A system and method for testing extreme working conditions of AC switching devices
By designing an AC switching device test system that includes a bidirectional DC power supply and a supercapacitor, the existing technology problems of large power grid impact, high cost, and low control accuracy are solved, and safety, automation and high-efficiency testing under low power grid capacity are achieved. Accurate extreme working condition testing provides a safe and reliable testing environment.
Patent Information
- Application Number
- CN202210169723.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-02-23
AI Technical Summary
The existing AC switching device extreme working condition test system has a large impact on the power grid, high cost, low control accuracy, and low degree of automation, and cannot meet the safety testing needs under low power grid capacity.
Design a test system that includes a bidirectional DC power supply, supercapacitor, DC/AC AC power supply, switch controller and high-precision resistive-inductive load. The main control unit controls the turning on and off of the switching device, and uses the supercapacitor to simulate the power grid environment. It can test the electrical life, fault current and short-circuit carrying current of the AC switching device. It is completely disconnected from the power grid to avoid power grid impact, and achieves high-precision control through the optocoupler isolation drive circuit.
It provides a safe and reliable test environment, reduces test costs, improves control accuracy and automation, meets the safety test requirements under low power grid capacity, avoids the danger of the test piece in the event of failure, and realizes the test in the laboratory Simulation testing under conditions.
Smart Images

Figure CN114518532B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of industrial testing equipment, and relates to an extreme working condition testing system and a testing method of an AC switching device. Background Art
[0002] AC electrical switches, such as AC relays, AC contactors, AC circuit breakers and other switching devices, are widely used in various industrial fields. The traditional testing method for AC electrical switches is to use the power grid to directly provide an AC test environment, directly draw power through a dedicated power grid line, and then use an AC voltage regulator and a resistive-inductive load for testing. In addition, switches and fuses are used during the test to achieve hard shutdown under power conditions.
[0003] For switching devices such as AC relays, AC contactors, and AC circuit breakers, the arc extinguishing ability of the contact breaking of the tested switching device, the connection test performance under fault current, and the withstand capacity under short-circuit current are usually tested to test the product performance and reliability under extreme working conditions. In particular, the fault current and short-circuit withstand current can reach a maximum of more than 10kA, which requires a large amount of energy to be generated in a short time, and there is a high test risk due to possible product failures. The IEC 62055-31 Electricity metering – Payment systems – Part 31: Particular requirements – Static payment meters for active energy (classes 1and 2) standard also has clear technical requirements for this.
[0004] Disadvantages of traditional testing methods: 1) High requirements for the power grid, which requires the grid to be able to provide a large amount of energy in a short period of time, and the test process has a large impact on the entire power grid; 2) High cost, usually using a dedicated grid line solution, the economic cost is too high; 3) The phase angle control accuracy during the test is insufficient, and it is often necessary to repeat the test method many times to achieve the required test requirements; 4) Most of the current systems are built manually, with a low degree of automation, and generally only the testing unit can have the grid conditions for testing.
[0005] After searching, the technical solution disclosed in the Chinese invention patent application "A test device for AC and DC small-capacity switching elements" with application publication number CN102636746A and application publication date August 15, 2012 is the latest technical solution, but the purpose of the document is to solve the problems of no electrical isolation between the main circuit and the sampling circuit of the test equipment for AC and DC small-capacity switching elements in the field of low-voltage electrical appliances and low sampling rate, which is completely different from the technical problem to be solved by the present invention. Therefore, in the prior art, there is no extreme working condition test system for AC switching devices that has no impact on the power grid, low cost, high degree of automation and control accuracy. Summary of the invention
[0006] The purpose of the present invention is to design an extreme working condition test system for an AC switch device to solve the problems of large impact on the power grid, high cost and low control accuracy of the existing test system.
[0007] The present invention solves the above technical problems through the following technical solutions:
[0008] A system for testing the extreme working conditions of an AC switch device, for testing the electrical life, fault current and short-circuit current of the AC switch device; comprising: a bidirectional DC power supply (10), a super capacitor C, a DC / AC AC power supply (11), a first switch K1, a second switch K2, a first switch controller (12), a second switch controller (13), a high-precision resistive-inductive load (14), and a main control unit (15); the bidirectional DC power supply (10) is a rectifier unit in the forward direction and an inverter unit in the reverse direction, the AC side of the power supply is connected to a power grid, and the DC side is connected to the super capacitor C; The C / AC alternating current power source (11) is an inverter unit, the DC side of which is powered by a super capacitor C, the live wire of the AC side is connected to one end of a first switch K1, the other end of the first switch K1 is connected to one end of a second switch K2, the other end of the second switch K2 is connected to one end of a high-precision resistive-inductive load (14), and the other end of the high-precision resistive-inductive load (14) is connected to the neutral wire of the AC side of the DC / AC alternating current power source (11); the main control unit (15) generates PWM waves for controlling the rectifier unit and the inverter unit respectively; the main control unit (15) also generates control signals Control 1 and Control 2, which are respectively sent to the first switch controller (12) and the second switch controller (13) for controlling the opening and closing of the first switch K1 and the second switch K2.
[0009] The technical solution of the present invention utilizes a supercapacitor C as an energy storage element. When the bidirectional DC power supply (10) is working in the forward direction, the supercapacitor C is charged. The supercapacitor C provides a DC side power supply for the DC / AC alternating current power supply (11) for inversion. The power supply characteristics of the power grid are simulated. The main control unit (15) controls the opening and closing of the first switch K1 and the second switch K2 to test the electrical life, the fault current connected, and the short-circuit current carried by the AC switch device. During the extreme working condition test, the device is completely disconnected from the power grid and has no impact on the power grid. A safe and reliable test environment is provided, which meets the safety test requirements under low power grid capacity. No dedicated power grid line is required, the cost is low, and the problem of limitation of the test environment is solved.
[0010] Furthermore, the method for performing an electrical life test is as follows: first, the system is initialized, and then the parameters of the electrical life test are set; the system completes the initialization configuration and operation of the bidirectional DC power supply (10), the DC / AC AC power supply (11), and the high-precision resistive inductive load (14) according to the set configuration, and at the same time closes the Control 1 control signal to detect whether there is current in the loop current. If there is, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If not, the Control 2 control signal is closed; at this time, it is detected whether the total loop current reaches the current threshold. If not, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If so, after the conduction time is reached, the Control 1 control signal is disconnected; at this time, it is detected whether the total loop current is 0. If not, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If so, after the disconnection time is reached, the test number is counted +1; then compare whether the test number reaches the set number of cycles. If so, the test ends. If not, return to close the Control 2 control signal to continue execution.
[0011] Furthermore, the method for conducting the on-fault current test is as follows: first, the system is initialized and the parameters of the on-fault current test are set; the system completes the charging of the supercapacitor C according to the set configuration, disconnects the connection with the grid side, closes the Control 1 control signal, and at the same time, the DC / AC alternating current power supply (11) outputs according to the set voltage and frequency. At this time, it is detected whether the total loop current has current. If so, it is determined that the system is faulty and the test ends. The PWM signal and Control 1 are controlled to disconnect the DC / AC alternating current power supply (11) and the first switch K1. If not, the Control 2 control signal is closed at a specified phase angle. At this time, it is determined whether the total loop current reaches the current threshold. If not, it is determined that the system is faulty and the test ends. The PWM signal and Control 1 are controlled to disconnect the DC / AC alternating current power supply (11) and the first switch K1. If so, the timing starts. After the continuous working time is reached, the Control 1 signal is used to control the first switch K1 to turn off at the zero crossing point. At this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty and the test ends. The PWM signal and Control 1 are controlled to disconnect the DC / AC alternating current power supply (11) and the first switch K1. 1 disconnects the DC / AC power supply (11) and the first switch K1. If yes, the DC / AC power supply (11) stops, the Control 2 control signal is disconnected, and the test ends.
[0012] Furthermore, the method for carrying out the short-circuit current test is as follows: first, the system is initialized and the test parameters for carrying the short-circuit current are set; the system completes the charging of the supercapacitor C according to the set configuration, disconnects the connection with the grid side, and closes the Control 2 signal. At this time, it is detected whether there is current in the total loop current. If so, it is determined that the system is faulty, the test is ended, and the Control 1 signal and the PWM signal are disconnected. If not, when the voltage is detected to pass through zero, the Control 1 control signal is closed; at this time, it is detected whether the total loop current reaches the current threshold. If not, it is determined that the system is faulty, the test is ended, and the Control 1 signal and the PWM signal are disconnected. If so, the timing is started, and after the duration is reached, the Control 1 control signal is disconnected; at this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty, the test is ended, and the Control 1 signal and the PWM signal are disconnected. If so, the AC power supply, the switch of the device under test and the load are stopped, and the test is ended.
[0013] Furthermore, the AC switch device includes: an AC relay, an AC contactor, and an AC circuit breaker.
[0014] Furthermore, the inverter unit adopts a single-phase H-bridge inverter circuit.
[0015] Furthermore, the first switch controller (12) and the second switch controller (13) adopt an optocoupler isolation relay drive circuit, and the optocoupler isolation relay drive circuit comprises: a resistor R1, a resistor R2, a resistor R3, an optocoupler U1, a relay JK, a diode D1, and a transistor Q1; one end of the resistor R1 is connected to a power supply, the other end of the resistor R1 is connected to the 1# pin of the optocoupler U1, the 2# pin of the optocoupler U1 is grounded, the 4# pin of the optocoupler U1 is connected to the power supply, the 3# pin of the optocoupler U1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to the base of the transistor Q1, the emitter of the transistor Q1 is grounded, the collector of the transistor Q1 is connected to one end of the coil of the relay JK, the other end of the coil of the relay JK is connected to the power supply, the anode of the diode D1 is connected to the collector of the transistor Q1, the cathode of the diode D1 is connected to the power supply, and the resistor R3 is connected between the base and the emitter of the transistor Q1.
[0016] Furthermore, the control signal generated by the main control unit (15) is output after being isolated by the optical coupler U1, and is used to control the on and off of the transistor Q1, and then control the energization and de-energization of the coil of the relay JK, thereby controlling the on and off of the first switch K1 and the second switch K2.
[0017] Furthermore, the model of the optical coupler U1 is TLP521-1.
[0018] Furthermore, the model of the transistor Q1 is S8050LT1.
[0019] The advantages of the present invention are:
[0020] (1) The technical solution of the present invention uses a supercapacitor C as an energy storage element. The bidirectional DC power supply (10) charges the supercapacitor C when working in the forward direction. The supercapacitor C provides a DC side power supply for the DC / AC alternating current power supply (11) for inversion, simulating the power supply characteristics of the power grid. The main control unit (15) controls the opening and closing of the first switch K1 and the second switch K2 to test the electrical life, fault current and short-circuit current of the AC switch device. During the extreme working condition test, the device is completely disconnected from the power grid and has no impact on the power grid. A safe and reliable test environment is provided, which meets the safety test requirements under low power grid capacity. No dedicated power grid line is required, the cost is low, and the problem of limitation of the test environment is solved.
[0021] (2) A high-precision DC / AC power supply (11) is used to simulate the power grid environment and utilize its fast dynamic response capability to ensure that during the test, the voltage stability is higher and the voltage control accuracy, phase angle control accuracy and other indicators are more accurate;
[0022] (3) Through power electronic control technology, energy can be cut off in microseconds in the event of device failure, avoiding dangerous situations such as fire of the test piece;
[0023] (4) The test platform is safe and reliable, and can realize simulation testing under laboratory conditions for any working condition, and the same working condition can be repeatedly cycled. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is the circuit schematic diagram of the test system;
[0025] Figure 2 It is the circuit schematic diagram of DC / AC power supply;
[0026] Figure 3 is a circuit schematic diagram of the first and second switch controllers;
[0027] Figure 4 It is a flow chart of the electrical life test method;
[0028] Figure 5 This is the electrical life test effect diagram;
[0029] Figure 6 It is a flow chart of the method for testing the connected fault current;
[0030] Figure 7 It is a control diagram for connecting the fault current test signal;
[0031] Figure 8 It is the DC / AC power supply control logic diagram;
[0032] Fig. 9 This is the effect diagram of the connection fault test;
[0033] Fig.10 It is a flow chart of the carrying short-circuit current test method;
[0034] Fig.11 This is a diagram showing the effect of carrying short-circuit current. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments:
[0037] Embodiment 1
[0038] like Figure 1 As shown, a limit working condition test system of an AC switch device includes: a bidirectional DC power supply 10, a super capacitor C, a DC / AC AC power supply 11, a first switch K1, a second switch K2 (the AC switch device to be tested), a first switch controller 12, a second switch controller 13, a high-precision resistive-inductive load 14, and a main control unit 15; the bidirectional DC power supply 10 is a rectifier unit in the forward direction and an inverter unit in the reverse direction, and its AC side is connected to the power grid and the DC side is connected to the super capacitor C; the bidirectional DC power supply 10 charges the super capacitor C before the system starts testing and discharges the super capacitor C after the system completes the test; the DC / AC AC power supply 11 It is an inverter unit, whose DC side is powered by a super capacitor C, and the live wire of the AC side is connected to one end of the first switch K1, the other end of the first switch K1 is connected to one end of the second switch K2, the other end of the second switch K2 is connected to one end of the high-precision resistive-inductive load 14, and the other end of the high-precision resistive-inductive load 14 is connected to the neutral wire of the AC side of the DC / AC power supply 11; the main control unit 15 generates PWM waves for controlling the rectifier unit and the inverter unit respectively; the main control unit 15 also generates control signals, which are sent to the first switch controller 12 and the second switch controller 13 respectively, for controlling the opening and closing of the first switch K1 and the second switch K2.
[0039] The bidirectional DC power supply 10 is used to charge the supercapacitor C before the test and discharge it after the test; the DC / AC power supply 11 is a customized design, providing an AC voltage environment that simulates the power grid, and at the same time has a fast dynamic response performance for sudden load increase and reduction, meeting the voltage stability requirements of the device under test under various working conditions; the first switch K1, the second switch K2, and the DC / AC power supply 11 work together to cooperate in implementing various logic controls; the high-precision resistive-inductive load 14 is used to meet the load requirements of different power factors required for the test of the device under test, which complies with the IEC 62055-31 standard requirements. The system uses supercapacitor C in conjunction with a customized DC / AC power supply 11 to provide a test environment that simulates an AC power grid, which is completely isolated from the power grid in actual testing, while ensuring safety and reliability, and solving the problem of the test environment for large-capacity power grids.
[0040] like Figure 2 As shown, the inverter unit adopts a single-phase H-bridge inverter circuit.
[0041] like Figure 3As shown, the first switch controller 12 and the second switch controller 13 adopt an optocoupler isolation relay driving circuit, and the optocoupler isolation relay driving circuit includes: a resistor R1, a resistor R2, a resistor R3, an optocoupler U1, a relay JK, a diode D1, and a transistor Q1; one end of the resistor R1 is connected to a DC5V power supply, the other end of the resistor R1 is connected to the 1# pin of the optocoupler U1, the 2# pin of the optocoupler U1 is grounded, the 4# pin of the optocoupler U1 is connected to a DC12V power supply, and the 3# pin of the optocoupler U1 is connected to the ground. The # pin is connected to one end of the resistor R2, the other end of the resistor R2 is connected to the base of the transistor Q1, the emitter of the transistor Q1 is grounded, the collector of the transistor Q1 is connected to one end of the coil of the relay JK, the other end of the coil of the relay JK is connected to the DC12V power supply, the anode of the diode D1 is connected to the collector of the transistor Q1, the cathode of the diode D1 is connected to the DC12V power supply, the resistor R3 is connected between the base and the emitter of the transistor Q1, and the model of the optocoupler U1 is TLP521-1. The model of the transistor Q1 is S8050LT1. The control signal generated by the main control unit 15 is output after being isolated by the optocoupler U1, and is used to control the conduction and shutdown of the transistor Q1, and then control the power on and off of the coil of the relay JK, thereby controlling the opening and closing of the first switch K1 and the second switch K2.
[0042] The extreme operating condition test system of the AC switch device of the present invention is designed with three working modes:
[0043] 1. Electrical life test
[0044] The service life of the AC switch device under test is tested by controlling the second switch K2 (the AC switch device under test) to perform pulse switching.
[0045] like Figure 4As shown, the system is first initialized, and then the parameters of the electrical life test are set, including: voltage, current, on-time, off-time, number of cycles, etc.; the system completes the initialization configuration and operation of the DC power supply, AC power supply, and load according to the set configuration, and at the same time closes the Control 1 control signal to detect whether there is current in the total loop current. If there is, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If not, the Control 2 control signal is closed; at this time, it is detected whether the total loop current reaches the current threshold. If not, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If so, after the on-time is reached, the Control 1 control signal is disconnected; at this time, it is detected whether the total loop current is 0. If not, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If so, after the off-time is reached, the test number is counted +1; then compare whether the test number reaches the set number of cycles. If so, the test ends. If not, it returns to close the Control 2 control signal to continue execution.
[0046] Figure 5 This is an electrical life test effect diagram. The main control unit 15 sends a control signal Control1 to the first switch controller 12 to control the first switch K1 to always be in the on state. The main control unit 15 sends a control signal Control2 to the second switch controller 13 to control the second switch K2 to achieve periodic on and off. If the second switch K2 fails such as welding during the test, the main control unit 15 controls the PWM signal and the Control1 signal to immediately disconnect the first switch K1 and stop the operation of the DC / AC power supply 11.
[0047] 2. Connect the fault current test
[0048] The present invention realizes the control logic through the cooperation of the DC / AC power supply 11, the first switch K1, and the AC switch device under test as follows:
[0049] The on-fault current test of the AC switching device verifies the fault current under the specified power factor at any phase angle, and tests the electrical performance under abnormal load. Under this condition, the AC switching device under test is subjected to load attraction, but not load disconnection. Since the test is to test the attraction ability of the AC switching device under large current, the test system will be completely disconnected from the power grid during the test, and the entire test will have no impact on the power grid. If the AC switching device under test fails such as fusing or welding during the test, the system controls the Control 1 signal and the PWM signal to immediately disconnect the first switch K1 and stop the operation of the DC / AC power supply 11.
[0050] like Figure 6As shown, firstly, the system is initialized and the parameters for the fault current test are set, including: AC voltage, AC current, AC working frequency, load power factor, phase angle, continuous load time, etc.; the system completes the charging of the super capacitor C according to the set configuration, disconnects the connection with the grid side, closes the Control 1 control signal, and the AC power supply outputs according to the set voltage and frequency. At this time, it is detected whether the total loop current has current. If so, it is determined that the system is faulty and the test is over. The PWM signal and Control 1 are controlled to disconnect the AC power supply and the K1 switch. If not, the Control 2 control signal is closed at the specified phase angle. At this time, it is determined whether the total loop current reaches the current threshold. If not, it is determined that the system is faulty and the test is over. The PWM signal and Control 1 are controlled to disconnect the AC power supply and the K1 switch. If so, the timing starts. After the continuous working time is reached, the Control 1 signal is used to control the K1 switch to turn off at the zero point. At this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty and the test is over. The PWM signal and Control 1 are controlled to disconnect the AC power supply and the K1 switch. If so, the timing starts. After the continuous working time is reached, the Control 1 signal is used to control the K1 switch to turn off at the zero point. At this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty and the test is over. 1 Disconnect the AC power supply and K1 switch. If yes, the AC power supply is shut down, the Control 2 control signal is disconnected, and the test ends.
[0051] During the fault current test, the main technical difficulties of the system are the precise time control of the phase angle of the tested device, the technology for maintaining the stability of the AC power supply output voltage under sudden load increase and decrease conditions, and the precise shutdown of the zero point. The precise time control of the phase angle mainly solves two problems. One is the delay between the phase angle trigger signal and the Control 1 signal and the Control 2 signal, and the other is the delay between the Control 2 signal and the actual action of the tested AC switch device. The delay problem between the phase angle trigger signal and the Control 1 signal and the Control 2 signal is solved by using optical fiber transmission to connect the AC power phase angle trigger signal with the Control 1 and Control 2 control drive signals to achieve a response delay of the us level. The technical solution to solve the delay of the tested AC switch device itself is to set the delay time of the tested AC switch device in the software and use the advance signal trigger in the control logic.
[0052] Set the switch-on phase angle to 45° and the load power factor to 0.7. The control signal waveforms of the first switch K1 and the second switch K2 are as follows: Figure 7 As shown. Figure 8As shown in the figure, the software control logic of the AC power supply and the AC power supply output voltage stability control technology use an algorithm supplement method to compensate for the drop in the AC output voltage during sudden loading and the rise in the AC output voltage during sudden load reduction. Since the switching frequency of the AC power supply can reach 12kHz, the output voltage waveform control response time can achieve a dynamic response of 0.1ms, ensuring the smoothness and stability of the voltage waveform during the test. The operating conditions of the system are set as follows: voltage of 277Vac, frequency of 50Hz, current of 6000Arms, power factor of 0.7, and switch-on phase angle of 0°. The AC switching device is tested for the on-fault current, and its waveform is shown as follows Fig. 9 shown.
[0053] 3. Carrying short-circuit current test
[0054] The short-circuit current carrying test of the AC switch device is to verify the ability to withstand current for a short time in the closed state. The present invention uses the super capacitor C and the DC / AC power supply 11 to simulate the short-term large-capacity power grid conditions. At this time, the main control unit 15 sends a control signal Control 2 to the second switch controller 13 to control the second switch K2 to always be in the closed state. The main control unit 15 sends a control signal Control 1 to the first switch controller 12 to control the first switch K1 to realize the short-circuit test current conduction and disconnection.
[0055] like Fig.10 As shown, firstly, the system is initialized and the test parameters of the short-circuit current are set, including voltage, current, frequency, duration, power factor, etc.; the system completes the charging of the supercapacitor according to the set configuration, disconnects the connection with the grid side, and closes the Control 2 signal. At this time, it is detected whether there is current in the total loop current. If there is, it is determined that the system is faulty, the test is over, and the Control 1 signal and the PWM signal are disconnected. If not, when the voltage is detected to pass through zero, the Control 1 control signal is closed; at this time, it is detected whether the total loop current reaches the current threshold. If not, it is determined that the system is faulty, the test is over, and the Control 1 signal and the PWM signal are disconnected. If yes, the timing is started, and after the duration is reached, the Control 1 control signal is disconnected; at this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty, the test is over, and the Control 1 signal and the PWM signal are disconnected. If yes, the AC power supply, the switch of the device under test and the load are stopped, and the test is over.
[0056] The system working conditions are set as follows: voltage 277Vac, frequency 60Hz, current 12000Arms, power factor 1.0, and short-circuit current test is performed on the AC switch device. The waveform is as follows Fig.11 shown.
[0057] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An electrical life test method based on an extreme working condition test system of an AC switching device, characterized in that: The extreme working condition test system of the AC switch device comprises: a bidirectional DC power supply (10), a super capacitor C, a DC / AC AC power supply (11), a first switch K1, a second switch K2, a first switch controller (12), a second switch controller (13), a high-precision resistive inductive load (14), and a main control unit (15); the bidirectional DC power supply (10) is a rectifier unit in the forward direction and an inverter unit in the reverse direction, the AC side of which is connected to a power grid, and the DC side of which is connected to the super capacitor C; the DC / AC AC power supply (11) is an inverter unit, the DC side of which is powered by the super capacitor C, the live wire of the AC side is connected to one end of the first switch K1, the other end of the first switch K1 is connected to one end of the second switch K2, the other end of the second switch K2 is connected to one end of the high-precision resistive inductive load (14), and the other end of the high-precision resistive inductive load (14) is connected to the neutral wire of the AC side of the DC / AC AC power supply (11); the main control unit (15) generates PWM waves for controlling the rectifier unit and the inverter unit respectively; the main control unit (15) also generates control signals Control 1 and Control 2, respectively sent to the first switch controller (12) and the second switch controller (13), for controlling the opening and closing of the first switch K1 and the second switch K2; The first switch controller (12) and the second switch controller (13) adopt an optocoupler isolation relay drive circuit, and the optocoupler isolation relay drive circuit comprises: a resistor R1, a resistor R2, a resistor R3, an optocoupler U1, a relay JK, a diode D1, and a transistor Q1; one end of the resistor R1 is connected to a power supply, the other end of the resistor R1 is connected to the 1# pin of the optocoupler U1, the 2# pin of the optocoupler U1 is grounded, the 4# pin of the optocoupler U1 is connected to the power supply, the 3# pin of the optocoupler U1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to the base of the transistor Q1, the emitter of the transistor Q1 is grounded, the collector of the transistor Q1 is connected to one end of the coil of the relay JK, the other end of the coil of the relay JK is connected to the power supply, the anode of the diode D1 is connected to the collector of the transistor Q1, the cathode of the diode D1 is connected to the power supply, and the resistor R3 is connected between the base and the emitter of the transistor Q1; The control signal generated by the main control unit (15) is output after being isolated by the optical coupler U1, and is used to control the on and off of the transistor Q1, and then control the energization and de-energization of the coil of the relay JK, thereby controlling the on and off of the first switch K1 and the second switch K2; The electrical life test method is as follows: first, the system is initialized, and then the parameters of the electrical life test are set; the system completes the initialization configuration and operation of the bidirectional DC power supply (10), the DC / AC alternating current power supply (11), and the high-precision resistive inductive load (14) according to the set configuration, and at the same time closes the Control 1 control signal to detect whether there is current in the loop current. If there is, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If not, the Control 2 control signal is closed; at this time, it is detected whether the total loop current reaches the current threshold. If not, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If so, after the conduction time is reached, the Control 1 control signal is disconnected; at this time, it is detected whether the total loop current is 0. If not, it is determined that the system has a fault. At this time, the Control 1 control signal and the PWM signal are disconnected. If so, after the disconnection time is reached, the test number is counted +1; then compare whether the test number reaches the set number of cycles. If so, the test ends. If not, return to close the Control 2 control signal to continue execution.
2. The electrical life test method based on the extreme working condition test system of AC switching device according to claim 1 is characterized in that: The AC switch devices include: an AC relay, an AC contactor, and an AC circuit breaker.
3. The electrical life test method based on the extreme working condition test system of AC switching device according to claim 1 is characterized in that: The inverter unit adopts a single-phase H-bridge inverter circuit.
4. A method for testing the on-fault current of an extreme operating condition test system based on an AC switch device, characterized in that: The extreme working condition test system of the AC switch device comprises: a bidirectional DC power supply (10), a super capacitor C, a DC / AC AC power supply (11), a first switch K1, a second switch K2, a first switch controller (12), a second switch controller (13), a high-precision resistive inductive load (14), and a main control unit (15); the bidirectional DC power supply (10) is a rectifier unit in the forward direction and an inverter unit in the reverse direction, the AC side of which is connected to a power grid, and the DC side of which is connected to the super capacitor C; the DC / AC AC power supply (11) is an inverter unit, the DC side of which is powered by the super capacitor C, the live wire of the AC side is connected to one end of the first switch K1, the other end of the first switch K1 is connected to one end of the second switch K2, the other end of the second switch K2 is connected to one end of the high-precision resistive inductive load (14), and the other end of the high-precision resistive inductive load (14) is connected to the neutral wire of the AC side of the DC / AC AC power supply (11); the main control unit (15) generates PWM waves for controlling the rectifier unit and the inverter unit respectively; the main control unit (15) also generates control signals Control 1 and Control 2, respectively sent to the first switch controller (12) and the second switch controller (13), for controlling the opening and closing of the first switch K1 and the second switch K2; The first switch controller (12) and the second switch controller (13) adopt an optocoupler isolation relay drive circuit, and the optocoupler isolation relay drive circuit comprises: a resistor R1, a resistor R2, a resistor R3, an optocoupler U1, a relay JK, a diode D1, and a transistor Q1; one end of the resistor R1 is connected to a power supply, the other end of the resistor R1 is connected to the 1# pin of the optocoupler U1, the 2# pin of the optocoupler U1 is grounded, the 4# pin of the optocoupler U1 is connected to the power supply, the 3# pin of the optocoupler U1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to the base of the transistor Q1, the emitter of the transistor Q1 is grounded, the collector of the transistor Q1 is connected to one end of the coil of the relay JK, the other end of the coil of the relay JK is connected to the power supply, the anode of the diode D1 is connected to the collector of the transistor Q1, the cathode of the diode D1 is connected to the power supply, and the resistor R3 is connected between the base and the emitter of the transistor Q1; The control signal generated by the main control unit (15) is output after being isolated by the optical coupler U1, and is used to control the on and off of the transistor Q1, and then control the energization and de-energization of the coil of the relay JK, thereby controlling the on and off of the first switch K1 and the second switch K2; The on-fault current test method is as follows: first, the system is initialized and the parameters of the on-fault current test are set; the system completes the charging of the super capacitor C according to the set configuration, disconnects the connection with the grid side, closes the Control 1 control signal, and at the same time, the DC / AC alternating current power supply (11) outputs according to the set voltage and frequency. At this time, it is detected whether the total loop current has current. If so, it is determined that the system is faulty and the test ends. The PWM signal and Control 1 are controlled to disconnect the DC / AC alternating current power supply (11) and the first switch K1. If not, the Control 2 control signal is closed at a specified phase angle. At this time, it is determined whether the total loop current reaches the current threshold. If not, it is determined that the system is faulty and the test ends. The PWM signal and Control 1 are controlled to disconnect the DC / AC alternating current power supply (11) and the first switch K1. If so, the timing starts. After the continuous working time is reached, the Control 1 signal is used to turn off the first switch K1 at the zero crossing point. At this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty and the test ends. The PWM signal and Control 1 are controlled to disconnect the DC / AC alternating current power supply (11) and the first switch K1. 1 disconnects the DC / AC power supply (11) and the first switch K1. If yes, the DC / AC power supply (11) stops, the Control 2 control signal is disconnected, and the test ends.
5. The on-fault current testing method based on the extreme working condition testing system of AC switching device according to claim 4, characterized in that: The AC switch devices include: an AC relay, an AC contactor, and an AC circuit breaker.
6. The on-fault current testing method based on the extreme working condition testing system of AC switching device according to claim 4, characterized in that: The inverter unit adopts a single-phase H-bridge inverter circuit.
7. A short-circuit current test method based on an extreme working condition test system of an AC switch device, characterized in that: The extreme working condition test system of the AC switch device comprises: a bidirectional DC power supply (10), a super capacitor C, a DC / AC AC power supply (11), a first switch K1, a second switch K2, a first switch controller (12), a second switch controller (13), a high-precision resistive inductive load (14), and a main control unit (15); the bidirectional DC power supply (10) is a rectifier unit in the forward direction and an inverter unit in the reverse direction, the AC side of which is connected to a power grid, and the DC side of which is connected to the super capacitor C; the DC / AC AC power supply (11) is an inverter unit, the DC side of which is powered by the super capacitor C, the live wire of the AC side is connected to one end of the first switch K1, the other end of the first switch K1 is connected to one end of the second switch K2, the other end of the second switch K2 is connected to one end of the high-precision resistive inductive load (14), and the other end of the high-precision resistive inductive load (14) is connected to the neutral wire of the AC side of the DC / AC AC power supply (11); the main control unit (15) generates PWM waves for controlling the rectifier unit and the inverter unit respectively; the main control unit (15) also generates control signals Control 1 and Control 2, respectively sent to the first switch controller (12) and the second switch controller (13), for controlling the opening and closing of the first switch K1 and the second switch K2; The first switch controller (12) and the second switch controller (13) adopt an optocoupler isolation relay drive circuit, and the optocoupler isolation relay drive circuit comprises: a resistor R1, a resistor R2, a resistor R3, an optocoupler U1, a relay JK, a diode D1, and a transistor Q1; one end of the resistor R1 is connected to a power supply, the other end of the resistor R1 is connected to the 1# pin of the optocoupler U1, the 2# pin of the optocoupler U1 is grounded, the 4# pin of the optocoupler U1 is connected to the power supply, the 3# pin of the optocoupler U1 is connected to one end of the resistor R2, the other end of the resistor R2 is connected to the base of the transistor Q1, the emitter of the transistor Q1 is grounded, the collector of the transistor Q1 is connected to one end of the coil of the relay JK, the other end of the coil of the relay JK is connected to the power supply, the anode of the diode D1 is connected to the collector of the transistor Q1, the cathode of the diode D1 is connected to the power supply, and the resistor R3 is connected between the base and the emitter of the transistor Q1; The control signal generated by the main control unit (15) is output after being isolated by the optical coupler U1, and is used to control the on and off of the transistor Q1, and then control the energization and de-energization of the coil of the relay JK, thereby controlling the on and off of the first switch K1 and the second switch K2; The short-circuit current carrying test method is as follows: first, the system is initialized and the test parameters of the short-circuit current carrying are set; the system completes the charging of the supercapacitor C according to the set configuration, disconnects the connection with the grid side, and closes the Control 2 signal. At this time, it is detected whether the total loop current has current. If so, it is determined that the system is faulty, the test is ended, and the Control 1 signal and the PWM signal are disconnected. If not, when the voltage is detected to pass through the zero point, the Control 1 control signal is closed; at this time, it is detected whether the total loop current reaches the current threshold. If not, it is determined that the system is faulty, the test is ended, and the Control 1 signal and the PWM signal are disconnected. If so, the timing is started, and after the duration is reached, the Control 1 control signal is disconnected; at this time, it is detected whether the total loop current is 0. If not, it is determined that the system is faulty, the test is ended, and the Control 1 signal and the PWM signal are disconnected. If so, the AC power supply, the switch of the device under test and the load are stopped, and the test is ended.
8. The short-circuit current carrying test method of the extreme working condition test system based on AC switch device according to claim 7 is characterized in that: The AC switch devices include: an AC relay, an AC contactor, and an AC circuit breaker.
9. The short-circuit current carrying test method of the extreme working condition test system based on AC switch device according to claim 7, characterized in that: The inverter unit adopts a single-phase H-bridge inverter circuit.
10. The short-circuit current carrying test method of the extreme working condition test system based on AC switch device according to claim 7, characterized in that: The model of the optical coupler U1 is TLP521-1; the model of the transistor Q1 is S8050LT1.
Citation Information
Patent Citations
Test device for alternating current and direct current small-capacity switch element
CN102636746A
Direct-current circuit breaker on-off characteristic test method
CN103424692A
Wind turbine generating set testing power supply with functions of energy storage and load simulation and method
CN104868503A
Flexible direct-current power transmission valve segment short-circuit experiment testing system and testing method thereof
CN105301406A
Super-capacitor energy-storage type power grid load balancing device and control method thereof
CN108493975A