Repair method for shield tunnel segments

Through the application of three-dimensional scanning and BIM model, combined with epoxy reinforcement and seam steel ring reinforcement technology, the problem of water leakage and breakage of the shield tunnel pipe sheet is solved, and the stability and safety of the tunnel structure is improved, which meets the satisfaction of the The demand for subway operations.

CN114370287BActive Publication Date: 2024-11-29SHANGHAI FOUNDATION ENGINEERING GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111491173.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-08
Publication Date
2024-11-29
Estimated Expiration
2041-12-08

AI Technical Summary

Technical Problem

Shield structure tunnel pipes are prone to quality problems such as water leakage, crushing and misalignment during construction and operation, which will affect the safety of the tunnel structure in serious cases and need to be repaired in a timely and effective manner to ensure construction and operation safety.

Method used

The arc-surface contour point cloud model of the inner surface of the pipe sheet is collected by using a three-dimensional scanning to generate a BIM model and process the steel lining ring. Through water leakage treatment, epoxy reinforcement and ring longitudinal joint sealing at the crushing position, the steel ring is installed in the form of a riding joint Reinforce and use a steel epoxy slurry to fill the surface gap between the arc steel plate and the pipe sheet, replace the temporary support ring-by-ring to increase the stiffness between the rings and longitudinal stability.

Benefits of technology

The safe reinforcement of the shield tunnel pipe section is achieved, ensuring the reliability of the construction process and the repaired subway operation needs, and eliminating the problems of water leakage and structural instability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114370287B_ABST
    Figure CN114370287B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for repairing a shield tunnel segment, and the steps are as follows: Step 1, using three-dimensional scanning to collect the point cloud model of the inner arc surface contour of the on-site segment, and then performing BIM modeling according to the point cloud model; Step 2, generating a reinforced steel lining ring model and CAD drawings according to the established BIM on-site segment model, and processing the steel lining ring; Step 3, using leakage water treatment, stacking epoxy reinforcement at the broken position, and ring longitudinal seam sealing measures to reinforce the tunnel segment; Step 4, using the seam-riding form to install the seam-riding steel ring to the intersection of two ring segments to replace the temporary support inside the tunnel ring by ring, increase the stiffness between the rings, reinforce the segments inside the rings, and improve the longitudinal stability of the tunnel structure; Step 5, using rigid epoxy slurry to fill the gap between the back of the arc steel plate and the surface of the segment. The shield tunnel segment repair method provided by the present invention is safe in construction, reliable in process, and meets the needs of subway operation after repair.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a shield tunnel segment construction method, in particular to a shield tunnel segment repair method. Background Art

[0002] With the continuous development of urban construction, the existing ground transportation has gradually been unable to meet people's daily travel needs. Widening roads, adding elevated roads, and digging subway tunnels have become the norm for urban infrastructure construction, among which subway tunnels are developing the fastest. The construction of subway tunnels mainly adopts the shield method, which is known for its good anti-leakage, safe and fast construction, and little impact on the surrounding environment. However, when encountering foundation pit excavation around the tunnel, changes in the upper load of the tunnel, settlement during the operation of the subway tunnel, and earthquakes, it may cause quality problems such as water leakage, breakage, and misalignment of the tunnel segments. In severe cases, it will affect the safety of the tunnel structure. If it is not repaired in a timely and effective manner, it will bring fatal threats to the construction and subway train operation. Therefore, tunnel segment repair technology is an important task to ensure the safety of tunnel construction and operation. Summary of the invention

[0003] In view of this, an object of the present invention is to provide a method for repairing shield tunnel segments, so that the repaired shield tunnel segments meet the needs of subway operation.

[0004] To achieve the above object, the technical solution of the present invention is: a method for repairing a shield tunnel segment, comprising the following steps:

[0005] Step 1: Use 3D scanning to collect the point cloud model of the curved surface contour of the on-site segment, and then perform BIM modeling based on the point cloud model;

[0006] Step 2: Generate a reinforced steel liner ring model and CAD drawings based on the established BIM on-site segment model, and process the steel liner ring;

[0007] Step 3: Reinforce the tunnel segments by treating leakage, reinforcing the broken parts with epoxy, and sealing the longitudinal seams;

[0008] Step 4: Install the saddle steel ring at the junction of two ring segments in a saddle manner to replace the temporary support inside the tunnel ring by ring, increase the stiffness between rings, reinforce the segments inside the rings, and improve the longitudinal stability of the tunnel structure;

[0009] Step 5: Use rigid epoxy slurry to fill the gap between the back of the curved steel plate and the surface of the segment.

[0010] Further, step four includes the following steps:

[0011] 1) After completing the repair work of water leakage and breakage of the pipe segment in step 3, install and reinforce the seam steel ring;

[0012] 2) First add a vertical support outside the installation position of the connecting steel ring, then remove the temporary "M-shaped" support of the connecting steel ring and immediately carry out the connecting steel ring construction of the ring segment;

[0013] 3) Within the scope of tunnel repair and reinforcement, a Q345B arc-shaped steel plate is installed at the segment annular joint between every two segments, close to the inner curved surface of the tunnel;

[0014] 4) The installation of the curved steel plate should be from bottom to top and symmetrical from left to right;

[0015] 5) After the arc steel plate is installed and fixed, the longitudinal connection seams between the arc steel plates are welded and reinforced by carbon dioxide gas shielded welding groove welding;

[0016] 6) After welding is completed, the anchor holes reserved on the curved steel plate are used to implant M16 chemical anchors 16 cm into the segment structure to connect and fix the curved steel plate to the segment structure.

[0017] Furthermore, in step four, after the connecting steel ring is assembled and welded, the steel ring is sealed. During the steel ring sealing process, a grouting port is reserved and a hose is inserted for injection of epoxy resin. The reserved grouting hole hoses are evenly distributed on both sides of the connecting steel ring and arranged in a "Z" shape with a spacing of 50 cm.

[0018] Furthermore, in step four, there are different degrees of misalignment between the segment rings in the reinforcement area, the saddle steel ring is located between the two ring segments, and the gaps between the connecting steel rings are of different sizes. In order to ensure that the interfaces of adjacent steel plates can be aligned when the connecting steel rings are installed and at the same time to ensure that the connecting steel rings and the segments have force contact points before the epoxy solidifies, it is necessary to add low and high pads so that the steel rings and steel plates are on the same ring surface and can have force contact points with the segments.

[0019] Furthermore, in the above steps, after the installation of the saddle steel ring is completed, if water leakage still occurs in the tunnel, a connecting steel ring can be used to weld the saddle steel ring into a whole to cover the entire leakage area and prevent water leakage from occurring in the tunnel.

[0020] Furthermore, in step five, a small electric grouting pump is used to inject epoxy resin, grouting holes are reserved on both sides of the steel ring curvature, and a grouting nozzle is installed every 1 meter along the edge sealing position of the steel ring; the injection sequence is from bottom to top, and the grouting can only be stopped when the resin overflows from the upper reserved grouting nozzle. During the grouting process, the pressure is controlled within 0.1MPa.

[0021] The beneficial effects of the present invention are:

[0022] The present invention adopts the measures of leakage water treatment, stacked epoxy reinforcement at broken positions, and ring longitudinal seam sealing to reinforce the tunnel segments; the steel ring is installed at the intersection of two ring segments in a riding seam form to replace the temporary support inside the tunnel one by one, increase the stiffness between the rings, reinforce the segments within the rings, and improve the longitudinal stability of the tunnel structure; rigid epoxy slurry is used to fill the gap between the back of the arc steel plate and the surface of the segment; the shield tunnel segment repair method provided by the present invention is safe in construction, reliable in process, and meets the subway operation requirements after repair. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a flow chart of the method for repairing a shield tunnel segment of the present invention;

[0024] Figure 2 This is a schematic diagram of the installation of steel rings at the segment misalignment position;

[0025] Figure 3 It is a block diagram of steel liner ring;

[0026] Figure 4 It is a schematic diagram of steel liner ring reinforcement;

[0027] In the figure: 6, segment; 7, low spacer; 8, curved steel plate; 9, gap between the back of the curved steel plate and the surface of the segment; 10, chemical anchor; 11, high spacer; 12, steel edge sealing; 13, segment steel ring block form and numbering; 14, segment steel ring; 15, connecting steel ring; 16, segment ring seam. DETAILED DESCRIPTION

[0028] The present invention is described below based on embodiments. Those skilled in the art should understand that the drawings provided herein are for illustrative purposes and are not necessarily drawn to scale.

[0029] like Figure 1 As shown, the shield tunnel segment repair method of the present invention comprises the following steps:

[0030] Step 1: Use 3D scanning to collect the point cloud model of the inner arc surface contour of the on-site segment 6, and then perform BIM modeling based on the point cloud model;

[0031] Step 2: Generate a reinforcement steel liner ring model and CAD drawings based on the established BIM on-site segment 6 model, and process the steel liner ring;

[0032] Step 3: Reinforce the tunnel segments by treating leakage, reinforcing the broken parts with epoxy, and sealing the longitudinal seams;

[0033] Step 4: Install the saddle steel ring 14 to the junction of the two ring segments in a saddle manner (see Figure 4 ) Replace the temporary supports inside the tunnel ring by ring, increase the stiffness between rings, strengthen the segments inside the rings, and improve the longitudinal stability of the tunnel structure;

[0034] Step 5: Use rigid epoxy slurry to fill the gap 9 between the back of the curved steel plate and the surface of the segment.

[0035] Step 4 includes the following steps:

[0036] 1) After completing the water leakage and broken repair work of the pipe segment 6 in step 3, install and reinforce the seam steel ring 14, see Figure 2 , 3, 4;

[0037] 2) First, add a vertical support outside the installation position of the connecting steel ring 15, then remove the temporary "M-shaped" support of the connecting steel ring 15 and immediately start the construction of the connecting steel ring 15 of the ring segment;

[0038] 3) Within the scope of tunnel repair and reinforcement, a Q345B arc-shaped steel plate 8 is installed at the segment annular seam 16 between every two segments, close to the inner curved surface of the tunnel;

[0039] 4) The arc steel plate 8 is installed from bottom to top and symmetrically from left to right;

[0040] 5) After the arc-shaped steel plate 8 is installed and fixed, the longitudinal connection seams between the arc-shaped steel plates are welded and reinforced by carbon dioxide gas shielded welding groove welding;

[0041] 6) After welding is completed, the anchor holes reserved on the curved steel plate 8 are used to implant M16 chemical anchors 10 16 cm into the segment structure to connect and fix the curved steel plate 8 to the segment structure.

[0042] Preferably, in step four, after the connecting steel ring 15 is assembled and welded, the steel ring edge sealing 12 is performed thereon. During the steel ring edge sealing 12, a grouting port is reserved and a hose is inserted for the purpose of injecting epoxy resin. The reserved grouting hole hoses are evenly distributed on both sides of the connecting steel ring 15 and are arranged in a "Z" shape with a spacing of 50 cm.

[0043] Preferably, in step 5, a small electric grouting pump is used to inject epoxy resin, grouting holes are reserved on both sides of the steel ring arc, and a grouting nozzle is installed every 1 meter along the steel ring edge 12. The injection sequence is from bottom to top, and the grouting can be stopped only when the upper reserved grouting nozzle overflows the resin. The pressure during the grouting process is controlled within 0.1MPa.

[0044] Preferably, in step four, there are different degrees of misalignment between the segment rings in the reinforcement area, the saddle steel ring 14 is located between the two segment rings, and the gaps between the connecting steel ring 15 and the connecting steel plate 15 are of different sizes. In order to ensure that the interfaces of adjacent steel plates can be aligned when the connecting steel ring 15 is installed and at the same time to ensure that the connecting steel ring 15 has a force contact point with the segment before the epoxy solidifies, it is necessary to add a low pad 7 and a high pad 11 so that the steel rings and steel plates are on the same annular surface and can have a force contact point with the segment.

[0045] Preferably, in the above steps, after the installation of the saddle steel ring 14 is completed, if water leakage still occurs in the tunnel, a connecting steel ring 15 can be used to weld the saddle steel ring 14 into a whole to cover the entire leakage area and prevent water leakage from occurring in the tunnel.

Claims

1. A method for repairing a shield tunnel segment, characterized in that: The steps include: Step 1: Use 3D scanning to collect the point cloud model of the curved surface contour of the on-site segment, and then perform BIM modeling based on the point cloud model; Step 2: Generate a reinforced steel liner ring model and CAD drawings based on the established BIM on-site segment model, and process the steel liner ring; Step 3: Reinforce the tunnel segments by treating leakage, reinforcing the broken parts with epoxy, and sealing the longitudinal seams; Step 4: Install the saddle steel ring at the junction of the two ring segments in a saddle manner to replace the temporary support inside the tunnel ring by ring, increase the stiffness between the rings, reinforce the segments inside the rings, and improve the longitudinal stability of the tunnel structure; Step 4 includes the following steps: 1) After completing the repair work of water leakage and breakage of the pipe segment in step 3, install and reinforce the seam steel ring; 2) First add a vertical support outside the installation position of the connecting steel ring, then remove the temporary "M-shaped" support of the connecting steel ring and immediately carry out the connecting steel ring construction of the ring segment; 3) Within the scope of tunnel repair and reinforcement, a Q345B arc-shaped steel plate is installed at the segment annular joint between every two segments, close to the inner curved surface of the tunnel; 4) The installation of the curved steel plate should be from bottom to top and symmetrical from left to right; 5) After the arc steel plate is installed and fixed, the longitudinal connection seams between the arc steel plates are welded and reinforced by carbon dioxide gas shielded welding groove welding; 6) After welding, the anchor holes reserved on the curved steel plate are used to implant M16 chemical anchor bolts 16 cm into the segment structure to connect and fix the curved steel plate to the segment structure; Step 5: Use rigid epoxy slurry to fill the gap between the back of the curved steel plate and the surface of the segment.

2. The method for repairing a shield tunnel segment according to claim 1, characterized in that: In step 4, after the connection steel ring is assembled and welded, the steel ring is sealed. During the steel ring sealing process, a grouting port is reserved and a hose is inserted for injection of epoxy resin. The reserved grouting hole hose is evenly distributed on both sides of the connection steel ring and arranged in a "Z" shape with a spacing of 50 cm.

3. The method for repairing shield tunnel segments according to claim 1, characterized in that: In step four, there are different degrees of misalignment between the segment rings in the reinforcement area. The saddle steel ring is located between the two ring segments, and the gaps between the connecting steel rings are of different sizes. In order to ensure that the interfaces of adjacent steel plates can be aligned when the connecting steel rings are installed, and at the same time to ensure that the connecting steel rings and the segments have force contact points before the epoxy solidifies, it is necessary to add low and high pads so that the steel rings and steel plates are on the same ring surface and have force contact points with the segments.

4. The method for repairing a shield tunnel segment according to claim 3 is characterized in that: In the above steps, after the installation of the saddle steel ring is completed, if water leakage still occurs in the tunnel, a connecting steel ring can be used to weld the saddle steel ring into a whole to cover the entire leakage area and prevent water leakage from occurring in the tunnel.

5. The method for repairing shield tunnel segments according to claim 1, characterized in that: In step five, a small electric grouting pump is used to inject epoxy resin. Grouting holes are reserved on both sides of the steel ring curvature, and a grouting nozzle is installed every 1 meter along the edge sealing position of the steel ring. The injection sequence is from bottom to top until the resin overflows from the upper reserved grouting nozzle. The grouting can be stopped. The pressure is controlled within 0.1MPa during the grouting process.

Citation Information

Patent Citations

  • Repair and reinforcement construction methods for segments in formed tunnel

    CN103643965A

  • Shield tunnel segment repairing process

    CN113404518A