A method and device for predicting SAGD production
By obtaining the well pattern combination of the reservoir and determining the production prediction model, it solves the problem of difficulty in accurately predicting SAGD recovery with existing technology, achieves higher prediction reliability and accuracy, and can better describe the production change trend and Recovery factor.
Patent Information
- Application Number
- CN202111474181.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-03
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-12-03
AI Technical Summary
The existing SAGD recovery prediction method relies on the accuracy of reservoir geological modeling and history matching, and is limited by software and hardware computing capabilities and network step sizes. It is difficult to establish a full reservoir model and cannot accurately describe three-phase changes and The entire process of vapor cavity formation and expansion failure.
By obtaining the well network combination of the target reservoir, the production prediction model is determined, and based on the model, the node data of each stage of production change is determined, the average daily oil production at each stage and the total oil production in the preset time period are predicted, and then the production is calculated. Yield.
It improves the reliability and accuracy of SAGD production prediction, can more accurately describe the production change trend, and enhances the ability to analyze reservoir development effects.
Smart Images

Figure CN114439459B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of oil reservoir production prediction, and in particular to a SAGD production prediction method and device. Background Art
[0002] Recovery factor is the most important comprehensive indicator to measure the effect and level of oil field development. Its current prediction method is mainly static method, which can only be applied to new areas and units with a short mining time. The dynamic method is better than the static method and can be applied to the middle and late stages of development.
[0003] Some achievements have been made in the existing research on recovery rate prediction, and industry standards have been formulated. However, among the methods in the industry standards, only the reservoir numerical simulation method is applicable to the prediction of SAGD recovery rate. Its certainty and reliability depend on the accuracy of reservoir geological modeling and historical matching, and it needs to meet two conditions: verification of the dynamic historical matching of the exploitation of the geological model and support from the development plan or development concept design. At the same time, the computing power and computing time of software and hardware also limit the size of the model, and the network step size further affects its precision, making it difficult to establish a full reservoir model or to accurately describe the entire process of three-field changes and steam cavity formation, expansion and exhaustion, which has certain limitations. Summary of the invention
[0004] In view of the above problems, the present invention is proposed to provide a method and apparatus for predicting SAGD production that overcomes the above problems or at least partially solves the above problems.
[0005] In a first aspect, the present invention provides a method for predicting SAGD production, comprising:
[0006] Acquire a well pattern combination mode of a target oil reservoir, and determine a production prediction model of the target oil reservoir based on the well pattern combination mode;
[0007] Based on the yield prediction model, determining node data of each stage of yield change;
[0008] Based on the node data of each stage of the production change, predict the average daily oil production of each stage;
[0009] Based on the average daily oil production of each stage and the node data of each stage, the total oil production of the target oil reservoir in a preset time period is predicted.
[0010] Furthermore, after predicting the total oil production of the target reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage, the method further includes:
[0011] Obtaining the total oil production of the target oil reservoir in a preset time period and the total reserves of the target oil reservoir;
[0012] The recovery factor of the target oil reservoir is determined based on the total oil production in the preset time period and the total reserves.
[0013] Furthermore, the reservoir production prediction model includes:
[0014] Vertical well and horizontal well combination production prediction model and dual horizontal well production prediction model.
[0015] Furthermore, the production prediction model of the target oil reservoir includes production prediction models corresponding to various stages of production change, and the various stages of production change include: an ascending stage, a stable stage, and a decaying stage, wherein the production prediction models corresponding to the ascending stage and the decaying stage are different.
[0016] Furthermore, the various stages of the production change include: a rising stage, a stable stage, and a decay stage. The node data of each stage of the production change is determined based on the production prediction model, including:
[0017] At the end of preheating, determining a first duration to an initial node of the rising phase and first daily oil production data at the initial node;
[0018] Based on the production prediction model, when the height of the steam chamber is equal to the thickness of the oil layer above the horizontal section of the horizontal well, determining the second time duration from the initial node to the starting node of the stable phase, and the second daily oil production data at the starting node;
[0019] Based on the production prediction model and the second daily oil production data, determining a third time period from the start node of the stable phase to the end node of the stable phase, and third daily oil production data at the end node, wherein the second daily oil production data is equal to the third daily oil production data;
[0020] Based on the daily oil production close to the limit oil-gas ratio and the production prediction model, fourth daily oil production data of the terminal node in the attenuation stage and a fourth time length from the end node to the terminal node are determined.
[0021] Further, based on the daily oil production when approaching the limit oil-gas ratio and the production prediction model, the fourth daily oil production data of the terminal node in the attenuation stage and the fourth time length from the terminal node to the terminal node are determined, including
[0022] Determining fourth daily oil production data of the terminal node in the decay phase based on the daily oil production when the oil-gas ratio is close to the limit;
[0023] Based on the fourth daily oil production data and the production prediction model, a fourth time duration from the end node to the terminal node is determined.
[0024] Furthermore, the average daily oil production in each stage is predicted based on the node data of each stage of the production change, including:
[0025] Based on the node data of each stage of the output change, a functional relationship between the time and the output of each stage is obtained through fitting;
[0026] Based on the functional relationship between the time and the output of each stage, a functional relationship of the average daily oil output of each stage is obtained;
[0027] Based on the functional relationship of the average daily oil production in each stage and the node data in each stage, the average daily oil production in each stage is predicted.
[0028] Furthermore, the total oil production of the target reservoir in a preset time period is predicted based on the average daily oil production of each stage and the node data of each stage, including:
[0029] Based on the average daily oil production of each stage and the node data of each stage, the oil production of each stage in a preset time period is obtained;
[0030] Based on the oil production in the preset time period of each stage, the total oil production of the target oil reservoir in the preset time period is predicted.
[0031] Furthermore, after predicting the total oil production of the target reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage, the method further includes:
[0032] Based on the predicted total oil production of the target oil reservoir in a preset time period, the development effect is analyzed and evaluated or the oil production index for the preset time period in the development plan is determined.
[0033] Furthermore, the production prediction model of the target oil reservoir is specifically obtained by modifying the original production prediction model based on the oil reservoir parameters of the target oil reservoir;
[0034] The method of modifying the original production preset model based on the reservoir parameters of the target reservoir includes:
[0035] Based on the relationship between the available pressure head coefficient and the expansion angle of the steam chamber in the reservoir parameters of the target reservoir and the effective length of the horizontal well, the original production prediction model is modified.
[0036] In a second aspect, the present invention further provides a SAGD production prediction device, comprising:
[0037] An acquisition module, used for acquiring a well pattern combination mode of a target oil reservoir, and determining a production prediction model of the target oil reservoir based on the well pattern combination mode;
[0038] A determination module, used to determine node data of each stage of yield change based on the yield prediction model;
[0039] A first prediction module is used to predict the average daily oil production in each stage based on the node data of each stage of the production change;
[0040] The second prediction module is used to predict the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage.
[0041] In a third aspect, the present invention further provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method steps when executing the program.
[0042] In a fourth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, which implements the above steps when executed by a processor.
[0043] One or more technical solutions in the embodiments of the present invention have at least the following technical effects or advantages:
[0044] The present invention provides a SAGD production prediction method, comprising: obtaining a well network combination mode of a target oil reservoir, and determining a production prediction model of the target oil reservoir based on the well network combination mode; determining node data of each stage of production change based on the production prediction model; predicting the average daily oil production of each stage based on the node data of each stage of production change; predicting the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage, by predicting the oil production of each stage, the oil production change trend of each stage is different, thereby obtaining a prediction result of the total oil production in the preset time period, and improving the reliability of the prediction result. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Also, throughout the accompanying drawings, the same reference figures are used to represent the same components. In the drawings:
[0046] Figure 1 A schematic flow chart showing the steps of a method for predicting SAGD production in an embodiment of the present invention is shown;
[0047] Figure 2 A vertical cross-sectional view of the steam-reservoir interface in an embodiment of the present invention is shown;
[0048] Figure 3 It shows the material balance relationship diagram of the vapor-liquid interface leakage in the embodiment of the present invention;
[0049] Figure 4 A schematic cross-sectional view of a steam chamber in an embodiment of the present invention is shown;
[0050] Figure 5 The overall process diagram of predicting oil production in an embodiment of the present invention is shown;
[0051] Figure 6 A schematic diagram showing that the changes of q to t in the rising stage and the decay stage in the embodiment of the present invention conform to the changes of the logarithmic function;
[0052] Figure 7a to Figure 7d A schematic diagram of a segmented fitting curve in the rising stage in an embodiment of the present invention is shown;
[0053] Figure 8 A table showing the production prediction results of a single well group in an oil reservoir according to an embodiment of the present invention is shown;
[0054] Fig. 9 A schematic diagram showing an annual oil production change curve drawn using prediction results in an embodiment of the present invention is shown;
[0055] Fig.10 A schematic diagram of the structure of a device for predicting SAGD production in an embodiment of the present invention is shown;
[0056] Fig.11 A schematic diagram of the structure of a computer device for implementing a method for predicting SAGD production in an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0057] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0058] Embodiment 1
[0059] The first embodiment of the present invention provides a method for predicting SAGD production, such as Figure 1 As shown, including:
[0060] S101, obtaining a well pattern combination mode of a target oil reservoir, and determining a production prediction model of the target oil reservoir based on the well pattern combination mode;
[0061] S102, determining node data of each stage of production change based on the production prediction model;
[0062] S103, based on the node data of each stage of production change, predict the average daily oil production of each stage;
[0063] S104, predicting the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage.
[0064] In the specific implementation, it is necessary to select a suitable production prediction model. Therefore, it is necessary to establish a complete reservoir engineering theory for SAGD technology. On the basis of making full use of the previous research results, the effective pressure head correlation coefficient β and the steam cavity expansion angle γ are introduced to establish the h related to it. 腔 ~q~t production prediction model. According to the reservoir and existing data, the existing production prediction model can also be used to predict production and recovery rate.
[0065] First, the well pattern combination mode of the target oil reservoir is obtained, and based on the well pattern combination mode, the production prediction model of the target oil reservoir is determined.
[0066] For example, for the well network combination of dual horizontal wells, a dual horizontal well production prediction model is determined; for the well network combination of vertical well + horizontal well, a vertical well + horizontal well production prediction model is determined.
[0067] The production forecast model is described in detail below:
[0068] 1. Dual horizontal well production prediction model
[0069] According to Figure 2 , Figure 3 The vertical profile of the steam-reservoir interface, the material balance relationship diagram of the vapor-liquid interface leakage, and the relationship between a and h are shown. After modifying the model, the daily oil production formula corresponding to the steam chamber rising and expansion (production increase) stage in the dual horizontal well production prediction model and the daily oil production formula corresponding to the steam chamber gradual attenuation (decreasing) stage are obtained.
[0070] Among them, the relationship between a and h includes:
[0071] a: Darcy's law:
[0072]
[0073] b: Energy conservation at the interface:
[0074]
[0075] c: Temperature distribution on one side of the interface:
[0076]
[0077] d: Viscosity-temperature empirical equation:
[0078]
[0079] e: Integral flow equation:
[0080]
[0081] f: Material balance equation at the interface:
[0082]
[0083] g: The oil leakage rate equation on one side of the horizontal well:
[0084]
[0085] h: Corresponding steam front equation:
[0086]
[0087] Where K is the effective permeability of the oil phase, in mD; L is the length of the horizontal well section, in m; ρ0, ρ g Respectively, the density of crude oil and steam, kg / m 2 ; θ is the horizontal angle of the vapor-liquid interface, in degrees; μ0 is the dynamic viscosity of crude oil, in mPa·s; v s is the kinematic viscosity of crude oil at steam temperature, in m 2 / s;T s The temperature of the steam, T R is the original temperature of the reservoir, m is the dimensionless viscosity-temperature correlation coefficient, a constant; U is the interface velocity, in m / s; ρc is the volume heat capacity of the reservoir, in J / (m 3 ·℃); ξ is the normal distance between steam and interface, in m; λ is the thermal conductivity of reservoir, in w / (m·℃); α is the thermal diffusion coefficient of oil layer, in m 2 / s; φ is the oil layer porosity, in %; ΔS0 is the movable oil saturation at steam temperature; h is the thickness of the oil layer above the horizontal section.
[0088] In model modification, Figure 4 As shown in the figure, it is a schematic diagram of the steam chamber cross section. During the SAGD production process, the pressure head h is only partially used to push the crude oil horizontally to the production well, so a coefficient β related to the effective pressure head is introduced, and the oil leakage rate on both sides of the horizontal production well is:
[0089]
[0090] The above is the original production prediction model, which has some drawbacks. Therefore, it is necessary to correct the original production prediction model to obtain the production prediction model of the target oil reservoir.
[0091] Specifically, based on the relationship between the available pressure head coefficient β and the steam expansion angle λ in the reservoir parameters of the target reservoir and the effective length L of the horizontal well i , and correct the original production forecast model.
[0092] Assuming that the shape of the steam chamber remains similar during the ascent process, the cumulative oil production is proportional to the product of the movable oil per unit area and the square of the steam chamber height. Assuming that the expansion angle of the steam chamber is determined by the shape of the steam chamber, the area of the steam chamber is γh 腔 2 , then:
[0093]
[0094] Differentiating it with respect to time, we get
[0095] q=2γφΔS0h 腔 2 , combined with formula (1-17) and integrated to obtain:
[0096]
[0097] Thus, the functional relationship between the steam cavity height h and time is obtained:
[0098]
[0099] In this formula, β is the available pressure head coefficient, γ is the expansion angle of the steam chamber, the unit is radian; t is the production time, the unit is d; It is independent of reservoir properties and time, and can be given by physical models of the target reservoir or numerical results.
[0100] Thus, a staged production prediction model is obtained, including the steam chamber rise and expansion (production increase) stages:
[0101] By combining (1-9), (1-10), (1-12) and The daily oil production in this rising stage is:
[0102]
[0103] When the steam chamber height is equal to the thickness of the oil layer above the horizontal section, q basically does not change with time, the daily oil production basically reaches the peak value, and enters the stable production stage; the relationship between the steam chamber height and the production time follows formula (1-12).
[0104] Calculation of daily oil production during the gradual exhaustion (decreasing) stage of the steam cavity:
[0105]
[0106] The above-obtained formula models correspond to the rising stage and the decay stage of the dual horizontal well production prediction model.
[0107] The following is a combined production prediction model for vertical wells and horizontal wells:
[0108] During the steam chamber rising phase:
[0109] In the combination of vertical and horizontal wells, in order to ensure the development effect, steam injection must be ensured at the toe to produce a more obvious end effect. Therefore, the oil drainage rate of the finite length horizontal well is higher than that of the horizontal well of the same length of the infinite length horizontal well. The end effect is equivalent to the fracture. Based on (1-13) and considering the end effect, the production equation of the finite length horizontal well is:
[0110]
[0111] Where, L e is the horizontal well producing length, which is m.
[0112] In its dimensionless form and We can get:
[0113]
[0114] If the number of steam injection wells is N, then
[0115]
[0116] Where, L i is the effective length of the horizontal well, in meters.
[0117] The daily oil production during the gradual attenuation (decreasing) stage of the steam cavity can be calculated using formula (1-14).
[0118] The production prediction model for dual horizontal wells is formula (1-13) and (1-14), and the production prediction model for vertical well + horizontal well is formula (1-17) and (1-14).
[0119] The reservoir parameters mentioned in the present invention include: thermal diffusion coefficient of the oil layer, porosity, permeability, crude oil properties, crude oil viscosity-temperature curve, original oil saturation, oil saturation before switching to SAGD, oil layer thickness, injection steam temperature, injection steam dryness, horizontal section length, oil layer thickness above the horizontal section and effective pressure head.
[0120] The thermal diffusion coefficient of the oil layer, porosity, permeability, crude oil properties, original oil saturation, and crude oil viscosity-temperature curve remain basically unchanged for the determined reservoir.
[0121] For a single SAGD well group, the oil layer thickness, the oil layer thickness above the horizontal section, and the length of the horizontal section remain basically unchanged, but the parameters of different well groups are different.
[0122] Currently, oil saturation can be obtained through monitoring data, reservoir engineering calculations, reservoir numerical simulations, etc.
[0123] Movable oil saturation △S in the model formula o It is related to the steam cavity temperature, which in turn is related to the steam cavity pressure, the steam temperature in the cavity, and the dryness.
[0124] The property changes of injected steam can be obtained through simulation calculations by software such as TWBS and CMG to determine the temperature and pressure of the bottom hole / steam chamber under different injection conditions, and then obtain △S o (Movable Oil Saturation).
[0125] The coefficient β can be obtained through previous production and monitoring data
[0126] The present invention exemplifies two oil reservoir production prediction models, including: a vertical well and horizontal well combined production prediction model and a dual horizontal well production prediction model. Of course, there are other prediction models, which will not be listed here one by one.
[0127] After the yield prediction model is determined, S102 is executed to determine the node data of each stage of yield change based on the yield prediction model.
[0128] Regardless of the prediction model, the corresponding production change trend is first an upward trend, then a stable area, and finally a decaying trend. Among them, the production prediction models corresponding to the rising stage of the upward trend and the decaying stage of the decaying trend are different.
[0129] In the dual-horizontal well production prediction model, the production prediction model corresponding to the rising stage is as shown in Formula 1-13, and the production prediction model corresponding to the decay stage is as shown in Formula 1-14.
[0130] In the vertical well + horizontal well production prediction model, the production prediction model corresponding to the rising stage is as shown in Formula 1-17, and the production prediction model corresponding to the decay stage is as shown in Formula 1-14.
[0131] Therefore, based on the output preset model, the node data of each stage of output change is determined, wherein the segment nodes include: initial value q0(h 腔 , t0), stable phase starting node q 稳0 (h 腔 , t 稳0), the terminal node q at the end of the stable phase d0 (h 腔 , t d0 ) and the terminal node q at the end of the decay phase e (h 腔 , t e ).
[0132] The initial value of the daily oil production q0 is determined at the end of the preheating, by determining the first duration of the initial node of the rising phase and the first daily oil production data q0 at the initial node.
[0133] The starting node of the stable phase is based on the production prediction model, that is, formula 1-12, 1-13. When the height of the steam chamber is equal to the thickness of the oil layer above the horizontal section of the horizontal well, the second time from the initial node to the starting node of the stable phase and the second daily oil production data q at the starting node are determined. 稳 .
[0134] The second duration is obtained by subtracting the first duration from the time obtained according to formula 1-12.
[0135] The end node of the stable phase is determined based on the production prediction model, i.e., formula 1-14, and the second day's oil production data to determine the third time period from the start node of the stable phase to the end node of the stable phase, as well as the third day's oil production data at the end node, wherein the second day's oil production data is equal to the third day's oil production data.
[0136] The third duration is the time obtained by subtracting the second duration from the time obtained according to formula 1-14.
[0137] The terminal node of the decay phase is based on the daily oil production and production prediction model when the oil-gas ratio is close to the limit, and the fourth daily oil production data q of the terminal node of the decay phase is determined. e , and the fourth duration from the terminal node to the terminal node.
[0138] Since the daily oil production data close to the limit oil-gas ratio is known, the fourth daily oil production data q is obtained e .
[0139] Next, based on the fourth day's oil production data and the production prediction model, ie, Formula 1-14, the fourth time duration from the end node to the terminal node is determined.
[0140] According to formula 1-14, when the oil production data of the fourth day is known, the time to reach the terminal node is calculated, and the fourth time is obtained by subtracting the third time, the second time, and the first time from the time.
[0141] Thus, the node data of each stage is obtained.
[0142] The node data at each stage can also be checked and corrected, which will not be elaborated here.
[0143] Next, S103 is executed to predict the average daily oil production in each stage based on the node data of each stage of production change.
[0144] Specifically, based on the node data of each stage of production change, the functional relationship between time and production in each stage is obtained through fitting; based on the functional relationship between time and production in each stage, the functional relationship of the average daily oil production in each stage is obtained; based on the functional relationship of the average daily oil production in each stage and the node data in each stage, the average daily oil production in each stage is predicted.
[0145] Since the production time unit in the prediction model is d, in actual application, it is sufficient to predict the annual oil production, which reduces unnecessary calculations and ensures the fitting accuracy. When calculating q~t, at least three time points between the i+1 year and the i-th year should be satisfied and t i+1 -t i = constant R, that is, the time intervals are equal and the annual q~t is not less than 3 points.
[0146] The q~t curves of the two stages of production increase and decrease show significant monotonicity and concavity. Therefore, it is determined that the changes in production in these two stages conform to the changes in the basic elementary function medium exponential / logarithmic function, that is, the fitted function form is q(t)=kln(t)+m or q(t=ke mt .
[0147] After fitting, the k value and the m value are determined, thereby determining the fitted function.
[0148] Then, it is necessary to convert daily production to annual production.
[0149] The q~t values calculated above and the units of the drawn curve are t / d (daily oil production)~d (time), which are instantaneous values and need to be annualized. The annualization method is as follows:
[0150] For the production increase stage and the decline stage, the determined piecewise function is integrated by the definite integral mean value theorem to obtain:
[0151]
[0152] Thus, the average daily oil production over a period of time can be obtained. The integral interval [a, b] is the starting and ending points of the production time of the year being sought. For adjacent intervals, the integral upper limit of the previous interval is the lower limit of the next integral interval. Therefore, the formula for predicting the average daily oil production in each stage is as follows:
[0153]
[0154] or
[0155] The values of k and m in the above-mentioned formula for predicting the average daily oil production in each stage can be determined by the values of k and m in the above-mentioned fitting function.
[0156] For the stable stage, the daily oil production in this stable stage is basically the peak production, that is, the average daily oil production formula in this stable stage is:
[0157] Therefore, after obtaining the formula for predicting the average daily oil production in each stage, S104 is executed to predict the total amount of the target oil reservoir in a preset time period based on the average daily oil production in each stage and the node data in each stage.
[0158] Since the total oil production in the preset time period can be the annual total oil production, the quarterly total oil production or the total oil production of a single month, the following description is based on the annual total oil production:
[0159] Specifically: based on the average daily oil production of each stage and the node data of each stage, the oil production of the preset time period of each stage is obtained; based on the oil production of the preset time period of each stage, the total oil production of the preset time period (total annual oil production) of the target oil reservoir is predicted.
[0160] For the rising stage and the decay stage, the annual oil production in the rising stage or the decay stage is Among them, ba corresponds to the second duration of the rising stage and the fourth duration of the decay stage. Therefore, the annual oil production in the rising stage and the annual oil production in the decay stage are predicted based on the node data of each stage of production change and the average daily oil production of each stage.
[0161] Of course, it is also possible to predict oil production for a quarter, etc., but we will not go into details here.
[0162] For the stable stage, the annual oil production in the stable stage is If the influence of the time rate needs to be considered and the production time interval is consistent with the two stages of output increase and decrease, the production time rate coefficient is introduced Here (ba) refers to the last year of the production increase stage (ba) ue As a benchmark, therefore, the annual oil production in the stable stage
[0163] After obtaining the annual oil production of each stage, the total annual oil production of the target reservoir is predicted based on the annual oil production of each stage.
[0164] Specifically, determine the annual oil production of a single well group in the SAGD stage, and add up the annual oil production to get the total annual oil production. Where n is the production period, and the total annual production of the entire reservoir can be obtained in the following two ways:
[0165] One is to use the production prediction model to predict the production of each well group separately and accumulate them;
[0166] The other is to import relevant parameters of typical well groups into the production prediction model and expand the production of typical well groups to the entire oil field accordingly.
[0167] After predicting the total annual oil production of the target reservoir, the prediction result is also verified and corrected. Specifically, the prediction result is plotted as an annual oil production change curve to observe whether there are any abnormal points in the curve shape. If there are abnormal points, return to S102 to redetermine the node data of each stage of production change, so as to adjust and eliminate the abnormal points to ensure the smoothness of the annual oil production change curve.
[0168] After confirming that the predicted total oil production of the target reservoir in the preset time period is accurate, it also includes:
[0169] The total oil production of the target oil reservoir in a preset time period and the total reserves of the target oil reservoir are obtained; based on the total oil production and total reserves in the preset time period, the recovery factor of the target oil reservoir is determined.
[0170] Specifically, the recovery factor formula
[0171] Among them, EOR SAGD is the recovery factor, Q is the total oil production in the preset time period, N 储量 is the total reserves of the reservoir.
[0172] In a specific implementation method, taking a super-heavy oil reservoir as an example, the total annual oil production is predicted, combined with the overall flow chart of the present invention Figure 5 As shown in the figure, the reservoir has an average porosity of 23% to 26% and a permeability of 1200mD to 1600mD, which is a high-porosity and high-permeability reservoir. The vertical well + horizontal well combined production prediction model is used, in which the horizontal well spacing is 70m, the vertical well is located between the horizontal wells, the horizontal section of the horizontal well is located at the lower part of the target layer, the horizontal section length is 300m to 400m, the oil layer thickness above the horizontal section is 40 to 45m, and the SAGD regional controlled geological reserves are 157×10 4 t.
[0173] According to the selected diameter + horizontal well combined production prediction model. According to the production prediction model, the node data of each stage of production change are determined, including: initial nodes q0, t0, which are specifically calculated by formulas (1-12) and (1-17), q0 = 9.13t / d, t0 = 30d.
[0174] The end of the production increase phase, that is, the starting node of the stable phase q 稳0 ,t 稳0 , where h 腔 When =h, qstable0=38.36t / d, tstable0=1200d.
[0175] The starting node of the stable stage is the end of the rising stage. When considering the production rate based on the mine experience, the maximum value of the stage can be increased by 5% to 10% compared with the end of the rising stage.
[0176] The initial value of the decay phase is the end value of the stable phase q d0 ,t d0 , and the daily oil production and q obtained by formula (1-17) ue Equivalent, the corresponding t d0 =3000d.
[0177] For the terminal node q in the decay phase e ,t e First, the daily production when the oil-gas ratio is close to the limit is q e =4.6t / d, then according to formula (1-14) we get the corresponding time t e =3700d.
[0178] Therefore, according to the above selected vertical well + horizontal well combined production prediction model and the determined node data of each stage, the changes of q~t in the rising stage and the decay stage conform to the logarithmic function change as follows: Figure 6 shown.
[0179] Then, the annual average daily output in the rising and decaying stages is obtained. The annual average daily output in the stable stage is calculated by the output at the end of the rising stage*R ηi Given.
[0180] The average annual daily output in the rising stage, decay stage and stable stage can be calculated as follows:
[0181] 1. Solve directly from the stage fitting function, substitute the annual production time as the upper and lower limits of the integral into the corresponding fitting formula, and the annual average daily oil production can be obtained by integration.
[0182] 2. Take the year as the basic unit, subdivide the interval, refit and give the q~t function expression for each year, then substitute the annual production time as the upper and lower limits of the integral into the corresponding fitting formula, and integrate to obtain the annual oil production. Figures 7a to 7d As shown in the figure, it is the segmented fitting curve of the rising stage. Similarly, the fitting function of each interval in the production decline stage can be obtained, and the annual average daily oil production can also be obtained.
[0183] The annual average daily output is obtained by multiplying the annual average daily output by the production time, which is the annual output. Compared with the expert review results, the annual error and the final error are both less than 10%, thus meeting the needs of on-site application.
[0184] like Figure 8 The table below shows the production prediction results for a single well group in this reservoir.
[0185] Then, the prediction results are plotted into an annual oil production curve, such as Fig. 9 As shown, observe the shape of the curve and whether there are abnormal points. If there are abnormal points, return to S102 to determine the node data of each stage and recalculate the abnormal point data to eliminate the abnormal points and make the curve relatively smooth.
[0186] Finally, in determining the recovery factor, when the substituted parameters are single well group parameters, the annual production of the reservoir can be accumulated by the prediction results of the single well group; when the substituted parameters are typical well group parameters of the target area, the annual production of the reservoir is the product of the prediction result and the number of well groups. In this embodiment, the proxy parameters are typical well group parameters. Therefore, the annual production recovery factor of the target reservoir is 30.86% to 31.08%, while the recovery factor approved by experts is 30.94%, so the prediction result is more reliable.
[0187] After obtaining the predicted total oil production of the target oil reservoir in the preset time period, the method further includes: analyzing and evaluating the development effect or compiling a development plan based on the predicted total oil production of the target oil reservoir in the preset time period.
[0188] Applications of oil production prediction:
[0189] Indicator forecasts in the preparation of various plans are based on years.
[0190] In the analysis and evaluation of development effects, annual indicators are used as the basis; for example, indicators such as annual oil production, oil-gas ratio, oil production rate, and production-injection ratio are generally based on years as annual indicators and stage indicators. At the same time, the calculation of stage indicators is generally based on years as nodes.
[0191] One or more technical solutions in the embodiments of the present invention have at least the following technical effects or advantages:
[0192] The present invention provides a SAGD production prediction method, comprising obtaining a well network combination mode of a target oil reservoir, and determining a production prediction model of the target oil reservoir based on the well network combination mode; determining node data of each stage of production change based on the production prediction model; predicting the average daily oil production of each stage based on the node data of each stage of production change; predicting the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage, by predicting the oil production of each stage, the oil production change trend of each stage is different, thereby obtaining a prediction result of the total oil production in the preset time period, and improving the reliability of the prediction result.
[0193] Embodiment 2
[0194] Based on the same inventive concept, the present invention also provides a SAGD production prediction device, such as Fig.10 As shown, including:
[0195] An acquisition module 1001 is used to acquire a well pattern combination mode of a target oil reservoir, and determine a production prediction model of the target oil reservoir based on the well pattern combination mode;
[0196] A determination module 1002 is used to determine node data of each stage of production change based on the production prediction model;
[0197] The first prediction module 1003 is used to predict the average daily oil production in each stage based on the node data of each stage of the production change;
[0198] The second prediction module 1004 is used to predict the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage.
[0199] In an optional embodiment, the method further includes a recovery factor prediction module, which is used to:
[0200] Obtaining the total oil production of the target oil reservoir in a preset time period and the total reserves of the target oil reservoir;
[0201] The recovery factor of the target oil reservoir is determined based on the total oil production in the preset time period and the total reserves.
[0202] In an optional embodiment, the reservoir production prediction model includes:
[0203] Vertical well and horizontal well combination production prediction model and dual horizontal well production prediction model.
[0204] In an optional embodiment, the production prediction model of the target oil reservoir includes production prediction models corresponding to various stages of production changes, and the various stages of production changes include: an ascending stage, a stable stage, and a decaying stage, wherein the production prediction models corresponding to the ascending stage and the decaying stage are different.
[0205] In an optional implementation, the various stages of the output change include: a rising stage, a stable stage, and a decay stage, and the determination model 1002 includes:
[0206] A first determining subunit is used to determine, at the end of preheating, a first duration to an initial node of the rising phase and first daily oil production data at the initial node;
[0207] A second determination subunit is used to determine, based on the production prediction model, a second time duration from the initial node to the starting node of the stable phase and second daily oil production data at the starting node when the height of the steam chamber is equal to the thickness of the oil layer above the horizontal section of the horizontal well;
[0208] a third determination subunit, configured to determine, based on the production prediction model and the second daily oil production data, a third time period from the start node of the stable phase to the end node of the stable phase, and third daily oil production data at the end node, wherein the second daily oil production data is equal to the third daily oil production data;
[0209] The fourth determination subunit is used to determine the fourth daily oil production data of the terminal node in the attenuation stage and the fourth time length from the end node to the terminal node based on the daily oil production when approaching the limit oil-gas ratio and the production prediction model.
[0210] In an optional implementation manner, the fourth determining subunit is configured to:
[0211] Determining fourth daily oil production data of the terminal node in the decay phase based on the daily oil production when the oil-gas ratio is close to the limit;
[0212] Based on the fourth daily oil production data and the production prediction model, a fourth time duration from the end node to the terminal node is determined.
[0213] In an optional implementation, the first prediction module 1003 includes:
[0214] A first obtaining unit is used to obtain a functional relationship between the time and the output in each stage through fitting based on the node data of each stage of the output change;
[0215] An obtaining unit, used for obtaining a functional relationship between the time and the output of each stage, and obtaining a functional relationship between the average daily oil production of each stage;
[0216] The first prediction subunit is used to predict the average daily oil production of each stage based on the functional relationship of the average daily oil production of each stage and the node data of each stage.
[0217] In an optional implementation, the second prediction module 1004 includes:
[0218] A second obtaining module is used to obtain the oil production of each stage in a preset time period based on the average daily oil production of each stage and the node data of each stage;
[0219] The second prediction subunit is used to predict the total oil production of the target oil reservoir in the preset time period based on the oil production in the preset time period of each stage.
[0220] In an optional embodiment, it also includes: an application module for analyzing and evaluating the development effect or determining the oil production index for the preset time period in the opening plan based on the predicted total oil production of the target oil reservoir for the preset time period.
[0221] In an optional implementation, the production prediction model of the target oil reservoir is specifically obtained by modifying the original production prediction model based on the reservoir parameters of the target oil reservoir;
[0222] The method of modifying the original production prediction model based on the reservoir parameters of the target reservoir includes:
[0223] Based on the relationship between the available pressure head coefficient and the expansion angle of the steam chamber in the reservoir parameters of the target reservoir and the effective length of the horizontal well, the original production prediction model is modified.
[0224] Embodiment 3
[0225] Based on the same inventive concept, an embodiment of the present invention provides a computer device, such as Fig.11 As shown, it includes a memory 1104, a processor 1102, and a computer program stored in the memory 1104 and executable on the processor 1102. When the processor 1102 executes the program, the steps of the above-mentioned SAGD production prediction method are implemented.
[0226] Among them, Fig.11In the embodiment of the present invention, a bus architecture (represented by bus 1100) is shown, and bus 1100 may include any number of interconnected buses and bridges, and bus 1100 links various circuits including one or more processors represented by processor 1102 and memory represented by memory 1104. Bus 1100 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 1106 provides an interface between bus 1100 and receiver 1101 and transmitter 1103. Receiver 1101 and transmitter 1103 may be the same element, namely a transceiver, providing a unit for communicating with various other devices over a transmission medium. Processor 1102 is responsible for managing bus 1100 and general processing, while memory 1104 may be used to store data used by processor 1102 when performing operations.
[0227] Embodiment 4
[0228] Based on the same inventive concept, a fourth embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, which implements the steps of the above-mentioned SAGD production prediction method when executed by a processor.
[0229] The algorithm and display provided herein are not inherently related to any particular computer, virtual system or other device. Various general purpose systems can also be used together with the teachings based on this. According to the above description, it is obvious that the structure required for constructing such systems. In addition, the present invention is not directed to any specific programming language either. It should be understood that various programming languages can be utilized to realize the content of the present invention described herein, and the description of the above specific languages is for disclosing the best mode of the present invention.
[0230] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.
[0231] Similarly, it should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, this disclosed method should not be interpreted as reflecting the intention that the claimed invention requires more features than those explicitly recited in each claim. More specifically, as reflected in the claims below, inventive aspects lie in less than all the features of the individual embodiments disclosed above. Therefore, the claims that follow the specific embodiment are hereby expressly incorporated into the specific embodiment, with each claim itself serving as a separate embodiment of the present invention.
[0232] Those skilled in the art will appreciate that the modules in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or components in the embodiments may be combined into one module or unit or component, and in addition they may be divided into a plurality of submodules or subunits or subcomponents. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this manner may be combined in any combination. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature providing the same, equivalent or similar purpose.
[0233] In addition, those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims below, any one of the claimed embodiments may be used in any combination.
[0234] The various component embodiments of the present invention may be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. Those skilled in the art should understand that a microprocessor or digital signal processor (DSP) may be used in practice to implement some or all of the functions of some or all of the components of a prediction device for SAGD production or a computer device according to an embodiment of the present invention. The present invention may also be implemented as a device or device program (e.g., a computer program and a computer program product) for executing part or all of the methods described herein. Such a program for implementing the present invention may be stored on a computer-readable medium, or may be in the form of one or more signals. Such a signal may be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.
[0235] It should be noted that the above embodiments illustrate the present invention rather than limit it, and that those skilled in the art may devise alternative embodiments without departing from the scope of the appended claims. In the claims, any reference symbol between brackets shall not be construed as a limitation on the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "one" or "an" preceding an element does not exclude the presence of a plurality of such elements. The present invention may be implemented by means of hardware comprising a number of different elements and by means of a suitably programmed computer. In a unit claim enumerating a number of devices, several of these devices may be embodied by the same hardware item. The use of the words first, second, and third, etc., does not indicate any order. These words may be interpreted as names.
Claims
1. A method for predicting SAGD production, characterized in that: include: Acquire a well pattern combination mode of a target oil reservoir, and determine a production prediction model of the target oil reservoir based on the well pattern combination mode; Based on the yield prediction model, determining node data of each stage of yield change; Based on the node data of each stage of the production change, predict the average daily oil production of each stage; Based on the average daily oil production of each stage and the node data of each stage, predicting the total oil production of the target oil reservoir in a preset time period; The average daily oil production at each stage is predicted based on the node data at each stage of the production change, including: Based on the node data of each stage of the output change, a functional relationship between the time and the output of each stage is obtained through fitting; Based on the functional relationship between the time and the output of each stage, a functional relationship of the average daily oil output of each stage is obtained; Based on the functional relationship of the average daily oil production in each stage and the node data in each stage, predict the average daily oil production in each stage; The various stages of the production change include: a rising stage, a stable stage, and a decay stage. The node data of each stage of the production change is determined based on the production prediction model, including: At the end of preheating, determining a first duration to an initial node of the rising phase and first daily oil production data at the initial node; Based on the production prediction model, when the height of the steam chamber is equal to the thickness of the oil layer above the horizontal section of the horizontal well, determining the second time duration from the initial node to the starting node of the stable phase, and the second daily oil production data at the starting node; Based on the production prediction model and the second daily oil production data, determining a third time period from the start node of the stable phase to the end node of the stable phase, and third daily oil production data at the end node, wherein the second daily oil production data is equal to the third daily oil production data; Based on the daily oil production when approaching the limit oil-gas ratio and the production prediction model, determining the fourth daily oil production data of the terminal node in the attenuation stage and the fourth time length from the terminal node to the terminal node; The fourth daily oil production data of the terminal node in the attenuation stage and the fourth time length from the terminal node to the terminal node are determined based on the daily oil production when the oil-gas ratio is close to the limit and the production prediction model, including Determining fourth daily oil production data of the terminal node in the decay phase based on the daily oil production when the oil-gas ratio is close to the limit; Determining a fourth duration from the end node to the terminal node based on the fourth daily oil production data and the production prediction model; The production prediction model of the target oil reservoir is specifically obtained by modifying the original production prediction model based on the reservoir parameters of the target oil reservoir; The method of modifying the original production preset model based on the reservoir parameters of the target reservoir includes: Based on the relationship between the available pressure head coefficient and the expansion angle of the steam chamber in the reservoir parameters of the target reservoir and the effective length of the horizontal well, the original production prediction model is modified.
2. The prediction method according to claim 1, characterized in that: After predicting the total oil production of the target reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage, the method further includes: Obtaining the total oil production of the target oil reservoir in a preset time period and the total reserves of the target oil reservoir; The recovery factor of the target oil reservoir is determined based on the total oil production in the preset time period and the total reserves.
3. The prediction method according to claim 1, characterized in that: The target reservoir production prediction model includes: Vertical well and horizontal well combination production prediction model and dual horizontal well production prediction model.
4. The prediction method according to claim 1, characterized in that: The production prediction model of the target oil reservoir includes production prediction models corresponding to various stages of production change, wherein the production prediction models corresponding to the rising stage and the attenuation stage are different.
5. The prediction method according to claim 1, characterized in that: The method of predicting the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage includes: Based on the average daily oil production of each stage and the node data of each stage, the oil production of each stage in a preset time period is obtained; Based on the oil production in the preset time period of each stage, the total oil production of the target oil reservoir in the preset time period is predicted.
6. The prediction method according to claim 1, characterized in that: After predicting the total oil production of the target reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage, the method further includes: Based on the predicted total oil production of the target reservoir in a preset time period, the development effect is analyzed and evaluated or a development plan is compiled.
7. A SAGD production prediction device, the prediction device is used to implement the method according to any one of claims 1 to 6, characterized in that: include: An acquisition module, used for acquiring a well pattern combination mode of a target oil reservoir, and determining a production prediction model of the target oil reservoir based on the well pattern combination mode; A determination module, used to determine node data of each stage of yield change based on the yield prediction model; A first prediction module is used to predict the average daily oil production in each stage based on the node data of each stage of the production change; The second prediction module is used to predict the total oil production of the target oil reservoir in a preset time period based on the average daily oil production of each stage and the node data of each stage.
8. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method steps according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method steps as claimed in any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Obtaining method and device of gas assisted dosage in steam assisted gravity drainage process
CN104389568A
Peak capacity determining method for SAGD well
CN106285630A
Method for predicting steam assisted gravity drainage development indexes of new development areas
CN107545102A
Method for predicting middle and later period yield profile in production well by using SAGD
CN111461458A
Method for estimation of SAGD process characteristics
US20110288778A1
