A configuration optimization method and system for high voltage cable sheath protector
Through real-time induced voltage and energy calculation, the parameter configuration of the protective layer protector is optimized, and the problem of unreasonable configuration of the protective layer protector in the prior art is solved, and the safety and performance of high-voltage cable lines are improved.
Patent Information
- Application Number
- CN202210437081.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-20
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-04-20
AI Technical Summary
The existing technology lacks the technology to optimize the design of high-voltage cable protective devices, which cannot provide a theoretical basis for power cable lines, resulting in unreasonable configuration of the protective device, affecting its performance under lightning overvoltage and operating overvoltage.
By obtaining the real-time induced voltage of the protective layer protector, calculating the energy and influencing factors during its operation, optimizing the parameter configuration of the protective layer protector according to the adaptation curve, using entropy weight method and PSO optimization algorithm to update the parameter scheme to ensure that it is in Safety and performance in high-voltage environments.
It effectively avoids the safety hazards of the protective layer protector in high-voltage environment, optimizes its parameter configuration, and improves the safety and reliability of the cable lines.
Smart Images

Figure CN114784777B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a configuration optimization method and system for a high-voltage cable sheath protector, belonging to the technical field of overhead power transmission line ground wire insulation monitoring. Background Art
[0002] There are several reasons why the cable sheath protector is damaged under induced overvoltage: (1) Insufficient understanding of the overvoltage level of the metal sheath of the high-voltage cable line; (2) Improper configuration of the sheath protector. The selection of cable sheath protector parameters needs to consider the influencing factors of overvoltage and combine them with the insulation requirements of the cable outer sheath. At present, unreasonable configuration of sheath protectors often occurs in power grids. (3) Changes in the state of the sheath protector under multiple impacts. When lightning overvoltage and operating overvoltage occur, the overvoltage transmitted from the transmission line generates an induced overvoltage on the metal sheath, which causes the state of the sheath protector to change. In view of the above reasons, it is necessary to carry out multiple continuous impulse current tests to evaluate the impulse current tolerance capability of the sheath protector; to study the change rules of the performance parameters such as residual voltage, leakage current, power loss, etc. of the sheath protector under multiple overvoltages with the number of overvoltage impacts, etc.
[0003] According to GB50217 "Design Specifications for Power Engineering Cables", DL / T 401 "Guidelines for the Selection of High-voltage Cables" and DL / T5221 "Technical Regulations for the Design of Urban Power Cable Lines", the general regulations for the selection of sheath protector parameters are as follows: (1) The residual voltage of the protector when passing the maximum impulse current multiplied by 1.4 should be lower than the impulse withstand voltage of the cable sheath insulation; (2) The protector can withstand the maximum power frequency voltage for 5 seconds without damage; (3) The protector should be able to pass the maximum impulse current for a total of 20 times without damage.
[0004] Currently, there is a lack of technology for optimizing the design of technical parameters of power cable sheath protectors, which cannot provide a theoretical basis for selecting sheath protectors for power cable line design. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a configuration optimization method for a high-voltage cable sheath protector, which can optimize the high-voltage cable line sheath protector. To achieve the above purpose, the present invention is implemented by adopting the following technical solutions:
[0006] In a first aspect, the present invention provides a method, characterized in that it comprises:
[0007] Obtain the real-time induced voltage of the sheath protector;
[0008] According to the amplitude of the real-time induced voltage obtained, it is judged whether the sheath protector starts to act;
[0009] In response to the sheath protector starting to operate, calculating the energy absorbed by the sheath protector when it operates and determining whether the accumulated energy exceeds a threshold value;
[0010] In response to the accumulated energy exceeding a threshold value, an adaptation curve of the influencing factor of the sheath protector is calculated according to the energy absorbed when the sheath protector is actuated;
[0011] According to the calculated adaptation curve, the parameter configuration of the sheath protector is optimized.
[0012] In combination with the first aspect, further, the determining whether the sheath protector starts to act includes:
[0013] Calculate the actual rated voltage of the sheath protector using the following formula:
[0014] U r =U P / k (1)
[0015] In formula (1), U r is the actual rated voltage of the sheath protector, U p is the maximum value of the real-time induced voltage obtained, k is the power frequency voltage coordination coefficient of the protector, and the value range of k is 1.1 to 1.3, which is determined according to the insulation tolerance of the cable sheath and the action of the sheath protector;
[0016] Calculate the initial operating voltage of the sheath protector by the following formula:
[0017]
[0018] In formula (2), U 1mA is the starting action voltage;
[0019] If the amplitude of the real-time induced voltage obtained exceeds the starting action voltage of the protective layer protector, the protective layer protector starts to act; if the amplitude of the real-time induced voltage obtained does not exceed the starting action voltage of the protective layer protector, the protective layer protector does not act, and the real-time induced voltage of the protective layer protector continues to be obtained.
[0020] In combination with the first aspect, further, the energy absorbed by the sheath protector when it is in action is calculated by the following formula:
[0021]
[0022] In formula (3), in the case of a single-phase short circuit, the duration of the power frequency short-circuit current from t1-t2 is the high-voltage circuit breaker action response time; in the case of a lightning current directly striking the line, the duration of the power frequency short-circuit current from t1-t2 is the duration of a single lightning current; u(t) is the transient overvoltage of the sheath, and i(t) is the sheath circulating current.
[0023] In combination with the first aspect, further, the threshold is the threshold of the protective layer protector. If the calculated energy absorbed by the protective layer protector when it is actuated exceeds the threshold of the protective layer protector, hidden dangers may occur in the operation of the protective layer protector, and the parameter configuration of the protective layer protector needs to be optimized; if the calculated energy absorbed by the protective layer protector when it is actuated does not exceed the threshold of the protective layer protector, the protective layer protector operates normally, and the real-time induced voltage of the protective layer protector continues to be obtained.
[0024] In combination with the first aspect, further, the calculation of the adaptation curve of the influencing factors of the protective layer protector includes:
[0025] The initial single-core cable is laid in a "pin" shape, including single-core A, single-core B and single-core C. The distance between any two single-core cables is equal, and each single-core is provided with a sheath O.
[0026] Calculate the induced voltage on the sheath of any single core using the following formula:
[0027]
[0028] In formula (4), U O is the induced voltage on the sheath, f is the layout of the sheath protector line, I A ,I B ,I C are the core currents flowing through the three single-core cables, R is the average geometric radius of the sheath, r is the radius of the single-core cable core conductor, and D is the distance between any two single-core cables;
[0029] According to formula (4), the influencing factors of the sheath protector include the layout of the sheath protector line, the core current flowing through the single-core cable, the average geometric radius of the sheath, the radius of the single-core cable core conductor and the distance between any two single-core cables. The adaptation curve of the influencing factors of the sheath protector is calculated according to formula (4).
[0030] In combination with the first aspect, preferably, if the core currents flowing through the three single-core cables are equal, the induced voltage on the sheath of any single core is calculated by the following formula:
[0031]
[0032] In formula (5), U O is the induced voltage on the sheath, f is the layout of the sheath protector, R is the average geometric radius of the sheath, r is the radius of the single-core cable core conductor, and D is the distance between any two single-core cables.
[0033] In combination with the first aspect, further, the optimizing the parameter configuration of the sheath protector includes:
[0034] According to the calculated adaptation curve, five indicators that affect the parameter configuration of the sheath protector are initialized, including cable length, grounding method, protector energy absorption capacity, nominal discharge residual voltage and 2ms current capacity;
[0035] The entropy weight method is used to calculate the weights of the five indicators' influence on the parameter configuration of the sheath protector;
[0036] Based on the calculated weights, the least squares support vector machine algorithm based on PSO optimization is used to optimize and update the parameter configuration scheme of the sheath protector, and the optimal solution of the parameter configuration of the sheath protector is obtained.
[0037] In combination with the first aspect, further, obtaining the optimal solution for parameter configuration of the sheath protector includes:
[0038] Initialize the parameters of the least squares support vector machine algorithm based on PSO optimization, including the initial value of the iteration counter k=0, the maximum number of iterations k max and the maximum value Γ of the types of protection device configuration optimization schemes;
[0039] Initialize the parameters ω, c1, c2, r1, and r2 of the five indicators that affect the parameter configuration of the sheath protector to random values in the range of [0,1] to form an initial configuration scheme;
[0040] Initialize the initial velocity and initial position of the initial configuration scheme:
[0041]
[0042] In formula (6), V r is the initial velocity of the initial configuration, v ω is the initial velocity of parameter ω, is the initial velocity of parameter c1, is the initial velocity of parameter c2, is the initial velocity of parameter r1, is the initial velocity of parameter r2; U τ is the initial position of the initial configuration scheme, u ω is the initial position of the parameter ω, is the initial position of parameter c1, is the initial position of parameter c2, is the initial position of parameter r1, is the initial position of parameter r2;
[0043] k=k+1, the speed and position of updating the configuration scheme are expressed by the following formula:
[0044]
[0045] In formula (6), V r is the initial speed of the configuration scheme generated by the update, f1, f2, f3, f4, f5 are the weight values of the five indicators calculated by the entropy weight method, and U τ The optimized position of the configuration scheme generated for the update is the updated sheath protector configuration scheme;
[0046] Calculate the evaluation coefficient f of the updated protector configuration scheme τ , compare f τ and the preset evaluation coefficient threshold f τ ', if f τ <f τ ', then continue to update the protector configuration scheme; if f τ ≥f τ ', then the updated protector configuration scheme is the optimal scheme, and the parameters ω, c1, c2, r1, and r2 of the five indicators that affect the parameter configuration of the sheath protector in the optimal scheme are extracted to obtain the optimal solution for the parameter configuration of the sheath protector.
[0047] In a second aspect, the present invention provides a configuration optimization system for a high-voltage cable sheath protector, comprising:
[0048] Acquisition module: used to obtain the real-time induced voltage of the sheath protector;
[0049] Judgment module: used to judge whether the sheath protector starts to act according to the amplitude of the real-time induced voltage obtained;
[0050] A first calculation module: in response to the sheath protector starting to act, calculates the energy absorbed by the sheath protector when it acts and determines whether the accumulated energy exceeds a threshold;
[0051] A second calculation module: in response to the accumulated energy exceeding the threshold, calculating the adaptation curve of the influencing factors of the sheath protector according to the energy absorbed when the sheath protector is actuated;
[0052] Optimization module: used to optimize the parameter configuration of the sheath protector according to the calculated adaptation curve.
[0053] In a third aspect, the present invention provides a computer device, including a processor and a storage medium;
[0054] The storage medium is used to store instructions;
[0055] The processor is used to operate according to the instructions to execute the steps of the method described in the first aspect.
[0056] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in the first aspect.
[0057] Compared with the prior art, the configuration optimization method and system of a high-voltage cable sheath protector provided by the embodiment of the present invention achieves the following beneficial effects:
[0058] The present invention obtains the real-time induced voltage of the protective layer protector; determines whether the protective layer protector starts to act according to the amplitude of the acquired real-time induced voltage; in response to the protective layer protector starting to act, calculates the energy absorbed by the protective layer protector when it acts and determines whether the accumulated energy exceeds a threshold; in response to the accumulated energy exceeding the threshold, calculates the adaptation curve of the influencing factors of the protective layer protector according to the energy absorbed by the protective layer protector when it acts; the present invention can screen the protective layer protector that needs to be optimized, and can avoid accidents caused by the continued operation of the protective layer protector with potential safety hazards;
[0059] The present invention optimizes the parameter configuration of the sheath protector according to the calculated adaptation curve; the present invention can optimize the sheath protector of the high-voltage cable line. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 is a flow chart of a configuration optimization method for a high-voltage cable sheath protector provided in Example 1 of the present invention;
[0061] Figure 2 It is a flow chart for optimizing the parameter configuration of a sheath protector in a configuration optimization method of a high-voltage cable sheath protector provided in Example 1 of the present invention;
[0062] like Figure 3 It is an adaptation curve of the effect of the length of the sheath protector line on the sheath protector in embodiment 1 of the invention. DETAILED DESCRIPTION
[0063] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0064] Embodiment 1:
[0065] like Figure 1 As shown, a configuration optimization method for a high-voltage cable sheath protector comprises:
[0066] Obtain the real-time induced voltage of the sheath protector;
[0067] According to the amplitude of the real-time induced voltage obtained, it is judged whether the sheath protector starts to act;
[0068] In response to the sheath protector starting to operate, calculating the energy absorbed by the sheath protector when it operates and determining whether the accumulated energy exceeds a threshold value;
[0069] In response to the accumulated energy exceeding a threshold value, an adaptation curve of the influencing factor of the sheath protector is calculated according to the energy absorbed when the sheath protector is actuated;
[0070] According to the calculated adaptation curve, the parameter configuration of the sheath protector is optimized.
[0071] Step 1: Obtain the real-time induced voltage of the sheath protector.
[0072] Step 2: According to the amplitude of the real-time induced voltage obtained, determine whether the sheath protector starts to operate.
[0073] Step 2.1: Calculate the initial operating voltage of the sheath protector.
[0074] Calculate the actual rated voltage of the sheath protector using the following formula:
[0075] U r =U P / k (1)
[0076] In formula (1), U r is the actual rated voltage of the sheath protector, U p is the maximum value of the real-time induced voltage obtained, k is the power frequency voltage coordination coefficient of the protector, and the value range of k is 1.1 to 1.3, which is determined according to the insulation tolerance of the cable sheath and the action of the sheath protector.
[0077] Calculate the initial operating voltage of the sheath protector by the following formula:
[0078]
[0079] In formula (2), U 1mA is the starting action voltage;
[0080] Step 2.2: If the amplitude of the real-time induced voltage obtained exceeds the starting action voltage of the protective layer protector, the protective layer protector starts to act; if the amplitude of the real-time induced voltage obtained does not exceed the starting action voltage of the protective layer protector, the protective layer protector does not act, and the real-time induced voltage of the protective layer protector continues to be obtained.
[0081] Step 3: In response to the sheath protector starting to operate, the energy absorbed by the sheath protector when it operates is calculated and it is determined whether the accumulated energy exceeds a threshold.
[0082] Step 3.1: Calculate the energy absorbed by the sheath protector when it is activated, using the following formula:
[0083]
[0084] In Equation (3), in the case of a single-phase short circuit, the duration of the power-frequency short-circuit current from t1 to t2 is the operating response time of the high-voltage circuit breaker; in the case of a direct lightning strike on the line, the duration of the power-frequency short-circuit current from t1 to t2 is the duration of a single lightning strike current; u(t) is the transient overvoltage of the sheath, and i(t) is the sheath circulating current.
[0085] It also includes calculating the energy absorption capacity E of the sheath protector m , which is calculated by the following formula:
[0086] E m = UI m t (4)
[0087] In Equation (4), U is the residual voltage under the nominal discharge current of the sheath protector; I m is the 2ms square-wave current-carrying capacity; t is the square-wave current-carrying time.
[0088] Step 3.2: If the energy absorbed by the sheath protector during operation exceeds the threshold of the sheath protector, there will be potential hazards in the operation of the sheath protector, and the parameter configuration of the sheath protector needs to be optimized; if the energy absorbed by the sheath protector during operation does not exceed the threshold of the sheath protector, the sheath protector operates normally, and continue to obtain the real-time induced voltage of the sheath protector.
[0089] Step 4: In response to the accumulated energy exceeding the threshold, calculate the adaptation curve of the influencing factors of the sheath protector according to the energy absorbed by the sheath protector when it operates.
[0090] Step 4.1: Initialize the laying method of the single-core cable as the "pin" type, including single-core A, single-core B, and single-core C, and the distance between any two single-core cables is equal; initialize the sheath O.
[0091] Step 4.2: Calculate the induced voltage on the sheath, which is calculated by the following formula:
[0092]
[0093] In Equation (5), U O is the induced voltage on the metal sheath, f is the line layout method of the sheath protector, I A , I B , I C are the core currents flowing through the three single-core cables respectively, R is the average geometric radius of the sheath, r is the radius of the core conductor of the single-core cable, and D is the distance between any two single-core cables.
[0094] If the core currents flowing through the three single-core cables are equal, the induced voltage on the sheath of any single-core is calculated by the following formula:
[0095]
[0096] In formula (6), U O is the induced voltage on the sheath, f is the layout of the sheath protector, R is the average geometric radius of the sheath, r is the radius of the single-core cable core conductor, and D is the distance between any two single-core cables.
[0097] Step 4.3: The influencing factors of the sheath protector include the sheath protector line layout, the core current flowing through the single-core cable, the average geometric radius of the sheath, the single-core cable core conductor radius and the distance between any two single-core cables. The adaptation curve of the sheath protector influencing factors is calculated according to formula (4).
[0098] like Figure 3 Shown is the adaptation curve of the effect of the length of the sheath protector line on the sheath protector.
[0099] Step 5: Figure 2 As shown, the parameter configuration of the sheath protector is optimized according to the calculated adaptation curve.
[0100] Step 5.1: According to the calculated adaptation curve, initialize five indicators that affect the parameter configuration of the sheath protector, including cable length, grounding method, protector energy absorption capacity, nominal discharge residual voltage and 2ms current capacity.
[0101] Step 5.2: Use the entropy weight method to calculate the weights of the five indicators' influence on the parameter configuration of the sheath protector.
[0102] Step 5.2.1: Data normalization.
[0103] There are m evaluation indicators (cable length, grounding method, protector energy absorption capacity, nominal discharge residual voltage, 2ms current carrying capacity), and n evaluation objects (configuration scheme), so the original data matrix is:
[0104] A=(a ij ) m×n (7)
[0105] Parameter index data set after dimension removal:
[0106] R=(r ij ) m×n (8)
[0107] For the indicator where the larger one is better, the normalized formula is:
[0108]
[0109] In formula (9), r ij is the normalized index value, aij is the parameter indicator data set.
[0110] Step 5.2.2: Define entropy.
[0111] In an evaluation problem with m evaluation indicators and n evaluated objects, the entropy of the i-th indicator is:
[0112]
[0113] Where k = 1 / lnn, the entropy weight of the parameter index f ij The expression is:
[0114]
[0115] In formula (11), r ij is the normalized index value, f ij is the entropy weight of the parameter indicator.
[0116] Step 5.2.3: Define entropy weights.
[0117] After defining the entropy of the ith indicator, the entropy weight of the ith indicator can be obtained.
[0118] Step 5.3: Based on the calculated weights, the least squares support vector machine algorithm based on PSO optimization is used to optimize and update the parameter configuration scheme of the sheath protector to obtain the optimal solution of the parameter configuration of the sheath protector.
[0119] Step 5.3.1: Initialize the parameters of the least squares support vector machine algorithm based on PSO optimization, including the initial value of the iteration counter k = 0, the maximum number of iterations k max and the maximum value Γ of the types of protector configuration optimization schemes.
[0120] Step 5.3.2: Initialize the parameters ω, c1, c2, r1, and r2 of the five indicators that affect the parameter configuration of the sheath protector to random values in the range of [0,1] to form an initial configuration scheme.
[0121] Step 5.3.3: Initialize the initial velocity and initial position of the initial configuration scheme as follows:
[0122]
[0123] In formula (12), V r is the initial velocity of the initial configuration, v ω is the initial velocity of parameter ω, is the initial velocity of parameter c1, is the initial velocity of parameter c2, is the initial velocity of parameter r1, is the initial velocity of parameter r2; U τ is the initial position of the initial configuration scheme, u ω is the initial position of the parameter ω, is the initial position of parameter c1, is the initial position of parameter c2, is the initial position of parameter r1, is the initial position of parameter r2.
[0124] Step 5.3.4: k = k + 1, update the speed and position of the configuration scheme, which is expressed by the following formula:
[0125]
[0126] In formula (13), V r is the initial speed of the configuration scheme generated by the update, f1, f2, f3, f4, f5 are the weight values of the five indicators calculated by the entropy weight method, and U τ The optimized position of the configuration scheme generated for the update is the updated sheath protector configuration scheme.
[0127] Step 5.3.5: Calculate the evaluation coefficient f of the updated protector configuration scheme τ , compare f τ and the preset evaluation coefficient threshold f τ ', if f τ <f τ ', then continue to update the protector configuration scheme; if f τ ≥f τ ', then the updated protector configuration scheme is the optimal scheme, and the parameters ω, c1, c2, r1, and r2 of the five indicators that affect the parameter configuration of the sheath protector in the optimal scheme are extracted to obtain the optimal solution for the parameter configuration of the sheath protector.
[0128] The preset evaluation coefficient threshold f τ 'for: where f i is the weight value of the i-th parameter, a i It is the parameter value when the protector is under maximum load condition.
[0129] The present invention optimizes the sheath protector of the high-voltage cable line by taking into account factors such as cable length, grounding method, energy absorption capacity of the protector, nominal discharge residual voltage, and 2ms current carrying capacity. The configuration optimization method is concise and direct and is suitable for configuration optimization of most power cable line sheath protectors.
[0130] Embodiment 2:
[0131] The present invention provides a configuration optimization system for a high-voltage cable sheath protector, comprising:
[0132] Acquisition module: used to obtain the real-time induced voltage of the sheath protector;
[0133] Judgment module: used to judge whether the sheath protector starts to act according to the amplitude of the real-time induced voltage obtained;
[0134] A first calculation module: in response to the sheath protector starting to act, calculates the energy absorbed by the sheath protector when it acts and determines whether the accumulated energy exceeds a threshold;
[0135] A second calculation module: in response to the accumulated energy exceeding the threshold, calculating the adaptation curve of the influencing factors of the sheath protector according to the energy absorbed when the sheath protector is actuated;
[0136] Optimization module: used to optimize the parameter configuration of the sheath protector according to the calculated adaptation curve.
[0137] Embodiment 3:
[0138] An embodiment of the present invention provides a computer device, including a processor and a storage medium;
[0139] The storage medium is used to store instructions;
[0140] The processor is used to operate according to the instructions to execute the steps of the method described in embodiment 1.
[0141] Embodiment 4:
[0142] An embodiment of the present invention further provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of the method described in the first embodiment are implemented.
[0143] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0144] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A configuration optimization method for a high voltage cable sheath protector, characterized in that: include: Obtain the real-time induced voltage of the sheath protector; According to the amplitude of the real-time induced voltage obtained, it is judged whether the sheath protector starts to act; In response to the sheath protector starting to operate, calculating the energy absorbed by the sheath protector when it operates and determining whether the accumulated energy exceeds a threshold value; In response to the accumulated energy exceeding the threshold, an adaptation curve of the influencing factor of the sheath protector is calculated according to the energy absorbed when the sheath protector is actuated; wherein the calculation of the adaptation curve of the influencing factor of the sheath protector includes: The initial single-core cable is laid in a "pin" shape, including single-core A, single-core B and single-core C, and the distance between any two single-core cables is equal; the initial sheath O; Calculate the induced voltage on the sheath using the following formula: In formula (4), U O is the induced voltage on the metal sheath, f is the layout of the sheath protector circuit, I A ,I B ,I C are the core currents flowing through the three single-core cables, R is the average geometric radius of the sheath, r is the radius of the single-core cable core conductor, and D is the distance between any two single-core cables; According to formula (4), the influencing factors of the sheath protector include the layout of the sheath protector line, the core current flowing in the single-core cable, the average geometric radius of the sheath, the radius of the single-core cable core conductor and the distance between any two single-core cables. The adaptation curve of the influencing factors of the sheath protector is calculated according to formula (4); According to the calculated adaptation curve, the parameter configuration of the sheath protector is optimized.
2. The configuration optimization method of the high-voltage cable sheath protector according to claim 1 is characterized in that: The step of judging whether the sheath protector starts to act includes: Calculate the actual rated voltage of the sheath protector using the following formula: IN r =U P / k (1) In formula (1), U r is the actual rated voltage of the sheath protector, U p is the maximum value of the real-time induced voltage obtained, k is the power frequency voltage coordination coefficient of the protector, and the value range of k is 1.1 to 1.3, which is determined according to the insulation tolerance of the cable sheath and the action of the sheath protector; Calculate the initial operating voltage of the sheath protector by the following formula: In formula (2), U 1mA is the starting action voltage; If the amplitude of the real-time induced voltage obtained exceeds the starting action voltage of the protective layer protector, the protective layer protector starts to act; if the amplitude of the real-time induced voltage obtained does not exceed the starting action voltage of the protective layer protector, the protective layer protector does not act, and the real-time induced voltage of the protective layer protector continues to be obtained.
3. The configuration optimization method of the high-voltage cable sheath protector according to claim 1 is characterized in that: The energy absorbed by the sheath protector when it is actuated is calculated by the following formula: In formula (3), in the case of a single-phase short circuit, the duration of the power frequency short-circuit current from t1-t2 is the high-voltage circuit breaker action response time; in the case of a lightning current directly striking the line, the duration of the power frequency short-circuit current from t1-t2 is the duration of a single lightning current; u(t) is the transient overvoltage of the sheath, and i(t) is the sheath circulating current.
4. The configuration optimization method of the high-voltage cable sheath protector according to claim 1 is characterized in that: The threshold is the threshold of the protective layer protector. If the calculated energy absorbed by the protective layer protector when it is in action exceeds the threshold of the protective layer protector, hidden dangers may occur in the operation of the protective layer protector, and the parameter configuration of the protective layer protector needs to be optimized; if the calculated energy absorbed by the protective layer protector when it is in action does not exceed the threshold of the protective layer protector, the protective layer protector operates normally, and the real-time induced voltage of the protective layer protector continues to be obtained.
5. The configuration optimization method of the high-voltage cable sheath protector according to claim 1 is characterized in that: The optimizing of the parameter configuration of the sheath protector comprises: According to the calculated adaptation curve, five indicators that affect the parameter configuration of the sheath protector are initialized, including cable length, grounding method, protector energy absorption capacity, nominal discharge residual voltage and 2ms current capacity; The entropy weight method is used to calculate the weights of the five indicators' influence on the parameter configuration of the sheath protector; Based on the calculated weights, the least squares support vector machine algorithm based on PSO optimization is used to optimize and update the parameter configuration scheme of the sheath protector, and the optimal solution of the parameter configuration of the sheath protector is obtained.
6. The configuration optimization method of the high-voltage cable sheath protector according to claim 5 is characterized in that: The method of obtaining the optimal solution for parameter configuration of the sheath protector comprises: Initialize the parameters of the least squares support vector machine algorithm based on PSO optimization, including the initial value of the iteration counter k=0, the maximum number of iterations k max and the maximum value Γ of the types of protection device configuration optimization schemes; Initialize the parameters ω, c1, c2, r1, and r2 of the five indicators that affect the parameter configuration of the sheath protector to random values in the range of [0,1] to form an initial configuration scheme; Initialize the initial velocity and initial position of the initial configuration scheme: In formula (5), V r is the initial velocity of the initial configuration, v ω is the initial velocity of parameter ω, is the initial velocity of parameter c1, is the initial velocity of parameter c2, is the initial velocity of parameter r1, is the initial velocity of parameter r2; U τ is the initial position of the initial configuration scheme, u ω is the initial position of the parameter ω, is the initial position of parameter c1, is the initial position of parameter c2, is the initial position of parameter r1, is the initial position of parameter r2; k=k+1, the speed and position of updating the configuration scheme are expressed by the following formula: In formula (6), V r is the initial speed of the configuration scheme generated by the update, f1, f2, f3, f4, f5 are the weight values of the five indicators calculated by the entropy weight method, and U τ The optimized position of the configuration scheme generated for the update is the updated sheath protector configuration scheme; Calculate the evaluation coefficient f of the updated protector configuration scheme τ , compare f τ and the preset evaluation coefficient threshold f τ ', if f τ <f τ ', then continue to update the protector configuration scheme; if f τ ≥f τ ', then the updated protector configuration scheme is the optimal scheme, and the parameters ω, c1, c2, r1, and r2 of the five indicators that affect the parameter configuration of the sheath protector in the optimal scheme are extracted to obtain the optimal solution for the parameter configuration of the sheath protector.
7. A configuration optimization system for a high-voltage cable sheath protector, characterized in that: include: Acquisition module: used to obtain the real-time induced voltage of the sheath protector; Judgment module: used to judge whether the sheath protector starts to act according to the amplitude of the real-time induced voltage obtained; A first calculation module: in response to the sheath protector starting to act, calculates the energy absorbed by the sheath protector when it acts and determines whether the accumulated energy exceeds a threshold; The second calculation module: in response to the accumulated energy exceeding the threshold, the adaptation curve of the influencing factor of the sheath protector is calculated according to the energy absorbed when the sheath protector is in action; wherein the calculation of the adaptation curve of the influencing factor of the sheath protector includes: The initial single-core cable is laid in a "pin" shape, including single-core A, single-core B and single-core C, and the distance between any two single-core cables is equal; the initial sheath O; Calculate the induced voltage on the sheath using the following formula: In formula (4), U O is the induced voltage on the metal sheath, f is the layout of the sheath protector circuit, I A ,I B ,I C are the core currents flowing through the three single-core cables, R is the average geometric radius of the sheath, r is the radius of the single-core cable core conductor, and D is the distance between any two single-core cables; According to formula (4), the influencing factors of the sheath protector include the layout of the sheath protector line, the core current flowing through the single-core cable, the average geometric radius of the sheath, the radius of the single-core cable core conductor and the distance between any two single-core cables. The adaptation curve of the influencing factors of the sheath protector is calculated according to formula (4): Optimization module: used to optimize the parameter configuration of the sheath protector according to the calculated adaptation curve.
8. A computer device, characterized in that: including processor and storage medium; The storage medium is used to store instructions; The processor is used to operate according to the instructions to execute the steps of the method according to any one of claims 1 to 6.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Cited By
Optimization method for selecting cable line metal sheath protector based on induced overvoltage
CN120429792B