Wind tunnel operation system and wind tunnel operation method based on wind tunnel operation system

By designing the subsystems of the wind tunnel operation system to work together, the problem of automation and safe operation of the φ1m hypersonic low-density wind tunnel was solved, automatic control and safety monitoring of the wind tunnel was realized, and the reliability and safety of the test data were ensured. sex.

CN114509231BActive Publication Date: 2024-10-15BEIJING AEROSPACE YISEN WIND TUNNEL ENG TECH
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN202111666259.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-30
Publication Date
2024-10-15
Estimated Expiration
2041-12-30

AI Technical Summary

Technical Problem

Existing technology is difficult to meet the automation and safe operation requirements of φ1m hypersonic low-density wind tunnels, and lacks a high degree of automation and safe and reliable measurement and control systems.

Method used

A wind tunnel operation system is designed, including safety control subsystem, general control subsystem, pressure adjustment control subsystem, heater control subsystem, flow field display subsystem, angle of attack control subsystem, data acquisition subsystem, nitrogen Control subsystem and vacuum control subsystem, through the collaborative work of these subsystems, automatic control and safety monitoring of the wind tunnel are realized.

Benefits of technology

It realizes automated measurement and control of hypersonic low-density wind tunnels, improves operational safety, and ensures stable operation of the wind tunnel under different conditions and reliable collection of test data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114509231B_ABST
    Figure CN114509231B_ABST
Patent Text Reader

Abstract

The present application discloses a wind tunnel operation system and a wind tunnel operation method based on the wind tunnel operation system, which relates to the field of gas dynamics. The parameters such as nitrogen, pressure, temperature, etc. required for the operation of a hypersonic low-density wind tunnel can be controlled by the general control subsystem, so as to realize the automatic measurement and control of the hypersonic low-density wind tunnel. The wind tunnel operation system includes: the safety control subsystem sends a test start signal to the general control subsystem; the general control subsystem sends a test signal to other subsystems of the wind tunnel; the pressure regulation control subsystem opens the main valve; the heater control subsystem adjusts the heating power of the graphite resistance heating rod; the flow field display subsystem displays and records the low-density flow field; the nitrogen control subsystem continuously prepares nitrogen; the vacuum control subsystem continuously evacuates; the angle of attack control subsystem traverses the target angle of attack sequence and sends a data acquisition signal to the data acquisition subsystem; the data acquisition subsystem acquires the balance data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of wind tunnel control, and in particular to a wind tunnel operation system and a wind tunnel operation method based on the wind tunnel operation system. Background Art

[0002] The φ1m hypersonic low-density wind tunnel is a special equipment for studying the rarefied gas dynamic characteristics of aircraft. It adopts pressure vacuum operation mode and the working medium is pure nitrogen. The wind tunnel consists of equipment such as the main valve, pressure regulating valve, graphite resistance heater, front chamber, nozzle, test section, angle of attack mechanism, super expansion section, cooler, as well as nitrogen station (medium and high pressure nitrogen preparation, storage and supply), vacuum system (vacuum unit and vacuum ball), cooling water system, hydraulic station, data acquisition system, flow field display system and other auxiliary equipment / systems.

[0003] In related technologies, in order to ensure the normal operation of large wind tunnels, it is necessary to develop specific measurement and control systems for different wind tunnel types and test process requirements. The measurement and control systems are required to have a high degree of automation, strong safety and reliability, and the test process control method meets the operation requirements of large low-density wind tunnels. Therefore, a mature product that meets the automation and safety requirements of φ1m hypersonic low-density wind tunnels is urgently needed. Summary of the invention

[0004] In view of this, the present application provides a wind tunnel operation system and a wind tunnel operation method based on the wind tunnel operation system, the main purpose of which is to solve the current problem of the urgent need for a mature product that can meet the requirements of automated and safe operation of a φ1m hypersonic low-density wind tunnel.

[0005] According to a first aspect of the present application, a wind tunnel operation system is provided, the system comprising: a safety control subsystem, a master control subsystem, a pressure regulation control subsystem, a heater control subsystem, a flow field display subsystem, an angle of attack control subsystem, a data acquisition subsystem, a nitrogen control subsystem, and a vacuum control subsystem;

[0006] The safety control subsystem sends a test start signal to the general control subsystem, and the safety control subsystem is used to protect the wind tunnel operation system;

[0007] The general control subsystem receives the test start signal sent by the safety control subsystem, and sends the test start signal to the pressure regulation control subsystem, the heater control subsystem, the nitrogen control subsystem, and the vacuum control subsystem, and sends a hard-wired trigger signal to the flow field display subsystem and a test start signal to the angle of attack control subsystem when the current chamber pressure and the front chamber temperature reach the target pressure and the target temperature respectively, and sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem when the target angle of attack sequence is traversed, so as to complete the wind tunnel operation test;

[0008] The pressure regulating control subsystem receives the test start signal sent by the master control subsystem, opens the master valve, introduces medium and high pressure nitrogen into the wind tunnel, and adjusts the pressure regulating valve to adjust the pressure of the antechamber;

[0009] The heater control subsystem receives the test start signal sent by the master control subsystem, adjusts the heating power of the graphite resistance heating rod, heats the medium and high pressure nitrogen, and adjusts the temperature of the front chamber;

[0010] The flow field display subsystem receives the hard-wired trigger signal sent by the master control subsystem, and displays and records the low-density flow field with high-speed video;

[0011] The nitrogen control subsystem receives the test start signal sent by the general control subsystem, continuously detects the medium and high pressure nitrogen pressure, and when the pressure is less than the target nitrogen pressure lower limit, prepares nitrogen, opens the medium pressure tank air inlet valve or the high pressure tank air inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure upper limit, and closes the relevant valves;

[0012] The vacuum control subsystem receives the test start signal sent by the main control subsystem, continuously detects the vacuum degree of the wind tunnel, and when it is detected that the vacuum degree of the wind tunnel is lower than the target vacuum degree of the wind tunnel, continuously controls the wind tunnel vacuum pumping unit and the vacuum ball vacuum pumping unit to perform vacuum pumping;

[0013] The angle of attack control subsystem receives the test start signal sent by the general control subsystem, traverses the target angle of attack sequence, performs angle sequence movement under load conditions, and sends a data acquisition signal to the data acquisition subsystem when it moves to the angle of attack sequence value stored in the target angle of attack sequence;

[0014] The data acquisition subsystem receives the data acquisition signal sent by the angle of attack subsystem, collects balance data, and obtains the aerodynamic data of the wind tunnel. The aerodynamic data is the data generated when the wind tunnel has aerodynamic load.

[0015] Optionally, the wind tunnel operation system further includes: related subsystems;

[0016] The safety control subsystem receives the test preparation signal, calls the time server to send synchronization time to other subsystems, and sends the test preparation signal to the general control subsystem, wherein the other subsystems are subsystems in the wind tunnel operation system except the safety control subsystem;

[0017] The general control subsystem receives the test preparation signal sent by the safety control subsystem, obtains wind tunnel operation parameters, and sends the wind tunnel operation parameters to the other subsystems accordingly, and when the general control subsystem receives the reception success signal sent by the other subsystems, sends the test preparation signal to the relevant subsystems, and the relevant subsystems are subsystems participating in the wind tunnel operation preparation;

[0018] The related subsystem receives the test preparation signal and prepares for the test operation.

[0019] Optionally, the related subsystems include: a hydraulic control subsystem, a cooling water control subsystem, the data acquisition subsystem, the angle of attack control subsystem, the nitrogen control subsystem, the vacuum control subsystem, and the heater control subsystem;

[0020] The data acquisition subsystem receives the test preparation signal sent by the general control subsystem, measures and collects the parameters along the wind tunnel, prepares to collect the balance data, and receives the data acquisition signal sent by the angle of attack control subsystem, collects the balance data, and obtains the balance data corresponding to the wind tunnel under no-load conditions, where the no-load condition refers to the data generated when the wind tunnel does not have the aerodynamic load;

[0021] The angle of attack control subsystem receives the test preparation signal sent by the general control subsystem, traverses the target angle of attack sequence, performs the angle sequence movement under the no-load condition, and when moving to the angle of attack sequence value stored in the target angle of attack sequence, sends the data acquisition signal to the data acquisition subsystem;

[0022] The hydraulic control subsystem receives the test preparation signal sent by the master control subsystem, provides a high-pressure oil source to the master valve and the pressure regulating valve, and supplies oil to the hydraulic cylinder compression chamber of the master valve when the hydraulic control solenoid valve of the master valve is in a power-off state;

[0023] The nitrogen control subsystem receives the test preparation signal sent by the general control subsystem, prepares nitrogen, opens the medium-pressure gas tank inlet valve or the high-pressure gas tank inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure, and closes the relevant valves;

[0024] The cooling water control subsystem receives the test preparation signal sent by the general control subsystem and provides cooling circulating water to the heater, nozzle, super expansion section and vacuum unit;

[0025] The vacuum control subsystem receives the test preparation signal sent by the master control subsystem, controls the cavity vacuum pumping unit to vacuum the cavity, controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball, and when the vacuum degrees of the cavity and the vacuum ball are close, opens the separated vacuum valve to connect the cavity with the vacuum ball, and continuously controls the cavity vacuum pumping unit and the vacuum ball vacuum pumping unit to vacuum until the cavity vacuum degree reaches the cavity target vacuum degree;

[0026] The heater control subsystem receives the test preparation signal sent by the general control subsystem, preheats the components in the heater, and adjusts the heating power of the graphite resistance heating rod until the measured internal temperature of the heater reaches the target preheating temperature of the heater.

[0027] Optionally, the general control subsystem sends a test processing signal to the pressure regulating control subsystem and the vacuum control subsystem, and when the general control subsystem receives the processing completion signals sent by the pressure regulating control subsystem and the vacuum control subsystem, the general control subsystem sends a stop signal to the pressure regulating control subsystem, the heater control subsystem, the data acquisition subsystem, the nitrogen control subsystem, the vacuum control subsystem, the cooling water control subsystem, and the hydraulic control subsystem to complete the wind tunnel operation test processing, and sends a test end signal to the safety control subsystem;

[0028] The pressure regulating control subsystem receives the test processing signal sent by the main control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature;

[0029] The vacuum control subsystem receives the test processing signal sent by the general control subsystem, stops the cave body vacuum pumping unit and the vacuum ball vacuum pumping unit, closes the vacuum valve, and opens the air-breaking valve, which is used to allow outside air to flow into the cave body.

[0030] Optionally, the safety control subsystem further includes: nitrogen concentration monitoring interlock, cavern key component position status interlock, graphite resistance heater protection interlock, antechamber protection interlock, test section oxygen concentration interlock and vacuum interlock;

[0031] The safety control subsystem receives the test preparation signal sent by the main control console, connects all the safety monitoring sensors and limit switches corresponding to other subsystems to the safety control subsystem, and continuously detects the operating status of the other subsystems based on the safety monitoring sensors until the safety control subsystem receives the test end signal sent by the general control subsystem;

[0032] The nitrogen concentration monitoring interlock detects the nitrogen concentration in the nitrogen control subsystem, and when it is detected that the nitrogen concentration in the nitrogen control subsystem meets a first preset threshold, generates an alarm reminder, and sends a shutdown signal to the nitrogen control subsystem and the pressure regulation control subsystem;

[0033] The position state interlock of the key components of the tunnel body detects the closed door or manhole flange in the wind tunnel operation system, and when it is detected that there is an abnormally started door or manhole flange in the wind tunnel operation system, the closing signal is sent to the other subsystems in a time sequence;

[0034] The graphite resistance heater protection interlock detects the vacuum degree and heater temperature in the wind tunnel operation system, and when it is detected that the vacuum degree in the wind tunnel operation system meets the second preset threshold or the heater temperature meets the third preset threshold, sends a shutdown signal to the heater control subsystem and sends a cooling signal to the pressure regulation control subsystem;

[0035] The front chamber protection interlock detects the front chamber pressure and the front chamber temperature of the wind tunnel, and when it is detected that the front chamber pressure of the wind tunnel meets a fourth preset threshold or the front chamber temperature meets a fifth preset threshold, sends a shutdown signal to the heater control subsystem, sends an emergency return to zero instruction to the angle of attack control subsystem, and sends the shutdown signal to the pressure regulation control subsystem after a fixed delay;

[0036] The test section oxygen concentration interlock detects the test section oxygen concentration in the wind tunnel operation system, and locks the test section door when it is detected that the test section oxygen concentration in the wind tunnel operation system is lower than a sixth preset threshold;

[0037] The vacuum interlock detects the vacuum of the test section in the wind tunnel operation system, and locks the test section door when it is detected that the vacuum of the test section in the wind tunnel operation system is higher than a seventh preset threshold;

[0038] The other subsystems receive the closing signal sent by the safety control subsystem and close the corresponding valves respectively;

[0039] The pressure regulating control subsystem receives the cooling signal sent by the safety control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature;

[0040] The attack angle control subsystem receives the emergency return to zero instruction sent by the safety control subsystem, and returns the balance movement angle to zero.

[0041] According to a second aspect of the present application, a wind tunnel operation method based on a wind tunnel operation system is provided, the method comprising:

[0042] The safety control subsystem sends a test start signal to the general control subsystem, and the safety control subsystem is used to protect the wind tunnel operation system;

[0043] The general control subsystem receives the test start signal sent by the safety control subsystem, and sends the test start signal to the pressure regulation control subsystem, the heater control subsystem, the nitrogen control subsystem, and the vacuum control subsystem;

[0044] The pressure regulating control subsystem receives the test start signal sent by the master control subsystem, opens the master valve, introduces medium and high pressure nitrogen into the wind tunnel, and adjusts the pressure regulating valve to adjust the antechamber pressure of the wind tunnel;

[0045] The heater control subsystem receives the test start signal sent by the master control subsystem, adjusts the heating power of the graphite resistance heating rod, heats the medium and high pressure nitrogen, and adjusts the antechamber temperature of the wind tunnel;

[0046] The nitrogen control subsystem receives the test start signal sent by the general control subsystem, continuously detects the medium and high pressure nitrogen pressure, and when the pressure is less than the target nitrogen pressure lower limit, prepares nitrogen, opens the medium pressure tank air inlet valve or the high pressure tank air inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure upper limit, and closes the relevant valves;

[0047] The vacuum control subsystem receives the test start signal sent by the main control subsystem, continuously detects the vacuum degree of the wind tunnel, and when it is detected that the vacuum degree of the wind tunnel is lower than the target vacuum degree of the wind tunnel, continuously controls the wind tunnel vacuum pumping unit and the vacuum ball vacuum pumping unit to perform vacuum pumping;

[0048] When the antechamber pressure and the antechamber temperature reach the target pressure and the target temperature respectively, the master control subsystem sends a hard-wired trigger signal to the flow field display subsystem and sends a test start signal to the angle of attack control subsystem;

[0049] The flow field display subsystem receives the hard-wired trigger signal sent by the master control subsystem, and displays and records the low-density flow field with high-speed video;

[0050] The angle of attack control subsystem receives the test start signal sent by the general control subsystem, traverses the target angle of attack sequence, performs angle sequence movement under load conditions, and sends a data acquisition signal to the data acquisition subsystem when it moves to the angle of attack sequence value stored in the target angle of attack sequence;

[0051] The data acquisition subsystem receives the data acquisition signal sent by the angle of attack subsystem, collects the balance data, and obtains the aerodynamic data of the wind tunnel, wherein the aerodynamic data is the data generated when the wind tunnel has aerodynamic load;

[0052] When the target angle of attack sequence is traversed completely, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test.

[0053] Optionally, before the safety control subsystem sends a test start signal to the master control subsystem, the method further includes:

[0054] The safety control subsystem receives the test preparation signal, calls the time server to send synchronization time to other subsystems, and sends the test preparation signal to the general control subsystem, wherein the other subsystems are subsystems in the wind tunnel operation system except the safety control subsystem;

[0055] The master control subsystem receives the test preparation signal sent by the safety control subsystem, obtains the wind tunnel operation parameters, and sends the wind tunnel operation parameters to other subsystems accordingly;

[0056] When receiving the corresponding wind tunnel operation parameters, the other subsystems send a reception success signal to the master control subsystem;

[0057] When the master control subsystem receives the reception success signal sent by the other subsystems, it sends a test preparation signal to the relevant subsystems, and the relevant subsystems are subsystems involved in the wind tunnel operation preparation;

[0058] The related subsystem receives the test preparation signal sent by the general control subsystem and prepares for the test operation.

[0059] Optionally, the related subsystem receives the test preparation signal sent by the master control subsystem and operates according to the wind tunnel operation parameters, including:

[0060] The data acquisition subsystem receives the test preparation signal sent by the general control subsystem, measures and collects the parameters along the wind tunnel, and prepares to collect the balance data;

[0061] The angle of attack control subsystem receives the test preparation signal sent by the general control subsystem, traverses the target angle of attack sequence, performs the angle sequence movement under the no-load condition, and when moving to the angle of attack sequence value stored in the target angle of attack sequence, sends the data acquisition signal to the data acquisition subsystem;

[0062] The data acquisition subsystem receives the data acquisition signal sent by the angle of attack control subsystem, collects the balance data, and obtains the balance data of the wind tunnel under no-load conditions, where no-load means that the wind tunnel does not have the aerodynamic load during operation;

[0063] The hydraulic control subsystem receives the test preparation signal sent by the master control subsystem, provides a high-pressure oil source to the master valve and the pressure regulating valve, and supplies oil to the hydraulic cylinder compression chamber of the master valve when the hydraulic control solenoid valve of the master valve is in a power-off state;

[0064] The nitrogen control subsystem receives the test preparation signal sent by the general control subsystem, prepares nitrogen, opens the medium-pressure gas tank inlet valve or the high-pressure gas tank inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure, and closes the relevant valves;

[0065] The cooling water control subsystem receives the test preparation signal sent by the master control subsystem and provides cooling circulating water to the heater, nozzle, super expansion section and vacuum unit;

[0066] The vacuum control subsystem receives the test preparation signal sent by the master control subsystem, controls the cavity vacuum pumping unit to vacuum the cavity, controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball, and when the vacuum degrees of the cavity and the vacuum ball are close, opens the separated vacuum valve to connect the cavity with the vacuum ball, and continuously controls the cavity vacuum pumping unit and the vacuum ball vacuum pumping unit to vacuum until the cavity vacuum degree reaches the cavity target vacuum degree;

[0067] The heater control subsystem receives the test preparation signal sent by the master control subsystem, preheats the components in the heater, and adjusts the heating power of the graphite resistance heating rod until the measured internal temperature of the heater reaches the target preheating temperature of the heater.

[0068] Optionally, when the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem, and after the wind tunnel operation test is completed, the method further includes:

[0069] The general control subsystem sends a test processing signal to the pressure regulation control subsystem and the vacuum control subsystem;

[0070] The pressure regulating control subsystem receives the test processing signal sent by the main control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature;

[0071] The vacuum control subsystem receives the test processing signal sent by the master control subsystem, stops the cave body vacuum pumping unit and the vacuum ball vacuum pumping unit, closes the vacuum valve, and opens the air-breaking valve, wherein the air-breaking valve is used to allow outside air to flow into the cave body;

[0072] When the general control subsystem receives the processing completion signals sent by the pressure regulation control subsystem and the vacuum control subsystem, the general control subsystem sends a stop signal to the pressure regulation control subsystem, the heater control subsystem, the data acquisition subsystem, the nitrogen control subsystem, the vacuum control subsystem, the cooling water control subsystem, and the hydraulic control subsystem to complete the wind tunnel operation test processing.

[0073] Optionally, the method further comprises:

[0074] The safety control subsystem receives the test preparation signal sent by the main control console, and connects all the safety monitoring sensors and limit switches corresponding to other subsystems to the safety control subsystem;

[0075] When the safety control subsystem calls the nitrogen concentration monitoring interlock, based on the safety monitoring sensor, when it is detected that the nitrogen concentration in the nitrogen control subsystem meets the first preset threshold, an alarm reminder is generated, and a shutdown signal is sent to the nitrogen control subsystem and the pressure regulation control subsystem;

[0076] When the safety control subsystem calls the position status interlock of the key components of the tunnel body and detects that there is an abnormally started door or manhole flange plate in the wind tunnel operation system, it sends a shutdown signal to the other subsystems in a time sequence;

[0077] When the safety control subsystem calls the graphite resistance heater protection interlock, based on the safety monitoring sensor, when it is detected that the vacuum degree in the wind tunnel operation system meets the second preset threshold or the heater temperature meets the third preset threshold, a shutdown signal is sent to the heater control subsystem, and a cooling signal is sent to the pressure regulation control subsystem;

[0078] When the safety control subsystem calls the antechamber protection interlock and detects, based on the safety monitoring sensor, that the antechamber pressure of the wind tunnel meets the fourth preset threshold or the antechamber temperature meets the fifth preset threshold, a shutdown signal is sent to the heater control subsystem, and an emergency return to zero instruction is sent to the angle of attack control subsystem, and after a fixed delay, a shutdown signal is sent to the pressure regulation control subsystem;

[0079] When the safety control subsystem calls the test section oxygen concentration interlock, based on the safety monitoring sensor, it is detected that the oxygen concentration of the test section in the wind tunnel operation system is lower than a sixth preset threshold, the test section hatch is locked;

[0080] When the safety control subsystem calls the vacuum interlock, based on the safety monitoring sensor, it is detected that the vacuum degree of the test section in the wind tunnel operation system is higher than the seventh preset threshold value, and the test section door is locked;

[0081] The other subsystems receive the closing signal sent by the safety control subsystem and close the corresponding valves respectively;

[0082] The pressure regulating control subsystem receives the cooling signal sent by the safety control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature;

[0083] The attack angle control subsystem receives the emergency return to zero instruction sent by the safety control subsystem, and returns the balance movement angle to zero;

[0084] The safety control subsystem continuously detects the operating status of the other subsystems based on the safety monitoring sensor until the safety control subsystem receives a test end signal sent by the general control subsystem.

[0085] By means of the above technical scheme, the present application provides a wind tunnel operation system and a wind tunnel operation method based on the wind tunnel operation system. The present application sends a test start signal from the safety control subsystem to the general control subsystem, and then the general control subsystem sends a test start signal to the pressure regulation control subsystem, the heater control subsystem, the flow field display subsystem, the angle of attack control subsystem, the data acquisition subsystem, the nitrogen control subsystem, and the vacuum control subsystem to start the test operation, and the safety control subsystem detects the operation status of the wind tunnel in real time until the test operation ends. After receiving the test start signal, the angle of attack control subsystem starts to traverse the target angle of attack sequence. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test. The general control subsystem controls the nitrogen, pressure, temperature and other parameters required for the operation of the hypersonic low-density wind tunnel, and designs the safety control subsystem to be independent of other subsystems, improves the safety of measurement and control, and realizes the automated measurement and control of the hypersonic low-density wind tunnel.

[0086] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0087] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0088] Figure 1A A schematic diagram showing the composition of a wind tunnel operation system provided in an embodiment of the present application is shown.

[0089] Figure 1B A schematic diagram showing the composition of a wind tunnel operation system provided in an embodiment of the present application is shown;

[0090] Figure 1C A network diagram of a wind tunnel operation system provided by an embodiment of the present application is shown;

[0091] Figure 2A A schematic flow chart of a wind tunnel operation method based on a wind tunnel operation system provided in an embodiment of the present application is shown;

[0092] Figure 2B A schematic flow chart of a wind tunnel operation method based on a wind tunnel operation system provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0093] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.

[0094] An embodiment of the present application provides a wind tunnel operation system, in which the safety control subsystem sends a test start signal to the general control subsystem, and the general control subsystem then sends a test start signal to the pressure regulation control subsystem, the heater control subsystem, the flow field display subsystem, the angle of attack control subsystem, the data acquisition subsystem, the nitrogen control subsystem, and the vacuum control subsystem to start the test operation, and the safety control subsystem detects the operating status of the wind tunnel in real time until the test operation ends. After receiving the test start signal, the angle of attack control subsystem begins to traverse the target angle of attack sequence. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test. The general control subsystem controls the nitrogen, pressure, temperature and other parameters required for the operation of the hypersonic low-density wind tunnel, and designs the safety control subsystem to be independent of other subsystems, thereby improving the safety of measurement and control, and realizing automated measurement and control of the hypersonic low-density wind tunnel. Figure 1A As shown, the wind tunnel operation system includes: a safety control subsystem 101, a general control subsystem 102, a pressure regulation control subsystem 103, a heater control subsystem 104, a flow field display subsystem 105, a nitrogen control subsystem 106, a vacuum control subsystem 107, an angle of attack control subsystem 108, and a data acquisition subsystem 109.

[0095] Wind tunnel operation system

[0096] In the embodiment of the present application, the safety control subsystem 101 sends a test start signal to the general control subsystem 102, wherein the safety control subsystem 101 is used to protect the wind tunnel operation system and is independent of other subsystems.

[0097] The general control subsystem 102 sends a test start signal to the pressure regulation control subsystem 103, the heater control subsystem 104, and the angle of attack control subsystem 108, and sends a hard-wired trigger signal to the flow field display subsystem 105 to send a test start signal when the front chamber pressure and the front chamber temperature reach the target pressure and the target temperature respectively, and sends a test stop signal to the angle of attack control subsystem 108 and the flow field display subsystem 105 when the target angle of attack sequence is traversed, so as to complete the wind tunnel operation test. It should be noted that the general control subsystem 102 is used to control the automatic test operation process of the entire wind tunnel, and controls the operation sequence of other subsystems by interacting with other subsystems through instructions, and sends the target parameters of the current test to other subsystems, so that each subsystem can automatically operate according to the target parameters and sequence. Furthermore, the general control subsystem 102 can also obtain the main operation status and operation parameters of other subsystems by communicating with other subsystems, so as to realize the monitoring and display of the main status and parameters of all equipment / systems of the wind tunnel.

[0098] The pressure regulating control subsystem 103 receives the test start signal sent by the main control subsystem 102, opens the main valve, introduces medium and high pressure nitrogen into the wind tunnel, and adjusts the pressure regulating valve to adjust the antechamber pressure of the wind tunnel. It should be noted that the pressure regulating control subsystem 103 is used to switch the main valve of the wind tunnel, realize the on and off of the medium and high pressure nitrogen gas source, and regulate the nitrogen pressure of the pressure regulating valve, so as to finally make the antechamber airflow pressure reach the target value to establish the target Mach number flow field.

[0099] The heater control subsystem 104 receives the test start signal sent by the master control subsystem 102, adjusts the heating power of the graphite resistance heating rod, heats the medium and high pressure nitrogen, and adjusts the temperature of the antechamber of the wind tunnel. It should be noted that the heater control subsystem 104 is used to control multiple sets of heaters corresponding to different Mach numbers, and by adjusting and controlling the heating power of the graphite resistance heating rod over time and working conditions, the preheating of the heater body before the test and the real-time heating of the nitrogen gas flow during the test are achieved, and finally the antechamber gas flow temperature reaches the target value to establish the target Mach number flow field.

[0100] The flow field display subsystem 105 receives the hard-wired trigger signal sent by the general control subsystem 102, and displays and records the low-density flow field with high-speed video. It should be noted that the flow field display subsystem 105 mainly refers to a glow discharge display and recording device adapted to the conditions of thin and low-density gas in the wind tunnel, replacing the conventional Schlieren system, and realizing the display of the low-density flow field by controlling the high-voltage power supply, electrodes, etc. to generate discharge ionization, and recording the flow field display image with high-speed video camera.

[0101] The angle of attack control subsystem 108 receives the test start signal sent by the general control subsystem 102, traverses the target angle of attack sequence, performs angle sequence movement under load conditions, and when it moves to the angle of attack sequence value stored in the target angle of attack sequence, sends a data acquisition signal to the data acquisition subsystem 109. Specifically, the angle of attack control subsystem 108 is used to quickly and accurately position the model angle of attack according to the preset target angle of attack sequence, and measure the model force at different angles through the model balance. The angle of attack control subsystem mainly includes the model deadweight motion sequence control without pneumatic load before the test and the motion sequence control with pneumatic load during the test.

[0102] The data acquisition subsystem 109 receives the data acquisition signal sent by the angle of attack subsystem 106 to obtain the wind tunnel's aerodynamic data. It should be noted that the data acquisition subsystem 109 mainly acts on the wind tunnel's inlet pressure, front chamber pressure, front chamber total temperature, test section vacuum and other major parts, and can perform high-speed and high-precision acquisition and recording of along-the-way parameters such as pressure and temperature that characterize the entire wind tunnel's operating state, and perform high-speed and high-precision acquisition and recording of multiple aerodynamic parameters of the test model through a model balance, so as to analyze and optimize the model's aerodynamic characteristics.

[0103] The nitrogen control subsystem 106 receives the test start signal sent by the general control subsystem 102, and continuously detects the medium and high pressure nitrogen pressures. When the pressure is less than the target nitrogen pressure lower limit, nitrogen is prepared, the medium pressure tank inlet valve or the high pressure tank inlet valve is opened, the liquid nitrogen pump is started, and the nitrogen source pressure is detected. When the nitrogen source pressure reaches the nitrogen source target pressure upper limit, the liquid nitrogen pump is stopped and the relevant valves are closed.

[0104] The vacuum control subsystem 107 receives the test start signal sent by the main control subsystem 102, and continuously detects the vacuum degree of the wind tunnel. When it is detected that the vacuum degree of the wind tunnel is lower than the target vacuum degree of the wind tunnel, the vacuum pumping unit and the vacuum ball vacuum pumping unit are continuously controlled to perform vacuum pumping.

[0105] In another embodiment, in order to better realize the operation of the wind tunnel test, the wind tunnel operation system may also include other subsystems, see Figure 1B The wind tunnel operation system is in the test preparation mode and may further include a cooling water control subsystem 110 and a hydraulic control subsystem 111 .

[0106] In an embodiment of the present application, the safety control subsystem 101 receives a test preparation signal, calls a time server to send a synchronization time to the other subsystems, and sends a test preparation signal to the general control subsystem 102. Further, the general control subsystem 102 receives the test preparation signal sent by the safety control subsystem 101, and obtains the wind tunnel operation parameters. Subsequently, the wind tunnel operation parameters are sent to other subsystems accordingly. For example, the general control subsystem 102 sends the nitrogen gas source target pressure to the nitrogen control subsystem 106, sends the antechamber target pressure to the pressure regulation control subsystem 103, sends the antechamber target temperature and the heater target preheating temperature to the heater control subsystem 104, and sends the cave body target vacuum to the vacuum control subsystem 107.

[0107] Next, when the master control subsystem 102 receives the successful reception signal sent by other subsystems, it sends a test preparation signal to the relevant subsystems, that is, the subsystems involved in the wind tunnel operation preparation, such as the data acquisition subsystem 109, the angle of attack control subsystem 108, the hydraulic control subsystem 111, the nitrogen control subsystem 106, the cooling water control subsystem 110, the vacuum control subsystem 107, and the heater control subsystem 104. The relevant subsystems receive the test preparation signal and prepare for the test operation. It should be noted that the nitrogen control subsystem 106, the vacuum control subsystem 107, the cooling water control subsystem 110, and the hydraulic control subsystem are the energy subsystems of the wind tunnel operation system. Specifically, the data acquisition subsystem 109 receives the test preparation signal sent by the master control subsystem 102, measures and collects the parameters along the wind tunnel, prepares to collect the balance data, and receives the data acquisition signal sent by the angle of attack control subsystem 108 to obtain the balance data of the wind tunnel under no-load conditions. The angle of attack control subsystem 108 receives the test preparation signal sent by the general control subsystem 102, traverses the target angle of attack sequence, and performs angle sequence movement under no-load conditions. When it moves to the angle of attack sequence value stored in the target angle of attack sequence, it sends the data acquisition signal to the data acquisition subsystem 109.

[0108] The hydraulic control subsystem 111 receives the test preparation signal sent by the main control subsystem 102, provides a high-pressure oil source to the main valve and the pressure regulating valve, and supplies oil to the hydraulic cylinder compression chamber of the main valve when the hydraulic control solenoid valve of the main valve is in a power-off state. It should be noted that the hydraulic control subsystem is mainly used to control the hydraulic station and provide a high-pressure oil source that meets the pressure and flow requirements for the main valve and the pressure regulating valve of the pressure regulating system.

[0109] The nitrogen control subsystem 106 receives the test preparation signal sent by the general control subsystem 102, prepares nitrogen, opens the medium-pressure gas tank inlet valve or the high-pressure gas tank inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure, and closes the relevant valves. It should be noted that the nitrogen control subsystem is used to control and monitor the relevant equipment of the nitrogen station to achieve the preparation, storage and supply of nitrogen. By controlling the cryogenic pump and valves, the low-temperature liquid nitrogen in the liquid nitrogen tank is prepared into medium-pressure and high-pressure nitrogen, and stored in the medium-pressure and high-pressure nitrogen storage tanks, and according to the test requirements, the nitrogen supply valve is opened and switched to provide the wind tunnel with a nitrogen gas source that meets the pressure requirements.

[0110] The cooling water control subsystem 110 receives the test preparation signal sent by the general control subsystem 102, and provides cooling circulating water to the heater, nozzle, super expansion section, and vacuum unit.

[0111] The vacuum control subsystem 107 receives the test preparation signal sent by the general control subsystem 102, controls the cavity vacuum pumping unit to vacuum the cavity, controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball, and when the vacuum degrees of the cavity and the vacuum ball are close, opens the separating vacuum valve to connect the cavity and the vacuum ball, and continuously controls the cavity vacuum pumping unit and the vacuum ball vacuum pumping unit to vacuum until the cavity vacuum degree reaches the cavity target vacuum degree.

[0112] The heater control subsystem 104 receives the test preparation signal sent by the general control subsystem 102, preheats the components in the heater, and adjusts the heating power of the graphite resistance heating rod until the measured internal temperature of the heater reaches the target preheating temperature of the heater.

[0113] In another embodiment, the wind tunnel operation system is in the test post-processing mode, and the main control subsystem 102 sends a test processing signal to the pressure regulating control subsystem 103 and the vacuum control subsystem 107. When the main control subsystem receives the processing completion signal sent by the pressure regulating control subsystem 103 and the vacuum control subsystem 107, the main control subsystem 102 sends a stop signal to the pressure regulating control subsystem 103, the heater control subsystem 104, the data acquisition subsystem 109, the nitrogen control subsystem 106, the vacuum control subsystem 107, the cooling water control subsystem 110, and the hydraulic control subsystem 111 to complete the wind tunnel operation test processing. In fact, the pressure regulating control subsystem 103 receives the test processing signal sent by the main control subsystem 102, opens the main valve, controls the pressure regulating valve opening to reach the preset opening threshold, and introduces nitrogen into the heater to blow the heater down until the heater temperature drops to a safe temperature. The vacuum control subsystem 107 receives the test processing signal sent by the main control subsystem, stops the cave body vacuum pumping unit and the vacuum ball vacuum pumping unit, closes the vacuum valve, and opens the air-breaking valve, wherein the air-breaking valve is used to allow outside air to flow into the cave body.

[0114] In another embodiment, the safety control subsystem 101 also includes: nitrogen concentration monitoring interlock 1011, cave key component position status interlock 1012, graphite resistance heater protection interlock 1013, front chamber protection interlock 1014, test section oxygen concentration interlock 1015 and vacuum interlock 1016.

[0115] In an embodiment of the present application, the safety control subsystem 101 receives a test preparation signal sent by the main control console, and connects all the safety monitoring sensors and limit switches corresponding to other subsystems to the safety control subsystem 101. It should be noted that the other subsystems are subsystems other than the safety control subsystem in the wind tunnel operation system, and based on the safety monitoring sensors, they continuously detect the operating status of other subsystems until the safety control subsystem receives a test end signal sent by the general control subsystem. Furthermore, the main control console includes a mode switching switch, an emergency stop switch, and an emergency stop reset switch. Specifically, the mode switching switch includes four modes: maintenance, shutdown, preparation, and test. The maintenance mode is mainly used for maintenance and test actions of single wind tunnel equipment or systems, and is not restricted by the safety interlock and operation process of the wind tunnel. All equipment or systems cannot operate in shutdown mode. The preparation mode is mainly used for the preparation of nitrogen, vacuum, cooling water, hydraulic and other energy sources, preheating of the heater, control of the deadweight motion sequence of the angle of attack mechanism, and preparation of the data acquisition system and flow field display system before the formal ventilation and blowing of the wind tunnel. In the preparation mode, the main valve of the wind tunnel is prohibited from opening, and all systems are subject to the safety interlock and operation process of the wind tunnel. The test mode is mainly used for the formal blowing test of the wind tunnel. All equipment and systems operate according to the control process and are subject to the safety interlock and operation process of the wind tunnel. The emergency stop switch is used to stop the wind tunnel in an emergency, shut down the preset equipment that affects the safety of the wind tunnel and prohibit it from moving again. After the emergency stop is canceled by the emergency stop recovery switch, the wind tunnel can resume normal operation. The switch signals of the main console are sent to the safety control subsystem, and then sent to the relevant systems by the safety control subsystem.

[0116] Specifically, the nitrogen concentration monitoring interlock 1011 detects the nitrogen concentration of the hydraulic storage tank, liquid nitrogen pump, medium and high pressure nitrogen tank and pressure regulating control subsystem in the nitrogen control subsystem 106. When it is detected that the nitrogen concentration of the hydraulic storage tank, liquid nitrogen pump, medium and high pressure nitrogen tank and pressure regulating control subsystem in the nitrogen control subsystem 106 meets the first preset threshold, an alarm is generated, and a shutdown signal is sent to the nitrogen control subsystem 106 and the pressure regulating control subsystem 103. The position state interlock 1012 of the key components of the tunnel body detects the closed door or manhole flange in the wind tunnel operation system. When it is detected that there is an abnormally started door or manhole flange in the wind tunnel operation system, a shutdown signal is sent to other subsystems in a time sequence. The graphite resistance heater protection interlock 1013 detects the vacuum degree and heater temperature in the wind tunnel operation system. When it is detected that the vacuum degree in the wind tunnel operation system meets the second preset threshold or the heater temperature meets the third preset threshold, a shutdown signal is sent to the heater control subsystem 104, and a cooling signal is sent to the pressure regulating control subsystem 103. The antechamber protection interlock 1014 detects the antechamber pressure and antechamber temperature of the wind tunnel. When it is detected that the antechamber pressure of the wind tunnel meets the fourth preset threshold or the antechamber temperature meets the fifth preset threshold, a shutdown signal is sent to the heater control subsystem 104, and an emergency return to zero instruction is sent to the angle of attack control subsystem 108. After a fixed delay, a shutdown signal is sent to the pressure regulation control subsystem 103. The test section oxygen concentration interlock 1015 detects the oxygen concentration of the test section in the wind tunnel operation system. When it is detected that the oxygen concentration of the test section in the wind tunnel operation system is lower than the sixth preset threshold, the test section hatch is locked. The vacuum interlock 1016 detects the vacuum degree of the test section in the wind tunnel operation system. When it is detected that the vacuum degree of the test section in the wind tunnel operation system is higher than the seventh preset threshold, the test section hatch is locked.

[0117] Furthermore, other subsystems receive the closing signal sent by the safety control subsystem and close the corresponding valves respectively. The pressure regulation control subsystem 103 receives the cooling signal sent by the safety control subsystem 101, opens the main valve, controls the opening of the pressure regulating valve to reach the preset opening threshold, and introduces nitrogen into the heater to cool the heater until the heater temperature drops to a safe temperature. The angle of attack control subsystem 108 receives the emergency return to zero command sent by the safety control subsystem 101 and returns the balance movement angle to zero.

[0118] In addition, in actual application, the wind tunnel operation system, such as Figure 1CAs shown, it includes multiple host computers and slave computers, as well as network devices such as switches and optical fibers. The host computer is located in the central control room and is composed of an industrial control computer. The slave computers are composed of controllers located near the field equipment. Among them, the pressure regulation control subsystem 103 is a CRIO (compactRIO, a reconfigurable embedded measurement and control system) real-time controller, and the data acquisition subsystem 109 is a PXI (PCI extensions for Instrumentation, PCI extensions for instrument systems) and HBM (Hottinger Brüel & The control room computer and the field controller are connected to the switches adjacent to each other, and then a ring Ethernet is formed by multiple switches and the master control PLC through optical fiber to achieve high-speed and redundant data transmission. Further, the master control subsystem 102, the heater control subsystem 104, the pressure regulation control subsystem 103, the angle of attack control subsystem 108, the safety control subsystem 101, and the data acquisition subsystem 107 each include a one-to-one corresponding upper computer and a lower computer, and the nitrogen control subsystem 106, the vacuum control subsystem 107, the cooling water control subsystem 110, and the hydraulic control subsystem 111 are composed of independent lower computers and a common upper computer energy control computer. In addition, a time server is also equipped in the control room, and the standard time is sent to each system through the time server to achieve time synchronization of all systems. The flow field display subsystem 105 is also equipped with a computer, but since the data transmission volume of the on-site high-speed camera is very large, it is not networked with other systems and has an independent high-speed optical fiber transmission network.

[0119] The embodiment of the present application provides a wind tunnel operation system, in which the safety control subsystem sends a test start signal to the general control subsystem, and then the general control subsystem sends a test start signal to the pressure regulation control subsystem, the heater control subsystem, the flow field display subsystem, the angle of attack control subsystem, the data acquisition subsystem, the nitrogen control subsystem, and the vacuum control subsystem to start the test operation, and the safety control subsystem detects the operation status of the wind tunnel in real time until the test operation ends. After receiving the test start signal, the angle of attack control subsystem starts to traverse the target angle of attack sequence. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test. The general control subsystem controls the nitrogen, pressure, temperature and other parameters required for the operation of the hypersonic low-density wind tunnel, and designs the safety control subsystem to be independent of other subsystems, thereby improving the safety of measurement and control and realizing automated measurement and control of the hypersonic low-density wind tunnel.

[0120] The embodiment of the present application provides a pneumatic operation method based on a wind tunnel operation system, in which the safety control subsystem sends a test start signal to the general control subsystem, and then the general control subsystem sends a test start signal to the pressure regulation control subsystem, the heater control subsystem, the flow field display subsystem, the angle of attack control subsystem, the data acquisition subsystem, the nitrogen control subsystem, and the vacuum control subsystem to start the test operation, and the safety control subsystem detects the operating status of the wind tunnel in real time until the test operation ends. After receiving the test start signal, the angle of attack control subsystem begins to traverse the target angle of attack sequence. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test. The general control subsystem controls the nitrogen, pressure, temperature and other parameters required for the operation of the hypersonic low-density wind tunnel, and designs the safety control subsystem to be independent of other subsystems, thereby improving the safety of measurement and control, and realizing automated measurement and control of the hypersonic low-density wind tunnel. Figure 2A As shown, the method includes:

[0121] 201. The safety control subsystem sends a test start signal to the general control subsystem. The safety control subsystem is used to protect the wind tunnel operation system.

[0122] The φ1m hypersonic low-density wind tunnel is a special equipment for studying the rarefied gas dynamic characteristics of aircraft. It adopts a pressure vacuum operation mode and the working medium is pure nitrogen. The wind tunnel consists of equipment such as a main valve, a pressure regulating valve, a graphite resistance heater, a front chamber, a nozzle, a test section, an angle of attack mechanism, a super expansion section, a cooler, and other equipment, as well as ancillary equipment / systems such as a nitrogen station (medium and high pressure nitrogen preparation, storage and supply), a vacuum system (vacuum unit and vacuum ball), a cooling water system, a hydraulic station, a digital acquisition system, and a flow field display system. At present, in order to ensure the normal operation of large wind tunnels, it is necessary to develop specific measurement and control systems for different wind tunnel types and test process requirements. The measurement and control system is required to have a high degree of automation, strong safety and reliability, and the test process control method meets the operation requirements of large low-density wind tunnels. Therefore, there is an urgent need for a mature product that meets the automation and safety operation requirements of the φ1m hypersonic low-density wind tunnel.

[0123] Therefore, the present application proposes a pneumatic operation method based on a wind tunnel operation system, in which the safety control subsystem sends a test start signal to the general control subsystem, and then the general control subsystem sends a test start signal to the pressure regulation control subsystem, the heater control subsystem, the flow field display subsystem, the angle of attack control subsystem, the data acquisition subsystem, the nitrogen control subsystem, and the vacuum control subsystem to start the test operation, and the safety control subsystem detects the operation status of the wind tunnel in real time until the test operation ends. After receiving the test start signal, the angle of attack control subsystem starts to traverse the target angle of attack sequence. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test. The general control subsystem controls the nitrogen, pressure, temperature and other parameters required for the operation of the hypersonic low-density wind tunnel, and designs the safety control subsystem to be independent of other subsystems, thereby improving the safety of measurement and control and realizing automated measurement and control of the hypersonic low-density wind tunnel.

[0124] In order to realize the present invention, the wind tunnel operation system includes multiple host computers and slave computers, as well as network devices such as switches and optical fibers. The host computer is located in the central control room and is composed of an industrial control computer. The slave computer is composed of a controller located near the field equipment, wherein the pressure regulation control subsystem is a CRIO real-time controller, the data acquisition subsystem is a PXI and HBM controller, and the other subsystems are PLC controllers. The control room computer and the field controller are respectively connected to the switches adjacent to each other, and then a ring Ethernet is formed by multiple switches and the master control PLC through optical fibers to achieve high-speed and redundant data transmission. Further, the master control subsystem, the heater control subsystem, the pressure regulation control subsystem, the angle of attack control subsystem, the safety control subsystem, and the data acquisition subsystem each include a one-to-one corresponding host computer and a slave computer, and the nitrogen control subsystem, the vacuum control subsystem, the cooling water control subsystem, and the hydraulic control subsystem are composed of independent slave computers and a common host computer energy control computer. In addition, a time server is also equipped in the control room, and the standard time is sent to each system through the time server to achieve time synchronization of all systems. The flow field display subsystem is also equipped with a computer, but due to the large amount of data transmitted by the on-site high-speed camera, it is not networked with other systems and has an independent high-speed fiber optic transmission network.

[0125] In an embodiment of the present application, the main control console switches the wind tunnel operation system from the test preparation mode to the test mode through the mode switching switch, and sends the test signal to the safety control subsystem, so that the safety control subsystem sends the test signal to the general control subsystem, and then the general control subsystem sends a start signal to other subsystems to officially blow air into the wind tunnel.

[0126] In addition, before the formal test operation of the wind tunnel, the main console switches the wind tunnel operation system from the shutdown mode to the test preparation mode through the mode switch, and sends the test preparation signal to the safety control subsystem, so that the safety control subsystem sends the test preparation signal to the general control subsystem, and then the general control subsystem sends the start signal to other subsystems to prepare for the wind tunnel test. The specific process of wind tunnel test preparation is as follows:

[0127] First, the safety control subsystem receives the test preparation signal, calls the time server to send the synchronization time to all subsystems, and sends the test preparation signal to the master control subsystem.

[0128] Subsequently, the master control subsystem receives the test preparation signal sent by the safety control subsystem, obtains the wind tunnel operation parameters, and sends the wind tunnel operation parameters to other subsystems. When other subsystems receive the corresponding wind tunnel operation parameters, they send a reception success signal to the master control subsystem. When the master control subsystem receives the reception success signal sent by other subsystems, it sends a test preparation signal to the relevant subsystems.

[0129] Finally, the relevant subsystems receive the test preparation signal sent by the general control subsystem and prepare for the test operation. Specifically, the data acquisition subsystem receives the test preparation signal sent by the general control subsystem, measures and collects the parameters along the wind tunnel, and prepares to collect the balance data. The angle of attack control subsystem receives the test preparation signal sent by the general control subsystem, traverses the target angle of attack sequence, and performs angle sequence movement under no-load conditions. When it moves to the angle of attack sequence value stored in the target angle of attack sequence, it sends a data acquisition signal to the data acquisition subsystem. The data acquisition subsystem receives the data acquisition signal sent by the angle of attack control subsystem, collects the balance data, and obtains the balance data of the wind tunnel under no-load conditions. There is no pneumatic load during the operation of the no-load wind tunnel. The hydraulic control subsystem receives the test preparation signal sent by the general control subsystem, provides a high-pressure oil source to the main valve and the pressure regulating valve, and supplies oil to the hydraulic cylinder compression chamber of the main valve when the hydraulic control solenoid valve of the main valve is in a power-off state. The nitrogen control subsystem receives the test preparation signal sent by the main control subsystem, prepares nitrogen, opens the medium-pressure gas tank inlet valve or the high-pressure gas tank inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure, and closes the relevant valves. The cooling water control subsystem receives the test preparation signal sent by the main control subsystem, and provides cooling circulating water to the heater, nozzle, super expansion section, and vacuum unit. The vacuum control subsystem receives the test preparation signal sent by the main control subsystem, controls the cavern vacuum pumping unit to vacuum the cavern, controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball, and when the vacuum degree of the cavern and the vacuum ball are close, opens the separating vacuum valve to connect the cavern and the vacuum ball, and continuously controls the cavern vacuum pumping unit and the vacuum ball vacuum pumping unit to vacuum until the vacuum degree of the cavern reaches the target vacuum degree of the cavern. The heater control subsystem receives the test preparation signal sent by the general control subsystem, preheats the components in the heater, and adjusts the heating power of the graphite resistance heating rod until the measured internal temperature of the heater reaches the target preheating temperature of the heater.

[0130] 202. The general control subsystem receives the test start signal sent by the safety control subsystem, and sends the test start signal to the pressure regulation control subsystem, the heater control subsystem, the nitrogen control subsystem, and the vacuum control subsystem.

[0131] In an embodiment of the present application, after the general control subsystem receives the test start signal sent by the safety control subsystem, it enters the test mode and sends a test start signal to the pressure regulation control subsystem and the heater control subsystem to make the pressure regulation control subsystem and the heater control subsystem enter the test mode.

[0132] 203. The pressure regulating control subsystem receives the test start signal sent by the main control subsystem, opens the main valve, introduces medium and high pressure nitrogen into the wind tunnel, and adjusts the pressure regulating valve to adjust the antechamber pressure of the wind tunnel.

[0133] In an embodiment of the present application, after receiving the test start signal sent by the main control subsystem, the pressure regulation control subsystem controls the switch of the wind tunnel main valve to realize the on-off of the medium and high pressure nitrogen gas source, and controls the nitrogen pressure regulation of the pressure regulating valve, so as to finally make the front chamber airflow pressure reach the target value to establish the target Mach number flow field.

[0134] 204. The heater control subsystem receives the test start signal sent by the main control subsystem, adjusts the heating power of the graphite resistance heating rod, heats the medium and high pressure nitrogen, and adjusts the temperature of the antechamber of the wind tunnel.

[0135] In an embodiment of the present application, after the heater control subsystem receives the test start signal sent by the general control subsystem, it controls multiple sets of heaters corresponding to different Mach numbers, and adjusts and controls the heating power of the graphite resistance heating rod over time and working conditions to achieve preheating of the heater body before the test and real-time heating of the nitrogen airflow during the test, so that the airflow temperature in the front chamber reaches the target value to establish the target Mach number flow field.

[0136] 205. The nitrogen control subsystem receives the test start signal sent by the general control subsystem, continuously detects the medium and high pressure nitrogen pressures, and when the pressure is less than the target nitrogen pressure lower limit, prepares nitrogen, opens the medium pressure tank air inlet valve or the high pressure tank air inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure upper limit, and closes the relevant valves.

[0137] In the embodiment of the present application, the nitrogen control subsystem is used to control and monitor the relevant equipment of the nitrogen station to realize the preparation, storage and supply of nitrogen. By controlling the cryogenic pump and valves, the low-temperature liquid nitrogen in the liquid nitrogen tank is prepared into medium-pressure and high-pressure nitrogen, and stored in medium-pressure and high-pressure nitrogen storage tanks. According to the test requirements, the nitrogen supply valve is opened and switched to provide the wind tunnel with a nitrogen gas source that meets the pressure requirements.

[0138] 206. The vacuum control subsystem receives the test start signal sent by the main control subsystem, and continuously detects the vacuum degree of the wind tunnel. When it is detected that the vacuum degree of the wind tunnel is lower than the target vacuum degree of the wind tunnel, the vacuum control subsystem continuously controls the wind tunnel vacuum pumping unit and the vacuum ball vacuum pumping unit to perform vacuum pumping.

[0139] In an embodiment of the present application, the vacuum control subsystem controls the cavity vacuum pumping unit to vacuum the cavity, and controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball. When the vacuum degrees of the cavity and the vacuum ball are close, the separating vacuum valve is opened to connect the cavity with the vacuum ball, and the cavity vacuum pumping unit and the vacuum ball vacuum pumping unit are continuously controlled to vacuum until the cavity vacuum degree reaches the cavity target vacuum degree.

[0140] 207. When the front chamber pressure and the front chamber temperature reach the target pressure and the target temperature respectively, the general control subsystem sends a hard-wired trigger signal to the flow field display subsystem and sends a test start signal to the angle of attack control subsystem.

[0141] In the embodiment of the present application, the system continuously detects the antechamber pressure and antechamber temperature of the wind tunnel, and compares the antechamber pressure and antechamber temperature with the target pressure and target temperature respectively. When the comparison results indicate that the antechamber pressure and the antechamber temperature reach the target pressure and target temperature respectively, the general control subsystem sends a hard-wired trigger signal to the flow field display subsystem and sends a test start signal to the angle of attack control subsystem.

[0142] 208. The flow field display subsystem receives the hard-wired trigger signal sent by the general control subsystem, and displays and records the low-density flow field with high-speed video.

[0143] In an embodiment of the present application, the flow field display subsystem receives a hard-wired trigger signal sent by the general control subsystem, generates discharge ionization by controlling the high-voltage power supply, electrodes, etc., to display the low-density flow field, and performs high-speed image recording of the flow field display image through a high-speed camera.

[0144] 209. The angle of attack control subsystem receives the test start signal sent by the general control subsystem, traverses the target angle of attack sequence, and performs angle sequence movement under load conditions. When it moves to the angle of attack sequence value stored in the target angle of attack sequence, it sends a data acquisition signal to the data acquisition subsystem.

[0145] In an embodiment of the present application, the angle of attack control subsystem receives a test start signal sent by the general control subsystem, traverses the target angle of attack sequence, performs angle sequence movement under load conditions, and sends a data acquisition signal to the data acquisition subsystem when it moves to the angle of attack sequence value stored in the target angle of attack sequence. Specifically, the angle of attack control subsystem performs fast and high-precision positioning control on the model angle of attack according to a preset target angle of attack sequence, and measures the model forces at different angles through a model balance. Among them, the angle of attack control subsystem mainly includes the model's deadweight motion sequence control without aerodynamic load before the test and the motion sequence control under aerodynamic load during the test.

[0146] 210. The data acquisition subsystem receives the data acquisition signal sent by the angle of attack subsystem, collects the balance data, and obtains the aerodynamic data of the wind tunnel. The aerodynamic data is the data generated when there is aerodynamic load in the wind tunnel.

[0147] In the embodiment of the present application, the data acquisition subsystem receives the data acquisition signal sent by the angle of attack subsystem, and collects data on the main parts of the wind tunnel, such as the inlet pressure, front chamber pressure, front chamber total temperature, and test section vacuum degree. It can collect and record along-the-way parameters such as pressure and temperature that characterize the operation state of the entire wind tunnel at high speed and high precision, and collect and record multiple aerodynamic parameters of the test model at high speed and high precision through the model balance, so as to analyze and optimize the aerodynamic characteristics of the model.

[0148] 211. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test.

[0149] In the embodiment of the present application, when the angle of attack control subsystem completes traversing the target angle of attack sequence, it sends a traversal completion signal to the general control subsystem. Subsequently, when the general control subsystem receives the traversal completion signal, the general control subsystem sends a test stop signal to the angle of attack subsystem and the flow field display subsystem, so that the simulated balance angle in the angle of attack subsystem returns to zero, the flow field display subsystem is turned off, and the low-density flow field display and high-speed photography are stopped.

[0150] Furthermore, after the wind tunnel operation test is completed, the wind tunnel needs to be post-test processed, such as cooling the heater to reduce the heater temperature to a safe temperature, restoring the cave body from a vacuum state to normal pressure, and shutting down some subsystems of the wind tunnel operation system. Specifically, the general control subsystem sends a test processing signal to the pressure regulation control subsystem and the vacuum control subsystem. Subsequently, the pressure regulation control subsystem receives the test processing signal sent by the general control subsystem, opens the main valve, controls the pressure regulating valve opening to reach the preset opening threshold, and introduces nitrogen into the heater to cool the heater until the heater temperature drops to a safe temperature. Next, the vacuum control subsystem receives the test processing signal sent by the general control subsystem, stops the cave body vacuum pumping unit and the vacuum ball vacuum pumping unit, closes the vacuum valve, and opens the air-breaking valve, which is used to allow outside air to flow into the cave body. When the main control subsystem receives the processing completion signal sent by the pressure regulation control subsystem and the vacuum control subsystem, the main control subsystem sends a stop signal to the pressure regulation control subsystem, heater control subsystem, data acquisition subsystem, nitrogen control subsystem, vacuum control subsystem, cooling water control subsystem, and hydraulic control subsystem to complete the wind tunnel operation test processing.

[0151] In addition, when the wind tunnel operation system is in the test preparation mode and test mode, the safety control subsystem will detect the operating data of some subsystems in real time. When an abnormally operating subsystem is detected, a shutdown signal will be sent to the corresponding subsystem to protect the wind tunnel operation system.

[0152] Specifically, the safety control subsystem receives the test preparation signal sent by the main control console, and connects all the safety monitoring sensors and limit switches corresponding to other subsystems to the safety control subsystem. When the safety control subsystem calls the nitrogen concentration monitoring interlock, based on the safety monitoring sensor, it detects that the nitrogen concentration in the nitrogen control subsystem meets the first preset threshold, generates an alarm reminder, and sends a shutdown signal to the nitrogen control subsystem and the pressure regulation control subsystem. When the safety control subsystem calls the position status interlock of the key components of the cave body, it detects that there is an abnormally started door or manhole flange in the wind tunnel operation system, and sends a shutdown signal to other subsystems in a time sequence. When the safety control subsystem calls the graphite resistance heater protection interlock, based on the safety monitoring sensor, it detects that the vacuum degree in the wind tunnel operation system meets the second preset threshold or the heater temperature meets the third preset threshold, it sends a shutdown signal to the heater control subsystem, and sends a cooling signal to the pressure regulation control subsystem. When the safety control subsystem calls the antechamber protection interlock, based on the safety monitoring sensor, it detects that the antechamber pressure of the wind tunnel meets the fourth preset threshold or the antechamber temperature meets the fifth preset threshold, and sends a shutdown signal to the heater control subsystem, and sends an emergency return to zero command to the angle of attack control subsystem. After a fixed delay, it sends a shutdown signal to the pressure regulation control subsystem. When the safety control subsystem calls the test section oxygen concentration interlock, based on the safety monitoring sensor, it detects that the oxygen concentration of the test section in the wind tunnel operation system is lower than the sixth preset threshold, and locks the test section hatch. When the safety control subsystem calls the vacuum interlock, based on the safety monitoring sensor, it detects that the vacuum degree of the test section in the wind tunnel operation system is higher than the seventh preset threshold, and locks the test section hatch. Other subsystems receive the shutdown signal sent by the safety control subsystem and close the corresponding valves respectively. The pressure regulation control subsystem receives the cooling signal sent by the safety control subsystem, opens the main valve, controls the pressure regulating valve opening to reach the preset opening threshold, and introduces nitrogen into the heater to cool the heater until the heater temperature drops to a safe temperature. The angle of attack control subsystem receives the emergency return to zero command sent by the safety control subsystem and returns the balance movement angle to zero. The safety control subsystem continuously detects the operating status of other subsystems based on safety monitoring sensors until the safety control subsystem receives the test end signal sent by the master control subsystem.

[0153] It should be noted that the first preset threshold, the second preset threshold, the third preset threshold, the fourth preset threshold, the fifth preset threshold, and the sixth preset threshold can be set by relevant staff according to actual application scenarios, and this application does not specifically limit the value size.

[0154] In summary, if Figure 2BAs shown in the figure, the operation process of the wind tunnel operation method based on the wind tunnel operation system is that the main control console switches the wind tunnel operation system from the shutdown mode to the preparation mode, the safety control subsystem calls the time server to send the synchronization time to each subsystem, and sets the wind tunnel operation parameters, and sends the wind tunnel operation parameters to the corresponding subsystem. Subsequently, the data acquisition subsystem and the angle of attack control subsystem are turned on to traverse the target angle of attack sequence and collect balance data. Next, it is determined whether the angle of attack control subsystem has traversed the target angle of attack sequence. After the traversal is completed, the balance data of the wind tunnel under no-load conditions is obtained, and the nitrogen control subsystem, cooling water control subsystem, and vacuum control subsystem are turned on in sequence. Furthermore, it is determined in turn whether the wind tunnel has reached the target nitrogen pressure and target vacuum degree. When the wind tunnel has reached the target nitrogen pressure and target vacuum degree, the heater control subsystem is started. After the wind tunnel has reached the target preheating temperature, the main control console switches the wind tunnel operation system from the preparation mode to the test mode, and the pressure regulation control subsystem and the heater control subsystem are started in turn to adjust the antechamber pressure and antechamber temperature of the wind tunnel. When the antechamber pressure and the antechamber temperature reach the target antechamber pressure and the target antechamber temperature respectively, the flow field display subsystem is started. The data acquisition subsystem and the angle of attack control subsystem are started to traverse the target angle of attack sequence and perform balance data collection. Next, it is determined whether the angle of attack control subsystem has traversed the target angle of attack sequence. After the traversal is completed, the carrier gas dynamic data is obtained, and the angle of attack control subsystem and the flow field display subsystem are stopped. Subsequently, the pressure regulation control subsystem introduces a small flow of nitrogen to cool the heater, and the vacuum control subsystem is started to break the vacuum of the cave. Finally, judge the pressure and oxygen concentration in the test section. When the pressure and oxygen concentration in the test section reach the standard, stop the pressure regulation control subsystem, heater control subsystem, data acquisition subsystem, nitrogen control subsystem, vacuum control subsystem, cooling water control subsystem and hydraulic control subsystem.

[0155] The method provided in the embodiment of the present application is that the safety control subsystem sends a test start signal to the general control subsystem, and then the general control subsystem sends a test start signal to the pressure regulation control subsystem, the heater control subsystem, the flow field display subsystem, the angle of attack control subsystem, the data acquisition subsystem, the nitrogen control subsystem, and the vacuum control subsystem to start the test operation, and the safety control subsystem detects the operating status of the wind tunnel in real time until the test operation ends. After receiving the test start signal, the angle of attack control subsystem starts to traverse the target angle of attack sequence. When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test. The general control subsystem controls the nitrogen, pressure, temperature and other parameters required for the operation of the hypersonic low-density wind tunnel, and designs the safety control subsystem to be independent of other subsystems, improves the safety of measurement and control, and realizes the automated measurement and control of the hypersonic low-density wind tunnel.

[0156] Those skilled in the art will appreciate that the accompanying drawings are merely schematic diagrams of a preferred implementation scenario, and the modules or processes in the accompanying drawings are not necessarily required for implementing the present application.

[0157] Those skilled in the art will appreciate that the modules in the device in the implementation scenario can be distributed in the device in the implementation scenario according to the implementation scenario description, or can be changed accordingly and located in one or more devices different from the implementation scenario. The modules in the above implementation scenario can be combined into one module, or can be further split into multiple sub-modules.

[0158] The above application serial numbers are for description only and do not represent the advantages or disadvantages of the implementation scenarios.

[0159] The above disclosure only discloses several specific implementation scenarios of the present application. However, the present application is not limited thereto, and any changes that can be conceived by technicians in this field should fall within the scope of protection of the present application.

Claims

1. A wind tunnel operation system, characterized in that: The wind tunnel operation system includes: a safety control subsystem, a master control subsystem, a pressure regulation control subsystem, a heater control subsystem, a flow field display subsystem, a nitrogen control subsystem, a vacuum control subsystem, an angle of attack control subsystem, and a data acquisition subsystem; The safety control subsystem sends a test start signal to the general control subsystem, and the safety control subsystem is used to protect the wind tunnel operation system; The general control subsystem receives the test start signal sent by the safety control subsystem, and sends the test start signal to the pressure regulation control subsystem, the heater control subsystem, the nitrogen control subsystem, and the vacuum control subsystem, and sends a hard-wired trigger signal to the flow field display subsystem and a test start signal to the angle of attack control subsystem when the current chamber pressure and the front chamber temperature reach the target pressure and the target temperature respectively, and sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem when the target angle of attack sequence is traversed, so as to complete the wind tunnel operation test; The pressure regulating control subsystem receives the test start signal sent by the master control subsystem, opens the master valve, introduces medium and high pressure nitrogen into the wind tunnel, and adjusts the pressure regulating valve to adjust the pressure of the antechamber; The heater control subsystem receives the test start signal sent by the master control subsystem, adjusts the heating power of the graphite resistance heating rod, heats the medium and high pressure nitrogen, and adjusts the temperature of the front chamber; The flow field display subsystem receives the hard-wired trigger signal sent by the master control subsystem, and displays and records the low-density flow field with high-speed video; The nitrogen control subsystem receives the test start signal sent by the general control subsystem, continuously detects the medium and high pressure nitrogen pressure, and when the pressure is less than the target nitrogen pressure lower limit, prepares nitrogen, opens the medium pressure tank air inlet valve or the high pressure tank air inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure upper limit, and closes the relevant valves; The vacuum control subsystem receives the test start signal sent by the main control subsystem, continuously detects the vacuum degree of the wind tunnel, and when it is detected that the vacuum degree of the wind tunnel is lower than the target vacuum degree of the wind tunnel, continuously controls the wind tunnel vacuum pumping unit and the vacuum ball vacuum pumping unit to perform vacuum pumping; The angle of attack control subsystem receives the test start signal sent by the general control subsystem, traverses the target angle of attack sequence, performs angle sequence movement under load conditions, and sends a data acquisition signal to the data acquisition subsystem when it moves to the angle of attack sequence value stored in the target angle of attack sequence; The data acquisition subsystem receives the data acquisition signal sent by the angle of attack subsystem, collects balance data, and obtains the aerodynamic data of the wind tunnel. The aerodynamic data is the data generated when the wind tunnel has aerodynamic load.

2. The wind tunnel operation system according to claim 1, characterized in that: The wind tunnel operation system further includes: related subsystems; The safety control subsystem receives the test preparation signal, calls the time server to send synchronization time to other subsystems, and sends the test preparation signal to the general control subsystem, wherein the other subsystems are subsystems in the wind tunnel operation system except the safety control subsystem; The general control subsystem receives the test preparation signal sent by the safety control subsystem, obtains wind tunnel operation parameters, and sends the wind tunnel operation parameters to the other subsystems accordingly, and when the general control subsystem receives the reception success signal sent by the other subsystems, sends the test preparation signal to the relevant subsystems, and the relevant subsystems are subsystems participating in the wind tunnel operation preparation; The related subsystem receives the test preparation signal and prepares for the test operation.

3. The wind tunnel operation system according to claim 2, characterized in that: The related subsystems include: a hydraulic control subsystem, a cooling water control subsystem, the heater control subsystem, the nitrogen control subsystem, the vacuum control subsystem, the angle of attack control subsystem, and the data acquisition subsystem; The data acquisition subsystem receives the test preparation signal sent by the general control subsystem, measures and collects the parameters along the wind tunnel, prepares to collect the balance data, and receives the data acquisition signal sent by the angle of attack control subsystem, collects the balance data, and obtains the balance data corresponding to the wind tunnel under no-load conditions, where no-load means that the wind tunnel does not have the aerodynamic load during operation; The angle of attack control subsystem receives the test preparation signal sent by the general control subsystem, traverses the target angle of attack sequence, performs the angle sequence movement under the no-load condition, and when moving to the angle of attack sequence value stored in the target angle of attack sequence, sends the data acquisition signal to the data acquisition subsystem; The hydraulic control subsystem receives the test preparation signal sent by the master control subsystem, provides a high-pressure oil source to the master valve and the pressure regulating valve, and supplies oil to the hydraulic cylinder compression chamber of the master valve when the hydraulic control solenoid valve of the master valve is in a power-off state; The nitrogen control subsystem receives the test preparation signal sent by the general control subsystem, prepares nitrogen, opens the medium-pressure gas tank inlet valve or the high-pressure gas tank inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure, and closes the relevant valves; The cooling water control subsystem receives the test preparation signal sent by the general control subsystem and provides cooling circulating water to the heater, nozzle, super expansion section and vacuum unit; The vacuum control subsystem receives the test preparation signal sent by the master control subsystem, controls the cavity vacuum pumping unit to vacuum the cavity, controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball, and when the vacuum degrees of the cavity and the vacuum ball are close, opens the separated vacuum valve to connect the cavity with the vacuum ball, and continuously controls the cavity vacuum pumping unit and the vacuum ball vacuum pumping unit to vacuum until the cavity vacuum degree reaches the cavity target vacuum degree; The heater control subsystem receives the test preparation signal sent by the general control subsystem, preheats the components in the heater, and adjusts the heating power of the graphite resistance heating rod until the measured internal temperature of the heater reaches the target preheating temperature of the heater.

4. The wind tunnel operation system according to claim 3, characterized in that: The general control subsystem sends a test processing signal to the pressure regulating control subsystem and the vacuum control subsystem, and when the general control subsystem receives the processing completion signals sent by the pressure regulating control subsystem and the vacuum control subsystem, the general control subsystem sends a stop signal to the pressure regulating control subsystem, the heater control subsystem, the data acquisition subsystem, the nitrogen control subsystem, the vacuum control subsystem, the cooling water control subsystem, and the hydraulic control subsystem to complete the wind tunnel operation test processing, and sends a test end signal to the safety control subsystem; The pressure regulating control subsystem receives the test processing signal sent by the main control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature; The vacuum control subsystem receives the test processing signal sent by the general control subsystem, stops the cave body vacuum pumping unit and the vacuum ball vacuum pumping unit, closes the vacuum valve, and opens the air-breaking valve, which is used to allow outside air to flow into the cave body.

5. The wind tunnel operation system according to claim 1, characterized in that: The safety control subsystem also includes: nitrogen concentration monitoring interlock, cavern key component position status interlock, graphite resistance heater protection interlock, antechamber protection interlock, test section oxygen concentration interlock and vacuum interlock; The safety control subsystem receives a test preparation signal sent by the main control console, connects all safety monitoring sensors and limit switches corresponding to other subsystems to the safety control subsystem, and continuously detects the operating status of the other subsystems based on the safety monitoring sensors until the safety control subsystem receives a test end signal sent by the master control subsystem, wherein the other subsystems are subsystems in the wind tunnel operating system except the safety control subsystem; The nitrogen concentration monitoring interlock detects the nitrogen concentration in the nitrogen control subsystem, and when it is detected that the nitrogen concentration in the nitrogen control subsystem meets a first preset threshold, generates an alarm reminder, and sends a shutdown signal to the nitrogen control subsystem and the pressure regulation control subsystem; The position state interlock of the key components of the tunnel body detects the closed door or manhole flange in the wind tunnel operation system, and when it is detected that there is an abnormally started door or manhole flange in the wind tunnel operation system, the closing signal is sent to the other subsystems in a time sequence; The graphite resistance heater protection interlock detects the vacuum degree and heater temperature in the wind tunnel operation system, and when it is detected that the vacuum degree in the wind tunnel operation system meets the second preset threshold or the heater temperature meets the third preset threshold, sends a shutdown signal to the heater control subsystem and sends a cooling signal to the pressure regulation control subsystem; The front chamber protection interlock detects the front chamber pressure and the front chamber temperature of the wind tunnel, and when it is detected that the front chamber pressure of the wind tunnel meets a fourth preset threshold or the front chamber temperature meets a fifth preset threshold, sends a shutdown signal to the heater control subsystem, sends an emergency return to zero instruction to the angle of attack control subsystem, and sends the shutdown signal to the pressure regulation control subsystem after a fixed delay; The test section oxygen concentration interlock detects the test section oxygen concentration in the wind tunnel operation system, and locks the test section door when it is detected that the test section oxygen concentration in the wind tunnel operation system is lower than a sixth preset threshold; The vacuum interlock detects the vacuum of the test section in the wind tunnel operation system, and locks the test section door when it is detected that the vacuum of the test section in the wind tunnel operation system is higher than a seventh preset threshold; The other subsystems receive the closing signal sent by the safety control subsystem and close the corresponding valves respectively; The pressure regulating control subsystem receives the cooling signal sent by the safety control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature; The attack angle control subsystem receives the emergency return to zero instruction sent by the safety control subsystem, and returns the balance movement angle to zero.

6. A wind tunnel operation method based on a wind tunnel operation system, characterized in that: The method comprises: The safety control subsystem sends a test start signal to the general control subsystem, and the safety control subsystem is used to protect the wind tunnel operation system; The general control subsystem receives the test start signal sent by the safety control subsystem, and sends the test start signal to the pressure regulation control subsystem, the heater control subsystem, the nitrogen control subsystem, and the vacuum control subsystem; The pressure regulating control subsystem receives the test start signal sent by the master control subsystem, opens the master valve, introduces medium and high pressure nitrogen into the wind tunnel, and adjusts the pressure regulating valve to adjust the antechamber pressure of the wind tunnel; The heater control subsystem receives the test start signal sent by the master control subsystem, adjusts the heating power of the graphite resistance heating rod, heats the medium and high pressure nitrogen, and adjusts the antechamber temperature of the wind tunnel; The nitrogen control subsystem receives the test start signal sent by the general control subsystem, continuously detects the medium and high pressure nitrogen pressure, and when the pressure is less than the target nitrogen pressure lower limit, prepares nitrogen, opens the medium pressure tank air inlet valve or the high pressure tank air inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure upper limit, and closes the relevant valves; The vacuum control subsystem receives the test start signal sent by the main control subsystem, continuously detects the vacuum degree of the wind tunnel, and when it is detected that the vacuum degree of the wind tunnel is lower than the target vacuum degree of the wind tunnel, continuously controls the wind tunnel vacuum pumping unit and the vacuum ball vacuum pumping unit to perform vacuum pumping; When the antechamber pressure and the antechamber temperature reach the target pressure and the target temperature respectively, the master control subsystem sends a hard-wired trigger signal to the flow field display subsystem and sends a test start signal to the angle of attack control subsystem; The flow field display subsystem receives the hard-wired trigger signal sent by the master control subsystem, and displays and records the low-density flow field with high-speed video; The angle of attack control subsystem receives the test start signal sent by the general control subsystem, traverses the target angle of attack sequence, performs angle sequence movement under load conditions, and sends a data acquisition signal to the data acquisition subsystem when it moves to the angle of attack sequence value stored in the target angle of attack sequence; The data acquisition subsystem receives the data acquisition signal sent by the angle of attack subsystem, collects the balance data, and obtains the aerodynamic data of the wind tunnel, wherein the aerodynamic data is the data generated when the wind tunnel has aerodynamic load; When the target angle of attack sequence is traversed completely, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem to complete the wind tunnel operation test.

7. The method according to claim 6, characterized in that Before the safety control subsystem sends a test start signal to the master control subsystem, the method further includes: The safety control subsystem receives the test preparation signal, calls the time server to send synchronization time to other subsystems, and sends the test preparation signal to the general control subsystem, wherein the other subsystems are subsystems in the wind tunnel operation system except the safety control subsystem; The master control subsystem receives the test preparation signal sent by the safety control subsystem, obtains the wind tunnel operation parameters, and sends the wind tunnel operation parameters to other subsystems accordingly; When receiving the corresponding wind tunnel operation parameters, the other subsystems send a reception success signal to the master control subsystem; When the master control subsystem receives the reception success signal sent by the other subsystems, it sends a test preparation signal to the relevant subsystems, and the relevant subsystems are subsystems involved in the wind tunnel operation preparation; The related subsystem receives the test preparation signal sent by the general control subsystem and prepares for the test operation.

8. The method according to claim 7, characterized in that The relevant subsystem receives the test preparation signal sent by the master control subsystem and operates according to the wind tunnel operation parameters, including: The data acquisition subsystem receives the test preparation signal sent by the general control subsystem, measures and collects the parameters along the wind tunnel, and prepares to collect the balance data; The angle of attack control subsystem receives the test preparation signal sent by the general control subsystem, traverses the target angle of attack sequence, performs angle sequence movement under no-load conditions, and when moving to the angle of attack sequence value stored in the target angle of attack sequence, sends the data acquisition signal to the data acquisition subsystem; The data acquisition subsystem receives the data acquisition signal sent by the angle of attack control subsystem, collects the balance data, and obtains the balance data of the wind tunnel under no-load conditions, where no-load means that the wind tunnel does not have the aerodynamic load during operation; The hydraulic control subsystem receives the test preparation signal sent by the master control subsystem, provides a high-pressure oil source to the master valve and the pressure regulating valve, and supplies oil to the hydraulic cylinder compression chamber of the master valve when the hydraulic control solenoid valve of the master valve is in a power-off state; The nitrogen control subsystem receives the test preparation signal sent by the general control subsystem, prepares nitrogen, opens the medium-pressure gas tank inlet valve or the high-pressure gas tank inlet valve, starts the liquid nitrogen pump, detects the nitrogen gas source pressure, stops the liquid nitrogen pump when the nitrogen gas source pressure reaches the nitrogen gas source target pressure, and closes the relevant valves; The cooling water control subsystem receives the test preparation signal sent by the master control subsystem and provides cooling circulating water to the heater, nozzle, super expansion section and vacuum unit; The vacuum control subsystem receives the test preparation signal sent by the master control subsystem, controls the cavity vacuum pumping unit to vacuum the cavity, controls the vacuum ball vacuum pumping unit to vacuum the vacuum ball, and when the vacuum degrees of the cavity and the vacuum ball are close, opens the separated vacuum valve to connect the cavity with the vacuum ball, and continuously controls the cavity vacuum pumping unit and the vacuum ball vacuum pumping unit to vacuum until the cavity vacuum degree reaches the cavity target vacuum degree; The heater control subsystem receives the test preparation signal sent by the master control subsystem, preheats the components in the heater, and adjusts the heating power of the graphite resistance heating rod until the measured internal temperature of the heater reaches the target preheating temperature of the heater.

9. The method according to claim 6, characterized in that When the target angle of attack sequence is traversed, the general control subsystem sends a test stop signal to the angle of attack control subsystem and the flow field display subsystem. After the wind tunnel operation test is completed, the method further includes: The general control subsystem sends a test processing signal to the pressure regulation control subsystem and the vacuum control subsystem; The pressure regulating control subsystem receives the test processing signal sent by the main control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature; The vacuum control subsystem receives the test processing signal sent by the master control subsystem, stops the cave body vacuum pumping unit and the vacuum ball vacuum pumping unit, closes the vacuum valve, and opens the air-breaking valve, wherein the air-breaking valve is used to allow outside air to flow into the cave body; When the general control subsystem receives the processing completion signals sent by the pressure regulation control subsystem and the vacuum control subsystem, the general control subsystem sends a stop signal to the pressure regulation control subsystem, the heater control subsystem, the data acquisition subsystem, the nitrogen control subsystem, the vacuum control subsystem, the cooling water control subsystem, and the hydraulic control subsystem to complete the wind tunnel operation test processing.

10. The method according to claim 6, characterized in that The method further comprises: The safety control subsystem receives the test preparation signal sent by the main control console, and connects all the safety monitoring sensors and limit switches corresponding to other subsystems to the safety control subsystem, wherein the other subsystems are subsystems in the wind tunnel operation system other than the safety control subsystem; When the safety control subsystem calls the nitrogen concentration monitoring interlock, based on the safety monitoring sensor, when it is detected that the nitrogen concentration in the nitrogen control subsystem meets the first preset threshold, an alarm reminder is generated, and a shutdown signal is sent to the nitrogen control subsystem and the pressure regulation control subsystem; When the safety control subsystem calls the position status interlock of the key components of the tunnel body and detects that there is an abnormally started door or manhole flange plate in the wind tunnel operation system, it sends a shutdown signal to the other subsystems in a time sequence; When the safety control subsystem calls the graphite resistance heater protection interlock, based on the safety monitoring sensor, when it is detected that the vacuum degree in the wind tunnel operation system meets the second preset threshold or the heater temperature meets the third preset threshold, a shutdown signal is sent to the heater control subsystem, and a cooling signal is sent to the pressure regulation control subsystem; When the safety control subsystem calls the antechamber protection interlock and detects, based on the safety monitoring sensor, that the antechamber pressure of the wind tunnel meets the fourth preset threshold or the antechamber temperature meets the fifth preset threshold, a shutdown signal is sent to the heater control subsystem, and an emergency return to zero instruction is sent to the angle of attack control subsystem, and after a fixed delay, a shutdown signal is sent to the pressure regulation control subsystem; When the safety control subsystem calls the test section oxygen concentration interlock, based on the safety monitoring sensor, it is detected that the oxygen concentration of the test section in the wind tunnel operation system is lower than a sixth preset threshold, the test section hatch is locked; When the safety control subsystem calls the vacuum interlock, based on the safety monitoring sensor, it is detected that the vacuum degree of the test section in the wind tunnel operation system is higher than the seventh preset threshold value, and the test section door is locked; The other subsystems receive the closing signal sent by the safety control subsystem and close the corresponding valves respectively; The pressure regulating control subsystem receives the cooling signal sent by the safety control subsystem, opens the main valve, controls the opening of the pressure regulating valve to reach a preset opening threshold, and introduces nitrogen into the heater to cool the heater until the temperature of the heater drops to a safe temperature; The attack angle control subsystem receives the emergency return to zero instruction sent by the safety control subsystem, and returns the balance movement angle to zero; The safety control subsystem continuously detects the operating status of the other subsystems based on the safety monitoring sensor until the safety control subsystem receives a test end signal sent by the general control subsystem.

Citation Information

Patent Citations

  • Synchronous data acquisition system used in wind tunnel based on stable dynamic pressure control

    CN102393638A

  • Method for controlling temporary flush type supersonic velocity wind tunnel with ejector function

    CN103135624A

  • Process layout method for conventional hypersonic speed wind tunnel

    CN104458189A

  • Hypersonic speed propulsion wind tunnel control system based on PLC

    CN106647606A

  • Hypersonic wind tunnel film cooling experiment system and experiment method

    CN106679926A