A two-stage full-cycle rolling scheduling method

By dividing the intraday scheduling cycle of the power system into multiple segments, combining day-to-day scheduling, the problem of ignoring the full-day benefits of the fixed scheduling cycle is solved, and more efficient resource allocation and cost reduction are achieved.

CN114465228BActive Publication Date: 2024-11-26NANJING NORMAL UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111570705.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-21
Publication Date
2024-11-26
Estimated Expiration
2041-12-21

AI Technical Summary

Technical Problem

In the existing power system scheduling methods, the intraday scheduling cycle is fixed, which ignores the benefits within the day, resulting in the inaccurate and efficient scheduling plan.

Method used

The two-stage full-cycle rolling scheduling method is adopted to divide the intraday scheduling cycle into adjacent segments, transition segments and forward segments, dynamically adjust the scheduling cycle length, and optimize resource allocation through the combination of day-to-day scheduling and intraday scheduling.

Benefits of technology

It improves the accuracy of scheduling and computing efficiency, can better suppress the fluctuations and load curves of renewable energy generation, and reduce operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114465228B_ABST
    Figure CN114465228B_ABST
Patent Text Reader

Abstract

The present invention discloses a two-stage full-cycle rolling dispatching method, which belongs to the field of power system automation. The method comprises the following steps: step one, establishing a day-ahead dispatching model, and performing day-ahead dispatching calculations; step two, calculating each segment parameter of the intraday dispatching model; step three, establishing an intraday dispatching model, and performing intraday dispatching calculations according to the calculation results of step one and step two. The present invention adopts a rolling dispatching method, updates the day-ahead dispatching results and the intraday dispatching results according to the recent prediction results of load and renewable energy, improves the dispatching accuracy and calculation efficiency by setting the length of the dispatching range, optimizes the configuration of different types of resources in each stage, and achieves the optimization of social welfare.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of power system automation, and more specifically, relates to a two-stage full-cycle rolling dispatching method. Background Art

[0002] The development of renewable energy has made outstanding contributions to reducing the burning of fossil fuels and promoting sustainable social development. The integration of renewable resources into the power network, especially in large-scale power grids, brings some technical and operational challenges. Traditionally, the power system has relied on traditional generators to smooth the fluctuations and uncertainties of renewable energy generation. Under the high penetration rate of renewable resources, the role of traditional generators will change from mainly providing energy to providing reserves and backup power generation for intermittent renewable resources. In recent years, the rapid development of adjustable loads and electric vehicles has provided abundant load-side dispatching resources, providing a way to solve the problems encountered in the dispatching process of power generation sources. Energy storage resources, as a major flexible resource, help smooth the fluctuations of renewable energy generation and reshape the load curve.

[0003] However, in current research, the length of the intraday scheduling cycle is fixed (usually the next 2 hours), which causes the scheduling plan to only consider the current intraday scheduling cycle and ignore the benefits of the remaining time throughout the day. Summary of the invention

[0004] In view of the problem that the existing scheduling plan only considers the current intraday scheduling cycle and ignores the efficiency of the remaining time of the day, the present invention provides a two-stage full-cycle rolling scheduling method, which expands the scheduling range of the traditional model intraday scheduling to the full cycle, adopts the rolling scheduling method, and updates the day-ahead scheduling results and the intraday scheduling results according to the recent prediction results of load and renewable energy. By setting the length of the scheduling range, the scheduling accuracy and calculation efficiency are improved, and the optimal configuration of different types of resources in each stage is solved.

[0005] To solve the above problems, the present invention adopts the following technical solutions.

[0006] A two-stage full-cycle rolling scheduling method includes the following steps:

[0007] Step 1: Establish a day-ahead scheduling model and perform day-ahead scheduling calculations;

[0008] Step 2: Calculate the parameters of each segment of the intraday scheduling model;

[0009] Step 3: Establish an intraday scheduling model and perform intraday scheduling calculations based on the calculation results of steps 1 and 2.

[0010] Further technical solution, in step 1, a day-ahead scheduling model is established: the day-ahead scheduling cycle is 24 hours, the resolution is 1 hour, and the length of each period is ΔTTD =1h, total number of time periods N TD =24;

[0011] The objective function H of the day-ahead scheduling model is constructed by minimizing the cost DA :

[0012]

[0013] Where g represents the generator number, t represents the time period number, s represents the scene number, n represents the node number, w represents the wind turbine number, and N G is the number of generators, N S is the number of scenes, N TD is the total number of model time periods on the day before, N N is the total number of nodes, N W is the total number of wind turbines, ρ S is the probability of the scenario occurring, a g , b g , c g are the generator cost coefficients, P g,t,s is the output power of the g-th generator in the s-th scenario during period t; H st , H sh are the startup and shutdown costs of the generator respectively; h IN,n,t,s ,h DE,n,t,s are the costs required for the energy storage resources to increase and decrease in the scheduling amount in the sth scenario at the nth node and tth period; ES IN,n,t,s ,ES DE,n,t,s are the increase and decrease in the dispatch amount of energy storage resources in the sth scenario at the nth node and tth period; h L,n,t,s represents the load loss cost of the nth node in the sth scenario during the tth period; h C,w,t,s represents the wind cutting cost of the w-th wind turbine in the s-th scenario during period t; L n,t,s is the load loss of the nth node in the sth scenario during the tth period; C w,t,s is the wind cutting volume of the w-th wind turbine in the s-th scenario during the t-th period;

[0014] Set the constraints of the day-ahead dispatch model: active power balance constraint, generator start-up and shutdown state constraint, generator output upper and lower limit constraint, generator ramp constraint, energy storage resource upper and lower limit constraint and power constraint

[0015] Solve the day-ahead dispatch model to obtain the start-stop status u of the g-th wind turbine generator in period t g,t .

[0016] Further technical solutions,

[0017] Active power balance constraints:

[0018]

[0019] Among them, W w,t,s is the output power of the w-th wind turbine in the s-th scenario during period t, D n,t is the load power of the nth node in period t, and:

[0020] 0≤C w,t,s ≤W w,t,s

[0021] 0≤L n,t,s ≤D n,t,s

[0022] Generator start and stop state constraints:

[0023]

[0024] Among them, x g,t ,y g,t are the generator start and stop actions, u g,t represents the start and stop status of the g-th wind turbine in period t; u g,t-1 Represents the start and stop status of the g-th wind turbine in the t-1 period;

[0025] Generator output upper and lower limit constraints:

[0026] u g,t P min,g ≤P g,t,s ≤u g,t P max,g

[0027] Among them, P max,g and P min,g are the upper and lower limits of the output of the g-th wind turbine respectively;

[0028] Generator ramp constraints:

[0029] -RD g ≤P g,t,s -P g,t-1,s ≤RU g

[0030] Among them, RU g and RD g are the upper and lower bounds of the ramp rate of the g-th wind turbine, respectively. g,t-1,s is the output power of the g-th generator in the s-th scenario at time t-1;

[0031] Energy storage resource upper and lower limit constraints:

[0032]

[0033] Among them, ES IN,max,n,t,s , E.S. DE,max,n,t,s They are respectively the charging and discharging limits of the energy storage resource in the sth scenario at the nth node and tth period;

[0034] Power Constraints:

[0035] EQ n,t,s =EQ n,t-1,s +(ES IN,n,t-1,s -ES DE,n,t-1,s )

[0036] Among them, EQ n,t,s represents the amount of energy storage resources in the sth scenario at the nth node and tth period, EQ n,t-1,s represents the amount of energy storage resources in the sth scenario at the nth node in the t-1th period; ES IN,n,t-1,s ,ES DE,n,t-1,s They are respectively the increase and decrease in the scheduling amount of energy storage resources in the sth scenario at the nth node t-1 period.

[0037] Further technical solution, in step 3, the intraday scheduling cycle is divided into 3 sections:

[0038] The first segment is the adjacent segment: the resolution is 15 minutes, and the length of each segment is ΔT TIN =15min, total number of time periods N TIN =8, the length of the adjacent segment is 15min*8=2h;

[0039] The second section is the transition section: the resolution is recorded as ΔT TIM , each time period is ΔT TIM , the total number of time periods is N TIM =1;

[0040] The third segment is the long-term segment: the resolution is 1 hour, and the length of each segment is ΔT TIF = 1h, the total number of time periods is recorded as N TIF ;

[0041] The length of the forward period starts from the end time of the transition period and ends at the end time of the day; the sum of the number of periods in the near period, transition period and forward period is the total number of periods in the intraday scheduling model N TI , that is, N TI =N TIN +N TIM +N TIF .

[0042] Further technical solutions, the calculation of each segment parameter of the intraday scheduling model is as follows:

[0043] Transition section parameter calculation:

[0044] Using the current time tc Determine the transition period length ΔT TIM :

[0045] If c The minute hand reading is the whole hour, t c =X:00, where X is the hour hand reading, then ΔT TIM =1h;

[0046] If c The minute hand reads one quarter, t c =X:15, then ΔT TIM =45min;

[0047] If c The minute hand reads half a point, t c =X:30, then ΔT TIM =30min;

[0048] If c The minute hand reads three quarters. c =X:45, then ΔT TIM =15min;

[0049] Calculation of forward parameters:

[0050] Using the current time t c Determine N TIF , take t c The hour t ci :N TIF =24-t ci -3.

[0051] A further technical solution is to establish an intraday scheduling model: the scheduling cycle is from the current time to the end of the day, and is calculated every 15 minutes;

[0052] The objective function H of the intraday scheduling model is constructed by minimizing the cost ID :

[0053]

[0054] Among them, P g,t is the output power of the g-th wind turbine in period t, h g,t is the cost of the g-th wind turbine providing backup during period t, R g,t is the reserve capacity provided by the g-th wind turbine in period t, R ES,n,t is the backup capacity provided by the energy storage resource at the nth node in period t; h ES,n,t is the cost of energy storage resources providing backup at the nth node in period t; h IN,n,t and h DE,n,tare the costs required when the energy storage resource is dispatched at the nth node and in the tth period, respectively; ES IN,n,t and ES DE,n,t are the increase and decrease in the dispatch amount of energy storage resources at the nth node and time period; h L,n,t represents the load loss cost of the nth node in period t, L n,t is the load loss of the nth node in period t; h C,w,t represents the wind cutting cost of the wth wind turbine in period t, C w,t is the wind cutting volume of the wth wind turbine in period t; if t is located in the adjacent period, then ΔT TI =ΔT TIN ; If t is in the transition section, then ΔT TI =ΔT TIM ; If t is in the long term, then ΔT TI =ΔT TIF ;

[0055] Set the constraints of the intraday dispatch model: active power balance constraint, generator output upper and lower limit constraints, generator ramp constraint, power constraint and reserve capacity constraint;

[0056] Solve the intraday scheduling model to get u g,t , P g,t,s , E.S. IN,n,t and ES DE,n,t , determine the generator output and energy storage resource scheduling.

[0057] Further technical solutions,

[0058] Active power balance constraints:

[0059]

[0060] Among them, W w,t is the output power of the wth wind turbine in period t, D n,t is the load power of the nth node in period t, and:

[0061] 0≤C w,t ≤W w,t

[0062] 0≤L n,t ≤D n,t

[0063] Generator output upper and lower limit constraints:

[0064] u g,t P min,g ≤P g,t ≤u g,t P max,g

[0065] Among them, P max,g and P min,g are the upper and lower limits of the output of the g-th wind turbine respectively;

[0066] Generator ramp constraints:

[0067] -M·RD g ≤P g,t -P g,t-1 ≤M·RU g

[0068] Among them, RU g and RD g are the upper and lower bounds of the ramp rate of the g-th wind turbine, respectively. g,t-1 is the output power of the g-th generator in the t-1 period; if t is in the adjacent period, then M = ΔT TIN ; If t is in the transition section, then M = ΔT TIM ; If t is in the long term, then M = ΔT TIF ;

[0069] Energy storage resource upper and lower limit constraints:

[0070]

[0071] Among them, ES IN,max,n,t , E.S. DE,max,n,t are the charging and discharging limits of the energy storage resources at the nth node in the tth period;

[0072] Power Constraints:

[0073] EQ n,t =EQ n,t-1 +(ES IN,n,t-1 -ES DE,n,t-1 )

[0074] Among them, EQ n,t represents the amount of energy storage resources at the nth node in period t, EQ n,t-1 represents the amount of energy storage resources at the nth node in the t-1 period; ES IN,n,t-1 ,ES DE,n,t-1 are the increase and decrease in the scheduling amount of energy storage resources at the nth node in the t-1 period respectively;

[0075] Spare capacity constraints:

[0076]

[0077] Among them, R max,g is the upper limit of the generator reserve capacity, η is the confidence coefficient, Φ -1 is the inverse function of the normal distribution probability density function, δ Dand δ W are the standard deviations of load forecast and wind power forecast, respectively.

[0078] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0079] (1) The two-stage full-cycle rolling scheduling method of the present invention divides the daily scheduling cycle into three parts of different lengths, which greatly improves the scheduling efficiency. In this way, under the background of large-scale access to renewable energy, load fluctuations can be smoothed by scheduling generator resources and energy storage resources, thereby reducing operating costs.

[0080] (2) A two-stage full-cycle rolling scheduling method of the present invention extends the intraday scheduling cycle to the full cycle and dynamically adjusts the length of the intraday scheduling cycle to avoid ignoring the problem of the full-day cycle.

[0081] (3) In a two-stage full-cycle rolling scheduling method of the present invention, energy storage resources can compensate for the anti-peak characteristics of renewable energy and smooth load fluctuations, making full use of the flexibility of energy storage resources to participate in scheduling. BRIEF DESCRIPTION OF THE DRAWINGS

[0082] Figure 1 It is a flowchart of the present invention;

[0083] Figure 2 It is a schematic diagram of the rolling scheduling structure of the present invention;

[0084] Figure 3 It is a schematic diagram of the rolling scheduling process of the present invention. DETAILED DESCRIPTION

[0085] The present invention is further described below in conjunction with specific embodiments and drawings.

[0086] Example

[0087] This embodiment provides a two-stage full-cycle rolling dispatching method, which can achieve high-efficiency and low-cost energy storage resource dispatching while ensuring good peak shaving and valley filling effects, and provide guidance for rolling dispatching of power systems. Figure 1 As shown, firstly, a day-ahead and intraday rolling scheduling framework is established, the day-ahead scheduling calculation is performed, the segmented parameter calculation of the intraday scheduling model is performed, and the intraday scheduling calculation is performed.

[0088] Part 1: Establishing a day-ahead and intra-day rolling scheduling framework:

[0089] The day-ahead scheduling calculation is performed once every 24 hours. For example, Figure 2As shown, after executing the day-ahead scheduling calculation, it is determined whether 15 minutes has been reached. If reached, the segment parameter calculations of the intraday scheduling model are performed, and the transition segment calculation module and the long-term segment calculation module are called to obtain the time period parameters of the adjacent segment, transition segment and long-term segment, and the intraday scheduling calculation is performed. The above calculation process is continuously carried out.

[0090] Part 2: Execute the day-ahead scheduling calculation:

[0091] The day-ahead scheduling cycle is 24 hours, the resolution is 1 hour, and the length of each period is ΔT TD =1h, total number of time periods N TD =24;

[0092] The objective function H of the day-ahead scheduling model is constructed by minimizing the cost DA :

[0093]

[0094] Where g represents the generator number, t represents the time period number, s represents the scene number, n represents the node number, w represents the wind turbine number, and N G is the number of generators, N S is the number of scenes, N TD is the total number of model time periods on the day before, N N is the total number of nodes, N W is the total number of wind turbines, ρ s is the probability of the scenario occurring, a g , b g , c g are the generator cost coefficients, P g,t , s is the output power of the g-th generator in the s-th scenario during period t; H st , H sh are the startup and shutdown costs of the generator respectively; h IN,n,t,s ,h DE,n,t,s are the costs required for the energy storage resources to increase and decrease in the scheduling amount in the sth scenario at the nth node and tth period; ES IN,n,t,s ,ES DE,n,t,s are the increase and decrease in the dispatch amount of energy storage resources in the sth scenario at the nth node and tth period; h L,n,t,s represents the load loss cost of the nth node in the sth scenario during the tth period; h C,w,t,s represents the wind cutting cost of the w-th wind turbine in the s-th scenario during period t; L n,t,s is the load loss of the nth node in the sth scenario during the tth period; C w,t,s is the wind cutting volume of the w-th wind turbine in the s-th scenario during the t-th period;

[0095] The constraints of the day-ahead scheduling model are:

[0096] Active power balance constraints:

[0097]

[0098] Among them, W w,t,s is the output power of the w-th wind turbine in the s-th scenario during period t, D n,t is the load power of the nth node in period t, and:

[0099] 0≤C w,t,s ≤W w,t,s

[0100] 0≤L n,t,s ≤D n,t,s

[0101] Generator start and stop state constraints:

[0102]

[0103] Among them, x g,t ,y g,t are the generator start and stop actions, u g,t represents the start and stop status of the g-th wind turbine in period t; u g,t-1 Represents the start and stop status of the g-th wind turbine in the t-1 period;

[0104] Generator output upper and lower limit constraints:

[0105] u g,t P min,g ≤P g,t,s ≤u g,t P max,g

[0106] Among them, P max,g and P min,g are the upper and lower limits of the output of the g-th wind turbine respectively;

[0107] Generator ramp constraints:

[0108] -RD g ≤P g,t,s -P g,t-1,s ≤RU g

[0109] Among them, RU g and RD g are the upper and lower bounds of the ramp rate of the g-th wind turbine, respectively. g,t-1,s is the output power of the g-th generator in the s-th scenario at time t-1;

[0110] Energy storage resource upper and lower limit constraints:

[0111]

[0112] Among them, ES IN,max,n,t,s , E.S. DE,max,n,t,s They are respectively the charging and discharging limits of the energy storage resource in the sth scenario at the nth node and tth period;

[0113] Power Constraints:

[0114] EQ n,t,s =EQ n,t-1,s +(ES IN,n,t-1,s -ES DE,n,t-1,s )

[0115] Among them, EQ n,t,s represents the amount of energy storage resources in the sth scenario at the nth node and tth period, EQ n,t-1,s represents the amount of energy storage resources in the sth scenario at the nth node in the t-1th period; ES IN,n,t-1,s ,ES DE,n,t-1,s They are respectively the increase and decrease in the scheduling amount of energy storage resources in the sth scenario at the nth node t-1 period.

[0116] Solve the day-ahead dispatch model to obtain the start-stop status u of the g-th wind turbine generator in period t g,t , and then substitute it into the intraday scheduling model as input to solve other decision variables.

[0117] Part III: Calculation of parameters for each segment of the intraday scheduling model:

[0118] The intraday scheduling cycle is divided into 3 sections:

[0119] The first segment is the adjacent segment: the resolution is 15 minutes (the length of each segment ΔT TIN =15min), total number of time periods N TIN =8, the length of the adjacent segment is 15min*8=2h;

[0120] The second section is the transition section: the resolution is recorded as ΔT TIM , (the length of each period is ΔT TIM ), the total number of time periods is N TIM =1;

[0121] The third segment is the long-term segment: the resolution is 1 hour, (the length of each segment ΔT TIF =1h), the total number of time periods is recorded as N TIF ;

[0122] The length of the forward period starts from the end time of the transition period and ends at the end time of the day (24 hours); the sum of the number of periods in the near period, transition period and forward period is the total number of periods in the intraday scheduling model N TI , that is, N TI =N TIN +N TIM +N TIF .

[0123] Transition section parameter calculation:

[0124] Using the current time t c Determine the transition period length ΔT TIM There are several situations, such as Figure 3 As shown:

[0125] If c The minute hand reading is the whole hour, t c =X:00, where X is the hour hand reading, then ΔT TIM =1h, corresponding to Figure 3 Medium case 1;

[0126] If c The minute hand reads one quarter, t c =X:15, where X is the hour hand reading, then ΔT TIM =45min, corresponding to Figure 3 Medium situation 2;

[0127] If c The minute hand reads half a point, t c =X:30, where X is the hour hand reading, then ΔT TIM =30min, corresponding to Figure 3 Medium situation 3;

[0128] If c The minute hand reads three quarters. c =X:45, where X is the hour hand reading, then ΔT TIM =15min, corresponding to Figure 3 Medium situation 4;

[0129] Calculation of forward parameters:

[0130] Using the current time t c Determine N TIF , take t c The hour t ci :

[0131] N TIF =24-t ci -3

[0132] N TI 、N TIN 、NTIM 、N TIF , ΔT TIN , ΔT TIM and ΔT TIF As an important parameter in intraday scheduling, it is substituted into the intraday scheduling calculation.

[0133] Part 4: Intraday scheduling calculation:

[0134] Intraday scheduling model: The scheduling period is from the current time to the end of the day (24 hours), and is calculated every 15 minutes.

[0135] The objective function H of the intraday scheduling model is constructed by minimizing the cost ID :

[0136]

[0137] Among them, P g,t is the output power of the g-th wind turbine in period t, h g,t is the cost of the g-th wind turbine providing backup during period t, R g,t is the reserve capacity provided by the g-th wind turbine in period t, R Es,n,t is the backup capacity provided by the energy storage resource at the nth node in period t; h Es,n,t is the cost of energy storage resources providing backup at the nth node in period t; h IN,n,t and h DE,n,t are the costs required when the energy storage resource is dispatched at the nth node and in the tth period, respectively; ES IN,n,t and ES DE,n,t are the increase and decrease in the dispatch amount of energy storage resources at the nth node and time period; h L,n,t represents the load loss cost of the nth node in period t, L n,t is the load loss of the nth node in period t; h C,w,t represents the wind cutting cost of the wth wind turbine in period t, C w,t is the wind cutting volume of the wth wind turbine in period t; if t is located in the adjacent period, then ΔT TI =ΔT TIN ; If t is in the transition section, then ΔT TI =ΔT TIM ; If t is in the long term, then ΔT TI =ΔT TIF .

[0138] Set constraints for the intraday scheduling model:

[0139] Active power balance constraints:

[0140]

[0141] Among them, W w,t is the output power of the wth wind turbine in period t, D n,t is the load power of the nth node in period t, and:

[0142] 0≤C w,t ≤W w,t

[0143] 0≤L n,t ≤D n,t

[0144] Generator output upper and lower limit constraints:

[0145] u g,t P min,g ≤P g,t ≤u g,t P max,g

[0146] Among them, P max,g and P min,g are the upper and lower limits of the output of the g-th wind turbine respectively;

[0147] Generator ramp constraints:

[0148] -M·RD g ≤P g,t -P g,t-1 ≤M·RU g

[0149] Among them, RU g and RD g are the upper and lower bounds of the ramp rate of the g-th wind turbine, respectively. g,t-1 is the output power of the g-th generator in the t-1 period; if t is in the adjacent period, then M = ΔT TIN ; If t is in the transition section, then M = ΔT TIM ; If t is in the long term, then M = ΔT TIF ;

[0150] Energy storage resource upper and lower limit constraints:

[0151]

[0152] Among them, ES IN,max,n,t , E.S. DE,max,n,t are the charging and discharging limits of the energy storage resources at the nth node in the tth period;

[0153] Power Constraints:

[0154] EQ n,t =EQ n,t-1 +(ES IN,n,t-1 -ESDE,n,t-1 )

[0155] Among them, EQ n,t represents the amount of energy storage resources at the nth node in period t, EQ n,t-1 represents the amount of energy storage resources at the nth node in the t-1 period; ES IN,n,t-1 ,ES DE,n,t-1 are the increase and decrease in the scheduling amount of energy storage resources at the nth node in the t-1 period respectively;

[0156] Spare capacity constraints:

[0157]

[0158] Among them, R max,g is the upper limit of the generator reserve capacity, η is the confidence coefficient, Φ -1 is the inverse function of the normal distribution probability density function, δ D and δ W are the standard deviations of load forecast and wind power forecast, respectively.

[0159] Solve the intraday scheduling model and get u g,t , P g,t,s , Es IN,n,t and ES DE,n,t , determine the generator output and energy storage resource dispatching amount. Finally, the rolling dispatching method is adopted. According to the recent forecast results of load and renewable energy, the day-ahead dispatching results and the intraday dispatching results are updated. By setting the length of the dispatching range, the dispatching accuracy and calculation efficiency are improved, and the optimal configuration of different types of resources at each stage is solved to achieve the optimal social welfare.

[0160] The examples described in the present invention are merely descriptions of the preferred implementation modes of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made to the technical solutions of the present invention by engineers and technicians in this field should all fall within the protection scope of the present invention.

Claims

1. A two-stage full-cycle rolling scheduling method, characterized in that: The steps include: Step 1: Establish a day-ahead scheduling model and perform day-ahead scheduling calculations; Step 2: Calculate the parameters of each segment of the intraday scheduling model; Step 3: Establish an intraday scheduling model, and perform intraday scheduling calculations based on the calculation results of steps 1 and 2; In step 1, a day-ahead scheduling model is established: the day-ahead scheduling cycle is 24 hours, the resolution is 1 hour, and the length of each period is ΔT TD = 1h, total number of time periods N TD =24; The objective function H of the day-ahead scheduling model is constructed by minimizing the cost DA : Where g represents the generator number, t represents the time period number, s represents the scene number, n represents the node number, w represents the wind turbine number, and N G is the number of generators, N S is the number of scenes, N TD is the total number of model time periods on the day before, N N is the total number of nodes, N W is the total number of wind turbines, ρ s is the probability of the scenario occurring, a g , b g , c g are the generator cost coefficients, P g,t,s is the output power of the g-th generator in the s-th scenario during period t; H st , H sh are the generator startup and shutdown costs respectively; h IN,n,t,s ,h DE,n,t,s are the costs required for the energy storage resources to increase and decrease in the scheduling amount in the sth scenario at the nth node and tth period; ES IN,n,t,s ,ES DE,n,t,s are the increase and decrease in the dispatch amount of energy storage resources in the sth scenario at the nth node and tth period; h L,n,t,s represents the load loss cost of the nth node in the sth scenario during the tth period; h C,w,t,s represents the wind cutting cost of the w-th wind turbine in the s-th scenario during period t; L n,t,s is the load loss of the nth node in the sth scenario during the tth period; C w,t,s is the wind cutting volume of the w-th wind turbine in the s-th scenario during the t-th period; Set the constraints of the day-ahead dispatch model: active power balance constraint, generator start-up and shutdown state constraint, generator output upper and lower limit constraint, generator ramp constraint, energy storage resource upper and lower limit constraint and power constraint Solve the day-ahead dispatch model to obtain the start-stop status u of g wind turbines in period t g,t ; In step 3, the intraday scheduling cycle is divided into 3 sections: The first segment is the adjacent segment: the resolution is 15 minutes, and the length of each segment is ΔT TIN =15min, total number of time periods N TIN =8, the length of the adjacent segment is 15min*8=2h; The second section is the transition section: the resolution is recorded as ΔT TIM , each time period is ΔT TIM , the total number of time periods is N TIM =1; The third segment is the long-term segment: the resolution is 1 hour, and the length of each segment is ΔT TIF = 1h, the total number of time periods is recorded as N TIF ; The length of the forward period starts from the end time of the transition period and ends at the end time of the day; the sum of the number of periods in the near period, transition period and forward period is the total number of periods in the intraday scheduling model N TI , that is, N TI =N TIN +N TIM +N TIF ; The calculation of each segment parameter of the intraday scheduling model is as follows: Transition section parameter calculation: Using the current time t c Determine the transition period length ΔT TIM : If c The minute hand reading is the whole hour, t c =X:00, where X is the hour hand reading, then ΔT TIM =1h; If c The minute hand reads one quarter, t c =X:15, then ΔT TIM =45min; If c The minute hand reads half a point, t c =X:30, then ΔT TIM =30min; If c The minute hand reads three quarters. c =X:45, then ΔT TIM =15min; Calculation of forward parameters: Using the current time t c Determine N TIF , take t c The hour t ci :N TIF =24-t ci -3.

2. A two-stage full-cycle rolling scheduling method according to claim 1, characterized in that: Active power balance constraints: Among them, W w,t,s is the output power of the w-th wind turbine in the s-th scenario during period t, D n,t is the load power of the nth node in period t, and: 0≤C w,t,s ≤W w,t,s 0≤L n,t,s ≤D n,t,s Generator start and stop state constraints: Among them, x g,t ,y g,t are the generator start and stop actions, u g,t represents the start and stop status of the g-th wind turbine in period t; u g,t-1 Represents the start and stop status of the g-th wind turbine in the t-1 period; Generator output upper and lower limit constraints: u g,t Q min,g ≤P g,t,s ≤u g,t Q max,g Among them, P max,g and P min,g are the upper and lower limits of the output of the g-th wind turbine respectively; Generator ramp constraints: -RD g ≤P g,t,s -P g,t-1,s ≤RU g Among them, RU g and RD g are the upper and lower bounds of the ramp rate of the g-th wind turbine, respectively. g,t-1,s is the output power of the g-th generator in the s-th scenario at time t-1; Energy storage resource upper and lower limit constraints: Among them, ES IN,max,n,t,s , E.S. DE,max,n,t,s They are respectively the charging and discharging limits of the energy storage resource in the sth scenario at the nth node and tth period; Power Constraints: EQ n,t,s =EQ n,t-1,s +(ES IN,n,t-1 , s -IS DE,n,t-1,s ) Among them, EQ n,t,s represents the amount of energy storage resources in the sth scenario at the nth node and tth period, EQ n,t-1,s represents the amount of energy storage resources in the sth scenario at the nth node in the t-1th period; ES IN,n,t-1,s ,ES DE,n,t-1,s They are respectively the increase and decrease in the scheduling amount of energy storage resources in the sth scenario at the nth node t-1 period.

3. A two-stage full-cycle rolling scheduling method according to claim 1, characterized in that: Establish an intraday scheduling model: the scheduling cycle is from the current time to the end of the day, and is calculated every 15 minutes; The objective function H of the intraday scheduling model is constructed by minimizing the cost ID : Among them, P g,t is the output power of the g-th wind turbine in period t, h g,t is the cost of the g-th wind turbine providing backup during period t, R g,t is the reserve capacity provided by the g-th wind turbine in period t, R ES,n,t is the backup capacity provided by the energy storage resource at the nth node in period t; h ES,n,t is the cost of energy storage resources providing backup at the nth node in period t; h IN,n,t and h DE,n,t are the costs required when the energy storage resource is dispatched at the nth node and in the tth period, respectively; ES IN,n,t and ES DE,n,t are the increase and decrease in the scheduling amount of energy storage resources at the nth node and time period; h L,n,t represents the load loss cost of the nth node in period t, L n,t is the load loss of the nth node in period t; h C,w,t represents the wind cutting cost of the wth wind turbine in period t, C w,t is the wind cutting volume of the wth wind turbine in period t; if t is located in the adjacent period, then ΔT TI =ΔT TIN ; If t is in the transition section, then ΔT TI =ΔT TIM ; If t is in the long term, then ΔT TI =ΔT TIF ; Set the constraints of the intraday dispatch model: active power balance constraint, generator output upper and lower limit constraints, generator ramp constraint, power constraint and reserve capacity constraint; Solve the intraday scheduling model to get u g,t , P g,t,s , E.S. IN,n,t and ES DE,n,t , determine the generator output and energy storage resource scheduling.

4. A two-stage full-cycle rolling scheduling method according to claim 3, characterized in that: Active power balance constraints: Among them, W w,t is the output power of the w-th wind turbine in period t, and: 0≤C w,t ≤W w,t 0≤L n,t ≤D n,t Generator output upper and lower limit constraints: u g,t Q min,g ≤P g,t ≤u g,t Q max,g Generator ramp constraints: -M·RD g ≤P g,t -P g,t-1 ≤M·RU g Among them, P g,t-1 is the output power of the g-th generator in the t-1 period. If t is in the adjacent period, then M = ΔT TIN ; If t is in the transition section, then M = ΔT TIM ; If t is in the long term, then M = ΔT TIF ; Energy storage resource upper and lower limit constraints: Among them, ES IN,max,n,t , E.S. DE,max,n,t are respectively the charge and discharge limits of the energy storage resource at the nth node in the tth period; Power Constraints: EQ n,t =EQ n,t-1 +(ES IN,n,t-1 -IS DE,n,t-1 ) Among them, EQ n,t represents the amount of energy storage resources at the nth node in period t, EQ n,t-1 represents the amount of energy storage resources at the nth node in the t-1 period; ES IN,n,t-1 ,ES DE,n,t-1 are the increase and decrease in the scheduling amount of energy storage resources at the nth node in the t-1 period respectively; Spare capacity constraints: Among them, R max,g is the upper limit of the generator reserve capacity, η is the confidence coefficient, Φ -1 is the inverse function of the normal distribution probability density function, δ D and δ W are the standard deviations of load forecast and wind power forecast, respectively.