For SF 6 Monitoring module of inflation and deflation recovery device and flow meter correction method

By using the calibration container and pressure sensor in the monitoring module of the SF6 gas recovery device to calculate the correction coefficient of the flow meter, the deviation problem between the flow meter reading and the actual flow rate is solved, and the accuracy of the monitoring results and the applicability of intelligent transformation are improved. sex.

CN114440133BActive Publication Date: 2024-10-15HENAN PINGGAO ELECTRIC +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111555430.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-17
Publication Date
2024-10-15
Estimated Expiration
2041-12-17

AI Technical Summary

Technical Problem

There is a deviation between the flow meter reading of the existing SF6 gas recovery device and the actual flow rate, resulting in a large error in the monitoring results, which cannot meet the needs of intelligent transformation.

Method used

A monitoring module for SF6 inflation and deflation recovery device is designed, which includes gas pipelines, flow meters, calibration containers and valves. The correction coefficient of the flow meter is calculated through the pressure difference of the calibration container, and then the actual flow value is obtained, and A pressure sensor is installed at the GIS interface to calculate the air chamber volume.

Benefits of technology

It improves the accuracy of the monitoring results of the gas filling and recovery device, reduces the amount of gas required for flow meter correction, saves time, and enhances the intelligent function of the device. It is suitable for intelligent manufacturing and Internet of Things environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114440133B_ABST
    Figure CN114440133B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of real-time monitoring of gas during GIS inflation and deflation, and specifically to a monitoring module for SF6 inflation and deflation recovery devices and a flow meter correction method. The monitoring module for SF6 inflation and deflation recovery devices comprises a gas pipeline, wherein the gas pipeline has a GIS interface for connecting to the GIS and a gas recovery device interface for connecting to the gas recovery device. The gas pipeline is provided with a flow meter for monitoring the gas flow in the gas pipeline, a calibration container for storing gas and a valve in sequence along the direction of gas flow. The valve is used to close in the initial stage of gas flow and open after the flow meter is corrected. The calibration container is a container with a constant volume. The gas pipeline is also provided with a calibration container pressure detection structure for detecting the internal pressure of the calibration container.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of real-time monitoring of gas during GIS inflation and deflation, and in particular to a monitoring module for SF6 inflation and deflation recovery devices and a flow meter deviation correction method. Background Art

[0002] With the development and application of technologies such as intelligent manufacturing and the Internet of Things, traditional manufacturing has gradually shifted from mechanization, electrification, and digitization to networking, dataization, and intelligent manufacturing. The demand for intelligent recovery device products is also gradually increasing. With the promotion of the construction of ubiquitous power Internet of Things, new requirements have been put forward for the equipment operation management, status monitoring, data transmission, etc. of the recovery device, and the intelligent transformation of existing equipment (such as oil filter and SF6 gas recovery device) has begun.

[0003] At present, the automation and intelligence levels of SF6 gas recovery devices on the domestic and foreign markets are low, and some are still at the level of manual operation or electric button control. They do not have functions such as remote monitoring and data transmission, and can no longer meet the growing needs of the market.

[0004] In the prior art, the patent document CN113504152A discloses a SF6 gas chamber gas recovery device based on the diversion method, which includes a main gas path. The downstream of the main gas path for recovering gas is divided into three sub-gas paths. The main gas path is provided with a sensor, and two of the sub-gas paths are provided with flow meters and valves for controlling the opening and closing of the gas paths. When the valve is opened, the ratio of the gas flow through each gas path is certain. When recovering the gas, the real-time flow in each gas path is calculated by multiplying the ratio between the gas paths by the reading of the flow meter in the corresponding gas path, thereby calculating the actual flow of the recovered gas in the GIS gas chamber, the volume of the GIS gas chamber and the gas recovery rate of the gas recovery device.

[0005] Although the above-mentioned device can realize real-time monitoring of the flow rate of the gas recovery device and calculation of various numerical values, they are all obtained through corresponding calculations based on the actual readings of the flow meter. During the use of the flow meter, there will be a deviation between the readings and the actual flow rate. If the flow meter is not corrected, the above-mentioned various numerical values ​​calculated based on the flow meter readings are inaccurate, resulting in large errors in the monitoring results. Summary of the invention

[0006] The purpose of the present invention is to provide a monitoring module for SF6 gas filling and degassing recovery device to solve the technical problem that the flow meter in the prior art is inaccurate and causes large errors in the monitoring results. The present invention also provides a flow meter correction method to solve the technical problem that the flow meter in the prior art is inaccurate and causes large errors in the monitoring results.

[0007] To achieve the above-mentioned purpose, the technical solution of the monitoring module for SF6 inflation and deflation recovery device provided by the present invention is: the monitoring module for SF6 inflation and deflation recovery device includes a gas pipeline, the gas pipeline has a GIS interface for connecting to a GIS and a gas recovery device interface for connecting to a gas recovery device, the gas pipeline is provided with a flow meter for monitoring the gas flow in the gas pipeline, a calibration container for storing gas and a valve in sequence along the direction of gas flow, the valve is used to close in the initial stage of gas flow and open after the flow meter is corrected, the calibration container is a container with a constant volume, and the gas pipeline is also provided with a calibration container pressure detection structure for detecting the internal pressure of the calibration container.

[0008] The beneficial effect is that: the monitoring module for the SF6 inflation, deflation and recovery device provided by the present invention is different from the prior art. A calibration container is arranged on the gas pipeline downstream of the flow meter. According to the constant volume characteristic of the calibration container, the gas can be stored in the calibration container, and then, when the valve is closed, the actual flow rate can be calculated by multiplying the pressure difference of the calibration container before and after the gas enters the calibration container measured by the gas detection device of the calibration container and the volume of the calibration container. The correction coefficient of the flow meter can be obtained according to the quotient of the actual flow rate and the pressure difference of the flow meter before and after the gas enters, and the error between the flow meter reading and the actual flow value flowing through the flow meter can be obtained, which is conducive to obtaining a more accurate actual flow value and improving the accuracy of the monitoring results of the gas inflation and recovery device. The calibration container can also play a certain buffering role on the gas in the gas pipeline, making the gas in the gas pipeline more stable.

[0009] As a further improvement, the calibration container and the valve are provided on both sides of the flow meter.

[0010] The beneficial effect is that calibration containers and valves are arranged on both sides of the flow meter, which can not only correct the flow meter when the gas is charged and the recovery device recovers the gas, but also correct the flow meter when the gas is charged and the recovery device is charged, thereby increasing the function of the monitoring module for the SF6 charging and degassing recovery device.

[0011] As a further improvement, the calibration container pressure detection structure is arranged on the calibration container.

[0012] The beneficial effects are: the calibration container pressure detection structure is directly set on the calibration container, and there is no need to set a gas transportation pipeline between the two, which is beneficial to improving the accuracy of the measurement results of the calibration container pressure detection device, and can also reduce the amount of gas required for flow meter correction, saving time, and is beneficial to improving the correction efficiency of the flow meter.

[0013] As a further improvement, a filter is further provided on the gas pipeline, and the filter is located upstream of the flow meter during gas recovery.

[0014] The beneficial effect is that the setting of the filter can filter the gas recovered from the GIS, thereby preventing the debris in the GIS from contaminating the gas charging and recovery device.

[0015] As a further improvement, the gas pipeline is provided with a first pressure sensor which is always connected to the GIS interface and is used to measure the gas chamber pressure of the GIS.

[0016] The beneficial effect is that by setting the first pressure sensor at the GIS interface, the gas chamber volume of the GIS can be calculated according to the pressure of the GIS measured by the pressure sensor, which is beneficial to increase the function of the monitoring module used for the SF6 inflation and deflation recovery device, and further helps to improve the scope of application.

[0017] The technical solution of the flowmeter correction method provided by the present invention is: the flowmeter correction method collects the initial pressure value P0 of the calibration container on the gas pipeline and the initial flow value Q0 of the flowmeter on the gas pipeline, keeps the valve downstream of the calibration container closed and allows the gas to flow through the flowmeter into the calibration container, closes the valve after a set time interval and reads the pressure value P1 of the calibration container and the flow value Q1 of the flowmeter, calculates the correction coefficient K according to the formula Q=(P1-P0)*V and the formula K=(Q1-Q0) / Q, where V is the volume of the calibration container; and obtains the actual flow value of the flowmeter by multiplying the correction coefficient K by the reading of the flowmeter.

[0018] The beneficial effect is that the flow meter correction method provided by the present invention can correct the flow meter to more accurately obtain the actual flow value of the gas flowing through the flow meter, which is beneficial to improving the accuracy of the monitoring results of the gas inflation and recovery device.

[0019] As a further improvement, calibration containers and valves are provided on both sides of the flow meter. When the flow meter is rectified, the valve upstream of the flow meter is opened and the valve downstream is kept closed.

[0020] The beneficial effect is that calibration containers and valves are arranged on both sides of the flow meter, which can not only correct the flow meter when the gas is charged and the recovery device recovers the gas, but also correct the flow meter when the gas is charged and the recovery device is charged, thereby increasing the function of the monitoring module for the SF6 charging and degassing recovery device.

[0021] As a further improvement, a calibration container pressure detection structure is provided on the calibration container.

[0022] The beneficial effect is that the pressure in the calibration container can be accurately measured by arranging the calibration container tank pressure detection structure on the calibration container.

[0023] As a further improvement, a filter is further provided on the gas pipeline, and the filter is located upstream of the flow meter during gas recovery.

[0024] The beneficial effect is that the setting of the filter can filter the gas recovered from the GIS, thereby preventing the debris in the GIS from contaminating the gas charging and recovery device.

[0025] As a further improvement, the gas pipeline is provided with a GIS interface for connecting to the GIS, and the gas pipeline is provided with a first pressure sensor which is always connected to the GIS interface. Before gas recovery or inflation, the initial pressure value P of the first pressure sensor is recorded. 10 When the gas is recovered or inflated, the gas pipeline is kept unobstructed. When the reading of the first pressure sensor reaches the set value P 11 After that, disconnect the gas pipeline, close the valve located downstream of the flow meter, and record the reading of the first pressure sensor P at this time. 12 And the cumulative flow value Q3 of the flow meter, then according to the ideal gas state equation, according to the formula V = (Q3-Q2) / (P 12 -P 01 ) can calculate the air chamber volume V of the corresponding GIS.

[0026] The beneficial effect is: a first pressure sensor is set at the GIS interface, and the gas chamber volume of the GIS is calculated according to the pressure of the GIS measured by the pressure sensor, which is beneficial to increase the function of the monitoring module used for the SF6 inflation and deflation recovery device, and further helps to improve the scope of application. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A schematic diagram of the assembly of the monitoring module for the SF6 inflation and deflation recovery device provided by the present invention, the GIS and the recovery device;

[0028] Figure 2 This is a schematic diagram of the assembly of the second embodiment of the monitoring module for the SF6 inflation and deflation recovery device provided by the present invention, the GIS and the recovery device.

[0029] Explanation of the reference numerals: 1. GIS; 2. First manual valve; 3. First pressure sensor; 4. Filter; 5. First solenoid valve; 6. Flow meter; 7. Calibration container; 8. Second pressure sensor; 9. Second solenoid valve; 10. Third pressure sensor; 11. Second manual valve; 12. Recovery device; 13. Control system; 14. Barcode scanner; 15. Printer; 16. Cloud monitoring module; 17. Other intelligent modules; 18. Recovery device remote control system; 19. Pressure gauge. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.

[0031] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.

[0032] It should be noted that, in the specific implementation of the present invention, the terms that may appear, such as "first" and "second", etc., are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply the existence of such an actual relationship or order between these entities or operations. Moreover, the terms that may appear, such as "include", "comprise" or any other variants thereof, are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements that are not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the phrase "including a ..." and other defined elements that may appear do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0033] In the description of the present invention, unless otherwise clearly specified and limited, the terms that may appear, such as "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0034] In the description of the present invention, unless otherwise clearly specified and limited, the term "provided with" that may appear should be understood in a broad sense. For example, the object "provided with" may be a part of the body, or may be arranged separately from the body and connected to the body, and the connection may be a detachable connection or an inseparable connection. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] The present invention is further described in detail below in conjunction with embodiments.

[0036] Embodiment 1 of the monitoring module for SF6 gas filling and degassing recovery device provided in the present invention:

[0037] like Figure 1 As shown, the monitoring module for the SF6 filling and recovery device includes a gas pipeline, and a GIS interface and a recovery device interface are respectively provided at both ends of the gas pipeline. In this embodiment, the GIS interface is located at the left end of the gas pipeline, and is connected to the gas chamber of GIS1 through the first manual valve 2. The recovery device interface is located at the right end of the gas pipeline, and is connected to the recovery device 12 through the second manual valve 11.

[0038] A first pressure sensor 3, a filter 4, a first solenoid valve 5, a flow meter 6, a calibration container 7 and a calibration container pressure detection structure arranged on the calibration container 7, a second solenoid valve 9 and a third pressure sensor 10 are arranged from left to right between the GIS interface 2 and the recovery device 12. The above-mentioned components are all prior arts, and the specific structures of the components are not described here. Only the specific functions and working states of the components are described.

[0039] The first pressure sensor 3 is directly connected to the GIS interface. When the first solenoid valve 5, the second solenoid valve 9 or the second manual valve 11 is closed, the value measured by the first pressure sensor 3 is the pressure value in the gas chamber of GIS1; the filter 4 is arranged between the first manual valve 2 and the first solenoid valve 5. The filter 4 is used to filter the gas discharged from GIS1 during gas recovery to prevent the debris in GIS1 from entering the components on the right side of the filter 4 and the recovery device 12 on the gas pipeline, thereby avoiding contamination of the flow meter 6, the calibration container 7 and the recovery device 12; the flow meter 6 is used to monitor the cumulative flow of the gas flowing through itself in real time, so as to determine the amount of gas that has been recovered in GIS1.

[0040] The calibration container 7 is arranged on the right side of the flow meter 6, and is used to store the gas discharged from the GIS1 when the second solenoid valve 9 is closed. The volume of the calibration container 7 is known and constant. The calibration container 7 is provided with a second pressure sensor 8 and a pressure gauge 19. The second pressure sensor 8 and the pressure gauge 19 constitute a calibration container pressure detection structure. The calibration container pressure detection structure cooperates with the flow meter 6 to correct the deviation of the flow meter 6. The third pressure sensor 10 is arranged between the second solenoid valve 9 and the second manual valve 11. When the first solenoid valve 5 is closed, the pressure value measured by the third pressure sensor 10 is the pressure value in the recovery device 12. The third pressure sensor 10 and the first pressure sensor 3 are the same as the second pressure sensor 8. Pressure gauges 19 are additionally arranged at the same position, so that the operator can intuitively observe the pressure values ​​at various locations.

[0041] like Figure 1 As shown, the monitoring module is also provided with a control system 13, and the above-mentioned components are all connected to the control system 13, and the control system 13 receives the information fed back by the components and automatically controls the start and shut down of the components. Also connected to the control system 13 are a barcode scanner 14, a printer 15, a cloud monitoring module 16, a recycling device remote control system 18 and other intelligent modules 17. The operator can observe various information in the monitoring module through the cloud monitoring module 16, and control the operation of the recycling device 12 through the remote control system 13 of the recycling device 12. The operator can scan through the barcode scanner 14 or manually input various control information.

[0042] The monitoring module for the SF6 inflation and deflation recovery device provided by the present invention has four functions: flow meter 6 deviation correction, gas recovery rate calculation, GIS1 gas chamber volume measurement and gas recovery total amount statistics.

[0043] When the flowmeter 6 is corrected, the initial pressure value P0 of the calibration container 7 and the initial flow value Q0 of the flowmeter 6 are collected before the first solenoid valve 5 and the second solenoid valve 9 are opened, and then the first solenoid valve 5 is opened, and the second solenoid valve 9 is kept closed to allow the gas to flow into the calibration container 7. After a set time interval, the first solenoid valve 5 is closed and the pressure value P1 of the calibration container 7 and the flow value Q1 of the flowmeter 6 are read. Then, according to the formula Q=(P1-P0)*V, the actual cumulative flow Q of the flowmeter 6 can be obtained, and then according to the formula K=(Q1-Q0) / Q, the correction coefficient K of the flowmeter 6 can be calculated, where V is the volume of the calibration container 7. Therefore, in the subsequent gas recovery, the actual flow value of the flowmeter 6 can be obtained by multiplying the correction coefficient K with the reading of the flowmeter 6. Since the gas temperature does not change much during the inflation and recovery process, and the thermal mass flowmeter is used in this embodiment, the flowmeter 6 itself has a temperature compensation function, so when performing flow correction, it is not necessary to consider the influence of temperature changes on the correction accuracy. However, if a flow meter 6 without temperature compensation is selected in other embodiments and the ambient temperature changes greatly, a temperature sensor can be added at the GIS interface and the recovery device interface, and the temperature information can be imported into the control system 13 according to the ideal gas state equation to perform temperature compensation in the control program.

[0044] The calculation of the gas recovery rate, the measurement of the gas chamber volume of GIS1 and the calculation of the total amount of gas recovery are implemented in the gas recovery operation. Specifically, before the gas recovery operation is performed, the control system 13 first collects and records the initial pressure value P of the first pressure sensor 3. 10, the initial cumulative flow value Q2 of the flow meter 6, and then open the first solenoid valve 5 and the second solenoid valve 9, allowing the gas to flow through each component along the gas pipeline in sequence and enter the recovery device 12. When the control system 13 monitors that the pressure value of the first pressure sensor 3 reaches P 11 When the pressure value of the first pressure sensor 3 is P, the second solenoid valve 9 is closed and the first solenoid valve 5 is kept open. 12 and the cumulative flow value Q3 of the flow meter 6, and then according to the ideal gas state equation, according to the formula V = (Q3-Q2) / (P 12 -P 01 ) can calculate the volume V of the gas chamber of GIS1. After calculating the volume V of the gas chamber, it is convenient to intuitively understand the situation of the gas chamber in GIS1 and to facilitate data collection in the background. Then open the second solenoid valve 9 to continue the gas recovery operation. When the gas recovery is completed, the control system 13 automatically records the final pressure value P in the gas chamber of GIS1. 13 and the final cumulative flow value Q4 of the flow meter 6, the automatic control program of the control system 13 can calculate the total amount of gas Q recovered by the recovery device 12 in a single gas recovery operation according to the formula Q=Q4-Q3, and the gas recovery rate Ra of the gas chamber SF6 can be calculated according to the formula Ra=(P 10 -P 13 ) / P 13 *100% derived.

[0045] The monitoring module for the SF6 inflation and degassing recovery device provided by the present invention is different from the prior art. A calibration container 7 is arranged downstream of the flow meter 6 on the gas pipeline. According to the constant volume characteristic of the calibration container 7, the gas can be stored in the calibration container 7. Then, when the valve is closed, the actual flow rate can be calculated by multiplying the pressure difference of the calibration container 7 before and after the gas enters the calibration container 7 measured by the gas detection device of the calibration container 7 and the volume of the calibration container 7. The correction coefficient of the flow meter 6 can be obtained according to the quotient of the actual flow rate and the pressure difference of the flow meter 6 before and after the gas enters, and the error between the reading of the flow meter 6 and the actual flow value flowing through the flow meter 6 can be obtained, which is conducive to obtaining a more accurate actual flow value and improving the accuracy of the monitoring results of the gas inflation and recovery device during recovery.

[0046] In actual use, by adding the monitoring module of the present invention to the existing SF6 gas recovery device, intelligent transformation can be achieved. The equipment is expected to sell 60 units per year, with a single unit price of about 60,000 yuan, and can generate an annual output value of about 3.6 million yuan.

[0047] Among them, in this embodiment, the flow meter 6 is corrected only during the SF6 recovery process. The second solenoid valve 9 constitutes a valve located downstream of the flow meter 6. By closing the valve at the initial stage of flow, the flow meter 6 can be corrected.

[0048] In addition, it should be noted that, in the present embodiment, the filter 4 only filters the gas during the gas recovery process. For the process of the recovery device 12 inflating the GIS1, the filter 4 no longer filters the gas. In actual use, a filter will be added at the GIS interface.

[0049] In actual use, the flow meter needs to be calibrated not only after long-term use, but also when the size of the GIS interface and the recovery device interface changes, the flow meter needs to be calibrated to ensure the accuracy of subsequent data.

[0050] Embodiment 2 of the monitoring module for SF6 gas filling and degassing recovery device provided in the present invention:

[0051] The difference between this embodiment and embodiment 1 is that: in embodiment 1, a calibration container 7 is provided on the right side of the flow meter 6, and the flow rate and correction coefficient can be calculated by the flow rate of the flow meter 6 and the pressure value of the calibration container 7, so as to realize the correction of the flow meter 6 in the gas recovery operation. Figure 2 As shown, a calibration container 7 is added between the flow meter 6 and the first solenoid valve 5. Similarly to Embodiment 1, the flow meter 6 and the calibration container 7 located on the left side of the flow meter 6 can be used to correct the deviation of the flow meter 6 during the gas charging operation. At this time, both the first solenoid valve 5 and the second solenoid valve 9 are valves located downstream of the flow meter 6 when in use.

[0052] Of course, in other embodiments, the calibration container 7 may be provided only between the first solenoid valve 5 and the flow meter 6, and only the flow meter 6 is corrected during the gas charging operation.

[0053] Embodiment 3 of the monitoring module for SF6 gas filling and degassing recovery device provided in the present invention:

[0054] The difference between this embodiment and embodiment 1 is that in embodiment 1, the calibration container detection structure is directly installed on the calibration container 7. In this embodiment, the calibration container detection structure is arranged between the calibration container 7 and the second solenoid valve 9, and the calibration container detection structure is connected to the flow meter 6 through the gas pipeline.

[0055] Embodiment 4 of the monitoring module for SF6 gas filling and degassing recovery device provided in the present invention:

[0056] The difference between this embodiment and embodiment 1 is that in embodiment 1, a filter 4 is provided on the gas pipeline. In this embodiment, the filter 4 is no longer provided on the gas pipeline, but filters are provided at the GIS and the recovery device.

[0057] The present invention also provides an embodiment of a flow meter deviation correction method:

[0058] When the flowmeter 6 is corrected, the initial pressure value P0 of the calibration container 7 and the initial flow value Q0 of the flowmeter 6 are collected before the first solenoid valve 5 and the second solenoid valve 9 are opened, and then the first solenoid valve 5 is opened, and the second solenoid valve 9 is kept closed to allow the gas to flow into the calibration container 7, and then the first solenoid valve 5 is closed and the pressure value P1 of the calibration container 7 and the flow value Q1 of the flowmeter 6 are read, and then the actual cumulative flow Q of the flowmeter 6 can be obtained according to the formula Q=(P1-P0)*V, and then the correction coefficient K of the flowmeter 6 can be calculated according to the formula K=(Q1-Q0) / Q, where V is the volume of the calibration container 7. Therefore, in the subsequent gas recovery, the actual flow value Q of the flowmeter 6 can be obtained by multiplying the correction coefficient K by the flowmeter 6 reading Q2.

[0059] In this embodiment, all components used for the flow meter 6 to correct deviation are the structures in the monitoring module embodiment 1 for the SF6 inflation and deflation recovery device.

[0060] At the same time, the monitoring module of the SF6 gas filling and degassing recovery device can also realize the calculation of the gas recovery rate, the measurement of the gas chamber volume of GIS1 and the calculation of the total amount of gas recovery in the gas recovery operation. Specifically, before the gas recovery operation is performed, the control system 13 first collects and records the initial pressure value P of the first pressure sensor 3. 10 , the initial cumulative flow value Q2 of the flow meter 6, and then open the first electromagnetic valve 5 and the second electromagnetic valve 9, allowing the gas to flow through each component along the gas pipeline in sequence and enter the recovery device 12. When the control system 13 monitors that the pressure value of the first pressure sensor 3 reaches P 11 When the second electromagnetic valve 9 is closed, the first electromagnetic valve 5 is kept open, and the pressure value of the first pressure sensor 3 at this time is recorded as P 12 and the cumulative flow value Q3 of the flow meter 6, and then according to the ideal gas state equation, according to the formula V = (Q3-Q2) / (P 12 -P 01 ) can calculate the gas chamber volume V of GIS1. Then open the second solenoid valve 9 to continue the gas recovery operation. When the gas recovery is completed, the control system 13 automatically records the final pressure value P in the gas chamber of GIS1. 13and the final cumulative flow value Q4 of the flow meter 6, the automatic control program of the control system 13 can calculate the total amount of gas recovered by the recovery device 12 in a single gas recovery operation according to the formula Q=Q4-Q2, and the gas recovery rate Ra of the gas chamber SF6 can be calculated according to the formula Ra=(P 10 -P 13 ) / P 13 *100% derived.

[0061] The flow meter correction method provided by the present invention can correct the flow meter 6 and more accurately obtain the actual flow value of the gas flowing through the flow meter 6, which is beneficial to improving the accuracy of the monitoring results of the gas filling and recovery device 12.

[0062] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. The patent protection scope of the present invention shall be based on the claims. All equivalent structural changes made using the description and drawings of the present invention should be included in the protection scope of the present invention.

Claims

1. For SF 6 Monitoring module for inflation and deflation recovery devices, It is characterized in that The invention comprises a gas pipeline and a control system. The gas pipeline has a GIS interface for connecting to a GIS and a gas recovery device interface for connecting to a gas recovery device. The gas pipeline is provided with a flow meter for monitoring the gas flow in the gas pipeline, a calibration container for storing gas and a valve in sequence along the direction of gas flow. The valve is used to close in the initial stage of gas flow and open after the flow meter is rectified. The calibration container is a container with a constant volume. The gas pipeline is also provided with a calibration container pressure detection structure for detecting the internal pressure of the calibration container. Calibration containers and valves are provided on both sides of the flow meter so that the flow meter can be rectified when the gas recovery device recovers gas and when the GIS is inflated. A first pressure sensor connected to the GIS interface is provided on the gas pipeline for measuring the gas chamber pressure of the GIS. The flow meter, the valve and the first pressure sensor are connected to the control system so that the control system can control the opening and closing of the valve and can receive information fed back by the flow meter and the first pressure sensor. The calibration container can buffer the gas in the gas pipeline. When working, the control system of the monitoring module collects the initial pressure value P of the calibration container on the gas pipeline. 0 and the initial flow value Q of the flow meter on the gas pipeline 0 Keep the valve downstream of the calibration container closed and allow the gas to flow through the flow meter into the calibration container. After a set time, close the valve and read the pressure value P of the calibration container. 1 And the flow value Q of the flow meter 1 According to the formula Q = (P 1 -P 0 )*V and the formula K=(Q 1 -Q 0 ) / Q to calculate the correction factor K, where V is the volume of the calibration container; the actual flow value of the flow meter is obtained by multiplying the correction factor K with the reading of the flow meter.

2. The method for SF according to claim 1 6 Monitoring module for inflation and deflation recovery devices, It is characterized in that The calibration container pressure detection structure is arranged on the calibration container.

3. The method for SF according to claim 1. 6 Monitoring module for inflation and deflation recovery devices, It is characterized in that The gas pipeline is also provided with a filter, which is located upstream of the flow meter during gas recovery.

4. The method for SF according to claim 1 6 Monitoring module for inflation and deflation recovery devices, It is characterized in that The first pressure sensor is always connected to the GIS interface.

5. A kind of SF 6 Method for modifying the inflation and deflation recovery device, It is characterized in that In the existing SF 6 A monitoring module is connected to the pipeline interface of the inflation and deflation recovery device, and the monitoring module is the monitoring module according to any one of claims 1 to 4. When working, the control system of the monitoring module collects the initial pressure value P of the calibration container on the gas pipeline. 0 and the initial flow value Q of the flow meter on the gas pipeline 0 Keep the valve downstream of the calibration container closed and allow the gas to flow through the flow meter into the calibration container. After a set time, close the valve and read the pressure value P of the calibration container. 1 And the flow value Q of the flow meter 1 According to the formula Q = (P 1 -P 0 )*V and the formula K=(Q 1 -Q 0 ) / Q to calculate the correction factor K, where V is the volume of the calibration container; the actual flow value of the flow meter is obtained by multiplying the correction factor K with the reading of the flow meter.

6. The SF according to claim 5 6 Method for modifying the inflation and deflation recovery device, It is characterized in that When performing flow meter correction, open the valve upstream of the flow meter and keep the downstream valve closed.

7. The SF according to claim 5 or 6 6 Method for modifying the inflation and deflation recovery device, It is characterized in that The calibration container is provided with a calibration container pressure detection structure.

8. The SF according to claim 5 or 6 6 Method for modifying the inflation and deflation recovery device. It is characterized in that The gas pipeline is also provided with a filter, which is located upstream of the flow meter during gas recovery.

9. The SF according to claim 5 or 6 6 Method for modifying the inflation and deflation recovery device, It is characterized in that The first pressure sensor is always connected to the GIS interface. Before gas recovery or inflation, record the initial pressure value P of the first pressure sensor. 10 and the initial flow value Q of the flowmeter 2 When the gas is recovered or inflated, keep the gas pipeline unobstructed. When the reading of the first pressure sensor reaches the set value P 11 After that, disconnect the gas pipeline, close the valve located downstream of the flow meter, and record the reading of the first pressure sensor P at this time. 12 And the cumulative flow value Q of the flow meter 3 Then according to the ideal gas state equation, according to the formula V = (Q 3 -Q 2 ) / (P 12 -P 01 ) The air chamber volume V of the corresponding GIS can be calculated.