A life test device and method for sealing ring

By applying alternating pressure in the sealing ring life test device and transmitting pressure using pressure medium, the problem that the prior art cannot simulate the working state of the sealing ring under alternating pressure is solved, and accurate testing and efficient evaluation of the sealing ring life is achieved. .

CN114720117BInactive Publication Date: 2024-11-26NO 719 RES INST CHINA SHIPBUILDING IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210439840.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-25
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing seal ring life test device cannot effectively simulate the working state under alternating pressure, resulting in the inability to accurately predict the life of the seal ring.

Method used

A life test device including a pipeline simulation unit, a pressurization unit and a control unit is designed. By applying alternating pressure and transmitting pressure using a pressure medium, the working state of the seal ring under alternating pressure is simulated, and judged by the pressure sensor. Failure of the seal ring.

Benefits of technology

The life test of the seal ring under alternating pressure is realized, the flexibility and efficiency of the test are improved, multiple seal rings can be tested simultaneously, and the failure of the seal ring is accelerated by temperature adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114720117B_ABST
    Figure CN114720117B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of sealing ring life test, and specifically discloses a sealing ring life test device and method; the life test device comprises a simulation unit, a pressurizing unit, a connecting pipeline and a control unit; at least one pipeline simulation unit is provided, and each pipeline simulation unit comprises a pressure chamber and a plurality of test pipelines connected to the pressure chamber; the pressurizing unit is used to apply alternating pressure; the connecting pipeline connects the pressurizing unit and is connected to all the pressure chambers one by one; the connecting pipeline, all the pressure chambers and all the test pipelines are internally connected and filled with pressure medium; during the test, the sealing ring is installed in the test pipeline, the pressure medium senses the alternating pressure applied by the pressurizing unit, and transmits the pressure to the sealing ring; by collecting the pressure of the pressure medium at the working position of the sealing ring, it is judged whether the corresponding sealing ring has failed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of sealing ring life testing, and more specifically, relates to a sealing ring life testing device and method. Background Art

[0002] Sealing rings are an important component of pipelines. In large-scale equipment structures, they are difficult to disassemble and assemble, difficult to maintain, and have high reliability requirements, which directly affects the normal operation of the entire pipeline system.

[0003] For the test needs of the seal life research, it is usually based on the Arrhenius model to increase the ambient temperature of the seal to observe its physical properties and functional degradation; or to use the thermal aging test to test the life of the seal based on the calculation of thermogravimetric and activation energy. However, in actual use, as the internal pressure of the pipeline changes, the seal will have a certain degree of displacement and offset from the inner cavity of the pipeline; at the same time, as the pressure increases, the internal medium of the pipeline will also soak and corrode the seal material to varying degrees, causing a slight increase in the volume of the seal. Therefore, conventional test methods and equipment are no longer applicable.

[0004] Therefore, a system that can simulate the actual state to monitor the performance and study the life degradation of the sealing ring is currently in urgent need. Patent document CN201810144919.6 discloses a rubber sealing ring life prediction device and method, by installing the rubber sealing ring on the first cover plate and the second cover plate, and applying pressure to the rubber sealing ring through hydraulic oil to simulate the working state of the sealing ring, and then predict the life of the sealing ring; Patent document CN201821141068.1 discloses a sealing ring life tester, by installing the sealing ring into the first valve and the second valve, connecting the assembled valves to the pipeline and conveying hydraulic oil to the pipeline, and simulating the working state of the sealing ring by making the number of switches of the first valve and the second valve, so as to predict the life of the sealing ring. However, both of the above methods simulate the working state of the sealing ring under a specific oil pressure, but do not simulate the working state of the sealing ring under alternating pressure.

[0005] Based on the above defects and deficiencies, the art urgently needs to make further improvements to the design of the existing test device for studying the life of the sealing ring, so as to solve the problem of simulating the working state of the sealing ring under alternating pressure. Summary of the invention

[0006] In view of the above defects or improvement needs of the prior art, the present invention provides a life test device and method for a sealing ring, which can effectively solve the problem of simulating the working state of the sealing ring under alternating pressure, and is therefore particularly suitable for application scenarios of life research of the sealing ring.

[0007] To achieve the above object, according to one aspect of the present invention, a life test device for a sealing ring is provided, the life test device comprising a pipeline simulation unit, a pressurizing unit, a connecting pipeline and a control unit;

[0008] At least one pipeline simulation unit is provided, and each pipeline simulation unit comprises a pressure chamber and a plurality of test pipelines connected to the pressure chamber;

[0009] The pressurizing unit is used to apply alternating pressure;

[0010] The connecting pipeline is connected to the pressurizing unit and is connected to all the pressure chambers one by one; the connecting pipeline, all the pressure chambers and all the test pipelines are internally connected and filled with pressure medium; during testing, the sealing ring is installed in the test pipeline, and the pressure medium senses the pressure applied by the pressurizing unit and transmits the pressure to the sealing ring;

[0011] The control unit is connected to the pressurizing unit via an electrical signal to control the pressurizing unit so that the pressurizing unit applies alternating pressure.

[0012] Through the above conception, on the one hand, alternating pressure is applied to the pressure medium through the pressurizing unit to realize the simulation of the working state of the sealing ring under alternating pressure, the pressure is transmitted to the sealing ring through the pressure medium, and then the pressure of the pressure medium in the test pipeline where the sealing ring is located is collected to realize the life test of the sealing ring under alternating pressure; and the life test device can simultaneously test multiple sealing rings of the same size and material or multiple sealing rings of the same size but different materials, and has high flexibility in the actual testing process.

[0013] Preferably, the pressurizing unit includes a high-pressure plunger pump and a low-pressure plunger pump, and the connecting pipeline includes a first pipe section connecting the high-pressure plunger pump and the low-pressure plunger pump in parallel and a second pipe section connecting the first pipe section and each of the pressure chambers; the end of the second pipe section away from the first pipe section is connected to the pressure chambers one-to-one through a branch, and the second pipe section is correspondingly provided with a pipeline connecting piece at each branch access point; the control unit is electrically connected to the high-pressure plunger pump and the low-pressure plunger pump, respectively, and adjusts the high-pressure plunger pump and the low-pressure plunger pump, respectively, so as to realize the connection between the control unit and the pressurizing unit, and realize the adjustment of the pressurizing unit by the control unit; by setting a high-pressure plunger pump and a low-pressure plunger pump, and connecting the high-pressure plunger pump and the low-pressure plunger pump in parallel, the application of alternating pressure can be realized.

[0014] As a further preferred embodiment, one end of the first pipe section is connected to the second pipe section, and the other end is connected to a second sealing member; the pressure outlets of the high-pressure plunger pump and the low-pressure plunger pump are respectively connected to the first pipe section, so that the high-pressure plunger pump and the low-pressure plunger pump are connected in parallel, and the pressure inlets of the high-pressure plunger pump and the low-pressure plunger pump are respectively connected to the atmosphere; through this scheme, the high-pressure plunger pump and the low-pressure plunger pump are connected in parallel, and by setting the second sealing member, the first pipe section is blocked during testing to prevent the pressure medium from flowing out, and the blockage can be released when necessary to discharge the pressure medium.

[0015] As a further preferred embodiment, the first pipe section also includes a first switch member located between the connection points of the high-pressure plunger pump and the low-pressure plunger pump; the first pipe section and the second pipe section are connected via a second switch member; the control unit is electrically connected to the first switch member and the second switch member, respectively, to control the switching of the first switch member and the second switch member; by setting the first switch member and the second switch member, the first switch member and the second switch member are opened during testing to allow the pressure medium to flow; the first switch member and / or the second switch member can be closed during maintenance to block the flow of the pressure medium.

[0016] Preferably, the test pipeline includes a test tube and a first blocking piece; the front end of the test tube is connected to the pressure chamber, and the end is located outside the pressure chamber; the first blocking piece is detachably connected to the end of the test tube; during testing, the sealing ring is sealed between the test tube and the first blocking piece; this scheme simulates the actual working mode of the sealing ring by installing the sealing ring between the test tube and the first blocking piece.

[0017] Preferably, a first pressure sensor is provided at one end of the connecting pipeline close to the pressurizing unit, which is used to measure the pressure applied by the pressurizing unit to the pressure medium; the control unit is electrically connected to the first pressure sensor to receive the signal transmitted by the first pressure sensor, and adjusts the pressurizing unit according to the signal so that the pressure applied by the pressurizing unit to the pressure medium is equal to the working pressure on the sealing ring to be simulated; each of the test pipelines is provided with a second pressure sensor, which is used to measure the pressure of the pressure medium in each test pipeline to determine whether the sealing ring installed in the corresponding test pipeline has failed; the control unit is electrically connected to each of the second pressure sensors to receive the signal transmitted by the second pressure sensor, and determine whether the corresponding sealing ring has failed according to the signal.

[0018] Preferably, the life test device further comprises a temperature adjustment unit for providing a working environment temperature for the sealing ring during the test.

[0019] Preferably, the life test device also includes an input pipeline, one end of which is connected to the connecting pipeline, and the other end is connected to a third switch component. The input pipeline is used to inject the pressure medium into the connecting pipeline, the pressure chamber and the test pipeline, and prevent the pressure medium from flowing out during the test.

[0020] According to another aspect of the present invention, a life test method for a sealing ring is provided, the life test method comprising the following steps:

[0021] S1: Install the sealing ring to be tested in each of the test pipelines;

[0022] S2: Filling the connecting pipeline, all the pressure chambers and all the test pipelines with pressure medium;

[0023] S3: the pressurizing unit continuously applies alternating pressure to the pressure medium according to the working pressure of the sealing ring to be simulated, and the pressure medium transmits the pressure applied by the pressurizing unit to the sealing ring;

[0024] S4: collecting the pressure of the pressure medium in each of the test pipelines, and judging whether the corresponding sealing ring is invalid according to the pressure.

[0025] Preferably, the alternating pressure rises in a step-like manner in each cycle, and at the end of the cycle the pressure returns to an initial state to enter the next cycle. This solution can accelerate the failure of the sealing ring and improve the efficiency of the life test.

[0026] Preferably, the life test method further comprises making the working environment temperature of the sealing ring higher than the actual working environment temperature of the sealing ring to be simulated during the test, so as to further accelerate the failure of the sealing ring and improve the efficiency of the life test.

[0027] In general, the above technical solution conceived by the present invention has the following technical advantages compared with the prior art:

[0028] 1. Apply alternating pressure to the pressure medium through the pressurizing unit to simulate the working state of the sealing ring under alternating pressure, transfer the pressure to the sealing ring through the pressure medium, and then collect the pressure of the pressure medium in the test pipeline where the sealing ring is located to realize the life test of the sealing ring; moreover, the life test device can test multiple sealing rings of the same size and material or multiple sealing rings of the same size but different materials at the same time, with high flexibility in the actual test process.

[0029] 2. The application of alternating pressure is achieved by connecting a high-pressure plunger pump and a low-pressure plunger pump in parallel.

[0030] 3. The actual working mode of the sealing ring is simulated by installing the sealing ring between the test tube and the first blocking member.

[0031] 4. By setting a second blocking member, the pressure medium is prevented from flowing out during testing, and the pressure medium can be discharged when necessary by releasing the blockage; by setting a first switch member and a second switch member, the pressure medium can be allowed to flow during testing, and the pressure medium can be blocked during maintenance; by setting an input pipeline, the pressure medium can be injected, and the pressure medium can be prevented from flowing out during testing.

[0032] 5. The pressure of the pressure medium applied by the pressurizing unit and the pressure of the pressure medium at the working position of the sealing ring are measured by the first pressure sensor and the second pressure sensor to realize automatic feedback, automatic control and automatic judgment.

[0033] 6. By making the alternating pressure rise in a step-like manner in each cycle, the failure of the sealing ring is accelerated, thereby improving the efficiency of the life test; by setting a temperature control unit to provide a working environment temperature for the sealing ring during the test, and by making the working environment temperature of the sealing ring during the test higher than the actual working environment temperature of the sealing ring to be simulated, the failure of the sealing ring is further accelerated, thereby improving the efficiency of the life test. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 is a layout diagram of a life test device for a sealing ring according to an embodiment of the present invention;

[0035] Figure 2 It is a flow chart of a life test method of a sealing ring according to an embodiment of the present invention.

[0036] Throughout the drawings, the same reference numerals are used to denote the same elements or structures, wherein:

[0037] 1-pressure chamber, 2-test pipeline, 3-sealing ring, 4-pressurization unit, 5-first pipe section, 6-second pipe section, 7-host computer, 8-high and low temperature test chamber, 9-input pipeline, 21-test tube, 22-first blocking part, 23-second pressure sensor, 41-high pressure plunger pump, 42-low pressure plunger pump, 51-second blocking part, 52-first switch part, 53-second switch part, 54-first pressure sensor, 61-pipeline connecting part, remote mobile terminal 71, 91-third switch part. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0039] like Figure 1As shown, the life test device of the sealing ring provided in the embodiment of the present invention includes a pipeline simulation unit, a pressurizing unit 4, a connecting pipeline and a control unit;

[0040] At least one pipeline simulation unit is provided, and each pipeline simulation unit comprises a pressure chamber 1 and a plurality of test pipelines 2 connected to the pressure chamber 1;

[0041] The pressurizing unit 4 is used to apply alternating pressure;

[0042] The connecting pipeline is connected to the pressurizing unit 4 and is connected to all the pressure chambers 1 one by one; the connecting pipeline, all the pressure chambers 1 and all the test pipelines 2 are connected and filled with pressure medium; during the test, the sealing ring 3 is installed in the test pipeline 2, and the pressure medium senses the pressure applied by the pressurizing unit 4 and transmits the pressure to the sealing ring 3;

[0043] The control unit is connected to the pressurizing unit 4 via an electrical signal to adjust the pressurizing unit 4 so that the pressurizing unit 4 applies alternating pressure.

[0044] Through the mutual cooperation of the above-mentioned components, the actual working state of the sealing ring under alternating pressure can be simulated to realize the life test of the sealing ring, which is advanced.

[0045] Each component will be described in more detail below.

[0046] like Figure 1 As shown in , in this embodiment, two pipeline simulation units are provided. In this solution, the number of pipeline simulation units is not limited and can be provided according to the number of sealing rings 3 that need to be tested.

[0047] like Figure 1 As shown in , in this embodiment, the pressure chamber 1 is a hollow column and has a square column-like structure, and the axis of the pressure chamber 1 is arranged in the horizontal direction; in some embodiments, the pressure chamber 1 can also be formed by closing both ends of the pressure pipe; in this embodiment, the test pipeline 2 is arranged in sequence along the axis of the pressure chamber 1, and 5 test pipelines are arranged in sequence on one side of the pressure chamber 1, and 4 test pipelines are arranged in sequence on the other side; in some embodiments, the test pipeline 2 can also be arranged on the four sides of the pressure chamber 1. The arrangement method and number of the test pipeline 2 on the pressure chamber 1 of the present invention are not limited, so that the test pipeline 2 and the pressure chamber 1 form a closed structure that is internally connected.

[0048] like Figure 1As shown in the figure, the test pipeline 2 includes a test tube 21 and a first blocking piece 22; the front end of the test tube 21 is connected to the pressure chamber 1, and the end is located outside the pressure chamber 1; the first blocking piece 22 is detachably connected to the end of the test tube 21; during testing, the sealing ring 3 is sealed and installed between the test tube 21 and the first blocking piece 22 to simulate the installation form of the sealing ring 3 in the pipeline.

[0049] In the present embodiment, the pressure chamber 1 is connected to the test pipe 2 through a pipe joint. Furthermore, the pipe joint is a quick joint so as to be easily disassembled for inspection, wherein the female buckle of the quick joint is fixedly connected to the pressure chamber 1 (e.g., welded), and the male buckle of the quick joint is fixedly connected to the test pipe 2 (e.g., welded) or detachably connected (e.g., threaded), and the male buckle of the quick joint is snapped into the female buckle to realize the connection between the test pipe 2 and the pressure chamber 1; in some embodiments, the pipe joint can also be a pipe seat, one end of which is fixedly connected to the pressure chamber 1, and the other end of which is fixedly connected to the test pipe 2 (e.g., welded) or detachably connected (e.g., threaded); in other embodiments, the test pipe 21 is welded to the pressure chamber 1; in other embodiments, the test pipe 21 is directly connected to the pressure chamber 1 through threads.

[0050] The first blocking member 22 provided in this embodiment is a plug with threads, and the connection between the first blocking member 22 and the test tube 21 is a threaded connection; in some embodiments, the connection between the first blocking member 22 and the test tube 21 can be a snap connection.

[0051] The sealing ring 3 provided in this embodiment can be an O-ring. The O-ring is widely used in hydraulic systems due to its simple structure and reliable sealing method. Of course, it can also be a sealing ring of other shapes, which is not limited here. The present invention takes the O-ring as an example.

[0052] The control unit of this embodiment is a host computer 7 , and in this embodiment, the host computer 7 is also connected to a remote mobile terminal 71 , so that the test status can be checked and fault alarm information can be received through the remote mobile terminal 71 .

[0053] The pressure medium of this embodiment is hydraulic oil; in some embodiments, it can also be water or other media that can transmit pressure.

[0054] like Figure 1As shown in the figure, the pressurizing unit 4 includes a high-pressure plunger pump 41 and a low-pressure plunger pump 42; the high-pressure plunger pump 41 and the low-pressure plunger pump 42 are opened respectively according to the working pressure of the sealing ring 3 to be simulated. In this embodiment, when the required pressure is above 10Mpa, the high-pressure plunger pump 41 is enabled and the low-pressure plunger pump 42 is closed; when the required pressure is less than 10Mpa, the low-pressure plunger pump 42 is enabled and the high-pressure plunger pump 41 is closed; both the high-pressure plunger pump 41 and the low-pressure plunger pump 42 are electric pumps, and the upper computer 7 is electrically connected to the motors of the high-pressure plunger pump 41 and the low-pressure plunger pump 42 respectively to control the opening and closing of the high-pressure plunger pump 41 and the low-pressure plunger pump 42, and respectively adjust the high-pressure plunger pump 41 and the low-pressure plunger pump 42 to realize the connection between the upper computer 7 (i.e., the control unit) and the pressurizing unit 4, and realize the adjustment of the pressurizing unit 4 by the upper computer 7.

[0055] In this embodiment, the connecting pipeline includes a first pipe section 5 that connects the high-pressure plunger pump 41 and the low-pressure plunger pump 42 in parallel, and a second pipe section 6 that connects the first pipe section 5 and each pressure chamber 1; specifically, one end of the first pipe section 5 is connected to the second pipe section 6, and the other end is connected to the second sealing member 51; the pressure outlets of the high-pressure plunger pump 41 and the low-pressure plunger pump 42 are respectively connected to the first pipe section 5, so that the high-pressure plunger pump 41 and the low-pressure plunger pump 42 are connected in parallel, and the pressure inlets of the high-pressure plunger pump 41 and the low-pressure plunger pump 42 are respectively connected to the atmosphere; in this embodiment, the low-pressure plunger pump 42 is close to the second pipe section 6 at the access point of the first pipe section 5, and the high-pressure plunger pump 41 is located at the access point of the first pipe section 5 between the access point of the low-pressure plunger pump 42 and the second sealing member 51; the connection between the high-pressure plunger pump 41 and the low-pressure plunger pump 42 and the first pipe section 5 can be a fixed connection (such as welding) or a detachable connection (such as a threaded connection).

[0056] In this embodiment, the second blocking member 51 is a valve, which can be fixedly connected to the first pipe section 5 or detachably connected. The valve is closed during testing to prevent the pressure medium from flowing out, and is opened when the pressure medium in the system needs to be discharged, such as when inspecting and repairing the components in the life test device. In some embodiments, the second blocking member 51 can also be a plug, which can be detachably connected to the first pipe section 5, such as by threading or clamping. During testing, the plug is connected to the first pipe section 5 to achieve sealing, and the plug is removed when the pressure medium needs to be discharged.

[0057] Furthermore, the first pipe section 5 also includes a first switch component 52 located between the connection points of the high-pressure plunger pump 41 and the low-pressure plunger pump 42; the first pipe section 5 and the second pipe section 6 are connected through the second switch component 53; the upper computer 7 is electrically connected to the first switch component 52 and the second switch component 53 respectively to control the switching of the first switch component 52 and the second switch component 53; in this embodiment, the first switch component 52 and the second switch component 53 are both electric valves, such as electric ball valves, electric butterfly valves, etc.; the connection between the first switch component 52 and the second switch component 53 and each pipeline element can be a fixed connection (such as welding) or a detachable connection (such as a threaded connection). During the test, the first switch component 52 and the second switch component 53 are both in the open state to allow the pressure medium to flow; the first switch component 52 and the second switch component 53 can be closed when necessary to block the flow of the pressure medium; for example, when the high-pressure plunger pump 41 and / or the low-pressure plunger pump 42 is inspected and repaired, the first switch component 52 or the second switch component 53 is closed accordingly, and the second blocking component 51 is opened or removed to discharge the pressure medium in the first pipe section 5, and the pressure medium in the life test device can also be completely discharged.

[0058] A first pressure sensor 54 is provided at one end of the connecting pipeline close to the pressurizing unit 4, which is used to measure the pressure applied by the pressurizing unit 4 to the pressure medium; the upper computer 7 is electrically connected to the first pressure sensor 54 to receive the pressure signal transmitted by the first pressure sensor 54, and adjusts the pressurizing unit 4 according to the signal so that the pressure applied by the pressurizing unit 4 to the pressure medium is equal to the working pressure of the sealing ring 3 to be simulated; specifically, in this embodiment, the first pressure sensor 54 is connected to the inner wall of the first pipe section 5, and the pressure of the pressure medium in the first pipe section 5 is sensed to measure the pressure applied by the pressurizing unit 4 to the pressure medium. The first pressure sensor 54 transmits the pressure signal to the upper computer 7, and the upper computer 7 receives the pressure signal transmitted by the first pressure sensor 54, and correspondingly adjusts the high-pressure plunger pump 41 and / or the low-pressure plunger pump 42 according to the pressure signal to ensure that the pressure transmitted by the first pressure sensor 54 is equal to the working pressure of the sealing ring 3 to be simulated; further, in this embodiment, the first pressure sensor 54 is located between the high-pressure plunger pump 41 at the access point of the first pipe section 5 and the second blocking member 51.

[0059] Each test pipeline 2 is provided with a second pressure sensor 23, which is used to measure the pressure of the pressure medium in each of the test pipelines 2 to determine whether the sealing ring 3 installed in the corresponding test pipeline 2 has failed, and to analyze the compression and volume change of the sealing ring 3 in the corresponding test pipeline 2 through the change of the pressure index; the upper computer 7 is electrically connected to each second pressure sensor 23 to receive the signal transmitted by the second pressure sensor 23, and determine whether the corresponding sealing ring 3 has failed based on the signal; specifically, in this embodiment, the second pressure sensor 23 is connected to the inner wall of the test tube 21 of the test pipeline 2.

[0060] In this embodiment, the first pressure sensor 54 and the second pressure sensor 23 are both stress-sheet pressure sensors.

[0061] In this embodiment, Figure 1 As shown in the figure, one end of the second pipe section 6 away from the first pipe section 5 is connected to the pressure chamber 1 one by one through a branch, and the second pipe section 6 is correspondingly provided with a pipe connecting piece 61 at each branch access point, and the pipe connecting piece 61 can be an elbow or a tee, or a pipe connector; the connection between the second pipe section 6 and the pressure chamber 1 is welding.

[0062] In this embodiment, the life test device further includes a temperature control unit for providing a working environment temperature for the sealing ring 3 during the test; specifically, in this embodiment, the temperature control unit is a high and low temperature test box 8; during the test, Figure 1 As shown in , the pipeline simulation unit is placed in a high and low temperature test box 8, and the temperature in the high and low temperature test box 8 is set to provide a working environment temperature for the sealing ring 3 during the test.

[0063] In this embodiment, Figure 1 As shown in , the life test device also includes an input pipeline 9, one end of which is connected to the connecting pipeline, and the other end is connected to a third switch 91; the input pipeline 9 is used to inject pressure medium into the connecting pipeline, the pressure chamber 1 and the test pipeline 2, and prevent the pressure medium from flowing out during the test; specifically, the third switch 91 is a valve, which can be various valves in the prior art, such as a ball valve, a gate valve, a butterfly valve, etc. The valve can be connected to the upper computer 7 electrical signal, and the upper computer 7 controls its opening or closing. The valve can also be a manual valve. Furthermore, a connecting piece can also be set on the input pipeline 9 to connect more pipeline simulation units.

[0064] The method for performing a life test on a sealing ring using the life test device of this embodiment comprises the following steps:

[0065] S1: Install the sealing ring 3 to be tested in each test pipeline 2.

[0066] Specifically, the number of pipeline simulation units and the number of test pipelines of each pipeline simulation unit are designed according to the number of sealing rings 3 to be tested, and each sealing ring 3 is installed in a test pipeline 2; more specifically, the sealing ring 3 is first installed between the test tube 21 and the first blocking piece 22 of the test pipeline 2, and then the test tube 21 is threadedly connected with the first blocking piece 22 to fix the sealing ring 3 and make the sealing ring 3 have an initial compression amount;

[0067] In the present embodiment, after the sealing ring 3 is installed, the pipeline simulation unit is placed in the high and low temperature test box 8. The high and low temperature test box 8 serves as a temperature control unit to provide a working environment temperature for the sealing ring 3 during the test, and during the test, the working environment temperature of the sealing ring 3 is made higher than the actual working environment temperature of the sealing ring 3 to be simulated, so as to accelerate the failure of the sealing ring 3 and improve the efficiency of the life test; specifically, in the present embodiment, the actual working environment temperature of the sealing ring 3 to be simulated is 20°C, and the air temperature in the high and low temperature test box 8 is set to 50°C during the test, that is, the working environment temperature of the sealing ring 3 during the test is 50°C.

[0068] In some embodiments, a test bench is also provided, and the pressure chamber 1 of the pipeline simulation unit is placed on the test bench; in these embodiments, the test bench and the pipeline simulation unit are placed together in a high and low temperature test box 8; in other embodiments, the pressure chamber 1 is fixedly connected to the high and low temperature test box 8, and the fixed connection can be welding or screw fastening.

[0069] S2: Fill the connecting pipelines, all pressure chambers 1 and all test pipelines 2 with pressure medium.

[0070] In this embodiment, the pressure medium is hydraulic oil, which is injected through the input pipeline 9; specifically, the third switch component 91 is opened, the input pipeline 9 is connected to the oil tank storing the hydraulic oil, and the hydraulic oil is injected until the connecting pipeline, the pressure chamber 1 and the test pipeline 2 are filled; in the above process, the upper computer 7 controls the first switch component 52 and the second switch component 53 to be in the open state.

[0071] S3: the pressurizing unit 4 applies alternating pressure to the pressure medium according to the working pressure of the sealing ring 3 to be simulated, and the pressure medium transmits the pressure applied by the pressurizing unit 4 to each sealing ring 3.

[0072] In this embodiment, the pressurizing unit 4 applies alternating pressure to the pressure medium, and in each cycle, the pressure applied by the pressurizing unit 4 to the pressure medium rises in a step-like manner, and each cycle is specifically: 8Mpa pressure for 2 hours-10Mpa pressure for 2 hours-12Mpa pressure for 2 hours; at the end of a cycle, the pressure returns to the initial state of 8Mpa, and then enters the next cycle and executes 8Mpa pressure for 2 hours-10Mpa pressure for 2 hours-12Mpa pressure for 2 hours again. In the process of applying 8Mpa pressure, the high-pressure plunger pump 41 is turned off and the low-pressure plunger pump 42 is turned on; in the process of applying 10Mpa and 12Mpa pressures, the high-pressure plunger pump 41 is turned on and the low-pressure plunger pump 42 is turned off; the opening, closing and pressure regulation of the high-pressure plunger pump 41 and the low-pressure plunger pump 42 are all controlled by the host computer 7. The alternating pressure is continuously applied until all the sealing rings 3 fail, or the number of alternating cycles reaches a preset value.

[0073] Taking the process of applying a pressure of 10Mpa as an example, the host computer 7 controls the low-pressure plunger pump 42 to close, and the high-pressure plunger pump 41 to start and apply pressure to the pressure medium. The first pressure sensor 54 senses the pressure of the pressure medium in the first pipe section 5 and transmits the pressure signal to the host computer 7. The host computer 7 receives the pressure signal transmitted by the first pressure sensor 54, and adjusts the high-pressure plunger pump 41 according to the pressure signal to ensure that the pressure transmitted by the first pressure sensor 54 is 10Mpa. Similarly, in the above process, the host computer 7 controls the first switch 52 and the second switch 53 to be in the open state.

[0074] S4: collecting the pressure of the pressure medium in each test pipeline 2, and judging whether the corresponding sealing ring 3 is invalid according to the pressure.

[0075] In this embodiment, the pressure of the pressure medium in each test pipeline 2 is measured by a second pressure sensor 23 connected to the inner wall of the test tube 21; the second pressure sensor 23 transmits the measured pressure signal to the host computer 7, and the host computer 7 receives the pressure signal transmitted by the second pressure sensor 23 and determines whether the corresponding sealing ring 3 fails according to the required simulated working pressure and the allowed deviation value, and issues a fault alarm when the sealing ring 3 fails. The number of cycles of the alternating pressure when the sealing ring 3 fails, combined with the working environment temperature of the sealing ring 3, further determines whether the sealing ring 3 meets expectations.

[0076] In this embodiment, the experimental data can be exported and saved in a required format by the host computer 7.

[0077] The life test device and method of the sealing ring according to the present embodiment can simulate the working state of the sealing ring under alternating pressure, and meet the simulation requirements of the environmental conditions and operating conditions required for the life prediction test of the sealing ring. For example, the working environment temperature of the sealing ring is 0°C to 80°C, the pressure of the pressure medium is 3Mpa to 21Mpa, and the step alternating cycle is 5000 to 10000 times.

[0078] The above examples are used to exemplify the life test device and method of the sealing ring of the present invention, and do not constitute a limitation on the protection scope of the present invention.

[0079] In summary, the life testing device and method of the sealing ring according to the present invention can simulate the working state of the sealing ring under alternating pressure, and solve the problem of life testing of the sealing ring under alternating pressure; the life testing device and method can simultaneously test multiple sealing rings of the same size and material or multiple sealing rings of the same size but different materials, and have high flexibility in the actual testing process; and by applying a step-like increasing pressure in each pressure cycle, the working environment temperature of the sealing ring during the test is made higher than the actual working environment temperature to accelerate the failure of the sealing ring, and is therefore particularly suitable for applications in sealing ring life testing.

[0080] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A sealing ring life test device, characterized in that: It comprises a pipeline simulation unit, a pressurizing unit (4), connecting pipelines and a control unit; At least one pipeline simulation unit is provided, and each pipeline simulation unit comprises a pressure chamber (1) and a plurality of test pipelines (2) connected to the pressure chamber (1); The pressurizing unit (4) is used to apply alternating pressure; The connecting pipeline is connected to the pressurizing unit (4) and is connected to all the pressure chambers (1) one by one; the connecting pipeline, all the pressure chambers (1) and all the test pipelines (2) are internally connected and filled with pressure medium; during testing, the sealing ring (3) is installed in the test pipeline (2), and the pressure medium senses the pressure applied by the pressurizing unit (4) and transmits the pressure to the sealing ring (3); The control unit is electrically connected to the pressurizing unit (4) to control the pressurizing unit (4) so ​​that the pressurizing unit (4) applies alternating pressure; the pressurizing unit (4) comprises a high-pressure plunger pump (41) and a low-pressure plunger pump (42); the connecting pipeline comprises a first pipe section (5) connecting the high-pressure plunger pump (41) and the low-pressure plunger pump (42) in parallel and a second pipe section (6) connecting the first pipe section (5) and each of the pressure chambers (1); the end of the second pipe section (6) away from the first pipe section (5) is connected to the pressure chambers (1) in a one-to-one correspondence via a branch, and the second pipe section (6) is correspondingly provided with a pipe connecting piece (61) at each branch access point; the control unit The first pipe section (5) is electrically connected to the high-pressure plunger pump (41) and the low-pressure plunger pump (42) respectively, and the high-pressure plunger pump (41) and the low-pressure plunger pump (42) are regulated respectively, so as to realize the connection between the control unit and the pressurizing unit (4), and realize the adjustment of the pressurizing unit (4) by the control unit; one end of the first pipe section (5) is connected to the second pipe section (6), and the other end is connected to a second blocking member (51); the pressure outlets of the high-pressure plunger pump (41) and the low-pressure plunger pump (42) are respectively connected to the first pipe section (5), so that the high-pressure plunger pump (41) and the low-pressure plunger pump (42) are connected in parallel, and the pressure inlets of the high-pressure plunger pump (41) and the low-pressure plunger pump (42) are respectively connected to the atmosphere.

2. The life test device according to claim 1, characterized in that: The first pipe section (5) further comprises a first switch element (52) located between the connection points of the high-pressure plunger pump (41) and the low-pressure plunger pump (42); the first pipe section (5) and the second pipe section (6) are connected via a second switch element (53); and the control unit is respectively connected to the first switch element (52) and the second switch element (53) via electrical signals to control the switching of the first switch element (52) and the second switch element (53).

3. The life test device according to claim 1, characterized in that: The test pipeline (2) comprises a test tube (21) and a first blocking member (22); the front end of the test tube (21) is connected to the pressure chamber (1), and the end thereof is located outside the pressure chamber (1); the first blocking member (22) is detachably connected to the end of the test tube (21); during testing, the sealing ring (3) is sealingly installed between the test tube (21) and the first blocking member (22).

4. The life test device according to claim 1, characterized in that: A first pressure sensor (54) is provided at one end of the connecting pipeline close to the pressurizing unit (4) for measuring the pressure applied by the pressurizing unit (4) to the pressure medium; the control unit is electrically connected to the first pressure sensor (54) to receive the signal transmitted by the first pressure sensor (54), and adjusts the pressurizing unit (4) according to the signal so that the pressure applied by the pressurizing unit (4) to the pressure medium is equal to the working pressure on the sealing ring (3) to be simulated; each of the test pipelines (2) is provided with a second pressure sensor (23) for measuring the pressure of the pressure medium in each of the test pipelines (2) to determine whether the sealing ring (3) installed in the corresponding test pipeline (2) has failed; the control unit is electrically connected to each of the second pressure sensors (23) to receive the signal transmitted by the second pressure sensor (23), and determines whether the corresponding sealing ring (3) has failed according to the signal.

5. The life test device according to claim 1, characterized in that: The life test device also includes a temperature adjustment unit, which is used to provide a working environment temperature for the sealing ring (3) during testing.

6. The life test device according to claim 1, characterized in that: The life test device further comprises an input pipeline (9), one end of the input pipeline (9) being connected to the connecting pipeline, and the other end being connected to a third switch member (91), the input pipeline (9) being used to inject the pressure medium into the connecting pipeline, the pressure chamber (1) and the test pipeline (2), and to prevent the pressure medium from flowing out during the test.

7. A life test method for a sealing ring, the life test method being implemented by using a life test device as claimed in any one of claims 1 to 6, characterized in that: The following steps are involved: S1: installing the sealing ring (3) to be tested in each of the test pipelines (2); S2: filling the connecting pipeline, all the pressure chambers (1) and all the test pipelines (2) with pressure medium; S3: the pressurizing unit (4) applies alternating pressure to the pressure medium according to the working pressure of the sealing ring (3) to be simulated, and the pressure medium transmits the pressure applied by the pressurizing unit (4) to each sealing ring (3); S4: collecting the pressure of the pressure medium in each of the test pipelines (2), and judging whether the corresponding sealing ring (3) has failed based on the pressure.

8. The life test method according to claim 7, characterized in that: The alternating pressure rises in a step-like manner in each cycle, and the pressure returns to the initial state at the end of the cycle to enter the next cycle.

9. The life test method according to claim 7, characterized in that: The life test method further comprises making the working environment temperature of the sealing ring (3) higher than the actual working environment temperature of the sealing ring (3) to be simulated during the test, so as to accelerate the failure of the sealing ring (3).