Comprehensive judgment method for anti-corrosion of urban buried steel pipe network
By setting up monitoring modules on urban buried steel pipe networks and using wireless data transmission technology, potential problems are automatically identified and solved, efficient monitoring and maintenance of buried pipes is achieved, and monitoring problems of buried pipe network erosion is solved, improving the The stability and security of the pipeline network.
Patent Information
- Application Number
- CN202210272493.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-18
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-03-18
AI Technical Summary
The prior art is difficult to effectively monitor and prevent the erosion of urban buried steel pipe networks, resulting in frequent external corrosion and leakage accidents.
A comprehensive judgment method is adopted to send requests to the monitoring point through the pipeline monitoring center, collect and analyze voltage data, calculate absolute error values, identify potential problem areas, and carry out route planning to achieve maintenance of buried pipelines. The method includes setting up a monitoring module on the buried pipeline, utilizing wireless data transmission and voltage detection units, combining a microcontroller and transistor for voltage measurement, automatically identifying monitoring points that need maintenance, and providing maintenance route navigation.
It realizes efficient monitoring and maintenance of buried pipelines, can quickly identify and solve potential problems, reduces erosion risks, and improves the stability and safety of the pipeline network.
Smart Images

Figure CN114486710B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground pipelines, and in particular to a comprehensive judgment method for anti-corrosion of urban buried steel pipeline networks. Background Art
[0002] In recent years, with the increasingly complex underground service environment of buried pipelines, external corrosion and leakage accidents of buried pipelines have occurred frequently. How to effectively monitor the corrosion risk of pipelines has become an urgent need in actual production. Patent application number 2020105034813, named "Optimization Design Method for Open Cathodic Protection of Low-Pressure Gas Pipeline Network", discloses the following steps: determine the coordinates of the buried low-pressure gas pipeline network by field survey and drawing investigation; use the boundary element electric field calculation method to establish the geometric model of the buried pipeline of the low-pressure gas pipeline network; establish a temporary cathodic protection field test on site to obtain the protection potential distribution law of the buried pipeline under different protection current conditions; test the polarization curve of the low-pressure gas pipeline network steel in the investigated soil; test the soil resistivity; combine the polarization curve and field test to repeatedly calculate the polarization characteristics of the pipeline with anti-corrosion layer (including the anti-corrosion layer breakage rate and surface resistivity information), and obtain the cathode boundaries corresponding to the buried gas pipelines in different regions; according to the geometric model, the cathode boundary of the low-pressure gas pipeline network and the cathodic protection -850mV potential criterion, use numerical simulation calculation to determine the optimal distribution position of the shallow buried distributed anode, which has the advantages of high efficiency, high accuracy and good effect. Summary of the invention
[0003] The present invention aims to at least solve the technical problems existing in the prior art, and in particular innovatively proposes a comprehensive judgment method for anti-corrosion of urban buried steel pipe networks.
[0004] In order to achieve the above-mentioned object of the present invention, the present invention provides a comprehensive judgment method for anti-corrosion of urban buried steel pipe network, comprising the following steps:
[0005] S1, the pipeline monitoring center sends the monitoring data requested to the monitoring points to K monitoring points. After the monitoring points receive the monitoring data sent by the pipeline monitoring center, the monitoring points send the monitored monitoring data to the pipeline monitoring center;
[0006] S2, the pipeline monitoring center analyzes the received monitoring data and obtains analysis results.
[0007] In a preferred embodiment of the present invention, step S2 includes the following steps:
[0008] S21, obtaining the voltage value collected at the same time;
[0009] S22, calculating the absolute error value according to the voltage values collected at the same time;
[0010] S23, all the absolute error values form an absolute error value set, and the smallest absolute error value is selected from the absolute error value set; and the actual voltage value is calculated according to the voltage value corresponding to the smallest absolute error value;
[0011] S24, if the actual voltage value is not within the preset storage voltage threshold range, there is a human error at the monitoring point and maintenance is required.
[0012] In a preferred embodiment of the present invention, in step S2, route planning is performed for monitoring points that require maintenance.
[0013] The present invention also provides a judgment system for a comprehensive judgment method for anti-corrosion of an urban buried steel pipe network, comprising a buried pipeline from a starting point to a target point, and also comprising a monitoring point arranged at a distance of L km on the buried pipeline, wherein L is a positive number, km represents a length unit of kilometer, and the monitoring points are the first monitoring point, the second monitoring point, the third monitoring point, ..., the Kth monitoring point, wherein K is a positive integer greater than or equal to 1, and a pipeline monitoring module is arranged at the kth monitoring point, k=1, 2, 3, ..., K;
[0014] The pipeline monitoring module uploads the monitored data to the pipeline monitoring center, which analyzes the received monitoring data and maintains the monitoring points with problems.
[0015] In a preferred embodiment of the present invention, the pipeline monitoring module includes a monitoring pile arranged just above the buried pipeline and partially or completely under the ground, a PCB board fixing mounting seat for fixing the PCB board and a battery fixing mounting seat for fixing the battery are arranged in the monitoring pile, the PCB board is fixedly mounted on the PCB board fixing mounting seat, and the battery is fixedly mounted on the battery fixing mounting seat;
[0016] A controller, a wireless data transmission unit and a voltage detection unit are arranged on the PCB board, and the battery supplies power to the controller, the wireless data transmission unit and the voltage detection unit on the PCB board; the data wireless transmission end of the controller is connected to the data wireless transmission end of the wireless data transmission unit, and the voltage data end of the controller is connected to the voltage data end of the voltage detection unit;
[0017] It also includes a vertical extension pipe arranged on the left side or / and the right side of the buried pipeline, the vertical extension pipes arranged on the left side of the buried pipeline and the vertical extension pipes arranged on the right side of the buried pipeline are M in number, M is a positive integer greater than or equal to 1, the vertical extension pipes arranged on the left side of the buried pipeline are the first left vertical extension pipe, the second left vertical extension pipe, the third left vertical extension pipe, ..., the Mth left vertical extension pipe, and the vertical extension pipes arranged on the right side of the buried pipeline are the first right vertical extension pipe, the second right vertical extension pipe, the third right vertical extension pipe, ..., the Mth right vertical extension pipe;
[0018] Electrode 1 and electrode 2 are arranged directly below each left vertical extension tube or / and right vertical extension tube, and electrode 1 is located below electrode 2; electrode 1, electrode 2 and the outer wall of the buried pipeline are respectively connected to the voltage detection unit through wires.
[0019] In a preferred embodiment of the present invention, the wireless data transmission unit includes one or any combination of a 2G wireless data transmission subunit, a 3G wireless data transmission subunit, a 4G wireless data transmission subunit, a 5G wireless data transmission subunit, a NB-IOT wireless data transmission subunit, and a RoLa wireless data transmission subunit;
[0020] When the wireless data transmission unit is a 2G wireless data transmission subunit, the data wireless 2G transmission end of the controller is connected to the data wireless transmission end of the 2G wireless data transmission unit;
[0021] When the wireless data transmission unit is a 3G wireless data transmission subunit, the data wireless 3G transmission end of the controller is connected to the data wireless transmission end of the 3G wireless data transmission unit;
[0022] When the wireless data transmission unit is a 4G wireless data transmission subunit, the data wireless 4G transmission end of the controller is connected to the data wireless transmission end of the 4G wireless data transmission unit;
[0023] When the wireless data transmission unit is a 5G wireless data transmission subunit, the data wireless 5G transmission end of the controller is connected to the data wireless transmission end of the 5G wireless data transmission unit;
[0024] When the wireless data transmission unit is a NB-IOT wireless data transmission subunit, the data wireless NB-IOT transmission end of the controller is connected to the data wireless transmission end of the NB-IOT wireless data transmission unit;
[0025] When the wireless data transmission unit is a RoLa wireless data transmission subunit, the data wireless RoLa transmission end of the controller is connected to the data wireless transmission end of the RoLa wireless data transmission unit.
[0026] In a preferred embodiment of the present invention, the voltage detection unit includes a microcontroller, 2M voltage measurement units, 2M+1 relays and 2M+1 transistors; the microcontroller sends an on or off level to the transistor to control the on and off of the relay.
[0027] In a preferred embodiment of the present invention, a device for maintaining a buried pipeline includes a support rod and a hand-held rod detachably connected to the support rod, a rotating mechanism is provided at one end of the support rod, a forward and reverse control end of the rotating mechanism is connected to a forward and reverse control end of a maintenance controller, a rotating rod is provided on the rotating mechanism, an upper limiting groove and a lower limiting groove are provided in the rotating rod, an upper spring is provided in the upper limiting groove, and the upper telescopic rod can move in the upper limiting groove under the action of an external force and the upper spring and will not completely leave the upper limiting groove; a lower spring is provided in the lower limiting groove, and the lower telescopic rod can move in the lower limiting groove under the action of an external force and the lower spring and will not completely leave the lower limiting groove;
[0028] An upper cross bar is arranged on the upper telescopic rod, and a plurality of upper brush blocks and an upper liquid spraying pipe are arranged on the upper cross bar; a lower cross bar is arranged on the lower telescopic rod, and a plurality of lower brush blocks and a lower liquid spraying pipe are arranged on the lower cross bar;
[0029] It also includes a liquid storage tank and a pressurized pipe arranged on the support rod, the liquid outlet of the liquid storage tank is connected to the liquid inlet of the pressurized pipe, the pressurized control working end of the pressurized pipe is connected to the pressurized control working end of the maintenance controller, the liquid outlet of the pressurized pipe is connected to the infusion pipe through a rotating joint, one end of the infusion pipe is connected to the liquid inlet of the upper spray pipe, and the other end of the infusion pipe is connected to the liquid inlet of the lower spray pipe.
[0030] In a preferred embodiment of the present invention, anti-skid patterns are provided on the surface of the hand-held rod for preventing skidding;
[0031] The other end of the support rod is provided with an internal thread of the support rod, and one end of the hand-held rod is provided with an external thread of the hand-held rod adapted to the internal thread, and the hand-held rod external thread on the hand-held rod is screwed into the internal thread of the support rod on the support rod to realize the detachable connection between the support rod and the hand-held rod;
[0032] Or / and also includes an extension rod, one end of the extension rod is provided with an extension rod external thread 1 adapted to the support rod internal thread, the other end of the hand-held rod is provided with a hand-held rod internal thread, and the other end of the extension rod is provided with an extension rod external thread 2 adapted to the hand-held rod internal thread, and the total length of the rod is increased by connecting the extension rod;
[0033] Or / and the rotating mechanism includes a rotating motor, the forward and reverse control end of the rotating motor is connected to the forward and reverse control end of the maintenance controller, the mounting seat of the rotating motor is fixed on one end of the supporting rod, and the rotating shaft of the rotating motor is connected to the rotating rod.
[0034] In a preferred embodiment of the present invention, the calculation method of the number of pipeline monitoring modules set on the buried pipeline is:
[0035]
[0036] Wherein, K represents the total number of pipeline monitoring modules installed on the buried pipeline;
[0037] int() represents the rounding function;
[0038] l represents the total length of the buried pipeline;
[0039] L represents the distance between adjacent pipeline monitoring modules;
[0040] k1 represents the pipeline monitoring module set at a distance of dkm from the starting point; d∈(0,L);
[0041] Indicates the distance to the previous pipeline monitoring module It is the pipeline monitoring module of L;
[0042] k2 represents a pipeline monitoring module that is L away from the previous pipeline monitoring module k1;
[0043] k3 represents a pipeline monitoring module that is L away from the previous pipeline monitoring module k2;
[0044] k4 represents a pipeline monitoring module that is L away from the previous pipeline monitoring module k3;
[0045] ……;
[0046] k K Indicates the distance from the previous pipeline monitoring module k K-1 It is a pipeline monitoring module of L; it also represents a pipeline monitoring module set at a distance of dkm from the target point, l = (K-1)L+2d.
[0047] In summary, due to the adoption of the above technical solution, the present invention can monitor the buried pipeline and clean the pipeline at the monitoring point where problems occur.
[0048] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0050] Figure 1 It is a schematic diagram of the process of the present invention.
[0051] Figure 2 It is a schematic block diagram of the connection of the present invention.
[0052] Figure 3 It is a connection schematic diagram of the present invention.
[0053] Figure 4 It is a schematic diagram of the structure of the present invention.
[0054] Figure 5 It is a schematic diagram of the structure of the present invention. DETAILED DESCRIPTION
[0055] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0056] The present invention discloses a comprehensive judgment method for anti-corrosion of urban buried steel pipe networks, such as Figure 1 As shown, the following steps are included:
[0057] S1, the pipeline monitoring center sends the monitoring data requested to the monitoring points to K monitoring points. After the monitoring points receive the monitoring data sent by the pipeline monitoring center, the monitoring points send the monitored monitoring data to the pipeline monitoring center;
[0058] S2, the pipeline monitoring center analyzes the received monitoring data and obtains analysis results.
[0059] In a preferred embodiment of the present invention, step S1 includes the following steps:
[0060] S11, the microcontroller determines whether the timer timing is greater than or equal to a preset time first threshold:
[0061] If the timer is greater than or equal to the first preset time threshold, the timer is reset and restarted; and the next step is executed;
[0062] If the timer counts less than the preset first threshold, the timer continues to count and returns to step S11;
[0063] S12, the microcontroller sends a conduction level to all transistors (i.e., the first transistor 1, the second transistor 1, the third transistor 1, ..., the Mth transistor 1 and the first transistor 2, the second transistor 2, the third transistor 2, ..., the Mth transistor 2 and the common transistor). After sending the conduction level to all transistors, the microcontroller determines whether the timer timing is within the preset time second threshold range:
[0064] If the timer counts within the preset time second threshold range, the microcontroller controls all voltage measuring units (i.e., the first voltage measuring unit 1, the second voltage measuring unit 1, the third voltage measuring unit 1, ..., the Mth voltage measuring unit 1 and the first voltage measuring unit 2, the second voltage measuring unit 2, the third voltage measuring unit 2, ..., the Mth voltage measuring unit 2) to work, inputs the voltage data measured by all the voltage measuring units into the microcontroller, and records the collection time;
[0065] If the timer timing is less than the preset time minimum threshold, and the preset time minimum threshold is the minimum value within the preset time second threshold range, then return to step S12;
[0066] If the timer timing is greater than the preset time maximum threshold, and the preset time maximum threshold is the maximum value within the preset time second threshold range, the timer is reset and the timing is restarted, and the next step is executed;
[0067] S13, the microcontroller sends a cutoff level to all transistors. At this time, all electrodes 1 (the 1st left electrode 1, the 2nd left electrode 1, the 3rd left electrode 1, the Mth left electrode 1 and the 1st right electrode 1, the 2nd right electrode 1, the 3rd right electrode 1, the Mth right electrode 1) are connected to the outer wall of the buried pipeline to achieve polarization of all electrodes 1; return to step S11.
[0068] In a preferred embodiment of the present invention, step S2 includes the following steps:
[0069] S21, obtain the voltage values collected at the same time, which are u left1,t 、u left2,t 、u left3,t 、……、u leftM,t and u right1,t 、u right2,t 、u right3,t 、……、u rightM,t ,u left1,t represents the voltage value of the first left electrode 2 detected by the first voltage measuring unit 2 at time t, u left2,t represents the voltage value of the second left electrode 2 detected by the second voltage measuring unit 2 at time t, u left3,t represents the voltage value of the third left electrode 2 detected by the third voltage measuring unit 2 at time t, u leftM,t represents the voltage value of the Mth left electrode 2 detected by the Mth voltage measuring unit 2 at time t; u right1,t represents the voltage value of the first right electrode 2 detected by the first voltage measurement unit 1 at time t;
[0070] S22, calculating an absolute error value according to the voltage values collected at the same time, and the calculation method of the absolute error value is:
[0071]
[0072] Among them, u xy,t represents the voltage value of the yx-th electrode 2 detected by the y-th voltage measuring unit 2 at time t; left represents left, and right represents right;
[0073] u x′y′,t represents the voltage value of the y′x′ left electrode 2 detected by the y′ voltage measuring unit 2 at time t;
[0074] C stands for combination;
[0075] A stands for arrangement;
[0076] || represents the absolute value symbol;
[0077] u t Represents the absolute error value at time t;
[0078] S23, all absolute error values are combined into an absolute error value set, and the minimum absolute error value is selected from the absolute error value set; according to the voltage value corresponding to the minimum absolute error value, the actual voltage value is calculated, and the calculation method of the actual voltage value is:
[0079]
[0080] Among them, u x″y″ ' represents the voltage of the y″x″ electrode 2 detected by the y″ voltage measurement unit 2 at time t corresponding to the minimum absolute error value;
[0081] u represents the actual voltage value;
[0082] S24, if the actual voltage value is not within the preset storage voltage threshold range, there is a human error at the monitoring point and maintenance is required.
[0083] In a preferred embodiment of the present invention, in step S2, a route is planned for the monitoring points that need maintenance, and the method for planning the route for the monitoring points includes the following steps:
[0084] S2-1, obtaining the location of the staff receiving the maintenance task, and querying the location of the monitoring point to be maintained according to the ID number of the monitoring point to be maintained;
[0085] S2-2, the pipeline monitoring center calls the map data, takes the location of the staff as the starting point, and the location of the monitoring point to be maintained as the end point, and marks them on the map;
[0086] S2-3, when there is only one road: connect the starting point and the end point to form a constraint line, determine the angle between the constraint line and the road, which are angle 1 and angle 2 respectively. If α1<α2, α1 represents angle 1 and α2 represents angle 2, then the road corresponding to angle 1 is taken as the advancing direction; if α1>α2, then the road corresponding to angle 2 is taken as the advancing direction; if α1=α2, then the road corresponding to angle 1 or angle 2 is taken as the advancing direction;
[0087] When there are multiple roads, you are at the road selection window:
[0088] First, go forward the same distance along other roads on the road selection exit, and then reach the expected point after going forward the same distance along other roads on the road selection exit. Connect each expected point with the end point to form a constraint line set, and determine the length of each constraint line in the constraint line set. If β is the shortest constraint line in the constraint line set, the road corresponding to constraint line β is the forward direction;
[0089] S2-4, obtaining a forward route from the starting point to the end point according to step S2-3, and sending the forward route to the mobile phone of the staff for navigation;
[0090] S2-5, the staff proceeds according to the received navigation route.
[0091] The present invention also discloses a judgment system for a comprehensive judgment method for anti-corrosion of urban buried steel pipe network, including a buried pipe 26 from a starting point to a target point, such as Figure 2 As shown, a monitoring point is provided on the buried pipeline 26 at a distance of L km, where L is a positive number, km represents a length unit of kilometer, and they are the first monitoring point, the second monitoring point, the third monitoring point, ..., the Kth monitoring point, where K is a positive integer greater than or equal to 1, and a pipeline monitoring module is provided at the kth monitoring point, k = 1, 2, 3, ..., K;
[0092] The pipeline monitoring module uploads the monitored data to the pipeline monitoring center, which analyzes the received monitoring data and maintains the monitoring points with problems.
[0093] In a preferred embodiment of the present invention, Figure 3 As shown, the pipeline monitoring module includes a monitoring pile 16 arranged just above the buried pipeline 26 and partially or completely under the ground, a PCB board fixing mounting seat for fixing a PCB board 18 and a battery fixing mounting seat for fixing a battery 17 are arranged in the monitoring pile 16, the PCB board 18 is fixedly mounted on the PCB board fixing mounting seat, and the battery 17 is fixedly mounted on the battery fixing mounting seat;
[0094] A controller, a wireless data transmission unit and a voltage detection unit are arranged on the PCB board 18, and the storage battery 17 supplies power to the controller, the wireless data transmission unit and the voltage detection unit on the PCB board 18; the data wireless transmission end of the controller is connected to the data wireless transmission end of the wireless data transmission unit, and the voltage data end of the controller is connected to the voltage data end of the voltage detection unit;
[0095] It also includes a vertical extension pipe arranged on the left side or / and the right side of the buried pipeline 26, the vertical extension pipes arranged on the left side of the buried pipeline and the vertical extension pipes arranged on the right side of the buried pipeline 26 are M in number, M is a positive integer greater than or equal to 1, the vertical extension pipes arranged on the left side of the buried pipeline 26 are the first left vertical extension pipe, the second left vertical extension pipe, the third left vertical extension pipe, ..., the Mth left vertical extension pipe, and the vertical extension pipes arranged on the right side of the buried pipeline are the first right vertical extension pipe, the second right vertical extension pipe, the third right vertical extension pipe, ..., the Mth right vertical extension pipe;
[0096] Electrode 1 and electrode 2 are arranged directly below each left vertical extension tube or / and right vertical extension tube, and electrode 1 is located below electrode 2; electrode 1, electrode 2 and the outer wall of the buried pipeline are respectively connected to the voltage detection unit through wires.
[0097] Among them, the electrode one and the electrode two arranged directly below the first left vertical extension tube are the first left electrode one and the first left electrode two, respectively, and the first left electrode one is located below the first left electrode two; the electrode one and the electrode two arranged directly below the second left vertical extension tube are the second left electrode one and the second left electrode two, respectively, and the second left electrode one is located below the second left electrode two; the electrode one and the electrode two arranged directly below the third left vertical extension tube are the third left electrode one and the third left electrode two, respectively, and the third left electrode one is located below the third left electrode two; ...; the electrode one and the electrode two arranged directly below the Mth left vertical extension tube are the Mth left electrode one and the Mth left electrode two, respectively, and the Mth left electrode one is located below the Mth left electrode two;
[0098] The electrode one and the electrode two arranged directly below the first right vertical extension tube are the first right electrode one and the first right electrode two, respectively, and the first right electrode one is located below the first right electrode two; the electrode one and the electrode two arranged directly below the second right vertical extension tube are the second right electrode one and the second right electrode two, respectively, and the second right electrode one is located below the second right electrode two; the electrode one and the electrode two arranged directly below the third right vertical extension tube are the third right electrode one and the third right electrode two, respectively, and the third right electrode one is located below the third right electrode two; ...; the electrode one and the electrode two arranged directly below the Mth right vertical extension tube are the Mth right electrode one and the Mth right electrode two, respectively, and the Mth right electrode one is located below the Mth right electrode two;
[0099] The wire connected to the first left electrode is the first wire, and the other end of the first wire is connected to the first voltage terminal of the voltage detection unit; the wire connected to the second left electrode is the second wire, and the other end of the second wire is connected to the second voltage terminal of the voltage detection unit; the wire connected to the third left electrode is the third wire, and the other end of the third wire is connected to the third voltage terminal of the voltage detection unit; ...; the wire connected to the Mth left electrode is the Mth wire, and the other end of the Mth wire is connected to the Mth voltage terminal of the voltage detection unit;
[0100] The wire connected to the first left electrode 2 is the M+1th wire, and the other end of the M+1th wire is connected to the M+1th voltage terminal of the voltage detection unit; the wire connected to the second left electrode 2 is the M+2th wire, and the other end of the M+2th wire is connected to the M+2th voltage terminal of the voltage detection unit; the wire connected to the third left electrode 2 is the M+3th wire, and the other end of the M+3th wire is connected to the M+3th voltage terminal of the voltage detection unit; ...; the wire connected to the Mth left electrode 2 is the 2Mth wire, and the other end of the 2Mth wire is connected to the 2Mth voltage terminal of the voltage detection unit;
[0101] The wire connected to the first right electrode is the 2M+1 wire, and the other end of the 2M+1 wire is connected to the 2M+1 voltage terminal of the voltage detection unit; the wire connected to the second right electrode is the 2M+2 wire, and the other end of the 2M+2 wire is connected to the 2M+2 voltage terminal of the voltage detection unit; the wire connected to the third right electrode is the 2M+3 wire, and the other end of the 2M+3 wire is connected to the 2M+3 voltage terminal of the voltage detection unit; ...; the wire connected to the Mth right electrode is the 3M wire, and the other end of the 3M wire is connected to the 3M voltage terminal of the voltage detection unit;
[0102] The wire connected to the first right electrode 2 is the 3M+1 wire, and the other end of the 3M+1 wire is connected to the 3M+1 voltage terminal of the voltage detection unit; the wire connected to the second right electrode 2 is the 3M+2 wire, and the other end of the 3M+2 wire is connected to the 3M+2 voltage terminal of the voltage detection unit; the wire connected to the third right electrode 2 is the 3M+3 wire, and the other end of the 3M+3 wire is connected to the 3M+3 voltage terminal of the voltage detection unit; ...; the wire connected to the Mth right electrode 2 is the 4M wire, and the other end of the 4M wire is connected to the 4M voltage terminal of the voltage detection unit;
[0103] The conductor connected to the outer wall of the buried pipeline is the 4M+1 conductor, and the other end of the 4M+1 conductor is connected to the 4M+1 voltage terminal of the voltage detection unit;
[0104] The ends of the 1st left vertical extension tube, the 2nd left vertical extension tube, the 3rd left vertical extension tube, ..., the Mth left vertical extension tube and the 1st right vertical extension tube, the 2nd right vertical extension tube, the 3rd right vertical extension tube, ..., the Mth right vertical extension tube are on the same plane as the axial center of the buried pipeline, and the 1st left vertical extension tube, the 2nd left vertical extension tube, the 3rd left vertical extension tube, ..., the Mth left vertical extension tube and the 1st right vertical extension tube, the 2nd right vertical extension tube, the 3rd right vertical extension tube, ..., the Mth right vertical extension tube are d1cm away from the axial center of the buried pipeline, where cm represents the length unit centimeters, and d1∈[15,35].
[0105] Taking M=1 as an example, the vertical extension tube arranged on the left side of the buried pipeline 26 is the first left vertical extension tube 22b, and the vertical extension tube arranged on the right side of the buried pipeline 26 is the first right vertical extension tube 22a; the electrodes arranged directly below the first left vertical extension tube 22b are the first left electrode 1 24b and the first left electrode 2 23b, respectively, and the first left electrode 1 24b is located below the first left electrode 2 23b; the electrodes arranged directly below the first right vertical extension tube 22a are the first right electrode 1 24a and the first right electrode 2 23a, respectively, and the first right electrode 1 24a is located below the first right electrode 2 23a; the wire connected to the first left electrode 1 24b is the first wire 21b, and the other end of the first wire 21b is connected to the first voltage end of the voltage detection unit;
[0106] The wire connected to the first left electrode 23b is the second wire 19b, and the other end of the second wire 19b is connected to the second voltage terminal of the voltage detection unit; the wire connected to the first right electrode 24a is the third wire 21a, and the other end of the third wire 21a is connected to the third voltage terminal of the voltage detection unit; the wire connected to the first right electrode 23a is the fourth wire 19a, and the other end of the fourth wire 19a is connected to the fourth voltage terminal of the voltage detection unit; the wire connected to the outer wall of the buried pipeline 26 is the fifth wire 25, and the other end of the fifth wire 25 is connected to the fifth voltage terminal of the voltage detection unit. When it is necessary to replace the first left electrode 23b, the left replacement rod 20b (or the right replacement rod 20a) is used to extend into the first left vertical extension tube 22b to take out the first left electrode 23b, thereby replacing the first left electrode 23b; when it is necessary to replace the first right electrode 23a, the right replacement rod 20a (or the left replacement rod 20b) is used to extend into the first right vertical extension tube 22a to take out the first right electrode 23a, thereby replacing the first right electrode 23a; there is no need to dig to the depth of the buried pipeline 26, which is quick and convenient. In order to prevent the left vertical extension tube 22b and the right vertical extension tube 22a from being blocked, a blocking cap is provided on the pipe mouth. The vertical height between the first left electrode 1 24b and the first left electrode 2 23b is 1cm to 8cm, and the vertical height between the first right electrode 1 24a and the first right electrode 2 23a is 1cm to 8cm, preferably 2.5cm.
[0107] Taking M=2 as an example, the vertical extension tubes arranged on the left side of the buried pipeline are the first left vertical extension tube and the second left vertical extension tube, and the vertical extension tubes arranged on the right side of the buried pipeline are the first right vertical extension tube and the second right vertical extension tube; the electrodes arranged directly below the first left vertical extension tube are the first left electrode one and the first left electrode two, and the first left electrode one is located below the first left electrode two; the electrodes arranged directly below the second left vertical extension tube are the second left electrode one and the second left electrode two, and the first left electrode one is located below the first left electrode two. The 2 left electrode 1 is located below the 2 left electrode 2; the electrodes arranged directly below the 1 right vertical extension tube are the 1 right electrode 1 and the 1 right electrode 2, respectively, and the 1 right electrode 1 is located below the 1 right electrode 2; the electrodes arranged directly below the 2 right vertical extension tube are the 2 right electrode 1 and the 2 right electrode 2, respectively, and the 2 right electrode 1 is located below the 2 right electrode 2; the wire connected to the 1 left electrode 1 is the 1st wire, and the other end of the 1st wire is connected to the 1st voltage terminal of the voltage detection unit; and the wire connected to the 2 The wire connected to the left electrode one is the second wire, and the other end of the second wire is connected to the second voltage end of the voltage detection unit; the wire connected to the first left electrode two is the third wire, and the other end of the third wire is connected to the third voltage end of the voltage detection unit; the wire connected to the second left electrode two is the fourth wire, and the other end of the fourth wire is connected to the fourth voltage end of the voltage detection unit; the wire connected to the first right electrode one is the fifth wire, and the other end of the fifth wire is connected to the fifth voltage end of the voltage detection unit; the wire connected to the second right electrode one is the sixth wire, and the other end of the sixth wire is connected to the sixth voltage end of the voltage detection unit; the wire connected to the first right electrode two is the seventh wire, and the other end of the seventh wire is connected to the seventh voltage end of the voltage detection unit; the wire connected to the second right electrode two is the eighth wire, and the other end of the eighth wire is connected to the eighth voltage end of the voltage detection unit; the wire connected to the outer wall of the buried pipeline is the ninth wire, and the other end of the ninth wire is connected to the ninth voltage end of the voltage detection unit.
[0108] Taking M=3 as an example, the vertical extension tubes arranged on the left side of the buried pipeline are respectively the first left vertical extension tube, the second left vertical extension tube and the third left vertical extension tube, and the vertical extension tubes arranged on the right side of the buried pipeline are respectively the first right vertical extension tube, the second right vertical extension tube and the third right vertical extension tube; the electrodes arranged directly below the first left vertical extension tube are respectively the first left electrode one and the first left electrode two, and the first left electrode one is located below the first left electrode two; the electrodes arranged directly below the second left vertical extension tube are respectively the second left electrode one and the second left electrode two, and the second left electrode one is located below the second left electrode two; the electrodes arranged directly below the third left vertical extension tube are respectively the third left electrode one and the third left electrode two. The electrodes arranged directly below the first right vertical extension tube are the first right electrode one and the first right electrode two, and the first right electrode one is located below the first right electrode two; the electrodes arranged directly below the second right vertical extension tube are the second right electrode one and the second right electrode two, and the second right electrode one is located below the second right electrode two; the electrodes arranged directly below the third right vertical extension tube are the third right electrode one and the third right electrode two; the wire connected to the first left electrode one is the first wire, and the other end of the first wire is connected to the first voltage terminal of the voltage detection unit; the wire connected to the second left electrode one is the second wire, and the other end of the second wire is connected to the second voltage terminal of the voltage detection unit; the wire connected to the third left electrode one is the second wire, and the other end of the second wire is connected to the second voltage terminal of the voltage detection unit The wire connected to the first left electrode 1 is the third wire, and the other end of the third wire is connected to the third voltage terminal of the voltage detection unit; the wire connected to the first left electrode 2 is the fourth wire, and the other end of the fourth wire is connected to the fourth voltage terminal of the voltage detection unit; the wire connected to the second left electrode 2 is the fifth wire, and the other end of the fifth wire is connected to the fifth voltage terminal of the voltage detection unit; the wire connected to the third left electrode 2 is the sixth wire, and the other end of the sixth wire is connected to the sixth voltage terminal of the voltage detection unit; the wire connected to the first right electrode 1 is the seventh wire, and the other end of the seventh wire is connected to the seventh voltage terminal of the voltage detection unit; the wire connected to the second right electrode 1 is the eighth wire, and the other end of the eighth wire is connected to the eighth voltage terminal of the voltage detection unit The wire connected to the third right electrode 1 is the ninth wire, and the other end of the ninth wire is connected to the ninth voltage terminal of the voltage detection unit; the wire connected to the first right electrode 2 is the tenth wire, and the other end of the tenth wire is connected to the tenth voltage terminal of the voltage detection unit; the wire connected to the second right electrode 2 is the eleventh wire, and the other end of the eleventh wire is connected to the eleventh voltage terminal of the voltage detection unit; the wire connected to the third right electrode 2 is the twelfth wire, and the other end of the twelfth wire is connected to the twelfth voltage terminal of the voltage detection unit; the wire connected to the outer wall of the buried pipeline is the thirteenth wire, and the other end of the thirteenth wire is connected to the thirteenth voltage terminal of the voltage detection unit.
[0109] Taking M=4 as an example, the vertical extension tubes arranged on the left side of the buried pipeline are respectively the 1st left vertical extension tube, the 2nd left vertical extension tube, the 3rd left vertical extension tube and the 4th left vertical extension tube, and the vertical extension tubes arranged on the right side of the buried pipeline are respectively the 1st right vertical extension tube, the 2nd right vertical extension tube, the 3rd right vertical extension tube and the 4th right vertical extension tube; the electrodes arranged directly below the 1st left vertical extension tube are respectively the 1st left electrode 1 and the 1st left electrode 2, and the 1st left electrode 1 is located below the 1st left electrode 2; the electrodes arranged directly below the 2nd left vertical extension tube are respectively the 2nd left electrode 1 and the 2nd left electrode 2, and the 2nd left electrode 1 is located below the 2nd left electrode 2; the electrodes arranged directly below the 3rd left vertical extension tube are respectively the 3rd left electrode 1 and the 3rd left electrode 2. Electrode 2, the 3rd left electrode 1 is located below the 3rd left electrode 2; the electrodes arranged directly below the 4th left vertical extension tube are respectively the 4th left electrode 1 and the 4th left electrode 2, and the 4th left electrode 1 is located below the 4th left electrode 2; the electrodes arranged directly below the 1st right vertical extension tube are respectively the 1st right electrode 1 and the 1st right electrode 2, and the 1st right electrode 1 is located below the 1st right electrode 2; the electrodes arranged directly below the 2nd right vertical extension tube are respectively the 2nd right electrode 1 and the 2nd right electrode 2, and the 2nd right electrode 1 is located below the 2nd right electrode 2; the electrodes arranged directly below the 3rd right vertical extension tube are respectively the 3rd right electrode 1 and the 3rd right electrode 2, and the 3rd right electrode 1 is located below the 3rd right electrode 2; the electrodes arranged directly below the 4th right vertical extension tube are respectively The 4th right electrode 1 and the 4th right electrode 2, the 4th right electrode 1 is located below the 4th right electrode 2; the wire connected to the 1st left electrode 1 is the 1st wire, and the other end of the 1st wire is connected to the 1st voltage terminal of the voltage detection unit; the wire connected to the 2nd left electrode 1 is the 2nd wire, and the other end of the 2nd wire is connected to the 2nd voltage terminal of the voltage detection unit; the wire connected to the 3rd left electrode 1 is the 3rd wire, and the other end of the 3rd wire is connected to the 3rd voltage terminal of the voltage detection unit; the wire connected to the 4th left electrode 1 is the 4th wire, and the other end of the 4th wire is connected to the 4th voltage terminal of the voltage detection unit; the wire connected to the 1st left electrode 2 is the 5th wire, and the other end of the 5th wire is connected to the 5th voltage terminal of the voltage detection unit; the wire connected to the 2nd left electrode 2 is the 5th wire, and the other end of the 5th wire is connected to the 5th voltage terminal of the voltage detection unit. The wire connected to the first right electrode is the sixth wire, and the other end of the sixth wire is connected to the sixth voltage terminal of the voltage detection unit; the wire connected to the third left electrode two is the seventh wire, and the other end of the seventh wire is connected to the seventh voltage terminal of the voltage detection unit; the wire connected to the fourth left electrode two is the eighth wire, and the other end of the eighth wire is connected to the eighth voltage terminal of the voltage detection unit; the wire connected to the first right electrode one is the ninth wire, and the other end of the ninth wire is connected to the ninth voltage terminal of the voltage detection unit; the wire connected to the second right electrode one is the tenth wire, and the other end of the tenth wire is connected to the tenth voltage terminal of the voltage detection unit; the wire connected to the third right electrode one is the eleventh wire, and the other end of the eleventh wire is connected to the eleventh voltage terminal of the voltage detection unit;The wire connected to the 4th right electrode 1 is the 12th wire, and the other end of the 12th wire is connected to the 12th voltage terminal of the voltage detection unit; the wire connected to the 1st right electrode 2 is the 13th wire, and the other end of the 13th wire is connected to the 13th voltage terminal of the voltage detection unit; the wire connected to the 2nd right electrode 2 is the 14th wire, and the other end of the 14th wire is connected to the 14th voltage terminal of the voltage detection unit; the wire connected to the 3rd right electrode 2 is the 15th wire, and the other end of the 15th wire is connected to the 15th voltage terminal of the voltage detection unit; the wire connected to the 4th right electrode 2 is the 16th wire, and the other end of the 16th wire is connected to the 16th voltage terminal of the voltage detection unit; the wire connected to the outer wall of the buried pipeline is the 17th wire, and the other end of the 17th wire is connected to the 17th voltage terminal of the voltage detection unit. ;
[0110] In a preferred embodiment of the present invention, the wireless data transmission unit includes one or any combination of a 2G wireless data transmission subunit, a 3G wireless data transmission subunit, a 4G wireless data transmission subunit, a 5G wireless data transmission subunit, a NB-IOT wireless data transmission subunit, and a RoLa wireless data transmission subunit;
[0111] When the wireless data transmission unit is a 2G wireless data transmission subunit, the data wireless 2G transmission end of the controller is connected to the data wireless transmission end of the 2G wireless data transmission unit;
[0112] When the wireless data transmission unit is a 3G wireless data transmission subunit, the data wireless 3G transmission end of the controller is connected to the data wireless transmission end of the 3G wireless data transmission unit;
[0113] When the wireless data transmission unit is a 4G wireless data transmission subunit, the data wireless 4G transmission end of the controller is connected to the data wireless transmission end of the 4G wireless data transmission unit;
[0114] When the wireless data transmission unit is a 5G wireless data transmission subunit, the data wireless 5G transmission end of the controller is connected to the data wireless transmission end of the 5G wireless data transmission unit;
[0115] When the wireless data transmission unit is a NB-IOT wireless data transmission subunit, the data wireless NB-IOT transmission end of the controller is connected to the data wireless transmission end of the NB-IOT wireless data transmission unit;
[0116] When the wireless data transmission unit is a RoLa wireless data transmission subunit, the data wireless RoLa transmission end of the controller is connected to the data wireless transmission end of the RoLa wireless data transmission unit.
[0117] In a preferred embodiment of the present invention, the voltage detection unit includes a microcontroller, 2M voltage measuring units, 2M+1 relays and 2M+1 transistors; the microcontroller sends an on or off level to the transistor to control the on and off of the relay, so that the voltage measuring unit measures the voltage of the environment in which the buried pipeline 26 is located.
[0118] The 2M voltage measurement units are respectively the first voltage measurement unit 1, the second voltage measurement unit 1, the third voltage measurement unit 1, ..., the Mth voltage measurement unit 1 and the first voltage measurement unit 2, the second voltage measurement unit 2, the third voltage measurement unit 2, ..., the Mth voltage measurement unit 2;
[0119] 2M+1 relays include the 1st relay 1, the 2nd relay 1, the 3rd relay 1, ..., the Mth relay 1 and the 1st relay 2, the 2nd relay 2, the 3rd relay 2, ..., the Mth relay 2 and a common relay;
[0120] The 2M+1 transistors include the 1st transistor 1, the 2nd transistor 1, the 3rd transistor 1, ..., the Mth transistor 1 and the 1st transistor 2, the 2nd transistor 2, the 3rd transistor 2, ..., the Mth transistor 2 and a common transistor;
[0121] The first left electrode 1 is connected to the first end of the normally open contact of the first relay 1 and the first end of the normally closed contact of the first relay 1 respectively, the second end of the normally open contact of the first relay 1 is connected to the first measuring end of the first voltage measuring unit 1, and the first left electrode 2 is connected to the second measuring end of the first voltage measuring unit 1;
[0122] The second left electrode 1 is connected to the first end of the normally open contact of the second relay 1 and the first end of the normally closed contact of the second relay 1 respectively, the second end of the normally open contact of the second relay 1 is connected to the first measuring end of the second voltage measuring unit 1, and the second left electrode 2 is connected to the second measuring end of the second voltage measuring unit 1;
[0123] The third left electrode 1 is connected to the first end of the normally open contact of the third relay 1 and the first end of the normally closed contact of the third relay 1 respectively, the second end of the normally open contact of the third relay 1 is connected to the first measuring end of the third voltage measuring unit 1, and the third left electrode 2 is connected to the second measuring end of the third voltage measuring unit 1;
[0124] ……;
[0125] The Mth left electrode 1 is connected to the first end of the normally open contact of the Mth relay 1 and the first end of the normally closed contact of the Mth relay 1 respectively, the second end of the normally open contact of the Mth relay 1 is connected to the first measuring end of the Mth voltage measuring unit 1, and the Mth left electrode 2 is connected to the second measuring end of the Mth voltage measuring unit 1;
[0126] The first right electrode 1 is connected to the first end of the normally open contact of the first relay 2 and the first end of the normally closed contact of the first relay 2 respectively, the second end of the normally open contact of the first relay 2 is connected to the first measuring end of the first voltage measuring unit 2, and the first right electrode 2 is connected to the second measuring end of the first voltage measuring unit 2;
[0127] The second right electrode 1 is connected to the first end of the normally open contact of the second relay 2 and the first end of the normally closed contact of the second relay 2 respectively, the second end of the normally open contact of the second relay 2 is connected to the first measuring end of the second voltage measuring unit 2, and the second right electrode 2 is connected to the second measuring end of the second voltage measuring unit 2;
[0128] The third right electrode 1 is connected to the first end of the normally open contact of the third relay 2 and the first end of the normally closed contact of the third relay 2 respectively, the second end of the normally open contact of the third relay 2 is connected to the first measuring end of the third voltage measuring unit 2, and the third right electrode 2 is connected to the second measuring end of the third voltage measuring unit 2;
[0129] ……;
[0130] The Mth right electrode 1 is respectively connected to the first end of the normally open contact of the Mth relay 2 and the first end of the normally closed contact of the Mth relay 2, the second end of the normally open contact of the Mth relay 2 is connected to the first measuring end of the Mth voltage measuring unit 2, and the Mth right electrode 2 is connected to the second measuring end of the Mth voltage measuring unit 2;
[0131] The outer wall of the buried pipeline is respectively connected to the first end of the normally open contact of the common relay and the first end of the normally closed contact of the common relay, and the second end of the normally open contact of the common relay is connected to the common end of the first voltage measuring unit 1, the common end of the second voltage measuring unit 1, the common end of the third voltage measuring unit 1, ..., the common end of the Mth voltage measuring unit 1 and the common end of the first voltage measuring unit 2, the common end of the second voltage measuring unit 2, the common end of the third voltage measuring unit 2, ..., the common end of the Mth voltage measuring unit 2;
[0132] The second end of the normally closed contact of the first relay, the second end of the normally closed contact of the second relay, the second end of the normally closed contact of the third relay, ..., the second end of the normally closed contact of the Mth relay, and the second end of the normally closed contact of the second relay, the second end of the normally closed contact of the second relay, the second end of the normally closed contact of the third relay, ..., the second end of the normally closed contact of the second Mth relay are connected to the second end of the normally closed contact of the common relay;
[0133] The first end of the first relay input loop is connected to the collector of the first transistor, the emitter of the first transistor is connected to the first end of the first resistor, and the second end of the first resistor is connected to the power ground; the second end of the first relay input loop is connected to the +5V power supply; the base of the first transistor is connected to the first control terminal of the microcontroller;
[0134] The first end of the second relay 1 input loop is connected to the collector of the second transistor 1, the emitter of the second transistor 1 is connected to the first end of the second resistor 1, and the second end of the second resistor 1 is connected to the power ground; the second end of the second relay 1 input loop is connected to the +5V power supply; the base of the second transistor 1 is connected to the second control terminal of the microcontroller;
[0135] The first end of the third relay 1 input loop is connected to the collector of the third transistor 1, the emitter of the third transistor 1 is connected to the first end of the third resistor 1, and the second end of the third resistor 1 is connected to the power ground; the second end of the third relay 1 input loop is connected to the +5V power supply; the base of the third transistor 1 is connected to the third control terminal of the microcontroller;
[0136] ……;
[0137] The first end of the input loop of the Mth relay 1 is connected to the collector of the Mth transistor 1, the emitter of the Mth transistor 1 is connected to the first end of the Mth resistor 1, and the second end of the Mth resistor 1 is connected to the power ground; the second end of the input loop of the Mth relay 1 is connected to the +5V power supply; the base of the Mth transistor 1 is connected to the Mth control terminal of the microcontroller;
[0138] The first end of the first relay second input loop is connected to the collector of the first transistor 2, the emitter of the first transistor 2 is connected to the first end of the first resistor 2, and the second end of the first resistor 2 is connected to the power ground; the second end of the first relay second input loop is connected to the +5V power supply; the base of the first transistor 2 is connected to the control first end of the microcontroller;
[0139] The first end of the second relay second input loop is connected to the collector of the second transistor 2, the emitter of the second transistor 2 is connected to the first end of the second resistor 2, and the second end of the second resistor 2 is connected to the power ground; the second end of the second relay second input loop is connected to the +5V power supply; the base of the second transistor 2 is connected to the control second end of the microcontroller;
[0140] The first end of the third relay 2 input loop is connected to the collector of the third transistor 2, the emitter of the third transistor 2 is connected to the first end of the third resistor 2, and the second end of the third resistor 2 is connected to the power ground; the second end of the third relay 2 input loop is connected to the +5V power supply; the base of the third transistor 2 is connected to the control third end of the microcontroller;
[0141] ……;
[0142] The first end of the Mth relay second input loop is connected to the collector of the Mth transistor 2, the emitter of the Mth transistor 2 is connected to the first end of the Mth resistor 2, and the second end of the Mth resistor 2 is connected to the power ground; the second end of the Mth relay second input loop is connected to the +5V power supply; the base of the Mth transistor 2 is connected to the control Mth end of the microcontroller;
[0143] The first end of the common relay input loop is connected to the collector of the common transistor, the emitter of the common transistor is connected to the first end of the common resistor, and the second end of the common resistor is connected to the power ground; the second end of the common relay input loop is connected to the +5V power supply; the base of the common transistor is connected to the control end of the microcontroller.
[0144] When M=1, the first left electrode 1 is connected to the first end of the normally open contact of the first relay 1 and the first end of the normally closed contact of the first relay 1 respectively, the second end of the normally open contact of the first relay 1 is connected to the first measuring end of the first voltage measuring unit 1, and the first left electrode 2 is connected to the second measuring end of the first voltage measuring unit 1;
[0145] The first right electrode 1 is connected to the first end of the normally open contact of the first relay 2 and the first end of the normally closed contact of the first relay 2 respectively, the second end of the normally open contact of the first relay 2 is connected to the first measuring end of the first voltage measuring unit 2, and the first right electrode 2 is connected to the second measuring end of the first voltage measuring unit 2;
[0146] The outer wall of the buried pipeline is connected to the first end of the normally open contact of the common relay and the first end of the normally closed contact of the common relay respectively, and the second end of the normally open contact of the common relay is connected to the common end of the first voltage measuring unit 1 and the common end of the first voltage measuring unit 2;
[0147] The second end of the normally closed contact of the first relay 1 is connected to the second end of the normally closed contact of the first relay 2 and the second end of the normally closed contact of the common relay;
[0148] The first end of the first relay input loop is connected to the collector of the first transistor, the emitter of the first transistor is connected to the first end of the first resistor, and the second end of the first resistor is connected to the power ground; the second end of the first relay input loop is connected to the +5V power supply; the base of the first transistor is connected to the first control terminal of the microcontroller;
[0149] The first end of the first relay second input loop is connected to the collector of the first transistor 2, the emitter of the first transistor 2 is connected to the first end of the first resistor 2, and the second end of the first resistor 2 is connected to the power ground; the second end of the first relay second input loop is connected to the +5V power supply; the base of the first transistor 2 is connected to the control first end of the microcontroller;
[0150] The first end of the common relay input loop is connected to the collector of the common transistor, the emitter of the common transistor is connected to the first end of the common resistor, and the second end of the common resistor is connected to the power ground; the second end of the common relay input loop is connected to the +5V power supply; the base of the common transistor is connected to the control end of the microcontroller.
[0151] When M=2, the first left electrode 1 is connected to the first end of the normally open contact of the first relay 1 and the first end of the normally closed contact of the first relay 1 respectively, the second end of the normally open contact of the first relay 1 is connected to the first measuring end of the first voltage measuring unit 1, and the first left electrode 2 is connected to the second measuring end of the first voltage measuring unit 1;
[0152] The second left electrode 1 is connected to the first end of the normally open contact of the second relay 1 and the first end of the normally closed contact of the second relay 1 respectively, the second end of the normally open contact of the second relay 1 is connected to the first measuring end of the second voltage measuring unit 1, and the second left electrode 2 is connected to the second measuring end of the second voltage measuring unit 1;
[0153] The first right electrode 1 is connected to the first end of the normally open contact of the first relay 2 and the first end of the normally closed contact of the first relay 2 respectively, the second end of the normally open contact of the first relay 2 is connected to the first measuring end of the first voltage measuring unit 2, and the first right electrode 2 is connected to the second measuring end of the first voltage measuring unit 2;
[0154] The second right electrode 1 is connected to the first end of the normally open contact of the second relay 2 and the first end of the normally closed contact of the second relay 2 respectively, the second end of the normally open contact of the second relay 2 is connected to the first measuring end of the second voltage measuring unit 2, and the second right electrode 2 is connected to the second measuring end of the second voltage measuring unit 2;
[0155] The outer wall of the buried pipeline is respectively connected to the first end of the normally open contact of the common relay and the first end of the normally closed contact of the common relay, and the second end of the normally open contact of the common relay is connected to the common end of the first voltage measuring unit 1, the common end of the second voltage measuring unit 1, the common end of the first voltage measuring unit 2, and the common end of the second voltage measuring unit 2;
[0156] The second end of the first normally closed contact of the first relay and the second end of the first normally closed contact of the second relay are respectively connected to the second end of the second normally closed contact of the first relay, the second end of the second normally closed contact of the second relay and the second end of the normally closed contact of the common relay;
[0157] The first end of the first relay input loop is connected to the collector of the first transistor, the emitter of the first transistor is connected to the first end of the first resistor, and the second end of the first resistor is connected to the power ground; the second end of the first relay input loop is connected to the +5V power supply; the base of the first transistor is connected to the first control terminal of the microcontroller;
[0158] The first end of the second relay 1 input loop is connected to the collector of the second transistor 1, the emitter of the second transistor 1 is connected to the first end of the second resistor 1, and the second end of the second resistor 1 is connected to the power ground; the second end of the second relay 1 input loop is connected to the +5V power supply; the base of the second transistor 1 is connected to the second control terminal of the microcontroller;
[0159] The first end of the first relay second input loop is connected to the collector of the first transistor 2, the emitter of the first transistor 2 is connected to the first end of the first resistor 2, and the second end of the first resistor 2 is connected to the power ground; the second end of the first relay second input loop is connected to the +5V power supply; the base of the first transistor 2 is connected to the control first end of the microcontroller;
[0160] The first end of the second relay second input loop is connected to the collector of the second transistor 2, the emitter of the second transistor 2 is connected to the first end of the second resistor 2, and the second end of the second resistor 2 is connected to the power ground; the second end of the second relay second input loop is connected to the +5V power supply; the base of the second transistor 2 is connected to the control second end of the microcontroller;
[0161] The first end of the common relay input loop is connected to the collector of the common transistor, the emitter of the common transistor is connected to the first end of the common resistor, and the second end of the common resistor is connected to the power ground; the second end of the common relay input loop is connected to the +5V power supply; the base of the common transistor is connected to the control end of the microcontroller.
[0162] When M=3, the first left electrode 1 is connected to the first end of the normally open contact of the first relay 1 and the first end of the normally closed contact of the first relay 1 respectively, the second end of the normally open contact of the first relay 1 is connected to the first measuring end of the first voltage measuring unit 1, and the first left electrode 2 is connected to the second measuring end of the first voltage measuring unit 1;
[0163] The second left electrode 1 is connected to the first end of the normally open contact of the second relay 1 and the first end of the normally closed contact of the second relay 1 respectively, the second end of the normally open contact of the second relay 1 is connected to the first measuring end of the second voltage measuring unit 1, and the second left electrode 2 is connected to the second measuring end of the second voltage measuring unit 1;
[0164] The third left electrode 1 is connected to the first end of the normally open contact of the third relay 1 and the first end of the normally closed contact of the third relay 1 respectively, the second end of the normally open contact of the third relay 1 is connected to the first measuring end of the third voltage measuring unit 1, and the third left electrode 2 is connected to the second measuring end of the third voltage measuring unit 1;
[0165] The first right electrode 1 is connected to the first end of the normally open contact of the first relay 2 and the first end of the normally closed contact of the first relay 2 respectively, the second end of the normally open contact of the first relay 2 is connected to the first measuring end of the first voltage measuring unit 2, and the first right electrode 2 is connected to the second measuring end of the first voltage measuring unit 2;
[0166] The second right electrode 1 is connected to the first end of the normally open contact of the second relay 2 and the first end of the normally closed contact of the second relay 2 respectively, the second end of the normally open contact of the second relay 2 is connected to the first measuring end of the second voltage measuring unit 2, and the second right electrode 2 is connected to the second measuring end of the second voltage measuring unit 2;
[0167] The third right electrode 1 is connected to the first end of the normally open contact of the third relay 2 and the first end of the normally closed contact of the third relay 2 respectively, the second end of the normally open contact of the third relay 2 is connected to the first measuring end of the third voltage measuring unit 2, and the third right electrode 2 is connected to the second measuring end of the third voltage measuring unit 2;
[0168] The outer wall of the buried pipeline is respectively connected to the first end of the normally open contact of the common relay and the first end of the normally closed contact of the common relay, and the second end of the normally open contact of the common relay is connected to the common end of the first voltage measuring unit 1, the common end of the second voltage measuring unit 1, the common end of the third voltage measuring unit 1, and the common end of the first voltage measuring unit 2, the common end of the second voltage measuring unit 2, and the common end of the third voltage measuring unit 2;
[0169] The second end of the first normally closed contact of the first relay, the second end of the first normally closed contact of the second relay, and the second end of the first normally closed contact of the third relay are respectively connected to the second end of the second normally closed contact of the first relay, the second end of the second normally closed contact of the second relay, the second end of the second normally closed contact of the third relay, and the second end of the normally closed contact of the common relay;
[0170] The first end of the first relay input loop is connected to the collector of the first transistor, the emitter of the first transistor is connected to the first end of the first resistor, and the second end of the first resistor is connected to the power ground; the second end of the first relay input loop is connected to the +5V power supply; the base of the first transistor is connected to the first control terminal of the microcontroller;
[0171] The first end of the second relay 1 input loop is connected to the collector of the second transistor 1, the emitter of the second transistor 1 is connected to the first end of the second resistor 1, and the second end of the second resistor 1 is connected to the power ground; the second end of the second relay 1 input loop is connected to the +5V power supply; the base of the second transistor 1 is connected to the second control terminal of the microcontroller;
[0172] The first end of the third relay 1 input loop is connected to the collector of the third transistor 1, the emitter of the third transistor 1 is connected to the first end of the third resistor 1, and the second end of the third resistor 1 is connected to the power ground; the second end of the third relay 1 input loop is connected to the +5V power supply; the base of the third transistor 1 is connected to the third control terminal of the microcontroller;
[0173] The first end of the first relay second input loop is connected to the collector of the first transistor 2, the emitter of the first transistor 2 is connected to the first end of the first resistor 2, and the second end of the first resistor 2 is connected to the power ground; the second end of the first relay second input loop is connected to the +5V power supply; the base of the first transistor 2 is connected to the control first end of the microcontroller;
[0174] The first end of the second relay second input loop is connected to the collector of the second transistor 2, the emitter of the second transistor 2 is connected to the first end of the second resistor 2, and the second end of the second resistor 2 is connected to the power ground; the second end of the second relay second input loop is connected to the +5V power supply; the base of the second transistor 2 is connected to the control second end of the microcontroller;
[0175] The first end of the third relay 2 input loop is connected to the collector of the third transistor 2, the emitter of the third transistor 2 is connected to the first end of the third resistor 2, and the second end of the third resistor 2 is connected to the power ground; the second end of the third relay 2 input loop is connected to the +5V power supply; the base of the third transistor 2 is connected to the control third end of the microcontroller;
[0176] The first end of the common relay input loop is connected to the collector of the common transistor, the emitter of the common transistor is connected to the first end of the common resistor, and the second end of the common resistor is connected to the power ground; the second end of the common relay input loop is connected to the +5V power supply; the base of the common transistor is connected to the control end of the microcontroller.
[0177] When M=4, the first left electrode 1 is connected to the first end of the normally open contact of the first relay 1 and the first end of the normally closed contact of the first relay 1 respectively, the second end of the normally open contact of the first relay 1 is connected to the first measuring end of the first voltage measuring unit 1, and the first left electrode 2 is connected to the second measuring end of the first voltage measuring unit 1;
[0178] The second left electrode 1 is connected to the first end of the normally open contact of the second relay 1 and the first end of the normally closed contact of the second relay 1 respectively, the second end of the normally open contact of the second relay 1 is connected to the first measuring end of the second voltage measuring unit 1, and the second left electrode 2 is connected to the second measuring end of the second voltage measuring unit 1;
[0179] The third left electrode 1 is connected to the first end of the normally open contact of the third relay 1 and the first end of the normally closed contact of the third relay 1 respectively, the second end of the normally open contact of the third relay 1 is connected to the first measuring end of the third voltage measuring unit 1, and the third left electrode 2 is connected to the second measuring end of the third voltage measuring unit 1;
[0180] The fourth left electrode 1 is connected to the first end of the normally open contact of the fourth relay 1 and the first end of the normally closed contact of the fourth relay 1 respectively, the second end of the normally open contact of the fourth relay 1 is connected to the first measuring end of the fourth voltage measuring unit 1, and the fourth left electrode 2 is connected to the second measuring end of the fourth voltage measuring unit 1;
[0181] The first right electrode 1 is connected to the first end of the normally open contact of the first relay 2 and the first end of the normally closed contact of the first relay 2 respectively, the second end of the normally open contact of the first relay 2 is connected to the first measuring end of the first voltage measuring unit 2, and the first right electrode 2 is connected to the second measuring end of the first voltage measuring unit 2;
[0182] The second right electrode 1 is connected to the first end of the normally open contact of the second relay 2 and the first end of the normally closed contact of the second relay 2 respectively, the second end of the normally open contact of the second relay 2 is connected to the first measuring end of the second voltage measuring unit 2, and the second right electrode 2 is connected to the second measuring end of the second voltage measuring unit 2;
[0183] The third right electrode 1 is connected to the first end of the normally open contact of the third relay 2 and the first end of the normally closed contact of the third relay 2 respectively, the second end of the normally open contact of the third relay 2 is connected to the first measuring end of the third voltage measuring unit 2, and the third right electrode 2 is connected to the second measuring end of the third voltage measuring unit 2;
[0184] The 4th right electrode 1 is connected to the first end of the 4th relay 2 normally open contact and the first end of the 4th relay 2 normally closed contact respectively, the second end of the 4th relay 2 normally open contact is connected to the first measuring end of the Mth voltage measuring unit 2, and the 4th right electrode 2 is connected to the second measuring end of the 4th voltage measuring unit 2;
[0185] The outer wall of the buried pipeline is respectively connected to the first end of the normally open contact of the common relay and the first end of the normally closed contact of the common relay, and the second end of the normally open contact of the common relay is connected to the common end of the first voltage measuring unit 1, the common end of the second voltage measuring unit 1, the common end of the third voltage measuring unit 1, the common end of the fourth voltage measuring unit 1, and the common end of the first voltage measuring unit 2, the common end of the second voltage measuring unit 2, the common end of the third voltage measuring unit 2, and the common end of the fourth voltage measuring unit 2;
[0186] The second end of the first normally closed contact of the first relay, the second end of the first normally closed contact of the second relay, the second end of the first normally closed contact of the third relay, and the second end of the first normally closed contact of the fourth relay are respectively connected to the second end of the second normally closed contact of the first relay, the second end of the second normally closed contact of the second relay, the second end of the second normally closed contact of the third relay, the second end of the second normally closed contact of the fourth relay, and the second end of the common relay normally closed contact;
[0187] The first end of the first relay input loop is connected to the collector of the first transistor, the emitter of the first transistor is connected to the first end of the first resistor, and the second end of the first resistor is connected to the power ground; the second end of the first relay input loop is connected to the +5V power supply; the base of the first transistor is connected to the first control terminal of the microcontroller;
[0188] The first end of the second relay 1 input loop is connected to the collector of the second transistor 1, the emitter of the second transistor 1 is connected to the first end of the second resistor 1, and the second end of the second resistor 1 is connected to the power ground; the second end of the second relay 1 input loop is connected to the +5V power supply; the base of the second transistor 1 is connected to the second control terminal of the microcontroller;
[0189] The first end of the third relay 1 input loop is connected to the collector of the third transistor 1, the emitter of the third transistor 1 is connected to the first end of the third resistor 1, and the second end of the third resistor 1 is connected to the power ground; the second end of the third relay 1 input loop is connected to the +5V power supply; the base of the third transistor 1 is connected to the third control terminal of the microcontroller;
[0190] The first end of the fourth relay 1 input loop is connected to the collector of the fourth transistor 1, the emitter of the fourth transistor 1 is connected to the first end of the fourth resistor 1, and the second end of the fourth resistor 1 is connected to the power ground; the second end of the fourth relay 1 input loop is connected to the +5V power supply; the base of the fourth transistor 1 is connected to the fourth control terminal of the microcontroller;
[0191] The first end of the first relay second input loop is connected to the collector of the first transistor 2, the emitter of the first transistor 2 is connected to the first end of the first resistor 2, and the second end of the first resistor 2 is connected to the power ground; the second end of the first relay second input loop is connected to the +5V power supply; the base of the first transistor 2 is connected to the control first end of the microcontroller;
[0192] The first end of the second relay second input loop is connected to the collector of the second transistor 2, the emitter of the second transistor 2 is connected to the first end of the second resistor 2, and the second end of the second resistor 2 is connected to the power ground; the second end of the second relay second input loop is connected to the +5V power supply; the base of the second transistor 2 is connected to the control second end of the microcontroller;
[0193] The first end of the third relay 2 input loop is connected to the collector of the third transistor 2, the emitter of the third transistor 2 is connected to the first end of the third resistor 2, and the second end of the third resistor 2 is connected to the power ground; the second end of the third relay 2 input loop is connected to the +5V power supply; the base of the third transistor 2 is connected to the control third end of the microcontroller;
[0194] The first end of the fourth relay 2 input loop is connected to the collector of the fourth transistor 2, the emitter of the fourth transistor 2 is connected to the first end of the fourth resistor 2, and the second end of the fourth resistor 2 is connected to the power ground; the second end of the fourth relay 2 input loop is connected to the +5V power supply; the base of the fourth transistor 2 is connected to the control terminal 4 of the microcontroller;
[0195] The first end of the common relay input loop is connected to the collector of the common transistor, the emitter of the common transistor is connected to the first end of the common resistor, and the second end of the common resistor is connected to the power ground; the second end of the common relay input loop is connected to the +5V power supply; the base of the common transistor is connected to the control end of the microcontroller.
[0196] In a preferred embodiment of the present invention, Figure 4 and 5 As shown, the device for maintaining the buried pipeline 26 includes a support rod 3 and a hand-held rod 1 detachably connected to the support rod 3, a rotating mechanism 15 is arranged at one end of the support rod 3, the forward and reverse control end of the rotating mechanism 15 is connected to the forward and reverse control end of the maintenance controller, a rotating rod 14 is arranged on the rotating mechanism 15, an upper limiting groove 12a and a lower limiting groove 12b are arranged in the rotating rod 14, an upper spring 11a is arranged in the upper limiting groove 12a, and the upper telescopic rod 9a can move in the upper limiting groove 12a under the action of external force and the upper spring 11a and will not completely leave the upper limiting groove 12a; a lower spring 11b is arranged in the lower limiting groove 12b, and the lower telescopic rod 9b can move in the lower limiting groove 12b under the action of external force and the lower spring 11b and will not completely leave the lower limiting groove 12b;
[0197] An upper cross bar 13a is provided on the upper telescopic rod 9a, and a plurality of upper brush blocks 7a and an upper liquid spraying pipe 10a are provided on the upper cross bar 13a; a lower cross bar 13b is provided on the lower telescopic rod 9b, and a plurality of lower brush blocks 7b and a lower liquid spraying pipe 10b are provided on the lower cross bar 13b;
[0198] It also includes a liquid storage tank 5 and a pressurizing pipe 6 arranged on the support rod 3, the liquid outlet of the liquid storage tank 5 is connected to the liquid inlet of the pressurizing pipe 6, the pressurizing control working end of the pressurizing pipe 6 is connected to the pressurizing control working end of the maintenance controller, the liquid outlet of the pressurizing pipe 6 is connected to the liquid infusion pipe 8 through a rotary joint, one end of the liquid infusion pipe 8 is connected to the liquid inlet of the upper liquid spraying pipe 10a, and the other end of the liquid infusion pipe 8 is connected to the liquid inlet of the lower liquid spraying pipe 10b. The inner wall of the buried pipeline is cleaned.
[0199] In a preferred embodiment of the present invention, the surface of the hand-held rod 1 is provided with anti-skid patterns for anti-skid; the surface of the hand-held rod 1 is also provided with a forward button, a reverse button and a confirm button. When the forward button and the confirm button are pressed at the same time, the maintenance controller receives a forward control command, and the maintenance controller controls the motor to rotate forward. When the reverse button and the confirm button are pressed at the same time, the maintenance controller receives a reverse control command, and the maintenance controller controls the motor to rotate reversely. When the forward button, the reverse button, and the confirm button are pressed, or one or three of the forward button, the motor does not move. A control circuit board mounting seat for fixing and mounting a control circuit board is provided in the hand-held rod 1. The control circuit board is mounted on the control circuit board mounting seat. A hand-held rod controller and a first Bluetooth module are provided on the control circuit board. The Bluetooth data connection end of the hand-held rod controller is connected to the data connection end of the first Bluetooth module. The signal trigger end of the forward button is connected to the first trigger end of the hand-held rod controller. The signal trigger end of the reverse button is connected to the second trigger end of the hand-held rod controller. The signal trigger end of the confirm button is connected to the third trigger end of the hand-held rod controller. The corresponding Bluetooth data connection end of the maintenance controller is connected to the data connection end of the second Bluetooth module, and data interactive control is realized through Bluetooth.
[0200] The other end of the support rod 3 is provided with an internal thread of the support rod, and one end of the hand-held rod 1 is provided with an external thread of the hand-held rod adapted to the internal thread, and the external thread of the hand-held rod on the hand-held rod 1 is screwed into the internal thread of the support rod on the support rod 3 to achieve a detachable connection between the support rod 3 and the hand-held rod 1;
[0201] Or / and also includes an extension rod 2, at one end of which an extension rod external thread 1 is provided which is compatible with the internal thread of the support rod, at the other end of the hand-held rod 1 an internal thread of the hand-held rod is provided, at the other end of the extension rod 2 an extension rod external thread 2 is provided which is compatible with the internal thread of the hand-held rod, and the total length of the rod is increased by connecting the extension rod 2.
[0202] In a preferred embodiment of the present invention, the rotating mechanism 15 includes a rotating motor, the forward and reverse control end of the rotating motor is connected to the forward and reverse control end of the maintenance controller, the mounting seat of the rotating motor is fixed on one end of the support rod 3, and the rotating shaft of the rotating motor is connected to the rotating rod 14. When in use, if the length of the rod needs to be extended, the extension rod 2 is connected between the hand-held rod 1 and the support rod 3; the maintenance device is extended into the buried pipeline, and under the action of the upper spring 11a and the lower spring 11b, the upper brush block 7a and the lower brush block 7b are pressed against the inner pipe wall, and when its maintenance controller sends a work control command to its pressurized pipe 6, the upper spray pipe 10a and the lower spray pipe 10b spray cleaning liquid, and the maintenance controller sends a forward or reverse control command to the motor, so that the upper brush block 7a and the lower brush block 7b rotate around the pipe wall to clean the inner wall of the pipeline.
[0203] In a preferred embodiment of the present invention, the calculation method of the number of pipeline monitoring modules set on the buried pipeline is:
[0204]
[0205] Wherein, K represents the total number of pipeline monitoring modules installed on the buried pipeline;
[0206] int() represents the rounding function;
[0207] l represents the total length of the buried pipeline;
[0208] L represents the distance between adjacent pipeline monitoring modules;
[0209] k1 represents the pipeline monitoring module set at a distance of dkm from the starting point; d∈(0,L);
[0210] Indicates the distance to the previous pipeline monitoring module It is the pipeline monitoring module of L;
[0211] k2 represents a pipeline monitoring module that is L away from the previous pipeline monitoring module k1;
[0212] k3 represents a pipeline monitoring module that is L away from the previous pipeline monitoring module k2;
[0213] k4 represents a pipeline monitoring module that is L away from the previous pipeline monitoring module k3;
[0214] ……;
[0215] k K Indicates the distance from the previous pipeline monitoring module k K-1 It is a pipeline monitoring module of L; it also represents a pipeline monitoring module set at a distance of dkm from the target point, l = (K-1)L+2d.
[0216] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A comprehensive judgment method for anti-corrosion of urban buried steel pipe networks, characterized in that: The following steps are involved: S1, pipeline monitoring center Each monitoring point sends the monitoring data requested by the monitoring point, and after the monitoring point receives the monitoring data requested by the pipeline monitoring center, the monitoring point sends the monitored monitoring data to the pipeline monitoring center; S2, the pipeline monitoring center analyzes the received monitoring data and obtains analysis results; Step S2 includes the following steps: S21, obtain the voltage values collected at the same time, which are , , ,……, as well as , , ,……, , Indicates that the first voltage measurement unit is The voltage value of the first left electrode 2 detected at any moment, Indicates that the second voltage measurement unit is The voltage value of the second left electrode 2 detected at the moment, Indicates that the third voltage measurement unit 2 is The voltage value of the third left electrode 2 detected at the moment, Indicates Voltage measurement unit 2 Time detection Voltage value of left electrode 2; Indicates that the first voltage measurement unit is The voltage value of the first right electrode 2 detected at any moment; S22, calculating an absolute error value according to the voltage values collected at the same time; the absolute error value is calculated as follows: , hour, ; hour, ; in, Indicates Voltage measurement unit 2 Time detection The voltage value of electrode 2; Indicates left, Indicates right; Indicates Voltage measurement unit 2 Time detection Voltage value of left electrode 2; Indicates combination; Indicates arrangement; Indicates the absolute value symbol; express The absolute error value at the moment; S23, all absolute error values form an absolute error value set, and the smallest absolute error value is selected from the absolute error value set; the actual voltage value is calculated according to the voltage value corresponding to the smallest absolute error value; the actual voltage value is calculated as follows: , in, Indicates the minimum absolute error value corresponding to the Voltage measurement unit 2 Time detection The voltage of electrode 2; Indicates the actual voltage value; S24, if the actual voltage value is not within the preset storage voltage threshold range, the monitoring point considers that there is a problem and maintenance is required.
2. The comprehensive judgment method for anti-corrosion of urban buried steel pipe networks according to claim 1 is characterized in that: In step S2, route planning is performed for monitoring points that require maintenance.
