A method for launching four shield machines at a semi-covered excavation station

By using a combination of a translation device and a battery car in a half-cover excavation station, the problem of translation and launch of the shield machine in a small space is solved, and the construction efficiency and effectiveness are improved.

CN114278316BInactive Publication Date: 2024-10-11CHINA RAILWAY NO10 ENGINEERING GROUP THIRD CONSTRUCTION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111423917.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-26
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The small space of the semi-covered underground station makes the translation and starting construction of the shield machine difficult, and it is impossible to lay the track in conventional ways, which affects the construction efficiency.

Method used

A translation device is used to translate the trolley and the shield machine body, and each shield machine is equipped with two battery carts for excavation operations and material supply to ensure the departure of the four shield machines.

Benefits of technology

It improves the efficiency of multiple shield tunneling construction at the half-cover excavation station, enables the smooth launch and construction of shield tunneling machines, and facilitates material supply and dregs transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114278316B_ABST
    Figure CN114278316B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of shield construction, and specifically, to a method for starting four shield machines at a semi-covered excavation station, which includes the following steps: step one, track laying; step two, trolley translation; step three, shield machine body translation; step four, four shield machines starting. In the construction method of the present invention, the trolley and the shield machine body are translated into position on the translation track by a translation device; each shield machine is equipped with two battery cars, one battery car is used for excavation operations, and the other battery car is used for scheduling and movement on the bottom plate track, which is used to supply materials for the shield machine excavation and transport the slag during excavation, thereby ensuring the starting of the four shield machines and improving the construction efficiency of multiple shield machines at the semi-covered excavation station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shield construction, in particular to a method for starting four shield machines at a semi-covered excavation station. Background Art

[0002] A semi-covered excavation station refers to a subway station constructed using the semi-covered excavation method. In the semi-covered excavation method, after the main construction of the subway station is completed, the station will become a shield starting or receiving shaft. At this time, the shield starting or arrival end has only one hoisting hole located on the shield line in the covered excavation area, so that the shield machine on the shield line in the uncovered excavation area needs to be translated from the hoisting hole on the shield line in the covered excavation area to the starting position on the shield line in the uncovered excavation area, so as to carry out the starting operation of the shield machine. Due to the small size of the semi-covered underground station, the starting space is small, and the tracks in the station cannot be laid in the conventional way, making the translation and starting construction of the shield machine difficult. Summary of the invention

[0003] In view of certain defects in the prior art, the present invention provides a method for starting four shield machines at a semi-covered tunnel boring machine station.

[0004] In order to solve the above technical problems, the present invention is solved by the following technical solutions.

[0005] A method for starting four shield machines at a semi-covered excavation station comprises the following steps:

[0006] Step 1: Track laying

[0007] Used for laying base track and translation track;

[0008] Step 2: Move the trolley

[0009] The trolley is translated by a translation device;

[0010] Step 3: Shift the shield machine body

[0011] By modifying the translation device in step 2, it is used to translate the shield machine body;

[0012] Step 4: 4 shield machines start

[0013] By dispatching 8 electric vehicles to move along the bottom track, the starting of 4 shield machines is guaranteed.

[0014] In the construction method of the present invention, the trolley and the shield machine body are translated into position on the translation track by a translation device; each shield machine is equipped with two battery cars, one battery car is used for excavation operations, and the other battery car is used for scheduling and movement on the bottom plate track, which is used to supply materials for the shield machine excavation and transport out the debris during excavation, thereby ensuring the starting of four shield machines and improving the construction efficiency of multiple shield machines at the semi-covered excavation station.

[0015] Preferably, step one specifically comprises the following steps:

[0016] S1. Laying of base track

[0017] S11. Laying first tracks along two parallel shield lines, and laying two parallel first tracks on each shield line;

[0018] S12, two arc tracks are symmetrically laid between two parallel shield lines, and the arc tracks are used to connect the adjacent first tracks on the two shield lines;

[0019] S2. Laying of translation track

[0020] S21, leveling the floors at the ends of two parallel shield lines;

[0021] S22, laying a plurality of first pads on the floor along the translation direction of the shield machine;

[0022] S23, laying a plurality of second rails arranged in parallel along the translation direction of the shield machine on the first pad in step S22;

[0023] S24, applying lubricating grease on the second track in step S23;

[0024] S25. Place a second pad on the second track in step S24.

[0025] Through the steps of the present invention, the laying of the base track and the translation track can be preferably achieved.

[0026] Preferably, step S11 specifically includes the following steps:

[0027] S111. Lay channel steel at intervals of 1.5m along the shield line direction;

[0028] S112, the channel steel is provided with a cut groove;

[0029] S113. A T-shaped track is laid in the cut groove.

[0030] Through the steps of the present invention, the setting of two first tracks in each shield line is preferably achieved.

[0031] Preferably, step 2 specifically includes the following steps:

[0032] S31, assembling the translation device according to the length of the trolley;

[0033] S32, installing a moving wheel at the bottom of the translation device in step S31;

[0034] S33, installing the translation device in step S32 on the second pad;

[0035] S34, hoisting the trolley onto the translation device, and pulling the translation device along the translation track by a traction hoist to translate the trolley.

[0036] Through the steps of the present invention, the trolley can be preferably moved from the starting end of the shield line in the covered excavation area to the starting end of the shield line in the uncovered excavation area, thereby achieving the translation of the trolley into position.

[0037] Preferably, step three specifically includes the following steps:

[0038] S41, according to the length of the shield machine body, the moving wheels in the translation device in step S32 are removed, the translation device is modified, and the modified translation device is fixed on the second pad;

[0039] S42, hoisting the shield machine body onto the translation device modified in step S41, and pushing the modified translation device along the second track by a jack to translate the shield machine body.

[0040] Through the steps of the present invention, the shield machine body is preferably moved from the starting end of the shield line in the covered excavation area to the starting end of the shield line in the uncovered excavation area, and the shield machine body is translated into position, which is convenient for subsequent starting.

[0041] Preferably, step 4 specifically includes the following steps:

[0042] S51, 1# shield machine is equipped with 1# and 2# battery cars. When 1# battery car is working in tunnel excavation, 2# battery car is unloading materials from 1# slag hole;

[0043] S52, 2# shield machines are equipped with 3# and 4# battery cars. The 3# battery car is used for tunnel excavation, and the 4# battery car moves to the 2# slag hole via a curved track to discharge the material under the slag.

[0044] S53, 3# shield machines are equipped with 5# and 6# battery cars. The 5# battery car is used for tunnel excavation, and the 6# battery car moves to the 3# slag hole via a curved track to discharge the material under the slag.

[0045] S54 and 4# shield machines are equipped with 7# and 8# battery cars. When the 7# battery car is working on tunnel excavation, the 8# battery car is unloading materials from the 4# slag hole.

[0046] Through the steps of the present invention, it is preferably achieved that when four shield machines are working at the same time, eight battery vehicles can be dispatched on the bottom track at the same time to meet the shield construction of the shield machines. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 This is a schematic diagram of battery vehicle dispatching in Example 1;

[0048] Figure 2 Schematic diagram of the channel steel in Example 1;

[0049] Figure 3 is a schematic plan view of the bottom plate track in Example 1;

[0050] Figure 4 This is a schematic diagram of the translation device in Example 2 translating the shield machine body;

[0051] Figure 5 It is a schematic diagram of the translation device translating the trolley in Example 2;

[0052] Figure 6 is a schematic diagram of a support member in Example 2;

[0053] Figure 7 is a cross-sectional schematic diagram of the support member in Example 2;

[0054] Figure 8 is a cross-sectional schematic diagram of the supporting legs and the diagonal brace in Example 2;

[0055] Fig. 9 is a schematic diagram of the disc in Example 2;

[0056] Fig.10 is a schematic diagram of the lever in Example 2;

[0057] Fig.11 It is a partial schematic diagram of the working plate and the limiting member in Example 2;

[0058] Fig.12 This is a schematic diagram of the base plate in Example 2. DETAILED DESCRIPTION

[0059] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only for explaining the present invention and are not intended to limit it.

[0060] Example 1

[0061] like Figures 1 to 5 As shown, this embodiment provides a method for starting four shield machines at a semi-covered excavation station, which includes the following steps:

[0062] Step 1: Track laying

[0063] Used for laying base track and translation track;

[0064] Step 2: The trolley 120 degrees is moved horizontally

[0065] The trolley 120 is translated by a translation device;

[0066] Step 3: Shift the shield machine body 130

[0067] The translation device in step 2 is modified to translate the shield machine body 130;

[0068] Step 4: 4 shield machines start

[0069] By dispatching 8 electric vehicles to move along the bottom track, the starting of 4 shield machines is guaranteed.

[0070] In the construction method of this embodiment, the positioning of the shield machine body 130 and the trolley 120 on the shield line in the uncovered area of ​​the semi-covered station requires that the shield machine body and the trolley be hoisted onto a translation device in the covered area, and translated along the translation track to the starting position on the shield line in the uncovered area; in this construction method, four shield machines are started after being positioned at the ends of the shield line in the covered area and the shield line in the uncovered area, and each shield machine is equipped with two battery cars, one battery car is used for excavation operations, and the other battery car is used to move on the bottom plate track for supplying materials for the shield machine excavation and transporting the debris during excavation, thereby ensuring the starting of the four shield machines and improving the construction efficiency of multiple shield machines in the semi-covered station.

[0071] Preferably, step one specifically comprises the following steps:

[0072] S1. Laying of base track

[0073] S11, laying first tracks 15 along two parallel shield lines, and laying two parallel first tracks 15 on each shield line;

[0074] S12, two arc-shaped rails 16 are symmetrically laid between two parallel shield lines, and the arc-shaped rails 16 are used to connect the adjacent first rails 15 on the two shield lines;

[0075] S2. Laying of translation track

[0076] S21, leveling the floors at the ends of the two parallel shield lines. This step ensures that there is no debris on the floors at the starting ends of the two shield lines, satisfying the translation conditions;

[0077] S22, laying a plurality of first pads 140 on the floor along the translation direction of the shield machine. In this step, the first pads are 20 mm thick steel plates, which are laid at intervals of 1 m, and the steel plates are fixed to the floor with embedded reinforcement welding;

[0078] S23, laying multiple second rails 150 arranged along the translation direction of the shield machine in parallel on the first pad 140 in step S22, in this step, the rails are arranged at intervals of 500 mm, and are fixed to the first pad 140 by welding with seven-type plates;

[0079] S24, applying lubricating grease on the second track 150 in step S23;

[0080] S25. Place a second pad on the second track 150 in step S24. In this step, the second pad is made of a 20 mm thick steel plate.

[0081] Through the steps in this embodiment, the laying of the base track and the translation track is preferably achieved.

[0082] Preferably, step S11 specifically includes the following steps:

[0083] S111, laying channel steels 31 at intervals of 1.5 m along the shield line direction. In this step, the length of each channel steel 31 is 2.5 m;

[0084] S112, a slot 32 is provided on the channel steel 31. In this step, four slots 32 are symmetrically provided;

[0085] S113 , a T-shaped track 41 is laid in the groove 32 . In this step, two T-shaped tracks in adjacent grooves 32 form a first track 15 .

[0086] Through the steps in this embodiment, the arrangement of two first rails 15 in each shield line is preferably achieved.

[0087] Preferably, step 2 specifically includes the following steps:

[0088] S31, assembling the translation device according to the length of the trolley 120;

[0089] S32, installing a moving wheel at the bottom of the translation device in step S31;

[0090] S33, installing the translation device in step S32 on the second pad;

[0091] S34, hoisting the trolley 120 onto the translation device, and pulling the translation device along the translation track by a traction hoist to translate the trolley 120.

[0092] Through the steps in this embodiment, the trolley 120 is preferably moved from the starting end of the shield line in the covered excavation area to the starting end of the shield line in the uncovered excavation area, thereby achieving the translation of the trolley 120 into position.

[0093] Preferably, step three specifically includes the following steps:

[0094] S41, according to the length of the shield machine body 130, the moving wheels in the translation device in step S32 are removed, the translation device is modified, and the modified translation device is fixed on the second pad;

[0095] S42, hoisting the shield machine body 130 onto the translation device modified in step S41, pushing the modified translation device forward with the jack 160 to move along the second track 150, and performing translation of the shield machine body 130.

[0096] Through the steps in this embodiment, the shield machine body 130 is preferably moved from the starting end of the shield line in the covered excavation area to the starting end of the shield line in the uncovered excavation area, and the shield machine body 130 is translated into position to facilitate subsequent starting.

[0097] Preferably, step 4 specifically includes the following steps:

[0098] S51, 1# shield machine 21 is equipped with 1# and 2# battery cars. When 1# battery car is working in tunnel excavation, 2# battery car is unloading materials from 1# slag hole 11;

[0099] S52, 2# shield machine 22 is equipped with 3# and 4# battery cars, 3# battery car is used for tunnel excavation, 4# battery car moves to 2# slag hole 12 through curved track 16 to discharge materials under slag;

[0100] S53, 3# shield machine 23 is equipped with 5# and 6# battery cars, 5# battery car is used for tunnel excavation, 6# battery car moves to 3# slag hole 13 through curved track 16 to discharge materials under slag;

[0101] S54 and 4# shield machines 24 are equipped with 7# and 8# battery cars. When the 7# battery car is working on tunnel excavation, the 8# battery car is unloading materials from the 4# slag hole 14.

[0102] In the actual implementation process, four slag discharge holes are arranged at intervals on the shield line in the covered excavation area, which are used to transport the slag from the four shield machines on the two shield lines and to transport the pipe segments and other materials to the corresponding shield machines; in this embodiment, each shield machine is equipped with two battery cars, and the battery cars on the non-covered excavation shield line are guided to the corresponding slag discharge holes on the covered excavation shield line through the arc track, so as to better discharge slag and supply materials to the shield machine in the non-covered excavation area, thereby ensuring the smooth start of the shield machine in the non-covered excavation area; at the same time, two first tracks 15 are arranged on each shield line, which is convenient for the movement and dispatching of the two battery cars equipped with each shield machine, and for the battery cars on the covered excavation shield line to move to the corresponding slag holes, thereby ensuring the simultaneous construction of the four shield machines.

[0103] Example 2

[0104] like Figures 4 to 12 As shown, a translation device is provided in this embodiment, which is used to translate the trolley 120 and the shield machine body 130 in Example 1 into place.

[0105] The translation device in this embodiment includes a translation assembly, which includes a base plate 100, on which support members 110 are symmetrically arranged, and the support members 110 include parallel and inclined legs 200, on which diagonal braces 210 are arranged, and the upper ends of the legs 200 are connected by connecting blocks 220, and the upper side surface of the connecting block 220 is provided with a mounting groove 221, in which a working plate 300 that can be rotated to a horizontal position for carrying a trolley 120 is hingedly provided, and a driving mechanism for driving the working plate 300 to rotate to an inclined position for supporting the shield machine body 130 is provided in the mounting groove 221.

[0106] During actual use, the translation device in this embodiment is assembled according to the actual length of the trolley 120 and the shield machine body 130. It is composed of translation components connected by parallel connecting columns, and the two ends of the connecting columns are fixedly connected to the adjacent base plate 100 by welding.

[0107] In this embodiment, when the working plate 300 on the connecting block 220 is rotated to be horizontal, it is used to carry the trolley 120, so that the translation device can support the trolley 120 for translation; when the working plate 300 is rotated to be inclined so that its working surface is flush with the working side surface of the connecting block 220, the working surface of the working plate 300 can support the shield machine body 130 located between the supporting members 110, so that the translation device can translate the shield machine body 130; in this embodiment, the rotation of the working plate 300 is driven by a driving mechanism, which preferably facilitates the adjustment of the two states of the working plate 300.

[0108] In this embodiment, hinge grooves 222 are provided on the end walls opposite to the mounting groove 221; a hinge column 711 extending into the corresponding hinge groove 222 is provided at the end of the working plate 300, and a tension spring 700 for pulling the working plate 300 to rotate to a horizontal position is provided on the bottom wall of the mounting groove 221.

[0109] Through the structure in this embodiment, the hinge column 711 extends into the hinge groove 222, so that the working plate 300 is hingedly installed in the installation groove 221. Through the setting of the tension spring 700, the tension spring 700 always pulls the working plate 300 to rotate to the horizontal, which is convenient for supporting the translation of the trolley 120.

[0110] In this embodiment, the width of the working plate 300 is wider than the mounting groove 221, so that one side of the working plate 300 extends out of the mounting groove 221, so that when the working plate 300 is rotated to a horizontal position, a side wall of the mounting groove 221 can support the working plate 300, thereby better ensuring that the working plate 300 is in a horizontal position, thereby facilitating its support of the trolley 120.

[0111] In this embodiment, a first cavity 223 connected to the bottom wall of the mounting groove 221 is provided in the support leg 200, a blocking ring 320 is provided at the opening of the first cavity 223, a second cavity 311 coaxially arranged with the first cavity 223 is provided on the bottom wall of the first cavity 223, a ratchet groove 411 is provided at the opening of the second cavity 311, and a slide groove 412 spaced and connected to the ratchet groove 411 is provided on the side wall of the second cavity 311 along its length direction, and a limiting slide groove 312 connected to the second cavity 311 is provided on the side of the support leg 200 along its length direction; the driving mechanism includes a disk 330 located in the first cavity 223, and the upper side surface of the disk 330 is provided with a top column 331 that passes through the blocking ring 320 and extends into the mounting groove 221 and is used to lift the working plate 300, and a sleeve is provided on the top column 331 for pushing the disk 330 The first spring 321 moves downward, and the lower side surface of the disk 330 is provided with a sliding column 332 extending into the second cavity 311, and the side surface of the sliding column 332 is provided with a first slider 510 extending into the corresponding slide groove 412, and the lower end surface of the first slider 510 is provided with a first inclined surface 511 matching the ratchet groove 411; the driving mechanism also includes a lever 340 located in the second cavity 311, and the lever 340 is provided with a lever column 341 extending out of the limiting slide groove 312, and the side wall of the lever 340 is provided with a second slider 610 located in the corresponding slide groove 412, and the second slider 610 is provided with a second inclined surface 611. When the lever 340 drives the second slider 610 to move upward along the slide groove 412, the second inclined surface 611 is used to squeeze with the first inclined surface 511 to push the first slider 510 to slide into the corresponding ratchet groove 411.

[0112] When the driving mechanism of this embodiment is actually used, the lever 340 is driven to move upward along the second cavity 311 by lifting the lever 341 along the limit slide groove 312, so that the second slider 610 pushes the first slider 510 to move upward along the slide groove 412 to drive the disc 330 to move upward, so that the top post 331 moves upward to drive the working plate 300 to rotate, and the first slider 510 slides into the ratchet groove 411 through the guiding cooperation between the first inclined surface 511 and the second inclined surface 611, so that the top post 331 pushes the first slider 510 to move upward along the slide groove 412 to drive the disc 330 to move upward, so that the top post 331 moves upward to drive the working plate 300 to rotate. The movable working plate 300 remains in an inclined state; when the lifting column 341 is lifted again, the first slider 510 is rotated and slides into the ratchet groove 411 and into the slide groove 412 through the guiding effect of the first inclined surface 511 and the second inclined surface 611, so that the top column 331 is retracted into the first mounting cavity 223, so that the working plate 300 is rotated to a horizontal state under the action of the tension spring 700. Through the structure in this embodiment, the two states of the working plate 300 are preferably switched, and the operation is simple and convenient.

[0113] In this embodiment, a limiting member for limiting the position of the trolley 120 is provided on the working plate 300, and a sliding groove 721 is provided on the working plate 300 in parallel along its length direction, a step groove is provided at the end of the sliding groove 721 on the upper plate surface of the working plate 300, and a spring mounting groove 722 is provided at the end of the sliding groove 721 on the lower plate surface of the working plate 300; the limiting member includes a limiting plate 730 arranged in parallel in the corresponding sliding groove 721, and the lower end of the limiting plate 730 is connected by a connecting plate 740, and the connecting plate A slot 741 is provided on 740 for the corresponding top column 331 to pass through. Both ends of the limit plate 730 extend outward to form a mounting portion 731. A guide rod 732 is provided between the mounting portions 731 and passes through the working plate 300. A second spring located in the spring mounting groove 722 is sleeved on the guide rod 732. The second spring is used to push the limit plate 730 downward. When the working plate 300 rotates to a horizontal position, the side wall of the mounting groove 221 is used to push the connecting plate 740 upward to drive the limit plate 730 to extend out of the sliding groove 721.

[0114] Through the structure in this embodiment, when the working plate 300 is rotated to the horizontal, the side wall of the installation groove 221 can squeeze the lower plate surface of the connecting plate 740, so that the limiting plate 730 moves up and extends along the sliding groove 721, forming an installation sliding groove for limiting the wheels of the trolley 120, thereby facilitating the translation of the trolley 120; when the driving mechanism lifts the working plate 300 to be flush with the working side surface of the connecting block 220, the second spring pushes the limiting plate 730 to move down so that it is stored in the installation groove 221 , so that the working surface of the working plate 300 is preferably flat, and it is better for the working plate 300 to support the shield machine body 130; in this embodiment, a groove flush with the step groove is provided on the working surface of the working plate 300, so that the limit plate 730 is better accommodated in the groove, so that its upper side surface is flush with the working surface of the working plate 300, and the working plate 300 is better. Support the side wall of the shield machine body 130 located between the support members 110, it is convenient to translate the shield machine body 130.

[0115] In this embodiment, the upper side surface of the base plate 100 is parallelly provided with a mounting groove 811 along its length direction, and the lower end surface of the leg 200 is provided with a mounting block 230 extending into the corresponding mounting groove 811, and the mounting block 230 is provided with a mounting cavity 351 connected to the second cavity 311, and the mounting cavity 351 is symmetrically provided with a clamping block 360, and the clamping block 360 is provided with a positioning pin 620 extending out of the mounting block 230, and the positioning pin 620 is sleeved with a third spring 621 that pushes the clamping block 360 to approach each other, and the clamping block 360 is provided with a third inclined surface 622; a limiting groove 313 is provided on the side wall of the second cavity 311 along the length direction, and the second A baffle 630 is provided in the cavity 311, and a limit block 631 is provided on the baffle 630 and is located in the corresponding limit groove 313; a plug rod 342 is provided at the lower end of the lever 340 and passes through the baffle 630, and a fourth spring 640 is sleeved on the plug rod 342 and is located below the baffle 630 and is used to push the lower end of the plug rod 342 into the installation cavity 351; a plug block 650 is provided at the lower end of the plug rod 342, and a fourth inclined surface 651 is provided on the plug block 650 and cooperates with the third inclined surface 622 to drive the positioning pin 620 to extend out of the installation block 230; and positioning holes 812 for inserting the positioning pin 620 are provided at intervals along the length direction on the side walls opposite to the installation groove 811.

[0116] In this embodiment, the limit block 631 slides in the limit groove 313, so that the baffle 630 can be slidably installed in the second cavity 311, so that the fourth spring 640 always pushes the insertion rod 342 to extend into the installation cavity 351, and the fourth inclined surface 651 on the insertion block 650 pushes the third inclined surface 622 to make the clamping block 360 move away from each other in the installation cavity 351, so that the positioning pin 620 extends out of the installation clamp block 230 and is clamped into the corresponding positioning hole 812, so that the support member 110 is fixed in On the base plate 100, when the lever 340 is moved upward along the limiting slide groove 312 by the lifting column 341, the insertion rod 342 drives the insertion block 650 to retract into the second installation cavity 311, and the third spring 621 pushes the clamping blocks 360 to approach each other, driving the positioning pin 620 to retract into the installation cavity 351, thereby releasing the fixation of the support member 110 and enabling it to move along the installation slot 811, thereby adjusting the distance between the support members 110 and better adapting to shield machine bodies 130 of different sizes.

[0117] In this embodiment, the length of the mounting slot 811 is shorter than the distance between the support leg 200 and the lower end of the diagonal brace 210, which better ensures that when the support member 110 is installed on the base plate 100, the diagonal brace 210 is always located on the upper side surface of the base plate 100. In order to better enable the support member 110 to support the shield machine body 130, during actual use, the diagonal brace 210 is welded and fixed to the base 100 to increase the strength of the translation assembly, thereby facilitating the support of the shield machine body 130.

[0118] In conclusion, the above is only a preferred embodiment of the present invention, and all equivalent changes and modifications made according to the scope of the patent application of the present invention should fall within the scope of the patent of the present invention.

Claims

1. A method for starting four shield machines at a semi-covered excavation station, comprising the following steps: Step 1: Track laying Used for laying base track and translation track; Step 2: The trolley (120) moves horizontally The trolley (120) is translated by a translation device; Step 3: Shifting the shield machine body (130) The translation device in step 2 is modified to translate the shield machine body (130); Step 4: 4 shield machines start By dispatching 8 battery cars to move along the bottom track, the start of 4 shield machines is ensured; The translation device comprises a translation assembly, the translation assembly comprising a base plate (100), a support member (110) symmetrically arranged on the base plate (100), the support member (110) comprising parallel and inclined legs (200), a diagonal brace (210) arranged on the legs (200), the upper ends of the legs (200) being connected via a connecting block (220), a mounting groove (221) being arranged on the upper side surface of the connecting block (220), a working plate (300) being hingedly arranged in the mounting groove (221) and being rotatable to a horizontal position for supporting a vehicle frame (120), and a driving mechanism for driving the working plate (300) to rotate to an inclined position for supporting a shield machine body (130) being arranged in the mounting groove (221); A first cavity (223) connected to the bottom wall of the mounting groove (221) is provided in the support leg (200); a sealing ring (320) is provided at the opening of the first cavity (223); a second cavity (311) coaxially arranged with the first cavity (223) is provided on the bottom wall of the first cavity (223); a ratchet groove (411) is provided at the opening of the second cavity (311); and sliding grooves connected to the ratchet grooves (411) are provided at intervals on the side wall of the second cavity (311) along its length direction. (412), a limiting sliding groove (312) communicating with the second cavity (311) is provided on the side of the support leg (200) along its length direction; the driving mechanism comprises a disc (330) located in the first cavity (223), a top column (331) passing through the blocking ring (320) and extending into the mounting groove (221) and used for lifting the working plate (300) is provided on the upper side of the disc (330), and a first guide rod (331) is provided on the top column (331) for pushing the disc (330) downward The spring (321) is provided on the lower side of the disk (330) with a sliding column (332) extending into the second cavity (311), and the side of the sliding column (332) is provided with a first sliding block (510) extending into the corresponding sliding groove (312), and the lower end surface of the first sliding block (510) is provided with a first inclined surface (511) matching with the ratchet groove (411); the driving mechanism also includes a lever (340) located in the second cavity (311), and the lever (340) is provided with A lever post (341) extends out of the limit sliding groove (312), and a second slider (610) located in the corresponding sliding groove (412) is provided on the side wall of the lever (340), and a second inclined surface (611) is provided on the second slider (610). When the lever (340) drives the second slider (610) to move upward along the sliding groove (412), the second inclined surface (611) is used to press against the first inclined surface (511) to push the first slider (510) to slide into the corresponding ratchet groove (411).

2. The method for launching four shield machines at a semi-covered excavation station according to claim 1, characterized in that: Step 1 specifically includes the following steps: S1. Laying of base track S11, laying first tracks (15) along two parallel shield lines, and laying two parallel first tracks (15) on each shield line; S12, two arc-shaped rails (16) are symmetrically laid between two parallel shield lines, and the arc-shaped rails (16) are used to connect adjacent first rails (15) on the two shield lines; S2. Laying of translation track S21, leveling the floors at the ends of two parallel shield lines; S22, laying a plurality of first pads (140) on the floor along the translation direction of the shield machine; S23, laying a plurality of second rails (150) arranged along the translation direction of the shield machine in parallel on the first pad (140) in step S22; S24, applying lubricating grease on the second track (150) in step S23; S25. Place a second pad on the second track (150) in step S24.

3. The method for launching four shield machines at a semi-covered excavation station according to claim 2, characterized in that: Step S11 specifically includes the following steps: S111. Lay channel steel (31) at intervals of 1.5 m along the shield line direction; S112, the channel steel (31) is provided with a cutting groove (32); S113, a T-shaped track (41) is laid in the cut groove (32).

4. The method for launching four shield machines at a semi-covered excavation station according to claim 2, characterized in that: Step 2 specifically includes the following steps: S31, assembling the translation device according to the length of the trolley (120); S32, installing a moving wheel at the bottom of the translation device in step S31; S33, installing the translation device in step S32 on the second pad; S34, hoisting the trolley (120) onto the translation device, and pulling the translation device along the translation track by a traction hoist to translate the trolley (120); The working plate (300) is provided with a limiting member for limiting the position of the trolley (120); a sliding groove (721) is provided on the working plate (300) in parallel along its length direction; a step groove is provided at the end of the sliding groove (721) on the upper plate surface of the working plate (300); a spring mounting groove (722) is provided at the end of the sliding groove (721) on the lower plate surface of the working plate (300); the limiting member comprises a limiting plate (730) provided in parallel with the corresponding sliding groove (721); the lower end of the limiting plate (730) is connected via a connecting plate (740); the connecting plate (740) ) is provided with a notch (741) for the corresponding top column (331) to pass through, both ends of the limit plate (730) extend outward to form a mounting portion (731), a guide rod (732) is provided between the mounting portions (731) and passes through the working plate (300), a second spring located in the spring mounting groove (722) is sleeved on the guide rod (732), and the second spring is used to push the limit plate (730) to move downward, and when the working plate (300) rotates to a horizontal position, the side wall of the mounting groove (221) is used to push the connecting plate (740) to move upward to drive the limit plate (730) to extend out of the sliding groove (721); When the working plate (300) rotates to a horizontal position, the side wall of the installation groove (221) can press the lower plate surface of the connecting plate (740), thereby causing the limiting plate (730) to move upward and extend along the sliding groove (721), thereby forming an installation sliding groove for limiting the wheels of the trolley (120).

5. The method for launching four shield machines at a semi-covered excavation station according to claim 4, characterized in that: Step three specifically includes the following steps: S41, according to the length of the shield machine body (130), the moving wheels in the translation device in step S32 are removed, the translation device is modified, and the modified translation device is fixed on the second pad; S42, hoisting the shield machine body (130) onto the translation device modified in step S41, and pushing the modified translation device along the second track (150) by the jack (160) to translate the shield machine body (130); When the driving mechanism lifts the working plate (300) to be flush with the working side surface of the connecting block (220), the second spring pushes the limiting plate (730) downward so that it is accommodated in the installation groove (221), thereby making the working surface of the working plate (300) flat, and then the working plate (300) supports the shield machine body (130).

6. The method for launching four shield machines at a semi-covered excavation station according to claim 4, characterized in that: Step 4 specifically includes the following steps: S51, 1# shield machine (21) is equipped with 1# and 2# battery cars. When the 1# battery car is in tunnel excavation operation, the 2# battery car is in the 1# slag hole (11) to discharge slag materials; S52, 2# shield machines (22) are equipped with 3# and 4# battery cars, 3# battery car is used for tunnel excavation, and 4# battery car moves to 2# slag hole (12) via curved track (16) to discharge materials under slag; S53, 3# shield machine (23) is equipped with 5# and 6# battery cars, 5# battery car is used for tunnel excavation, and 6# battery car moves to 3# slag hole (13) via curved track (16) to discharge materials under slag; S54, 4# shield machine (24) is equipped with 7# and 8# battery cars. When the 7# battery car is in tunnel excavation operation, the 8# battery car is in the 4# slag hole (14) to discharge slag and materials.