An optimization method for empty tank allocation in molten iron transportation process

The optimization method for empty tank allocation in molten iron transportation addresses temperature and global optimization issues, enhancing tank utilization and reducing energy loss by strategically allocating tanks based on their location and state.

CN114580735BActive Publication Date: 2024-12-03NORTHEASTERN UNIV CHINA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210195122.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-01
Publication Date
2024-12-03
Estimated Expiration
2042-03-01

AI Technical Summary

Technical Problem

Current methods for empty tank allocation in molten iron transportation fail to consider the temperature of empty tanks, leading to excessive temperature drops during transportation, increased energy loss, and reduced steelmaking efficiency, while also lacking a global optimization approach that accounts for continuous updates in the blast furnace tapping process.

Method used

An optimization method using a mathematical model to allocate empty molten iron tanks based on their location, type, and temperature state, minimizing energy loss and ensuring timely delivery by constructing a set partitioning model to determine the optimal allocation of tanks across the iron-steel interface.

Benefits of technology

The method improves the turnover rate of molten iron tanks and reduces energy loss by prioritizing the use of higher-temperature tanks, ensuring smooth blast furnace operations and reducing energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114580735B_ABST
    Figure CN114580735B_ABST
Patent Text Reader

Abstract

The present invention provides an empty tank allocation optimization method for a molten iron transportation process, and relates to the field of metallurgical automatic control technology. The method first divides the iron and steel production interface of a steel enterprise into different areas, and determines the hot and cold states of the empty molten iron tanks; then, based on the requirement of the blast furnace iron-out task, the empty molten iron tanks of different areas, types and states are allocated to the molten iron empty tank allocation problem of the blast furnace iron-out task; and the molten iron empty tank allocation model based on the set partitioning model is quantitatively described to describe the molten iron empty tank allocation problem; finally, the optimal combination of the molten iron distribution allocation scheme is solved, and sent to the dispatching department for execution. The method can improve the utilization rate of the empty molten iron tanks and reduce the energy loss in the molten iron transportation process on the basis of meeting the blast furnace iron-out task requirement and ensuring the safety and smoothness of the blast furnace iron-out task.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of metallurgical automatic control, and in particular to an empty tank allocation optimization method for a molten iron transportation process. Background Art

[0002] Hot metal transportation is the process of timely transporting hot metal produced by blast furnace smelting in the ironmaking process to the tank dumping station in the steelmaking workshop. It is a bridge between the ironmaking process and the steelmaking process of steel enterprises. The timely arrival of hot metal in the steelmaking workshop is of great significance to the smooth implementation of the steelmaking plan. At present, the tools for loading hot metal in steel enterprises are mainly torpedo cans and open cans, which carry different amounts of hot metal. The smelted hot metal in the blast furnace flows out through its taphole to the torpedo can (TPC) or open cans and other loading tools for carrying (i.e., the iron receiving process), and then the torpedo can or open can is pulled by the locomotive to transport the hot metal to the tank dumping station in the steelmaking workshop. Empty can allocation refers to the timely transportation of different types of hot metal empty cans (torpedo cans or open cans) to the corresponding tapholes under the blast furnace tapping line before the blast furnace taps out. Blast furnace iron tapping is a continuous process. In order to ensure the safety and smoothness of the blast furnace iron tapping process, it is necessary to transport the specified type and quantity of empty molten iron tanks required for the blast furnace iron tapping task to the blast furnace iron tapping port to wait for iron before the blast furnace iron tapping.

[0003] Large steel enterprises usually have multiple blast furnaces. Due to the different construction periods of blast furnaces, the capacities of different blast furnaces are different, and the distances between the tapholes of different blast furnaces are also different. Some blast furnaces cannot be equipped with large weighing equipment for weighing torpedo cans due to their short wheelbases, so they can only use open cans to load and transport molten iron. Blast furnaces with different capacities produce different amounts of molten iron, resulting in different amounts of molten iron each time, and different types and quantities of empty molten iron cans. Each blast furnace usually has four tapholes, and iron is tapped in turn at different tapholes according to a certain cycle. According to the tapping plan of the steel enterprise, before the blast furnace tapping time, the number of empty torpedo cans and open cans that meet the tapping task requirements of different blast furnaces is known. As the blast furnace tapping task is executed, the torpedo cans and molten iron cans are distributed at different locations on the railway transportation track from the blast furnace area to the steelmaking workshop. Before allocating the empty molten iron cans, the specific location of each empty torpedo can and empty open can needs to be determined. At present, most steel enterprises install high-temperature resistant electronic tags based on radio frequency identification (RFID) technology on each molten iron tank, identify specific targets through radio signals, read and write relevant data, accurately identify the empty molten iron tank number, and determine the location of the molten iron tank. If the temperature of molten iron is too low, it will affect the quality of steel products. When the heat loss during the transportation of molten iron is large, the molten iron needs to be reheated after being transported to the steelmaking workshop, resulting in reduced steelmaking production efficiency and increased costs. Reducing the temperature drop during the transportation of molten iron is an effective way to reduce energy consumption and save energy in the steelmaking process. The temperature of torpedo tanks and empty open tanks is related to the time since the last iron pouring or empty tank maintenance and baking task. According to the time when the empty torpedo tanks and open empty tanks were last used and the pre-set threshold, the empty torpedo tanks and open empty tanks are divided into three states: hot tanks, warm tanks and cold tanks. When the distance from the empty molten iron tank to the blast furnace is the same, giving priority to the use of the empty molten iron tanks with higher temperatures can effectively reduce the temperature drop during the blast furnace iron tapping and molten iron transportation process, and reduce energy loss.

[0004] The problem of empty tank allocation during molten iron transportation is a complex technical problem, which involves how to select empty molten iron tanks of different types and different hot and cold states from different areas of the entire iron-steel interface. With the continuous update of blast furnace iron-making tasks and the implementation of tank allocation plans, the position of molten iron tanks in the iron-steel interface changes, and the hot and cold states of molten iron tanks also change continuously. For different blast furnace iron-making tasks, how to scientifically allocate empty molten iron tanks of different types and different hot and cold states in different areas is a very important and complex technical problem faced by steel companies.

[0005] The patent "A method and system for controlling molten iron transportation, patent number: CN202110265085.6" first obtains the tank allocation plan for the current molten iron transportation, selects the molten iron tank car according to the tank allocation plan and generates corresponding unique identification information, which is used to control and confirm that the molten iron tank car enters the track to receive iron. This patent is mainly about the information tracking, control and plan implementation of molten iron tank cars, rather than the specific allocation method of molten iron tank cars. The patent regards the tank allocation plan as known information, which can be simply triggered by the information system or given manually. The patent "An integrated scheduling system for ironmaking, steelmaking and continuous casting, patent number: CN200910243302.0" uses the embedded physical model of molten iron torpedo tanks and ladles to realize the allocation of molten iron torpedo tanks, but its physical model is essentially a rough allocation and scheduling method based on manual experience and empirical rules, and cannot guarantee the quality of the obtained molten iron tank allocation plan.

[0006] At present, in order to solve the problem of empty tank allocation during molten iron transportation, steel companies usually adopt an allocation method that relies on the subjective experience of dispatchers. Usually, after a qualitative analysis of the number and location of torpedo empty tanks and open empty tanks at the entire iron-steel interface, dispatchers allocate molten iron empty tanks for blast furnace iron-making tasks according to the principle of nearest allocation based on past experience and the tank types and number of empty tanks required for blast furnace iron-making tasks, and then use locomotives to transport the molten iron tanks to the iron-making outlets corresponding to the blast furnace iron-making tasks. Since the actual molten iron distribution process is affected by factors such as the distribution of molten iron empty tanks and the temperature of molten iron empty tanks, this nearest allocation method has the following problems:

[0007] (1) The local distribution of empty iron tanks does not take into account the temperature of the empty iron tanks. During the blast furnace iron-making process and the molten iron transportation process, the empty iron tanks in different cold and hot states have an important impact on the temperature of the molten iron during the transportation process. The temperature of the empty iron tanks is too low, resulting in excessive temperature drop of the molten iron during the transportation process. When the temperature of the molten iron transported to the steelmaking workshop is lower than the temperature required for the subsequent production process, secondary heating is required, which not only seriously affects the production rhythm of the steelmaking workshop, but also increases energy loss and steelmaking production costs.

[0008] (2) The current method of allocating empty iron tanks nearby only considers the single blast furnace tapping task, and does not consider the subsequent tapping task of the blast furnace, nor does it perform the allocation of empty iron tanks in a rolling manner over time. This is a local optimization rather than a global optimization. After the iron tank filled with molten iron completes the pouring process, the status of the iron tank is updated from a heavy tank to an empty tank, and can be used again. As time goes by, the blast furnace tapping task, the availability of the iron tanks at the entire iron-steel interface, and the hot and cold status of the empty tanks are constantly updated. Therefore, the allocation of empty iron tanks needs to be globally optimized in a rolling mode.

[0009] To sum up, by analyzing the factors involved in the molten iron transportation process and making reasonable decisions on the allocation of empty tanks in the molten iron transportation process, and on the premise of ensuring the safety and smoothness of the blast furnace iron tapping process, the reasonable allocation of empty molten iron tanks is of great significance to improving the turnover rate of molten iron tanks and reducing energy loss in the molten iron transportation process. Summary of the invention

[0010] The technical problem to be solved by the present invention is to provide an empty tank allocation optimization method for the molten iron transportation process in view of the deficiencies of the above-mentioned prior art. Before the blast furnace tapping, empty molten iron tanks of different areas, types and hot and cold states in the iron-steel interface are allocated to each blast furnace tapping task, so as to achieve the purpose of reducing energy loss in the molten iron transportation process and improving the turnover rate of molten iron tanks while ensuring the smooth blast furnace tapping process.

[0011] In order to solve the above technical problems, the technical solution adopted by the present invention is: an empty tank allocation optimization method for the molten iron transportation process, comprising the following steps:

[0012] Step 1: Obtain the location information of the blast furnace, steelmaking workshop, tank inspection station, iron casting station, and slag dumping room of the steel enterprise, and divide the iron-steel interface of the steel enterprise into different areas based on this information;

[0013] The distances from the empty hot metal tanks in the same area to the same blast furnace are equal, and the cost of using a locomotive to pull the empty hot metal tanks in the same area is the same, that is, when using the empty hot metal tanks in the same area, the fixed startup cost of the locomotive is the same;

[0014] Step 2, obtaining the blast furnace iron-tapping task information and the location information of the empty molten iron tank, and determining the hot and cold state of the empty molten iron tank according to the most recent iron pouring or maintenance baking time of the empty molten iron tank;

[0015] Among them, the time of blast furnace iron-making task, the type and quantity of molten iron tanks required, the location information of empty molten iron tanks, the last time of iron pouring or maintenance baking time of the molten iron tanks are obtained from the information system of the steel enterprise. 0 , according to the current time t and t 0 The difference tt 0 Determine the hot and cold state h of the empty molten iron tank, and divide the empty molten iron tank into three states: hot tank, warm tank and cold tank;

[0016] Step 3: construct a mathematical model to describe the decision of allocating empty molten iron tanks of different areas, types and states to the blast furnace tapping task while meeting the blast furnace tapping task requirements;

[0017] The specific steps include:

[0018] Step 3-1, mapping the number of empty molten iron tanks in different areas, types and states selected for the blast furnace tapping task in the empty molten iron tank allocation problem into a mathematical model decision variable;

[0019] Set the integer decision variable x' irh , represents the number of empty torpedo cans with a cold or hot state of h in the area r used by the blast furnace iron-making task i, r∈R, R is the set of areas divided by the iron-steel interface; set the integer decision variable x" irh , represents the number of open empty tanks with a cold or hot state of h in the area r used by the blast furnace iron-making task i; set the 0-1 decision variable y' ir , when the blast furnace iron-making task i uses the torpedo tank in area r, y' ir The value is 1, otherwise y' ir Set the value to 0; set the decision variable y to 0-1" ir , when the blast furnace tapping task i uses an open tank in area r, y" ir The value is 1, otherwise y" ir Set the value to 0; set the 0-1 decision variable z i , when the blast furnace iron-making task i uses a torpedo tank, z i The value is 1, otherwise z i The value is 0;

[0020] Step 3-2: Map the process constraints in the empty iron tank allocation problem into mathematical model constraints, as follows:

[0021] Step 3-2-1: Establish the demand process constraints for different types of molten iron empty tanks for different blast furnace iron-making tasks, as shown in the following formula:

[0022]

[0023]

[0024] Where N represents the set of all blast furnace tapping tasks i, R represents the set of regions divided by the iron-steel interface, H′ represents the set of all torpedo tanks in the iron-steel interface, H″ represents the set of all open tanks in the iron-steel interface, and b′ i represents the number of torpedo tanks required for blast furnace iron-making task i, b” i represents the number of open tanks required for blast furnace iron-making task i, x' irh Indicates the number of torpedo tanks with a cold or hot state of h in the area r used by the blast furnace iron-making task i, x" irh It indicates the number of open tanks with hot and cold states h in area r used by blast furnace tapping task i;

[0025] Step 3-2-2: Establish a process constraint that the sum of the number of hot metal ladle tanks with different hot and cold states selected in different regions is less than the number of empty hot metal ladle tanks with the corresponding hot and cold state h in the region r, as shown in the following formula:

[0026]

[0027]

[0028] Among them, a' rh represents the number of all torpedo tanks with hot and cold states h in region r, a” rh represents the number of all open tanks with hot and cold states h in region r;

[0029] Step 3-2-3, establish the process constraints of the fixed startup cost of locomotives in the same area r, that is, in the same area r, select empty molten iron tanks of different types and states, and only calculate the process constraints of the fixed startup cost once, as shown in the following formula:

[0030]

[0031]

[0032] Among them, a' rh represents the number of torpedo tanks with hot and cold states h in region r, a” rh represents the number of open tanks in region r with a hot / cold state of h; when the torpedo tanks in region r are selected, y' ir =1, at this time, the number of torpedo tanks with a cold and hot state of h in area r used by blast furnace iron-making task i is x' irh Should be less than or equal to the number a' of torpedo tanks with hot and cold states h in region r rh Similarly, when the blast furnace tapping task i selects an open tank in area r, y" ir =1, at this time, the number of open tanks with cold and hot states h in area r used by blast furnace iron-making task i is x" irh It should be less than the number a of all open tanks with hot and cold states h in region r” rh ;

[0033] Step 3-3, map the optimization index of the molten iron empty tank allocation problem into the mathematical model objective function, so as to minimize the sum of the distance between each selected molten iron empty tank and the blast furnace, the energy loss of the selected molten iron empty tank in different states, and the fixed startup cost of the locomotive, as shown in the following formula:

[0034]

[0035] Among them, c ir represents the distance from the blast furnace where the blast furnace iron-making task i is located to the region r, eih represents the energy loss caused by the blast furnace where the blast furnace iron-making task i is located using an empty molten iron tank with a cold or hot state of h, f ir It represents the fixed locomotive startup cost generated by the empty molten iron tanks in the area r used by the blast furnace iron-making task i;

[0036] Step 4: Based on the parameter information of the current blast furnace iron-making task and the distribution and hot and cold status information of the molten iron tanks in the iron-steel interface, and on the premise of meeting the blast furnace iron-making task's demand for molten iron empty tanks, a molten iron empty tank allocation model RMP based on the set partitioning model is established to quantitatively describe the molten iron empty tank allocation problem, and the molten iron empty tank allocation model is iteratively solved to obtain the optimal combination of molten iron allocation plans. The specific method is as follows:

[0037] Step 4-1, for each blast furnace tapping task i, allocate the allocation mode and quantity constraints of empty molten iron tanks that meet the tapping task;

[0038] For any blast furnace tapping task i, i∈N, N is the set of blast furnace tapping tasks, according to the demand of blast furnace tapping tasks for molten iron empty tanks and the types of molten iron empty tanks in different areas of the iron-steel interface, for each blast furnace tapping task i, a distribution mode of molten iron empty tanks that meets the tapping task is allocated. The specific mathematical model is as follows:

[0039] (RMP)min∑∑C iω λ iω (8)

[0040] Among them, ω∈Ω i For a feasible tank distribution solution, Ω i represents the set of all feasible tank allocation schemes for blast furnace iron-making task i, λ iω is a 0-1 decision variable. When the blast furnace iron-making task i selects the tank allocation scheme ω, λ iω The value of is 1, otherwise iω The value of C is 0. iω It represents the cost incurred when the blast furnace iron-making task i selects the tank allocation scheme ω;

[0041] Establish the quantity constraint of the molten iron empty tanks selected in the tank allocation plan, that is, the number of molten iron empty tanks with a hot and cold state of h in the selected area r should be less than or equal to the number of molten iron empty tanks with a hot and cold state of h in the current area r, as shown in the following formula:

[0042]

[0043]

[0044] Among them, A' rhiω The ω tank allocation scheme selected by blast furnace iron-making task i uses the number of torpedo tanks in cold and hot states h in area r, a' rhIndicates the number of torpedo tanks with a hot / cold state of h in the current region r; A" rhiω The ω tank allocation scheme selected by blast furnace iron-making task i uses the number of open tanks with cold and hot states h in area r, a” rh Indicates the number of open tanks with hot and cold states h in the current region r;

[0045] Establish the constraint that any blast furnace iron-making task i can only select one tank allocation method, as shown in the following formula:

[0046]

[0047] Establish a constraint for the tank distribution mode to ensure that the number of empty tanks selected for molten iron is equal to the number of empty tanks required for the blast furnace tapping task. Specifically:

[0048] (1) When the tank requirement for the blast furnace iron-making task is torpedo tanks, the constraint that the number of empty iron tanks is equal to the number of empty tanks required for the blast furnace iron-making task is:

[0049]

[0050]

[0051] Among them, b' i represents the number of torpedo tanks required for blast furnace iron-making task i, y' riω is a 0-1 variable. If the ω allocation scheme selected by blast furnace iron-making task i uses the torpedo tanks in area r, y' riω is 1, otherwise it is 0;

[0052] For any blast furnace iron-making task i, when the tank demand is a torpedo tank, the objective function of the tank distribution scheme generation model SP-1 is as follows:

[0053]

[0054] Among them, π' rh is the shadow price corresponding to the constraint in formula (9), δ i is the shadow price corresponding to the constraint in formula (11), c ir is the distance between the blast furnace where the blast furnace tapping task i is located and the area where the empty molten iron tank is selected, e ih represents the energy loss caused by selecting empty molten iron tanks in different hot and cold states for blast furnace tapping task i, f ir It represents the fixed startup cost of selecting locomotives to select empty hot metal tanks from different areas;

[0055] (2) When the tank requirement for blast furnace iron-making task i is an open tank, the constraint that the number of empty iron tanks is equal to the number of empty tanks required for blast furnace iron-making task is:

[0056]

[0057]

[0058] Among them, b” i The number of open tanks required for blast furnace tapping task i, y" riω is a 0-1 variable. If the ω allocation scheme selected by blast furnace iron-making task i uses an open tank in area r, y" riω is 1, otherwise it is 0;

[0059] For any blast furnace iron-making task i, when the tank distribution method is an open tank, the objective function of the tank distribution scheme generation model SP-2 is as follows:

[0060]

[0061] Among them, π rh is the shadow price corresponding to the constraint in formula (10), δ i is the shadow price corresponding to the constraint in formula (11), c ir is the distance between the blast furnace where the blast furnace tapping task i is located and the area where the empty molten iron tank is selected, e ih represents the energy loss caused by selecting empty molten iron tanks in different hot and cold states for blast furnace tapping task i, f ir It represents the fixed startup cost of selecting locomotives to select empty hot metal tanks from different areas;

[0062] Step 4-2, determine the initial allocation plan for empty molten iron tanks, and give priority to the allocation of empty molten iron tanks with high temperatures in the same area;

[0063] Step 4-2-1: For each area, sort them in descending order according to the number of empty molten iron tanks in it to form an order set S of empty molten iron tanks 0 ; For each blast furnace tapping task, arrange them in order of tapping time to form a blast furnace tapping order set G;

[0064] Step 4-2-2, select the first blast furnace tapping task i in the blast furnace tapping order set G that has not been allocated with a molten iron tank, and sequentially execute steps 4-2-3 to 4-2-5 to allocate the initial molten iron empty tank;

[0065] Step 4-2-3, give priority to selecting the first region r in the region set R, and judge according to the priority of the temperature of the empty molten iron tanks. If the number of empty molten iron tanks with a hot and cold state of h in region r is greater than or equal to the tank requirement of blast furnace tapping task i, then blast furnace tapping task i will use all empty molten iron tanks with a hot and cold state of h in region r, and update the number of empty molten iron tanks with a hot and cold state of h in region r, and update the empty molten iron tank order set S 0 ;

[0066] Step 4-2-4: If the number of hot and cold molten iron tanks in region r is less than the tank requirement of blast furnace tapping task i, and the total number of empty molten iron tanks in region r is greater than or equal to the tank requirement of blast furnace tapping task i, the empty molten iron tanks in region r are allocated to blast furnace tapping task i in the order of hot molten iron tanks, warm molten iron tanks, and cold molten iron tanks, and the number of empty molten iron tanks is updated, and the empty molten iron tank order set S is updated. 0 ;

[0067] Step 4-2-5: If the number of empty molten iron tanks in different states in each area of ​​the area set R is less than the tank requirement of the blast furnace tapping task i, the same blast furnace tapping task i needs to use empty molten iron tanks in different areas r. Arrange the empty molten iron tanks in different areas in descending order according to the number of empty molten iron tanks, and update the empty molten iron tank order set S 0 ;

[0068] Step 4-2-6, record the empty iron tank allocation scheme selected by all blast furnace tapping tasks i. If the blast furnace tapping order set G is empty, then step 4-2 ends, and the initial feasible tank allocation scheme for all blast furnace tapping tasks is obtained; otherwise, delete task i from the blast furnace tapping order set G, and re-execute step 4-2-2;

[0069] Step 4-3, iteratively solve the molten iron empty tank allocation model RMP;

[0070] Step 4-3-1, for each blast furnace iron-making task i, determine its initial molten iron empty tank allocation plan according to step 4-2, substitute it into the molten iron empty tank allocation model RMP of step 4-1 as the initial plan set;

[0071] Step 4-3-2 solves the molten iron empty tank allocation model RMP and obtains the shadow price of its corresponding constraints;

[0072] Step 4-3-3 For any blast furnace iron-making task i, construct a new tank allocation scheme. The solution steps are as follows:

[0073] Step 4-3-3-1: The distance c from the blast furnace where the blast furnace iron-making task i is located to the area r ir , represents the energy loss e of the empty tank in the blast furnace with the blast furnace iron-making task i and the usage status h ih , according to formula (10), the corresponding constrained shadow price π" rh , select the empty iron tanks in the same area r according to c = c ir +e ih -π" rh When selecting empty molten iron tanks with different hot and cold states in the same area, the empty molten iron tank with the smallest c value is selected first;

[0074] Step 4-3-3-2, define the state variable x, which represents the number of empty iron tanks required for blast furnace iron-making task i, and the decision variable a r represents the number of empty molten iron tanks selected from region r;

[0075] Step 4-3-3-3, define the optimal function f for selecting empty molten iron tanks r (x) represents the cost when the number of empty iron tanks selected from the first r areas is x, c r (a) represents the cost when the number of empty iron tanks is a from the rth area. The optimal function expression is:

[0076]

[0077] Step 4-3-3-4: Calculate f according to formula (18): r The value of (x), that is, the minimum cost when the number of empty hot metal tanks selected from the first r regions is x, is reversed based on the cost to determine the number of empty hot metal tanks of different cold and hot states h selected in each region r, and the corresponding high-quality tank allocation plan is obtained to complete the selection of the tank allocation plan;

[0078] Step 4-3-4, based on the high-quality tank allocation scheme inspection criterion, determine whether there is an ungenerated high-quality tank allocation scheme. If there is no ungenerated high-quality tank allocation scheme for all blast furnace iron-making tasks i, execute step 4-4; otherwise, record the newly generated high-quality tank allocation scheme, add it to and update the molten iron empty tank allocation model RMP, and return to step 4-3-2;

[0079] Step 4-4: Substitute all the initial molten iron ladle allocation plans generated in step 4-2 and the high-quality molten iron ladle allocation plans generated in step 4-3 into the molten iron ladle allocation constraints (8)-(11), while ensuring that the decision variable A' rhiω ,A” rhiω and λ iω The integer requirement is used to solve the optimal combination of molten iron distribution schemes and send it to the dispatching department for execution;

[0080] Step 5: Execute the empty tank allocation plan in a rolling manner;

[0081] Step 5-1, update the position and hot and cold status information of the empty molten iron tank in the iron and steel interface;

[0082] When the ladle filled with molten iron completes the pouring operation at the pouring station in the steelmaking workshop, the ladle changes from a heavy ladle to a usable empty ladle, and is assigned to the next blast furnace tapping task to be tapped; the position and hot and cold states h of the empty ladle at the entire iron-steel interface change continuously with the execution and time of the blast furnace tapping task. According to the position information of the empty ladle in the steel enterprise information system and the time from the last pouring or maintenance baking of the empty ladle, the position and state of the empty ladle at the entire iron-steel interface at the current decision moment are determined, and the number of torpedo ladle and open ladle with different hot and cold states h in the divided area r is updated;

[0083] Step 5-2, update the set of high-quality tank allocation solutions for the blast furnace iron-making task;

[0084] For each updated blast furnace iron-making task, the optimal combination of allocation schemes is obtained according to step 4, and the scheme is sent to the dispatching department for execution; after the optimal tank allocation scheme of blast furnace iron-making task i in the allocation scheme is executed, the empty molten iron tank selected by blast furnace iron-making task i is not available when executing subsequent blast furnace iron-making tasks. At this time, the molten iron tank that has completed the previous blast furnace iron-making task can be used, and the available empty molten iron tanks in the iron and steel interface are continuously updated; when executing subsequent blast furnace iron-making tasks, all tank allocation schemes of blast furnace iron-making task i are deleted from the allocation scheme set, and the tank allocation scheme of subsequent blast furnace iron-making tasks generated according to step 4 is added to the set of all empty tank allocation schemes;

[0085] Step 5-3: Repeat steps 5-1 and 5-2 until all blast furnace iron-making tasks are completed.

[0086] The beneficial effect of adopting the above technical solution is that the present invention provides an empty tank allocation optimization method for the molten iron transportation process, which determines how to select molten iron empty tanks in different areas, types, and hot and cold states on the entire iron-steel interface to meet the requirements of the blast furnace iron-making task for the type and quantity of molten iron empty tanks. The empty tank allocation optimization method in the molten iron transportation process provided by the present invention can improve the utilization rate of molten iron empty tanks and reduce energy loss in the molten iron transportation process on the basis of meeting the requirements of the blast furnace iron-making task and ensuring the safety and smoothness of the blast furnace iron-making. BRIEF DESCRIPTION OF THE DRAWINGS

[0087] Figure 1 A flow chart of an empty tank allocation optimization method for a molten iron transportation process provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0088] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0089] This embodiment takes a large steel enterprise as an example, and adopts the empty tank allocation optimization method for the molten iron transportation process of the present invention to determine the molten iron empty tank allocation plan of the steel enterprise. The steel enterprise has eight blast furnaces, five steelmaking workshops, a cast iron station, a tank inspection station, and a slag dumping room. There are two types of molten iron tanks in the steel enterprise, torpedo tanks and open tanks, with 60 torpedo tanks and 165 open tanks. The wheelbases between the blast furnaces are different, and the weighing equipment installed is different. Among them, the seventh blast furnace, the tenth blast furnace, the eleventh blast furnace and the new fourth blast furnace cannot be installed with weighing equipment for weighing torpedo tanks due to their short wheelbases, and can only use open tanks to carry molten iron; the new first blast furnace, the new second blast furnace and the new third blast furnace can only use torpedo tanks to carry molten iron; the new fifth blast furnace can use torpedo tanks and open tanks to carry molten iron at the same time.

[0090] In this embodiment, an empty tank allocation optimization method for the molten iron transportation process is provided. Figure 1 As shown, the following steps are included:

[0091] Step 1: Obtain the location information of the blast furnace, steelmaking workshop, tank inspection station, iron casting station, and slag dumping room of the steel enterprise, and divide the iron and steel production interface of the steel enterprise (i.e., the production and transportation facilities and sites related to the ironmaking and steelmaking processes) into different areas based on this information;

[0092] In this embodiment, according to the actual locations of the eight blast furnaces, five steelmaking workshops, the cast iron station, the tank inspection station and the slag dumping room in the steel enterprise, the entire iron-steel interface is divided into 6 areas. Among them, the new No. 2 blast furnace, the new No. 3 blast furnace and the No. 4 steelmaking plant are close to each other and have directly connected rail lines, so they are divided into one area; similarly, according to the distance and rail distribution, the new No. 1 blast furnace, the No. 10 blast furnace and the No. 11 blast furnace are divided into the same area; the new No. 5 blast furnace, the No. 7 blast furnace and the new No. 4 blast furnace are divided into the same area; the tank inspection room and the cast iron room are divided into the same area; the slag dumping room and the No. 3 steelmaking plant are divided into the same area; the No. 2 steelmaking plant and the No. 5 steelmaking plant are divided into the same area.

[0093] Among them, the distances from the empty hot metal tanks distributed in the same area to the same blast furnace are equal, and the cost of using the locomotive to pull the empty hot metal tanks in the same area is the same, that is, when using the empty hot metal tanks in the same area, the fixed startup cost of the locomotive is the same;

[0094] Step 2, obtaining the blast furnace iron-tapping task information and the location information of the empty molten iron tank, and determining the hot and cold state of the empty molten iron tank according to the most recent iron pouring or maintenance baking time of the empty molten iron tank;

[0095] Among them, the time of blast furnace iron-making task, the type and quantity of molten iron tanks required, the location information of empty molten iron tanks, the last time of iron pouring or maintenance baking time of the molten iron tanks are obtained from the information system of the steel enterprise. 0 , according to the current time t and t 0 The difference tt0 Determine the hot and cold state h of the empty molten iron tank, and divide the empty molten iron tank into three states: hot tank, warm tank and cold tank. When h=1, the empty molten iron tank is a hot tank; when h=2, the empty molten iron tank is a warm tank; when h=3, the empty molten iron tank is a cold tank;

[0096] In this embodiment, the thermal insulation performance of the torpedo tanks and open tanks used by the steel enterprise, the track distribution in the factory area, and the number of locomotives in the factory area are taken into consideration. According to the time from the last iron pouring of the molten iron tank or the maintenance baking time of the molten iron tank, the 0 The value of tt divides the molten iron tank into hot tank, warm tank and cold tank. 0 <4, that is, the time since the last iron pouring or the iron ladle maintenance and baking time is less than 4 hours, the iron ladle is classified as a hot ladle; similarly, when 4≤tt 0 ≤10, that is, the time since the last iron pouring or the iron ladle maintenance and baking time is greater than 4 hours and less than 10 hours, the iron ladle is classified as a warm ladle; when tt 0 >10, that is, the time since the last iron pouring or the iron ladle maintenance and baking time is more than 10 hours, the iron ladle is classified as a cold ladle.

[0097] Step 3: construct a mathematical model to describe the decision of allocating empty molten iron tanks of different areas, types and states to the blast furnace tapping task while meeting the blast furnace tapping task requirements;

[0098] The specific steps include:

[0099] Step 3-1, mapping the number of empty molten iron tanks in different areas, types and states selected for the blast furnace tapping task in the empty molten iron tank allocation problem into a mathematical model decision variable;

[0100] Set the integer decision variable x' irh , represents the number of empty torpedo cans with a cold or hot state of h in the area r used by the blast furnace iron-making task i, r∈R, R is the set of areas divided by the iron-steel interface; set the integer decision variable x" irh , represents the number of open empty tanks with a cold or hot state of h in the area r used by the blast furnace iron-making task i; set the 0-1 decision variable y' ir , when the blast furnace iron-making task i uses the torpedo tank in area r, y' ir The value is 1, otherwise y' ir Set the value to 0; set the decision variable y to 0-1" ir , when the blast furnace tapping task i uses an open tank in area r, y" ir The value is 1, otherwise y" ir Set the value to 0; set the 0-1 decision variable z i , when the blast furnace iron-making task i uses a torpedo tank, z i The value is 1, otherwise zi The value is 0;

[0101] Step 3-2: Map the process constraints in the empty iron tank allocation problem into mathematical model constraints, as follows:

[0102] Step 3-2-1: Establish the demand process constraints for different types of molten iron empty tanks for different blast furnace iron-making tasks, as shown in the following formula:

[0103]

[0104]

[0105] Where N represents the set of all blast furnace tapping tasks i, R represents the set of regions divided by the iron-steel interface, H′ represents the set of all torpedo tanks in the iron-steel interface, H″ represents the set of all open tanks in the iron-steel interface, and b′ i represents the number of torpedo tanks required for blast furnace iron-making task i, b” i represents the number of open tanks required for blast furnace iron-making task i, x' irh Indicates the number of torpedo tanks with a cold or hot state of h in the area r used by the blast furnace iron-making task i, x" irh represents the number of open tanks with a cold or hot state of h in area r used by blast furnace tapping task i; formula (1) represents the number of torpedo tanks selected from different areas and different states for any blast furnace tapping task i, and the number of torpedo tanks required to meet the blast furnace tapping requirements; formula (2) represents the number of open tanks selected from different areas and different states for any blast furnace tapping task i, and the number of open tanks required to meet the blast furnace tapping requirements;

[0106] In this embodiment, there are 8 blast furnaces, each of which taps iron once every 2 hours on average, and the daily blast furnace tapping task set N is about 90 times. According to the actual locations of each blast furnace, steelmaking workshop, tank inspection station, iron casting station, and slag pouring room of the steel enterprise, the entire iron-steel interface is divided into 6 areas. The steel enterprise has 60 torpedo tanks and 165 open tanks. According to the information of the steel plant information system, the number of torpedo tanks and open tanks in each divided area, the hot and cold states, the tapping time of each blast furnace tapping task, and the type and number of empty molten iron tanks required can be determined.

[0107] Step 3-2-2: Establish a process constraint that the sum of the number of hot metal ladle tanks with different hot and cold states selected in different regions is less than the number of empty hot metal ladle tanks with the corresponding hot and cold state h in the region r, as shown in the following formula:

[0108]

[0109]

[0110] Among them, a' rh represents the number of all torpedo tanks with hot and cold states h in region r, a” rh = represents the number of all open tanks with a hot / cold state of h in region r; formula (3) indicates that for any blast furnace tapping task i, the number of torpedo tanks with a hot / cold state of h in region r selected is less than or equal to the total number of torpedo tanks with a hot / cold state of h in region r; formula (4) indicates that for any blast furnace tapping task i, the number of open tanks with a hot / cold state of h in region r selected is less than or equal to the total number of all open tanks in the region, which satisfies the requirement that for any blast furnace tapping task i, the number of empty iron tanks with different states in different regions selected is less than or equal to the total number of empty iron tanks with corresponding hot / cold states in the region.

[0111] Step 3-2-3, establish the process constraints of the fixed startup cost of locomotives in the same area r, that is, in the same area r, select empty molten iron tanks of different types and states, and only calculate the process constraints of the fixed startup cost once, as shown in the following formula:

[0112]

[0113]

[0114] Among them, a' rh represents the number of torpedo tanks with hot and cold states h in region r, a” rh represents the number of open tanks in region r with a hot / cold state of h; when the torpedo tanks in region r are selected, y' ir =1, at this time, the number of torpedo tanks with a cold and hot state of h in area r used by blast furnace iron-making task i is x' irh Should be less than or equal to the number a' of torpedo tanks with hot and cold states h in region r rh Similarly, when the blast furnace tapping task i selects an open tank in area r, y" ir =1, at this time, the number of open tanks with cold and hot states h in area r used by blast furnace iron-making task i is x" irh It should be less than the number a of all open tanks with hot and cold states h in region r” rh ;

[0115] Step 3-3, mapping the optimization index of the molten iron empty tank allocation problem into the mathematical model objective function, so as to minimize the distance between each selected molten iron empty tank and the blast furnace, minimize the energy loss of the selected molten iron empty tanks in different states, and minimize the fixed startup cost of the locomotive;

[0116] In this embodiment, the distance between the empty molten iron tank and the blast furnace is mapped to the objective function of formula (19);

[0117]

[0118] The energy loss generated by selecting empty molten iron tanks in different hot and cold states is mapped into the objective function of formula (20);

[0119]

[0120] The fixed startup cost generated by the locomotive pulling empty iron tanks in different areas is mapped into the objective function of formula (21);

[0121]

[0122] Then, the optimization index of the molten iron empty tank allocation problem is mapped to the following mathematical model objective function, as follows:

[0123]

[0124] Among them, c ir represents the distance from the blast furnace where the blast furnace iron-making task i is located to the region r, e ih represents the energy loss caused by the blast furnace where the blast furnace iron-making task i is located using an empty molten iron tank with a cold or hot state of h, f ir represents the fixed locomotive startup cost generated by the empty iron tanks in the area r used by the blast furnace iron-making task i; Formula (7) indicates that for any blast furnace iron-making task i, the decision-making objective is to minimize the sum of the distance between the selected empty iron tanks and the blast furnace, the energy loss of the empty iron tanks in different states, and the fixed locomotive startup cost.

[0125] Step 4: Based on the parameter information of the current blast furnace iron-making task and the distribution and hot and cold status information of the molten iron tanks in the iron-steel interface, and on the premise of meeting the blast furnace iron-making task's demand for molten iron empty tanks, a molten iron empty tank allocation model RMP based on the set partitioning model is established to quantitatively describe the molten iron empty tank allocation problem, and the molten iron empty tank allocation model is iteratively solved to obtain the optimal combination of molten iron allocation plans. The specific method is as follows:

[0126] Step 4-1, for each blast furnace tapping task i, allocate the allocation mode and quantity constraints of empty molten iron tanks that meet the tapping task;

[0127] For any blast furnace tapping task i, i∈N, N is the set of blast furnace tapping tasks, according to the demand of blast furnace tapping tasks for molten iron empty tanks and the types of molten iron empty tanks in different areas of the iron-steel interface, for each blast furnace tapping task i, a distribution mode of molten iron empty tanks that meets the tapping task is allocated. The specific mathematical model is as follows:

[0128] (RMP)min∑∑C iω λ iω (8)

[0129] Among them, ω∈Ω iFor a feasible tank distribution solution, Ω i represents the set of all feasible tank allocation schemes for blast furnace iron-making task i, λ iω is a 0-1 decision variable. When the blast furnace iron-making task i selects the tank allocation scheme ω, λ iω The value of is 1, otherwise iω The value of C is 0. iω It represents the cost incurred when the blast furnace iron-making task i selects the tank allocation scheme ω;

[0130] Establish the quantity constraint of the molten iron empty tanks selected in the tank allocation plan, that is, the number of molten iron empty tanks with a hot and cold state of h in the selected area r should be less than or equal to the number of molten iron empty tanks with a hot and cold state of h in the current area r, as shown in the following formula:

[0131]

[0132]

[0133] Among them, A' rhiω The ω tank allocation scheme selected by blast furnace iron-making task i uses the number of torpedo tanks in cold and hot states h in area r, a' rh Indicates the number of torpedo tanks with a hot / cold state of h in the current region r; A" rhiω The ω tank allocation scheme selected by blast furnace iron-making task i uses the number of open tanks with cold and hot states h in area r, a” rh Indicates the number of open tanks with hot and cold states h in the current region r;

[0134] Establish the constraint that any blast furnace iron-making task i can only select one tank allocation method, as shown in the following formula:

[0135]

[0136] Establish a constraint for the tank distribution mode to ensure that the number of empty tanks selected for molten iron is equal to the number of empty tanks required for the blast furnace tapping task. Specifically:

[0137] (1) When the tank requirement for the blast furnace iron-making task is torpedo tanks, the constraint that the number of empty iron tanks is equal to the number of empty tanks required for the blast furnace iron-making task is:

[0138]

[0139]

[0140] Among them, b' i represents the number of torpedo tanks required for blast furnace iron-making task i, y' riω is a 0-1 variable. If the ω allocation scheme selected by blast furnace iron-making task i uses the torpedo tanks in area r, y' riωis 1, otherwise it is 0;

[0141] For any blast furnace iron-making task i, when the tank demand is a torpedo tank, the objective function of the tank distribution scheme generation model SP-1 is as follows:

[0142]

[0143] Among them, π' rh is the shadow price corresponding to the constraint in formula (9), δ i is the shadow price corresponding to the constraint in formula (11), c ir is the distance between the blast furnace where the blast furnace tapping task i is located and the area where the empty molten iron tank is selected, e ih represents the energy loss caused by selecting empty molten iron tanks in different hot and cold states for blast furnace tapping task i, f ir It represents the fixed startup cost of selecting locomotives to select empty hot metal tanks from different areas;

[0144] (2) When the tank requirement for blast furnace iron-making task i is an open tank, the constraint that the number of empty iron tanks is equal to the number of empty tanks required for blast furnace iron-making task is:

[0145]

[0146]

[0147] Among them, b” i The number of open tanks required for blast furnace tapping task i, y" riω is a 0-1 variable. If the ω allocation scheme selected by blast furnace iron-making task i uses an open tank in area r, y" riω is 1, otherwise it is 0;

[0148] For any blast furnace iron-making task i, when the tank distribution method is an open tank, the objective function of the tank distribution scheme generation model SP-2 is as follows:

[0149]

[0150] Among them, π rh is the shadow price corresponding to the constraint in formula (10), δ i is the shadow price corresponding to the constraint in formula (11), c ir is the distance between the blast furnace where the blast furnace tapping task i is located and the area where the empty molten iron tank is selected, e ih represents the energy loss caused by selecting empty molten iron tanks in different hot and cold states for blast furnace tapping task i, f ir It represents the fixed startup cost of selecting locomotives to select empty hot metal tanks from different areas;

[0151] Step 4-2, determine the initial allocation plan for empty molten iron tanks, and give priority to the allocation of empty molten iron tanks with high temperatures in the same area;

[0152] Step 4-2-1: For each area, sort them in descending order according to the number of empty molten iron tanks in it to form an order set S of empty molten iron tanks 0 ; For each blast furnace tapping task, arrange them in order of tapping time to form a blast furnace tapping order set G;

[0153] Step 4-2-2, select the first blast furnace tapping task i in the blast furnace tapping order set G that has not been allocated with a molten iron tank, and sequentially execute steps 4-2-3 to 4-2-5 to allocate the initial molten iron empty tank;

[0154] Step 4-2-3, give priority to selecting the first region r in the region set R, and make a judgment according to the priority of the temperature of the empty molten iron tank (i.e., h ranges from 1 to 3). If the number of empty molten iron tanks with a hot and cold state of h in region r is greater than or equal to the tank requirement of blast furnace tapping task i, then blast furnace tapping task i will use all empty molten iron tanks with a hot and cold state of h in region r, and update the number of empty molten iron tanks with a hot and cold state of h in region r, and update the empty molten iron tank order set S 0 ;

[0155] Step 4-2-4: If the number of hot and cold molten iron tanks in region r is less than the tank requirement of blast furnace tapping task i, and the total number of empty molten iron tanks in region r is greater than or equal to the tank requirement of blast furnace tapping task i, the empty molten iron tanks in region r are allocated to blast furnace tapping task i in the order of hot molten iron tanks, warm molten iron tanks, and cold molten iron tanks, and the number of empty molten iron tanks is updated, and the empty molten iron tank order set S is updated. 0 ;

[0156] Step 4-2-5: If the number of empty molten iron tanks in different states in each area of ​​the area set R is less than the tank requirement of the blast furnace tapping task i, the same blast furnace tapping task i needs to use empty molten iron tanks in different areas r. Arrange the empty molten iron tanks in different areas in descending order according to the number of empty molten iron tanks, and update the empty molten iron tank order set S 0 ;

[0157] Step 4-2-6, record the empty iron tank allocation scheme selected by all blast furnace tapping tasks i. If the blast furnace tapping order set G is empty, then step 4-2 ends, and the initial feasible tank allocation scheme for all blast furnace tapping tasks is obtained; otherwise, delete task i from the blast furnace tapping order set G, and re-execute step 4-2-2;

[0158] Step 4-3, iteratively solve the molten iron empty tank allocation model RMP;

[0159] Step 4-3-1, for each blast furnace iron-making task i, determine its initial molten iron empty tank allocation plan according to step 4-2, substitute it into the molten iron empty tank allocation model RMP of step 4-1 as the initial plan set;

[0160] Step 4-3-2 solves the molten iron empty tank allocation model RMP and obtains the shadow price of its corresponding constraints;

[0161] Step 4-3-3 For any blast furnace iron-making task i, construct a new tank allocation scheme. The solution steps are as follows:

[0162] Step 4-3-3-1: The distance c from the blast furnace where the blast furnace iron-making task i is located to the area r ir , represents the energy loss e of the empty tank in the blast furnace with the blast furnace iron-making task i and the usage status h ih , formula (10) corresponds to the constrained shadow price π” rh As input, select the empty iron cans in the same area r according to c = c ir +e ih -π" rh When selecting empty molten iron tanks with different hot and cold states in the same area, the empty molten iron tank with the smallest c value is selected first;

[0163] Step 4-3-3-2, define the state variable x, which represents the number of empty iron tanks required for blast furnace iron-making task i, and the decision variable a r represents the number of empty molten iron tanks selected from region r;

[0164] Step 4-3-3-3, define the optimal function f for selecting empty molten iron tanks r (x) represents the cost when the number of empty iron tanks selected from the first r areas is x, c r (a) represents the cost when the number of empty iron tanks is a from the rth area. The optimal function expression is:

[0165]

[0166] Step 4-3-3-4: Calculate f according to formula (18): r The value of (x), that is, the minimum cost when the number of empty hot metal tanks selected from the first r regions is x, is reversed based on the cost to determine the number of empty hot metal tanks of different cold and hot states h selected in each region r, and the corresponding high-quality tank allocation plan is obtained to complete the selection of the tank allocation plan;

[0167] Step 4-3-4, based on the high-quality tank allocation scheme inspection criterion, determine whether there is an ungenerated high-quality tank allocation scheme. If there is no ungenerated high-quality tank allocation scheme for all blast furnace iron-making tasks i, execute step 4-4; otherwise, record the newly generated high-quality tank allocation scheme, add it to and update the molten iron empty tank allocation model RMP, and return to step 4-3-2;

[0168] Step 4-4: Substitute all the initial molten iron ladle allocation plans generated in step 4-2 and the high-quality molten iron ladle allocation plans generated in step 4-3 into the molten iron ladle allocation constraints (8)-(11), while ensuring that the decision variable A' rhiω ,A” rhiω and λ iω The integer requirement is used to solve the optimal combination of molten iron distribution schemes and send it to the dispatching department for execution;

[0169] Step 5: Execute the empty tank allocation plan in a rolling manner;

[0170] Step 5-1, update the position and hot and cold status information of the empty molten iron tank in the iron and steel interface;

[0171] When the ladle filled with molten iron completes the pouring operation at the pouring station in the steelmaking workshop, the ladle changes from a heavy ladle to a usable empty ladle, and is assigned to the next blast furnace tapping task to be tapped; the position and hot and cold states h of the empty ladle at the entire iron-steel interface change continuously with the execution and time of the blast furnace tapping task. According to the position information of the empty ladle in the steel enterprise information system and the time from the last pouring or maintenance baking of the empty ladle, the position and state of the empty ladle at the entire iron-steel interface at the current decision moment are determined, and the number of torpedo ladle and open ladle with different hot and cold states h in the divided area r is updated;

[0172] Step 5-2, update the set of high-quality tank allocation solutions for the blast furnace iron-making task;

[0173] For each updated blast furnace iron-making task, the optimal combination of allocation schemes is obtained according to step 4, and the scheme is sent to the dispatching department for execution; after the optimal tank allocation scheme of blast furnace iron-making task i in the allocation scheme is executed, the empty molten iron tank selected by blast furnace iron-making task i is not available when executing subsequent blast furnace iron-making tasks. At this time, the molten iron tank that has completed the previous blast furnace iron-making task can be used, and the available empty molten iron tanks in the iron and steel interface are continuously updated; when executing subsequent blast furnace iron-making tasks, all tank allocation schemes of blast furnace iron-making task i are deleted from the allocation scheme set, and the tank allocation scheme of subsequent blast furnace iron-making tasks generated according to step 4 is added to the set of all empty tank allocation schemes;

[0174] Step 5-3: Repeat steps 5-1 and 5-2 until all blast furnace iron-making tasks are completed.

[0175] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some or all of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope defined by the claims of the present invention.

Claims

1. An empty tank allocation optimization method for molten iron transportation process, characterized by: Divide the iron-steel interface of a steel enterprise into different areas; Determine the hot and cold status of the empty molten iron tank; Based on meeting the needs of blast furnace tapping, the molten iron empty tank allocation problem is to allocate molten iron empty tanks of different areas, types and states to the blast furnace tapping task; The empty hot metal tank allocation model based on the set partitioning model quantitatively describes the empty hot metal tank allocation problem. Solve the optimal combination of molten iron distribution and allocation plans and send them to the dispatching department for execution; The specific steps include: Step 1: Obtain the location information of the blast furnace, steelmaking workshop, tank inspection station, iron casting station, and slag dumping room of the steel enterprise, and divide the iron-steel interface of the steel enterprise into different areas based on this information; Step 2, obtaining the blast furnace iron-tapping task information and the location information of the empty molten iron tank, and determining the hot and cold state of the empty molten iron tank according to the most recent iron pouring or maintenance baking time of the empty molten iron tank; Step 3: construct a mathematical model to describe the decision of allocating empty molten iron tanks of different areas, types and states to the blast furnace tapping task while meeting the blast furnace tapping task requirements; Step 3-1, mapping the number of empty molten iron tanks in different areas, types and states selected for the blast furnace tapping task in the empty molten iron tank allocation problem into a mathematical model decision variable; Set the integer decision variable x' irh , represents the number of empty torpedo cans with a cold or hot state of h in the area r used by the blast furnace iron-making task i, r∈R, R is the set of areas divided by the iron-steel interface; set the integer decision variable x" irh , represents the number of open empty tanks with a cold or hot state of h in the area r used by the blast furnace iron-making task i; set the 0-1 decision variable y' ir , when the blast furnace iron-making task i uses the torpedo tank in area r, y' ir The value is 1, otherwise y' ir Set the value to 0; set the decision variable y to 0-1" ir , when the blast furnace tapping task i uses an open tank in area r, y" ir The value is 1, otherwise y" ir Set the value to 0; set the 0-1 decision variable z i , when the blast furnace iron-making task i uses a torpedo tank, z i The value is 1, otherwise z i The value is 0; Step 3-2: Map the process constraints in the empty iron tank allocation problem into mathematical model constraints, as follows: Step 3-2-1: Establish the demand process constraints for different types of molten iron empty tanks for different blast furnace iron-making tasks, as shown in the following formula: Where N represents the set of all blast furnace tapping tasks i, R represents the set of regions divided by the iron-steel interface, H′ represents the set of all torpedo tanks in the iron-steel interface, H″ represents the set of all open tanks in the iron-steel interface, and b i ' represents the number of torpedo tanks required for blast furnace iron-making task i, b i " represents the number of open tanks required for blast furnace iron-making task i, x' irh represents the number of torpedo tanks with a cold or hot state of h in the area r used by the blast furnace iron-making task i, x i ” rh It indicates the number of open tanks with hot and cold states h in area r used by blast furnace tapping task i; Step 3-2-2: Establish a process constraint that the sum of the number of hot metal ladle tanks with different hot and cold states selected in different regions is less than the number of empty hot metal ladle tanks with the corresponding hot and cold state h in the region r, as shown in the following formula: Among them, a' rh represents the number of all torpedo tanks with a hot / cold state h in region r, a' r ' h represents the number of all open tanks with hot and cold states h in region r; Step 3-2-3, establish the process constraints of the fixed startup cost of locomotives in the same area r, that is, in the same area r, select empty molten iron tanks of different types and states, and only calculate the process constraints of the fixed startup cost once, as shown in the following formula: Among them, a' rh represents the number of torpedo tanks with a hot / cold state h in region r, a' r ' h represents the number of open tanks in region r with a hot / cold state of h; when a torpedo tank in region r is selected, y' ir =1, at this time, the number of torpedo tanks with a cold and hot state of h in area r used by blast furnace iron-making task i is x' irh Should be less than or equal to the number of torpedo tanks with hot and cold states h in region r, a' rh Similarly, when the blast furnace tapping task i selects an open tank in area r, y" ir =1, at this time, the number of open tanks with cold and hot states h in area r used by blast furnace iron-making task i is x i ” rh Should be less than the number a' of all open tanks with hot and cold states h in region r r ' h ; Step 3-3, map the optimization index of the molten iron empty tank allocation problem into the mathematical model objective function, so as to minimize the sum of the distance between each selected molten iron empty tank and the blast furnace, the energy loss of the selected molten iron empty tank in different states, and the fixed startup cost of the locomotive, as shown in the following formula: Among them, c ir represents the distance from the blast furnace where the blast furnace iron-making task i is located to the region r, e ih represents the energy loss caused by the blast furnace where the blast furnace iron-making task i is located using an empty molten iron tank with a cold or hot state of h, f ir It represents the fixed locomotive startup cost generated by the empty molten iron tanks in the area r used by the blast furnace iron-making task i; Step 4: Based on the parameter information of the current blast furnace iron-making task and the distribution and hot and cold status information of the molten iron tanks in the iron-steel interface, and on the premise of meeting the blast furnace iron-making task's demand for empty molten iron tanks, a molten iron tank allocation model RMP based on a set partitioning model is established to quantitatively describe the molten iron tank allocation problem; the molten iron tank allocation model is iteratively solved to obtain the optimal combination of molten iron allocation plans; Step 5: Execute the empty tank allocation plan in a rolling manner until all blast furnace iron-making tasks are completed.

2. The method for optimizing the empty tank allocation in the molten iron transportation process according to claim 1, characterized in that: In step 1, the distances from the empty molten iron tanks distributed in the same area to the same blast furnace are equal, and the cost of using a locomotive to pull the empty molten iron tanks in the same area is the same, that is, when using the empty molten iron tanks in the same area, the fixed starting cost of the locomotive is the same.

3. The method for optimizing the empty tank allocation in the molten iron transportation process according to claim 2, characterized in that: The specific method of step 2 is: obtaining the time of the blast furnace iron-making task, the type and quantity of the required molten iron tanks, the location information of the empty molten iron tank, the last time the molten iron tank was poured or the maintenance and baking time t0 of the molten iron tank from the steel enterprise information system, determining the hot and cold state h of the empty molten iron tank according to the difference t-t0 between the current time t and t0, and dividing the empty molten iron tank into three states: hot tank, warm tank and cold tank.

4. The method for optimizing the empty tank allocation in the molten iron transportation process according to claim 3 is characterized in that: The specific method of step 4 is: Step 4-1, for each blast furnace tapping task i, allocate the allocation mode and quantity constraints of the empty molten iron tanks that meet the tapping task; For any blast furnace tapping task i, i∈N, N is the set of blast furnace tapping tasks, according to the demand of blast furnace tapping tasks for molten iron empty tanks and the types of molten iron empty tanks in different areas of the iron-steel interface, for each blast furnace tapping task i, a distribution mode of molten iron empty tanks that meets the tapping task is allocated. The specific mathematical model is as follows: (RMP)min∑∑C iω λ iω (8) where ω∈Ω i For a feasible tank distribution solution, Ω i represents the set of all feasible tank allocation schemes for blast furnace iron-making task i, λ iω is a 0-1 decision variable. When the blast furnace iron-making task i selects the tank allocation scheme ω, λ iω The value of is 1, otherwise iω The value of C is 0. iω It represents the cost incurred when the blast furnace iron-making task i selects the tank allocation scheme ω; Establish the quantity constraint of the molten iron empty tanks selected in the tank allocation plan, that is, the number of molten iron empty tanks with a hot and cold state of h in the selected area r should be less than or equal to the number of molten iron empty tanks with a hot and cold state of h in the current area r, as shown in the following formula: Among them, A r ' hiω The ω tank allocation scheme selected by blast furnace iron-making task i uses the number of torpedo tanks in cold and hot states h in area r, a' rh Indicates the number of torpedo tanks with a hot / cold state of h in the current region r; A r ” hiω The ω tank allocation scheme selected by blast furnace iron-making task i uses the number of open tanks with cold and hot states h in area r, a' r ' h Indicates the number of open tanks with hot and cold states h in the current region r; Establish the constraint that any blast furnace iron-making task i can only select one tank allocation method, as shown in the following formula: Establish a constraint for the tank distribution mode to ensure that the number of empty tanks selected for molten iron is equal to the number of empty tanks required for the blast furnace tapping task. Specifically: (1) When the tank requirement for the blast furnace iron-making task is torpedo tanks, the constraint that the number of empty iron tanks is equal to the number of empty tanks required for the blast furnace iron-making task is: Among them, b i ' represents the number of torpedo tanks required for blast furnace iron-making task i, y' riω is a 0-1 variable. If the ω allocation scheme selected by blast furnace iron-making task i uses the torpedo tanks in area r, y' riω is 1, otherwise it is 0; For any blast furnace iron-making task i, when the tank demand is a torpedo tank, the objective function of the tank distribution scheme generation model SP-1 is as follows: Among them, π' rh is the shadow price corresponding to the constraint in formula (9), δ i is the shadow price corresponding to the constraint in formula (11), c ir is the distance between the blast furnace where the blast furnace tapping task i is located and the area where the empty molten iron tank is selected, e ih represents the energy loss caused by selecting empty molten iron tanks in different hot and cold states for blast furnace tapping task i, f ir It represents the fixed startup cost of selecting locomotives to select empty hot metal tanks from different areas; (2) When the tank requirement for blast furnace iron-making task i is an open tank, the constraint that the number of empty iron tanks is equal to the number of empty tanks required for blast furnace iron-making task is: Among them, b i " is the number of open tanks required for blast furnace iron-making task i, y' r ' iω is a 0-1 variable. If the ω allocation scheme selected by blast furnace iron-making task i uses an open tank in area r, y' r ' iω is 1, otherwise it is 0; For any blast furnace iron-making task i, when the tank distribution method is an open tank, the objective function of the tank distribution scheme generation model SP-2 is as follows: Among them, π' r ' h is the shadow price corresponding to the constraint in formula (10), δ i is the shadow price corresponding to the constraint in formula (11), c ir is the distance between the blast furnace where the blast furnace tapping task i is located and the area where the empty molten iron tank is selected, e ih represents the energy loss caused by selecting empty molten iron tanks in different hot and cold states for blast furnace tapping task i, f ir It represents the fixed startup cost of selecting locomotives to select empty hot metal tanks from different areas; Step 4-2, determine the initial allocation plan for empty molten iron tanks, and give priority to the allocation of empty molten iron tanks with high temperatures in the same area; Step 4-2-1: For each area, arrange the empty molten iron tanks in descending order according to the number of empty molten iron tanks therein to form an empty molten iron tank order set S0; for each blast furnace tapping task, arrange them in order of tapping time to form a blast furnace tapping order set G; Step 4-2-2, select the first blast furnace tapping task i in the blast furnace tapping order set G that has not been allocated with a molten iron tank, and sequentially execute steps 4-2-3 to 4-2-5 to allocate the initial molten iron empty tank; Step 4-2-3, give priority to selecting the first region r in the region set R, and make judgments according to the priority of the temperature of the empty molten iron tanks. If the number of empty molten iron tanks with a hot / cold state of h in region r is greater than or equal to the tank requirement of blast furnace tapping task i, then all blast furnace tapping task i uses empty molten iron tanks with a hot / cold state of h in region r, and updates the number of empty molten iron tanks with a hot / cold state of h in region r, and updates the order set S0 of empty molten iron tanks; Step 4-2-4, if the number of hot and cold molten iron tanks in area r is less than the tank requirement of blast furnace tapping task i, and the total number of empty molten iron tanks in area r is greater than or equal to the tank requirement of blast furnace tapping task i, the empty molten iron tanks in area r are allocated to blast furnace tapping task i in the order of hot molten iron tank, warm molten iron tank and cold molten iron tank, and the number of empty molten iron tanks is updated, and the empty molten iron tank order set S0 is updated; Step 4-2-5: if the number of empty molten iron tanks in different states in each area of ​​the area set R is less than the tank requirement of the blast furnace tapping task i, the same blast furnace tapping task i needs to use empty molten iron tanks in different areas r; arrange the empty molten iron tanks in different areas in descending order according to the number of empty molten iron tanks, and update the empty molten iron tank order set S0; Step 4-2-6, record the empty iron tank allocation scheme selected by all blast furnace tapping tasks i. If the blast furnace tapping order set G is empty, then step 4-2 ends, and the initial feasible tank allocation scheme for all blast furnace tapping tasks is obtained; otherwise, delete task i from the blast furnace tapping order set G, and re-execute step 4-2-2; Step 4-3, iteratively solve the molten iron empty tank allocation model RMP; Step 4-3-4, based on the high-quality tank allocation scheme inspection criterion, determine whether there is an ungenerated high-quality tank allocation scheme. If there is no ungenerated high-quality tank allocation scheme for all blast furnace iron-making tasks i, execute step 4-4; otherwise, record the newly generated high-quality tank allocation scheme, add it to and update the molten iron empty tank allocation model RMP, and return to step 4-3-2; Step 4-4: Substitute all the initial molten iron ladle allocation plans generated in step 4-2 and the high-quality molten iron ladle allocation plans generated in step 4-3 into the molten iron ladle allocation constraints (8)-(11), while ensuring that the decision variable A r ' hiω ,A r ” hiω and λ iω The integer requirement is met to solve the optimal combination of molten iron distribution plans and send it to the dispatching department for execution.

5. The method for optimizing the empty tank allocation in the molten iron transportation process according to claim 4, characterized in that: The specific method of step 4-3 is: Step 4-3-1, for each blast furnace iron-making task i, determine its initial molten iron empty tank allocation plan according to step 4-2, substitute it into the molten iron empty tank allocation model RMP of step 4-1 as the initial plan set; Step 4-3-2 solves the molten iron empty tank allocation model RMP and obtains the shadow price of its corresponding constraints; Step 4-3-3 For any blast furnace iron-making task i, construct a new tank allocation scheme. The solution steps are as follows: Step 4-3-3-1: The distance c from the blast furnace where the blast furnace iron-making task i is located to the area r ir , represents the energy loss e of the empty tank in the blast furnace with the blast furnace iron-making task i and the usage status h ih , according to formula (10), the corresponding constraint shadow price π' r ' h , select the empty iron tanks in the same area r according to c = c ir +e ih -π' rh When selecting empty molten iron tanks with different hot and cold states in the same area, the empty molten iron tank with the smallest c value is selected first; Step 4-3-3-2, define the state variable x, which represents the number of empty iron tanks required for blast furnace iron-making task i, and the decision variable a r represents the number of empty molten iron tanks selected from region r; Step 4-3-3-3, define the optimal function f for selecting empty molten iron tanks r (x) represents the cost when the number of empty iron tanks selected from the first r areas is x, c r (a) represents the cost when the number of empty iron tanks is a from the rth area. The optimal function expression is: Step 4-3-3-4: Calculate f according to formula (18): r The value of (x), that is, the minimum cost when the number of empty molten iron tanks selected from the first r areas is x, is reversed based on the cost to determine the number of empty molten iron tanks in different hot and cold states h selected in each area r, and the corresponding high-quality tank allocation plan is obtained to complete the selection of the tank allocation plan.

6. The method for optimizing the empty tank allocation in the molten iron transportation process according to claim 5, characterized in that: The specific method of step 5 is: Step 5-1, update the position and hot and cold status information of the empty molten iron tank in the iron and steel interface; When the ladle filled with molten iron completes the pouring operation at the pouring station in the steelmaking workshop, the ladle changes from a heavy ladle to a usable empty ladle, and is assigned to the next blast furnace tapping task to be tapped; the position and hot and cold states h of the empty ladle at the entire iron-steel interface change continuously with the execution and time of the blast furnace tapping task. According to the position information of the empty ladle in the steel enterprise information system and the time from the last pouring or maintenance baking of the empty ladle, the position and state of the empty ladle at the entire iron-steel interface at the current decision moment are determined, and the number of torpedo ladle and open ladle with different hot and cold states h in the divided area r is updated; Step 5-2, update the set of high-quality tank allocation solutions for the blast furnace iron-making task; For each updated blast furnace iron-making task, the optimal combination of allocation schemes is obtained according to step 4, and the scheme is sent to the dispatching department for execution; after the optimal tank allocation scheme of blast furnace iron-making task i in the allocation scheme is executed, the empty molten iron tank selected by blast furnace iron-making task i is not available when executing subsequent blast furnace iron-making tasks. At this time, the molten iron tank that has completed the previous blast furnace iron-making task can be used, and the available empty molten iron tanks in the iron and steel interface are continuously updated; when executing subsequent blast furnace iron-making tasks, all tank allocation schemes of blast furnace iron-making task i are deleted from the allocation scheme set, and the tank allocation scheme of subsequent blast furnace iron-making tasks generated according to step 4 is added to the set of all empty tank allocation schemes; Step 5-3: Repeat steps 5-1 and 5-2 until all blast furnace iron-making tasks are completed.