A shore power equipment energy efficiency monitoring system and energy efficiency judgment method

Through the energy efficiency monitoring system of shore power equipment, multiple sets of data acquisition and exchange modules are used, combined with communication protocols and data acquisition monitoring and control systems, computing equipment and system energy efficiency, the problem of energy waste in shore power supply system is solved and energy utilization efficiency is achieved Improvement and monitoring effectiveness.

CN114362362BActive Publication Date: 2024-11-12JIANGSU ZHENAN ELECTRIC POWER EQUIP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111567174.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-20
Publication Date
2024-11-12
Estimated Expiration
2041-12-20

AI Technical Summary

Technical Problem

It is difficult to judge the operating power of each device when multiple devices are running simultaneously, resulting in waste of energy and the power supply structure cannot be effectively optimized.

Method used

A shore power equipment energy efficiency monitoring system was designed, and data acquisition and processing was collected and processed through multiple sets of data acquisition modules and data exchange modules. The RS485, CAN bus and Ethernet communication connections were used, and the data acquisition and monitoring control system was combined with the calculation equipment energy efficiency and The total energy efficiency of the system provides a method of judging energy consumption.

Benefits of technology

Quantitative judgment of the power loss of the ship's shore power system has been achieved, energy utilization efficiency has been improved, power supply structure has been optimized, and monitoring effectiveness and data accuracy have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114362362B_ABST
    Figure CN114362362B_ABST
Patent Text Reader

Abstract

The present invention discloses a shore power equipment energy efficiency monitoring system and an energy efficiency judgment method. It includes multiple groups of data acquisition modules for collecting parameters of each device and multiple data exchange modules connected to each group of data acquisition modules. Each data exchange module is connected to a host computer through a switch to realize networking. The host computer is provided with a data acquisition and monitoring control system. The data information collected by the data acquisition module can be transmitted to the host computer through the data exchange module and processed by the data acquisition and monitoring control system to output the judgment result. The advantages are: it can provide a reference for relevant staff of the port terminal to improve the energy utilization efficiency of the shore power supply of the port terminal and optimize the power supply structure; in addition, the power loss of the ship's shore power system can be quantitatively analyzed from the perspective of "energy", thereby improving the effectiveness of monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an auxiliary facility for a shore power supply system in a port terminal, and in particular to an energy efficiency monitoring system for shore power equipment and an energy efficiency judgment method. Background Art

[0002] Shore power supply systems have been widely used in ports and terminals. In the existing technology, although shore power supply systems can achieve reliable power supply, the parameters of each phase during its operation can only be monitored by a single monitoring unit. In particular, during operation, multiple devices are running at the same time, and it is difficult to judge the operating power of each device. Some devices do not even need to be used, but are still in the power supply state, resulting in energy waste. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a shore power equipment energy efficiency monitoring system and energy efficiency judgment method that can quantitatively judge the power loss of the ship's shore power system and provide a reference for relevant port and terminal personnel, thereby improving the energy utilization efficiency of shore power supply and optimizing the power supply structure.

[0004] In order to solve the above technical problems, the shore power equipment energy efficiency monitoring system of the present invention includes multiple groups of data acquisition modules for collecting parameters of each device and multiple data exchange modules connected to each group of the data acquisition modules. Each data exchange module is connected to the host computer through a switch to achieve networking. The host computer is equipped with a data acquisition and monitoring control system. The data information collected by the data acquisition module can be transmitted to the host computer through the data exchange module and processed by the data acquisition and monitoring control system to output a judgment result.

[0005] Each of the devices is connected to the data acquisition module through a RS485 communication unit.

[0006] Each group of the data acquisition modules is connected to the corresponding data exchange modules via a CAN bus communication.

[0007] Each of the data exchange modules is connected to the switch via Ethernet communication.

[0008] The equipment includes shore-based power supply equipment, ship-to-shore connection equipment and ship power receiving equipment.

[0009] The shore-based power supply equipment includes a high-voltage incoming line cabinet, a high-voltage outgoing line cabinet, a step-down transformer, a low-voltage shore power main cabinet, and a low-voltage variable frequency power supply cabinet.

[0010] The ship-shore connection equipment includes a low-voltage shore power box, a cable lifting and retracting device, and a ship shore power connection box.

[0011] The ship power receiving equipment includes a ship power grid cabinet, a ship diesel generator, and a ship load cabinet.

[0012] A method for determining energy consumption based on a shore power equipment energy efficiency monitoring system, the steps are as follows:

[0013] A. The data information collected by the data acquisition module is transmitted to the data exchange module, and then the data exchange module transmits the data information to the data acquisition and monitoring control system of the host computer for processing;

[0014] B. Calculate the energy consumption based on the acquired data information through the data acquisition and monitoring control system. The calculation method is as follows:

[0015] (1) Energy efficiency algorithm for conventional electrical equipment:

[0016] Equipment energy efficiency = (equipment output power / equipment input power)*(power factor^X) “Equipment output power / equipment input power” is the main part of measuring equipment energy efficiency;

[0017] "Power factor ^ X" is the impact of the equipment power factor on energy efficiency. The power factor is turned on X times, and X is the impact ratio of the power factor on the overall energy efficiency calculation. The value of X is less than 1.

[0018] (2) Step-down transformer energy efficiency calculation formula:

[0019] Transformer efficiency = (output power / input power)*r

[0020] The r in the formula is the temperature influence coefficient. Usually, when the temperature is >50 degrees Celsius, r<1; when the temperature is <10 degrees Celsius, r>1; in other normal temperature ranges, r=1.0, indicating that the influence of temperature on energy efficiency can be ignored at this time;

[0021] (3) System total energy efficiency calculation formula:

[0022] Total system energy efficiency = Σ(equipment energy efficiency*(equipment power / (total power of each device in the system))

[0023] The total energy efficiency of the system is the weighted average value obtained by multiplying the energy efficiency of each device by the coefficient of the impact of a single device on the system energy efficiency. The coefficient of the impact of a single device on the system energy efficiency is "device power / (the sum of the powers of all devices in the system)", which estimates the impact of a single device on the system energy efficiency based on the proportion of the power of a single device in the total power of the system.

[0024] Whether it is the energy efficiency of a single device or the total energy efficiency of the system, in actual operation, it is less than 1, that is, the system energy efficiency cannot reach 100%.

[0025] The advantages of the present invention are:

[0026] The whole system is simple in design and the data collection is comprehensive and accurate. The corresponding power consumption parameters can be obtained by simply converting the data collected by the data acquisition module through the data acquisition module and the data exchange module and uploading it to the host computer, thereby obtaining a basis for energy consumption judgment, which can provide a reference for relevant staff of the port terminal to improve the energy utilization efficiency of the shore power supply of the port terminal and optimize the power supply structure; in addition, through the data acquisition and monitoring control system of the host computer, the energy efficiency of each device and the total energy efficiency of the system can be directly calculated based on a specific energy consumption judgment method, and the system energy efficiency data and historical change trends can be monitored and recorded in real time, so as to quantify the power loss of the ship's shore power system from the perspective of "energy", thereby improving the effectiveness of monitoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a structural schematic diagram of the energy efficiency monitoring system based on shore power equipment of the present invention;

[0028] Figure 2 This is a schematic diagram of the ship shore power system in the present invention;

[0029] Figure 3 It is the architecture diagram of the data acquisition and monitoring control system in the present invention. DETAILED DESCRIPTION

[0030] The shore power equipment energy efficiency monitoring system and energy efficiency determination method of the present invention are further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0031] Embodiment 1:

[0032] As shown in the figure, the shore power equipment energy efficiency monitoring system of this embodiment includes multiple groups of data acquisition modules for collecting parameters of various equipment (including shore-based power supply equipment, ship-shore connection equipment and ship power receiving equipment) and multiple data exchange modules connected to each group of data acquisition modules. The multiple data acquisition modules transmit the parameters to the data exchange modules, and each data exchange module is connected to the host computer through a switch to achieve networking. It can be seen from the figure that the equipment and the data acquisition module are connected through RS485 hardware communication using the Modbus-RTU protocol, and each group of data acquisition modules is connected to the corresponding data exchange module through the CAN bus communication. The Modbus-TCP protocol is used to connect each data exchange module to the switch through Ethernet communication. A data acquisition and monitoring control system is provided in the host computer. The data information collected by the data acquisition module can be transmitted to the host computer through the data exchange module and processed by the data acquisition and monitoring control system to output the judgment result.

[0033] Furthermore, the shore-based power supply equipment includes a high-voltage incoming line cabinet, a high-voltage outgoing line cabinet, a step-down transformer, a low-voltage shore power main cabinet, and a low-voltage frequency conversion power supply cabinet; the ship-shore connection equipment includes a low-voltage shore power box, a cable lifting and retracting device, and a ship shore power connection box; the ship power receiving equipment includes a ship power grid-connected cabinet, a ship diesel generator, and a ship load cabinet.

[0034] Embodiment 2:

[0035] The energy consumption determination method based on the shore power equipment energy efficiency monitoring system of this embodiment includes the following steps:

[0036] A. The data information collected by the data acquisition module is transmitted to the data exchange module, and then the data exchange module transmits the data information to the data acquisition and monitoring control system of the host computer for processing. For the data acquisition and monitoring control system, the server software with B / S architecture can be used, and the Tomcat server is locally deployed and run. The system data collection frequency is 1-5 seconds and stored in the local database of the MySql server. The configuration interface uses the main function SCADA of the platform, that is, the data acquisition and monitoring control system. The monitoring data display mode is configured real-time data display and real-time curve display. The calculation of various statistical data is realized by metadata programming.

[0037] B. Calculate the energy consumption based on the acquired data information through the data acquisition and monitoring control system. The calculation method is as follows:

[0038] (1) Energy efficiency algorithm for conventional electrical equipment:

[0039] Equipment energy efficiency = (equipment output power / equipment input power) * (power factor ^ X) "Equipment output power / equipment input power" is the main part of measuring equipment energy efficiency. If the input power of the equipment is equal to the output power, the value of this part is 1, but there will be losses in actual operation, so the value of this part is usually less than 1.

[0040] "Power factor ^ X" is the impact of the equipment power factor on energy efficiency. The power factor is turned on X times, and X is the impact ratio of the power factor on the overall energy efficiency calculation. The value of X is less than 1.

[0041] (2) Step-down transformer energy efficiency calculation formula:

[0042] Transformer efficiency = (output power / input power)*r

[0043] Step-down transformers are different from general electrical equipment. When calculating energy efficiency, the influence of temperature must be considered. The r in the formula is the temperature influence coefficient. Usually, when the temperature is >50 degrees Celsius, r<1 (usually 0.75); when the temperature is <10 degrees Celsius, r>1 (usually 1.1); in other normal temperature ranges, r=1.0, indicating that the influence of temperature on energy efficiency can be ignored at this time;

[0044] (3) System total energy efficiency calculation formula:

[0045] Total system energy efficiency = Σ(equipment energy efficiency*(equipment power / (total power of each device in the system))

[0046] The total energy efficiency of the system is the weighted average value obtained by multiplying the energy efficiency of each device by the coefficient of the impact of a single device on the system energy efficiency. The coefficient of the impact of a single device on the system energy efficiency is "device power / (the sum of the powers of all devices in the system)", which estimates the impact of a single device on the system energy efficiency based on the proportion of the power of a single device in the total power of the system.

[0047] Whether it is the energy efficiency of a single device or the total energy efficiency of the system, in actual operation, it is less than 1, that is, the system energy efficiency cannot reach 100%.

[0048] The specific calculation method is as follows:

[0049] The input power, power factor and transformer temperature of each device are collected through the data acquisition module, and the input power of the lower-level device is equivalent to the output power of the upper-level device. The temperature influence coefficient value is calculated according to the measured temperature value of the transformer and substituted into the energy efficiency core algorithm to calculate the energy efficiency of a single device. The output power of the last-level device is accumulated according to the actual load operating power of the ship. After the energy efficiency value of each device is calculated, the energy efficiency calculation of the overall system is carried out.

[0050] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. A method for determining energy consumption based on a shore power equipment energy efficiency monitoring system, characterized in that: The system includes multiple groups of data acquisition modules for collecting parameters of various devices and multiple data exchange modules connected to each group of the data acquisition modules. Each of the data exchange modules is connected to a host computer through a switch to realize networking. A data acquisition and monitoring control system is provided in the host computer. The data information collected by the data acquisition module can be transmitted to the host computer through the data exchange module and processed by the data acquisition and monitoring control system to output a judgment result. The method comprises the following steps: A. The data information collected by the data acquisition module is transmitted to the data exchange module, and then the data exchange module transmits the data information to the data acquisition and monitoring control system of the host computer for processing; B. Calculate the energy consumption based on the acquired data information through the data acquisition and monitoring control system. The calculation method is as follows: (1) Energy efficiency algorithm for conventional electrical equipment: Equipment energy efficiency = (equipment output power / equipment input power) * (power factor ) "Equipment output power / equipment input power" is the main part of measuring equipment energy efficiency; Power Factor ” is the impact of the equipment power factor on energy efficiency, the power factor is the power of X, X is the impact ratio of the power factor on the overall energy efficiency calculation, and the value of X is less than 1; (2) Step-down transformer energy efficiency calculation formula: Transformer efficiency = (output power / input power) * r The r in the formula is the temperature influence coefficient. Usually, when the temperature is >50 degrees Celsius, r <1; when the temperature is <10 degrees Celsius, r>1; in other normal temperature ranges, r = 1.0, indicating that the impact of temperature on energy efficiency can be ignored at this time; (3) System total energy efficiency calculation formula: Total system energy efficiency = Σ(equipment energy efficiency*(equipment power / (total power of each device in the system)) The total energy efficiency of the system is the weighted average value obtained by multiplying the energy efficiency of each device by the coefficient of the impact of a single device on the system energy efficiency. The coefficient of the impact of a single device on the system energy efficiency is "device power / (the sum of the powers of all devices in the system)", which estimates the impact of a single device on the system energy efficiency based on the proportion of the power of a single device in the total power of the system. Whether it is the energy efficiency of a single device or the total energy efficiency of the system, in actual operation, it is less than 1, that is, the system energy efficiency cannot reach 100%.

2. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 1 is characterized in that: Each of the devices is connected to the data acquisition module through a RS485 communication unit.

3. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 1 or 2 is characterized in that: Each group of the data acquisition modules is connected to the corresponding data exchange modules via a CAN bus communication.

4. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 3 is characterized in that: Each of the data exchange modules is connected to the switch via Ethernet communication.

5. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 1, 2 or 4, characterized in that: The equipment includes shore-based power supply equipment, ship-to-shore connection equipment and ship power receiving equipment.

6. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 5 is characterized in that: The shore-based power supply equipment includes a high-voltage incoming line cabinet, a high-voltage outgoing line cabinet, a step-down transformer, a low-voltage shore power main cabinet, and a low-voltage variable frequency power supply cabinet.

7. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 5 is characterized in that: The ship-shore connection equipment includes a low-voltage shore power box, a cable lifting and retracting device, and a ship shore power connection box.

8. The energy consumption judgment method based on the shore power equipment energy efficiency monitoring system according to claim 5 is characterized in that: The ship power receiving equipment includes a ship power grid cabinet, a ship diesel generator, and a ship load cabinet.