A wind turbine generator selection method based on entropy weight ideal point method
Through the entropy weight ideal point method, a wind turbine selection index system is constructed, which solves the problem of single index and strong subjectivity in the existing technology, realizes the scientific and objective selection of wind turbines, and satisfies the selection and optimization of wind turbines. The relevant requirements, the process is clear and scalable.
Patent Information
- Application Number
- CN202111662148.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-31
AI Technical Summary
The existing wind turbine selection method has single indicators, is not systematic and comprehensive enough, and the selection results are not scientific and accurate enough. It relies on expert scoring, and the evaluation is highly subjective, and cannot meet the relevant requirements for wind turbine selection and optimization.
Using the method based on the entropy weight ideal point method, by determining the wind turbine selection index system, constructing the eigenvalue matrix, performing index homogenization and dimensionless processing, calculating the distance between positive and negative ideal points, obtaining the relative proximity, and selecting the optimal Wind turbines avoid expert weighting and ensure the objectivity and scientificity of the selection results.
It achieves the selection of optimal wind turbines by comprehensively considering economic, environmental, technical and other aspects without the weight of experts. The process is clear and operable, meeting the relevant requirements for wind turbine selection and optimization, and has strong scalability. , avoiding the subjective influence of expert scoring.
Smart Images

Figure CN114357761B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind power generation, and more specifically to a method for selecting a wind power generator set based on an entropy weight ideal point method. Background Art
[0002] Wind power generation has attracted widespread attention for its mature technology, low comprehensive cost, good environmental benefits, abundant and renewable resources, inexhaustible resources, short construction period, the most suitable conditions for large-scale development, and simple operation. In the entire wind farm construction process, the investment in wind turbines is relatively large. In order to optimize the economic benefits of the entire wind farm, it is particularly necessary to select the type of wind turbines in the early stage of construction. At present, there are relatively many methods for wind turbine selection, but the disadvantages are also relatively prominent. At present, there are multi-objective decision-making methods, which select the type of wind turbines according to geographic information such as the location of the wind farm, and consider the maximum power, annual investment and carbon dioxide emissions generated in the area to select the type of wind turbines; Monte Carlo method is used to establish a mathematical model of wind turbine power generation, and various candidate models are analyzed for technical and economic indicators such as annual power generation and capacity coefficient, so as to select the model with the best economic indicators; or by analyzing the relationship between the swept area per kilowatt and power generation, wind energy utilization efficiency, and power curve, it is believed that wind turbine selection should give priority to wind turbines with large swept area per kilowatt. The main disadvantages of these methods are that they have a single index, are not systematic and comprehensive, and the selection results are not scientific and accurate enough, and they can no longer meet the relevant requirements for wind turbine selection and optimization. Zhou Huiqin constructed a comprehensive index system for wind turbine selection and used a fuzzy comprehensive evaluation method based on the analytic hierarchy process (AHP) to select wind turbines. Its disadvantage is that it mainly relies on expert scoring and the evaluation is subjective.
[0003] Therefore, it is necessary to develop a wind turbine selection method that ensures the objectivity of the selection results and meets the relevant requirements of wind turbine selection and optimization. Summary of the invention
[0004] The purpose of the present invention is to provide a method for selecting a wind turbine generator set based on an entropy weight ideal point method. The method is a method for determining the index weights according to the eigenvalue matrix composed of the evaluation indexes of the evaluated object, taking into account economic, environmental, technical and other aspects without expert weights. Applying the method to the selection of wind turbine generator sets can ensure the objectivity of the selection results, and the indicators are diverse, the considerations are systematic and comprehensive, the selection results are scientific and accurate, and the relevant requirements for the selection and optimization of wind turbines are met; and the problems in the prior art that the indicators are single, the considerations are not systematic and comprehensive enough, the selection results are not scientific and accurate enough, and the relevant requirements for the selection and optimization of wind turbines can no longer be met, and the evaluation mainly relies on expert scoring and is subjective can be solved.
[0005] In order to achieve the above object, the technical solution of the present invention is: a method for selecting a wind turbine generator set based on an entropy weight ideal point method, characterized in that it comprises the following steps:
[0006] Step 1: Determine the wind turbine selection index;
[0007] The wind turbine selection index system was finally selected from five aspects: technical performance of the unit, adaptability to the wind farm, economic performance of the unit, operating performance of the unit, and product technical services;
[0008] Step 2: Determine the eigenvalue matrix of program indicators;
[0009] Step 3: Determine the nature of the indicator;
[0010] Step 4: Homogenization of index parameters;
[0011] Step 5: Dimensionless processing;
[0012] Step 6: Determine the calculation method of positive and negative ideal points;
[0013] Step 7: Calculate the distance from the positive and negative ideal points;
[0014] Step 8: Calculate relative proximity;
[0015] A relative proximity C is defined, C = [c1, c2, ..., ci] (i = 1, 2, ..., m), which represents the ratio of the distance to the negative ideal point to the sum of the distances to the positive ideal point and the negative ideal point. The larger the ci value, the better the solution, thereby obtaining the optimal wind turbine selection.
[0016] In the above technical scheme, in step one, the wind turbine generator selection index system includes swept area, rated wind speed, cut-out wind speed, safe wind speed, power regulation mode, generator power factor, generator insulation level, hub height, wind turbine control system, power guarantee curve, unit design life, wind farm average wind speed, wind farm wind turbine safety level, capacity factor, low temperature requirements, lightning protection requirements, grid adaptation requirements, equipment and installation engineering costs, total static engineering investment, operation and maintenance costs, repair costs, annual power generation of the unit, unit installed capacity investment, unit power generation cost, operation status of this model, sales status of this model, unit manufacturer capabilities, supply capabilities, warranty period, technical services and training, etc., a total of n indicators, the selected indicators can be selected according to demand, and the indicators can be further increased according to demand, with strong scalability.
[0017] In the above technical solution, in step 2, the method for determining the scheme index characteristic value matrix is as follows: assuming that there are m schemes participating in the comparison, and assuming that the index characteristic value matrix of each scheme is X i =(x i1 , …, xij ), where i = 1, 2, ... m; the indicator eigenvalue matrix between different schemes of the same indicator is X j =(x 1j , …, x ij ), where j = 1, 2, ... n; i, j represent the serial numbers of the indicators respectively; m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine selection indicator system; x ij Indicates the value of the jth indicator in the i-th solution.
[0018] In the above technical solution, in step three, the method for judging the nature of the indicator is specifically: determining the types of indicators in the wind turbine selection indicator system, that is, distinguishing the indicator as a benefit-type or cost-type indicator, among which the one involving expenses is a cost-type indicator, and the one involving output is a benefit-type indicator.
[0019] In the above technical solution, in step 4, the method for homogenizing the index parameters is specifically as follows:
[0020] The eigenvalue matrices of different schemes are homogenized using the benefit-type indicator homogenization formula or the cost-type indicator homogenization formula to obtain the matrix R of each scheme. i =(r i1 ,…,r ij ), where i = 1, 2, ... m;
[0021] When the efficiency-based indicator homogenization formula is used for homogenization,
[0022] r ij =(x ij -inf(X j )) / (sup(X j )-inf(X j ));
[0023] When the cost-based indicator homogenization formula is used for homogenization,
[0024] r ij =(sup(X j )-x ij ) / (sup(X j )-inf(X j ));
[0025] In the above formula: sup(X j ) is the maximum value of the jth index in different schemes; inf(X j ) is the minimum value of the jth indicator in different schemes; i and j represent the serial numbers of the indicators respectively; x ij represents the value of the jth indicator in the i-th solution; r ijrepresents the normalized value of the jth indicator in the i-th solution, r ij Greater than or equal to 0 and less than or equal to 1 for comparison; m represents the total number of options participating in the comparison.
[0026] In the above technical solution, in step 5, the dimensionless processing method is specifically as follows:
[0027] Eliminate the impact of different dimensions between indicators and obtain the attribute matrix A i =a ij =w j R i , where i = 1, 2, ... m;
[0028] in
[0029] Among them, w j is the entropy weight of the jth evaluation index, H j The entropy of the jth evaluation index, f ij is the weight of the jth indicator of the ith option among all the alternatives; r ij represents the normalized value of the jth indicator in the i-th solution, r ij Greater than or equal to 0 and less than or equal to 1 for comparison; m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine selection index system.
[0030] In the above technical solution, in step 6, the calculation method for determining the positive and negative ideal points is specifically as follows:
[0031] Let the positive ideal point be P + , the negative ideal point is P - , according to the definition of the ideal point:
[0032] P + =(P1 + , P2 + ,…,Pn + )
[0033] P - =(P1 - , P2 - ,…,Pn - )
[0034] Where n represents the total number of indicators in the wind turbine selection index system; Pn + is the nth positive ideal point; Pn - is the nth negative ideal point;
[0035] When the jth indicator is a benefit indicator, the calculation formulas for the positive and negative ideal points are
[0036] P + =max{a ij |i=1,2,…,m}, j=1,2,…,n;
[0037] P-=min{a ij |i=1,2,…,m}, j=1,2,…,n;
[0038] Wherein, m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine generator selection index system; i and j represent the serial numbers of the indicators respectively; a ij It represents the value of the jth indicator in the i-th scheme after homogenization and dimensionless processing;
[0039] When the jth indicator is a cost indicator, the calculation formulas for the positive and negative ideal points are
[0040] P + =min{a ij |i=1,2,…,m}, j=1,2,…,n;
[0041] P - =max{a ij |i=1,2,…,m}, j=1,2,…,n;
[0042] Wherein, m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine generator selection index system; i and j represent the serial numbers of the indicators respectively; a ij It represents the value of the jth indicator after homogenization and dimensionless processing in the i-th solution.
[0043] In the above technical solution, in step seven, the method for calculating the distance from the positive and negative ideal points is specifically:
[0044] Calculate the distances of each solution to the positive and negative ideal points respectively: i+ and d i- ,but:
[0045]
[0046]
[0047] Where n represents the total number of indicators in the wind turbine selection index system; a ij It represents the value of the jth indicator in the i-th scheme after homogenization and dimensionless processing; represents the jth positive ideal point; represents the jth negative ideal point.
[0048] The beneficial effects of the present invention are:
[0049] (1) The method of the present invention can be used to select the optimal wind turbine generator set by comprehensively considering multiple aspects such as economy, environment, and technology, and determining the index weights according to the eigenvalue matrix composed of the evaluation indexes of the evaluated object without expert weights;
[0050] (2) The method of the present invention has a clear process and strong operability. The present invention adopts the entropy weight method to avoid the expert scoring link, thereby standardizing the indicators, ensuring the objectivity of the selection results, and meeting the relevant requirements for wind turbine selection and optimization; the present invention can select indicators according to specific requirements and has strong scalability;
[0051] (3) The method of the present invention has strong adaptability and can select wind turbine selection indicators according to actual projects. It has strong scalability and can comprehensively consider multiple indicators such as unit technical performance, adaptability to wind farms, unit economic performance, unit operating performance, product technical services, etc., and will not affect the evaluation results due to the high subjectivity of a certain factor. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0053] The following is a detailed description of the implementation of the present invention in conjunction with the accompanying drawings, but they do not constitute a limitation of the present invention and are only given as examples. At the same time, the advantages of the present invention are made clearer and easier to understand through the description.
[0054] The present invention is now described in detail by taking the selection of wind turbine generator sets for a certain wind farm project as an example, which can also provide guidance for the selection of wind turbine generator sets for other wind power generation projects.
[0055] In this embodiment, a wind farm project plans to build a TBH wind farm with an installed capacity of 49.5MW. The project is located in a plain with good geological conditions and traffic construction conditions, which is conducive to the construction of wind farm traffic and the installation of wind power facilities and equipment. Therefore, the project in this embodiment mainly considers indicators such as unit economic performance, unit operation performance, product services, etc. during the selection process. There are five types of wind turbine models to be selected, including 2200kW and 2000kW from different manufacturers. Among them, the first type of model has two hub heights, so there are 6 evaluation schemes in total. The wind turbine models are represented by WTG1~WTG6 (WTG1~WTG6 are Scheme 1, Scheme 2, Scheme 3, Scheme 4, Scheme 5, and Scheme 6, respectively), see Table 1.
[0056] Table 1 Comparison of main technical parameters of each model
[0057]
[0058] This embodiment adopts the wind turbine generator selection method based on the entropy weight ideal point method described in the present invention to select the type of wind turbine generator set. The specific method is as follows:
[0059] (1) Select some indicators, as shown in Table 2.
[0060] (2) Determine the type of indicator, some of which are nameplate parameters, and some require industry professional scoring. Among them, safe wind speed, capacity factor, operation status of this model, unit manufacturer, supply capacity, warranty period, technical service and training are income indicators (i.e. benefit indicators).
[0061] Table 2 Selected indicators
[0062]
[0063] (3) The eigenvalue matrices of different schemes are homogenized to obtain the matrix R of each scheme.
[0064]
[0065] (4) Eliminate the impact of different dimensions among indicators and obtain the attribute matrix A.
[0066] w=[0.125, 0.124, 0.125, 0.127, 0.125, 0.125, 0.125, 0.124].
[0067]
[0068] (5) Calculate the positive and negative ideal point matrices;
[0069] P + =[0.042, 0.052, 0.042, 0.064, 0.042, 0.042, 0.042, 0.026],
[0070] P - - = [0.021, 0.026, 0.021, 0.032, 0.021, 0.021, 0.021, 0.051]
[0071] (6) The distance from each scheme to be evaluated to the positive ideal point;
[0072] d + =[0.039, 0.019, 0.049, 0.035, 0.034, 0.041]
[0073] (7) The distance from each evaluated solution to the negative ideal point;
[0074] d -=[0.053, 0.061, 0.038, 0.055, 0.057, 0.052]
[0075] (8) Calculate the superiority C of each scheme under relative proximity based on the distance from each scheme to be evaluated to the positive and negative ideal points;
[0076] The superiority matrix is C = [0.577, 0.767, 0.438, 0.613, 0.625, 0.558]
[0077] (9) According to the degree of superiority, each solution can be ranked according to its superiority:
[0078] Plan 2 > Plan 4 > Plan 5 > Plan 1 > Plan 6 > Plan 3.
[0079] Conclusion: This embodiment adopts the method of the present invention to select indicators such as unit economic performance, unit operating performance, product services, etc. based on the characteristics of the objective conditions of the project without expert weights, and comprehensively considers economic, environmental, technical and other aspects. It has strong scalability and a method for determining indicator weights based on the eigenvalue matrix composed of the evaluation indicators of the evaluated object to select the optimal wind turbine generator set. The process is clear and the operability is strong. This embodiment adopts the entropy weight method to avoid the expert scoring link, thereby standardizing the indicators, ensuring the objectivity of the selection results, and at the same time ensuring the pertinence of the project of this embodiment (that is, ensuring that the selection results of this embodiment are fully compatible with the project characteristics or requirements).
[0080] Other parts not described belong to the prior art.
Claims
1. A wind turbine generator selection method based on entropy weight ideal point method, Features: The steps include: Step 1: Determine the wind turbine selection index; The wind turbine selection index system was finally selected from five aspects: technical performance of the unit, adaptability to the wind farm, economic performance of the unit, operating performance of the unit, and product technical services; Step 2: Determine the eigenvalue matrix of program indicators; Step 3: Determine the nature of the indicator; Step 4: Homogenization of index parameters; Step 5: Dimensionless processing; Step 6: Determine the calculation method of positive and negative ideal points; Step 7: Calculate the distance from the positive and negative ideal points; Step 8: Calculate relative proximity; Define a relative proximity C, C = [c1, c2, ..., ci] (i = 1, 2, ..., m), which represents the ratio of the distance to the negative ideal point to the sum of the distances to the positive ideal point and the negative ideal point. The larger the ci value, the better the solution, thereby obtaining the optimal wind turbine generator selection; In step 1, the wind turbine generator selection index system includes swept area, rated wind speed, cut-out wind speed, safe wind speed, power regulation mode, generator power factor, generator insulation level, hub height, wind turbine control system, power guarantee curve, unit design life, wind farm average wind speed, wind farm wind turbine safety level, capacity factor, low temperature requirements, lightning protection requirements, grid adaptation requirements, equipment and installation engineering costs, total static engineering investment, operation and maintenance costs, repair costs, annual power generation of the unit, unit installed capacity investment, unit power generation cost, this model operation, this model sales, unit manufacturer capabilities, supply capabilities, warranty period, technical services and training, a total of n indicators; In step 2, the method for determining the scheme indicator eigenvalue matrix is as follows: Assume that there are m schemes participating in the comparison, and assume that the indicator eigenvalue matrix of each scheme is X i =(x i1 , …, x ij ), where i = 1, 2, ... m; the indicator eigenvalue matrix between different schemes of the same indicator is X j =(x 1j , …, x ij ), where j = 1, 2, ... n; i, j represent the serial numbers of the indicators respectively; m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine selection indicator system; x ij Indicates the value of the jth indicator in the i-th solution; In step three, the method for judging the nature of the indicator is specifically as follows: determining the types of indicators in the wind turbine generator selection indicator system, that is, distinguishing the indicator as a benefit-type or cost-type indicator, where the indicator involving expenses is a cost-type indicator and the indicator involving output is a benefit-type indicator; In step 4, the method for homogenizing the index parameters is as follows: The eigenvalue matrices of different schemes are homogenized using the benefit-type indicator homogenization formula or the cost-type indicator homogenization formula to obtain the matrix R of each scheme. i =(r i1 ,…,r ij ), where i = 1, 2, ... m; When the efficiency-based indicator homogenization formula is used for homogenization, r ij =(x ij -inf(X j )) / (sup(X j )-inf(X j )); When the cost-based indicator homogenization formula is used for homogenization, r ij =(sup(X j )-x ij ) / (sup(X j )-inf(X j )); In the above formula: sup(X j ) is the maximum value of the jth index in different schemes; inf(X j ) is the minimum value of the jth indicator among different schemes; i, j represent the serial numbers of the indicators respectively; x ij represents the value of the jth indicator in the i-th solution; r ij represents the normalized value of the jth indicator in the i-th solution, r ij Greater than or equal to 0, less than or equal to 1; In step 5, the dimensionless processing method is as follows: Eliminate the impact of different dimensions between indicators and obtain the attribute matrix A i =a ij =w j R i , where i = 1, 2, ... m; j = 1, 2, ... n; m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine selection index system; r ij It represents the normalized value of the jth indicator in the i-th scheme; in Among them, w j is the entropy weight of the jth evaluation index, H j The entropy of the jth evaluation index, f ij is the weight of the jth indicator of the ith option among all the alternatives; In step six, the calculation method for determining the positive and negative ideal points is as follows: Let the positive ideal point be P + , the negative ideal point is P - , according to the definition of an ideal point: P + =(P1 + ,P2 + ,…,Pn + ) P-=(P1 - ,P2 - ,…,Pn - ) Where n represents the total number of indicators in the wind turbine selection index system; Pn + is the nth positive ideal point; Pn - is the nth negative ideal point; When the jth indicator is a benefit indicator, the calculation formulas for the positive and negative ideal points are P + =max{a ij |i=1,2,…,m},j=1,2,…,n; P-=min{a ij |i=1,2,...,m},j=1,2,...,n; Wherein, m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine generator selection index system; i and j represent the serial numbers of the indicators respectively; a ij It represents the value of the jth indicator in the i-th scheme after homogenization and dimensionless processing; When the jth indicator is a cost indicator, the calculation formulas for the positive and negative ideal points are P + =min{a ij |i=1,2,...,m},j=1,2,...,n; P - =max{a ij |i=1,2,…,m},j=1,2,…,n; Wherein, m represents the total number of schemes participating in the comparison; n represents the total number of indicators in the wind turbine generator selection index system; i and j represent the serial numbers of the indicators respectively; a ij It represents the value of the jth indicator in the i-th scheme after homogenization and dimensionless processing; In step seven, the method for calculating the distance from the positive and negative ideal points is as follows: Calculate the distances of each solution to the positive and negative ideal points respectively: i+ and d i- ,but: Where n represents the total number of indicators in the wind turbine selection index system; a ij It represents the value of the jth indicator in the i-th scheme after homogenization and dimensionless processing; represents the jth positive ideal point; represents the jth negative ideal point.
Citation Information
Patent Citations
Critical path identifying method taking into account subjective and objective factors comprehensively
CN107622360A
Comprehensive evaluation method and device for intelligent park energy utilization scheme
CN108122057A
Railway construction scheme evaluation method based on a hybrid multi-attribute decision
CN109523183A
Processing parameter optimization method based on combined weight-double decision and surface quality multiple targets
CN111881559A
Processing parameter optimization method based on grey correlation analysis method-entropy weight ideal point method and processing surface integrity multiple indexes
CN111881560A
