A method for rapid analysis of distribution network fault points based on 5G communication
Through GIS map technology based on 5G communication, the problems of rapid analysis and emergency repair route planning of distribution network fault points are solved, rapid interaction of fault information and rapid planning of emergency repair routes are achieved, and the efficiency and management level of emergency repairs are improved.
Patent Information
- Application Number
- CN202210233473.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-10
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2042-03-10
AI Technical Summary
It is difficult for the existing technology to quickly realize on-site and remote management of distribution network fault points, and combine the rapid planning of navigation routes to reasonably plan navigation route information.
Using a 5G communication method, the power grid equipment operation data is detected through sensors, and the GIS map is used to navigate fault points, equipment maintenance and fault point management, so as to achieve rapid analysis and emergency repair route planning of fault points.
It realizes rapid interaction of distribution network fault information and rapid planning of emergency repair routes, improves the efficiency and management level of emergency repairs, and realizes dynamic management of fault points throughout the life cycle.
Smart Images

Figure CN114660405B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method for rapid analysis of fault points, and in particular to a method for rapid analysis of fault points in a distribution network based on 5G communication. Background Art
[0002] GIS positioning combines geography and cartography as well as remote sensing and computer science, and uses the comprehensive application of inputting, storing, querying, analyzing and displaying geographic data. How to quickly and effectively use the GIS positioning service on the mobile terminal is an important method of this project. Based on the electronic map on the mobile terminal, this project integrates switch archive information and fault indicator archive information, and quickly realizes GIS positioning of the fault switch position by matching keywords with switches and fault information in the automation system; it is difficult for existing technologies to quickly realize the latitude and longitude information of key equipment in the form of dragging, and to realize the on-site and remote marking of fault investigation points at high speed and efficiency. It is also a key technology and difficulty of this project to combine the rapid planning of navigation routes and reasonably plan navigation route information.
[0003] The original power outage repair mostly relied on the personal technical ability of the repair personnel. There was a lack of records of the repair process. The process was only organized through the recollections of key personnel afterwards, and typical cases were formed for dissemination, which restricted the dissemination efficiency of case analysis and experience analysis after the repair. The research results of this project rely on on-site fault location and on-site pictorial and textual feedback. Relevant personnel can use the fault repair tasks to achieve real-time communication, on-site command, result reporting, task archiving and auxiliary management of the entire life cycle of fault repair. This project provides a closed-loop management process for fault tasks for fault repair, which truly solves problems for front-line personnel on site and improves the level of management personnel. This is the difficulty to be solved and broken through in this project. Summary of the invention
[0004] In view of the problem that the prior art of the above technical solution is difficult to quickly realize the latitude and longitude information marking of key equipment in the form of dragging, and to realize the on-site marking and remote marking of fault investigation points at a high speed and effectively, and to combine the rapid planning of navigation routes and the reasonable planning of navigation route information, the present invention provides a method for rapid analysis of distribution network fault points based on 5G communication.
[0005] The technical solution adopted by the present invention to solve its technical problem is: a method for quickly analyzing and judging the fault point of a distribution network based on 5G communication, the operation data of the power grid equipment is detected by the corresponding sensor, the sensor is connected to the control console through the 5G communication network, the control console is connected to the mobile alarm terminal through the communication network, and the control console has a built-in GIS map, including the following steps:
[0006] Step 1: Initialize the GIS map and import the required monitoring targets and corresponding sensors and road data;
[0007] Step 2: configure the targets directly monitored by the sensor on the GIS map, and configure the targets monitored by combining the sensor detection data on the GIS map;
[0008] Step 3: Establish a fault detection model and configure the monitoring targets in the fault detection model on the GIS map;
[0009] Step 4: According to manual repair reports and sensor feedback, determine the power grid fault point and execute sub-steps including fault point navigation steps, equipment maintenance steps and fault point management according to needs.
[0010] Preferably, in step four, first determine whether the target directly monitored by the sensor has a fault. If so, obtain the fault point and mark it. Then determine whether the monitoring target monitored after the sensor detection data are combined with each other. If so, obtain the fault point and mark it. Again, import the sensor data into the fault detection model, determine whether there is a fault based on the calculation of the fault detection model. If so, obtain the fault point and mark it. Finally, all the fault points are fed back together.
[0011] Preferably, the fault point navigation step includes the following sub-steps:
[0012] A1. Read the fault point and fault type on the GIS map;
[0013] A2. Update the available roads on the GIS map according to the fault points and fault types;
[0014] A3. Determine the processing order according to the fault point and fault type, and then list all available roads between the fault points and the roads required to reach the first fault point according to the processing order to form several processing solutions;
[0015] A4. Comprehensively calculate the resources required for all treatment plans, select the one that requires the least resources as the navigation plan, and select the one that requires the second least resources as the backup plan.
[0016] Preferably, the comprehensive calculation in step A4 refers to weighted conversion data including the quantity of materials, route distance, and time required in the processing plan.
[0017] Preferably, the equipment maintenance step includes the following sub-steps:
[0018] B1. Update the available roads on the GIS map according to the maintenance method of the monitoring target of this maintenance;
[0019] B2. According to the processing order of the monitoring targets of this maintenance, all available roads between the fault points and the roads required to reach the first fault point are listed in the processing order to form several processing plans;
[0020] B3. Comprehensively calculate the resources required for all treatment plans and select the one that requires the least resources as the maintenance plan;
[0021] B4. Update the monitoring target status of this maintenance on the GIS map according to the specific maintenance operations.
[0022] Preferably, the fault point management includes fault point investigation, fault location positioning, fault repair and execution tracking, and fault archiving.
[0023] Preferably, in step four, the automation system fault information is studied and dynamic management of the power outage fault throughout its life cycle is achieved through fault information push, fault site location, fault process tracking, and fault problem archiving.
[0024] The substantial effect of the present invention is: based on the research on the interaction of electronic maps under the mobile GIS positioning technology, the interaction of electronic maps under the GIS positioning technology is studied and analyzed, and the analysis and research on the application technologies such as distribution network fault information interaction, emergency repair routes, and rapid planning are quickly realized. According to the fault information of the automation system, this project studies and realizes the dynamic management of the whole life cycle of power outage faults through the forms of fault information push, fault site location, fault process tracking, and fault problem archiving, and realizes fault point exploration feedback, fault location location, fault repair and execution tracking, and fault archiving. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 , is a schematic diagram of an overall process of this embodiment;
[0026] Figure 2 , is a flow chart of the fault point navigation steps in this embodiment;
[0027] Figure 3 , is a flow chart of the equipment maintenance steps in this embodiment. DETAILED DESCRIPTION
[0028] The technical solution of the present invention is further described in detail below through specific embodiments.
[0029] Embodiment 1:
[0030] A method for rapid analysis of distribution network fault points based on 5G communication (see Appendix Figure 1), the power grid equipment operation data is detected by the corresponding sensor, the sensor is connected to the control console through the 5G communication network, the control console is connected to the mobile alarm terminal through the communication network, and the control console has a built-in GIS map, including the following steps:
[0031] Step 1: Initialize the GIS map and import the required monitoring targets and corresponding sensors and road data;
[0032] Step 2: configure the targets directly monitored by the sensor on the GIS map, and configure the targets monitored by combining the sensor detection data on the GIS map;
[0033] Step 3: Establish a fault detection model and configure the monitoring targets in the fault detection model on the GIS map;
[0034] Step 4: According to manual repair reports and sensor feedback, determine the power grid fault point and execute sub-steps including fault point navigation steps, equipment maintenance steps and fault point management according to needs.
[0035] In step 4, first determine whether the target directly monitored by the sensor has a fault. If there is a fault, obtain the fault point and mark it. Then determine whether the monitoring target monitored by the sensor detection data is faulty after being combined with each other. If there is a fault, obtain the fault point and mark it. Then, import the sensor data into the fault detection model, determine whether there is a fault according to the calculation of the fault detection model, and if there is a fault, obtain the fault point and mark it. Finally, all the fault points are fed back together. In step 4, the automation system fault information is studied and the full life cycle dynamic management of power outage faults is realized through fault information push, fault site location, fault process tracking, and fault problem archiving.
[0036] The original power outage repair mostly relies on the personal technical ability of the repair personnel. The repair process lacks records. The process is only organized through the recollections of key personnel afterwards, and typical cases are formed for dissemination, which restricts the dissemination efficiency of case analysis and experience analysis after the repair. This embodiment relies on manual on-site fault location and on-site picture and text feedback. It can also make the controller make a preliminary judgment on the fault based on the feedback of sensors (including meters). Then the relevant personnel can realize the dynamic management of the whole life cycle of fault repair through real-time communication, on-site command, result reporting, task archiving and auxiliary management through the fault repair task. When the sensor and manual repair are reported, a mobile terminal or monitor can be used to upload the on-site data and content in a combined manner. According to the on-site situation, the console can realize the on-site staff to carry out construction repair on the spot through the GIS map, and the backstage support personnel can cooperate in the backstage to achieve the repair goal. At the same time, the steps, content and gains and losses of the repair are recorded. The recorded content can provide further guidance in the next repair process, thereby forming a positive incentive. In this embodiment, the mobile terminal used can be a smart phone or other terminal device connected to the console. The connection between the terminal device and the console needs to be connected through a gateway. The terminal device needs to include at least voice call, photo taking and positioning functions.
[0037] The fault point navigation step includes the following sub-steps (see Appendix Figure 2 ):
[0038] A1. Read the fault point and fault type on the GIS map;
[0039] A2. Update the available roads on the GIS map according to the fault points and fault types;
[0040] A3. Determine the processing order according to the fault point and fault type, and then list all available roads between the fault points and the roads required to reach the first fault point according to the processing order to form several processing solutions;
[0041] A4. Comprehensively calculate the resources required for all treatment plans, select the one that requires the least resources as the navigation plan, and select the one that requires the second least resources as the backup plan.
[0042] The comprehensive calculation in step A4 refers to the weighted conversion data of the quantity of materials, route distance, and time required in the treatment plan. For example, in the treatment plan, it can be manually set that the weighted value of the quantity of materials required is 0.1, the weighted value of the route distance is 0.3, and the weighted value of the time spent is 0.6. The quantity of materials required is measured by weight. According to daily statistics, a conversion function is established with the average number of materials required for a single maintenance as the center. The result value range of the conversion function is set to 0 to 1. The average number of materials required for a single maintenance is 0.5. The conversion value of the materials required in the current plan is calculated and multiplied by the weighted value. Similarly, according to daily statistics, the average number of materials required for a single maintenance is used as the center. A conversion function is established with the distance of a single maintenance route as the center. The result value range of the conversion function is set to 0 to 1. The average value of the distance of a single maintenance route is 0.5. The conversion value of the required distance in the current solution is calculated and multiplied by the weighted value. According to daily statistics, a conversion function is established with the average time required for a single maintenance as the center. The result value range of the conversion function is set to 0 to 1. The average time required for a single maintenance is 0.5. The conversion value of the time required in the current solution is calculated and multiplied by the weighted value. The three weighted values are added together and the data with the smallest value is selected. In the above scheme, the conversion function can be selected in the form of a normal distribution function, a bell-shaped membership function, etc.
[0043] The equipment maintenance step includes the following sub-steps (see Appendix Figure 3 ):
[0044] B1. Update the available roads on the GIS map according to the maintenance method of the monitoring target of this maintenance;
[0045] B2. According to the processing order of the monitoring targets of this maintenance, all available roads between the fault points and the roads required to reach the first fault point are listed in the processing order to form several processing plans;
[0046] B3. Comprehensively calculate the resources required for all treatment plans and select the one that requires the least resources as the maintenance plan;
[0047] B4. Update the monitoring target status of this maintenance on the GIS map according to the specific maintenance operations.
[0048] The fault point management includes fault point investigation, fault location positioning, fault repair and execution tracking, and fault archiving.
[0049] In this embodiment, based on the research and analysis of electronic map interaction under mobile GIS positioning technology, the electronic map interaction under GIS positioning technology is quickly realized to analyze and study the application technologies such as distribution network fault information interaction, emergency repair routes, and rapid planning. According to the fault information of the automation system, this project studies and realizes the dynamic management of the whole life cycle of power outages through fault information push, fault site location, fault process tracking, and fault problem archiving, and realizes fault point investigation feedback, fault location location, fault repair and execution tracking, and fault archiving.
[0050] The above-described embodiment is only a preferred solution of the present invention and does not limit the present invention in any form. There are other variations and modifications without exceeding the technical solution described in the claims.
Claims
1. A method for rapid analysis of distribution network fault points based on 5G communication, characterized in that: The operation data of the power grid equipment is detected by the corresponding sensor, and the sensor is connected to the control console through the 5G communication network. The control console is connected to the mobile 2 alarm terminal through the communication network. The control console has a built-in GIS map, including the following steps: Step 1: Initialize the GIS map and import the required monitoring targets and corresponding sensors and road data; Step 2: configure the targets directly monitored by the sensor on the GIS map, and configure the targets monitored by combining the sensor detection data on the GIS map; Step 3: Establish a fault detection model and configure the monitoring targets in the fault detection model on the GIS map; Step 4: According to manual repair reports and sensor feedback, determine the grid fault point and execute sub-steps including fault point navigation steps, equipment maintenance steps and fault point management according to needs; In the step 4, firstly, it is determined whether the target directly monitored by the sensor has a fault. If a fault exists, the fault point is obtained and marked. Then, it is determined whether the monitoring target monitored by combining the sensor detection data has a fault. If a fault exists, the fault point is obtained and marked. Then, the sensor data is imported into the fault detection model. It is determined whether a fault exists according to the calculation of the fault detection model. If a fault exists, the fault point is obtained and marked. Finally, all the fault points are fed back together. The fault point navigation step includes the following sub-steps: A1. Read the fault point and fault type on the GIS map; A2. Update the available roads on the GIS map according to the fault points and fault types; A3. Determine the processing order according to the fault point and fault type, and then list all available roads between the fault points and the roads required to reach the first fault point according to the processing order to form several processing solutions; A4. Comprehensively calculate the resources required for all treatment plans, select the one that requires the least resources as the navigation plan, and select the one that requires the second least resources as the backup plan; The comprehensive calculation in step A4 refers to the weighted conversion data including the quantity of materials, route distance, and time required in the processing plan; The equipment maintenance step includes the following sub-steps: B1. Update the available roads on the GIS map according to the maintenance method of the monitoring target of this maintenance; B2. According to the processing order of the monitoring targets of this maintenance, all available roads between the fault points and the roads required to reach the first fault point are listed in the processing order to form several processing plans; B3. Comprehensively calculate the resources required for all treatment plans and select the one that requires the least resources as the maintenance plan; B4. Update the monitoring target status of this maintenance on the GIS map according to the specific maintenance operations.
2. According to the method for rapid analysis of distribution network fault points based on 5G communication according to claim 1, it is characterized in that: The fault point management includes fault point investigation, fault location positioning, fault repair and execution tracking, and fault archiving.
3. The method for rapid analysis of distribution network fault points based on 5G communication according to claim 2 is characterized in that: In step 4, the automation system fault information is studied and the full life cycle dynamic management of the power outage fault is achieved through fault information push, fault site location, fault process tracking, and fault problem archiving.
Citation Information
Patent Citations
Transmission line fault location, equipment information query and navigation system and method
CN107271843A
Distribution network repair assistant decision-making and intelligent management and control system
CN110289682A