Heating flanging shaping device and flanging shaping method thereof
Through double-head heating and automatic transfer of workpieces by transformers and truss manipulators, efficient and automated production of heating flange setting equipment is achieved, solving the problems of low efficiency and manual operation of existing equipment, and improving production efficiency and cooling speed.
Patent Information
- Application Number
- CN202111589747.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-23
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2041-12-23
AI Technical Summary
The existing heating flange setting equipment is inefficient, requires two steps and requires manual operation. After cooling and setting, it requires manual assembly of flanges and tightening, which has a large workload.
The double-head heating and deformation machine is used to automatically transfer the workpiece through the truss robot, which can complete the heating flange and shaping at both ends of the pipeline in one process, and cool in the water tank to reduce the need for manual assembly of flanges.
Improves production efficiency, reduces manual workload, and realizes automated heating flip and cooling shaping processes, with short cooling time.
Smart Images

Figure CN114211738B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of pipeline processing, and in particular relates to heating flanging shaping equipment and a flanging shaping method thereof. Background Art
[0002] Plastic pipes are widely used in the fields of construction, agriculture, industry, etc. due to their advantages of light weight, high strength, corrosion resistance, low price, and easy processing. Flanging of plastic pipes facilitates the connection between pipes, has better sealing, and has smooth pipe openings that are not easy to hurt people.
[0003] The heating and deformation process of the existing heating flanging shaping equipment is realized in two steps. The two steps are carried out separately. Each step takes a certain amount of time and requires changing workstations to complete. At the same time, the existing heating flanging equipment adopts single-head heating and deformation. To complete the flanging shaping of a pipe, the same process needs to be repeated twice. After cooling and shaping, the flange needs to be manually assembled and tightened. Therefore, the entire production process of the existing heating flanging shaping equipment requires manual operation, which is inefficient and labor-intensive. Summary of the invention
[0004] The purpose of the present invention is to provide a heating flanging shaping device and a flanging shaping method thereof, which adopts double-head heating and deformation, and can complete the flanging shaping of both ends of the pipeline in one process, adopts automatic shaping and then direct cooling, and does not require manual assembly flange fastening. A truss manipulator is used to automatically transfer workpieces between all processes, which has high efficiency and low manual workload.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] The heating flanging and shaping equipment is used for heating and flanging pipes, and includes a heating and shaping machine, a shaping and cooling machine and a truss manipulator. The truss manipulator transfers the pipe on the heating and shaping machine to the shaping and cooling machine. The heating and shaping machine includes a heating and shaping machine frame, and the heating and shaping machine frame is provided with a supporting and heating structure for placing the pipe and a heating structure for simultaneously heating both ends of the pipe. The shaping and cooling machine includes a shaping and cooling machine frame, and the shaping and cooling machine frame is provided with a supporting and shaping structure for placing the pipe and a shaping structure for simultaneously extruding and shaping both ends of the pipe. The pipe is transferred from the heating and shaping machine to the shaping and cooling machine via the truss manipulator.
[0007] Both the heating and forming machine and the forming and cooling machine use double-head heating or forming. Both of them only need one process to complete the heating and flanging or forming of both ends of the pipe. Direct cooling after automatic forming is adopted, and there is no need for manual assembly and fastening of flanges. Truss manipulators are used to automatically transfer workpieces between all processes, which is highly efficient and requires less manual work.
[0008] Furthermore, the heating variant machine frame is provided with at least one supporting heating structure, the heating structure on one side is fixed on the heating variant machine frame, and the heating structure on the other side is fixed on the mobile heating component, the mobile heating component includes a first track and a first support platform, the heating structure is installed on the first support platform, the first support platform is provided with a first slider, the first slider slides on the first track, and the first slider is fixed to the first track by bolts.
[0009] The position of the first support platform is adjusted on the first track according to the length of the pipeline so that the heaters at both ends are close to the pipeline. After the position of the heater is determined, the first slider is fixed to the first track with bolts. The first track and the first support platform are used to adjust the position of the heater.
[0010] Furthermore, the first support platform is provided with a second track, the second track is slidably connected to the second support platform, the second support platform is fixed with a heating structure, the first support platform is provided with at least one supporting heating structure, the supporting heating structure is connected to the heating cylinder, the piston rod of the heating cylinder is fixed to the second support platform, and the heating cylinder drives the second support platform and the heating structure to move.
[0011] When heating and flanging, both ends of the pipe soften and the length of the pipe becomes shorter. Therefore, the second support platform is pulled by the heating cylinder so that the heating structures at both ends can continuously press the two ends of the pipe, and the flanging effect of both ends of the pipe can be achieved in one process.
[0012] Furthermore, the heating structure includes a heater and a center positioning adjustment seat, the shaping structure includes a shaping flange and a center positioning adjustment seat, the heater or the shaping flange is fixed to the center positioning adjustment seat, the center positioning adjustment seat includes a motor screw and a positioning plate, the positioning plate is driven by the motor screw to move up and down, the positioning plate is fixed to the heater or the shaping flange, and the positioning assembly drives the heater to move up and down.
[0013] According to the different sizes of pipelines, the positioning plate of the center positioning adjustment seat is driven by the motor screw to move up and down, so that the center of the heater or the positioning flange is aligned with the center of the pipeline.
[0014] Furthermore, the shaping cooling machine frame is provided with at least two shaping structures, one shaping structure is fixed on the shaping cooling machine frame, and the other shaping structure is fixed on the mobile shaping component, the mobile shaping component includes a third track and a third support platform, the third support platform is fixed with at least one supporting shaping structure, the third support platform is provided with a third slider, the third slider slides on the third track, and the third slider is fixed to the third track by bolts.
[0015] The position of the third support platform is adjusted on the third track according to the length of the pipeline, so that the shaping structures at both ends are close to the pipeline, and after the heater position is determined, the third slider is fixed on the third track with bolts. The third track and the third support platform are used to adjust the position of the shaping structure.
[0016] Furthermore, the shaping structure on the third support platform also includes an end surface pressing cylinder, one end of which is fixed to the positioning plate, and a piston rod of the end surface pressing cylinder is fixed to the shaping flange.
[0017] The end face clamping cylinder makes the shaped flanges at both ends continuously clamp the two ends of the pipeline, achieving the clamping effect of both ends of the pipeline in one process.
[0018] Furthermore, the shaping cooling machine frame is provided with a water tank, the supporting shaping structure and the shaping structure are located in the water tank, and the water tank is provided with a water inlet and a water outlet.
[0019] The shaped pipes are cooled in a water tank, which shortens the cooling time and greatly improves the efficiency.
[0020] Furthermore, the truss manipulator includes a truss x-axis, a truss y-axis and a truss z-axis, the truss z-axis is connected to the pipe clamp, the truss x-axis is provided with at least two x-axis tracks and an x-axis moving assembly, the x-axis track is provided with an x-axis slider, the x-axis moving assembly includes an x-axis motor, an x-axis conveyor belt and an x-axis roller, the two ends of the x-axis conveyor belt are respectively installed on the x-axis motor and the x-axis roller, one of the x-axis sliders is fixed to the x-axis conveyor belt, a truss y-axis is provided between the x-axis tracks, the truss y-axis is provided with a y-axis slide rail and a y-axis moving assembly, the y-axis slide rail is provided with a y-axis slider, the y-axis slider is fixed with a z-axis fixing seat, the z-axis fixing seat fixes the truss z-axis, the y-axis moving assembly includes a y-axis motor, a y-axis conveyor belt and a y-axis roller, the two ends of the y-axis conveyor belt are respectively installed on the y-axis motor and the y-axis roller, wherein the truss z-axis is fixed to the y-axis conveyor belt.
[0021] The rotation of the x-axis motor drives the x-axis conveyor belt to rotate, and drives one of the x-axis sliders to slide on the x-axis track, thereby moving the position of the pipe fixture in the x-axis direction. Similarly, the rotation of the y-axis motor drives the y-axis conveyor belt to rotate, and drives the y-axis slider to slide on the y-axis track, thereby moving the position of the pipe fixture in the y-axis direction. Thus, the pipe fixture can be moved to the specified position on the xy plane.
[0022] Furthermore, the z-axis fixed seat is provided with a z-axis motor and a z-axis slider, the z-axis motor is provided with a gear, the truss z-axis is provided with a z-axis track and a rack, the z-axis slider is connected to the z-axis track, the gear is matched with the rack, and the pipe clamp includes a double-cylinder cylinder and a splint, and the splints are fixed at both ends of the double-cylinder cylinder.
[0023] The rotation of the z-axis motor drives the gear to rotate, and the gear cooperates with the rack on the truss z-axis so that the truss z-axis drives the pipe clamp to move up and down. The cooperation of the z-axis track and the z-axis slider improves the stability of the truss z-axis.
[0024] A flanging shaping method using a heating flanging shaping device:
[0025] 1. Heating deformation machine position debugging:
[0026] (1) Place the pipe on the supporting heating structure of the heating transformer;
[0027] (2) Adjust the position of the center positioning adjustment seat to align the center of the heater with the center of the pipe;
[0028] (3) moving the first support platform on the first track according to the length of the pipeline so that both ends of the pipeline are close to the heater, and fixing the position of the first slider by bolts to fix the first support platform;
[0029] 2. Position debugging of the shaping cooling machine:
[0030] (1) Place the pipe on the supporting shaping structure of the shaping cooling machine;
[0031] (2) Adjust the position of the center positioning adjustment seat to align the center of the fixed flange with the center of the pipe;
[0032] (3) moving the third support platform on the third track according to the length of the pipeline so that both ends of the pipeline are close to the fixed flange, and fixing the position of the third slider by bolts, thereby fixing the third support platform;
[0033] 4. Heating and flanging:
[0034] (1) Place the pipe on the supporting heating structure of the heating transformer by means of a truss manipulator;
[0035] (2) The heating cylinder starts to pull the second support platform, so that the heaters at both ends press and heat the two ends of the pipe. The two ends of the pipe are heated and the heating cylinder continues to squeeze until the two ends of the pipe are flared;
[0036] (3) After the set time is reached, the heating cylinder pushes away from the second support platform, and the heaters at both ends are separated from the pipeline;
[0037] 4. Cooling and shaping:
[0038] (1) The pipe is transferred from the heating and deforming machine to the supporting shaping structure of the shaping and cooling machine by a truss manipulator;
[0039] (2) The end face pressing cylinder is started to press the two end faces of the pipe with the fixed flanges at both ends;
[0040] (3) Water is poured into the water tank through the water inlet, and the water covers the pipes for cooling. After cooling and shaping for a set time, the water is discharged from the water outlet;
[0041] (4) The end face pressing cylinder returns to the origin, the forming flange is separated from the two end faces of the pipe, and the truss manipulator transfers the pipe from the forming cooling machine to the finished product area. The pipe in the finished product area is finally placed in the pipe drying oven for drying.
[0042] Among them, in step 4 and step 5, the specific steps of the truss manipulator moving the pipeline are as follows:
[0043] (1) The pipe clamp is driven by the x-axis moving component and the y-axis moving component to move to a specified position along the x-axis and the y-axis;
[0044] (2) The z-axis motor rotates to drive the gear to rotate, and the gear cooperates with the rack of the truss z-axis to move the truss z-axis downward, so that the pipe clamp moves near the pipe;
[0045] (3) The double cylinder is started to clamp the pipe;
[0046] (4) The z-axis motor rotates in the opposite direction to move the pipe clamp upward and move it to the next designated position through the x-axis moving component;
[0047] (5) The z-axis motor rotates to move the pipe clamp downward. After the movement stops, the double-cylinder cylinder returns to its original position to release the clamp and place the pipe in the specified position;
[0048] (6) The z-axis motor rotates in the opposite direction to move the pipe clamp upward, and steps (1) to (5) are repeated until all pipes are moved.
[0049] First, manually adjust the heating and forming machine and the shaping and cooling machine according to the size and length of the pipeline, so that the center of the heater or the shaping flange is aligned with the center of the pipeline, which is convenient for the subsequent fully automatic heating and flanging and cooling and shaping. During heating and flanging, the heater is continuously heated and pressed on both ends of the pipeline through the heating cylinder, and the heating and flanging of both ends of the pipeline can be achieved in one process, which improves work efficiency. Similarly, during cooling and shaping, the shaping flange is pressed on both ends of the pipeline through the end face pressing cylinder, and water is injected into the water tank for cooling, and the cooling time is short. The transfer of the pipeline is achieved by the truss manipulator. The position can be set in advance to continuously transfer the pipeline, which is efficient and requires less manual work.
[0050] Due to the adoption of the above technical solution, the present invention has the following beneficial effects:
[0051] The heating and forming machine and the shaping and cooling machine in the equipment both use double-head heating or shaping. Both of them only need one process to complete the heating flanging or shaping of both ends of the pipe. Direct cooling after automatic shaping is adopted, and there is no need for manual assembly and fastening of flanges. Truss manipulators are used to automatically transfer workpieces between all processes, which is highly efficient and requires less manual work. The specific beneficial effects are as follows:
[0052] 1. Adjust the position of the first support platform on the first track according to the length of the pipeline so that the heaters at both ends are close to the pipeline. After determining the position of the heater, fix the slider to the first track with bolts. The first track and the first support platform are set to adjust the position of the heater. When heating and flanging, the two ends of the pipeline soften and the length of the pipeline becomes shorter. Therefore, the second support platform is pulled by the heating cylinder so that the heating structures at both ends continuously press the two ends of the pipeline, and the flanging effect of both ends of the pipeline is achieved in one process.
[0053] 2. According to the different sizes of pipelines, the positioning plate of the center positioning adjustment seat is driven by the motor screw to move up and down, and the center of the heater or positioning flange is aligned with the center of the pipeline.
[0054] 3. Adjust the position of the third support platform on the third track according to the length of the pipeline, so that the shaping structures at both ends are close to the pipeline. After determining the position of the heater, fix the slider on the third track with bolts. The third track and the third support platform are set to adjust the position of the shaping structure. The end face clamping cylinder makes the shaping flanges at both ends continuously press the two ends of the pipeline, and the compression effect of both ends of the pipeline is achieved in one process. The shaped pipeline is cooled in the water tank, the cooling time is short, and the efficiency is greatly improved.
[0055] 4. The rotation of the x-axis motor drives the x-axis conveyor belt to rotate, and drives one of the x-axis sliders to slide on the x-axis track, thereby moving the position of the pipe fixture in the x-axis direction. Similarly, the rotation of the y-axis motor drives the y-axis conveyor belt to rotate, and drives the y-axis slider to slide on the y-axis track, thereby moving the position of the pipe fixture in the y-axis direction. Thus, the pipe fixture can be moved to the specified position on the xy plane. The rotation of the z-axis motor drives the gear to rotate, and the gear and the rack on the z-axis of the truss cooperate to enable the z-axis of the truss to drive the pipe fixture up and down. The cooperation of the z-axis track and the z-axis slider improves the stability of the z-axis of the truss. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] The present invention will be further described below with reference to the accompanying drawings.
[0057] Figure 1 It is a structural schematic diagram of the heating flanging shaping device in the present invention;
[0058] Figure 2 It is a structural schematic diagram of a heating deformation machine;
[0059] Figure 3 It is a structural schematic diagram of a shaping cooling machine;
[0060] Figure 4 This is a schematic diagram of the structure of the truss manipulator. DETAILED DESCRIPTION
[0061] like Figure 1The heating flanging and shaping equipment shown is used for heating and flanging the pipe 5, and includes a heating and shaping machine 1, a shaping and cooling machine 2 and a truss manipulator 3. The truss manipulator 3 transfers the pipe 5 on the heating and shaping machine to the shaping and cooling machine 2.
[0062] like Figure 2 The heating variant machine 1 shown includes a heating variant machine frame 101, and the heating variant machine frame 101 is provided with two supporting heating structures 102 for placing pipes 5 and two heating structures, and the heating structure includes a heater 108 and a center positioning adjustment seat 4, wherein one heater 108 is fixed on the heating variant machine frame 101, and the other heater 108 is fixed on the mobile heating component. The mobile heating component includes a first track 103 and a first support platform 104, and the heating structure is installed on the first support platform 104, and the first support platform 104 is provided with a first slider 105, and the first slider 105 slides on the first track 103, and the first slider 105 is fixed to the first track 103 by bolts. The first support platform 104 is provided with a second track 106, the second track 106 is slidably connected to the second support platform 107, the second support platform 107 is fixed with a heater 108, the first support platform 104 is provided with at least one supporting heating structure 102, the supporting heating structure 102 is connected to the heating cylinder 109, the piston rod of the heating cylinder 109 is fixed to the second support platform 107, and the heating cylinder 109 drives the second support platform 107 and the heating structure to move.
[0063] The position of the first support platform 104 is adjusted on the first track 103 according to the length of the pipe 5, so that the heaters 108 at both ends are close to the pipe 5. After the position of the heater 108 is determined, the first slider 105 is fixed to the first track 103 with bolts. The first track 103 and the first support platform 104 are set to adjust the position of the heater 108. When heating and flanging, the two ends of the pipe 5 soften and the length of the pipe 5 becomes shorter. Therefore, the second support platform 107 is pulled by the heating cylinder 109, so that the heating structures at both ends continuously press the two ends of the pipe 5, and the flanging effect of the two ends of the pipe 5 is achieved in one process.
[0064] like Figure 3The shaping cooling machine 2 shown includes a shaping cooling machine frame 201, and the shaping cooling machine frame 201 is provided with a water tank 202, and the water tank 202 is provided with a water inlet and a water outlet. The water tank 202 is provided with a supporting shaping structure 203 for placing a pipe 5 and a shaping structure for simultaneously extruding and shaping the two ends of the pipe fitting, and the shaping structure includes a shaping flange 204 and a center positioning adjustment seat 4. The shaping cooling machine frame 201 is provided with at least two shaping structures, one shaping structure is fixed on the shaping cooling machine frame 201, and the other shaping structure is fixed on the mobile shaping assembly, and the mobile shaping assembly includes a third track 205 and a third support platform 206, and the third support platform 206 is fixed with at least one supporting shaping structure 203, and the third support platform 206 is provided with a third slider 207, and the third slider 207 slides on the third track 205, and the third slider 207 is fixed to the third track 205 by bolts. The shaping structure on the third support platform 206 also includes an end surface pressing cylinder 208 , and a piston rod of the end surface pressing cylinder 208 is fixed to the shaping flange 204 .
[0065] The position of the third support platform 206 is adjusted on the third track 205 according to the length of the pipe 5, so that the shaping structures at both ends are close to the pipe 5. After the position of the heater 108 is determined, the third slider 207 is fixed to the third track 205 with bolts. The third track 205 and the third support platform 206 are set to adjust the position of the shaping structure. The end face pressing cylinder 208 makes the shaping flanges 204 at both ends continuously press the two ends of the pipe 5, and the pressing effect of the two ends of the pipe 5 is achieved in one process. The shaped pipe 5 is cooled in the water tank 202, the cooling time is short, and the efficiency is greatly improved.
[0066] like Figure 2 and Figure 3 As shown, the heater 108 or the shaping flange 204 is fixed to the center positioning adjustment seat 4, and the center positioning adjustment seat 4 includes a motor screw and a positioning plate 209. The positioning plate 209 is driven by the motor screw to move up and down. The positioning plate 209 is fixed to the heater 108 or the shaping flange 204, and the positioning assembly drives the heater 108 to move up and down.
[0067] According to the size of the pipeline 5 , the positioning plate 209 of the center positioning adjustment seat 4 is driven by the motor screw to move up and down, so that the center of the heater 108 or the positioning flange is aligned with the center of the pipeline 5 .
[0068] like Figure 4As shown, the truss manipulator 3 includes a truss x-axis 301, a truss y-axis 302 and a truss z-axis 303, the truss z-axis 303 is connected to the pipe clamp 304, the truss x-axis 301 is provided with at least two x-axis tracks 305 and an x-axis moving assembly, the x-axis track 305 is provided with an x-axis slider 306, the x-axis moving assembly includes an x-axis motor 307, an x-axis conveyor belt 308 and an x-axis roller 309, the two ends of the x-axis conveyor belt 308 are respectively installed on the x-axis motor 307 and the x-axis roller 309, and one of the x-axis sliders 306 is fixed to the x-axis conveyor belt 308 A truss y-axis 302 is provided between the x-axis rails 305, the truss y-axis 302 is provided with a y-axis slide rail 310 and a y-axis moving assembly, the y-axis slide rail 310 is provided with a y-axis slider 311, the y-axis slider 311 is fixed with a z-axis fixing seat 312, the z-axis fixing seat 312 fixes the truss z-axis 303, the y-axis moving assembly includes a y-axis motor 313, a y-axis conveyor belt 314 and a y-axis roller 315, the two ends of the y-axis conveyor belt 314 are respectively installed on the y-axis motor 313 and the y-axis roller 315, wherein the truss z-axis 303 is fixed to the y-axis conveyor belt 314. The z-axis fixed seat 312 is provided with a z-axis motor 316 and a z-axis slider 317, the z-axis motor 316 is provided with a gear 318, the truss z-axis 303 is provided with a z-axis track 319 and a rack 320, the z-axis slider 317 is connected to the z-axis track 319, the gear 318 is matched with the rack 320, and the pipe clamp 304 includes a double-cylinder cylinder 321 and a clamp 322, and the clamps 322 are fixed at both ends of the double-cylinder cylinder 321.
[0069] The x-axis motor 307 rotates to drive the x-axis conveyor belt 308 to rotate, and drives one of the x-axis sliders 306 to slide on the x-axis track 305, thereby moving the position of the pipe clamp 304 in the x-axis direction. Similarly, the y-axis motor 313 rotates to drive the y-axis conveyor belt 314 to rotate, and drives the y-axis slider 311 to slide on the y-axis track, thereby moving the position of the pipe clamp 304 in the y-axis direction. Thus, the pipe clamp 304 can be moved to a specified position on the xy plane. The z-axis motor 316 rotates to drive the gear 318 to rotate, and the gear 318 cooperates with the rack 320 on the truss z-axis 303 so that the truss z-axis 303 drives the pipe clamp 304 to move up and down, and the cooperation of the z-axis track 319 and the z-axis slider 317 improves the stability of the truss z-axis 303.
[0070] A flanging shaping method using a heating flanging shaping device:
[0071] 1. Heating and deformation machine 1 position debugging:
[0072] (1) placing the pipe 5 on the supporting heating structure 102 of the heating deformation machine;
[0073] (2) Adjust the position of the center positioning adjustment seat 4 to align the center of the heater 108 with the center of the pipeline 5;
[0074] (3) The first support platform 104 is moved on the first track 103 according to the length of the pipeline 5, so that both ends of the pipeline 5 are close to the heater 108, and the position of the first slider 105 is fixed by bolts, thereby fixing the first support platform 104;
[0075] 2. Position debugging of shaping cooling machine 2:
[0076] (1) placing the pipe 5 on the supporting shaping structure 203 of the shaping cooling machine 2;
[0077] (2) Adjust the position of the center positioning adjustment seat 4 to align the center of the shaped flange 204 with the center of the pipeline 5;
[0078] (3) Move the third support platform 206 on the third track 205 according to the length of the pipeline 5, so that both ends of the pipeline 5 are close to the fixed flange 204, and fix the position of the third slider 207 by bolts, thereby fixing the third support platform 206;
[0079] 3. Heating and flanging:
[0080] (1) The pipe 5 is placed on the supporting heating structure 102 of the heating deformation machine by the pipe clamp 304 of the truss manipulator 3;
[0081] (2) The heating cylinder 109 starts to pull the second support platform 107, so that the heaters 108 at both ends press and heat the two ends of the pipe 5. The two ends of the pipe 5 are heated and the heating cylinder 109 is continuously squeezed until the two ends of the pipe 5 are in a trumpet shape;
[0082] (3) After the set time is reached, the heating cylinder 109 pushes away from the second support platform 107, and the heaters 108 at both ends are separated from the pipeline 5;
[0083] 4. Cooling and shaping:
[0084] (1) The pipe 5 is transferred from the heating and deforming machine to the supporting shaping structure 203 of the shaping and cooling machine 2 by the pipe clamp 304 of the truss manipulator 3;
[0085] (2) The end surface pressing cylinder 208 is started to press the two end surfaces of the pipeline 5 with the fixed flanges 204 at both ends;
[0086] (3) Water is poured into the water tank 202 through the water inlet, and the water covers the pipe 5 for cooling. After cooling and shaping for a set time, the water is discharged from the water outlet;
[0087] (4) The end face pressing cylinder 208 returns to the origin, the shaping flange 204 is separated from the two end faces of the pipe 5, and the truss manipulator 3 transfers the pipe 5 from the shaping cooling machine 2 to the finished product area. The pipe 5 in the finished product area is finally placed in the pipe drying oven for drying.
[0088] Among them, in step 3 and step 4, the specific steps when the truss manipulator 3 moves the pipeline 5 are as follows:
[0089] (1) The pipe clamp 304 is moved to a specified position along the x-axis and y-axis driven by the x-axis moving assembly and the y-axis moving assembly;
[0090] (2) The z-axis motor 316 rotates to drive the gear 318 to rotate, and the gear 318 cooperates with the rack 320 of the truss z-axis 303 to move the truss z-axis 303 downward, so that the pipe clamp 304 moves to the vicinity of the pipe 5;
[0091] (3) The double cylinder 321 is started to make the clamping plate 322 clamp the pipe 5;
[0092] (4) the z-axis motor 316 rotates in the opposite direction to move the pipe clamp 304 upward and to the next designated position through the x-axis moving assembly;
[0093] (5) The z-axis motor 316 rotates to move the pipe clamp 304 downward, and after stopping the movement, the double-cylinder cylinder 321 returns to its original position to release the clamp 322, and the pipe 5 is placed at the designated position;
[0094] (6) The z-axis motor 316 rotates in the opposite direction to move the pipe clamp 304 upward, and steps (1)-(5) are repeated until all pipes 5 are moved.
[0095] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims
1. Heating flanging shaping equipment, used for heating flanging of pipes, characterized by: The invention comprises a heating and deforming machine, a shaping and cooling machine and a truss manipulator, wherein the truss manipulator transfers the pipe on the heating and deforming machine to the shaping and cooling machine, wherein the heating and deforming machine comprises a heating and deforming machine frame, wherein the heating and deforming machine frame is provided with a supporting heating structure for placing the pipe and a heating structure for simultaneously heating both ends of the pipe fitting, wherein the shaping and cooling machine comprises a shaping and cooling machine frame, wherein the shaping and cooling machine frame is provided with a supporting shaping structure for placing the pipe and a shaping structure for simultaneously extruding and shaping both ends of the pipe fitting, wherein the pipe is transferred from the heating and deforming machine to the shaping and cooling machine through the truss manipulator, wherein the heating and deforming machine frame is provided with at least one of the supporting heating structures, and one side The heating structure is fixed on the frame of the heating variant machine, and the heating structure on the other side is fixed on the mobile heating component. The mobile heating component includes a first track and a first support platform. The heating structure is installed on the first support platform. The first support platform is provided with a first slider. The first slider slides on the first track. The first slider is fixed to the first track by bolts. The first support platform is provided with a second track. The second track is slidably connected to the second support platform. The second support platform is fixed with the heating structure. The first support platform is provided with at least one supporting heating structure. The supporting heating structure is connected to the heating cylinder. The piston rod of the heating cylinder is fixed with The second support platform, the heating cylinder drives the second support platform and the heating structure to move, the heating structure includes a heater and a center positioning adjustment seat, the shaping structure includes a shaping flange and the center positioning adjustment seat, the heater or the shaping flange is fixed to the center positioning adjustment seat, the center positioning adjustment seat includes a motor screw and a positioning plate, the positioning plate is driven by the motor screw to move up and down, the positioning plate is fixed to the heater or the shaping flange, the center positioning adjustment seat drives the heater to move up and down, the shaping cooling machine frame is provided with at least two shaping structures, one of which is fixed on the shaping cooling machine frame, Another shaping structure is fixed on a mobile shaping component, and the mobile shaping component includes a third track and a third support platform, and at least one of the supporting shaping structures is fixed on the third support platform, and the third support platform is provided with a third slider, and the third slider slides on the third track, and the third slider is fixed to the third track by bolts, and the shaping structure on the third support platform also includes an end face clamping cylinder, one end of the end face clamping cylinder is fixed to the positioning plate, and the piston rod of the end face clamping cylinder is fixed to the shaping flange, and the shaping cooling machine frame is provided with a water tank, and the supporting shaping structure and the shaping structure are located in the water tank, and the water tank is provided with a water inlet and a water outlet.
2. The heating flanging shaping equipment according to claim 1, characterized in that: The truss manipulator includes a truss x-axis, a truss y-axis and a truss z-axis, the truss z-axis is connected to a pipe clamp, the truss x-axis is provided with at least two x-axis tracks and an x-axis moving assembly, the x-axis track is provided with an x-axis slider, the x-axis moving assembly includes an x-axis motor, an x-axis conveyor belt, an x-axis motor and an x-axis roller, the two ends of the x-axis conveyor belt are respectively installed on the x-axis motor and the x-axis roller, one of the x-axis sliders is fixed to the x-axis conveyor belt, the truss y-axis is provided between the x-axis tracks, the truss y-axis is provided with a y-axis slide rail and a y-axis moving assembly, the y-axis slide rail is provided with a y-axis slider, and the y-axis slider The block is fixed with a z-axis fixing seat, and the z-axis fixing seat fixes the truss z-axis, the y-axis moving assembly includes a y-axis motor, a y-axis conveyor belt, a y-axis motor and a y-axis roller, and the two ends of the y-axis conveyor belt are respectively installed on the y-axis motor and the y-axis roller, wherein the truss z-axis is fixed to the y-axis conveyor belt, the z-axis fixing seat is provided with a z-axis motor and a z-axis slider, the z-axis motor is provided with a gear, the truss z-axis is provided with a z-axis track and a rack, the z-axis slider is connected to the z-axis track, the gear is matched with the rack, and the pipe clamp includes a double-cylinder cylinder and a clamping plate, and the two ends of the double-cylinder cylinder fix the clamping plate.
3. A flanging shaping method using the heating flanging shaping device as claimed in claim 1 or 2, characterized in that:
1. Heating deformation machine position debugging: (1) Place the pipe on the supporting heating structure of the heating transformer; (2) Adjust the position of the center positioning adjustment seat to align the center of the heater with the center of the pipe; (3) moving the first support platform on the first track according to the length of the pipeline so that both ends of the pipeline are close to the heater, and fixing the position of the first slider by bolts to fix the first support platform; 2. Position debugging of the shaping cooling machine: (1) Place the pipe on the supporting structure of the shaping cooler; (2) Adjust the position of the center positioning adjustment seat to align the center of the fixed flange with the center of the pipeline; (3) Move the third support platform on the third track according to the length of the pipeline so that both ends of the pipeline are close to the fixed flange, and fix the position of the third slider by bolts to fix the third support platform; 3. Heating and flanging: (1) Place the pipe on the supporting heating structure of the heating transformer by using the truss manipulator; (2) The heating cylinder starts to pull the second support platform, so that the heaters at both ends press and heat the two ends of the pipe. The heating cylinder continuously squeezes the two ends of the pipe while heating them until the two ends of the pipe are flared; (3) When the set time is reached, the heating cylinder pushes away from the second support platform, and the heaters at both ends are separated from the pipeline; 4. Cooling and shaping: (1) The pipe is transferred from the heating and deforming machine to the supporting shaping structure of the shaping and cooling machine through the truss manipulator; (2) The end face pressing cylinder is started to press the two end faces of the pipe with the fixed flanges at both ends; (3) Water is poured into the water tank through the water inlet, and the water covers the pipe for cooling. After cooling and shaping for a set time, the water is discharged from the water outlet; (4) The end face pressing cylinder returns to the origin, the forming flange is separated from the two end faces of the pipe, and the truss manipulator transfers the pipe from the forming cooling machine to the finished product area. The pipe in the finished product area is finally placed in the pipe drying oven for drying; Among them, in step 3 and step 4, the specific steps of the truss manipulator moving the pipeline are as follows: (1) The pipe clamp moves to the specified position along the x-axis and y-axis driven by the x-axis moving component and the y-axis moving component; (2) The rotation of the z-axis motor drives the gear to rotate. The gear cooperates with the rack of the truss z-axis to move the truss z-axis downward, so that the pipe clamp moves near the pipe; (3) The double cylinder is started to clamp the pipe; (4) The z-axis motor rotates in the opposite direction to move the pipe clamp upward and moves to the next designated position through the x-axis moving component; (5) The z-axis motor rotates to move the pipe clamp downward. After the movement stops, the double-cylinder cylinder returns to its original position to release the clamp and place the pipe in the specified position; (6) The z-axis motor rotates in the opposite direction to move the pipe clamp upward, and steps (1) to (5) are repeated until all pipes are moved.
Citation Information
Patent Citations
Automatic machining system for plant protecting jacket
CN107309959A
Nylon pipe flanging machine
CN110576588A
Automatic flanging mechanism for steel lining teflon straight pipes
CN111688175A