A method, device and storage medium for determining IFFT / FFT points
By detecting the cell load status and scheduling the terminal into the target BWP set, dynamically adjusting the number of IFFT/FFT points, the problem of excessive resource and energy consumption of 5G base stations when the load becomes lighter, and the effective reduction of base station energy consumption is achieved.
Patent Information
- Application Number
- CN202011326054.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-24
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-11-24
AI Technical Summary
When the load of 5G base stations becomes lighter, the existing technology cannot dynamically adjust the number of IFFT/FFT points, resulting in too much resource and energy consumption and cannot effectively reduce the consumption of physical layer processing.
By detecting the cell load status, the terminal is scheduled into the target BWP set, and the number of IFFT/FFT points is dynamically determined based on the preset point correspondence relationship, so as to realize dynamic adjustment of the number of IFFT/FFT points.
It effectively reduces the physical layer processing volume, saves energy consumption, and improves the energy efficiency of the base station.
Smart Images

Figure CN114554575B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the wireless field, and in particular to an IFFT / FFT point determination method, device and storage medium. Background Art
[0002] Energy conservation and consumption reduction has always been a topic of long-term concern and research in the communications industry. The fifth-generation mobile communication technology (5G, 5th generation mobile networks) brings about a massive data explosion while also facing the challenge of high energy consumption. Existing solutions reduce the energy consumption of 5G base stations through new materials, new processes, new chips, and other hardware technologies and software technologies such as deep sleep and intelligent shutdown. Among them, deep sleep refers to the purpose of reducing average power consumption by shutting down some radio frequency and digital channels when there is no business or the load is light at night, leaving only the most basic interface circuits working. Intelligent shutdown means that the scheduler schedules data to specified symbols according to the business load, and shuts down the power amplifier power supply during the remaining symbol time when there is no valid information transmission, so as to achieve energy saving.
[0003] Physical layer processing is the main component of base station operations, among which Fast Fourier Transform (FFT) / Inverse Fast-Fourier-Transformation (IFFT) processing is the main module of the physical layer. When implementing 5G large-scale antenna base stations, the IFFT / FFT points are large, the channels are many, the amount of calculation is large, and a large amount of processing resources are consumed, while generating corresponding energy consumption. The existing technology adopts a solution of fixing the IFFT / FFT points according to the system bandwidth, that is, when the base station load becomes lighter, the IFFT / FFT points cannot be dynamically adjusted. When the system bandwidth remains unchanged, it will always calculate according to the maximum IFFT / FFT points, consuming a large amount of resources and energy. Summary of the invention
[0004] In view of this, the main purpose of the present invention is to provide a method, device and storage medium for determining the number of IFFT / FFT points.
[0005] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0006] An embodiment of the present invention provides a method for determining the number of IFFT / FFT points, the method comprising:
[0007] Scheduling a terminal in a cell into a target BWP set, and determining a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP;
[0008] Based on a preset point correspondence relationship, the IFFT / FFT points corresponding to the target bandwidth are determined.
[0009] In the above solution, before scheduling the terminal in the cell into the target BWP set, the method includes:
[0010] detecting a load status of the cell;
[0011] When it is determined that the load state meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set;
[0012] The load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
[0013] In the above solution, determining the target bandwidth corresponding to the target BWP set includes:
[0014] Corresponding to the target BWP set including a BWP, determining a bandwidth of the BWP included in the target BWP set as the target bandwidth;
[0015] Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
[0016] In the above scheme, the preset point number correspondence relationship includes: the correspondence relationship between bandwidth and IFFT / FFT point number;
[0017] The determining, based on a preset point correspondence relationship, the number of IFFT / FFT points corresponding to the target bandwidth includes:
[0018] The preset point correspondence relationship is queried according to the target bandwidth to determine the IFFT / FFT points corresponding to the target bandwidth.
[0019] In the above scheme, the method further includes:
[0020] Detect centralized dispatching status;
[0021] When it is determined that the centralized scheduling state is in the on state, it is determined that the centralized scheduling function is present; the centralized scheduling function represents the function of scheduling the terminals in the cell into the target BWP set.
[0022] In the above scheme, the method further includes:
[0023] Receive switch status instructions from network management equipment;
[0024] According to the switch state instruction, the centralized dispatch state is adjusted.
[0025] An embodiment of the present invention provides an IFFT / FFT point determination device, the device comprising:
[0026] A first processing module is used to schedule the terminal in the cell into a target BWP set and determine a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP;
[0027] The second processing module is used to determine the IFFT / FFT points corresponding to the target bandwidth based on a preset point correspondence relationship.
[0028] In the above solution, the first processing module is further used to detect the load status of the cell;
[0029] When it is determined that the load state meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set;
[0030] The load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
[0031] In the above solution, the first processing module is used to determine the bandwidth of the BWP included in the target BWP set as the target bandwidth in response to the target BWP set including a BWP;
[0032] Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
[0033] In the above scheme, the preset point number correspondence relationship includes: the correspondence relationship between bandwidth and IFFT / FFT point number;
[0034] The second processing module is used to query the preset point correspondence relationship according to the target bandwidth, and determine the IFFT / FFT points corresponding to the target bandwidth.
[0035] In the above scheme, the first processing module is also used to detect the centralized scheduling state; when it is determined that the centralized scheduling state is on, it is determined that it has a centralized scheduling function; the centralized scheduling function indicates that it has the function of scheduling the terminal in the cell to the target BWP set.
[0036] In the above solution, the first processing module is further used to receive a switch status instruction from a network management device; and adjust the centralized scheduling state according to the switch status instruction.
[0037] An embodiment of the present invention provides an IFFT / FFT point determination device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of any one of the above IFFT / FFT point determination methods are implemented.
[0038] An embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of any of the above methods for determining the number of IFFT / FFT points are implemented.
[0039] An embodiment of the present invention provides a method, device and storage medium for determining the number of IFFT / FFT points, the method comprising: scheduling terminals in a cell into a target bandwidth part (BWP, Bandwidth Part) set, and determining a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP; based on a preset point correspondence relationship, determining the number of IFFT / FFT points corresponding to the target bandwidth; in this way, the number of IFFT / FFT points at the physical layer can be dynamically adjusted to reduce the amount of physical layer processing, thereby saving energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 A flowchart of a method for determining the number of IFFT / FFT points provided by an embodiment of the present invention;
[0041] Figure 2 A schematic diagram of TTI configuration parameters provided by an embodiment of the present invention;
[0042] Figure 3 A flowchart of another method for determining the number of IFFT / FFT points provided by an embodiment of the present invention;
[0043] Figure 4 A schematic diagram of the structure of an IFFT / FFT point determination device provided by an embodiment of the present invention;
[0044] Figure 5 A schematic diagram of the structure of another IFFT / FFT point determination device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0045] The method provided by the embodiment of the present invention schedules the terminal in the cell into a target BWP set, and determines the target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP; based on a preset point correspondence relationship, determines the IFFT / FFT points corresponding to the target bandwidth.
[0046] The present invention will be further described in detail below in conjunction with the embodiments.
[0047] Figure 1 A flow chart of a method for determining the number of IFFT / FFT points provided by an embodiment of the present invention; Figure 1As shown, the method is applied to a base station, such as an enhanced base station (eNB), a 5G base station (gNB, gNodeB) or a NB, and the method includes:
[0048] Step 101: Schedule a terminal in a cell into a target BWP set, and determine a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP;
[0049] Step 102: Determine the IFFT / FFT points corresponding to the target bandwidth based on a preset point correspondence relationship.
[0050] In some embodiments, before scheduling the terminal in the cell into the target BWP set, the method includes:
[0051] detecting a load status of the cell;
[0052] When it is determined that the load state meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set;
[0053] The load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
[0054] Specifically, the preset threshold can be preset by the developer. The load status is used to determine whether the terminal in the cell can be scheduled in the target BWP set. In actual application, when it is determined that the load is lower than the preset threshold, it is considered that all terminals in the cell can be scheduled in the target BWP set. Among them, the load being lower than the preset threshold can be reflected by a variety of features, such as: the number of users connected to the current cell is small (such as specifically less than a preset user threshold), the total business volume is not large (such as specifically less than a preset business volume threshold), the number of users and the total business volume are far lower than the peak requirements (such as the number of users is less than a preset user threshold, and the business volume is less than a preset business volume threshold), etc.
[0055] In actual application, when the network management equipment of the base station controls the base station to turn on the physical layer energy-saving function (the energy-saving function here refers to turning on the centralized scheduling function, that is, the base station can execute the function of centrally scheduling the terminals of the cell to the target BWP), the scheduler of the base station (which can be understood as a functional module for the base station to implement centralized scheduling) will schedule all terminals in the cell to the same BWP (such as 20MHz) or several connected BWPs according to the current business load situation. When the load is light, it reduces the bandwidth occupied by the signal. At this time, the physical layer of the base station (which can be understood as another functional module for the base station to implement centralized scheduling, specifically refers to the module for determining the number of IFFT / FFT points) can configure the number of points according to the effective bandwidth when performing IFFT / FFT processing, without the need to perform calculations according to the maximum number of points of the cell system bandwidth.
[0056] In some embodiments, determining the target bandwidth corresponding to the target BWP set includes:
[0057] Corresponding to the target BWP set including a BWP, determining a bandwidth of the BWP included in the target BWP set as the target bandwidth;
[0058] Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
[0059] Here, the target BWP set includes at least one BWP, specifically including two cases:
[0060] Case 1: The target BWP set includes one BWP; that is, all terminals in the cell are centrally scheduled in one BWP;
[0061] Case 2: The target BWP set includes at least two connected BWPs; that is, all terminals in the cell are centrally scheduled in at least two connected BWPs.
[0062] For the second situation, since different BWPs correspond to different bandwidths; after determining that the terminals in the cell are centrally scheduled in at least two connected BWPs, the bandwidth of each BWP in the at least two connected BWPs can be determined, and the bandwidth of each BWP in the at least two connected BWPs can be added together to obtain the sum of the bandwidths, and the sum of the bandwidths is used as the target bandwidth. Then, based on the preset point correspondence relationship, the IFFT / FFT points corresponding to the sum of the bandwidths can be determined.
[0063] In some embodiments, the method further comprises:
[0064] Detect centralized dispatching status;
[0065] When it is determined that the centralized scheduling state is in the on state, it is determined that the centralized scheduling function is present; the centralized scheduling function represents the function of scheduling the terminals in the cell into the target BWP set.
[0066] Here, the network management equipment of the base station can control whether the base station turns on centralized scheduling. Furthermore, the base station can first detect the centralized scheduling state before executing steps 101 and 102. When it is determined that the centralized scheduling state is on, the function of turning on the BWP centralized scheduling of the cell terminal can be determined, and then the BWP centralized scheduling of the cell terminal can be executed, that is, the operation of scheduling the terminals in the cell into the target BWP set can be executed.
[0067] In actual application, the network management device can be a device for managing base stations, located outside the base station, and can automatically set the default switch state through its own program; in addition, the base station operation and maintenance personnel can also manually configure the switch state.
[0068] Based on this, in some embodiments, the method further includes:
[0069] Receive switch status instructions from network management equipment;
[0070] According to the switch state instruction, the centralized dispatch state is adjusted.
[0071] In some embodiments, the preset point number correspondence relationship includes: a correspondence relationship between bandwidth and IFFT / FFT point number;
[0072] The determining, based on a preset point correspondence relationship, the number of IFFT / FFT points corresponding to the target bandwidth includes:
[0073] The preset point correspondence relationship is queried according to the target bandwidth to determine the IFFT / FFT points corresponding to the target bandwidth.
[0074] In actual application, the base station may include a scheduler and a physical layer; the scheduler is used to implement a centralized scheduling function, and the physical layer is used to configure the corresponding IFFT / FFT points.
[0075] Based on this, in some embodiments, scheduling the terminal in the cell into the target BWP set includes:
[0076] The scheduler of the base station schedules the terminals in the cell into the target BWP set and configures the transmission time interval (TTI) configuration parameters;
[0077] Here, the TTI configuration parameters include: an identifier of a target bandwidth corresponding to the target BWP set and a size of the target bandwidth;
[0078] That is, the scheduler determines the size of the target bandwidth corresponding to the target BWP set, and determines the identifier of the corresponding target bandwidth;
[0079] Accordingly, determining the number of IFFT / FFT points corresponding to the target bandwidth based on a preset point correspondence relationship includes:
[0080] The physical layer of the base station receives a TTI configuration parameter from a scheduler of the base station, where the TTI configuration parameter includes an identifier of a target bandwidth;
[0081] Determine an identifier of a target bandwidth corresponding to the target BWP set based on the TTI configuration parameter;
[0082] The preset point correspondence relationship is queried according to the identifier of the target bandwidth to determine the IFFT / FFT points corresponding to the target bandwidth.
[0083] Specifically, after the physical layer reads the TTI configuration parameters, it determines the identifier of the target bandwidth recorded in the TTI configuration parameters; according to the identifier of the target bandwidth, the preset point correspondence relationship can be queried, so as to determine the IFFT / FFT points corresponding to the target bandwidth.
[0084] Here, the size of the target bandwidth may also be used as an identifier, and the corresponding IFFT / FFT points may be queried based on the size of the target bandwidth.
[0085] Here, the TTI configuration parameters are used to characterize the scheduling result.
[0086] The TTI configuration parameters may include: first information and second information; wherein,
[0087] The first information is used to indicate whether the centralized scheduling function is enabled in the current TTI;
[0088] The second information is used to describe the determined target bandwidth (specifically, the identifier of the target bandwidth and / or the size of the target bandwidth).
[0089] The first information and the second information in the TTI configuration parameters can be filled in by the scheduler; if the scheduler determines to turn on the centralized scheduling function, it can be marked as turned on through the first information; after the scheduler implements centralized scheduling of terminals in the cell, the target bandwidth can be determined according to the bandwidth corresponding to the target BWP set of the centralized scheduling, and the target bandwidth can be filled in with the second information corresponding to the target bandwidth.
[0090] Specifically, in order to realize the above-mentioned function of dynamically configurable IFFT / FFT points, a message can be added to the TTI configuration parameters obtained by the physical layer of the base station to inform the physical layer whether the centralized scheduling BWP function is enabled in the current cell, as well as the total bandwidth of the centralized scheduling BWP. Here, a TTI configuration parameter is provided; Figure 2 A schematic diagram of TTI configuration parameters provided by an embodiment of the present invention; Figure 2 In the , R represents a reserved bit (which can occupy several bits to increase the possibility of transmitting information later), which can be set to "0";
[0091] Sch_bwp_en (equivalent to a first information) indicates whether the centralized scheduling function is enabled in the current TTI, and the size may be 1 bit.
[0092] When Sch_bwp_en = "1", it means that all users in the current TTI are centrally scheduled in one BWP or at least two connected BWPs;
[0093] When Sch_bwp_en = "0", it indicates that the BWP is not centrally scheduled in the current TTI.
[0094] Schedule_bwp (equivalent to a second information) is used to mark the determined target bandwidth. Specifically, when Sch_bwp_en = "1", Schedule_bwp can be used to determine the total bandwidth of the BWP centrally scheduled in the current TTI.
[0095] The size of Schedule_bwp can be 4 bits.
[0096] The corresponding relationship between the configuration of Schedule_bwp, the BWP bandwidth size, and the corresponding IFFT / FFT points can be shown in Table 1 below.
[0097]
[0098]
[0099] Table 1
[0100] Configure the bandwidth corresponding to BWP according to Table 1, and query the IFFT / FFT points corresponding to the matching BWP bandwidth through the target bandwidth. For example, under 5G 20MHz bandwidth, when the sub-carrier spacing (SCS, Sub-Carrier Space) = 30kHz, the IFFT / FFT points only need to be configured to 1024 points; under 100MHz bandwidth, the IFFT / FFT points are 4096 points; compared with 20MHz, the method provided by the embodiment of the present invention reduces the amount of calculation of the IFFT / FFT module by about 3 / 4.
[0101] It should be noted that when the network management equipment of the base station controls the base station to turn off the physical layer energy-saving configuration function, the scheduler does not turn on the centralized scheduling function (that is, the centralized scheduling of terminals within the cell cannot be performed in the target BWP center), then the physical layer determines the IFFT / FFT points and can perform point calculations according to the system bandwidth, and there is no limitation here.
[0102] The method provided in the embodiment of the present invention takes into account the large-scale antenna array configuration of 5G and the large number of IFFT / FFT channels. The above method can significantly reduce the base station processing volume, thereby achieving the effect of reducing energy consumption.
[0103] Figure 3 A flow chart of a method for determining the number of IFFT / FFT points provided by an embodiment of the present invention; Figure 3 As shown, the method is applied to a terminal, and the method includes:
[0104] Step 301: The network management device of the base station configures the switch state of the physical layer IFFT / FFT energy saving;
[0105] The switch state of the physical layer IFFT / FFT energy saving is equivalent to the switch state of the above-mentioned centralized scheduling function; that is, the network management device configures whether the base station can perform centralized scheduling.
[0106] Step 302, the base station determines the switch state; if it is determined to be in the closed state, it proceeds to step 303; if it is determined to be in the open state, it proceeds to step 304;
[0107] Here, the base station includes at least a scheduler and a physical layer; the switch state can be determined by the scheduler of the base station; when the scheduler determines that the current switch state is off, it is considered that the physical layer IFFT / FFT energy saving function is not turned on (equivalent to Figure 1 The centralized scheduling function is not enabled in the method shown), and the process goes to step 303; when the scheduler determines that the current switch state is enabled, it is considered that the physical layer IFFT / FFT energy saving function is enabled (equivalent to Figure 1 The centralized scheduling function is enabled in the method shown), and the process goes to step 304;
[0108] Step 303: The scheduler does not perform centralized BWP scheduling of the terminals in the cell;
[0109] Step 304: The scheduler performs centralized BWP scheduling of terminals in the cell according to the service load;
[0110] Here, the scheduler performs centralized BWP scheduling of terminals in the cell according to the service load, including:
[0111] The scheduler schedules the terminals in the cell into a target BWP set; the target BWP set includes at least one BWP.
[0112] The step 304 further includes: sending the scheduling result to the physical layer. The scheduling result can be presented by TTI configuration parameters. The TTI configuration parameters can be used Figure 2 The parameter structure shown.
[0113] Step 305: The physical layer receives TTI configuration parameters;
[0114] Step 306: The physical layer extracts centralized scheduling enable information sch_bwp_en;
[0115] Step 307, determine whether sch_bwp_en is 0 or 1, when sch_bwp_en=0, go to step 308; when sch_bwp_en=1, go to step 310;
[0116] Step 308: The physical layer extracts the system bandwidth (BW) of the cell;
[0117] Step 309: The physical layer configures the IFFT / FFT points of the current cell according to the system bandwidth;
[0118] Step 310: The physical layer extracts the BWP bandwidth information of the centralized scheduling of the cell users (i.e., determines Schedule_bwp);
[0119] Step 311: The physical layer configures the IFFT / FFT points of the current cell according to Schedule_bwp.
[0120] Specifically describing steps 306-311, the physical layer receives TTI configuration parameters, and the TTI configuration parameters include at least: Schedule_bwp, Sch_bwp_en; determines whether to perform centralized scheduling based on Sch_bwp_en; specifically, when Sch_bwp_en = "1", it means that all terminals in the current TTI are centrally scheduled in one BWP or at least two connected BWPs; then, the BWP bandwidth and IFFT / FFT points can be determined based on Schedule_bwp; specifically, the BWP bandwidth and IFFT / FFT points corresponding to Schedule_bwp are determined based on Table 1 above.
[0121] When Sch_bwp_en = "0", it means that users are not centrally scheduled in the current TTI, then the physical layer extracts the cell system bandwidth (BW) and configures the IFFT points of the current cell according to the system bandwidth BW. Here, the system bandwidth (BW) is the configured bandwidth of the cell, corresponding to its unique FFT / IFFT points. For example, if the cell is configured with 100Mhz, then the IFFT / FFT points are 4096.
[0122] Figure 4 A schematic diagram of the structure of an IFFT / FFT point determination device provided by an embodiment of the present invention; Figure 4 As shown, the device is applied to a base station, and the device includes:
[0123] A first processing module is used to schedule the terminal in the cell into a target BWP set and determine a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP;
[0124] The second processing module is used to determine the IFFT / FFT points corresponding to the target bandwidth based on a preset point correspondence relationship.
[0125] In some embodiments, the first processing module is further used to detect the load status of the cell;
[0126] When it is determined that the load state meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set;
[0127] The load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
[0128] In some embodiments, the first processing module is used to determine the bandwidth of the BWP included in the target BWP set as the target bandwidth in response to the target BWP set including a BWP;
[0129] Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
[0130] In some embodiments, the preset point number correspondence relationship includes: a correspondence relationship between bandwidth and IFFT / FFT point number;
[0131] The second processing module is used to query the preset point correspondence relationship according to the target bandwidth, and determine the IFFT / FFT points corresponding to the target bandwidth.
[0132] In some embodiments, the first processing module is further used to detect the centralized scheduling state;
[0133] When it is determined that the centralized scheduling state is in the on state, it is determined that the centralized scheduling function is present; the centralized scheduling function represents the function of scheduling the terminals in the cell into the target BWP set.
[0134] In some embodiments, the first processing module is further used to receive a switch status instruction from a network management device;
[0135] According to the switch state instruction, the centralized dispatch state is adjusted.
[0136] It should be noted that: the IFFT / FFT point determination device provided in the above embodiment only uses the division of the above program modules as an example when implementing the corresponding IFFT / FFT point determination method. In actual applications, the above processing can be assigned to different program modules as needed, that is, the internal structure of the server is divided into different program modules to complete all or part of the processing described above. In addition, the device provided in the above embodiment and the embodiment of the corresponding method belong to the same concept, and its specific implementation process is detailed in the method embodiment, which will not be repeated here.
[0137] Figure 5 A schematic diagram of the structure of another IFFT / FFT point determination device provided by an embodiment of the present invention, such as Figure 5As shown, the device 50 includes: a processor 501 and a memory 502 for storing a computer program that can be run on the processor; when the processor 501 is used to run the computer program, it executes: scheduling the terminal in the cell into a target BWP set, and determining the target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP; based on a preset point correspondence relationship, determining the IFFT / FFT points corresponding to the target bandwidth.
[0138] In one embodiment, the processor 501 is also used to execute the following when running the computer program: detecting the load status of the cell; and determining that when the load status meets the preset load requirement, scheduling the terminal in the cell into the target BWP set; the load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
[0139] In one embodiment, the processor 501 is further configured to execute, when running the computer program: corresponding to the target BWP set including one BWP, determining a bandwidth of the BWP included in the target BWP set as the target bandwidth;
[0140] Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
[0141] In one embodiment, the processor 501 is further configured to execute, when running the computer program: querying the preset point correspondence relationship according to the target bandwidth to determine the IFFT / FFT points corresponding to the target bandwidth.
[0142] In one embodiment, the processor 501 is further configured to, when running the computer program, perform: detecting a centralized scheduling state;
[0143] When it is determined that the centralized scheduling state is in the on state, it is determined that the centralized scheduling function is present; the centralized scheduling function represents the function of scheduling the terminals in the cell into the target BWP set.
[0144] In one embodiment, the processor 501 is further configured to, when running the computer program, execute: receiving a switch state instruction from a network management device;
[0145] According to the switch state instruction, the centralized dispatch state is adjusted.
[0146] In actual application, the device 50 may further include: at least one network interface 503. The various components in the device 50 are coupled together via a bus system 504. It is understood that the bus system 504 is used to achieve connection and communication between these components. In addition to the data bus, the bus system 504 also includes a power bus, a control bus, and a status signal bus. However, for the sake of clarity, Figure 5 In the figure, various buses are marked as bus system 504. There may be at least one processor 501. The network interface 503 is used for wired or wireless communication between the apparatus 50 and other devices.
[0147] The memory 502 in the embodiment of the present invention is used to store various types of data to support the operation of the device 50 .
[0148] The method disclosed in the above embodiment of the present invention can be applied to the processor 501, or implemented by the processor 501. The processor 501 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit in the processor 501 or the instruction in the form of software. The above processor 501 can be a general processor, a digital signal processor (DSP, DiGital Signal Processor), or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. The processor 501 can implement or execute the methods, steps and logic block diagrams disclosed in the embodiment of the present invention. The general processor can be a microprocessor or any conventional processor, etc. The steps of the method disclosed in the embodiment of the present invention can be directly embodied as a hardware decoding processor to execute, or the hardware and software modules in the decoding processor can be combined to execute. The software module can be located in a storage medium, which is located in the memory 502. The processor 501 reads the information in the memory 502 and completes the steps of the above method in combination with its hardware.
[0149] In an exemplary embodiment, the device 50 can be implemented by one or more application specific integrated circuits (ASIC), DSP, programmable logic device (PLD), complex programmable logic device (CPLD), field programmable gate array (FPGA), general processor, controller, microcontroller (MCU), microprocessor, or other electronic components to execute the aforementioned method.
[0150] An embodiment of the present invention also provides a computer-readable storage medium having a computer program stored thereon; when the computer program is executed by a processor, the computer program executes: scheduling terminals within a cell into a target BWP set, and determining a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP; and determining the IFFT / FFT points corresponding to the target bandwidth based on a preset point correspondence relationship.
[0151] In one embodiment, when the computer program is executed by the processor, the following is performed: detecting the load status of the cell; when it is determined that the load status meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set; the load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
[0152] In one embodiment, when the computer program is executed by a processor, the computer program performs: corresponding to the target BWP set including a BWP, determining the bandwidth of the BWP included in the target BWP set as the target bandwidth;
[0153] Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
[0154] In one embodiment, when the computer program is executed by a processor, the computer program executes: querying the preset point correspondence relationship according to the target bandwidth to determine the IFFT / FFT points corresponding to the target bandwidth.
[0155] In one embodiment, when the computer program is executed by the processor, the following is performed: detecting a centralized scheduling state; when determining that the centralized scheduling state is on, determining that it has a centralized scheduling function; the centralized scheduling function indicates that it has a function of scheduling terminals in a cell into a target BWP set.
[0156] In one embodiment, when the computer program is executed by a processor, the computer program performs the following steps: receiving a switch state instruction from a network management device; and adjusting a centralized scheduling state according to the switch state instruction.
[0157] In the several embodiments provided in the present application, it should be understood that the disclosed apparatus and method can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored, or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.
[0158] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0159] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0160] A person skilled in the art can understand that: all or part of the steps of implementing the above method embodiment can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiment; and the aforementioned storage medium includes: mobile storage devices, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), disks or optical disks, etc. Various media that can store program codes.
[0161] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.
[0162] It should be noted that: "first", "second", etc. are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.
[0163] In addition, the technical solutions described in the embodiments of the present application can be combined arbitrarily without conflict.
[0164] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for determining the number of IFFT / FFT points, characterized in that: The method comprises: Scheduling a terminal in a cell into a target BWP set, and determining a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP; Based on a preset point correspondence relationship, determining the IFFT / FFT points corresponding to the target bandwidth; The determining the target bandwidth corresponding to the target BWP set includes: Corresponding to the target BWP set including a BWP, determining a bandwidth of the BWP included in the target BWP set as the target bandwidth; Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
2. The method according to claim 1, characterized in that Before scheduling the terminal in the cell into the target BWP set, the method includes: detecting a load status of the cell; When it is determined that the load state meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set; The load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
3. The method according to claim 1, characterized in that The preset point correspondence relationship includes: a correspondence relationship between bandwidth and IFFT / FFT points; The determining, based on a preset point correspondence relationship, the number of IFFT / FFT points corresponding to the target bandwidth includes: The preset point correspondence relationship is queried according to the target bandwidth to determine the IFFT / FFT points corresponding to the target bandwidth.
4. The method according to any one of claims 1 to 3, characterized in that: The method further comprises: Detect centralized dispatching status; When it is determined that the centralized scheduling state is in the on state, it is determined that the centralized scheduling function is present; the centralized scheduling function represents the function of scheduling the terminals in the cell into the target BWP set.
5. The method according to claim 4, characterized in that The method further comprises: Receive switch status instructions from network management equipment; According to the switch state instruction, the centralized dispatch state is adjusted.
6. An IFFT / FFT point determination device, characterized in that: The device comprises: A first processing module is used to schedule the terminal in the cell into a target BWP set and determine a target bandwidth corresponding to the target BWP set; the target BWP set includes at least one BWP; A second processing module, used for determining the IFFT / FFT points corresponding to the target bandwidth based on a preset point correspondence relationship; The first processing module is used for determining the bandwidth of the BWP included in the target BWP set as the target bandwidth in response to the target BWP set including a BWP; Corresponding to the target BWP set including at least two connected BWPs, a sum of bandwidths of the at least two connected BWPs is determined as the target bandwidth.
7. The device according to claim 6, characterized in that The first processing module is further used to detect the load status of the cell; When it is determined that the load state meets the preset load requirement, determining to schedule the terminal in the cell into the target BWP set; The load status meeting the preset load requirement indicates that the load of the corresponding cell is lower than a preset threshold.
8. The device according to claim 6, characterized in that The preset point correspondence relationship includes: a correspondence relationship between bandwidth and IFFT / FFT points; The second processing module is used to query the preset point correspondence relationship according to the target bandwidth, and determine the IFFT / FFT points corresponding to the target bandwidth.
9. The device according to any one of claims 6 to 8, characterized in that The first processing module is further used to detect a centralized scheduling state; when it is determined that the centralized scheduling state is on, it is determined that the centralized scheduling function is present; the centralized scheduling function indicates that the terminal in the cell is scheduled to a target BWP set.
10. The device according to claim 9, characterized in that The first processing module is further used to receive a switch status instruction from a network management device; and adjust the centralized scheduling state according to the switch status instruction.
11. An IFFT / FFT point determination device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the method according to any one of claims 1 to 5 are implemented.
12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.
