first heating outlet pipe 130→second heating outlet pipe 140→user end→second heating return pipe 150→first heating return pipe 120→main heat exchanger 110. When electric heating is used, the first switching device 410 is in the second state, the second switching port 412 is connected to the third switching port 413, the second switching device 420 is in the fifth state, and the fifth switching port 422 is connected to the sixth switching port 423. The inlet of the first water inlet end 311 of the auxiliary heat exchanger 310 is connected to the inlet of the second heating outlet pipe 140, the outlet of the first water outlet end 312 of the auxiliary heat exchanger 310 is connected to the outlet of the second heating return pipe 150, the inlet of the second heating return pipe 150 is connected to the outlet of the device required for heating at the user end, the outlet of the second heating outlet pipe 140 is connected to the inlet of the device required for heating at the user end, the second water pump 520 stops running, the first water pump 510 and the third water pump 530 are running, and the device required for heating at the user end is heated by the heat generated by the bathroom system 200 with the aid of the auxiliary heat exchanger 310. At this time, the flow direction of bathroom water is: bathroom return pipe 250 → auxiliary heat exchanger 310 → first bathroom water inlet pipe 220 → electric water heater 210 → bathroom outlet pipe 230 → bathroom return pipe 250, and the flow direction of heating water is: second heating return pipe 150 → auxiliary heat exchanger 310 → second heating outlet pipe 140 → second heating return pipe 150.
[0069] It should be noted that in the heating mode, the water temperature in the second heating water outlet pipe 140 can be detected by the first temperature detection unit 610. If the water temperature in the second heating water outlet pipe 140 cannot meet the user's usage requirements within the preset time, gas heating will be used and the electric heating state will be turned off.
[0070] Please continue to refer to Figure 1When the user selects the bathroom mode, this mode has three states: pure electric heating, gas heating, or dual energy heating (i.e., a working mode that uses both electric heating and gas heating). When pure electric heating is used, the heating pipe 214 in the electric water heater 210 is powered on for heating, the third water pump 530 is running, and the flow direction of bathroom water is: bathroom return pipe 250 → auxiliary heat exchanger 310 → first bathroom inlet pipe 220 → electric water heater 210 → bathroom outlet pipe 230 → bathroom return pipe 250. When gas heating is used, the first switching device 410 is in the first state, the first switching port 411 is connected to the second switching port 412, the second switching device 420 is in the fourth state, the fourth switching port 421 is connected to the fifth switching port 422. The outlet of the first heating outlet pipe 130 is connected to the inlet of the first water inlet end 311 of the auxiliary heat exchanger 310, and the inlet of the first heating return pipe 120 is connected to the outlet of the first water outlet end 312 of the auxiliary heat exchanger 310. The main heat exchanger 110, the first heating water outlet pipe 130, the auxiliary heat exchanger 310 and the first heating water return pipe 120 form a circulation loop, and the bathroom system 200 can use the heat generated by the heating system 100 with the help of the auxiliary heat exchanger 310. The flow direction of bathroom water is bathroom return pipe 250 → auxiliary heat exchanger 310 → first bathroom water inlet pipe 220 → electric water heater 210 → bathroom water outlet pipe 230 → bathroom water return pipe 250, and the flow direction of heating water is: main heat exchanger 110 → first heating water outlet pipe 130 → auxiliary heat exchanger 310 → first heating water return pipe 120 → main heat exchanger 110. When dual energy heating is used, the flow direction of heating water and bathroom water is the same as when only gas heating is used, and the states of each water pump and each switching device are the same as when only gas heating is used. At the same time, the heating pipe 214 in the electric water heater 210 is powered on for heating, and the third water pump 530 is running.
[0071] It should be noted that in the bathroom mode, the water temperature in the first bathroom water inlet pipe 220 can be detected by the third temperature detection unit 630, the water temperature in the second bathroom water inlet pipe 240 can be detected by the fourth temperature detection unit 640, and the water temperature in the water tank 211 can be detected by the temperature measuring tube 213. If it is detected within the preset time that the water temperature of the bathroom water cannot meet the user's usage requirements, it means that only gas heating cannot meet the user's usage requirements, and dual energy heating will be used at this time.
[0072] Please continue to refer to Figure 1 When the user selects the heating-bathroom mode, since the gas heating and electric heating are in different systems, the heating system 100 uses gas heating and the bathroom system 200 uses electric heating, and the two systems can operate independently without affecting each other. In this way, it can avoid the situation in the related art that when the heating system 100 and the bathroom system 200 share gas heating, the water temperatures in the two systems affect each other, and the heat generated by the bathroom and heating cannot be effectively utilized.
[0073] Please continue to refer to Figure 1 When the user selects the zero cold water mode, if the water temperature in the first bathroom water inlet pipe 220 is detected by the third temperature detection unit 630 or the water temperature in the electric water heater 210 is detected by the temperature measuring tube 213 to be lower than the user set temperature, the third water pump 530 is operated to heat the bathroom system 200, so that the water temperature of the bathroom water in the bathroom system 200 is maintained within a certain temperature range, so that the bathroom water is instantly heated. At this time, the heating method of the bathroom water in the bathroom system 200 can refer to the contents of some of the aforementioned embodiments, which will not be repeated here.
[0074] In summary, the embodiment of the present application uses an electric energy heat source in the bathroom system 200, so that the heating system 100 and the bathroom system 200 have independent heating sources respectively, and the warm bath synchronous operation function can be realized. In addition, since the heating system 100 and the bathroom system 200 can perform heat exchange through the auxiliary heat exchanger 310, each switching device and each water pump are provided to cooperate with each pipeline in the heating system 100 and the bathroom system 200, so that the heat generated when running any system in the heating system 100 and the bathroom system 200 can be used by the other system (for example, the bathroom system 200 can use the auxiliary heat exchanger 310 to reversely heat the heating water), thereby avoiding the waste of heat. At the same time, with the assistance of setting the bathroom return pipe 250 in the pipeline, the zero cold water function can be realized. Therefore, the embodiment of the present application can realize the peak-shifting of electricity and gas, realize the heating gas and heat preservation electricity, and reduce emissions.
[0075] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0076] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A gas-fired hot water boiler, characterized in that: include: A heating system (100), the heating system (100) comprising a main heat exchanger (110), a first heating water return pipe (120) connected to the main heat exchanger (110), a first heating water outlet pipe (130) connected to the main heat exchanger (110), a second heating water outlet pipe (140) connected to the first heating water outlet pipe (130), and a second heating water return pipe (150) connected to the first heating water return pipe (120); A bathroom system (200), the bathroom system (200) comprising an electric water heater (210) and a first bathroom water inlet pipe (220) and a bathroom water outlet pipe (230) respectively connected to the electric water heater (210); and an auxiliary heat exchanger (310), the auxiliary heat exchanger (310) having a first water inlet end (311) and a first water outlet end (312) which are in communication with each other, and a second water inlet end (313) and a second water outlet end (314) which are in communication with each other; The interiors of two of the first heating water outlet pipe (130), the second heating water outlet pipe (140) and the first water inlet end (311) can be selectively connected, the interiors of two of the first heating water return pipe (120), the second heating water return pipe (150) and the first water outlet end (312) can be selectively connected, the second water outlet end (314) is connected to the first bathroom water inlet pipe (220), and the second water inlet end (313) is connected to the second bathroom water inlet pipe (240), so that the heating system (100) and the bathroom system (200) can perform heat exchange with the aid of the auxiliary heat exchanger (310).
2. The gas heating water heater according to claim 1, characterized in that: The gas heating water heater further comprises a first switching device (410); The first switching device (410) is provided with a first switching port (411), a second switching port (412) and a third switching port (413); The first switching port (411) is in communication with the outlet of the first heating water outlet pipe (130), the second switching port (412) is in communication with the inlet of the first water inlet end (311), and the third switching port (413) is in communication with the inlet of the second heating water outlet pipe (140); The first switching device (410) has a first state, a second state and a third state; when the first switching device (410) is in the first state, the first switching port (411) and the second switching port (412) are connected; when the first switching device (410) is in the second state, the second switching port (412) and the third switching port (413) are connected; when the first switching device (410) is in the third state, the first switching port (411) and the third switching port (413) are connected.
3. The gas heating water heater according to claim 2, characterized in that: The second heating water outlet pipe (140) is provided with a first temperature detection unit (610) for detecting water temperature.
4. The gas heating water heater according to claim 1, characterized in that: The gas heating water heater further comprises a second switching device (420); The second switching device (420) comprises a fourth switching port (421), a fifth switching port (422) and a sixth switching port (423); The fourth switching port (421) is connected to the inlet of the first heating water return pipe (120), the fifth switching port (422) is connected to the outlet of the first water outlet (312), and the sixth switching port (423) is connected to the outlet of the second heating water return pipe (150); The second switching device (420) has a fourth state, a fifth state and a sixth state; when the second switching device (420) is in the fourth state, the fourth switching port (421) and the fifth switching port (422) are connected; when the second switching device (420) is in the fifth state, the fifth switching port (422) and the sixth switching port (423) are connected; when the second switching device (420) is in the sixth state, the fourth switching port (421) and the sixth switching port (423) are connected.
5. The gas heating water heater according to claim 4, characterized in that: The second heating water return pipe (150) is provided with a first water pump (510).
6. The gas heating water heater according to any one of claims 1 to 5, characterized in that: A second water pump (520) is provided on the first heating water return pipe (120).
7. The gas-fired hot water heater according to any one of claims 1 to 5, characterized in that: The bypass of the second bathroom water inlet pipe (240) is connected to the bathroom water return pipe (250); The inlet of the bathroom water return pipe (250) is connected to the outlet of the bathroom water outlet pipe (230).
8. The gas-fired hot water heater according to claim 7, characterized in that: The bathroom water return pipe (250) is provided with a third water pump (530).
9. The gas heating water heater according to any one of claims 1 to 5, characterized in that: The first heating water outlet pipe (130) is provided with a second temperature detection unit (620) for detecting water temperature.
10. The gas heating water heater according to any one of claims 1 to 5, characterized in that: The first bathroom water inlet pipe (220) is provided with a third temperature detection unit (630) for detecting water temperature.
11. The gas heating water heater according to any one of claims 1 to 5, characterized in that: The second bathroom water inlet pipe (240) is provided with a fourth temperature detection unit (640) for detecting water temperature.
12. The gas heating water heater according to any one of claims 1 to 5, characterized in that: The second bathroom water inlet pipe (240) is provided with a flow detection unit (710) for detecting water flow.