Cement material processing device and cement material processing method
By designing a circulating bed furnace-type device in cement clinker calcining technology and controlling the reaction temperature in different regions, the problems of high heat consumption and serious NOx emissions of rotary kiln equipment are solved, and efficient cement clinker firing and environmental protection are achieved.
Patent Information
- Application Number
- CN202011497183.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-17
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2040-12-17
AI Technical Summary
In the existing cement clinker calcining technology, the rotary kiln equipment has high heat consumption, serious NOx emissions, huge and complex equipment, low thermal efficiency, which cannot further reduce heat consumption and cost, and the temperature is uneven during the firing process, resulting in poor clinker quality. and environmental pollution.
A cement material treatment device is designed, including a pre-decomposition part, a pre-firing part, a sintering part, a separator and a cooling part. By forming a circulation loop, each reaction temperature is controlled in different regions, and CaCO3 pre-heating and decomposition and C2S sintering are realized. The sub-region processing of C3S firing uses a circulating bed furnace structure to achieve temperature matching and chemical reaction optimization.
Reduces the thermal load in the cement clinker firing area, reduces NOx generation, improves the clinker firing quality and the energy utilization rate of the equipment, reduces the equipment's floor area, and reduces the flue gas volume, improves environmental pollution. question.
Smart Images

Figure CN114646220B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the field of cement production, and in particular to a cement material processing device and a cement material processing method. Background Art
[0002] Cement clinker calcination mainly includes the following processes: 1) raw material preheating and CaCO3 decomposition (800-900℃); 2) 2CaO·SiO2(C2S) generation (900-1200℃); 3) 3CaO·SiO2(C3S) generation (>1300℃).
[0003] At present, the most efficient production system in traditional cement clinker calcination is mainly the new dry pre-decomposition kiln, which has the advantages of low heat consumption, large single kiln production capacity, and easy operation of the automated process. It is a relatively mature technology. In the new dry pre-decomposition kiln, the raw material preheating and decomposition process (<900℃) is mainly completed in the cyclone and decomposition furnace equipment at all levels, while the C2S (dicalcium silicate) and C3S (tricalcium silicate) calcination is mainly completed in the rotary kiln equipment (1000~1800℃).
[0004] However, the rotary kiln is a large equipment, the materials in the kiln are piled up, the gas, liquid and solid heat exchange efficiency is low, the heat transfer speed in the kiln is slow and the temperature is uneven. At present, the heat consumption and cost of the rotary kiln cannot be further reduced, and the maximum thermal efficiency can only reach about 60%, and it has been unable to break through the process bottleneck.
[0005] In addition, the temperature of the cement kiln head is as high as 1800℃, which makes the rotary kiln contribute 80% of thermal type and 40% of fuel type NOx. This is one of the reasons why cement kilns are an important source of fossil energy consumption and environmental pollution.
[0006] Fluidized cement calcining technology is expected to overcome the above-mentioned technical defects of rotary kiln and become a new generation of cement clinker calcining technology. Chinese patent CN1073054C and Japanese patent JP01148737A disclose a method and device for calcining cement clinker, wherein cement raw material powder preheated by four-stage cyclone and decomposed by decomposition furnace (900-1100°C) is granulated and calcined (>1450°C) in a fluidized bed, and then the calcined clinker is sent to a cooler. This method calcines cement clinker with low heat loss and high efficiency.
[0007] U.S. Patent No. 4,402,754A discloses a device for burning cement clinker using a circulating fluidized bed, in which the cement raw material powder preheated by a cyclone is heated (950-1150°C) and clinkered (1400°C) in a two-stage circulating fluidized bed device in series, and then cooled and discharged. This method has a high thermal efficiency for burning clinker.
[0008] Chinese patent CN1171066C discloses a large-particle fluidized cement clinker calcining device, which consists of a preheating chamber, a fluidized pre-calcining chamber, a fluidized calcining chamber and a cooling chamber. It combines moving bed technology with fluidization technology to improve the problem of poor quality of cement clinker in moving bed vertical kiln.
[0009] The new dry cement production process uses a rotary kiln for firing. The equipment is bulky and has high heat consumption. Both C2S and C3S are fired in the rotary kiln. The temperature of the rotary kiln head is too high (1800°C) and the combustion temperature is uneven, resulting in high NOx emissions, serious environmental pollution, and low energy utilization.
[0010] The existing cement clinker fluidized firing method retains the pre-decomposition equipment of the dry pre-decomposition kiln, and simply replaces the rotary kiln with a bubbling fluidized bed. The entire firing equipment is still large and complex, and the heat consumption reduction is limited; the overall reaction is still divided into raw material decomposition and clinker calcination, and the C2S firing process is not separated from the clinker calcination process.
[0011] In addition, the temperature distribution in the burning / granulating furnace is uneven, the temperature is high, the material and the high-temperature flue gas flow in the opposite direction, the amount of flue gas in the clinker burning area is large, the NOx emission level is high and unstable, and it is difficult to scale up the equipment.
[0012] Moreover, in the fluidized bed calcination of cement, the materials in each system react step by step, and there is no material circulation process between the systems, so the calcination quality of fine material particles cannot be guaranteed. Summary of the invention
[0013] The present invention is proposed to alleviate or solve at least one aspect or at least one point of the above problems.
[0014] According to one aspect of an embodiment of the present invention, a cement material processing device is provided, comprising:
[0015] A pre-decomposition part, adapted to perform pre-decomposition treatment on cement raw materials;
[0016] The pre-burning section is suitable for pre-burning cement materials. The pre-burning section includes a first material inlet, a first circulation inlet and a first circulation outlet. The first material inlet is arranged at the bottom or lower part of the pre-burning section, and the first circulation outlet is arranged at the top or upper part of the pre-burning section. The lower part or bottom of the pre-burning section is provided with a first fuel inlet and a first air distribution inlet for supplying fuel and corresponding air distribution to the pre-burning section.
[0017] The firing section is suitable for firing the cement material from the pre-firing section, the firing section comprises a second material inlet and a second circulation outlet, and the firing section is provided with a second fuel inlet and a second air distribution inlet for supplying fuel and corresponding air distribution to the firing section;
[0018] A separator, wherein the material inlet of the separator is communicated with the first circulation outlet;
[0019] A distributor, the distributor has a first inlet and a first distribution port and a second distribution port communicating with the first inlet, the first inlet communicating with the material outlet of the separator, the first distribution port communicating with the material inlet of the pre-decomposition part via a first material return device, the second distribution port communicating with the second material inlet via a second material return device, and the cement raw material is suitable for entering the pre-decomposition part from the first distribution port;
[0020] The material outlet of the pre-decomposition part is communicated with the first material inlet, and the second circulation outlet is communicated with the first circulation inlet;
[0021] The cooling section is suitable for cooling the cement material from the burning section, and the cooled cement clinker is suitable for being discharged from the cooling section.
[0022] An embodiment of the present invention also relates to a cement material processing device, comprising:
[0023] A pre-decomposition part, adapted to perform pre-decomposition treatment on cement raw materials;
[0024] The pre-burning section is suitable for pre-burning cement materials. The pre-burning section includes a first material inlet and a first circulation outlet. The first material inlet is arranged at the bottom or lower part of the pre-burning section. The material outlet of the pre-decomposition section is connected to the first material inlet. The first circulation outlet is arranged at the top or upper part of the pre-burning section. The lower part or bottom of the pre-burning section is provided with a first fuel inlet and a first air distribution inlet for supplying fuel and corresponding air distribution to the pre-burning section.
[0025] The firing section is suitable for firing the cement material from the pre-firing section, the firing section includes a second material inlet and a second material outlet, the bottom edge or lower part of the firing section is provided with a second fuel inlet and a second air distribution inlet for supplying fuel and corresponding air distribution to the firing section, the second material inlet is provided at the lower part or bottom of the firing section, and the second material outlet is provided at the top or upper part of the firing section;
[0026] A separator, wherein the material inlet of the separator is communicated with the first circulation outlet;
[0027] A distributor, the distributor has a first inlet and a first distribution port and a second distribution port communicating with the first inlet, the first inlet communicating with the material outlet of the separator, the first distribution port communicating with the material inlet of the pre-decomposition part via a first material return device, the second distribution port communicating with the second material inlet via a second material return device, and the cement raw material is suitable for entering the pre-decomposition part from the first distribution port;
[0028] a cooling section, adapted to cool the cement material from the burning section, and the cooled cement clinker is adapted to be discharged from the cooling section,
[0029] Wherein: the second material outlet is communicated with the smoke outlet of the separator.
[0030] According to another aspect of an embodiment of the present invention, a cement material processing method based on the above-mentioned cement material processing device is proposed, wherein:
[0031] The method comprises forming a first circulation loop of cement material, the first circulation loop comprises in sequence: a pre-burning part, a separation part, a distributor, and a pre-decomposition part, and / or the method comprises forming a second circulation loop of cement material, the second circulation loop comprises in sequence: a pre-burning part, a separation part, a distributor, and a burning part; or
[0032] The method comprises forming a first circulation loop of cement material, wherein the first circulation loop comprises in sequence: a pre-burning part, a separation part, a distributor, and a pre-decomposition part. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 A flow chart of cement material processing according to an exemplary embodiment of the present invention;
[0034] Figure 2 is a schematic diagram of a cement material processing device according to an exemplary embodiment of the present invention, Figure 1 The flowchart shown corresponds to;
[0035] Figure 3 is a schematic diagram of a cement material processing device according to another exemplary embodiment of the present invention, Figure 1 The flowchart shown corresponds to;
[0036] Figure 4 A flowchart of cement material processing according to another exemplary embodiment of the present invention;
[0037] Figure 5 is a schematic diagram of a cement material processing device according to an exemplary embodiment of the present invention, Figure 4 The flowchart shown corresponds to the following.
[0038] Exemplary description of reference numerals:
[0039] Pre-decomposition unit 10; decomposition furnace 11; first material return device 12;
[0040] Pre-firing unit 20; Pre-firing furnace 21; Separator 22;
[0041] Granulation / sintering unit 30; distributor 31; main sintering furnace 32; second returner 33;
[0042] Clinker cooling unit 40; Clinker cooling furnace 41. DETAILED DESCRIPTION
[0043] The following description of the embodiments of the present invention with reference to the accompanying drawings is intended to explain the overall inventive concept of the present invention and should not be construed as limiting the present invention.
[0044] Figure 1 FIG. 1 is a flow chart of cement material processing according to an exemplary embodiment of the present invention. Figure 1 As shown, in Figure 1 The cement material processing shown includes four units, namely a pre-decomposition unit 10, a pre-burning unit 20, a granulation / burning unit 30, and a clinker cooling unit 40.
[0045] like Figure 1 As shown, the cement raw material enters the pre-decomposition unit 10, and exchanges heat with the high-temperature flue gas and fine particles (e.g., the temperature is 1000-1200°C) from the pre-firing unit 20 in the pre-decomposition unit 10, and the raw material is preheated and CaCO3 is decomposed. In one embodiment of the present invention, the operating temperature of the pre-decomposition unit 10 is between 800 and 900°C.
[0046] Then, if Figure 1 As shown, the raw material that has completed preheating and CaCO3 decomposition (for example, 800-900°C) enters the pre-sintering unit 20 (for example, 1000-1200°C), and the pre-sintering unit 20 is introduced with fuel and air distribution, while receiving high-temperature flue gas and fine particles (1000-1100°C) from the granulation / sintering unit 30. The raw material completes the pre-sintering C2S firing reaction (1000-1200°C) in the pre-sintering unit 20, and the combustion of the fuel and the high-temperature flue gas from the firing unit 30 provide the heat required for the pre-sintering reaction.
[0047] The high-temperature fine particles formed by the separator of the product of the pre-sintering unit 20 enter the pre-decomposition unit 10 to participate in the raw material preheating and CaCO3 decomposition process. In one embodiment of the present invention, the operating temperature of the pre-sintering unit 20 is between 1000 and 1200°C.
[0048] In addition, the high-temperature coarse particles formed by the separator of the pre-burning unit 20 enter the granulation / burning unit 30, where the cement raw material is granulated and C3S is burned to form high-temperature clinker. In one embodiment of the present invention, the operating temperature of the granulation / burning unit 30 is between 1300 and 1450°C.
[0049] The granulation / firing unit 30 is provided with quenching air to preliminarily cool the high-temperature clinker to below 1100°C. The high-temperature flue gas and unfired fine particles are cooled to 1000-1100°C before entering the pre-firing unit 20 to provide heat for the pre-firing reaction with the raw material.
[0050] See also Figure 1The high-temperature clinker is then fed into the clinker cooling unit 40 (for example, after being cooled by the cooling unit, the clinker temperature is less than 900° C.). After being cooled, the clinker temperature is reduced to, for example, below 500° C. Figure 1 As shown, in Figure 1 In the illustrated embodiment, air is used as cooling air to recover the heat of the clinker, and the hot air (>500° C.) after the waste heat is recovered enters the pre-firing unit 20 as distribution air to participate in the fuel combustion.
[0051] In the present invention, the main reactions in the cement clinker burning process are controlled in different regions, and more accurate reaction control is achieved by controlling the temperature of each region, specifically including: CaCO3 preheating and decomposition is completed in the pre-decomposition unit 10 (for example, 800-900°C), C2S burning is completed in the pre-burning unit 20 (for example, 1000-1200°C), granulation and C3S burning are completed in the granulation / burning unit 30 (for example, 1300-1450°C), and clinker cooling and sensible heat utilization are completed in the clinker cooling unit 40 (for example, <500°C). Since the optimal reaction temperatures of different reactions in the cement clinker burning process are different, the matching of temperature (heat) and chemical reaction process can be achieved by controlling the different reactions in the cement clinker burning process in different regions, thereby greatly reducing the heat load of the clinker burning zone, avoiding or reducing the heat loss and low chemical reaction rate caused by temperature mismatch when the C2S burning, granulation and C3S burning are completed in the same burning zone.
[0052] also, Figure 1 In the embodiment shown, by constructing a circulation loop between the units, the system operation is made safer and more stable, and multiple circulations of fine material particles can be achieved through control, which fully ensures that the fine particle material has sufficient burning / granulation time and effectively ensures the burning quality of the clinker.
[0053] Figure 2 is a schematic diagram of a cement material processing device according to an exemplary embodiment of the present invention, Figure 1 The flowchart shown corresponds to the following.
[0054] exist Figure 2 In the illustrated embodiment, the pre-calcining unit 10 includes a calcining furnace 11 and a first returner 12, in which the cement raw material completes the preheating and calcining process (e.g., 800-900° C.). Optionally, although not shown, the upper part or top of the pre-calcining furnace is provided with fuel and air distribution ports for providing heat for the decomposition reaction of the calcining furnace through the combustion of the fuel.
[0055] like Figure 2As shown, the pre-sintering unit includes a pre-sintering furnace 21 and a separator 22 disposed at the outlet of the pre-sintering furnace 21, and the separator 22 separates the particles from the pre-sintering furnace 21. The material outlet of the separator 22 is connected to the inlet of a distributor 31, and the distributor 31 includes two distribution ports, the first distribution port is connected to the material inlet of the pre-calcining furnace 11, and the second distribution port is connected to the material inlet of the main sintering furnace 32 as a component of the granulation / sintering unit 30, as shown in FIG. Figure 2 As shown, the cement raw material enters the precalcining furnace 11 through the first distribution port. In the distributor 31, fine particles enter the precalcining furnace 11, while coarse particles enter the main sintering furnace 32. The distributor 31 can be in the form of a non-mechanical return device such as a double U / L-type valve, a U-type valve and an L-type valve, a mechanical valve such as a double flap valve, and a mechanical valve and a non-mechanical return valve, or any other structure that can separate coarse particles from fine particles.
[0056] The material outlet of the precalcining furnace 11 is connected to the first return feeder 12, and then enters the precalcining furnace 21 through the material inlet of the precalcining furnace 21 or the first circulation inlet B. The decomposed material completes the calcination process (for example, 1000-1200°C) of the clinker to generate the intermediate product, mainly C2S, in the precalcining furnace 21. Then the intermediate product enters the separator 22 through the first circulation outlet A1, and the separation process of the particulate material and the flue gas is completed in the separator 22. Figure 2 As shown, fuel and air are supplied from the bottom or lower part of the pre-sintering furnace 21 to provide the heat required for C2S sintering and partial granulation. The temperature in the pre-sintering furnace 21 is controlled at 1000-1200°C.
[0057] like Figure 2 As shown, a second circulation outlet A2 is provided at the lower part of the main sintering furnace 32 , and the outlet of the first return device 12 is communicated with the second circulation outlet A2 , and both are connected to the first circulation inlet B of the pre-sintering furnace 21 via the first circulation pipeline C.
[0058] In one embodiment of the present invention, the fine particle material that has not completed granulation and C3S sintering in the sintering furnace 32 is transported to the first circulation inlet B of the pre-sintering furnace 21 (which is located near the top of the dense phase area (the area below the pre-sintering furnace transport separation height (TDH)) of the pre-sintering furnace 21) through the second circulation outlet A2, and then enters the pre-sintering furnace 21 to continue pre-sintering (e.g. 1000-1200°C) and subsequent granulation / sintering process (e.g. 1300-1450°C). The high-temperature flue gas from the sintering is cooled to 1000-1100°C by quenching wind and then enters the pre-sintering furnace 21 to provide heat for C2S sintering.
[0059] As can be understood by those skilled in the art, the position of the first circulation inlet B is not limited to the top of the dense phase zone as long as the circulation between the pre-sintering furnace and the sintering furnace can be formed.
[0060] like Figure 2 As shown, the clinker cooling unit 40 includes a clinker cooling section 41 for introducing cooling air to cool the clinker. The cooled clinker is discharged from the clinker cooling section 41. The preheated hot air (e.g., >900°C) enters the pre-firing furnace 21 through the second circulation outlet A2 to provide heat for C2S sintering.
[0061] exist Figure 2 In the illustrated embodiment, the clinker cooling section 41 is directly connected to the main firing furnace 32. The cooling air provided by the bottom or lower part of the clinker cooling section 41 in the clinker cooling unit 40 provides an air separation function for returning the incompletely fired materials in the main firing furnace 32 to the pre-firing furnace 21.
[0062] Figure 2 The embodiment shown includes two circulation loops, namely: a circulation loop consisting of a pre-firing furnace 21, a separator 22, a first distribution port of a distributor 31, a pre-decomposition furnace 11, and a first return material device 12; and a circulation loop consisting of a pre-firing furnace 21, a separator 22, a second distribution port of a distributor 31, and a main sintering furnace 32.
[0063] The following is an example Figure 2 The specific processing flow of the embodiment shown.
[0064] The cement raw material enters the decomposition furnace 11 from the top or upper part through the first distribution port of the distributor 31, and is preheated by the high-temperature particles (1000-1100°C) coming out of the separator 22, and the decomposition process of CaCO3 is completed in the decomposition furnace 11. The temperature can be controlled at 800-1000°C.
[0065] The decomposed material is returned by the first return device 12 and then enters the pre-sintering furnace 21 for fluidization to complete the C2S sintering and granulation of some particles. Figure 2 As shown, fuel and air are supplied from the bottom or lower part of the pre-sintering furnace 21 to provide the heat required for C2S sintering and partial granulation. The temperature in the pre-sintering furnace 21 is controlled at 1000-1200°C.
[0066] The particles and high-temperature flue gas from the first circulation outlet A1 of the pre-calcining furnace 21 enter the separator 22 to complete the separation process of particles and flue gas. The separated particles enter the distributor 31, where the separated fine particles enter the pre-calcining furnace 11, and the separated coarse particles enter the main calcining furnace 32 for granulation and clinker calcination.
[0067] The cooling air from the cooling section 41 can play a sorting role, and the incompletely burned clinker will be returned to the burning furnace 21 through the second circulation outlet A2. The lower part of the main burning furnace 32 is connected to the cooling section 41 of the clinker cooling unit, and the cooling air is introduced into the bottom of the cooling section 41, so that the cooling section 41 forms a fluidized bed, and the large-particle cement clinker and the finer particles of the incompletely burned clinker entering the cooling section 41 complete the air separation process. The large-particle cement clinker that has completed granulation and burning in the burning furnace 32 is quickly cooled to below 1100°C by the quenching air, and the incompletely burned clinker will be returned to the burning furnace 21 through the second circulation outlet A2. The high-temperature flue gas (1000-1100°C) generated by the burning furnace and the hot air (>900°C) preheated by the cooling section clinker are returned to the pre-burning furnace 21 through the second circulation outlet B, providing a certain amount of heat for the pre-burning reaction. The large particles of clinker are cooled to about 500°C and discharged from the bottom of the cooling section.
[0068] exist Figure 2 In the illustrated embodiment, the flue gas in the pre-firing furnace 21 does not enter the main firing furnace 32, but is discharged through the separator 22, thereby significantly reducing the amount of flue gas entering the main firing furnace 32, thereby avoiding the technical disadvantage of excessively high flue gas volume in the main firing furnace in the existing fluidized cement firing technology.
[0069] Figure 3 is a schematic diagram of a cement material processing device according to another exemplary embodiment of the present invention, Figure 1 The flowchart shown corresponds to the following. Figure 3 and Figure 2 The difference is that in Figure 3 In the embodiment, a second material return device 33 is provided between the second distribution port of the distributor 31 and the main sintering furnace 32 .
[0070] Figure 4 is a flow chart of cement material processing according to another exemplary embodiment of the present invention. Figure 5 is a schematic diagram of a cement material processing device according to an exemplary embodiment of the present invention, Figure 4 The flowchart shown corresponds to the following.
[0071] Figure 4-5 The embodiment shown is Figure 3 The difference is: (1) Figure 5 In the embodiment, the material outlet of the precalcining furnace 11 is connected to the first material return device 12, and the outlet of the first material return device 12 is connected to the precalcining furnace 21; the second distribution port of the distributor 31 is connected to the second material return device 33, and the outlet of the second material return device 33 is connected to the material inlet of the main calcining furnace 32, and the material inlet of the main calcining furnace 32 is arranged at the lower part of the main calcining furnace 32; (2) Figure 5In the embodiment, the main sintering furnace 32 is in the form of a fluidized bed, and its circulation outlet (i.e., the second circulation outlet) A2 is arranged at the upper part of the main sintering furnace 32, while the pre-sintering furnace 21 is specially provided with a circulation inlet (i.e., the first circulation inlet B) which is independent of the material inlet of the pre-sintering furnace 21, and the first circulation inlet B is connected with the second circulation outlet A2 and is located between the first circulation outlet A1 and the material inlet of the pre-sintering furnace 21 in terms of height; (3) Figure 5 In the embodiment, the cooling section 41 is independently provided from the main sintering furnace 32, and the bottom or lower part of the main sintering furnace 32 is connected to the cooling section 41 through the second conveying channel D; (4) Figure 5 In the embodiment, the fuel inlet and the air distribution inlet of the main firing furnace 32 are arranged at the lower part or the bottom of the main firing furnace 32.
[0072] Although not shown, Figure 5 The embodiment shown can be changed so that the pre-firing furnace 21 is not provided with the first circulation inlet B, and the second circulation outlet A2 is directly connected to the flue gas outlet of the separator 22 .
[0073] Figure 1-5 The embodiment shown contains two circulation loops simultaneously:
[0074] One is a circulation loop formed between the pre-calcining unit 10 and the pre-decomposition unit 20. The circulation loop includes a pre-decomposition furnace 11, a pre-calcining furnace 21, a separator 22, and a distributor 31 arranged in sequence.
[0075] The second is a circulation loop formed between the granulation / sintering unit 30 and the pre-sintering unit 20. The circulation loop includes a pre-sintering furnace 21, a separator 22, a distributor 31, and a main sintering furnace 32 arranged in sequence.
[0076] The cement raw material can achieve the following process in the cement clinker burning method described in the present invention: preheating (<800°C) → decomposition (800-900°C) → C2S burning (1000-1200°C) → granulation\C3S burning (1300-1450°C) → cooling (<500°C) → clinker discharge process.
[0077] exist Figure 1-5 In the embodiment shown:
[0078] 1) High temperature particles provide heat for raw material preheating and decomposition;
[0079] 2) The preheated raw material is decomposed in the decomposition furnace;
[0080] 3) The decomposed raw material completes the formation reaction of the key intermediate product C2S into clinker in the pre-burning furnace and partial granulation;
[0081] 4) By separating the coarse and fine particles of the material, the fine particles can continue to participate in the processes described in 1) to 3) above, forming the first cycle, and the coarse particles enter the main sintering furnace for granulation and C3S sintering;
[0082] 5) The particles complete the granulation and C3S burning process in the main burning furnace. The large-particle cement clinker that has been burned is discharged after cooling. The fine particles that have not been burned are returned to the pre-burning furnace to continue the above 3) to 5) processes, forming a second cycle.
[0083] 6) By controlling the flow direction of high-temperature flue gas in each part of the entire system, the high-temperature flue gas can provide heat for the reaction of each part, thereby achieving the matching of temperature (heat) and reaction in the entire reaction process.
[0084] In the present invention, the pre-calcination corresponds to a process mainly including the generation of the intermediate product C2S, and the calcination corresponds to a process mainly including granulation and calcination of C3S.
[0085] In the present invention, a pre-burning unit (i.e., pre-burning section) is provided to perform pre-burning treatment on cement materials, and a granulation / burning unit (i.e., burning section) is provided to perform burning treatment on cement materials from the pre-burning unit. The treatment processes of the burning section and the pre-burning section are separated and connected by a separator provided between the burning section and the pre-burning section. Thus, compared with the prior art, the C2S burning process is separated from the clinker calcining process.
[0086] In the present invention, by setting a separator between the pre-calcining unit (i.e., the pre-calcining section) and the granulation / calcining unit (i.e., the burning section), the flue gas from the pre-calcining section can be separated to avoid or reduce its direct entry into the burning section. This is helpful in overcoming the problems in the prior art of large flue gas volume in the clinker burning zone and high and unstable NOx emission levels.
[0087] In the present invention, when it is feasible to remove the first material returner 12 or the second material returner 33 or other designs can be used as replacements, the first material returner 12 and / or the second material returner 33 may not be provided.
[0088] It should be pointed out that in the present invention, each numerical range, except for explicitly stating that it does not include the endpoint value, can be the endpoint value or the median value of each numerical range, all of which are within the protection scope of the present invention.
[0089] Based on the above, the present invention proposes the following technical solutions:
[0090] 1. A cement material processing device, comprising:
[0091] A pre-decomposition part, adapted to perform pre-decomposition treatment on cement raw materials;
[0092] The pre-burning section is suitable for pre-burning cement materials. The pre-burning section includes a first material inlet, a first circulation inlet and a first circulation outlet. The first material inlet is arranged at the bottom or lower part of the pre-burning section, and the first circulation outlet is arranged at the top or upper part of the pre-burning section. The lower part or bottom of the pre-burning section is provided with a first fuel inlet and a first air distribution inlet for supplying fuel and corresponding air distribution to the pre-burning section.
[0093] The firing section is suitable for firing the cement material from the pre-firing section, the firing section comprises a second material inlet and a second circulation outlet, and the firing section is provided with a second fuel inlet and a second air distribution inlet for supplying fuel and corresponding air distribution to the firing section;
[0094] A separator, wherein the material inlet of the separator is communicated with the first circulation outlet;
[0095] A distributor, the distributor has a first inlet and a first distribution port and a second distribution port communicating with the first inlet, the first inlet communicating with the material outlet of the separator, the first distribution port communicating with the material inlet of the pre-decomposition part via a first material return device, the second distribution port communicating with the second material inlet via a second material return device, and the cement raw material is suitable for entering the pre-decomposition part from the first distribution port;
[0096] The material outlet of the pre-decomposition part is communicated with the first material inlet, and the second circulation outlet is communicated with the first circulation inlet;
[0097] The cooling section is suitable for cooling the cement material from the burning section, and the cooled cement clinker is suitable for being discharged from the cooling section.
[0098] 2. The device according to item 1, wherein:
[0099] The first material inlet and the first circulation inlet are the same inlet;
[0100] The second material inlet is arranged at the top or upper part of the sintering part, the second fuel inlet and the second air distribution inlet are arranged at the top or upper part of the sintering part, and the second circulation outlet is arranged at the bottom or lower part of the sintering part.
[0101] 3. The device according to 2, wherein:
[0102] The cooling part is vertically integrated with the firing part, and the cooling part is located below the firing part;
[0103] A cooling air inlet is provided at the bottom or lower part of the cooling part, and the cooling air inlet is provided below the second circulation outlet. The cooling air inlet constitutes a sorting air inlet, and the cooling air constitutes the sorting air.
[0104] 4. The device according to item 1, wherein:
[0105] The first material returner and the second material returner are independent of each other;
[0106] The first circulation inlet is located between the first material inlet and the first circulation outlet in the height direction;
[0107] The second material inlet is arranged at the lower part or bottom of the sintering part, the second fuel inlet and the second air distribution inlet are arranged at the lower part or bottom of the sintering part, and the second circulation outlet is arranged at the top or upper part of the sintering part.
[0108] 5. The device according to claim 4, wherein:
[0109] The cooling section is independently provided from the sintering section, at least a part of which is located below the sintering section, and the cooling section is connected to the sintering section via a second conveying pipe;
[0110] The second air distribution inlet constitutes the sorting air inlet, and the fuel air distribution in the firing section constitutes the sorting air.
[0111] 6. A cement material processing device, comprising:
[0112] A pre-decomposition part, adapted to perform pre-decomposition treatment on cement raw materials;
[0113] The pre-burning section is suitable for pre-burning cement materials. The pre-burning section includes a first material inlet and a first circulation outlet. The first material inlet is arranged at the bottom or lower part of the pre-burning section. The material outlet of the pre-decomposition section is connected to the first material inlet. The first circulation outlet is arranged at the top or upper part of the pre-burning section. The lower part or bottom of the pre-burning section is provided with a first fuel inlet and a first air distribution inlet for supplying fuel and corresponding air distribution to the pre-burning section.
[0114] The firing section is suitable for firing the cement material from the pre-firing section, the firing section includes a second material inlet and a second material outlet, the bottom edge or lower part of the firing section is provided with a second fuel inlet and a second air distribution inlet for supplying fuel and corresponding air distribution to the firing section, the second material inlet is provided at the lower part or bottom of the firing section, and the second material outlet is provided at the top or upper part of the firing section;
[0115] A separator, wherein the material inlet of the separator is communicated with the first circulation outlet;
[0116] A distributor, the distributor has a first inlet and a first distribution port and a second distribution port communicating with the first inlet, the first inlet communicating with the material outlet of the separator, the first distribution port communicating with the material inlet of the pre-decomposition part via a first material return device, the second distribution port communicating with the second material inlet via a second material return device, and the cement raw material is suitable for entering the pre-decomposition part from the first distribution port;
[0117] a cooling section, adapted to cool the cement material from the burning section, and the cooled cement clinker is adapted to be discharged from the cooling section,
[0118] Wherein: the second material outlet is communicated with the smoke outlet of the separator.
[0119] 7. The device according to 6, wherein:
[0120] The cooling section is independently provided from the sintering section, at least a part of which is located below the sintering section, and the cooling section is connected to the sintering section via a second conveying pipe;
[0121] The second air distribution inlet constitutes the sorting air inlet, and the fuel air distribution in the firing section constitutes the sorting air.
[0122] 8. A cement material processing method based on a cement material processing device, wherein:
[0123] The cement material processing device is a cement material processing device according to any one of 1-5, the method includes forming a first circulation loop of cement material, the first circulation loop includes in sequence: a pre-burning part, a separation part, a distributor, and a pre-decomposition part, and / or the method includes forming a second circulation loop of cement material, the second circulation loop includes in sequence: a pre-burning part, a separation part, a distributor, and a burning part; or
[0124] The cement material processing device is the cement material processing device according to 6 or 7, and the method includes forming a first circulation loop of cement material, and the first circulation loop includes: a pre-burning part, a separation part, a distributor, and a pre-decomposition part in sequence.
[0125] 9. The method according to 8, wherein:
[0126] The temperature of the pre-decomposition treatment is controlled between 800-900°C; and / or
[0127] The temperature of the pre-sintering treatment is controlled between 1000-1200°C; and / or
[0128] The temperature of the sintering process is controlled between 1300-1450°C.
[0129] Based on the above scheme, the present invention can achieve at least one of the following technical effects:
[0130] 1. Temperature matching and energy consumption reduction: by controlling the raw material decomposition reaction, dicalcium silicate (C2S) burning reaction and tricalcium silicate (C3S, clinker) burning reaction in the cement clinker burning process in different regions, the temperature (heat) and chemical reaction process are matched, thereby significantly reducing the energy consumption in the clinker burning area;
[0131] 2. The temperature is uniform and mild, reducing pollution. The main reactions in the cement clinker burning process are carried out in different regions, which further reduces the temperature of the cement high-temperature burning zone, thereby reducing the NOx generated by the high-temperature burning of cement. x Amount generated.
[0132] 3. Fluidized reaction, good heat transfer effect.
[0133] 4. The equipment adopts fluidized structure to reduce floor space.
[0134] 5. Greatly reduce the amount of flue gas entering the clinker burning area, thereby greatly reducing the thermal NO in the clinker burning area x The amount of generated gas avoids the large amount of flue gas in the main burning area and the thermal NO x Technical disadvantages of large generation volume.
[0135] 6. The circulating bed furnace is adopted, with double-sided circulation between the dicalcium silicate (C2S) pre-burning furnace and the raw meal decomposition furnace, and between the dicalcium silicate (C2S) pre-burning furnace and the tricalcium silicate (C3S, clinker) burning furnace, realizing different circulation paths for large particles and powder, realizing multiple circulations of fine particles of materials, thereby extending the circulation and burning time of unburned fine particles and improving the burning quality of cement clinker.
[0136] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes may be made to the embodiments and combinations of elements may be made without departing from the principles and spirit of the invention, the scope of the invention being defined by the appended claims and their equivalents.
Claims
1. A cement material processing device, include: A pre-decomposition part, adapted to perform pre-decomposition treatment on cement raw materials; A pre-burning section is suitable for pre-burning cement materials, the pre-burning section comprises a first material inlet, a first circulation inlet (B) and a first circulation outlet (A1), the first material inlet is arranged at the bottom or lower part of the pre-burning section, the first circulation outlet is arranged at the top or upper part of the pre-burning section, and the lower part or bottom of the pre-burning section is provided with a first fuel inlet and a first air distribution inlet for supplying fuel and corresponding air distribution to the pre-burning section; The firing section is suitable for firing the cement material from the pre-firing section, the firing section comprises a second material inlet and a second circulation outlet (A2), and the firing section is provided with a second fuel inlet and a second air distribution inlet for supplying fuel and corresponding air distribution to the firing section; A separator (22), wherein the material inlet of the separator is connected to the first circulation outlet (A1); A distributor (31), the distributor having a first inlet and a first distribution port and a second distribution port communicating with the first inlet, the first inlet communicating with the material outlet of the separator, the first distribution port communicating with the material inlet of the pre-decomposition part via a first material return device, the second distribution port communicating with the second material inlet of the sintering part via a second material return device (33), and the cement raw material is suitable for entering the pre-decomposition part from the first distribution port; The material outlet of the pre-decomposition part is connected to the first material inlet of the pre-calcination part, and the second circulation outlet (A2) is connected to the first circulation inlet (B); The cooling section is suitable for cooling the cement material from the burning section, and the cooled cement clinker is suitable for being discharged from the cooling section.
2. The device according to claim 1, in: The first material inlet and the first circulation inlet (B) are the same inlet; The second material inlet is arranged at the top or upper part of the sintering part, the second fuel inlet and the second air distribution inlet are arranged at the top or upper part of the sintering part, and the second circulation outlet (A2) is arranged at the bottom or lower part of the sintering part.
3. The device according to claim 2, in: The cooling part is vertically integrated with the firing part, and the cooling part is located below the firing part; A cooling air inlet is provided at the bottom or lower part of the cooling part, and the cooling air inlet is provided below the second circulation outlet (A2). The cooling air inlet constitutes a sorting air inlet, and the cooling air constitutes the sorting air.
4. The device according to claim 1, in: The first material return device (12) and the second material return device (32) are independent material return devices; The first circulation inlet (B) is located between the first material inlet and the first circulation outlet (A1) in the height direction; The second material inlet is arranged at the lower part or bottom of the sintering section, the second fuel inlet and the second air distribution inlet are arranged at the lower part or bottom of the sintering section, and the second circulation outlet (A2) is arranged at the top or upper part of the sintering section.
5. The device according to claim 4, in: The cooling section is independently provided from the sintering section, at least a part of which is located below the sintering section, and the cooling section is connected to the sintering section via a second conveying pipe; The second air distribution inlet constitutes the sorting air inlet, and the fuel air distribution in the firing section constitutes the sorting air.
6. A cement material processing device, include: A pre-decomposition part, adapted to perform pre-decomposition treatment on cement raw materials; The pre-burning section is suitable for pre-burning cement materials. The pre-burning section includes a first material inlet and a first circulation outlet (B). The first material inlet is arranged at the bottom or lower part of the pre-burning section. The material outlet of the pre-decomposition section is connected to the first material inlet of the pre-burning section. The first circulation outlet (B) is arranged at the top or upper part of the pre-burning section. The lower part or bottom of the pre-burning section is provided with a first fuel inlet and a first air distribution inlet for supplying fuel and corresponding air distribution to the pre-burning section. A firing section, suitable for firing the cement material from the pre-firing section, the firing section comprising a second material inlet and a second material outlet (A2), the bottom edge or lower portion of the firing section is provided with a second fuel inlet and a second air distribution inlet for supplying fuel and corresponding air distribution to the firing section, the second material inlet is provided at the lower portion or bottom of the firing section, and the second material outlet is provided at the top or upper portion of the firing section; A separator (22), the material inlet of the separator being in communication with the first circulation outlet; A distributor (31), the distributor having a first inlet and a first distribution port and a second distribution port communicating with the first inlet, the first inlet communicating with the material outlet of the separator (22), the first distribution port communicating with the material inlet of the pre-decomposition part via a first material return device, the second distribution port communicating with the second material inlet via a second material return device (33), and the cement raw material is suitable for entering the pre-decomposition part from the first distribution port; a cooling section, adapted to cool the cement material from the burning section, and the cooled cement clinker is adapted to be discharged from the cooling section, Wherein: the second material outlet (A2) is connected to the flue gas outlet of the separator.
7. The device according to claim 6, in: The cooling section is independently provided from the sintering section, at least a part of which is located below the sintering section, and the cooling section is connected to the sintering section via a second conveying pipe; The second air distribution inlet constitutes the sorting air inlet, and the fuel air distribution in the firing section constitutes the sorting air.
8. A cement material processing method based on a cement material processing device, in: The cement material processing device is a cement material processing device according to any one of claims 1 to 5, the method comprises forming a first circulation loop of cement material, the first circulation loop comprises in sequence: a pre-burning part, a separation part, a distributor, and a pre-decomposition part, and / or the method comprises forming a second circulation loop of cement material, the second circulation loop comprises in sequence: a pre-burning part, a separation part, a distributor, and a burning part; or The cement material processing device is a cement material processing device according to claim 6 or 7, and the method includes forming a first circulation loop of cement material, and the first circulation loop includes: a pre-burning part, a separation part, a distributor, and a pre-decomposition part in sequence.
9. The method according to claim 8, in: The temperature of the pre-decomposition treatment is controlled between 800-900°C; and / or The temperature of the pre-sintering treatment is controlled between 1000-1200°C; and / or The temperature of the sintering process is controlled between 1300-1450°C.