Oil pumping method and device based on intermittent full-cycle motion of crank
Through the oil pumping method and device of intermittent full-circle motion of the crank, the problem of insufficient liquid supply and automatic start-up and shutdown safety of the beam-type oil production unit is solved, intelligent intermittent pumping production is realized, the cost and power consumption are reduced, and the liquid production volume is increased. and system efficiency.
Patent Information
- Application Number
- CN202110036805.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-12
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-01-12
AI Technical Summary
When the liquid supply of the existing beam-type oil production unit is insufficient, the dynamic fluid level drops, resulting in a decrease in liquid production and an increase in power consumption. Moreover, automatic startup and shutdown poses safety risks. The reciprocating crank motion of the traditional intermittent oil pumping unit causes electrical and mechanical problems.
The oil pumping method and device based on the intermittent full-circle motion of the crank are used to determine the time period set of the intermittent full-circle motion of the crank by generating a surface power diagram and a pump power diagram, and run the full-circle motion of the crank in adjacent intervals. , realizes intelligent intermittent pumping and avoids the disadvantages caused by the shutdown and non-circular movement of traditional intermittent oil pumping units.
It realizes intelligent indirect pumping production of oil pumping units, reduces costs and power consumption, avoids safety hazards, and improves liquid production volume and system efficiency.
Smart Images

Figure CN114753811B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil pumping units, and in particular to an oil pumping method and device based on intermittent full-cycle motion of a crank. Background Art
[0002] In the prior art, most oil and gas fields use beam pumps for oil production. The basic working principle of the pump is that the motor lifts the oil pump downhole through a connecting rod mechanism to pump crude oil, which has the advantages of being economical and reliable. Therefore, continuously improving its efficiency is an important research direction, especially for a large number of oil wells with insufficient fluid supply in China. Insufficient fluid supply causes the dynamic liquid level to drop after a period of pumping, the filling degree of the oil pump decreases, and the liquid production of the pump decreases. However, the motor of the pump is still consuming electricity during operation, and the amount of electricity consumption per unit of liquid production increases. In the actual operation of oilfield enterprises, electricity consumption accounts for a large proportion of their oil production costs, resulting in serious waste.
[0003] As a countermeasure, a technology of starting and stopping the pumping unit by intermittent pumping has been developed, that is, an intermittent start-stop method of starting the pumping unit for a period of time and then stopping the pumping unit for a period of time. Since the period of rest can wait for the downhole oil to flow in to increase the dynamic liquid level, increase the filling degree of the pumping pump, and directly save electricity, killing two birds with one stone. However, the problem that follows is how to realize the start and stop. The existing practice is to use manual start and stop, such as turning on the machine at work and shutting down the machine after get off work, turning it on and off once a day. This intermittent pumping system is simple and feasible, but there are the following problems. The best intermittent pumping system should be to start pumping when the oil flow converges to the appropriate liquid level, and stop pumping in time when the dynamic liquid level drops, so as to maintain the optimal oil flow and increase the liquid production. Therefore, automatic start and stop came into being. It can detect and calculate the downhole oil flow conditions through technical means, start and stop the pumping unit in time, and ensure the optimal liquid production. However, there are safety issues with automatic start and shutdown. During the intervals of shutdown, the moving parts of the oil pump are stationary. If someone approaches the moving parts of the oil pump for various reasons, the oil pump may suddenly start without obvious warning and cause a safety accident.
[0004] In addition, when the underground oil is thick oil or oil with high sand content, especially in winter, long-term pumping and stopping operation will cause wax deposition at the wellhead and other faults. Long-term stopping operation in winter requires pulling the handbrake, loosening the packing, and even sweeping the line, which brings a great economic burden to the oil and gas field.
[0005] At present, there is a technical method to solve the problem, which is called the operation method of the beam pumping unit based on non-full-cycle motion. The method is to arrange the crank of the beam pumping unit to reciprocate continuously during the period of intermittent pumping and stop continuous operation, without doing work to lift oil, just to remind personnel not to approach the pumping unit to achieve safety purposes. However, its continuous reciprocating motion also causes some electrical and mechanical problems, such as long-term positive and negative impact of the gearbox, the gearbox cannot lift oil through the gears to reduce lubrication efficiency, the ordinary motor is not cooled well and heats up due to long-term non-full-cycle operation, and the use of small-power inverters to bear reciprocating motion and switch to industrial frequency starting mode to start the motor in order to reduce costs. Summary of the invention
[0006] In response to the problems in the prior art, the present invention provides an oil pumping method and device based on intermittent full-cycle motion of a crank, which can realize intelligent intermittent pumping production of the oil pumping unit and can effectively reduce costs and save electricity consumption.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0008] In a first aspect, the present invention provides an oil pumping method based on intermittent full-cycle motion of a crank, comprising:
[0009] Generate a ground dynamometer diagram based on the stroke, load and stroke frequency of the target oil and gas well;
[0010] Generate a time period set of crank intermittent full-cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram;
[0011] According to the time period set, at least one crank full cycle motion is performed within existing adjacent interval time periods in the target oil and gas well.
[0012] In one embodiment, the oil pumping method based on the intermittent full-cycle motion of the crank further includes:
[0013] The stroke, load and number of strokes are determined according to the liquid level in the target oil and gas well, the well pressure, the crank mechanical parameters, the voltage of the motor, and the current mutual inductance parameters.
[0014] In one embodiment, a subset of the time period set includes at least one crank full cycle, and the time interval between adjacent subsets is less than one tenth of the existing adjacent time interval in the target oil and gas well;
[0015] The elements in the subset are the time required for one crank to make a full revolution.
[0016] In one embodiment, the oil pumping method based on the intermittent full-cycle motion of the crank further includes:
[0017] A pump power diagram is generated according to the electric power diagram corresponding to the electric submersible plunger pump in the target oil and gas well.
[0018] In one embodiment, the step of generating a pump power diagram according to an electric power diagram corresponding to an electric submersible plunger pump in a target oil and gas well includes:
[0019] Obtaining the current, voltage and power of the electric submersible piston pump;
[0020] Using the dynamic equation of the motor mover, a pump load model corresponding to the electric submersible piston pump is generated according to the current, voltage and power of the electric submersible piston pump;
[0021] An electrical work diagram is generated based on the current, voltage, power and pump load model.
[0022] In a second aspect, the present invention provides an oil pumping device based on intermittent full-cycle motion of a crank, comprising:
[0023] A surface dynamometer diagram generating unit, used for generating a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well;
[0024] A time period set generating unit, used for generating a time period set of the crank intermittent full cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram;
[0025] The time period inserting unit is used to run at least one crank full cycle motion within the existing adjacent interval time periods in the target oil and gas well according to the time period set.
[0026] In one embodiment, the oil pumping device based on intermittent full-cycle motion of the crank also includes: a three-parameter determination unit, which is used to determine the stroke, load and number of strokes based on the liquid level in the target oil and gas well, the well pressure, the crank mechanical parameters, the voltage of the motor, and the current mutual inductance parameters.
[0027] In one embodiment, a subset of the time period set includes at least one crank full cycle, and the time interval between adjacent subsets is less than one tenth of the existing adjacent time interval in the target oil and gas well;
[0028] The elements in the subset are the time required for one crank to make a full revolution.
[0029] In one embodiment, the oil pumping device based on the intermittent full-cycle motion of the crank further includes:
[0030] The pump work diagram generating unit is used to generate a pump work diagram according to the electric work diagram corresponding to the electric submersible plunger pump in the target oil and gas well.
[0031] In one embodiment, the pump performance diagram generating unit comprises:
[0032] A third parameter acquisition module is used to obtain the current, voltage and power of the electric submersible piston pump;
[0033] A pump load model generating module, for generating a pump load model corresponding to the electric submersible piston pump according to the current, voltage and power of the electric submersible piston pump by using the dynamic equation of the motor mover;
[0034] The electric power diagram generation module is used to generate the electric power diagram according to the current, voltage, power and pump load model.
[0035] In a third aspect, the present invention provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of an oil pumping method based on intermittent full-cycle motion of a crank are implemented.
[0036] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of an oil pumping method based on intermittent full-cycle motion of a crank.
[0037] From the above description, it can be seen that the oil pumping method and device based on the intermittent full-cycle motion of the crank provided by the embodiment of the present invention first generates a ground indicator diagram according to the stroke, load and stroke frequency of the target oil and gas well; then, a time period set of the intermittent full-cycle motion of the crank is generated according to the ground indicator diagram and the pump diagram; finally, according to the time period set, at least one full-cycle motion of the crank is operated in the existing adjacent interval time periods in the target oil and gas well. The present invention economically realizes the intermittent pumping function of the walking beam pumping unit without stopping (power off) and with intelligent safety and flexible motor start, overcoming the unreasonable changes in the oil flow level caused by traditional intermittent pumping and overcoming the drawbacks caused by the reciprocating motion of the crank. Intelligent intermittent pumping can save electricity consumption while ensuring the liquid production to the maximum extent, and produces better economic benefits than the more extensive traditional intermittent pumping system. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 Schematic diagram of the oil pumping method based on the intermittent full-cycle motion of the crank in the embodiment of the present invention Figure 1 ;
[0040] Figure 2 It is a timing diagram of the oil pumping method based on the intermittent full-cycle motion of the crank in an embodiment of the present invention;
[0041] Figure 3 Schematic diagram of the oil pumping method based on the intermittent full-cycle motion of the crank in the embodiment of the present invention Figure 2 ;
[0042] Figure 4 Schematic diagram of the oil pumping method based on the intermittent full-cycle motion of the crank in the embodiment of the present invention Figure 3 ;
[0043] Figure 5 is a flow chart of step 500 in an embodiment of the present invention;
[0044] Figure 6 It is a schematic flow chart of an oil pumping method based on intermittent full-cycle motion of a crank in a specific application example of the present invention;
[0045] Figure 7 It is a timing diagram of the oil pumping method in the prior art;
[0046] Figure 8 The timing of the oil pumping method based on the intermittent full-cycle motion of the crank in the specific application example of the present invention is Figure 1 ;
[0047] Fig. 9 The timing of the oil pumping method based on the intermittent full-cycle motion of the crank in the specific application example of the present invention is Figure 2 ;
[0048] Fig.10 The surface power indicator of a well corresponding to a well in a specific application example of the present invention that does not use the method provided by the present invention Figure 1 ;
[0049] Fig.11 The surface power indicator of a well corresponding to a well in a specific application example of the present invention that does not use the method provided by the present invention Figure 2 ;
[0050] Fig.12 The surface power indicator of a well corresponding to the method provided by the present invention in a specific application example of the present invention is shown in FIG. Figure 1 ;
[0051] Fig.13 The surface power indicator of a well corresponding to the method provided by the present invention in a specific application example of the present invention is shown in FIG. Figure 2 ;
[0052] Fig.14 The structural frame of the oil pumping device based on the intermittent full-cycle motion of the crank in the embodiment of the present invention is Figure 1 ;
[0053] Fig.15 The structural frame of the oil pumping device based on the intermittent full-cycle motion of the crank in the embodiment of the present invention is Figure 2 ;
[0054] Fig.16 The structural frame of the oil pumping device based on the intermittent full-cycle motion of the crank in the embodiment of the present invention is Figure 3 ;
[0055] Fig.17 It is a structural block diagram of a pump work diagram generating unit in an embodiment of the present invention;
[0056] Fig.18 FIG. 4 is a schematic diagram of the structure of an electronic device in an embodiment of the present invention. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0058] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0059] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or apparatuses.
[0060] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0061] The embodiment of the present invention provides a specific implementation of the oil pumping method based on the intermittent full-cycle motion of the crank, see Figure 1 , the method specifically includes the following contents:
[0062] Step 100: Generate a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well.
[0063] It can be understood that the ground work diagram, also known as the bare rod work diagram, refers to a closed curve that represents the change in the hanging point load when the bare rod is in different positions in a pumping cycle. The area of the graph can reflect the work done by the bare rod in a pumping cycle.
[0064] Step 200: Generate a time period set of crank intermittent full-cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram.
[0065] It should be noted that the subset (or element) in the time period set in step 200 corresponds to a number of time periods, which may be equal or unequal, and the time intervals between them may be equal or unequal, depending on the specific working conditions.
[0066] Step 300: According to the time period set, at least one crank full cycle motion is performed within existing adjacent interval time periods in the target oil and gas well.
[0067] The difference from the existing beam pumping intermittent pumping mode and the above-mentioned beam pumping operation method based on non-integer motion is that in step 300, the crank of the beam pumping unit performs intermittent short-term full-cycle motion during the period of intermittent pumping to stop continuous operation, replacing the traditional intermittent pumping and non-integer motion mode of intermittent pumping with complete shutdown. Figure 2 ( Figure 2 Where T1 is the intermittent continuous start-up time; T2 is the intermittent shutdown time; t1 is the intermittent full-cycle rotation interval time; t2 is the inching interval time; t3 is the intermittent full-cycle rotation time; D is intermittent inching; Z is intermittent full-cycle rotation), the existing adjacent interval time periods in the target oil and gas well in step 300 refers to the time period between the two T1 in the figure, where t1 is a subset of the time period set, t2 is an element of the subset, each t2 corresponds to a crank full-cycle motion, and a subset (t1) is formed by four crank full-cycle motions in the figure. It should be noted that each subset may not be equal, and the distance between each element may also be unequal.
[0068] From the above description, it can be seen that the pumping method and device based on the intermittent full-cycle motion of the crank provided by the embodiment of the present invention first generates a ground indicator diagram according to the stroke, load and stroke frequency of the target oil and gas well; then, generates a time period set of the intermittent full-cycle motion of the crank according to the ground indicator diagram and the pump diagram; finally, according to the time period set, runs at least one full-cycle motion of the crank in the existing adjacent interval time periods in the target oil and gas well. The intermittent operation mode provided by the present invention includes a single-direction drive with selectable time length, and there is a preset interval time between each two intermittent operations. For the shortest intermittent operation, it is the inching of the drive motor. The motor belt starts to move but the crank is only inching. The inching can play the role of a safety reminder before the motor of the pumping well is started. The intermittent operation mode can also start from the inching, gradually increase the intermittent operation time according to a certain interval time, and realize the safety reminder with greater force until continuous operation starts. The intermittent motion mode with a relatively long time can also be that the drive motor drives the crank to run continuously for several circles after starting, which is especially necessary when the pumping well works at low temperature, wax deposition, and sand deposition. The interval between two intermittent operations is determined according to the strategy formulated by the intelligent control module.
[0069] In one embodiment, see Figure 3 , the oil pumping method based on the intermittent full-cycle motion of the crank also includes:
[0070] Step 400: Determine the stroke, load and number of strokes according to the liquid level in the target oil and gas well, the well pressure, the crank mechanical parameters, the voltage of the motor, and the current mutual inductance parameters.
[0071] It can be understood that the stroke is the distance between the top dead center and the bottom dead center of the bare rod during the operation of the pumping unit. The stroke refers to the number of times the pumping rod reciprocates up and down per minute in the pumping well. The pumping units currently used in oil fields. The inertial load generated by the acceleration has the following relationship: C (= stroke * stroke 2 / 1790).
[0072] In one embodiment, a subset in the time period set includes at least one crank full cycle, and the time interval between adjacent subsets is less than one tenth of the existing adjacent interval time in the target oil and gas well; the elements in the subset are the time required for a crank full cycle movement.
[0073] See also Figure 2 In the time period T2 when the crank stops running, the walking beam pump is started by a flexible starting method at time intervals of t1 (generally t1 is much smaller than T2, preferably smaller than one tenth of T2) and runs for several consecutive cycles (such as 1-2 cycles or even more, depending on the oil quality) of the crank and then stops.
[0074] In one embodiment, see Figure 4, the oil pumping method based on the intermittent full-cycle motion of the crank also includes:
[0075] Step 500: Generate a pump power diagram according to the electric power diagram corresponding to the electric submersible plunger pump in the target oil and gas well.
[0076] It is understandable that the downhole pump diagram of the beam pumping well can directly reflect the working condition of the oil pump, and is an important basis for oil well fault analysis and lifting process parameter optimization. The existing downhole pump diagrams are all tested at the ground bare rod to obtain the bare rod indicator diagram, and then calculated according to the elastic mathematical model of the sucker rod, which indirectly reflects the working condition of the oil pump. However, due to the strong Coulomb friction between the sucker rod and the oil pipe, it is a complex nonlinear process of electromechanical fluid coupling, and the complexity and unpredictability of the downhole working conditions make it difficult to establish an accurate mathematical model, resulting in an error between the ground indirect test results based on the mathematical model and the actual pump condition, and the approximate pump diagram is obtained. Therefore, step 500 uses a MEMS (micro-electromechanical system) sensor to measure the acceleration of the upper end of the oil pump, and then calculates the stroke of the oil pump through quadratic integration, so as to accurately judge the working condition of the oil pump.
[0077] In one embodiment, see Figure 5 , step 500 comprises:
[0078] Step 501: obtaining the current, voltage and power of the electric submersible piston pump;
[0079] Step 502: using the dynamic equation of the motor mover, generating a pump load model corresponding to the electric submersible piston pump according to the current, voltage and power of the electric submersible piston pump;
[0080] Step 503: Generate an electrical work diagram according to the current, voltage, power and pump load model.
[0081] In step 501 to step 503, the pump power diagram is calculated according to the electrical diagram through the plunger load model and the motor output shaft power model. This method does not require the installation of load sensors underground.
[0082] The advantages of the unidirectional drive method provided by the present invention over the crank swing method mentioned in the background art are as follows: the present invention adopts unidirectional drive instead of bidirectional swing reciprocating motion to avoid the impact caused by the bidirectional motion of the electrical and mechanical systems, because the initial design of the oil pump is not designed and manufactured according to the bidirectional operation mode. The present invention adopts unidirectional drive instead of bidirectional swing reciprocating motion to avoid the problem that the gearbox gear cannot be lubricated by the gear operation due to long-term bidirectional swing.
[0083] To further illustrate the present solution, the present invention also provides a specific application example of an oil pumping method based on intermittent full-cycle motion of a crank, which specifically includes the following contents.
[0084] In this specific application example, there is also provided an oil pumping device based on intermittent full-cycle motion of a crank, which includes: a motor, an electric quantity measurement module, an intelligent controller single-chip computer module, an isolation coupler, a soft starter or a frequency converter drive module, a wireless communication module, and a host computer. Specifically, an intelligent control box and a motor driver are added to the power supply cabinet of an ordinary walking beam pumping unit. The intelligent computer program in the intelligent control box controls all the time period sets given by the method of the present invention according to instructions. In addition, the intelligent analysis program therein can also independently determine the timing of intermittent pumping by analyzing the downhole oil and liquid conditions, so as to achieve a more optimized oil pumping process. The purpose of selecting a reasonable motor driver is to solve the flexible starting of the motor.
[0085] In another embodiment, the pumping device based on the intermittent full-cycle motion of the crank includes a soft starter or a frequency converter controlled by an intelligent controller. The intelligent controller is composed of a microprocessor chip and a peripheral circuit. After the intelligent controller collects the power parameters of the pumping well motor for intelligent calculation or directly obtains the control strategy and instructions of the artificial input after optimization by the upper computer, it outputs intermittent drive signals of different time lengths through the isolation coupler. This signal is connected to the control input terminal of the soft starter or the frequency converter, and the drive motor starts and stops according to the set time to achieve intermittent operation. The intelligent controller is connected to the power collection module for measuring voltage, current, power, etc., and the current collection of the motor is obtained through a current transformer. It can be understood that the advantage of using a soft starter or a frequency converter as an electric drive module to drive the motor is that they can accept the control of the intelligent controller and can reduce the starting voltage of the motor during frequent starting, avoiding the strong impact current of the intermittently running motor during frequent power frequency starting, and protecting the motor and mechanical system.
[0086] The soft starter or inverter drive module is connected to the motor to control the start and stop of the motor. In particular, by setting the soft starter drive module to control the motor to drive the intermittent operation of the pumping well, the intelligent intermittent pumping production of the pumping unit can be realized, which can effectively reduce costs. The intelligent controller single-chip computer module is connected to the power acquisition module that measures voltage, current, power, etc. In addition, the current acquisition of the motor is obtained through a current transformer. The working steps of the device are as follows: First, the intelligent controller receives the output signal of the power acquisition module and analyzes the power parameters. The power parameters are calculated or uploaded to the host computer for more comprehensive calculations. According to the power parameters and other parameters collected by the system, intelligent calculations are performed to obtain analysis data of the field working conditions. The future control strategy and control parameters are determined by analyzing the data. According to the optimization strategy and parameters obtained by intelligent calculation, the intelligent controller outputs intermittent drive signals of different time lengths through the isolation coupler, which are connected to the control input of the soft starter or inverter to drive the motor to start and stop to achieve intermittent operation.
[0087] The pumping device based on the intermittent full-cycle motion of the crank has the following beneficial effects: by setting a soft starter or a frequency converter drive module to control the operation of the motor to drive the pumping well to run intermittently during the intermittent pumping stage, the intelligent intermittent pumping production of the pumping unit can be realized, which can effectively reduce costs and save electricity consumption.
[0088] See also Figure 6 Based on the above-mentioned oil pumping device based on intermittent full-cycle crank motion, the oil pumping method based on intermittent full-cycle crank motion provided in this specific application example includes the following steps:
[0089] Step S10: Generate a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well.
[0090] Specifically, the intelligent controller receives the output signal of the power acquisition module, including the three-phase voltage signal and the current transformer signal, analyzes the power of the power parameter, and uses the power curve to calculate the construction drawing. The construction drawing is calculated (when the donkey head moves up and down, the displacement and pressure (load) sensor pressure coordinates are obtained). Then, intelligent calculations are performed based on the power parameters and other parameters collected by the system (such as liquid level, pump crank parameters, etc.) to obtain the analysis data of the on-site working conditions. The future control strategy and control parameters are determined by analyzing the data.
[0091] Step S20: Generate a time period set of the crank intermittent full-cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram.
[0092] Specifically, since t1 is much smaller than T2, the short (t3) crank full cycle operation during the interval t1 does not affect the overall oil return function and energy saving effect through intermittent pumping compared with the traditional intermittent pumping. In addition, the relatively short time interval t1 full cycle oil extraction action produces an anti-waxing effect that is beneficial to the pumping well, and there are no problems caused by the reciprocating motion of the crank (problems caused by non-full cycle crank reciprocating operation: such as long-term positive and negative impact of the gear box, the gear box cannot extract oil through the gears to reduce the lubrication efficiency, and the ordinary motor is not cooled well and heats up due to long-term non-full cycle operation.
[0093] Also, see Figure 8 as well as Fig. 9 It is also possible to not perform a full rotation during the t1 period, but only perform inching or angular rotation, or a combination of the three. Figure 8 as well as Fig. 9 middle:
[0094] T1 is the continuous startup time of intermittent extraction;
[0095] T2 is the intermittent pumping stop time;
[0096] T3 is the time interval for the intermittent operation of the group of intermittently stopped devices;
[0097] t1 is the duration of inching;
[0098] t2, t3, and t4 are the durations of different durations of intermittent motion (small angles that are not full cycles);
[0099] t5 is the duration of the transition from intermittent operation to several full-cycle operations.
[0100] Step S30: According to the time period set, at least one crank movement is performed within existing adjacent interval time periods in the target oil and gas well.
[0101] Here, a test well in Dagang Oilfield is used as an example to explain step S30. Figure 2 as well as Figure 7 , where t is in seconds and T is usually in 10 minutes. Fig.11 This is the operation sequence diagram of the traditional intermittent pumping method, and the corresponding time base is measured in hours. For example, the pumping unit is started when going to work in the morning and shut down when leaving work. There is even an intermittent pumping arrangement where the pumping unit is started for 2 days and shut down for 5 days.
[0102] After step S30, the oil well surface performance diagram (see Figures 10 to 13 ) and Table 1, it can be found that the oil well fluid supply has been significantly improved, and the alternating load has no significant change. No fatigue damage to the sucker rod, motor overload, or dry grinding of the gearbox gear occurred during the production process. As can be seen from Table 1, the well pump efficiency increased by 108%, the system efficiency increased by 8.8 percentage points, the output increased by 3.9%, and the daily power consumption decreased by 38.2%.
[0103] Table 1 Comparison of system efficiency improvement before and after XX well construction
[0104]
[0105] This method does not have the drawbacks brought by the reciprocating motion of the crank, and there is no need to consider at which point of the running track the pump stops. The actual position where the pump stops freely is uncertain and has nothing to do with the upper and lower dead points. It is possible to stop at more than two equilibrium points.
[0106] Compared with the safety reminder function of the above-mentioned beam pumping unit operation method based on non-full-cycle crank motion, the method implemented by the present invention is: before starting at time interval t1, the motor is intermittently "jogged" several times at time interval t2 so that the nearby personnel can feel that the pumping unit is about to start and avoid it. It is completely unnecessary to use a relatively exaggerated, energy-consuming, and intermittent component wear-increasing method to achieve the reminder function. It is of course better if an audio reminder is provided at the same time as the jogging, and it is also easy to implement.
[0107] The pumping method based on the intermittent full-cycle motion of the crank provided in this specific application example is an intermittent short-term full-cycle motion of the crank of the beam pumping unit during the period of time when the intermittent pumping stops continuous operation to replace the intermittent pumping and the so-called non-full-cycle crank motion mode. The following technical problems can be solved: (1) To change the long-term shutdown to intermittent operation without cutting off the power and pulling the handbrake, especially in the winter to prevent wax deposition. (2) Effectively remind the personnel approaching the pumping unit before starting. (3) Frequent starting should prevent the severe motor power frequency starting mode from causing additional damage to the pumping unit due to electrical and mechanical shocks. (4) Overcoming the problems caused by non-full-cycle reciprocating operation: such as long-term forward and reverse impact of the gearbox, the gearbox cannot pump oil through the gears to reduce the lubrication efficiency, and the ordinary motor is not cooled well and heat is generated due to long-term non-full-cycle operation.
[0108] Based on the same inventive concept, the embodiments of the present application also provide an oil pumping device based on the intermittent full-cycle motion of a crank, which can be used to implement the method described in the above embodiments, such as the following embodiments. Since the principle of solving the problem by the oil pumping device based on the intermittent full-cycle motion of a crank is similar to that of the oil pumping method based on the intermittent full-cycle motion of a crank, the implementation of the oil pumping device based on the intermittent full-cycle motion of a crank can refer to the implementation of the oil pumping method based on the intermittent full-cycle motion of a crank, and the repeated parts will not be repeated. As used below, the term "unit" or "module" can be a combination of software and / or hardware that implements a predetermined function. Although the system described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.
[0109] The embodiment of the present invention provides a specific implementation of an oil pumping device based on crank intermittent full-cycle motion that can realize an oil pumping method based on crank intermittent full-cycle motion, see Fig.14 The pumping device based on the intermittent full-cycle motion of the crank specifically includes the following contents:
[0110] A surface dynamometer diagram generating unit 10 is used to generate a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well;
[0111] A time period set generating unit 20, configured to generate a time period set of the crank intermittent full cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram;
[0112] The time period inserting unit 30 is used to run at least one crank full cycle motion within the existing adjacent interval time periods in the target oil and gas well according to the time period set.
[0113] In one embodiment, see Fig.15The pumping device based on the intermittent full-cycle motion of the crank also includes: a three-parameter determination unit 40, which is used to determine the stroke, load and number of strokes according to the liquid level in the target oil and gas well, the well pressure, the crank mechanical parameters, the motor voltage, and the current mutual inductance parameters.
[0114] In one embodiment, a subset of the time period set includes at least one crank full cycle, and the time interval between adjacent subsets is less than one tenth of the existing adjacent time interval in the target oil and gas well;
[0115] The elements in the subset are the time required for one crank to make a full revolution.
[0116] In one embodiment, see Fig.16 , the oil pumping device based on the intermittent full-cycle motion of the crank also includes:
[0117] The pump performance diagram generating unit 50 is used to generate a pump performance diagram according to the electric performance diagram corresponding to the electric submersible plunger pump in the target oil and gas well.
[0118] In one embodiment, see Fig.17 , the pump work diagram generating unit 50 comprises:
[0119] The third parameter acquisition module 501 is used to acquire the current, voltage and power of the electric submersible piston pump;
[0120] A pump load model generating module 502 is used to generate a pump load model corresponding to the electric submersible piston pump according to the current, voltage and power of the electric submersible piston pump by using the dynamic equation of the motor mover;
[0121] The electric power diagram generation module 503 is used to generate an electric power diagram according to the current, voltage, power and pump load model.
[0122] From the above description, it can be known that the pumping device based on the intermittent full-cycle motion of the crank provided in the embodiment of the present invention first generates a mechanical three-dimensional model of the beam pumping unit according to the station field, the mechanical structure of the beam pumping unit and the relative motion relationship between its components; then, a multiphase flow motion model of the beam pumping unit is generated according to the flow field distribution of the oil-gas mixture in the beam pumping unit; finally, a digital twin model of the beam pumping unit is generated according to the mechanical three-dimensional model and the multiphase flow motion model. The present invention relates to simulation control and analysis of beam pumping units; it integrates real-time transmission of the Internet of Things, big data drive, and multi-body model enhancement, thereby solving technical problems that cannot be achieved or are difficult to achieve with physical models. In summary, the present invention provides an effective control device for intelligent closed loops that can accurately and vividly display and control, optimize process, and perform real-time and fine control.
[0123] The devices, modules or units described in the above embodiments may be implemented by computer chips or entities, or by products with certain functions. A typical implementation device is an electronic device, and the electronic device may be, for example, a personal computer, a laptop computer, a cellular phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.
[0124] In a typical example, the electronic device specifically includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the steps of the above-mentioned oil pumping method based on the intermittent full-cycle motion of the crank are implemented, and the steps include:
[0125] Step 100: Generate a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well;
[0126] Step 200: Generate a time period set of crank intermittent full-cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram;
[0127] Step 300: According to the time period set, at least one crank full cycle motion is performed within existing adjacent interval time periods in the target oil and gas well.
[0128] Reference below Fig.18 , which shows a schematic structural diagram of an electronic device 600 suitable for implementing an embodiment of the present application.
[0129] like Fig.18 As shown, electronic device 600 includes a central processing unit (CPU) 601, which can perform various appropriate operations and processes according to a program stored in a read-only memory (ROM) 602 or a program loaded from a storage portion 608 into a random access memory (RAM) 603. In RAM 603, various programs and data required for the operation of system 600 are also stored. CPU 601, ROM 602, and RAM 603 are connected to each other via a bus 604. An input / output (I / O) interface 605 is also connected to bus 604.
[0130] The following components are connected to the I / O interface 605: an input section 606 including a keyboard, a mouse, etc.; an output section 607 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 608 including a hard disk, etc.; and a communication section 609 including a network interface card such as a LAN card, a modem, etc. The communication section 609 performs communication processing via a network such as the Internet. A drive 610 is also connected to the I / O interface 605 as needed. A removable medium 611, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 610 as needed, so that a computer program read therefrom is installed as needed as the storage section 608.
[0131] In particular, according to an embodiment of the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present invention includes a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned oil pumping method based on the intermittent full-cycle motion of the crank are implemented, and the steps include:
[0132] Step 100: Generate a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well;
[0133] Step 200: Generate a time period set of crank intermittent full-cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram;
[0134] Step 300: According to the time period set, at least one crank full cycle motion is performed within existing adjacent interval time periods in the target oil and gas well.
[0135] In such an embodiment, the computer program may be downloaded and installed from a network via the communication section 609 , and / or installed from the removable medium 611 .
[0136] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0137] For the convenience of description, the above device is described in various units according to their functions. Of course, when implementing the present application, the functions of each unit can be implemented in the same or multiple software and / or hardware.
[0138] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0139] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0141] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, commodity or device including the element.
[0142] The present application may be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application may also be practiced in distributed computing environments where tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules may be located in local and remote computer storage media, including storage devices.
[0143] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0144] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.
Claims
1. A method for pumping oil based on intermittent full-cycle motion of a crank, characterized in that: include: Generate a ground dynamometer diagram based on the stroke, load and stroke frequency of the target oil and gas well; Generate a time period set of crank intermittent full-cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram; According to the time period set, at least one crank full cycle movement is performed within the interval time period of the existing adjacent intermittent pumping continuous operation in the target oil and gas well; According to the time period set, at least one crank full-cycle movement is performed in the interval time period of the existing adjacent intermittent pumping continuous operation in the target oil and gas well, including: in the time period when the intermittent pumping stops the continuous operation, the crank of the beam pumping unit performs intermittent short-time full-cycle movement; The subsets in the time period set include at least one crank full cycle, and the time interval between adjacent subsets is less than one tenth of the existing interval time of adjacent intermittent pumping continuous operation in the target oil and gas well; The elements in the subset are the time required for one crank to make a full revolution.
2. The oil pumping method based on intermittent full-cycle crank motion according to claim 1, characterized in that: Also includes: The stroke, load and number of strokes are determined according to the liquid level in the target oil and gas well, the well pressure, the mechanical parameters of the crank, the voltage of the motor, and the current mutual inductance parameters.
3. The oil pumping method based on intermittent full-cycle crank motion according to claim 1, characterized in that: Also includes: A pump power diagram is generated according to the electric power diagram corresponding to the electric submersible plunger pump in the target oil and gas well.
4. The oil pumping method based on intermittent full-cycle crank motion according to claim 3, characterized in that: The step of generating a pump power diagram according to the electric power diagram corresponding to the electric submersible plunger pump in the target oil and gas well comprises: Obtaining the current, voltage and power of the electric submersible piston pump; Using the dynamic equation of the motor mover, a pump load model corresponding to the electric submersible piston pump is generated according to the current, voltage and power of the electric submersible piston pump; An electrical work diagram is generated based on the current, voltage, power and pump load model.
5. An oil pumping device based on intermittent full-cycle motion of a crank, characterized in that: include: A surface dynamometer diagram generating unit, used for generating a surface dynamometer diagram according to the stroke, load and stroke frequency of the target oil and gas well; A time period set generating unit, used for generating a time period set of the crank intermittent full cycle motion according to the ground dynamometer diagram and the pump dynamometer diagram; A time period inserting unit, configured to operate at least one crank full cycle movement in the interval time period of the existing adjacent intermittent pumping continuous operation in the target oil and gas well according to the time period set; According to the time period set, at least one crank full-cycle movement is performed in the interval time period of the existing adjacent intermittent pumping continuous operation in the target oil and gas well, including: in the time period when the intermittent pumping stops the continuous operation, the crank of the beam pumping unit performs intermittent short-time full-cycle movement; The subsets in the time period set include at least one crank full cycle, and the time interval between adjacent subsets is less than one tenth of the existing interval time of adjacent intermittent pumping continuous operation in the target oil and gas well; The elements in the subset are the time required for one crank to make a full revolution.
6. The oil pumping device based on intermittent full-cycle motion of the crank according to claim 5, characterized in that: Also includes: The three-parameter determination unit is used to determine the stroke, load and number of strokes according to the liquid level in the target oil and gas well, the well pressure, the crank mechanical parameters, the voltage of the motor, and the current mutual inductance parameters.
7. The oil pumping device based on intermittent full-cycle motion of the crank according to claim 5, characterized in that: Also includes: The pump work diagram generating unit is used to generate a pump work diagram according to the electric work diagram corresponding to the electric submersible plunger pump in the target oil and gas well.
8. The oil pumping device based on intermittent full-cycle motion of the crank according to claim 7, characterized in that: The pump work diagram generating unit comprises: A third parameter acquisition module is used to obtain the current, voltage and power of the electric submersible piston pump; A pump load model generating module, for generating a pump load model corresponding to the electric submersible piston pump according to the current, voltage and power of the electric submersible piston pump by using the dynamic equation of the motor mover; The electric power diagram generation module is used to generate the electric power diagram according to the current, voltage, power and pump load model.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the oil pumping method based on the intermittent full-cycle motion of the crank as described in any one of claims 1 to 4 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the oil pumping method based on the intermittent full-cycle motion of the crank as claimed in any one of claims 1 to 4 are implemented.
Citation Information
Patent Citations
System and method for controlling interval pumping of oil well
CN102122161A
Method and device for generating pump indicator diagram based on electric submersible plunger pump
CN111963144A