A method for managing engineering cost data

Through the verification and node division of engineering cost data, combined with the classification and screening of the database and the processing of multiple verification rules, the problem of low data accuracy is solved, the high accuracy and timeliness of data are achieved, and the engineering cost is improved. Management reliability and performance.

CN114490604BActive Publication Date: 2024-10-22ECONOMIC & TECH RES INST OF HUBEI ELECTRIC POWER COMPANY SGCC +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202210058122.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-19
Publication Date
2024-10-22
Estimated Expiration
2042-01-19

AI Technical Summary

Technical Problem

There is a problem of low data accuracy in the existing project cost data management, which results in the lack of timeliness and binding force of the information and the inability to improve the ability of cost control.

Method used

The project cost data is verified and divided into nodes through verification rules, the data is written into the corresponding database according to the write data range of the database, and the same type of data is classified, filtered, processed and stored, and template fusion rules and integrity rules are used. , hook relationship rules, interval verification rules and trend verification rules for data processing, and finally provide visual display in the form of graphics, images, videos, animations, etc.

Benefits of technology

It improves the accuracy, reliability and timeliness of data, ensures the practicality and availability of information, realizes dynamic updating and real-time comparison of data, and enhances the reliability of data display.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114490604B_ABST
    Figure CN114490604B_ABST
Patent Text Reader

Abstract

A method for managing engineering cost data includes the following steps: S1, collecting engineering cost data; S2, first verifying the engineering cost data through verification rules, then dividing the verified engineering cost data into nodes, and then writing the divided engineering cost data into a corresponding database according to the write data range of the database; S3, first classifying and screening the same type of data in the database, and then forming different batches of data according to time or content, and then storing the formed batches of data in the database; S4, calling the data stored in the database for visual display. This design not only improves the accuracy of the data, but also improves the convenience of data use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering cost, and in particular to an engineering cost data management method, which is mainly applicable to improving data accuracy. Background Art

[0002] In order to ensure the in-depth collection and analysis of engineering data, relatively accurate cost estimation results are obtained through big data analysis, providing a solid foundation for cost management to guide the implementation and development of subsequent construction activities. In the process of applying artificial intelligence, the original data generated during the entire construction process of the construction project are collected and summarized by adaptive collection robots, and then automatically analyzed to efficiently complete the collection and integration of cost estimation data. Due to the lack of unified engineering cost information management standards in various regions of my country, the lack of effective coordination and communication between engineering cost management departments, the lack of information exchange between enterprises and engineering cost management departments, and the single channel, the slow construction of engineering cost information standards, the delayed release of engineering indicator information, and the unstable time, resulting in the lack of timeliness and binding force of engineering cost information, and the inability to improve the ability of cost control. Traditional engineering cost is mainly completed by cost personnel, cost software and price information in the region. It cannot achieve dynamic update and real-time comparison during the calculation process, and cannot accurately provide decision-making basis; if manual methods are used for collection, it is difficult to ensure the comprehensiveness and accuracy of data collection. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects and problems of low data accuracy in the prior art and to provide a method for managing engineering cost data with high data accuracy.

[0004] To achieve the above objectives, the technical solution of the present invention is: a method for managing engineering cost data, the method comprising the following steps:

[0005] S1. Collect project cost data;

[0006] S2, first verify the engineering cost data through the verification rules, then divide the verified engineering cost data into nodes, and then write the divided engineering cost data into the corresponding database according to the write data range of the database;

[0007] S3, first classify and screen the same type of data in the database, then form different batches of data according to time or content, and then store the formed batches of data in the database;

[0008] S4. Call the data stored in the database for visual display.

[0009] In step S2, the basis for writing the engineering cost data into the corresponding database is:

[0010] Calculate the difference between the first data and the subsequent data after the first data appears, record it as the first data difference, and calculate the difference between the first data and the first data. The probability of occurrence of the data is judged, and the specific judgment method is:

[0011] The first case: The first data difference is less than the second When the probability of occurrence of the data is The data is calculated twice and the The first data is used as the reference data to replace the first data difference. The data is modified to data difference;

[0012] The second case: The difference between the first data is greater than the When the probability of occurrence of the first data is calculated, the probability of occurrence of subsequent data is continued to be calculated, and the probability of subsequent occurrence of the same data stream is calculated until the first situation mentioned above occurs.

[0013] In step S2, the verification rules include template fusion rules, integrity rules, cross-reference relationship rules, interval verification rules and trend verification rules;

[0014] When there is no misalignment in the engineering cost data or the first type of data difference is used, the template fusion rules are used uniformly to achieve unified processing of the engineering cost data; if there is an integrity problem in the engineering cost data, it is processed using the integrity rules, and after processing, it is transmitted to the template fusion rules for verification, and then the cross-reference rule verification is performed to obtain the first type of data difference, and then the interval check and trend check are performed to perform statistics on the data.

[0015] In step S2, the template fusion rule is:

[0016] The first data difference is calculated and merged with the currently collected cost data to obtain the total amount of data merged by the data template. The data larger than the first data difference is compared and saved, and the data smaller than the first data difference is recalculated through the template fusion rule algorithm. After confirmation, it is merged with the selected first data difference.

[0017] In step S2, the integrity rule is: sorting by the set trigger keywords, trigger prefix words, trigger suffix words, trigger table and trigger paragraph word count to verify the integrity of the cost data.

[0018] In step S2, the cross-reference relationship is calculated as follows:

[0019] First, determine the numerical range of the first data difference, determine the predicted score corresponding to the data based on the numerical range of the first data difference, then obtain the predicted weight corresponding to the standardized data, and then calculate and generate the standard based on the predicted weight and the predicted score. The predicted score is matched with the predicted cost in the standard to obtain the cross-reference relationship between the first data difference and the predicted cost.

[0020] In step S2, the interval verification rule is:

[0021] Use the calibration interval of the index data to calibrate the data;

[0022] Generate a database of first data difference values, save and analyze all stored and collected first data difference values, and generate a verification interval of the indicator data after verifying the integrity of the first data difference values;

[0023] During verification, if abnormal data needs to be repaired, the first data difference is repaired using the cross-reference record of the first data difference.

[0024] In step S2, the trend verification rule is:

[0025] Use the trend test ratio to determine whether the indicator data is abnormal;

[0026] First, the initial indicator data stored in the database is extracted, and then the initial indicator data is segmented and reorganized. Then, the reorganized indicator data is compared with the initial indicator data to obtain the trend verification ratio.

[0027] In step S4, the meaning of the data is presented in the form of one or more combinations of graphics, images, videos, animations, and audios.

[0028] In step S4, as the data changes in real time, the current form and changes of the data are displayed in real time by dynamically acquiring the data.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. In a method for managing engineering cost data of the present invention, the engineering cost data is first verified by verification rules, and then the verified engineering cost data is divided into nodes, and then the divided engineering cost data is written into the corresponding database according to the data writing range of the database, which can ensure the validity and practicality of various indicator data in information collection, and integrate big data by unifying relevant data standards, thereby improving the accuracy of data; at the same time, the same type of data in the database is first classified and screened, and then different batches of data are formed according to time or content, and then the formed batch data are stored in the database, and statistical data of different times or different contents can be listed, so as to realize dynamic update and real-time comparison of data. Therefore, the present invention improves the accuracy of data.

[0031] 2. In a method for managing engineering cost data of the present invention, template fusion rules, integrity rules, cross-reference relationship rules, interval verification rules and trend verification rules are used to process cost data to ensure the integrity, accuracy, consistency, availability, timeliness, intelligence and rationality of the data, thereby improving the reliability of the data. Therefore, the present invention improves the reliability of the data.

[0032] 3. In a method for managing engineering cost data of the present invention, the meaning of data is presented in the form of one or more combinations of graphics, images, videos, animations and audios, so as to solve the problem that a large amount of data content is difficult to interpret and understand when presented through a data table; as the data changes in real time, the current form and changes of the data are presented in real time by dynamically acquiring the data, thereby improving the reliability of the displayed data. Therefore, the present invention is easy to use and has high reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a flow chart of a method for managing engineering cost data of the present invention. DETAILED DESCRIPTION

[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0035] See also Figure 1 , a method for managing engineering cost data, the method comprising the following steps:

[0036] S1. Collect project cost data;

[0037] S2, first verify the engineering cost data through the verification rules, then divide the verified engineering cost data into nodes, and then write the divided engineering cost data into the corresponding database according to the write data range of the database;

[0038] S3, first classify and screen the same type of data in the database, then form different batches of data according to time or content, and then store the formed batches of data in the database;

[0039] S4. Call the data stored in the database for visual display.

[0040] In step S2, the basis for writing the engineering cost data into the corresponding database is:

[0041] Calculate the difference between the first data and the subsequent data after the first data appears, record it as the first data difference, and calculate the difference between the first data and the first data. The probability of occurrence of the data is judged, and the specific judgment method is:

[0042] The first case: The first data difference is less than the second When the probability of occurrence of the data is The data is calculated twice and the The first data is used as the reference data to replace the first data difference. The data is modified to data difference;

[0043] The second case: The difference between the first data is greater than the When the probability of occurrence of the first data is calculated, the probability of occurrence of subsequent data is continued to be calculated, and the probability of subsequent occurrence of the same data stream is calculated until the first situation mentioned above occurs.

[0044] In step S2, the verification rules include template fusion rules, integrity rules, cross-reference relationship rules, interval verification rules and trend verification rules;

[0045] When there is no misalignment in the engineering cost data or the first type of data difference is used, the template fusion rules are used uniformly to achieve unified processing of the engineering cost data; if there is an integrity problem in the engineering cost data, it is processed using the integrity rules, and after processing, it is transmitted to the template fusion rules for verification, and then the cross-reference rule verification is performed to obtain the first type of data difference, and then the interval check and trend check are performed to perform statistics on the data.

[0046] In step S2, the template fusion rule is:

[0047] The first data difference is calculated and merged with the currently collected cost data to obtain the total amount of data merged by the data template. The data larger than the first data difference is compared and saved, and the data smaller than the first data difference is recalculated through the template fusion rule algorithm. After confirmation, it is merged with the selected first data difference.

[0048] In step S2, the integrity rule is: sorting by the set trigger keywords, trigger prefix words, trigger suffix words, trigger table and trigger paragraph word count to verify the integrity of the cost data.

[0049] In step S2, the cross-reference relationship is calculated as follows:

[0050] First, determine the numerical range of the first data difference, determine the predicted score corresponding to the data based on the numerical range of the first data difference, then obtain the predicted weight corresponding to the standardized data, and then calculate and generate the standard based on the predicted weight and the predicted score. The predicted score is matched with the predicted cost in the standard to obtain the cross-reference relationship between the first data difference and the predicted cost.

[0051] In step S2, the interval verification rule is:

[0052] Use the calibration interval of the index data to calibrate the data;

[0053] Generate a database of first data difference values, save and analyze all stored and collected first data difference values, and generate a verification interval of the indicator data after verifying the integrity of the first data difference values;

[0054] During verification, if abnormal data needs to be repaired, the first data difference is repaired using the cross-reference record of the first data difference.

[0055] In step S2, the trend verification rule is:

[0056] Use the trend test ratio to determine whether the indicator data is abnormal;

[0057] First, the initial indicator data stored in the database is extracted, and then the initial indicator data is segmented and reorganized. Then, the reorganized indicator data is compared with the initial indicator data to obtain the trend verification ratio.

[0058] In step S4, the meaning of the data is presented in the form of one or more combinations of graphics, images, videos, animations, and audios.

[0059] In step S4, as the data changes in real time, the current form and changes of the data are displayed in real time by dynamically acquiring the data.

[0060] The principle of the present invention is described as follows:

[0061] The statistical data is divided into nodes, and the divided data are respectively stored in the corresponding databases; the above-mentioned types of data are configured with corresponding front-end modules; data division information is configured for each front-end module; the data division information specifies the write data range of each database node, and implements the prefix identification of the data; when writing data to the corresponding database node through the front-end module, the front-end module writes the data to the corresponding database node according to the write data range of the corresponding database node, and implements data classification storage; the data that does not belong to the write data range of the corresponding database node is forwarded to the corresponding front-end module for re-comparison and screening; the forwarded data is written into the corresponding database by the corresponding front-end module, and the record of the written data is identified.

[0062] The output classification conclusions obtained from the previous data are modeled, and statistical icons are obtained after the necessary data factors are modeled. The data counted by the big data intelligent module are listed according to the labels and discharged through the intelligent listing module. The specific discharge method can be statistically ranked according to the construction cost, actual cost, purchase price and profit calculation. The statistical icon is established based on the first data difference, and the construction cost, actual cost and purchase price are arranged vertically, and the specific profit calculation is calculated based on the difference. The interval calculation places the data conclusion after the comparison of each data stream restriction.

[0063] For statistical items, whether the statistical distribution of different samples obtained under the same matrix undergoes significant changes, the statistical results are output to the intelligent statistical listing module; if significant changes occur, the intelligent statistical listing module changes the way it stores data, wherein the transmitted data includes at least one stream data, which is connected to the big database intelligent module, and is processed in real time by the data using the stream processing method to generate the desired results, and these stream data are accumulated into batch data to perform necessary operations on the batch data.

[0064] The intelligent statistical listing module applies the stream data to classify and screen data of the same type, and then inputs the stream data into the intelligent statistical listing module, and forms different batch data according to time or content, and stores the formed batch data in the database.

[0065] Example:

[0066] See also Figure 1 , a method for managing engineering cost data, the method comprising the following steps:

[0067] S1. Collect project cost data;

[0068] S2, first verify the engineering cost data through the verification rules, then divide the verified engineering cost data into nodes, and then write the divided engineering cost data into the corresponding database according to the write data range of the database;

[0069] The basis for writing engineering cost data into the corresponding database is:

[0070] Calculate the difference between the first data and the subsequent data after the first data appears, record it as the first data difference, and calculate the difference between the first data and the first data. The probability of occurrence of the data is judged, and the specific judgment method is:

[0071] The first case: The first data difference is less than the second When the probability of occurrence of the data is The data is calculated twice and the The first data is used as the reference data to replace the first data difference. The data is modified to data difference;

[0072] The second case: The difference between the first data is greater than the When the probability of occurrence of the data is calculated, the probability of occurrence of subsequent data is calculated, and the probability of subsequent occurrence of the same data stream is calculated until the first situation mentioned above occurs;

[0073] The verification rules include template fusion rules, integrity rules, cross-reference relationship rules, interval verification rules and trend verification rules;

[0074] When there is no misalignment in the engineering cost data or the first data difference is used, the template fusion rule is used uniformly to achieve unified processing of the engineering cost data; if there is an integrity problem in the engineering cost data, it is processed by the integrity rule, and after processing, it is sent to the template fusion rule for verification, and then the cross-check relationship rule is verified to obtain the first data difference, and then the interval verification and trend verification are performed to perform statistics on the data;

[0075] The template fusion rule is:

[0076] Calculate the first data difference, merge the first data difference with the currently collected cost data, and obtain the total amount of data merged by the data template. Compare and save the data that is larger than the first data difference, and recalculate the data that is smaller than the first data difference through the template fusion rule algorithm. After confirming that it is correct, merge it with the selected first data difference.

[0077] The integrity rule is: sorting by the set trigger keywords, trigger prefix words, trigger suffix words, trigger table and trigger paragraph word count to verify the integrity of the cost data;

[0078] The cross-reference relationship is calculated as follows:

[0079] First, determine the numerical range of the first data difference, determine the predicted score corresponding to the data according to the numerical range of the first data difference, then obtain the predicted weight corresponding to the standardized data, and then calculate and generate the standard according to the predicted weight and the predicted score, correspond the predicted score to the predicted cost in the standard, and obtain the cross-reference relationship between the first data difference and the predicted cost;

[0080] In actual operation, add the cross-reference relationship restriction for the first type of data difference to avoid data duplication restriction;

[0081] The interval verification rule is:

[0082] Use the calibration interval of the index data to calibrate the data;

[0083] Generate a database of first data difference values, save and analyze all stored and collected first data difference values, and generate a verification interval of the indicator data after verifying the integrity of the first data difference values;

[0084] During verification, if abnormal data needs to be repaired, the first data difference is repaired using the cross-reference relationship record of the first data difference;

[0085] Abnormal data include the first type of data difference with abnormal values, interval anomalies, and empty values;

[0086] The trend verification rule is:

[0087] Use the trend test ratio to determine whether the indicator data is abnormal;

[0088] First, the initial indicator data stored in the database is extracted, and then the initial indicator data is segmented and reorganized, and then the reorganized indicator data is compared with the initial indicator data to obtain the trend verification ratio;

[0089] S3, first classify and screen the same type of data in the database, then form different batches of data according to time or content, and then store the formed batches of data in the database;

[0090] S4, calling the data stored in the database for visual display;

[0091] The meaning of the data is presented in the form of one or more combinations of graphics, images, videos, animations and audios; as the data changes in real time, the current form and changes of the data are displayed in real time by dynamically acquiring the data.

Claims

1. A method for managing construction cost data, characterized in that: The method comprises the following steps: S1. Collect project cost data; S2, first verify the engineering cost data through the verification rules, then divide the verified engineering cost data into nodes, and then write the divided engineering cost data into the corresponding database according to the write data range of the database; The verification rules include template fusion rules, integrity rules, cross-reference relationship rules, interval verification rules and trend verification rules; When there is no misalignment in the engineering cost data or the first data difference is used, the template fusion rule is used uniformly to achieve unified processing of the engineering cost data; if there is an integrity problem in the engineering cost data, it is processed by the integrity rule, and after processing, it is sent to the template fusion rule for verification, and then the cross-check relationship rule is verified to obtain the first data difference, and then the interval verification and trend verification are performed to perform statistics on the data; The basis for writing engineering cost data into the corresponding database is: After the first data appears, the difference between the subsequent data and the first data is calculated, recorded as the first data difference, and the probability of occurrence of the first data difference and the nth data is judged. The specific judgment method is: The first case: when the difference of the first data is less than the probability of occurrence of the nth data, the nth data is calculated twice, and the nth data is used as the reference data to replace the difference of the first data, so as to modify the nth data to the difference of the nth data; The second case: when the difference of the first data is greater than the probability of occurrence of the nth data, continue to calculate the probability of occurrence of subsequent data, and calculate the probability of subsequent occurrence of the same data stream, until the first case mentioned above occurs; S3, first classify and screen the same type of data in the database, then form different batches of data according to time or content, and then store the formed batches of data in the database; S4. Call the data stored in the database for visual display.

2. A method for managing construction cost data according to claim 1, characterized in that: In step S2, the template fusion rule is: The first data difference is calculated and merged with the currently collected cost data to obtain the total amount of data merged by the data template. The data larger than the first data difference is compared and saved, and the data smaller than the first data difference is recalculated through the template fusion rule algorithm. After confirmation, it is merged with the selected first data difference.

3. A method for managing construction cost data according to claim 1, characterized in that: In step S2, the integrity rule is: sorting by the set trigger keywords, trigger prefix words, trigger suffix words, trigger table and trigger paragraph word count to verify the integrity of the cost data.

4. A method for managing construction cost data according to claim 1, characterized in that: In step S2, the cross-reference relationship is calculated as follows: First, determine the numerical range of the first data difference, determine the predicted score corresponding to the data based on the numerical range of the first data difference, then obtain the predicted weight corresponding to the standardized data, and then calculate and generate the standard based on the predicted weight and the predicted score. The predicted score is matched with the predicted cost in the standard to obtain the cross-reference relationship between the first data difference and the predicted cost.

5. A method for managing construction cost data according to claim 4, characterized in that: In step S2, the interval verification rule is: Use the calibration interval of the index data to calibrate the data; Generate a database of first data difference values, save and analyze all stored and collected first data difference values, and generate a verification interval of the indicator data after verifying the integrity of the first data difference values; During verification, if abnormal data needs to be repaired, the first data difference is repaired using the cross-reference record of the first data difference.

6. A method for managing construction cost data according to claim 1, characterized in that: In step S2, the trend verification rule is: Use the trend test ratio to determine whether the indicator data is abnormal; First, the initial indicator data stored in the database is extracted, and then the initial indicator data is segmented and reorganized. Then, the reorganized indicator data is compared with the initial indicator data to obtain the trend verification ratio.

7. A method for managing construction cost data according to claim 1, characterized in that: In step S4, the meaning of the data is presented in the form of one or more combinations of graphics, images, videos, animations, and audios.

8. A method for managing construction cost data according to claim 1, characterized in that: In step S4, as the data changes in real time, the current form and changes of the data are displayed in real time by dynamically acquiring the data.