A low channel-dependent method for monitoring leakage current of substation cables

By collecting electrical quantity signals on both sides on the substation boss cable, adjusting the monitoring mode and using the principle of differential protection for leakage current monitoring, the false alarm problem is solved, the monitoring accuracy and cost-effectiveness are improved, and the monitoring level of insulation conditions is improved.

CN114720906BActive Publication Date: 2024-11-15STATE GRID JIANGSU ELECTRIC POWER CO LTD MAINTENANCE BRANCH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210297912.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-25
Publication Date
2024-11-15
Estimated Expiration
2042-03-25

AI Technical Summary

Technical Problem

The existing substation manager cable leakage monitoring methods are prone to false alarms due to current phase difference or the disappearance of one side of the signal. Although fiber channel can avoid phase difference error, it is costly and cannot solve the problem of loss of CT current signal on one side.

Method used

Using a low channel dependence method, the electrical quantity acquisition unit collects the electrical quantity signals on both sides of the long cable, adjusts the monitoring mode, corrects the phase difference using the comparison reference, and monitors leakage current based on the principle of differential protection when the signals on both sides are complete. , switch the monitoring mode when incomplete, and use the current amplitude difference principle to determine leakage.

Benefits of technology

It improves the accuracy of leakage monitoring, reduces the error caused by phase difference, avoids false alarms, reduces costs, is suitable for promotion and use, and improves the monitoring level of the insulation condition of AC long cables in the substation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114720906B_ABST
    Figure CN114720906B_ABST
Patent Text Reader

Abstract

The present invention discloses a low-channel-dependent substation long cable leakage current monitoring method, which aims to solve the problem of false alarms caused by phase difference or disappearance of signals on one side in the long cable leakage monitoring process in the prior art. It includes: respectively collecting electrical quantity signals on both sides of the long cable through an electrical quantity acquisition unit, and judging the integrity of the electrical quantity signals on both sides of the long cable; when the electrical quantity signals on both sides of the long cable are complete, correcting the phase difference on both sides of the long cable using a comparison benchmark, and performing leakage current monitoring according to the differential protection principle; when the electrical quantity signals on both sides of the long cable are incomplete, switching the long cable monitoring mode using a preset switching mechanism, and performing leakage current monitoring based on the electrical quantity signals on one side of the long cable. The present invention can improve the accuracy of leakage monitoring and enhance the monitoring level of the insulation condition of the long cable in the substation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a long cable leakage current monitoring method for a transformer substation with low channel dependence, belonging to the technical field of transformer substation leakage monitoring. Background Art

[0002] At present, it is becoming normal for 220kV and below substations to be unmanned and for 500kV to be undermanned, which puts higher requirements on the daily operation and maintenance of substations. Substation electrical fire accidents are the focus of substation operation and maintenance work. Electrical fires in the station are generally divided into fires caused by cable or load short circuits and fires caused by insulation damage. The short-circuit current of the former is large, and the fault current can generally be cut off by the action of air switches, fuses, and protective devices; the latter generally has a small fault current and is often discovered only when an electric shock accident or fire occurs. This puts huge firefighting pressure on the AC system of substations with a large number of cables. The leakage caused by insulation damage occurs between the ABCN system and PE. By monitoring and calculating and analyzing the comparative leakage current of the AC system feeder cable and the load, the insulation condition of the secondary circuit of the substation AC system can be evaluated, fault hazards can be discovered in time, and fire accidents can be effectively avoided. The long cables that bridge the AC room and the switchyard in the AC secondary circuit of the substation (such as the AC secondary circuit related to the high-voltage circuit breaker and the transformer air-cooling circuit) are long and have many links where insulation damage may occur. Therefore, it is urgent to monitor the long cables and detect leakage faults in time.

[0003] The existing residual current (based on residual current amplitude criterion) or composite current (based on residual current and other current composite criteria) leakage monitoring methods generally measure the residual current at the beginning and end of the line or the phase current and residual current to identify long cable leakage. Due to the influence of electromagnetic environment and other factors at the substation site, the current difference calculated by measuring the CT induction at both ends often leads to a large phase difference due to the timing problem, resulting in a false alarm of leakage fault, or because the signal on one side disappears, causing the differential current to increase and leading to a false alarm of leakage fault. In order to solve the problem of current acquisition phase difference at both ends of the line, the idea of ​​optical fiber differential protection can be imitated, optical fiber can be laid along the cable, and information interaction can be realized by using a directly connected optical fiber channel. Its advantages are that it is less affected by electromagnetic interference, light weight, small size, and can avoid measurement errors caused by timing. Its disadvantages are that the cost is too high and it is not suitable for popularization. In addition, the optical fiber channel cannot solve the problem of false alarm caused by the loss of CT current signal on one side. Summary of the invention

[0004] In order to solve the problem of false alarm caused by phase difference or disappearance of signal on one side during long cable leakage monitoring, the present invention proposes a low channel-dependent substation long cable leakage current monitoring method, which adjusts the monitoring mode according to the signal conditions on both sides of the substation long cable, corrects the phase difference, improves the leakage monitoring accuracy, and enhances the monitoring level of the insulation condition of the substation AC long cable.

[0005] In order to solve the above technical problems, the present invention adopts the following technical means:

[0006] The present invention proposes a low channel-dependent substation long cable leakage current monitoring method, comprising the following steps:

[0007] The electrical quantity signals on both sides of the long cable are collected by the electrical quantity collection unit, and the integrity of the electrical quantity signals on both sides of the long cable is judged;

[0008] When the electrical quantity signals on both sides of the long cable are complete, the phase difference on both sides of the long cable is corrected using the comparison benchmark, and leakage current monitoring is performed based on the differential protection principle;

[0009] When the electrical quantity signals on both sides of the long cable are incomplete, the long cable monitoring mode is switched using a preset switching mechanism, and leakage current monitoring is performed based on the electrical quantity signals on one side of the long cable.

[0010] Furthermore, the electrical quantity collection unit includes at least 2 current transformers and 1 voltage transformer, wherein one current transformer is used to collect the A-phase load current of the long cable, the other current transformer is used to collect the residual current of the long cable, and the voltage transformer is used to collect the head end bus voltage or the end load side voltage of the long cable.

[0011] Furthermore, when the electrical quantity signals on both sides of the long cable are complete, the leakage current monitoring method includes:

[0012] A short-time current signal is coupled to the A-phase load current on both sides of the long cable at the same time as a comparison reference signal;

[0013] When there is a comparison reference signal in the collected electrical quantity signals on both sides of the long cable, the load side current of the long cable is aligned with the bus side current on the time axis according to the comparison reference signal to obtain the adjusted load side current;

[0014] The differential current is calculated using the long cable bus-side current and the adjusted load-side current, and the long cable leakage is identified based on the current vector differential principle;

[0015] When there is no comparison reference signal in the collected electrical quantity signals on both sides of the long cable, the differential current is calculated using the currents on both sides of the long cable, and the long cable leakage is identified based on the current amplitude differential principle.

[0016] Furthermore, the method for judging long cable leakage based on the current vector differential principle is as follows:

[0017] If |I M (t)-I′ N (t)|>I T , then it is judged that the long cable has leakage, otherwise it is judged that the long cable has no leakage;

[0018] Among them, I M (t) represents the residual current amplitude on the long cable bus side at time t, I′ N (t) represents the residual current amplitude on the load side of the long cable at time t after adjustment, I T is the current amplitude differential threshold.

[0019] Furthermore, the expression for long cable leakage determination based on the current amplitude differential principle is as follows:

[0020]

[0021] Among them, I M (t) represents the residual current amplitude on the long cable bus side at time t, I N (t) represents the residual current amplitude on the load side of the long cable at time t, I T′ is the current amplitude differential threshold, Indicates the critical value of residual current on the load side of a long cable. is the mechanism conversion coefficient, It is the current amplitude differential threshold value with braking.

[0022] Furthermore, The calculation formula is as follows:

[0023]

[0024] The calculation formula is as follows:

[0025]

[0026] Furthermore, when the electrical quantity signals on both sides of the long cable are incomplete, the leakage current monitoring method includes:

[0027] When the switch is closed, if the electrical quantity signal on the bus side of the long cable disappears and the electrical quantity signal on the load side is normal, after a delay, the bus side CT is judged to be abnormal, and a bus side CT abnormal alarm signal is generated, and the monitoring mode of the long cable is switched to the load leakage mode. The residual current on the load side of the long cable and the preset load side residual current threshold are used to determine whether the AC load has leakage;

[0028] When the switch is closed, if the electrical quantity signal on the load side of the long cable disappears and the electrical quantity signal on the bus side is normal, after a delay, the load side CT is judged to be abnormal, and a load side CT abnormal alarm signal is generated, and the monitoring mode of the long cable is switched to the full branch leakage mode, and the residual current on the long cable bus side and the preset bus side residual current threshold are used to determine whether the AC load has leakage;

[0029] When the switch is closed, if the electrical quantity signals on both sides of the long cable disappear, a cable abnormality alarm signal is generated and no leakage detection is performed.

[0030] The following advantages can be obtained by using the above technical means:

[0031] The present invention proposes a low-channel-dependent method for monitoring leakage current of long cables in substations. When the signals on both sides of the long cable can be collected, the phase difference of the signals on both sides is corrected by comparing the reference, reducing the additional error caused by the phase difference of the current at the beginning and end of the long cable. Then, the corrected signal is used to calculate the differential current and perform leakage discrimination, thereby improving the accuracy of the differential current calculation, and thus improving the accuracy of leakage monitoring. When the comparison reference disappears, the present invention can use the current amplitude differential principle to perform leakage discrimination, improve the fault tolerance of the calculation result, reduce the influence of the phase difference on the leakage discrimination, and thus ensure the accuracy of the leakage discrimination result. When the signals on both sides cannot be fully collected, the method of the present invention can adjust the monitoring mode in time, perform leakage discrimination according to the residual current on one side, avoid the problem of false alarm caused by the sudden increase of the differential current, and further improve the performance of leakage monitoring of long cables.

[0032] The method of the present invention does not rely excessively on channel performance, and can adjust the monitoring mode according to the signal integrity on both sides of the long cable of the substation, so as to accurately monitor the leakage of the long cable under different acquisition signals, thereby improving the accuracy of the leakage monitoring technology and enhancing the monitoring level of the insulation condition of the long AC cable of the substation. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A flowchart of the steps of a method for monitoring leakage current of a long cable in a substation with low channel dependence according to the present invention;

[0034] Figure 2 This is a schematic diagram of a substation cable in an embodiment of the present invention;

[0035] Figure 3 It is a schematic diagram of correcting the phase difference between two sides of a long cable by using a comparison reference in an embodiment of the present invention;

[0036] Figure 4 Schematic diagram of a switching mechanism for switching monitoring modes when electrical quantity signals on both sides of a long cable are incomplete in an embodiment of the present invention. DETAILED DESCRIPTION

[0037] The technical solution of the present invention is further described below in conjunction with the accompanying drawings:

[0038] In the prior art, the detection method based on the residual current principle generally installs a residual current transformer (RCT) at the beginning and end of a long cable to extract the residual current at both ends, and then takes the difference current of the residual current at both ends to determine whether there is leakage based on the difference current. However, in practical applications, this method has the following problems:

[0039] 1. The key to calculating the differential current principle lies in the simultaneity of the data at both ends. Since the AC system of the substation is generally not connected to the timing system or uses optical fiber communication, the phase difference of the current at the beginning and end of the long cable may be caused by factors such as communication delay, resulting in additional errors, which may cause the monitored differential current to be too large or even cause false alarms. This problem can be solved by optical fiber communication, but the cost is too high.

[0040] 2. The reliability of small CT in AC system of substation is much worse than that of primary equipment CT. The current signal of one side of CT is often lost. At this time, the residual current differential flow becomes a single-side residual current, and there is a possibility of false alarm due to the increase of differential current. This problem cannot be solved even by using optical fiber communication and other methods.

[0041] In view of the above problems, the present invention proposes a low channel-dependent substation long cable leakage current monitoring method. The present invention comprehensively considers the different situations of the current signals on both sides of the long cable and provides monitoring methods under different situations, such as Figure 1 As shown, the specific steps include:

[0042] Step A: Electrical quantity collection:

[0043] An electrical quantity acquisition unit is respectively arranged on both sides of the long cable, and then the electrical quantity signals on both sides of the long cable are respectively acquired through the electrical quantity acquisition unit, wherein the electrical quantity acquisition unit includes at least 2 current transformers and 1 voltage transformer, and the electrical quantity signal includes a current signal and a voltage signal.

[0044] like Figure 2 As shown, at the long cable bus side / head end (i.e. Figure 2 The first electrical quantity collection unit is set on the M side of the cable. Specifically, the four wires A, B, C, and N on the M side are regarded as a whole, and the first current transformer is installed on the four wires. The second current transformer is installed at the A-phase head end of the M side. The residual current and the A-phase load current on the M side of the long cable are collected through the first current transformer and the second current transformer. At the same time, the first voltage transformer is installed on the M side, and the head-end bus voltage is collected through the first voltage transformer. Figure 2A second electrical quantity collection unit is set on the N side of the long cable. Specifically, the four lines A, B, C, and N on the N side are regarded as a whole, a third current transformer is installed on the four lines, and a fourth current transformer is installed at the end of the A phase on the N side. The residual current on the N side of the long cable and the A phase load current are collected through the third current transformer and the fourth current transformer. At the same time, a second voltage transformer is installed on the N side, and the load side voltage at the end of the long cable is collected through the second voltage transformer.

[0045] The method of the present invention mainly utilizes the residual current on both sides of the long cable to perform leakage detection, and simultaneously utilizes the A-phase load current and the voltage on both sides for auxiliary judgment.

[0046] Step B: Determination of electrical quantity integrity:

[0047] The integrity of the electrical quantity signals on both sides of the long cable is judged, that is, whether the electrical quantity signals on both sides of the long cable can be collected at the same time.

[0048] Depending on the received signals, the method of the present invention may face two situations: first, the electrical quantity signals on both sides of the long cable are complete, that is, the electrical quantity signals on both sides of the long cable can be collected at the same time; second, the electrical quantity signals on both sides of the long cable are incomplete, that is, only the electrical quantity signals on one side of the long cable can be collected, or even the electrical quantity signals on both sides cannot be collected.

[0049] In view of the above two situations, the embodiments of the present invention provide different leakage monitoring methods, see step C and step D for details.

[0050] Step C: When the electrical quantity signals on both sides of the long cable are complete, the monitoring mode of the long cable is switched to the long cable measurement mode. In this mode, the phase difference on both sides of the long cable is corrected using a comparison reference, and leakage current monitoring is performed according to the differential protection principle.

[0051] Step C01: Figure 3 As shown, a short-time current signal is coupled to the current on both sides of the long cable at the same time. Based on the simultaneity of the short-time current signal and using the short-time current signal as a comparison benchmark, the communication delay can be adjusted to achieve synchronization of the electrical quantity signals on both sides.

[0052] Step C02: Since the current amplitude change of the short-time current signal is different from the current amplitude change of the long cable, when a comparison reference signal exists in the collected electrical quantity signals on both sides of the long cable, an obvious bulge or depression can be seen in the current waveform diagram. According to the comparison reference signal, the load side current of the long cable is aligned with the bus side current on the time axis, and the current waveform diagrams on both sides of the long cable containing the comparison reference are overlapped in time to synchronize the currents on both sides of the long cable and obtain the adjusted load side current.

[0053] Step C03: Based on step C02, the differential current is calculated using the long cable bus-side current and the adjusted load-side current, and the long cable leakage is determined based on the current vector differential principle.

[0054] If |I M (t)-I′ N (t)|>I T , it is judged that the long cable has leakage, otherwise it is judged that the long cable has no leakage.

[0055] Among them, I M (t) represents the residual current amplitude on the long cable bus side at time t, I′ N (t) represents the residual current amplitude on the load side of the long cable at time t after adjustment, I T is the current amplitude differential threshold, a typical empirical value is 10mA.

[0056] Step C03. Although the comparison reference signal is coupled in step C01, in the actual electrical quantity collection process, it is possible that the current signals on both sides of the long cable can be collected but the comparison reference signal cannot be collected or the comparison reference signal is suddenly lost. When there is no comparison reference in the electrical quantity signals on both sides of the long cable, the method of the present invention can perform long cable leakage judgment based on the current amplitude differential principle.

[0057] The expression for long cable leakage judgment based on the current amplitude differential principle is as follows:

[0058]

[0059] Among them, I M (t) represents the residual current amplitude on the long cable bus side at time t, I N (t) represents the residual current amplitude on the load side of the long cable at time t, I T′ is the current amplitude differential threshold, Indicates the critical value of residual current on the load side of a long cable. is the mechanism conversion coefficient, It is the current amplitude differential threshold value with braking.

[0060] In the embodiment of the present invention, I T′ A typical empirical value is 10mA. The empirical value is 200mA.

[0061] The mechanism conversion coefficient is as follows In an embodiment of the present invention, The calculation formula is as follows:

[0062]

[0063] The calculation formula is as follows:

[0064]

[0065] According to formula (4), when the residual current on the load side of the long cable is small When I T′ As a fixed value for long cable leakage judgment, if ||I M (t)|-|I N (t)||>I T′ , then it is judged that the long cable is leaking, otherwise it is not leaking; when the residual current on the load side of the long cable is large When As a fixed value for long cable leakage judgment, if It is judged that the long cable is leaking electricity, otherwise it is not leaking electricity.

[0066] In an embodiment of the present invention, if the comparison benchmark can be collected at the beginning, but the subsequent comparison benchmark is lost, since the phase difference has been eliminated by adjusting the load side current phase at the beginning, although the comparison benchmark is lost, the signal error on both sides of the long cable will not be too large. At this time, the current amplitude differential principle with relatively low channel requirements and low sensitivity to phase difference is adopted to distinguish long cable leakage, which can improve the accuracy of the distinction. In addition, if the comparison benchmark cannot be collected all the time, resulting in the inability to eliminate the phase difference, the method of the present invention can also directly use the current amplitude differential principle to distinguish long cable leakage, because the current amplitude differential principle has low sensitivity to phase difference and is robust. This principle can reduce the calculation error and improve the accuracy of leakage distinction.

[0067] Step D: When the electrical quantity signals on both sides of the long cable are incomplete, the monitoring mode of the long cable is switched using a preset switching mechanism, and leakage current monitoring is performed based on the electrical quantity signals on one side of the long cable. Figure 4 As shown, the specific operation of step D is as follows:

[0068] Step D01, when the switch is closed, if the electrical quantity signal on the bus side of the long cable disappears and the electrical quantity signal on the load side is normal, after a delay, it is determined that the bus side CT is abnormal, and a bus side CT abnormal alarm signal is generated, and the monitoring mode of the long cable is switched to the load leakage mode. The residual current on the load side of the long cable and the preset load side residual current threshold are used to determine whether the AC load has leakage. When the residual current on the load side of the long cable exceeds the load side residual current threshold, the long cable is leaking.

[0069] Step D02, after the switch is closed, if the electrical quantity signal on the load side of the long cable disappears and the electrical quantity signal on the bus side is normal, after a delay, it is determined that the load side CT is abnormal, and a load side CT abnormal alarm signal is generated, and the monitoring mode of the long cable is switched to the full branch leakage mode. The residual current on the bus side of the long cable and the preset bus side residual current threshold are used to determine whether the AC load has leakage. When the residual current on the bus side of the long cable exceeds the bus side residual current threshold, the long cable is leaking.

[0070] Step D03: After the switch is closed, if the electrical quantity signals on both sides of the long cable disappear, a cable abnormality alarm signal is generated, and no leakage detection is performed.

[0071] Step D04: When the switch is in the open position, the branch exits after a delay.

[0072] In step D, leakage detection is performed only when the switch is closed. If the switch is not closed, leakage detection is not performed. The load-side residual current threshold and the bus-side residual current threshold are generally manually set empirical values.

[0073] In the embodiment of the present invention, the step numbers A, B, C, and D do not represent the operating order of the steps, but are only used to distinguish different steps. Different steps can be performed in parallel or in sequence according to actual conditions.

[0074] Compared with the prior art, the method of the present invention does not rely too much on channel performance, does not need to connect a timing system to the substation AC system or use optical fiber communication, and can directly use the current signals at the beginning and end of the long cable to perform accurate and reliable leakage current monitoring. Specifically, the method of the present invention can adjust the monitoring mode according to the signal conditions on both sides of the long cable of the substation, correct the phase difference when the signals on both sides of the cable are complete, reduce the additional error caused by the phase difference between the currents at the beginning and end of the long cable, improve the accuracy of the differential current calculation, and then improve the accuracy of leakage monitoring. When the current signal on one side of the cable is lost, leakage monitoring can be performed based on the single-side current signal to avoid false alarms of leakage faults. Compared with the prior art, the method of the present invention has lower cost, is easy to promote and use, effectively improves the accuracy of leakage monitoring, and improves the monitoring level of the insulation condition of the substation AC long cable.

[0075] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for monitoring leakage current of a substation cable with low channel dependence, characterized in that: The steps include: The electrical quantity signals on both sides of the long cable are collected by the electrical quantity collection unit, and the integrity of the electrical quantity signals on both sides of the long cable is judged; When the electrical quantity signals on both sides of the long cable are complete, the phase difference on both sides of the long cable is corrected using the comparison benchmark, and leakage current monitoring is performed based on the differential protection principle; When the electrical quantity signals on both sides of the long cable are incomplete, the long cable monitoring mode is switched using the preset switching mechanism, and leakage current monitoring is performed based on the electrical quantity signals on one side of the long cable; When the electrical quantity signals on both sides of the long cable are complete, the leakage current monitoring methods include: A short-time current signal is coupled to the A-phase load current on both sides of the long cable at the same time as a comparison reference signal; When there is a comparison reference signal in the collected electrical quantity signals on both sides of the long cable, the load side current of the long cable is aligned with the bus side current on the time axis according to the comparison reference signal to obtain the adjusted load side current; The differential current is calculated using the long cable bus-side current and the adjusted load-side current, and the long cable leakage is identified based on the current vector differential principle; When there is no reference signal for comparison in the collected electrical quantity signals on both sides of the long cable, the differential current is calculated using the currents on both sides of the long cable, and the long cable leakage is identified based on the current amplitude differential principle; When the electrical quantity signals on both sides of a long cable are incomplete, the leakage current monitoring methods include: When the switch is closed, if the electrical quantity signal on the bus side of the long cable disappears and the electrical quantity signal on the load side is normal, after a delay, the bus side CT is judged to be abnormal, and a bus side CT abnormal alarm signal is generated, and the monitoring mode of the long cable is switched to the load leakage mode. The residual current on the load side of the long cable and the preset load side residual current threshold are used to determine whether the AC load has leakage; When the switch is closed, if the electrical quantity signal on the load side of the long cable disappears and the electrical quantity signal on the bus side is normal, after a delay, the load side CT is judged to be abnormal, and a load side CT abnormal alarm signal is generated, and the monitoring mode of the long cable is switched to the full branch leakage mode, and the residual current on the long cable bus side and the preset bus side residual current threshold are used to determine whether the AC load has leakage; When the switch is closed, if the electrical quantity signals on both sides of the long cable disappear, a cable abnormality alarm signal is generated and no leakage detection is performed.

2. A method for monitoring leakage current of a long cable in a substation with low channel dependence according to claim 1, characterized in that: The electrical quantity collection unit includes at least two current transformers and one voltage transformer, wherein one current transformer is used to collect the A-phase load current of the long cable, the other current transformer is used to collect the residual current of the long cable, and the voltage transformer is used to collect the bus voltage at the head end or the load side voltage at the end of the long cable.

3. A method for monitoring leakage current of a long cable in a substation with low channel dependence according to claim 1, characterized in that: The method for judging long cable leakage based on the current vector differential principle is: if , then it is judged that the long cable has leakage, otherwise it is judged that the long cable has no leakage; in, It represents the residual current amplitude on the long cable bus side at time t, It indicates the residual current amplitude on the load side of the long cable at time t after adjustment, is the current amplitude differential threshold.

4. A method for monitoring leakage current of a long cable in a substation with low channel dependence according to claim 1, characterized in that: The expression for long cable leakage judgment based on the current amplitude differential principle is as follows: ; in, It represents the residual current amplitude on the long cable bus side at time t, It represents the residual current amplitude on the load side of the long cable at time t, is the current amplitude differential threshold, Indicates the critical value of residual current on the load side of a long cable. is the mechanism conversion coefficient, It is the current amplitude differential threshold value with braking.

5. A method for monitoring leakage current of a long cable in a substation with low channel dependence according to claim 4, characterized in that: The calculation formula is as follows: ; The calculation formula is as follows: 。