Single well business process management method and device

By determining business nodes and building business processes in single-well business process management, combined with the automated distribution function of workflows, the problem of large labor consumption in the existing technology is solved, and efficient automated management of single-well business processes is realized.

CN114626652BActive Publication Date: 2025-02-18SUZHOU GUOSHUANG SOFTWARE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011456756.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-10
Publication Date
2025-02-18
Estimated Expiration
2040-12-10

AI Technical Summary

Technical Problem

The existing single-well business process management method requires manual assignment of tasks and management processes, resulting in a large labor consumption, especially in multitasking situations.

Method used

By determining business nodes based on the single-well production process and building business processes according to preset production rules. When an alarm information is detected, the target business node is determined from the business process, and a task ticket is sent to the push target of the target business node through the workflow.

Benefits of technology

It realizes automated management of single-well business processes, reduces manual intervention, saves human resources, and improves the efficiency and accuracy of task distribution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114626652B_ABST
    Figure CN114626652B_ABST
Patent Text Reader

Abstract

The present invention discloses a single-well business process management method and device, which relates to the field of process management, and is mainly used to solve the problem of large manpower consumption in the current single-well business process management. The method includes: determining a business node according to the single-well production process, and the business node is set based on the link with problems in the single-well production process; constructing a business process according to the business node and preset production rules, and the business process contains multiple business nodes; when an alarm message is detected, determining a target business node from the business process, and the target business node corresponds to the alarm message; sending a task work order to the push target of the target business node through a workflow, and the workflow is generated based on the business process to transmit the task work order corresponding to the alarm message. The present invention is used for the single-well business process management process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of process management, and in particular to a single well business process management method and device. Background Art

[0002] In the process of oilfield development and management, the business management process of single well data has always been the "last mile" of oilfield production and operation. Since tasks need to be assigned and managed based on some existing situations and problems at the single well site, in the management process of the single well business process, it is generally necessary to manually assign the tasks to be assigned.

[0003] At present, when conducting single-well business process management, manual task assignment and process management often require a lot of manpower, especially when there are multiple tasks that need to be executed in the single-well business process. The existing single-well business process management method obviously requires a lot of manpower to analyze the problem and assign corresponding tasks based on the analysis results. It can be seen that the current single-well business process management method has the problem of high manpower consumption. Summary of the invention

[0004] In view of the above problems, the present invention provides a single well business process management method and device, the main purpose of which is to solve the problem of high manpower consumption in the current single well business process management process.

[0005] In order to solve the above technical problems, in a first aspect, the present invention provides a single well business process management method, the method comprising:

[0006] Determine a business node according to the single well production process, wherein the business node is set based on a link with problems in the single well production process;

[0007] According to the business node, a business process is constructed according to preset production rules, wherein the business process includes a plurality of the business nodes;

[0008] When the alarm information is detected, determining a target service node from the service process, the target service node corresponding to the alarm information;

[0009] The task worksheet is sent to the push target of the target business node through the workflow, wherein the workflow is generated based on the business process and is used to transmit the task worksheet corresponding to the alarm information.

[0010] Optionally, determining the business node according to the single well production process includes:

[0011] By analyzing the liquid volume change information in the transmission line, the target points where problems exist in the production process are determined;

[0012] A service node is determined according to the target point and the expert knowledge base.

[0013] Optionally, the preset production rules include geological professional rules and process professional rules; the business process includes geological work flow and ground process flow;

[0014] The step of constructing a business process according to the business node and preset production rules includes:

[0015] According to the geological professional rules and the business nodes, the geological workflow is constructed, wherein the geological professional rules are established based on the management method and technical characteristics of the geological profession in ground production;

[0016] The ground process flow is constructed according to the process professional rules and the business nodes. The process professional rules are established based on the management method and technical characteristics of the process professional in ground production.

[0017] Optionally, before sending the task work order to the push target of the target service node through the workflow, the method further includes:

[0018] According to the user configuration instruction, the workflow is configured based on the business process.

[0019] Optionally, before sending the task work order to the push target of the target service node through the workflow, the method further includes:

[0020] Setting work order configuration rules, wherein the work order configuration rules are used to set the work order parameters of the task work order according to user instructions, and the work order parameters include task content, work order form, and push target corresponding to the work order;

[0021] According to the user's work order operation instructions and the work order configuration rules, task work orders corresponding to different push targets are generated.

[0022] Optionally, sending the task work order to the push target of the target business node through the workflow includes:

[0023] Determine the target task work order corresponding to the target business node according to the push target in the work order configuration rule;

[0024] The target task work order is sent to the push target corresponding to the target business node through the workflow.

[0025] In a second aspect, an embodiment of the present invention further provides a single well business process management device, including:

[0026] A first determination unit is used to determine a business node according to a single well production process, wherein the business node is set based on a link with problems in the single well production process;

[0027] A construction unit, configured to construct a business process according to the business node and a preset production rule, wherein the business process includes a plurality of the business nodes;

[0028] A second determining unit is used to determine a target service node from the service process when the alarm information is detected, the target service node corresponding to the alarm information;

[0029] The sending unit is used to send the task worksheet to the push target of the target business node through the workflow, wherein the workflow is generated based on the business process and is used to transmit the task worksheet corresponding to the alarm information.

[0030] Optionally, the first determining unit includes:

[0031] A first determination module is used to determine a target point where a problem exists in the production process by analyzing the liquid volume change information in the transmission line;

[0032] The second determination module is used to determine the service node according to the target point and the expert knowledge base.

[0033] Optionally, the preset production rules include geological professional rules and process professional rules; the business process includes geological work flow and ground process flow;

[0034] The construction unit comprises:

[0035] A first construction module is used to construct the geological workflow according to the geological professional rules and the business nodes, wherein the geological professional rules are established based on the management method and technical characteristics of the geological profession in ground production;

[0036] The second construction module is used to construct the ground process flow according to the process professional rules and the business nodes. The process professional rules are established based on the management method and technical characteristics of the process profession in ground production.

[0037] Optionally, the device further comprises:

[0038] A configuration unit is used to configure the workflow based on the business process according to a user configuration instruction.

[0039] Optionally, the device further comprises:

[0040] A setting unit, used to set a work order configuration rule, wherein the work order configuration rule is used to set the work order parameters of the task work order according to a user instruction, and the work order parameters include task content, work order form, and a push target corresponding to the work order;

[0041] The generating unit is used to generate task work orders corresponding to different push targets according to the user's work order operation instructions and the work order configuration rules.

[0042] Optionally, the sending unit includes:

[0043] A determination module, configured to determine a target task work order corresponding to the target business node according to the push target in the work order configuration rule;

[0044] The sending module is used to send the target task work order to the push target corresponding to the target business node through the workflow.

[0045] In order to achieve the above-mentioned purpose, according to the third aspect of the present invention, a storage medium is provided, which includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above-mentioned single well business process management method.

[0046] In order to achieve the above-mentioned purpose, according to a fourth aspect of the present invention, a processor is provided, wherein the processor is used to run a program, wherein the program executes the above-mentioned single well business process management method when running.

[0047] Through the above technical scheme, the single-well business process management method and device provided by the present invention solves the problem of high manpower consumption in the existing single-well business process management process. The present invention determines the business node according to the single-well production process, and then constructs the business process according to the preset production rules based on the business node. After that, when the alarm information is detected, the target business node is determined from the business process, and finally the task work order is sent to the push target of the target business node through the workflow, thereby realizing the function of managing the single-well business process. In the above scheme, since the business process contains multiple business nodes, the business nodes are set based on the links with problems in the single-well production process, which ensures that in the process of determining the business process based on the generated process, the possible problem points, i.e., the business nodes, can be determined based on the production situation to set the business process, thereby laying the foundation for providing the task work order of the corresponding problem when the alarm information exists in the future, and ensuring the accuracy of the task work order, which can reflect the problem corresponding to the alarm information. At the same time, since the workflow is generated based on the business process, the task work order corresponding to the alarm information can be transmitted. This enables the automatic task work order distribution function to be executed based on the workflow when there is alarm information during the single well business process management process, without the need for manual work order distribution, thus saving manpower and solving the problem of high manpower consumption in the prior art.

[0048] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0050] Figure 1 A flow chart of a single well business process management method provided by an embodiment of the present invention is shown;

[0051] Figure 2 Another flow chart of a single well business process management method provided by an embodiment of the present invention is shown;

[0052] Figure 3 A block diagram showing a composition of a single well business process management device provided by an embodiment of the present invention;

[0053] Figure 4A block diagram showing another single well business process management device provided by an embodiment of the present invention is shown;

[0054] Figure 5 A block diagram showing a composition of a device for single-well business process management provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0055] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.

[0056] In order to solve the problem of high manpower consumption in the current single well business process management process, the embodiment of the present invention provides a single well business process management method, such as Figure 1 As shown, the method includes:

[0057] 101. Determine the business nodes based on the single well production process.

[0058] Among them, the business node is set based on the problematic links in the single well production process.

[0059] In the process of collecting and managing single well data, the entire single well data can first be analyzed on the ground in an integrated manner, that is, according to the oil and gas ground production process, analyze which links may have problems in the process of oil and gas passing through the pipeline from the single well to the station. The way to judge whether there may be a problem can be based on the change between the output volume and the injection volume, so as to analyze which steps or links in the production process will have problems. Here, the problems include but are not limited to leakage, abnormal transmission pressure difference, etc., and different problems often come from different links. Therefore, in the process of this step, its essence is to determine the link with problems based on the entire single well production process, and then determine the corresponding business node, so that tasks can be assigned based on the business node to solve the problems.

[0060] 102. Build business processes based on business nodes and preset production rules.

[0061] Wherein, the business process includes a plurality of the business nodes. After the aforementioned step 101 determines the business nodes corresponding to the single well production process, these business nodes can be used to construct the corresponding business process. At the same time, since different production processes are controlled by certain rules, that is to say, each production process has certain corresponding rules, namely, preset production rules. Therefore, in this step, it is necessary to construct the corresponding business process based on the preset production rules. For example, when the preset production rules are geological professional rules, the method described in this step needs to use business nodes to construct the corresponding business process according to the geological professional rules.

[0062] 103. When an alarm message is detected, a target business node is determined from the business process.

[0063] The target service node corresponds to the alarm information.

[0064] Based on the above description, it can be known that in the management process of single well data, there may be some emergencies or problems in the entire link of single well-pipeline-station, and when these problems occur, they will be identified by the preset detection device or equipment, thereby issuing corresponding alarm information. Therefore, in an embodiment of the present invention, when step 103 detects the existence of alarm information through detection, it is necessary to determine which node in the business process constructed in the above step 102 has a problem based on the alarm information, that is, to determine the target business node. Specifically, the method of determining the target business node from the business process can be based on the alarm position in the alarm information, determining the business node corresponding to the alarm position in the business process, and determining this business node as the target business node. Of course, in the specific operation process, the method of determining the target business node is not limited to the method described above, and other methods can also be selected according to actual needs.

[0065] 104. Send the task work order to the push target of the target business node through the workflow.

[0066] The workflow is generated based on the business process and is used to transmit the task work order corresponding to the alarm information.

[0067] In practical applications, the workflow can be understood as "the automation of part or all of the business process in a computer application environment", that is, an abstract and generalized automated operation system of the business rules between the workflow and its various operation steps. In computers, workflow is part of computer-supported collaborative work, and its main problem is to use computers to automatically transfer documents, information or tasks between multiple participants according to certain predetermined rules in order to achieve a certain business goal.

[0068] Therefore, when the aforementioned steps determine the business process containing each business node, the corresponding workflow can be set, so as to use the workflow to realize functions such as automatic transmission of files, information and tasks. In this embodiment, when the aforementioned steps also determine the target business node corresponding to the alarm information, the task worksheet can be sent to the target business node based on the workflow. At the same time, since the business node actually corresponds to a push target, that is, a specific operator or team, the workflow can be used in this step to directly send the task worksheet to the push target of the target business node, thereby realizing the effect of automatically dispatching tasks to the corresponding staff or team using the workflow.

[0069] The above embodiment provides a single-well business process management method. For the problem of large manpower consumption in the existing single-well business process management process, the present invention determines the business node according to the single-well production process, and then builds the business process according to the preset production rules based on the business node. After that, when the alarm information is detected, the target business node is determined from the business process, and finally the task work order is sent to the push target of the target business node through the workflow, thereby realizing the function of managing the single-well business process. In the above scheme, since the business process contains multiple business nodes, the business nodes are set based on the links with problems in the single-well production process, which ensures that in the process of determining the business process based on the generated process, the possible problem points, i.e., business nodes, can be determined based on the production situation to set the business process, thereby laying the foundation for providing the task work order of the corresponding problem when the alarm information exists in the future, and ensuring the accuracy of the task work order, which can reflect the problem corresponding to the alarm information. At the same time, since the workflow is generated based on the business process, the task work order corresponding to the alarm information can be transmitted. This enables the automatic task work order distribution function to be executed based on the workflow when there is alarm information during the single well business process management process, without the need for manual work order distribution, thus saving manpower and solving the problem of high manpower consumption in the prior art.

[0070] Furthermore, as a Figure 1 The embodiment shown in the figure is refined and expanded. The embodiment of the present invention also provides another single well business process management method, such as Figure 2 As shown, the specific steps include:

[0071] 201. Determine the business nodes based on the single well production process.

[0072] Among them, the business node is set based on the problematic links in the single well production process.

[0073] In the single well production process, there may be various problems, such as problems that occur during single well on-site production, problems that occur when gas and liquid flow through pipelines, problems that occur after gas and liquid arrive at the station, etc. Therefore, in the embodiment of the present invention, nodes that may have problems can be determined in the entire process of single well production, and the corresponding business nodes can be determined accordingly.

[0074] Specifically, this step can be performed in the following manner, including:

[0075] First, by analyzing the liquid volume change information in the transmission line, the target point with problems in the production process is determined. Then, based on the target point and the expert knowledge base, the business node is determined. Since there may be multiple target points with problems in actual applications, when determining a specific business node, it is necessary to combine the expert knowledge base to determine the associated target point as a business node. Of course, the specific determination method needs to be determined based on the knowledge content in the expert knowledge base, and is not specifically limited here.

[0076] 202. Build business processes based on business nodes and preset production rules.

[0077] The business process includes a plurality of business nodes.

[0078] In specific applications, since different production rules correspond to different business processes, which is determined by the production characteristics of different production rules, when constructing business processes based on preset production rules in this step, it is necessary to construct corresponding business processes based on different preset production rules. Among them, the preset production rules may include: geological professional rules and process professional rules. Correspondingly, the business process may include: geological work process and ground process process. Specifically, this step can be performed in the following ways:

[0079] On the one hand, when the preset generation rules are specifically the geological professional rules, this step is executed as follows: constructing the geological workflow according to the geological professional rules and the business nodes, wherein the geological professional rules are established based on the management methods and technical characteristics of the geological profession in ground production.

[0080] On the other hand, when the preset generation rule is specifically the process professional rule, this step is executed as follows: construct the ground process flow according to the process professional rule and the business node, wherein the process professional rule is established based on the management method and technical characteristics of the process profession in ground production.

[0081] By constructing corresponding geological workflows and ground process flows according to geological professional rules and process professional rules respectively, it can be ensured that business nodes are constructed into corresponding business processes according to the characteristics of different production rules, thereby ensuring that the constructed business processes can meet the characteristics of each different preset production rules and have better adaptability, thus laying the foundation for the accuracy of subsequent single-well business data management based on business processes.

[0082] 203. When the alarm information is detected, a target business node is determined from the business process.

[0083] Wherein, the target business node corresponds to the alarm information. In an embodiment of the present invention, the method of determining the target business node based on the alarm information includes but is not limited to the following method: when the business nodes in the business process contain the location information corresponding to each node, the business node at the same position in the business process can be determined based on the alarm position in the alarm information, so as to determine this business node as the target business node. Similarly, when the alarm information contains the work link targeted by the alarm, it is necessary to determine the business node corresponding to the work link from the business process, so as to determine this business node as the target business node.

[0084] 204. Set work order configuration rules.

[0085] The work order configuration rules are used to set the work order parameters of the task work order according to user instructions, and the work order parameters include task content, work order form, and push target corresponding to the work order.

[0086] When a problem occurs and an alarm occurs, it is necessary to assign tasks in a timely manner to solve the alarm problem. Therefore, in this embodiment, the work order configuration rules can also be set in advance based on the user's instructions, so that when an alarm occurs later, the automatic task work order generation process can be executed based on the work order configuration rules. Specifically, the work order configuration rules contain work order parameters corresponding to different alarms, including task content, work order form, and the push target to which the work order needs to be pushed.

[0087] 205. According to the user's work order operation instructions and work order configuration rules, task work orders corresponding to different push targets are generated.

[0088] Since the problems caused by the alarm can generally be simulated in advance, based on this, a corresponding task work order can be generated in advance for each alarm situation. That is to say, when an alarm is detected subsequently, the required task work order can be directly obtained from the various task work orders generated in this step, thereby saving the time for generating task work orders during the task work order distribution process and improving the efficiency of task distribution.

[0089] It should be noted that the above-mentioned task worksheet can also be used to export task worksheets, enter task worksheets, display task worksheet details, and customize the content of task worksheets through preset operating instructions when the user needs it, thereby ensuring that the task worksheet actually generated can perform relevant operations based on the actual needs of the user.

[0090] It should be noted that, in this embodiment, the method steps described in steps 204-205 can be executed in the order described in the embodiment of the present invention, or can be executed before step 201, and no limitation is made here. The order described in this embodiment is only exemplary and no specific limitation is made.

[0091] 206. According to the user configuration instruction, the workflow is configured based on the business process.

[0092] Based on the description in the above embodiments, it can be known that the workflow can automatically execute the preset operation process. Therefore, in this step, the workflow corresponding to the business process can be generated based on the user's specific instructions, that is, the user configuration instructions. Among them, the configuration instructions can include the push target corresponding to each task when the workflow is running. In this way, it can be ensured that the function of automatically sending the task work order can be executed through the workflow in the future.

[0093] 207. Send the task work order to the push target of the target business node through the workflow.

[0094] The workflow is generated based on the business process and is used to transmit the task work order corresponding to the alarm information.

[0095] Specifically, this step may include:

[0096] First, according to the push target in the work order configuration rule, determine the target task work order corresponding to the target business node;

[0097] Then, the target task work order is sent to the push target corresponding to the target business node through the workflow.

[0098] Since the business node corresponding to the alarm information has been determined in the previous steps, and the task work order of the push target of each business node has been pre-generated, in this step, the required target task work order can be directly determined based on the push target, and the target task work order can be sent to the push target through the workflow.

[0099] In addition, in actual applications, the processing information of single well site feedback can also be obtained in real time. The processing information can be understood as the staff or team at the single well site obtaining the processing method, processing process and processing results corresponding to the current task work order through the remote terminal, thereby realizing the real-time acquisition function of the current task progress.

[0100] Furthermore, as a response to the above Figure 1 In order to realize the method shown in the figure, the embodiment of the present invention also provides a single well business process management device for Figure 1 The device embodiment corresponds to the aforementioned method embodiment. For ease of reading, this device embodiment will not repeat the details of the aforementioned method embodiment one by one, but it should be clear that the device in this embodiment can correspond to all the contents of the aforementioned method embodiment. Figure 3 As shown, the device includes: a first determining unit 31, a constructing unit 32, a second determining unit 33 and a sending unit 34, wherein

[0101] The first determination unit 31 may be used to determine a service node according to a single well production process, wherein the service node is set based on a link with problems in the single well production process;

[0102] A construction unit 32 may be configured to construct a business process according to a preset production rule based on the business node determined by the first determination unit 31, wherein the business process includes a plurality of the business nodes;

[0103] The second determining unit 33 may be configured to determine a target service node from the service process constructed by the constructing unit 32 when the alarm information is detected, the target service node corresponding to the alarm information;

[0104] The sending unit 34 may be configured to send a task worksheet to a push target of a target business node determined by the second determining unit 33 through a workflow, wherein the workflow is generated based on the business process and is configured to transmit a task worksheet corresponding to the alarm information.

[0105] Furthermore, as a response to the above Figure 2 In order to realize the method shown in the figure, the embodiment of the present invention also provides a single well business process management device for Figure 2 The device embodiment corresponds to the aforementioned method embodiment. For ease of reading, this device embodiment will not repeat the details of the aforementioned method embodiment one by one, but it should be clear that the device in this embodiment can correspond to all the contents of the aforementioned method embodiment. Figure 4 As shown, the device comprises:

[0106] A first determining unit 41, a constructing unit 42, a second determining unit 43 and a sending unit 44, wherein

[0107] The first determination unit 41 may be used to determine a service node according to a single well production process, wherein the service node is set based on a link with problems in the single well production process;

[0108] A construction unit 42 may be configured to construct a business process according to a preset production rule based on the business node determined by the first determination unit 41, wherein the business process includes a plurality of the business nodes;

[0109] A second determining unit 43 may be configured to determine a target service node from the service process constructed by the constructing unit 42 when the alarm information is detected, the target service node corresponding to the alarm information;

[0110] The sending unit 44 may be configured to send a task worksheet to a push target of a target business node determined by the second determining unit 43 through a workflow, wherein the workflow is generated based on the business process and is configured to transmit a task worksheet corresponding to the alarm information.

[0111] Further, the first determining unit 41 includes:

[0112] The first determination module 411 may be used to determine a target point where a problem exists in the production process by analyzing the liquid volume change information in the transmission line;

[0113] The second determination module 412 may be configured to determine a service node according to the target point determined by the first determination module 411 and the expert knowledge base.

[0114] Furthermore, the preset production rules include geological professional rules and process professional rules; the business process includes geological work flow and ground process flow;

[0115] The construction unit 42 comprises:

[0116] The first construction module 421 can be used to construct the geological workflow according to the geological professional rules and the business nodes. The geological professional rules are established based on the management method and technical characteristics of the geological profession in ground production;

[0117] The second construction module 422 can be used to construct the ground process flow according to the process professional rules and the business nodes. The process professional rules are established based on the management method and technical characteristics of the process professional in ground production.

[0118] Furthermore, the device also includes:

[0119] The configuration unit 45 may be used to configure the workflow based on the business process constructed by the construction unit 42 according to user configuration instructions.

[0120] Furthermore, the device also includes:

[0121] A setting unit 46, which can be used to set a work order configuration rule, wherein the work order configuration rule can be used to set the work order parameters of the task work order according to the user instruction, and the work order parameters include the task content, the work order form and the push target corresponding to the work order;

[0122] The generating unit 47 can be used to generate task work orders corresponding to different push targets according to the work order operation instructions of the user and the work order configuration rules set by the setting unit 46, so that the sending unit 44 can send based on the task work order.

[0123] Furthermore, the sending unit 44 includes:

[0124] The determination module 441 may be used to determine a target task work order corresponding to the target business node according to the push target in the work order configuration rule;

[0125] The sending module 442 may be used to send the target task work order determined by the determining module 441 to a push target corresponding to the target business node through a workflow.

[0126] By means of the above technical scheme, an embodiment of the present invention provides a single-well business process management method and device. In order to solve the problem of high manpower consumption in the existing single-well business process management process, the present invention determines the business node according to the single-well production process, and then constructs the business process according to the preset production rules based on the business node. After that, when the alarm information is detected, the target business node is determined from the business process, and finally the task work order is sent to the push target of the target business node through the workflow, thereby realizing the function of managing the single-well business process. In the above scheme, since the business process contains multiple business nodes, the business nodes are set based on the links with problems in the single-well production process, which ensures that in the process of determining the business process based on the generated process, the possible problem points, i.e., the business nodes, can be determined based on the production situation to set the business process, thereby laying the foundation for providing the task work order of the corresponding problem when the alarm information exists in the future, and ensuring the accuracy of the task work order, which can reflect the problem corresponding to the alarm information. At the same time, since the workflow is generated based on the business process, the task work order corresponding to the alarm information can be transmitted. This enables the automatic task work order distribution function to be executed based on the workflow when there is alarm information during the single well business process management process, without the need for manual work order distribution, thus saving manpower and solving the problem of high manpower consumption in the prior art.

[0127] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and a single well business process management method that can be automatically executed is implemented by adjusting kernel parameters, thereby solving the problem of large manpower consumption in the existing technology.

[0128] An embodiment of the present invention provides a storage medium on which a program is stored. When the program is executed by a processor, the single-well business process management method is implemented.

[0129] An embodiment of the present invention provides a processor, which is used to run a program, wherein the single-well business process management method is executed when the program is running.

[0130] The embodiment of the present invention provides a device 50, such as Figure 5 As shown, the device includes at least one processor 501, and at least one memory 502 and a bus 503 connected to the processor; wherein the processor 501 and the memory 502 communicate with each other via the bus 503; the processor 501 is used to call the program instructions in the memory to execute the above-mentioned single well business process management method.

[0131] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0132] The present application also provides a computer program product, which, when executed on a process management device, is suitable for executing a program that initializes the following method steps: determining a business node based on a single-well production process, wherein the business node is set based on a problematic link in the single-well production process; constructing a business process based on the business node and preset production rules, wherein the business process includes a plurality of the business nodes; when an alarm message is detected, determining a target business node from the business process, wherein the target business node corresponds to the alarm message; and sending a task work order to a push target of the target business node through a workflow, wherein the workflow is generated based on the business process and is used to transmit a task work order corresponding to the alarm message.

[0133] Furthermore, the determining of the business node according to the single well production process includes:

[0134] By analyzing the liquid volume change information in the transmission line, the target points where problems exist in the production process are determined;

[0135] A service node is determined according to the target point and the expert knowledge base.

[0136] Furthermore, the preset production rules include geological professional rules and process professional rules; the business process includes geological work flow and ground process flow;

[0137] The step of constructing a business process according to the business node and preset production rules includes:

[0138] According to the geological professional rules and the business nodes, the geological workflow is constructed, wherein the geological professional rules are established based on the management method and technical characteristics of the geological profession in ground production;

[0139] The ground process flow is constructed according to the process professional rules and the business nodes. The process professional rules are established based on the management method and technical characteristics of the process professional in ground production.

[0140] Furthermore, before sending the task work order to the push target of the target service node through the workflow, the method further includes:

[0141] According to the user configuration instruction, the workflow is configured based on the business process.

[0142] Furthermore, before sending the task work order to the push target of the target service node through the workflow, the method further includes:

[0143] Setting work order configuration rules, wherein the work order configuration rules are used to set the work order parameters of the task work order according to user instructions, and the work order parameters include task content, work order form, and push target corresponding to the work order;

[0144] According to the user's work order operation instructions and the work order configuration rules, task work orders corresponding to different push targets are generated.

[0145] Furthermore, sending the task work order to the push target of the target business node through the workflow includes:

[0146] Determine the target task work order corresponding to the target business node according to the push target in the work order configuration rule;

[0147] The target task work order is sent to the push target corresponding to the target business node through the workflow.

[0148] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable process management device to generate a machine, so that the instructions executed by the processor of the computer or other programmable process management device generate instructions for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0149] In a typical configuration, the device includes one or more processors (CPU), memory and bus. The device may also include input / output interface, network interface and the like.

[0150] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip. The memory is an example of a computer-readable medium.

[0151] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0152] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0153] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0154] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A single well business process management method, characterized in that: include: Determine a business node according to the single well production process, wherein the business node is set based on a link with problems in the single well production process; According to the business node, a business process is constructed according to preset production rules, wherein the business process includes a plurality of the business nodes; When the alarm information is detected, determining a target service node from the service process, the target service node corresponding to the alarm information; Sending a task worksheet to a push target of the target business node through a workflow, wherein the workflow is generated based on the business process and is used to transmit the task worksheet corresponding to the alarm information; Before sending the task work order to the push target of the target service node through the workflow, the method further includes: Setting work order configuration rules, wherein the work order configuration rules are used to set the work order parameters of the task work order according to user instructions, and the work order parameters include task content, work order form, and push target corresponding to the work order; Generate task work orders corresponding to different push targets according to the user's work order operation instructions and the work order configuration rules; The sending of the task work order to the push target of the target business node through the workflow includes: Determine the target task work order corresponding to the target business node according to the push target in the work order configuration rule; The target task work order is sent to the push target corresponding to the target business node through the workflow.

2. The method according to claim 1, characterized in that Determining the business nodes according to the single well production process includes: By analyzing the liquid volume change information in the transmission line, the target points where problems exist in the production process are determined; A service node is determined according to the target point and the expert knowledge base.

3. The method according to claim 2, characterized in that The preset production rules include geological professional rules and process professional rules; the business process includes geological work process and ground process process; The step of constructing a business process according to the business node and preset production rules includes: According to the geological professional rules and the business nodes, the geological workflow is constructed, wherein the geological professional rules are established based on the management method and technical characteristics of the geological profession in ground production; The ground process flow is constructed according to the process professional rules and the business nodes. The process professional rules are established based on the management method and technical characteristics of the process professional in ground production.

4. The method according to claim 3, characterized in that Before sending the task work order to the push target of the target service node through the workflow, the method further includes: According to the user configuration instruction, the workflow is configured based on the business process.

5. A single well business process management device, characterized in that: A single well business process management method for implementing any one of claims 1 to 4, comprising: A first determination unit is used to determine a business node according to a single well production process, wherein the business node is set based on a link with problems in the single well production process; A construction unit, configured to construct a business process according to the business node and a preset production rule, wherein the business process includes a plurality of the business nodes; A second determining unit is used to determine a target service node from the service process when the alarm information is detected, the target service node corresponding to the alarm information; The sending unit is used to send the task worksheet to the push target of the target business node through the workflow, wherein the workflow is generated based on the business process and is used to transmit the task worksheet corresponding to the alarm information.

6. The device according to claim 5, characterized in that The first determining unit includes: A first determination module is used to determine a target point where a problem exists in the production process by analyzing the liquid volume change information in the transmission line; The second determination module is used to determine the service node according to the target point and the expert knowledge base.

7. A storage medium, characterized in that: The storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the single well business process management method described in any one of claims 1 to claim 4.

8. A processor, characterized in that: The processor is used to run a program, wherein the program, when running, executes the single well business process management method as described in any one of claims 1 to claim 4.

Citation Information

Patent Citations

  • Execution method, apparatus and medium for controlling work flows

    CN107844924A

  • A method and system for creating a business flowchart that combines problems estimated from the business processing patterns of each business type and business flow

    JP6508855B1