A construction method for preventing arch tunnel cracking

By using sealing plates and a motor-driven eccentric wheel system in tunnel construction, the problem of cracking in the arch of railway tunnels was solved, improving the quality of concrete pouring and construction safety.

CN114687767BActive Publication Date: 2024-11-15CHINA RAILWAY 16TH BUREAU GRP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210336369.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-31
Publication Date
2024-11-15
Estimated Expiration
2042-03-31

AI Technical Summary

Technical Problem

In railway tunnel construction, arch cracking, rockfall, and invert arch bulging are the main safety hazards, which are difficult to effectively solve with existing technologies.

Method used

The molding and limiting equipment, including sealing plates, clamping plates and motor-driven eccentric wheel system, improves the fullness and pouring quality of concrete through vibration and gas flow, and reduces hollow sounds and honeycomb pitting.

Benefits of technology

It effectively reduces air bubbles and honeycomb pitting in the concrete inside the tunnel, improves the fullness of the concrete, prevents cracking in the arch, and ensures construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114687767B_ABST
    Figure CN114687767B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of tunnel construction, specifically, a construction method for preventing cracks in the arched part of a tunnel, S1: first customize the top curvature and corresponding quantity of the forming limit device corresponding to the curvature of the tunnel according to the type and length of the tunnel; S2: during installation, first install and lay the blocking plate on the inner wall of the tunnel from both sides to the arch through the bracket, and then install a circle of clamping plates along the arc of the tunnel on the back of the blocking plate, and clamp the clamping plates at the same time, and then pour the top of the blocking plate 1; S3: after the tunnel is poured with concrete, remove the clamping plate, and then disassemble the blocking plate from the arch downwards on both sides in turn, and collect and fix the blocking plate after disassembly. The concrete poured on the top of the blocking plate can be tamped to reduce the bubbles inside the concrete, thereby improving the quality of concrete pouring inside the tunnel, reducing the generation of empty sounds and honeycomb surfaces, and improving the fullness of the concrete inside the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel construction, in particular to a construction method for preventing cracking of an arch tunnel. Background Art

[0002] Railway tunnel construction is to first dig a tunnel, and then pour cement and other filling materials into the tunnel for fixation and protection.

[0003] A Chinese patent with publication number CN112392502A discloses a tunnel construction method, comprising: S1: constructing the tunnel (1) between the first point (4) and the second point (5), so that the tunnel (1) extends upward from the first point (4) to the second point (5) in a manner in which steep slope sections (2) and gentle slope sections (3) are alternately distributed.

[0004] According to the research conducted by the relevant railway departments, the biggest safety hazard in railway tunnel operation is arch cracking, block falling and arch bulging. The main reasons for the cracking and block falling are the rigid extrusion of the trolley at the construction joint, the cutting of the cantilever end of the water stop at the construction joint, cold joints in concrete construction, incomplete concrete, empty sounds caused by bubbles inside the concrete during pouring, honeycomb surface and other problems.

[0005] To this end, the present invention provides a construction method for preventing cracking of an arch tunnel. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0007] The technical solution adopted by the present invention to solve the technical problem is: a construction method for preventing cracking of an arch tunnel described in the present invention comprises:

[0008] S1: First, customize the top curvature and corresponding quantity of the forming limit device corresponding to the curvature of the tunnel according to the type and length of the tunnel;

[0009] S2: During installation, the blocking plate is first installed and laid on the inner wall of the tunnel from both sides to the arch through the bracket, and then a circle of pressing plates is installed along the arc of the tunnel on the back of the blocking plate, and the pressing plates are pressed at the same time, and then the top of the blocking plate 1 can be poured;

[0010] S3: After the tunnel is poured with concrete, remove the compression plate, and then remove the blocking plates from both sides from the top of the arch downwards. After removal, collect and fix the blocking plates.

[0011] Furthermore, the number of customized forming limit devices in S1 needs to be 5% more than the expected usage; by producing more sealing plates, when installing the sealing plates inside the tunnel, the holes left by accidentally damaged sealing plates can be promptly filled to ensure the normal progress of the construction.

[0012] Furthermore, the forming limit device in S1 includes a sealing plate; a cavity is opened inside the sealing plate; a motor is installed inside the cavity; a rotating rod is provided inside the cavity; multiple groups of support frames are sleeved in the middle of the rotating rod; the rotating rod is rotatably connected to the middle of the support frame; a spring is installed between the support frame and the inner wall of the cavity; a flexible shaft is connected between the end of the rotating rod and the output end of the motor; an eccentric wheel is fixedly connected to the middle of the rotating rod; during the installation of the sealing plate, it is necessary to assemble multiple sealing plates together, and at the same time, it is necessary to make the spliced ​​sealing plates fit tightly, and then turn on the motor inside the cavity so that the motor drives the rotating rod and the eccentric wheel to rotate inside the sealing plate through the flexible shaft, at which time the rotating eccentric wheel will vibrate, and the vibration generated by the eccentric wheel can be transmitted to the sealing plate through the rotating rod, the support frame and the spring, at which time the concrete poured on the top of the sealing plate can be tamped, reducing the bubbles inside the concrete, thereby improving the concrete pouring quality inside the tunnel, reducing the generation of empty sounds and honeycombed surfaces, and improving the fullness of the concrete inside the tunnel.

[0013] Furthermore, a fan blade is provided in the middle of the rotating rod; the fan blade is fixedly connected to the rotating rod; by installing the fan blade in the middle of the rotating rod, the fan blade can be driven to rotate simultaneously when the rotating rod rotates. Since the motor is installed inside the cavity and generates a large amount of heat, the heat is difficult to dissipate effectively. At this time, the rotation of the fan blade will drive the gas flow inside the cavity, so that the gas near the motor will also flow. Part of the gas is discharged through the vent holes connected between the cavity and the sealing plate, thereby reducing the heat of the motor and ensuring that the long-term vibration of the sealing plate does not affect the concrete inside the tunnel; at the same time, the air inside the cavity can circulate, which can keep the cavity dry and reduce corrosion problems such as rust on the parts inside the cavity due to long-term presence of moisture on the surface.

[0014] Furthermore, a drainage tube is sleeved in the middle of the rotating rod; the support frame and the drainage tube are connected by a connecting rod; the position of the drainage tube corresponds to the fan blade; by sleeved with the drainage tube in the middle of the rotating rod, the gas flow driven by the fan blade can be made more stable; at the same time, the vibration of the eccentric wheel can cause the drainage tube to swing, and by lifting the weight of the rotating rod and the support frame, the amplitude of the sealing plate can be made more stable.

[0015] Furthermore, a plurality of groups of support rods are fixedly connected to the middle part of the rotating rod; a first magnet is provided at the end of each support rod; a pull rope is connected between the first magnet and the end of the support rod; by providing a support rod and a first magnet in the middle part of the rotating rod, when the rotating rod rotates, the support rod, the first magnet and the pull rope can be driven to rotate inside the drainage tube, and at this time, the rotating support rod, the first magnet and the pull rope can break up the airflow flowing through the drainage tube, and at the same time, if there is a large amount of moisture inside the cavity, the water droplets inside the gas flowing through the drainage tube will be broken up by the support rod, the first magnet and the pull rope, so that the drying speed inside the cavity is faster.

[0016] Furthermore, a first elastic bracket is fixedly connected to the inner wall of the sealing plate; a second magnet is fixedly connected to the middle of the first elastic bracket; the position of the second magnet corresponds to the position of the first magnet; by arranging the first elastic bracket and the second magnet on the inner wall of the cavity, the first magnet can intermittently approach and move away from the second magnet when it rotates, and the second magnet will shake on the inner wall of the cavity. The vibration of the second magnet will increase the vibration frequency of the sealing plate, thereby improving the vibration effect of the sealing plate on the concrete, further reducing the empty sound and honeycombed surface inside the concrete, and improving the flatness of the concrete surface.

[0017] Furthermore, a pair of third magnets is provided between the positions where the two second magnets are close to each other; a second elastic bracket is connected between the third magnet and the adjacent first elastic bracket; the third magnets close to each other are set to repel each other; by providing the third magnet in the middle of the first elastic bracket, when the first elastic bracket vibrates, the third magnet can swing under the support of the second elastic bracket, and at the same time, due to the mutual repulsion of the third magnet, the third magnet will produce a larger swing between the second magnets, thereby increasing the swing amplitude of the third magnet, further increasing the vibration frequency of the sealing plate, and improving the fullness of the concrete on the top of the sealing plate.

[0018] Furthermore, a guide plate is fixedly connected to the middle part of the rotating rod at a position away from the motor; the guide plate has a concave side arranged toward the fan blades; by providing the guide plate in the middle part of the rotating rod, the gas flowing through the guide tube can be guided, so that the gas flow direction inside the cavity is more stable, and at the same time, the gas flowing inside the cavity can impact the second magnet and the third magnet, reducing the impurities remaining on the second magnet and the third magnet, thereby improving the swing stability of the second magnet and the third magnet.

[0019] Furthermore, a wind guide plate is fixedly connected to the side wall of the guide plate; the wind guide plate is arranged on the side of the guide plate close to the fan blade; by providing the wind guide plate on the guide plate, the wind guide plate can guide the gas inside the cavity, so that the gas impacting the guide plate flows to the boundary of the guide plate faster. This setting can increase the gas flow rate inside the cavity, thereby further ensuring the swing stability of the second magnet and the third magnet.

[0020] The beneficial effects of the present invention are as follows:

[0021] 1. In the construction method for preventing cracking of an arch tunnel described in the present invention, the vibration generated by the eccentric wheel can be transmitted to the sealing plate through the rotating rod, the support frame and the spring. At this time, the concrete poured on the top of the sealing plate can be tamped to reduce the bubbles inside the concrete, thereby improving the concrete pouring quality inside the tunnel, reducing the generation of empty sounds and honeycombed surfaces, and improving the fullness of the concrete inside the tunnel.

[0022] 2. The construction method for preventing cracking of an arch tunnel described in the present invention provides a support rod and a first magnet in the middle of the rotating rod. When the rotating rod rotates, the support rod, the first magnet and the pull rope can be driven to rotate inside the drainage tube. At this time, the rotating support rod, the first magnet and the pull rope can break up the airflow flowing through the drainage tube. At the same time, if there is a large amount of moisture inside the cavity, the water droplets inside the gas flowing through the drainage tube will be broken up by the support rod, the first magnet and the pull rope, so that the drying speed inside the cavity is faster. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention will be further described below in conjunction with the accompanying drawings.

[0024] Figure 1 It is a flow chart of the construction method of the present invention;

[0025] Figure 2 It is a diagram of a blocking plate of the present invention;

[0026] Figure 3 is a cross-sectional view of the blocking plate in the present invention;

[0027] Figure 4 yes Figure 3 A partial enlarged view of the middle part;

[0028] Figure 5 It is a schematic diagram of the matching structure of two swing bars in the present invention;

[0029] Figure 6 It is a schematic diagram of the structure of the guide plate;

[0030] In the figure: 1. blocking plate; 11. cavity; 12. motor; 13. rotating rod; 14. supporting frame; 15. flexible shaft; 16. eccentric wheel; 2. fan blades; 3. drainage tube; 4. supporting rod; 41. first magnet; 42. pull rope; 5. first elastic bracket; 51. second magnet; 6. third magnet; 61. second elastic bracket; 7. guide plate; 8. wind guide plate. DETAILED DESCRIPTION

[0031] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0032] Embodiment 1

[0033] like Figure 1 As shown, a construction method for preventing cracking of an arch tunnel according to an embodiment of the present invention comprises:

[0034] S1: First, customize the top curvature and corresponding quantity of the forming limit device corresponding to the curvature of the tunnel according to the type and length of the tunnel;

[0035] S2: During installation, the blocking plate 1 is first installed and laid on the inner wall of the tunnel from both sides to the arch through the bracket, and then a circle of pressing plates is installed on the back of the blocking plate 1 along the arc of the tunnel, and the pressing plates are pressed at the same time, and then the top of the blocking plate 1 can be poured;

[0036] S3: After the tunnel is poured with concrete, the pressing plate is removed, and then the blocking plates 1 are disassembled from both sides from the arch downwards in sequence. After the disassembly is completed, the blocking plates 1 are collected and fixed.

[0037] The number of customized forming limit devices in S1 needs to be 5% more than the expected usage; by producing a larger portion of the plugging plates 1, when the plugging plates 1 are installed inside the tunnel, the holes left by the accidentally damaged plugging plates 1 can be promptly filled to ensure the normal progress of the construction.

[0038] like Figure 2-5 As shown, the forming limiting device in S1 includes a blocking plate 1; a cavity 11 is opened inside the blocking plate 1; a motor 12 is installed inside the cavity 11; a rotating rod 13 is provided inside the cavity 11; a plurality of support frames 14 are sleeved in the middle of the rotating rod 13; the rotating rod 13 is rotatably connected to the middle of the support frame 14; a spring is installed between the support frame 14 and the inner wall of the cavity 11; a flexible shaft 15 is connected to the end of the rotating rod 13 and the output end of the motor 12; an eccentric wheel 16 is fixedly connected to the middle of the rotating rod 13; during the installation of the blocking plate 1, multiple blocking plates 1 need to be assembled together, and the same When the plugging plates 1 are connected, it is necessary to make the spliced ​​plugging plates 1 fit tightly, and then turn on the motor 12 inside the cavity 11, so that the motor 12 drives the rotating rod 13 and the eccentric wheel 16 to rotate inside the plugging plate 1 through the flexible shaft 15. At this time, the rotating eccentric wheel 16 will vibrate. At this time, the vibration generated by the eccentric wheel 16 can be transmitted to the plugging plate 1 through the rotating rod 13, the support frame 14 and the spring. At this time, the concrete poured on the top of the plugging plate 1 can be tamped to reduce the bubbles in the concrete, thereby improving the concrete pouring quality inside the tunnel, reducing the generation of empty sounds and honeycombed surfaces, and improving the fullness of the concrete inside the tunnel.

[0039] A fan blade 2 is provided in the middle of the rotating rod 13; the fan blade 2 is fixedly connected to the rotating rod 13; by installing the fan blade 2 in the middle of the rotating rod 13, when the rotating rod 13 rotates, the fan blade 2 can be driven to rotate at the same time. Because the motor 12 is installed inside the cavity 11, the heat generated is relatively large, and the heat is difficult to dissipate effectively. At this time, the rotation of the fan blade 2 will drive the gas flow inside the cavity 11, so that the gas near the motor 12 will also flow, and part of the gas will be discharged through the vent hole connected between the cavity 11 and the sealing plate 1, thereby reducing the heat of the motor 12 and ensuring that the long-term vibration of the sealing plate 1 does not affect the concrete inside the tunnel; at the same time, the air inside the cavity 11 can circulate, which can keep the cavity 11 dry and reduce the corrosion problems such as rust on the parts inside the cavity 11 due to the long-term presence of moisture on the surface.

[0040] A drainage tube 3 is sleeved in the middle of the rotating rod 13; the support frame 14 is connected to the drainage tube 3 by a connecting rod; the position of the drainage tube 3 corresponds to the fan blade 2; by sleeved with the drainage tube 3 in the middle of the rotating rod 13, the gas flow driven by the fan blade 2 can be made more stable; at the same time, the vibration of the eccentric wheel 16 can cause the drainage tube 3 to swing, and by lifting the weight of the rotating rod 13 and the support frame 14, the amplitude of the sealing plate 1 can be made more stable.

[0041] A plurality of groups of support rods 4 are fixedly connected to the middle of the rotating rod 13; a first magnet 41 is provided at the end of each support rod 4; a pull rope 42 is connected between the first magnet 41 and the end of the support rod 4; by providing the support rod 4 and the first magnet 41 in the middle of the rotating rod 13, when the rotating rod 13 rotates, the support rod 4, the first magnet 41 and the pull rope 42 can be driven to rotate inside the drainage tube 3, at this time, the rotating support rod 4, the first magnet 41 and the pull rope 42 can break up the airflow flowing through the drainage tube 3, and at the same time, if there is a large amount of moisture inside the cavity 11, the water droplets inside the gas flowing through the drainage tube 3 will be broken up by the support rod 4, the first magnet 41 and the pull rope 42, so that the drying speed inside the cavity 11 is faster.

[0042] A first elastic bracket 5 is fixedly connected to the inner wall of the sealing plate 1; a second magnet 51 is fixedly connected to the middle of the first elastic bracket 5; the position of the second magnet 51 corresponds to the position of the first magnet 41; by arranging the first elastic bracket 5 and the second magnet 51 on the inner wall of the cavity 11, the first magnet 41 can intermittently approach and move away from the second magnet 51 when rotating, and the second magnet 51 will shake on the inner wall of the cavity 11 at this time. The vibration of the second magnet 51 will increase the vibration frequency of the sealing plate 1, thereby improving the vibration effect of the sealing plate 1 on the concrete, further reducing the empty sound and honeycombed surface inside the concrete, and improving the flatness of the concrete surface.

[0043] A pair of third magnets 6 is provided between the positions where the two second magnets 51 are close to each other; a second elastic bracket 61 is connected between the third magnet 6 and the adjacent first elastic bracket 5; the third magnets 6 close to each other are set to repel each other; by providing the third magnet 6 in the middle part of the first elastic bracket 5, when the first elastic bracket 5 vibrates, the third magnet 6 can swing under the support of the second elastic bracket 61, and at the same time, due to the mutual repulsion of the third magnet 6, the third magnet 6 will produce a larger swing between the second magnets 51, thereby increasing the swing amplitude of the third magnet 6, further increasing the vibration frequency of the sealing plate 1, and improving the fullness of the concrete on the top of the sealing plate 1.

[0044] Embodiment 2

[0045] like Figure 6As shown, compared with Example 1, another implementation of the present invention is that a guide plate 7 is fixedly connected to the middle of the rotating rod 13 at a position away from the motor 12; the guide plate 7 has a concave side arranged toward the fan blade 2; by providing a guide plate 7 in the middle of the rotating rod 13, the gas flowing through the guide tube 3 can be guided, so that the gas flow direction inside the cavity 11 is more stable, and at the same time, the gas flowing inside the cavity 11 can impact the second magnet 51 and the third magnet 6, reducing the impurities remaining on the second magnet 51 and the third magnet 6, thereby improving the swing stability of the second magnet 51 and the third magnet 6.

[0046] A wind guide plate 8 is fixedly connected to the side wall of the guide plate 7; the wind guide plate 8 is arranged on the side of the guide plate 7 close to the fan blade 2; by arranging the wind guide plate 8 on the guide plate 7, the wind guide plate 8 can guide the gas inside the cavity 11, so that the gas impacting the guide plate 7 flows to the boundary of the guide plate 7 faster. This setting can increase the gas flow rate inside the cavity 11, thereby further ensuring the swing stability of the second magnet 51 and the third magnet 6.

[0047] During operation, during the process of installing the blocking plate 1, it is necessary to assemble multiple blocking plates 1 together, and at the same time, it is necessary to make the spliced ​​blocking plates 1 fit tightly, and then turn on the motor 12 inside the cavity 11, so that the motor 12 drives the rotating rod 13 and the eccentric wheel 16 to rotate inside the blocking plate 1 through the flexible shaft 15, and the rotating eccentric wheel 16 will generate vibration at this time. At this time, the vibration generated by the eccentric wheel 16 can be transmitted to the blocking plate 1 through the rotating rod 13, the support frame 14 and the spring, and the concrete poured on the top of the blocking plate 1 can be tamped at this time, reducing the bubbles in the concrete, thereby improving the concrete pouring quality inside the tunnel, reducing the generation of empty sounds and honeycombed surfaces, and improving The fullness of the concrete inside the tunnel; by installing the fan blade 2 in the middle of the rotating rod 13, the fan blade 2 can be driven to rotate at the same time when the rotating rod 13 rotates. Because the motor 12 is installed inside the cavity 11, the heat generated is relatively large, and the heat is difficult to dissipate effectively. At this time, the rotation of the fan blade 2 will drive the gas inside the cavity 11 to flow, so that the gas near the motor 12 will also flow, and part of the gas will be discharged through the vent hole connected between the cavity 11 and the sealing plate 1, thereby reducing the heat of the motor 12 and ensuring that the long-term vibration of the sealing plate 1 does not stir the concrete inside the tunnel; at the same time, the air inside the cavity 11 can circulate, so that the inside of the cavity 11 can be kept dry, reducing The parts inside the cavity 11 are less likely to be rusted or otherwise corroded due to the presence of moisture on the surface for a long time; by sleeved with a drainage tube 3 in the middle of the rotating rod 13, the gas flow driven by the fan blades 2 can be made more stable; at the same time, the vibration of the eccentric wheel 16 can cause the drainage tube 3 to swing, and the amplitude of the blocking plate 1 can be made more stable by lifting the weight of the rotating rod 13 and the support frame 14; by arranging a support rod 4 and a first magnet 41 in the middle of the rotating rod 13, the support rod 4, the first magnet 41 and the pull rope 42 can be driven to rotate inside the drainage tube 3 when the rotating rod 13 rotates. At this time, the rotating support rod 4, the first magnet 41 and the pull rope 42 can break up the airflow passing through the drainage tube 3. At the same time, if When there is a large amount of moisture inside the cavity 11, the water droplets inside the gas flowing through the drainage tube 3 will be dispersed by the support rod 4, the first magnet 41 and the pull rope 42, so that the drying speed inside the cavity 11 is faster; by providing the first elastic bracket 5 and the second magnet 51 on the inner wall of the cavity 11, the first magnet 41 can intermittently approach and move away from the second magnet 51 when rotating, and the second magnet 51 will shake on the inner wall of the cavity 11. The vibration of the second magnet 51 will increase the vibration frequency of the sealing plate 1, thereby improving the vibration effect of the sealing plate 1 on the concrete, further reducing the empty sound and honeycomb surface inside the concrete, and improving the flatness of the concrete surface;By providing the third magnet 6 in the middle of the first elastic bracket 5, when the first elastic bracket 5 vibrates, the third magnet 6 can swing under the support of the second elastic bracket 61. At the same time, due to the mutual repulsion of the third magnet 6, the third magnet 6 will produce a larger swing between the second magnets 51, thereby increasing the swing amplitude of the third magnet 6, further increasing the vibration frequency of the sealing plate 1, and improving the fullness of the concrete on the top of the sealing plate 1. By providing a guide plate 7 in the middle of the rotating rod 13, the gas flowing through the guide tube 3 can be guided, so that the gas flow direction inside the cavity 11 is more stable. At the same time, the gas flowing inside the cavity 11 can impact the second magnet 51 and the third magnet 6, reducing the impurities remaining on the second magnet 51 and the third magnet 6, thereby improving the swing stability of the second magnet 51 and the third magnet 6; by providing an air guide plate 8 on the guide plate 7, the air guide plate 8 can guide the gas inside the cavity 11, so that the gas impacting the guide plate 7 flows to the boundary of the guide plate 7 faster. This setting can increase the gas flow rate inside the cavity 11, thereby further ensuring the swing stability of the second magnet 51 and the third magnet 6. ;

[0048] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0049] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.

[0050] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A construction method for preventing cracking of an arch tunnel, characterized in that: include S1: First, customize the top curvature and corresponding quantity of the forming limit device corresponding to the curvature of the tunnel according to the type and length of the tunnel; S2: During installation, the plugging plate (1) is first installed and laid on the inner wall of the tunnel from both sides to the arch through the bracket, and then a circle of pressing plates is installed on the back of the plugging plate (1) along the arc of the tunnel, and the pressing plates are pressed at the same time, and then the top of the plugging plate (1) can be poured; S3: After the tunnel is poured with concrete, the pressing plate is removed, and then the blocking plates (1) are removed from both sides from the top of the arch downwards in sequence. After the removal is completed, the blocking plates (1) are collected and fixed; The number of customized plugging plates (1) in S1 needs to be 5% more than the expected usage; The forming limiting device in S1 comprises a blocking plate (1); a cavity (11) is provided inside the blocking plate (1); a motor (12) is installed inside the cavity (11); a rotating rod (13) is provided inside the cavity (11); a plurality of support frames (14) are sleeved in the middle of the rotating rod (13); the rotating rod (13) is rotatably connected to the middle of the support frame (14); a spring is installed between the support frame (14) and the inner wall of the cavity (11); a flexible shaft (15) is connected between the end of the rotating rod (13) and the output end of the motor (12); an eccentric wheel (16) is fixedly connected to the middle of the rotating rod (13); A fan blade (2) is provided in the middle of the rotating rod (13); the fan blade (2) is fixedly connected to the rotating rod (13); The middle part of the rotating rod (13) is sleeved with a drainage tube (3); the support frame (14) and the drainage tube (3) are connected via a connecting rod; the position of the drainage tube (3) corresponds to the fan blade (2); A plurality of support rods (4) are fixedly connected to the middle of the rotating rod (13); a first magnet (41) is provided at the end of each support rod (4); a pull rope (42) is connected between the first magnet (41) and the end of the support rod (4); A first elastic bracket (5) is fixedly connected to the inner wall of the blocking plate (1); a second magnet (51) is fixedly connected to the middle of the first elastic bracket (5); the position of the second magnet (51) corresponds to the position of the first magnet (41); A pair of third magnets (6) is provided between two adjacent positions of the second magnets (51); a second elastic bracket (61) is connected between the third magnets (6) and the adjacent first elastic brackets (5); and the mutually adjacent third magnets (6) are arranged to repel each other.

2. A construction method for preventing cracking of an arch tunnel according to claim 1, characterized in that: A guide plate (7) is fixedly connected to a position in the middle of the rotating rod (13) away from the motor (12); the concave side of the guide plate (7) is arranged toward the fan blade (2).

3. A construction method for preventing cracking of an arch tunnel according to claim 2, characterized in that: A wind guide plate (8) is fixedly connected to the side wall of the guide plate (7); the wind guide plate (8) is arranged on a side of the guide plate (7) close to the fan blades (2).