A method and system for predicting water inflow during the whole life cycle of a working face
By studying the geological, hydrogeological characteristics of coal seams and roof slabs of underground working surfaces and the development characteristics of water conduction cracks, a method for predicting water inflow in the entire life cycle of the working surface was constructed, and the error problem of water inflow prediction in the western mining area was solved, and the coal mining process was realized scientific and accurate prediction and provision of water prevention and control measures.
Patent Information
- Application Number
- CN202111497364.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-12-09
AI Technical Summary
During the coal mining process in the western mining area, due to unclear hydrogeological conditions, it is difficult to form scientific and effective water control measures. There are significant errors in the prediction of water inflow during and after the mining process of the working face, and there is a lack of accurate prediction methods for water inflow throughout the life cycle.
By studying the geological and hydrogeological characteristics of coal seams and roof slabs of underground working surfaces, the development characteristics of water conduction cracks of the backlog rocks of the working surface, and the reconstruction characteristics of the top water partition layer after the recovery and mining are completed, the prediction formula for water inrush in the entire life cycle of the working surface is constructed, including before recovery and mining , Analysis of the change law of water inrush volume during and after recovery and recovery, and establish a water inrush volume prediction method and system.
Scientifically and accurately judge the dynamic development laws of the roof water conduction cracks, provide the basis for the reconstruction of the roof water barrier layer and the self-healing of the water conduction cracks, and establish a calculation formula that can accurately predict the water influx of the working face throughout the life cycle, which improves the coal mining process water damage problem.
Smart Images

Figure CN114491921B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of comprehensive application technology of hydrogeology and mining engineering, and in particular relates to a method and system for predicting water inflow during the entire life cycle of a working face. Background Art
[0002] my country's energy endowment characteristics of "rich in coal, less gas and poor in oil" determine that coal is the main energy source for my country's long-term stability in the future. In 2020, my country's coal production reached 3.9 billion tons, making it the world's largest coal producer and consumer. In addition, the absolute amount of coal resource production and demand in my country is still on the rise. During the 14th Five-Year Plan period, coal production will remain at around 4 billion tons. With the depletion of shallow coal resources in the east and west, coal mining will extend to the deep west in the future. Among them, the deep buried areas of mining areas such as northern Shaanxi, Huanglong, Shendong, and Ningdong are the top priority. The coal seam burial depth generally exceeds 500m, with excellent coal quality and simple geological conditions. However, the western mining area belongs to the newly developed mining area, and the coal seam occurrence conditions, roof stratigraphic structure, and aquifer spatial distribution characteristics vary greatly. The hydrogeological conditions of the study area are still not fully understood, which makes it difficult to form targeted and scientifically effective water prevention and control measures. Many types of water disasters have occurred in many mines during infrastructure construction and production, posing a serious threat to the safe and efficient mining of coal resources. The roof of the main coal seam in the western mining area has developed multiple water-rich aquifers. During the coal mining process, the water level of multiple aquifers in different mines has dropped significantly. At present, a large number of studies have focused on the analysis of the changing rules of water inflow during the working face mining process, the prediction and calculation of water inflow, etc., which have great limitations and the final error is also very significant. In addition, how does the water inflow change after the working face mining is completed? How does the water inflow of the working face evolve during the entire life cycle from the beginning of mining to the end? How to accurately predict? There is a lack of relevant research.
[0003] Therefore, it is very necessary to carry out research on the geological and hydrogeological characteristics of coal seams and roofs in underground working faces, the development characteristics of water-conducting fracture zones caused by overburden mining in working faces, the reconstruction (self-healing) characteristics of roof aquicludes after mining, and the evolution characteristics of water inflow before and after mining in working faces, so as to establish an accurate and scientific method for predicting water inflow in working faces throughout the entire cycle. However, after mining in working faces, water inflow in the goaf is often no longer observed, and there is a lack of water inflow data in the goaf in working faces, which makes it difficult to establish a method for predicting water inflow in working faces throughout the entire cycle that matches the actual situation. Summary of the invention
[0004] In view of the defects and shortcomings in the prior art, the present invention provides a method and system for predicting the water inflow of a working face throughout its life cycle, which solves the problem that accurate prediction of the water inflow of working faces in western mining areas has not been carried out during and after mining.
[0005] In order to achieve the above object, the present invention adopts the following technical scheme:
[0006] A method for predicting water inflow during the entire life cycle of a working face, specifically comprising:
[0007] The changing rules of water inflow in the whole life cycle of the working face in the early stage of mining, the middle and late stages of mining and the end of mining are analyzed, and the prediction formula of water inflow in the whole life cycle of the working face is constructed:
[0008]
[0009] Where, Q is the water inflow in the goaf of the working face, m 3 / h; Formula (1) is used to predict the water inflow in the early stage of working face mining; Formula (2) is used to predict the water inflow in the middle and late stages of working face mining; Formula (3) is used to predict the water inflow after the end of working face mining;
[0010] H d —Upward development height of water-conducting fracture zone, m, H d =αx; α—coefficient between water-conducting fracture zone and mining advance; x—indicates mining advance, m;
[0011] S—development area of water-conducting fracture zone in the roof of the working face, m 2 ; S = xy, y—working surface width, m;
[0012] r—water-conducting fracture self-healing ratio, r=βt; β—water-conducting fracture self-healing ratio coefficient over time, t represents time, day;
[0013] a1—the slope of the water inflow equation in the early stage of working face mining; b1—the intercept of the water inflow equation in the early stage of working face mining;
[0014] a2—the slope of the water inflow equation in the middle and late stages of mining at the working face; b2—the intercept of the water inflow equation in the middle and late stages of mining at the working face;
[0015] a3—the slope of the water inflow equation after the working face is mined; b3—the intercept of the water inflow equation after the working face is mined.
[0016] Optionally, the method further includes: Step 1: basic characteristics of the working face; collecting basic parameters of the working face to be mined in the coal mine, and determining the width y of the working face, in m;
[0017] Step 2: Evolution characteristics of overburden during mining of the working face; Study the development characteristics of the water-conducting fracture zone caused by the destruction of the overburden during mining of the working face, and determine the development height H of the water-conducting fracture zone d , unit, m;
[0018] Step 3: Evolution characteristics of water inflow in the working face; Study the evolution characteristics of water inflow Q in the goaf during the working face mining process to determine the relationship between the water inflow in the goaf and the water-conducting fracture zone in the roof; Study the evolution characteristics of water inflow in the goaf after the working face mining is completed to determine the relationship between the water inflow in the goaf and the reconstruction of the impermeable layer, that is, the self-healing ratio r of the water-conducting fractures.
[0019] Optionally, in step 2, the height of the water-conducting fracture zone is determined by comprehensively judging the actual measured height of the water-conducting fracture zone and the change in water inflow in the goaf.
[0020] Optionally, the actual height of the water-conducting fracture zone is measured mainly by constructing an observation hole for the water-conducting fracture zone during the mining process to measure the height of the water-conducting fracture zone; the water inflow in the goaf is mainly obtained by actual observation and statistics underground.
[0021] A water inflow prediction system for the whole life cycle of a working face, specifically comprising:
[0022] Working face full life cycle water inflow prediction module:
[0023] Where, Q is the water inflow in the goaf of the working face, m 3 / h; Formula (1) is used to predict the water inflow in the early stage of working face mining; Formula (2) is used to predict the water inflow in the middle and late stages of working face mining; Formula (3) is used to predict the water inflow after the end of working face mining;
[0024] H d —Upward development height of water-conducting fracture zone, m, H d =αx; α—coefficient between water-conducting fracture zone and mining advance; x—indicates mining advance, m;
[0025] S—development area of water-conducting fracture zone in the roof of the working face, m 2 ; S = xy, y—working surface width, m;
[0026] r—water-conducting fracture self-healing ratio, r=βt; β—water-conducting fracture self-healing ratio coefficient over time, t represents time, day;
[0027] a1—the slope of the water inflow equation in the early stage of working face mining; b1—the intercept of the water inflow equation in the early stage of working face mining;
[0028] a2—the slope of the water inflow equation in the middle and late stages of mining at the working face; b2—the intercept of the water inflow equation in the middle and late stages of mining at the working face;
[0029] a3—the slope of the water inflow equation after the working face is mined; b3—the intercept of the water inflow equation after the working face is mined.
[0030] Optionally, also include:
[0031] Working face basic feature acquisition module: collect the basic parameters of the working face to be mined in the coal mine, and determine the working face width y, unit: m;
[0032] Working face mining overburden evolution characteristics acquisition module: study the development characteristics of water-conducting fracture zones caused by overburden destruction during working face mining, and determine the development height H of water-conducting fracture zones d , unit, m;
[0033] Working face water inflow evolution characteristics acquisition module: study the evolution characteristics of water inflow Q in the goaf during the working face mining process, and determine the relationship between the water inflow in the goaf and the water-conducting fracture zone in the roof; study the evolution characteristics of water inflow in the goaf after the working face mining is completed, and determine the relationship between the water inflow in the goaf and the reconstruction of the impermeable layer, that is, the self-healing ratio r of the water-conducting fractures.
[0034] Optionally, in the working face mining overburden evolution feature acquisition module, the height of the water-conducting fracture zone is determined by combining the measured height of the water-conducting fracture zone and the change in water inflow in the goaf.
[0035] Optionally, the actual height of the water-conducting fracture zone is measured mainly by constructing an observation hole for the water-conducting fracture zone during the mining process to measure the height of the water-conducting fracture zone; the water inflow in the goaf is mainly obtained by actual observation and statistics underground.
[0036] Compared with the prior art, the present invention has the following beneficial technical effects:
[0037] (1) The characteristics of the change in water inflow in the goaf during the working face recovery process determined by the present invention can be used to scientifically and accurately determine the dynamic development law of the water-conducting fracture zone in the roof.
[0038] (2) The characteristics of the change in water inflow in the goaf after the working face is mined can provide a scientific basis for the reconstruction of the roof waterproof layer and the self-healing of water-conducting fissures.
[0039] (3) The calculation formula for the water inflow of a working face over the entire life cycle established by the present invention can scientifically and accurately carry out research on the prediction of water inflow during and after the mining process of the working face. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:
[0041] Figure 1 This is the monitoring map of water-conducting fracture zones during the mining process of the working face;
[0042] Figure 2 This is a graph showing the change in water inflow during the entire life cycle of a working face. DETAILED DESCRIPTION
[0043] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] See also Figure 1 and Figure 2 The present invention provides a method for predicting the water inflow of a working face over its entire life cycle. The technical problems that need to be solved include: surveying the geological and hydrogeological characteristics of coal seams and roofs of working faces to be mined in typical coal mines in western mining areas, and mastering parameters such as the mining process and mining thickness of the working face; studying the development characteristics of water-conducting fracture zones during the mining of the working face and the reconstruction (self-healing) characteristics of the roof aquiclude after the mining is completed; studying the evolution characteristics of water inflow in the goaf during the mining of the working face, determining the relationship between the water inflow in the goaf and the water-conducting fracture zones in the roof, and determining the relationship between the water inflow in the goaf and the reconstruction of the aquiclude; analyzing the changing rules of water inflow in the entire life cycle during and after the mining of the working face, constructing a method for predicting water inflow in the entire life cycle of the working face, and providing a scientific basis for accurately predicting the water inflow in the entire life cycle of the working face in the western mining areas.
[0045] Therefore, in order to achieve the specific purpose of the present invention, a method for predicting water inflow during the entire life cycle of a working face comprises the following steps:
[0046] A method for predicting the water inflow of a working face throughout its life cycle is established by studying the geological and hydrogeological characteristics of the coal seam and roof of the underground working face, the development characteristics of the water-conducting fracture zone caused by overburden mining of the working face, the reconstruction (self-healing) characteristics of the roof aquiclude after mining, and the evolution characteristics of the water inflow before and after mining of the working face. This method provides a scientific basis for accurately predicting the water inflow of the working face throughout its life cycle in the western mining area, including:
[0047] Step 1: Basic features of the working surface;
[0048] The basic parameters of the working face to be mined in typical underground coal mines in the western mining area were determined, including the working face width (y), face length, mining technology, mining thickness (M), etc.
[0049] Step 2: Evolution characteristics of overburden rock during mining at the working face;
[0050] The development characteristics of the water-conducting fracture zone caused by the destruction of the overburden during the mining process of the working face were studied, and the development height of the water-conducting fracture zone (H d );
[0051] Step 3: Evolution characteristics of water inflow at the working face;
[0052] The evolution characteristics of water inflow (Q) in the goaf during the mining process of the working face were studied to determine the relationship between the water inflow in the goaf and the water-conducting fracture zone in the roof; the evolution characteristics of water inflow in the goaf after the mining of the working face were studied to determine the relationship between the water inflow in the goaf and the reconstruction of the impermeable layer, that is, the self-healing ratio of water-conducting fractures (r).
[0053] Step 4: Prediction of water inflow during the whole cycle of the working face;
[0054] The changing rules of water inflow in the whole life cycle of the working face in the early stage of mining, the middle and late stages of mining and the end of mining are analyzed, and the prediction formula of water inflow in the whole life cycle of the working face is constructed:
[0055]
[0056] Where, Q is the water inflow in the goaf of the working face, m 3 / h; Formula (1) is used to predict the water inflow in the early stage of working face mining; Formula (2) is used to predict the water inflow in the middle and late stages of working face mining; Formula (3) is used to predict the water inflow after the end of working face mining;
[0057] H d —Upward development height of water-conducting fracture zone, m, H d =αx; α—coefficient between water-conducting fracture zone and mining advance; x—indicates mining advance, m;
[0058] S—development area of water-conducting fracture zone in the roof of the working face, m 2 ; S = xy, y—working surface width, m;
[0059] r—water-conducting fracture self-healing ratio, r=βt; β—water-conducting fracture self-healing ratio coefficient over time, t represents time, day;
[0060] a1—the slope of the water inflow equation in the early stage of working face mining; b1—the intercept of the water inflow equation in the early stage of working face mining;
[0061] a2—the slope of the water inflow equation in the middle and late stages of mining at the working face; b2—the intercept of the water inflow equation in the middle and late stages of mining at the working face;
[0062] a3—the slope of the water inflow equation after the working face is mined; b3—the intercept of the water inflow equation after the working face is mined.
[0063] Combining steps 1, 2, 3 and 4, a scientific prediction is made on the water inflow of the working face over its entire life cycle.
[0064] In step 2, the dynamic development process of the water-conducting fracture zone is relatively complex. The dynamic changes of the development of the water-conducting fracture zone can be comprehensively judged by combining the actual measurement of the water-conducting fracture zone and the change of water inflow in the goaf. In step 2, due to the change of the overburden fracture structure, the self-healing of the water-conducting fracture occurred, but the actual self-healing ratio r of the water-conducting fracture cannot be directly measured. Therefore, in step 3, the water inflow in the goaf is used to infer the self-healing ratio of the water-conducting fracture.
[0065] In step 4, there are certain differences in the changes in the full-cycle water inflow of different working faces, and it is necessary to master parameters such as the maximum water inflow and the full-cycle time of water inflow. During the observation of water inflow in the goaf area, specific data such as water inflow value, mining advance, and duration have been obtained.
[0066] Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical solution of this application fall within the protection scope of the present invention.
[0067] Embodiment 1:
[0068] This embodiment is further explained by taking the deep Jurassic coalfield area of the Ordos Basin in the west as an example. The deep Jurassic coalfield in the Ordos Basin in my country is the top priority for the development of coal resources in the future. The coal seam burial depth generally exceeds 500m, and it has the characteristics of excellent coal quality and simple geological conditions. However, the western mining area belongs to the newly developed mining area, and the coal seam occurrence conditions, roof stratigraphic structure, and aquifer spatial distribution characteristics vary greatly. The hydrogeological conditions in the study area are still not completely clear, which makes it difficult to form targeted and scientifically effective water prevention and control measures. Many types of water disasters have occurred in many mines during infrastructure and production, posing a serious threat to the safe and efficient mining of coal resources. The roof of the main coal seam in the western mining area develops multiple layers of water-rich aquifers. During coal mining, multiple aquifers in different mines have experienced significant water level drops. At present, a large number of studies have focused on the analysis of the law of changes in water inflow during the working face recovery process, the prediction and calculation of water inflow, etc., which have great limitations, and the final error is also very significant. How does the water inflow change after the working face recovery? How does the water inflow of the working face evolve during the whole life cycle from the beginning of mining to the end? How to accurately predict it? There is a lack of relevant research. Therefore, it is very necessary to carry out research on the geological and hydrogeological characteristics of the coal seam and roof of the underground working face, the development characteristics of the water-conducting fracture zone caused by the overburden mining of the working face, the reconstruction (self-healing) characteristics of the roof aquiclude after the end of mining, and the evolution characteristics of the water inflow before and after the mining of the working face, so as to establish an accurate and scientific method for predicting the water inflow of the working face throughout the whole life cycle. However, after the mining of the working face is completed, the water inflow of its goaf is no longer observed, and the water inflow data of the goaf of the working face is lacking, which makes it difficult to establish a method for predicting the water inflow of the working face throughout the whole life cycle that is consistent with the actual situation. Therefore, constructing a method for predicting the water inflow of the working face throughout the whole life cycle can provide a good scientific basis for accurately predicting the water inflow of the working face throughout the whole life cycle in the western mining area, reasonably arranging the working face / mine drainage system in the coal mine, and carrying out scientific water prevention and control measures.
[0069] Taking the deep Jurassic coalfield area in the Ordos Basin in the west as an example, it is further explained that under the action of tectonic movements in different periods in the western mining area, controlled by sedimentary cycles, multiple aquifers have developed within the water-conducting fracture zone of the coal seam roof. Under this condition, the geological and hydrogeological characteristics of the coal seam and roof of the typical coal mine underground working face to be mined in the western mining area are surveyed, and the parameters such as the mining process and mining thickness of the working face are mastered; the development characteristics of the water-conducting fracture zone during the working face mining process and the reconstruction (self-healing) characteristics of the roof aquifer after the mining are studied; the evolution characteristics of the water inflow in the goaf during the working face mining process are studied, and the relationship between the water inflow in the goaf and the water-conducting fracture zone of the roof is determined, and the relationship between the water inflow in the goaf and the reconstruction of the aquifer is determined; the change law of the water inflow in the whole life cycle during and after the mining of the working face is analyzed, and a prediction method for the water inflow in the whole life cycle of the working face is constructed.
[0070] Step 1: Basic features of the working surface;
[0071] The geological and hydrogeological characteristics of the coal seams and roof of a typical coal mine in the western mining area were investigated. The study area is controlled by the monocline structure of the Yishan slope in the Ordos Basin. The coal seams and overlying strata are distributed at a gentle angle from east to west (inclination 1-5°); the main mining area is the 3-1 coal of the Yan'an Formation of the Jurassic System (thickness 3-6m), and the roof of the coal seam develops the third section of the Yan'an Formation, the Zhiluo Formation, the Anding Formation, the Zhidan Group and other strata, all of which belong to river / river-lake facies deposits, and are spatially interbedded with aquicludes. The lithology of the aquicludes is mudstone and sandy mudstone; Controlled by the accumulation cycle, three aquifers are developed within the water-conducting fracture zone of the roof. The lithology is medium sandstone and coarse sandstone, specifically the Ⅰ# aquifer (i.e. the Qilizhen sandstone aquifer of the first section of the Zhiluo Formation), the Ⅱ# aquifer (i.e. the Zhenwudong sandstone aquifer of the third section of the Yan'an Formation) and the Ⅲ# aquifer (i.e. the 3-1 coal roof aquifer). The distances from the roof of the 3-1 coal seam are 77.4-109.4m, 48.7-83.2m and 4.9-16.2m respectively. Among them, the Ⅰ# aquifer is highly water-rich (the water inflow from the borehole is 92.0-136.0m 3 / h), high water pressure (5.0~6.0MPa);
[0072] Working face 01 is the first mining working face of this mine, arranged in a northwest-southeast direction, with a working face length of 2,600m and a face width of 240m; working face 02 is the secondary mining working face, adjacent to working face 01, with a working face length of 3,100m and a face width of 240m.
[0073] Step 2: Evolution characteristics of overburden rock during mining at the working face;
[0074] This mine adopts a fully mechanized one-time mining method with a mining thickness of 5 to 6 meters. During the mining process of the working face, the overburden damage can be roughly divided into three stages: (1) In the early stage of the mining process of the working face, the overburden damage leads to the upward development of the water-conducting fracture zone. ① The first pressure is located at 60 meters, and the water-conducting fracture zone develops and connects to the III# aquifer; ② When the mining is carried out to 150 to 180 meters, the first large periodic pressure occurs, and the water-conducting fracture zone develops and connects to the II# aquifer; ③ When the working face is mined to 280 to 320 meters, the second large periodic pressure occurs, and the water-conducting fracture zone develops and connects to the I# aquifer. (2) In the middle and late stages of the mining process of the working face, as the goaf area becomes larger and larger, the water-conducting fracture zone of the roof gradually expands outward; at the same time, under the action of the cantilever beam of the key layer, the water-conducting fracture zone develops in a certain periodicity. (3) After the working face is mined, the aquiclude of the coal seam roof is mainly composed of mudstone and sandy mudstone, and the mud is mainly composed of kaolinite and chlorite, and also contains about 25% illite and montmorillonite. The swelling property of mudstone when exposed to water and the compaction of the roof of the goaf play a role in "rebuilding the aquiclude", resulting in the self-healing of the water-conducting cracks in the roof and the regeneration of the aquiclude.
[0075] According to the mining process of the working face, 4 to 8 water-conducting fracture zone monitoring holes are arranged within the working face, including the early mining range and the mid-to-late mining range of the working face. The height H of the water-conducting fracture zone during the mining process is monitored. d ( Figure 1 ).
[0076] Step 3: Evolution characteristics of water inflow at the working face;
[0077] Due to the development of overburden damage during mining and the self-healing of fractures and aquicludes after mining, the water inflow in the goaf can be divided into three stages: (1) In the early stage of mining, the water-conducting fracture zone develops upward to connect different aquifers, resulting in a rapid increase in the water inflow in the goaf. When the water-conducting fracture zone develops to connect to the Ⅰ# aquifer, the water inflow in the goaf increases to 132-183m 3 / h, forming the first water inflow peak; (2) In the middle and late stages of mining, under the action of the cantilever beam of the key layer, the water-conducting fracture zone develops periodically. As the damage range of the roof aquifer expands, the water inflow in the goaf also increases in a "step-by-step" manner. Around the end of mining, the highest water inflow in the goaf (390m 3 / h); (3) After the working face is mined, the aquiclude of the coal seam roof is mainly composed of mudstone and sandy mudstone, and the mud is mainly composed of kaolinite and chlorite, and also contains about 25% illite and montmorillonite; the swelling property of mudstone in contact with water and the compaction of the roof of the goaf play a role in "rebuilding the aquiclude", resulting in the self-healing of the water-conducting cracks in the roof and the regeneration of the aquiclude.
[0078] After the working face is mined, the self-healing degree of the water-conducting fracture zone in the roof is difficult to obtain through on-site monitoring. In view of the fact that the self-healing degree of the water-conducting fractures determines the change of the water inflow in the goaf, this study uses the change of the water inflow in the goaf over time to reversely deduce the self-healing ratio of the water-conducting fractures, that is, to establish the relationship formula between the self-healing ratio of the water-conducting fractures (r) and the water inflow time (t), see step 4 for details.
[0079] Step 4: Prediction of water inflow during the whole cycle of the working face;
[0080] By analyzing the changing rules of water inflow during and after the mining process of the working face, it is found that the mining footage / mining time and water inflow are closely related parameters. The water inflow at different stages is affected by the development of water-conducting fracture zones caused by overburden damage, which can be reflected in the slope of the calculation formula. Based on this, the prediction formula for water inflow during the whole life cycle of the working face is constructed as follows:
[0081]
[0082] The upward development height of the water-conducting fracture zone (H d), the water-conducting fracture zone development area (S) of the working face roof, and the self-healing ratio of water-conducting fractures (r) are normalized to the mining footage (L) or the duration (t) to obtain H d =0.48L, S=240L, r=0.0018t, a1—the slope of the water inflow equation in the early stage of working face mining; b1—the intercept of the water inflow equation in the early stage of working face mining; a2—the slope of the water inflow equation in the middle and late stages of working face mining; b2—the intercept of the water inflow equation in the middle and late stages of working face mining; a3—the slope of the water inflow equation after the end of working face mining; b3—the intercept of the water inflow equation after the end of working face mining;
[0083] The specific data are: a1=1.301875; b1=12.052; a2=0.001389; b2=120.89; a3=-415.556; b3=32490;
[0084] The calculation equation of water inflow in the whole life cycle of this working face is determined as follows:
[0085]
[0086] Combining steps 1, 2, 3 and 4, we can construct a formula to predict the water inflow of working faces in the western deep-buried mining area throughout their life cycle, and realize accurate prediction of the water inflow during and after the mining process of the working face.
[0087] Therefore, a method for predicting the water inflow of a working face throughout its life cycle of the present invention has the following advantages: surveying the geological and hydrogeological characteristics of the coal seams and roofs of the working faces to be mined in typical coal mines in western mining areas, and mastering the working face mining technology, mining thickness and other parameters; studying the development characteristics of the water-conducting fracture zone during the working face mining process and the reconstruction (self-healing) characteristics of the roof aquiclude after the mining is completed; studying the evolution characteristics of the water inflow in the goaf during the working face mining process, determining the relationship between the water inflow in the goaf and the water-conducting fracture zone in the roof, and determining the relationship between the water inflow in the goaf and the reconstruction of the aquiclude; analyzing the changing laws of the water inflow in the working face during and after the mining process, constructing a method for predicting the water inflow in the working face throughout its life cycle, and providing a scientific basis for accurately predicting the water inflow in the working face throughout its life cycle in the western mining areas.
[0088] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0089] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
[0090] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.
Claims
1. A method for predicting water inflow during the entire life cycle of a working face, characterized in that: Specifically include: The changing rules of water inflow in the whole life cycle of the working face in the early stage of mining, the middle and late stages of mining and the end of mining are analyzed, and the prediction formula of water inflow in the whole life cycle of the working face is constructed: Where, Q is the water inflow in the goaf of the working face, m 3 / h; Formula (1) is used to predict the water inflow in the early stage of working face mining; Formula (2) is used to predict the water inflow in the middle and late stages of working face mining; Formula (3) is used to predict the water inflow after the end of working face mining; H d —Upward development height of water-conducting fracture zone, m, H d =αx; α—coefficient between water-conducting fracture zone and mining advance; x—indicates mining advance, m; S—development area of water-conducting fracture zone in the top plate of the working face, m 2 ; S = xy, y—working surface width, m; r—water-conducting fracture self-healing ratio, r=βt; β—water-conducting fracture self-healing ratio coefficient over time, t represents time, day; a1—the slope of the water inflow equation in the early stage of working face mining; b1—the intercept of the water inflow equation in the early stage of working face mining; a2—the slope of the water inflow equation in the middle and late stages of mining at the working face; b2—the intercept of the water inflow equation in the middle and late stages of mining at the working face; a3—the slope of the water inflow equation after the working face is mined; b3—the intercept of the water inflow equation after the working face is mined.
2. The method for predicting water inflow during the entire life cycle of a working face according to claim 1 is characterized in that: It also includes: Step 1: basic features of the working face; collecting basic parameters of the working face to be mined in the coal mine, and determining the width y of the working face, unit: m; Step 2: Evolution characteristics of overburden during mining of the working face; Study the development characteristics of the water-conducting fracture zone caused by the destruction of the overburden during mining of the working face, and determine the development height H of the water-conducting fracture zone d , unit, m; Step 3: Evolution characteristics of water inflow in the working face; Study the evolution characteristics of water inflow Q in the goaf during the working face mining process to determine the relationship between the water inflow in the goaf and the water-conducting fracture zone in the roof; Study the evolution characteristics of water inflow in the goaf after the working face mining is completed to determine the relationship between the water inflow in the goaf and the reconstruction of the impermeable layer, that is, the self-healing ratio r of the water-conducting fractures.
3. The method for predicting water inflow during the entire life cycle of a working face according to claim 2 is characterized in that: In the step 2, the height of the water-conducting fracture zone is determined by comprehensively judging the actual measured height of the water-conducting fracture zone and the change in water inflow in the goaf.
4. The method for predicting water inflow during the entire life cycle of a working face according to claim 3 is characterized in that: The actual height of the water-conducting fracture zone is measured by constructing an observation hole in the water-conducting fracture zone during the mining process to measure the height of the water-conducting fracture zone; the water inflow in the goaf is mainly obtained by actual underground observation and statistics.
5. A working face full life cycle water inflow prediction system, characterized in that: Specifically include: Working face full life cycle water inflow prediction module: Where, Q is the water inflow in the goaf of the working face, m 3 / h; Formula (1) is used to predict the water inflow in the early stage of working face mining; Formula (2) is used to predict the water inflow in the middle and late stages of working face mining; Formula (3) is used to predict the water inflow after the end of working face mining; H d —Upward development height of water-conducting fracture zone, m, H d =αx; α—coefficient between water-conducting fracture zone and mining advance; x—indicates mining advance, m; S—development area of water-conducting fracture zone in the top plate of the working face, m 2 ; S = xy, y—working surface width, m; r—water-conducting fracture self-healing ratio, r=βt; β—water-conducting fracture self-healing ratio coefficient over time, t represents time, day; a1—the slope of the water inflow equation in the early stage of working face mining; b1—the intercept of the water inflow equation in the early stage of working face mining; a2—the slope of the water inflow equation in the middle and late stages of mining at the working face; b2—the intercept of the water inflow equation in the middle and late stages of mining at the working face; a3—the slope of the water inflow equation after the working face is mined; b3—the intercept of the water inflow equation after the working face is mined.
6. The working face full life cycle water inflow prediction system according to claim 5 is characterized in that: Also includes: Working face basic feature acquisition module: collect the basic parameters of the working face to be mined in the coal mine, and determine the working face width y, unit: m; Working face mining overburden evolution characteristics acquisition module: study the development characteristics of water-conducting fracture zones caused by overburden destruction during working face mining, and determine the development height H of water-conducting fracture zones d , unit, m; Working face water inflow evolution characteristics acquisition module: study the evolution characteristics of water inflow Q in the goaf during the working face mining process, and determine the relationship between the water inflow in the goaf and the water-conducting fracture zone in the roof; study the evolution characteristics of water inflow in the goaf after the working face mining is completed, and determine the relationship between the water inflow in the goaf and the reconstruction of the impermeable layer, that is, the self-healing ratio r of the water-conducting fractures.
7. The working face full life cycle water inflow prediction system according to claim 6 is characterized in that: In the working face mining overburden evolution feature acquisition module, the height of the water-conducting fracture zone is determined by combining the measured height of the water-conducting fracture zone and the change in water inflow in the goaf.
8. The working face full life cycle water inflow prediction system according to claim 7 is characterized in that: The actual height of the water-conducting fracture zone is measured by constructing an observation hole in the water-conducting fracture zone during the mining process to measure the height of the water-conducting fracture zone; the water inflow in the goaf is mainly obtained by actual underground observation and statistics.