A kind of fine sand soil in-situ solidified roadbed and its construction method
The solidified layer is formed by mixing fine sand and curing agent, which solves the problem of difficult compaction of fine sand embankments and the shortage of sand and gravel resources, realizes resource utilization of fine sand and green construction, and is suitable for in-situ solidification of roadbeds. , reducing construction steps and disturbances, improving project quality and resource utilization efficiency.
Patent Information
- Application Number
- CN202210077099.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-01-24
AI Technical Summary
In the existing technology, silty fine sand embankments are not easy to compact and are easy to loosen after compaction. In some areas, due to geographical environment and project cost factors, silty fine sand has to be used in large quantities as high-grade highway embankment fillers, resulting in a shortage of sand and gravel resources and environmental problems. Destruction, and the construction method of strong compaction is not suitable for near construction areas, and it is easy to cause disturbance and disturb residents.
The fine sand and curing agent are used to stir to form a solidified layer. The drainage cushion and vertical steel plates are laid in the subgrade cavity to construct the cavity. The fine sand is injected and dehydrated, then the curing agent is added for stirring to form a solidified soil subgrade, reducing construction steps. and ground occupation, suitable for in-situ cured roadbed.
It realizes the resource utilization of fine sand, saves land, shortens the construction period, increases the foundation preloading period, reduces the amount of earthwork and engineering investment, is suitable for green and environmentally friendly construction, and reduces the impact on the environment.
Smart Images

Figure CN114508012B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of road engineering, and in particular relates to a silty sand soil body in-situ solidified roadbed and a construction method thereof. Background Art
[0002] With the development of export-oriented economy, the construction of infrastructure in coastal areas is at an unprecedented high tide. Ports, docks and other infrastructure must be built near the sea, which often requires land reclamation and sand filling in the sea to form land. Sand filling is generally in a relatively loose state and cannot meet the requirements of bearing capacity, settlement control and prevention of liquefaction. It must be reinforced to meet the requirements of the project.
[0003] And with the rapid development of high-grade highway construction, the contradiction of decreasing per capita land resources has been aggravated. In order to save non-renewable land resources and take the path of sustainable development, many high-grade highway embankments have chosen sand filling, and in sand-filled embankments, medium-coarse sand is generally used more, and fine sand is rarely used. The main reason is that fine sand embankments are not easy to compact, are easy to loosen after compaction, and the dynamic load of vehicles has a great influence on the strength and deformation of the embankment. However, in some areas, especially in coastal areas of my country, due to factors such as geographical environment and engineering cost, fine sand has to be used as a large amount of filling material for high-grade highway embankments.
[0004] On the other hand, the scale of road construction in my country is expanding year by year. The development of road construction has led to a huge demand for roadbed fillers. However, high-quality fillers such as sand and gravel can only be obtained through riverbed sand mining, mountain quarrying and other methods, which destroys the original natural ecological environment, and sand and gravel resources are becoming increasingly scarce.
[0005] Using fine sand as roadbed filler after solidification treatment is an important way to solve the above problems. By adding solidification materials, the water and clay minerals in the fine sand react with the solidification materials physically and chemically, thereby improving the engineering properties of the fine sand. The fine sand solidified soil formed by the treatment is used as roadbed filler. This treatment method has the advantages of large processing capacity and short processing time. It can consume a huge amount of fine sand, allowing construction in coastal areas to use local materials, realizing the resource utilization of fine sand, and is of great significance to environmental protection and ecological civilization construction.
[0006] At present, there is a technology for pouring embankments using fluidized solidified soil. The specific construction method is to inject fine sand into a pre-built fine sand pool, add a curing agent, and pour the embankment after the fluidized solidified soil meets the requirements. Compared with the fluidized solidified soil embankment pouring technology, the in-situ solidified roadbed involved in the present invention directly injects fine sand into the roadbed cavity, does not require the construction of a fine sand pool, saves land, and can effectively increase the preloading period of the foundation.
[0007] After solidification, fine sand is used as roadbed filler to form a solidified soil roadbed. Currently, the main methods used are dynamic compaction and vibroflotation. However, the dynamic compaction method causes large vibrations during construction and is not suitable for areas close to buildings and structures, as it is prone to disturbance and nuisance to residents. Summary of the invention
[0008] Purpose of the invention: In order to solve the problems existing in the prior art, the present invention provides an in-situ solidified roadbed of fine sand soil; the present invention also provides a construction method thereof, which has fewer steps and can better balance the construction period and project quality.
[0009] Technical solution: In order to achieve the above-mentioned invention purpose, a silt-sand soil in-situ solidified roadbed of the present invention includes a drainage cushion layer and a solidified layer located above the drainage cushion layer, wherein the solidified layer is formed by mixing silt-sand and a solidifying agent; the content of particles of the silt-sand with a particle size greater than 0.075 mm exceeds 50% of the total weight of the silt-sand soil, and the content of particles with a particle size greater than 0.075 mm is less than 75% of the total weight of the silt-sand soil. The amount of the solidifying agent added only needs to meet the set solidification parameters, and can be added by referring to the range of the amount of the solidifying agent added in the prior art. The inventive point of the present invention is that the silt-sand and the solidifying agent are mixed on-site, and the silt-sand soil is used to solidify the roadbed in-situ without the need for additional steps.
[0010] Furthermore, the curing agent is cement and / or lime.
[0011] Furthermore, a construction method for in-situ solidification of a roadbed of fine sand soil comprises the following steps:
[0012] 1) Lay a drainage cushion layer with a thickness of 0.3-0.7m above the foundation soil within the boundary range of the construction site;
[0013] 2) inserting a vertical steel plate into the foundation soil to a depth of 0.5-1m, the vertical steel plate being fixed by a support frame, the vertical steel plate being enclosed to form a cavity, and the cavity being located above the drainage cushion layer;
[0014] 3) Pour fine sand into the cavity, open the drain valve after it is left to stand, and use a vacuum pump in conjunction with the drain valve to pump water out of the cavity;
[0015] 4) monitoring the moisture content change of the fine sand in the cavity, and after the moisture content drops to the set moisture content, adding a curing agent to the fine sand to obtain a cured layer;
[0016] 5) After the strength of the solidified layer reaches the set value, the vertical steel plates are pulled out and recovered; formwork is set up on both sides of the formed roadbed body, and the embankment slope is filled by pouring fluidized solidified soil.
[0017] Further, in the step 2), the support frame is located outside the cavity; the support frame is trapezoidal, and includes a first steel pipe, a rotating steel bar, a positioning steel bar, a second steel pipe, a first transverse steel bar, and a second transverse steel bar. The rotating steel bar is inserted into the first steel pipe for welding, and the positioning steel bar is inserted into the second steel pipe for positioning. The rotating steel bar and the positioning steel bar are welded by the first transverse steel bar and the second transverse steel bar serving as the two sides of the trapezoidal support frame.
[0018] Furthermore, the first transverse steel bars, the second transverse steel bars, the rotating steel bars, and the positioning steel bars are respectively steel bars with a diameter of mm; the first steel pipe and the second steel pipe are respectively steel pipes with an outer diameter of 16 mm and an inner diameter of 14 mm.
[0019] Furthermore, in the step 2), the support frame welded on the vertical steel plate is rotated to be perpendicular to the vertical steel plate, and the first steel pipe with the rotating steel bar inserted is welded to the vertical steel plate. The welding position should be at least 1m away from the bottom end of the vertical steel plate, and the support frame is fixed so that it no longer rotates; when in use, the rotating steel bar is rotated to be fixed perpendicular to the vertical steel plate, and when not in use, the rotating steel bar is rotated to fit the vertical steel plate.
[0020] Furthermore, a circular hole with a drainage valve diameter is provided at 0.7-1 m from the bottom of the vertical steel plate, an upper pull-out hole is opened at the top of the vertical steel plate, and a sealing strip is built into the vertical steel plate.
[0021] Furthermore, the vertical steel plate is a stainless steel plate with a thickness of 50-100 mm, a length of 2-3 m, and a height greater than or equal to 3 m; there are four vertical steel plates, and the four vertical steel plates are enclosed to form the rectangular cavity.
[0022] Furthermore, the drain valve is made of two identical steel sheets with holes overlapped together. The steel sheets are installed in advance before the vertical steel plates are inserted. A control handle is welded on the outer steel sheet. After the fine sand is injected and left to stand, the control handle is turned to make the holes of the two steel sheets overlap to drain the water. After the drainage is completed, the control handle is turned, and the drainage holes are blocked by the adjacent steel sheets, and no water flows out. The main body of the drain valve uses a drill bit with a diameter of 3-5mm to open three elliptical holes of the same size and equal spacing on the steel edge, and the manufactured drain valve is installed in the circular hole reserved in the vertical steel plate.
[0023] Furthermore, in the step 4), a mixer 15 is used to mix the fine sand and the curing agent.
[0024] Beneficial effects: Compared with the prior art, the in-situ solidified roadbed of a silt-soil body of the present invention comprises a drainage cushion layer and a solidified layer located above the drainage cushion layer, wherein the solidified layer is formed by mixing silt-sand and a solidifying agent; the content of silt-sand particles with a particle size greater than 0.075 mm exceeds 50% of the total weight of the silt-soil body, and the content of particles with a particle size greater than 0.075 mm is less than 75% of the total weight of the silt-soil body. The present invention has a simple structure by constructing the embankment formwork in situ into a cavity for embankment filling, and arranging a drainage cushion layer at the bottom thereof. The construction method of the present invention is to pour fine sand into the roadbed cavity formed in situ by the roadbed template, add a curing agent after the fine sand is dehydrated and stir on site to form a solidified soil roadbed, and the fine sand can be directly injected into the embankment cavity to achieve preliminary drainage, and after the moisture content is reduced to the optimal moisture content, a curing agent is added and stirred, and the fine sand is easily liquefied to carry out mixing to ensure the mixing uniformity and material workability, and then the solidified fine sand is maintained to finally form a solidified soil embankment. The construction method of the present invention has fewer processes, fast construction speed, and little influence from weather factors. In addition to being able to quickly complete the filling of the embankment, reduce the slope angle, reduce the amount of earthwork, and better balance the relationship between the construction period, project quality and project investment, the vertical steel plate of this method can be recycled, which is green and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a top view of the steel plate after erection;
[0026] Figure 2 is a structural schematic diagram of the support frame;
[0027] Figure 3 It is a structural schematic diagram of the vertical steel plate;
[0028] Figure 4 This is a schematic diagram of the drainage cushion layer;
[0029] Figure 5 The figure is a schematic diagram of the support frame installation process;
[0030] Figure 6 Schematic diagram of adding fine sand into the cavity;
[0031] Figure 7 is a schematic diagram of a blender;
[0032] Figure 8 is a schematic diagram of the plug-in pin;
[0033] Fig. 9 This is a schematic diagram of the vertical steel plate after recovery;
[0034] Fig.10 This is a schematic diagram after the construction is completed;
[0035] The accompanying drawings are marked as: 1-vertical steel plate, 2-sealing strip, 3-drain valve, 4-control handle, 5-upper pull-out hole, 6-first steel pipe, 7-rotating steel bar, 8-positioning steel bar, 9-second steel pipe, 10-first transverse steel bar, 11-second transverse steel bar, 12-drainage cushion layer, 13-fine sand, 14-vacuum pump, 15-mixer, 16-plug-in pin, 17-base, 18-support frame. DETAILED DESCRIPTION
[0036] The structure and performance of the present invention will be further described below in conjunction with the accompanying drawings.
[0037] It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent modifications of the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.
[0038] The Code for Design of Building Foundations (GB50007--2002) stipulates that soil with a particle size greater than 0.075mm that exceeds 50% of the total weight is called silt. Silt content: particles with a particle size greater than 0.075mm > 50%; fine sand content: particles with a particle size greater than 0.075 > 75%; silt and fine sand content: particles with a particle size greater than 0.075mm > 75% > 50%. The silt and fine sand soil body in the present invention, that is, the silt and fine sand 13, has a particle size greater than 0.075mm that exceeds 50% of the total weight, and a particle size greater than 0.075mm that is less than 75% of the total weight. The total weight is the weight of the sampled silt and fine sand soil body.
[0039] A fine sand soil in-situ solidified roadbed includes the determination of the thickness and strength of the solidified layer, and the structural design of a vertical steel plate 1, a trapezoidal support frame 2, a drainage cushion layer 12, and a drainage valve 3.
[0040] A drainage cushion layer 12 of a certain thickness is laid in the embankment filling cavity formed in situ by the vertical steel plate 1, and then fine sand 13 is injected into the cavity. At the same time, the drainage valve 3 is opened and the vacuum pump 14 is used to pump water out. After the moisture content of the fine sand 13 drops to the target value, a curing agent is added to the fine sand 13, and a mixer 15 is used to mix it on site to form a cured soil embankment in the area.
[0041] First, the thickness and strength of the solidified layer of the in-situ solidified roadbed of fine sand soil are determined. According to the double-layer foundation bearing capacity theory, the ultimate bearing capacity of the foundation can be calculated using the following formula:
[0042] f u =c1N m +q
[0043]
[0044] β=BL / [2(B+L)H]k c
[0045] k c =c2 / c1
[0046] Where: f u ——Ultimate bearing capacity of foundation, kPa;
[0047] c1——undrained shear strength of the bearing layer soil, kPa;
[0048] N m — modified bearing capacity factor considering the influence of layered soil;
[0049] c2——undrained shear strength of underlying layer, kPa;
[0050] N c s r ——Terzaghi bearing capacity coefficient and foundation shape coefficient respectively;
[0051] B, L – width and length of the foundation, m;
[0052] H——the thickness of the solid soil layer under the base, that is, the thickness of the solidified soil layer, m;
[0053] β——punching shear coefficient;
[0054] k c ——Ratio of the undrained shear strength of two soil layers;
[0055] q——overload on both sides of the foundation, kPa;
[0056] From the above formula, we can know that the bearing capacity of the double-layer foundation is related to the bearing capacity coefficient and the undrained shear strength of the bearing layer. The bearing capacity coefficient is related to the load size, treatment thickness and the undrained shear strength ratio of the upper and lower layers. The treatment thickness that meets the bearing capacity requirements can be obtained.
[0057] On the premise that the treatment thickness is known, the vertical steel plate 1, the support frame 18, the drainage cushion layer 12 and the drainage valve 3 are designed and constructed.
[0058] like Figure 1 As shown, the vertical steel plate 1 is provided with a circular hole of the same diameter as the drainage valve 3 at 0.7-1m (not less than the height of the drainage cushion layer) from the bottom thereof, and an upper pull-out hole 5 is opened at the top of the vertical steel plate 1. The vertical steel plate 1 can be made of ordinary carbon steel or stainless steel. The vertical steel plate 1 is built with a sealing strip 2, which is made of rubber material to prevent leakage at the joints of the steel plates.
[0059] The second steel pipe 9 is a positioning steel pipe. The first steel pipe 6 is a welded steel pipe.
[0060] like Figure 2 As shown, the support frame 18 is in the shape of a right-angled trapezoid composed of steel bars and steel pipes, and the rotating steel bars 7 are inserted into the first steel pipe 6 and then welded to other steel bars and the second steel pipe 9. The support frame 18 is trapezoidal, and the support frame 18 can be rotated to be vertically fixed to the vertical steel plate 1 when in use, and can be rotated to fit the steel plate when not in use, so as to facilitate transportation.
[0061] like Figure 3 As shown, the drain valve 3 is made of two identical steel sheets with holes overlapped together. The steel sheets are installed in advance before the vertical steel plate 1 is inserted, and can be made of stainless steel or other materials. A stainless steel control handle 4 is welded on the outer steel sheet. When the fine sand 13 is injected and left to stand, the control handle 4 is turned to make the holes of the two steel sheets overlap to drain water; after the drainage is completed, the handle is turned, and the drainage holes are blocked by the adjacent steel sheets, and no water flows out.
[0062] like Figure 4 As shown, the drainage cushion layer 12 uses a well-graded crushed stone or sand cushion layer as a cushion layer for the solidified earth embankment, while blocking the solid phase in the fine sand 13 to facilitate precipitation of the fine sand 13.
[0063] like Figure 5-10 As shown, the construction method of in-situ solidification roadbed of fine sand soil includes the following steps:
[0064] Step 1: A 0.3-0.7m thick well-graded drainage cushion layer 12 should be laid within the boundary of the construction site, and the gravel soil should be compacted to meet the requirements of the specification;
[0065] Step 2: Control the verticality of the vertical steel plates 1. Manually insert four vertical steel plates 1 into the foundation soil to a depth of 0.5-1m. Then rotate the support frame 18 welded on the vertical steel plates 1 to be perpendicular to the vertical steel plates 1. Insert steel bars into the second steel pipe 9. The depth of the steel bars into the soil is not less than the thickness of the cushion layer. Fix the support frame 18 so that it does not rotate any more.
[0066] Step 3: inject fine sand 13 into the cavity of the in-situ structure of the vertical steel plate 1, open the drain valve 3 after it is left to stand, and use the vacuum pump 14 to cooperate with the drain valve 3 to pump water out;
[0067] Step 4: monitor the moisture content of the fine sand 13 in the cavity, and when the moisture content drops to the optimum moisture content, add cement, lime or other curing agent to the fine sand 13, and use a mixer 15 to fully mix the fine sand 13 and the curing agent; the mixer 15 may be elevated by a base 17;
[0068] Step 5: After the strength of the solidified soil embankment reaches the required level, the vertical steel plate 1 is pulled up and recovered through the pull-out holes 5. Formwork is set up on both sides of the formed roadbed body, and the embankment slope is filled in the form of fluidized solidified soil pouring.
[0069] Example
[0070] A fine sand soil in-situ solidified roadbed includes the preparation of a drainage cushion layer 12 and fine sand 13, the manufacture of a vertical steel plate 1, a support frame 18, and a drainage valve 3, and a construction method thereof. First, the vertical steel plate 1 is manufactured.
[0071] (1) Fabrication of vertical steel plate 1. Use stainless steel plates with a thickness of 50-100 mm, a length of 2-3 m, and a height of at least 3 m. Use an electric drill with a diameter of 10 mm to cut circular holes with a diameter of 15 mm every 20 mm horizontally at a distance of 0.7-1 m (not less than the height of the drainage cushion layer) from the bottom of the steel plate for subsequent installation of the drainage valve 3; use a drill with a diameter of 5 mm to drill a hole 8-10 cm from the top of the steel plate; vertically attach sealing strips 2 on both sides of the vertical steel plate 1 to prevent leakage at the joints of the vertical steel plate 1. The sealing strips 2 are made of rubber and fixed to the edges of the vertical steel plate 1 by hot rolling and bonding.
[0072] (2) Fabrication of the support frame 18. The steel bars and steel pipes of the support frame 18 are made of carbon steel. The support frame 18 is composed of three steel bars and two steel pipes. First, the rotating steel bar 7 is inserted into the first steel pipe 6 to be welded to the vertical steel plate 1. Then, the rotating steel bar 7 is welded to the steel bars (first transverse steel bar 10, second transverse steel bar 11) as the two sides of the trapezoidal support frame 18 and the second steel pipe 9 as the shorter bottom side of the trapezoid. Finally, the first steel pipe 6 with the rotating steel bar 7 inserted is welded to the vertical steel plate 1. The welding position should be at least 1m away from the bottom end of the vertical steel plate 1, and the fabrication and installation of the support frame 18 is completed. The steel bar is 12mm, and the steel pipe has an outer diameter of 16mm and an inner diameter of 14mm.
[0073] (3) Fabrication of the drain valve 3. The main body of the drain valve 3 is made of two steel sheets of the same size and structure, and stainless steel is selected. A drill with a diameter of 3-5 mm is used to open three elliptical holes of the same size and equal spacing on the steel edge. A control handle 4 is welded on the outer steel sheet, and stainless steel is selected to control the switch of the drain valve 3. The manufactured drain valve 3 is installed in the circular hole reserved in the vertical steel plate 1, and the manufacture and installation of the drain valve 3 are completed.
[0074] After the above-mentioned equipment is manufactured, and the fine sand 13 and drainage cushion layer 12 are prepared, the construction of the soil in-situ solidification roadbed is carried out. A road section to be constructed that lacks conventional roadbed fillers is selected. The designed height of the embankment of this section is 2m, the length of the section is 200m, and the scale of a construction area is 2×2m. Calculate the thickness of its solidification layer.
[0075] The construction method of in-situ solidification roadbed of fine sand soil comprises the following steps:
[0076] Step 1: Lay a 0.5m thick well-graded drainage cushion layer 12 within the boundary range of the construction site, and compact the gravel soil to meet the specification requirements;
[0077] Step 2: Control the verticality of the vertical steel plates 1. Manually insert four vertical steel plates 1 into the foundation soil to a depth of 0.5 m. Then rotate the support frame 18 welded on the vertical steel plates 1 to be perpendicular to the vertical steel plates 1. Insert steel bars into the second steel pipe 9. The depth of the steel bars into the soil is not less than the thickness of the cushion layer. Fix the support frame 18 so that it does not rotate any more.
[0078] Step 3: inject fine sand 13 into the cavity of the in-situ structure of the vertical steel plate 1, open the drain valve 3 after it is left to stand, and use the vacuum pump 14 to cooperate with the drain valve 3 to pump water out;
[0079] Step 4: monitor the moisture content of the fine sand 13 in the cavity, and when the moisture content drops to the optimal moisture content, add a curing agent such as cement and lime to the fine sand 13, and use a mixer 15 to fully stir the fine sand 13 and the curing agent;
[0080] Step 5: After the strength of the solidified soil embankment reaches the required level, the vertical steel plate 1 is pulled up and recovered through the pull-out holes 5. Formwork is set up on both sides of the formed roadbed body, and the embankment slope is filled in the form of fluidized solidified soil pouring.
Claims
1. A construction method for in-situ solidification of fine sandy soil roadbed, characterized in that: The silt-sand soil body in-situ solidified roadbed comprises a drainage cushion layer (12) and a solidified layer located above the drainage cushion layer (12), wherein the solidified layer is formed by mixing silt-sand (13) and a solidifying agent; the content of particles with a particle size greater than 0.075 mm in the silt-sand (13) exceeds 50% of the total weight of the silt-sand soil body, and the content of particles with a particle size greater than 0.075 mm is less than 75% of the total weight of the silt-sand soil body; the solidifying agent is cement and / or lime; the drainage cushion layer (12) has a thickness of 0.3-0.7 m and is directly laid above the foundation soil; the silt-sand soil body is directly solidified in-situ on the drainage cushion layer (12) to form a solidified layer, wherein, during solidification, the excess water in the silt-sand soil body is firstly discharged, and then the solidifying agent is added and stirred to solidify to form a solidified layer; The steps include: 1) Lay a drainage cushion layer (12) with a thickness of 0.3-0.7m above the foundation soil within the boundary of the construction site; 2) inserting the vertical steel plate (1) into the foundation soil to a depth of 0.5-1 m, the vertical steel plate (1) being fixed by a support frame (18), the vertical steel plate (1) being enclosed to form a cavity, the cavity being located above the drainage cushion layer (12); 3) injecting fine sand (13) into the cavity, opening the drain valve (3) after it is left to stand, and using a vacuum pump (14) in conjunction with the drain valve (3) to pump water out of the cavity; 4) monitoring the change in the moisture content of the fine sand (13) in the cavity, and after the moisture content drops to a set moisture content, adding a curing agent to the fine sand (13) to obtain a cured layer; 5) After the strength of the solidified layer reaches the set value, the vertical steel plate (1) is pulled up and recovered; formwork is set up on both sides of the formed roadbed body, and the embankment slope is filled in the form of fluidized solidified soil pouring; in the step 2), the support frame (18) is located outside the cavity; the support frame (18) is trapezoidal, and the support frame (18) includes a first steel pipe (6), a rotating steel bar (7), a positioning steel bar (8), a second steel pipe (9), a first transverse steel bar (10), and a second transverse steel bar (11); the rotating steel bar (7) is inserted into the first steel pipe (6) for welding, and the positioning steel bar (8) is inserted into the second steel pipe (9) for positioning; the rotating steel bar (7) and the positioning steel bar (8) are welded by the first transverse steel bar (10) and the second transverse steel bar (11) as the two waists of the trapezoidal support frame (18); The first transverse steel bar (10), the second transverse steel bar (11), the rotating steel bar (7), and the positioning steel bar (8) are all steel bars with a diameter of 12 mm; the first steel pipe (6) and the second steel pipe (9) are all steel pipes with an outer diameter of 16 mm and an inner diameter of 14 mm; In the step 2), the support frame (18) is rotated to be perpendicular to the vertical steel plate (1), and the first steel pipe (6) with the rotating steel bar (7) inserted therein is welded to the vertical steel plate (1), and the welding position is at least 1 m away from the bottom end of the vertical steel plate (1); A circular hole with a diameter of the drain valve (3) is provided at a distance of 0.7-1 m from the bottom of the vertical steel plate (1), an upper pull-out hole (5) is provided at the top of the vertical steel plate (1), and a sealing strip (2) is built into the vertical steel plate (1); the drain valve (3) is made of two identical steel plates with holes overlapped together, the steel plates are installed in advance before the vertical steel plate (1) is inserted into the foundation soil, a control handle (4) is welded on the outer steel plate, and after the fine sand (13) is injected and left to stand, the control handle (4) is rotated to make the holes of the two steel plates overlap, and drainage is performed; after drainage is completed, the control handle (4) is rotated, and the drainage holes are blocked by the adjacent steel plates, and no water flows out; the main body of the drain valve (3) uses a drill bit with a diameter of 3-5 mm to open three elliptical holes of the same size and equal spacing on the steel edge, and the prepared drain valve (3) is installed in the circular hole reserved in the vertical steel plate (1).
2. The construction method of in-situ solidification roadbed of fine sand soil according to claim 1 is characterized in that: The vertical steel plate (1) is a stainless steel plate with a thickness of 50-100 mm, a length of 2-3 m, and a height greater than or equal to 3 m. There are four vertical steel plates (1), and the four vertical steel plates (1) are enclosed to form a rectangular cavity.
3. The construction method of in-situ solidification roadbed of fine sand soil according to claim 1, characterized in that: In the step 4), a mixer (15) is used to mix the fine sand (13) and the curing agent.