A permeable embossed pavement construction method and pavement thereof

Through the permeable embossed pavement construction method, the problems of uneven color after the permeable pavement are solved, and the aesthetic design and long-term use effect of permeable pavement are achieved, which is suitable for sponge urban construction and urban beautification.

CN114808595BActive Publication Date: 2024-11-26SHANGHAI LIANGGU ECOLOGICAL ENVIRONMENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110089419.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-22
Publication Date
2024-11-26
Estimated Expiration
2041-01-22

AI Technical Summary

Technical Problem

The existing embossing methods and equipment are mainly aimed at concrete or asphalt pavements. There are no embossing construction methods and devices for permeable pavements, which lead to protrusions and deformations after forming the permeable pavements, and the color is uneven, which affects the aesthetics and Service life.

Method used

Adopt the permeable embossed pavement construction method, including the preparation of permeable base layer, color permeable pavement surface layer laying, embossing and maintenance management, through the layering design of primary color base layer and colored surface layer, overall coloring treatment and surface spraying protective agent to avoid initial The raised phenomenon caused by wetness in the base layer during the coagulation period, and solves the problem of color falling off and mottled after long-term use.

Benefits of technology

It effectively solves the problems of protrusion, fading, color partitioning of permeable embossed pavement, and realizes the aesthetic design and long-term use effect of permeable pavement. It has high application value and application prospects, and is suitable for sponge urban construction and urban beautification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114808595B_ABST
    Figure CN114808595B_ABST
Patent Text Reader

Abstract

The present invention discloses a new permeable pavement embossing construction method, which relates to the fields of building construction and pavement, and aims to solve the problem that there is no permeable pavement embossing construction method at present, which includes the following steps: preparing a base layer, construction preparation, laying a colored permeable pavement surface layer, embossing, and maintenance; wherein, the embossing operation is as follows: after there is no obvious moisture on the surface of the colored surface layer and before the colored surface layer is initially solidified, evenly sprinkle demoulding powder on the surface of the colored surface layer, and the demoulding powder is required to be thin and even; after the demoulding powder is placed, determine the position and angle of the first embossing mold; then, other embossing molds are placed close to the first embossing mold in turn; after the embossing mold is placed on the colored surface layer sprinkled with demoulding powder, the embossing mold is compacted until the embossing is completed. The present application is simple to operate, effectively solves the problems of bulges and deformation after pavement forming, and has good effects and high application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the fields of building construction and pavement, in particular to the field of permeable buildings, and specifically to a permeable embossed pavement construction method and pavement thereof. Background Art

[0002] In the process of urban road construction, asphalt pavement and cement pavement were mainly used in the early stage. Hardened pavements such as asphalt and cement will cause rainwater to gather on the surface, or flow directly into rivers, unable to penetrate into the ground, affecting urban sanitation and transportation. Especially after heavy rain, the amount of water entering the sewer increases greatly, which puts a huge processing burden on the city's drainage pipes and sewage treatment plants. At the same time, the runoff coefficient of this type of hardened pavement is generally 0.9, which means that nearly 90% of the rainfall will form surface runoff loss, which is a huge waste of water resources and will greatly increase the burden on urban drainage facilities and the probability of urban rainwater floods. Furthermore, since this type of hardened pavement has no water retention function, it is impossible for water to evaporate from the hardened pavement under high temperature evaporation, thereby destroying the earth's water cycle, reducing the air exchange and air humidity of the pavement, and deteriorating the air quality, which to a certain extent promotes the "urban heat island effect".

[0003] As an important resource, rainwater resources can be collected and utilized effectively to alleviate the serious shortage of urban water resources and prevent and alleviate urban waterlogging. To this end, the Ministry of Housing and Urban-Rural Development issued the "Technical Guidelines for Sponge City Construction - Construction of Low-Impact Development Rainwater System (Trial)" in October 2014. Sponge city means that the city can be like a sponge, with good "elasticity" in adapting to environmental changes and responding to disasters. When it rains, it absorbs, stores, infiltrates and purifies water. When needed, the stored water is "released" and utilized. It combines natural means and artificial measures to maximize the accumulation, infiltration and purification of rainwater in urban areas under the premise of drainage and flood safety, and promote the utilization of rainwater resources and ecological environment protection. In the process of sponge city construction, the systematic nature of natural precipitation, surface water and groundwater should be coordinated, and all aspects of water recycling such as water supply and drainage should be coordinated, and its complexity and long-term nature should be considered.

[0004] As far as road construction is concerned, with the large-scale promotion of the sponge city concept, permeable pavement has begun to be used. However, the aesthetic design of the permeable pavement is also very important; through the embossing process, different concave and convex patterns can be formed on the permeable pavement, which plays a role in aesthetics.

[0005] Existing embossing methods and equipment are mainly for concrete or asphalt pavements. For example, Chinese patent application CN201420594070.X discloses a concrete road pavement embossing machine, Chinese patent application CN201620192107.5 discloses a concrete pavement embossing mold, Chinese patent application CN201921433503.2 discloses a concrete pavement embossing device, Chinese patent application CN201821258389.X discloses a high-strength embossed photovoltaic glass for pavement paving, Chinese patent application CN201510635461.0 discloses a method for hot embossing color slurry sealing of asphalt pavement, and Chinese patent application CN201910603508.3 discloses a method for hot embossing color slurry sealing of asphalt pavement. At present, there is no embossing construction method and / or device for permeable pavement.

[0006] To this end, the present application provides a permeable embossed pavement construction method and pavement thereof. Summary of the invention

[0007] The purpose of the invention is to provide a permeable embossed pavement construction method and pavement thereof in view of the problem that there is currently no permeable pavement embossing construction method. The present application provides a new permeable pavement embossing construction method, which is easy to operate and effectively solves the problems of bulges and deformation after pavement forming, and has good effects and high application value.

[0008] In order to achieve the above object, the present invention adopts the following technical solution:

[0009] A method for constructing a permeable embossed pavement comprises the following steps:

[0010] (1) Preparation of base layer

[0011] Prepare the base layer, the height of the base layer reaches the elevation and the base layer is permeable;

[0012] (2) Construction preparation

[0013] After the base is completed, the construction preparation of the permeable pavement working surface is carried out;

[0014] (3) Paving of colored permeable pavement surface

[0015] The colored permeable pavement surface layer includes a primary color base layer and a colored surface layer arranged on the upper surface of the primary color base layer;

[0016] First, mix the raw materials of the primary color bottom layer and transport them to the working surface; spread the mixed materials of the primary color bottom layer on the base layer and vibrate and level it with a low-frequency flat plate vibrator to form the primary color bottom layer;

[0017] The raw materials of the colored surface layer are mixed and transported to the working surface; the mixed materials of the colored surface layer are spread on the original color base layer, and the colored surface layer is smoothed and slurried with a trowel to complete the paving of the colored permeable pavement surface layer;

[0018] (4) Embossing

[0019] After there is no obvious moisture on the surface of the colored surface layer and before the colored surface layer begins to solidify, evenly sprinkle the release powder on the surface of the colored surface layer. The release powder should be thin and even.

[0020] After the release powder is placed, the position and angle of the first embossing mold are determined; then, the other embossing molds are placed close to the first embossing mold in sequence; after the embossing mold is placed on the colored surface layer sprinkled with the release powder, the embossing mold is compacted until the embossing is completed;

[0021] (5) Maintenance

[0022] After the embossing is completed, maintenance and management can be carried out.

[0023] In step 4, when the embossing mold is placed, the mold cannot be repeatedly removed and retried.

[0024] In the step 5, after the embossing is completed, maintenance management is carried out, and the maintenance management operations include: finished product protection, seam cutting and filling, road surface maintenance, and spraying of protective agent.

[0025] The height of the colored surface layer is 30 mm to 50 mm. Preferably, the height of the colored surface layer is 30 mm.

[0026] In the step 4, a plurality of embossing dies are used for alternate embossing; firstly, the position and angle of the first embossing die are determined, and the embossing is performed by the embossing die, and then a second embossing die is placed next to the embossing die for embossing; and this process is repeated until the embossing is completed.

[0027] The permeable embossed pavement is prepared by the above method.

[0028] In the traditional embossed pavement construction, the embossing step requires multiple slurry sweeping, slurry lifting, and spraying of colored strengthening materials. The steps are cumbersome, there are many human factors in the spreading of strengthening materials, and there are chemical reactions with water, and the construction effect is difficult to control. The permeable embossed pavement can avoid this. The present application uses permeable materials as the base material of the embossed pavement, which is permeable and can meet the requirements of embossing; at the same time, the present application adopts a layered structure design of primary color base layer and colored surface layer, the colored surface layer is overall colored, and the surface is sprayed with a protective agent, which effectively solves the problems of color shedding and mottled after long-term use of the permeable embossed pavement; further, based on the improvement of the construction process, the problem of road bulge caused by the wet base layer in the initial setting period is effectively avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention will now be described by way of example with reference to the accompanying drawings, in which:

[0030] Figure 1 This is the result diagram of the colored embossed water permeability prepared in Example 1. DETAILED DESCRIPTION

[0031] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.

[0032] Any feature disclosed in this specification, unless otherwise stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

[0033] Example 1

[0034] When embossing is performed in a conventional manner, it is very easy to produce bulges of varying degrees ranging from 2~5mm to 30~50mm in diameter on the surface. The occurrence of this phenomenon will directly cause children to fall when running. After analysis, the inventor believes that the main factor for this is that when the water on the surface of the concrete is basically evaporated but still remains moist, it is necessary to sprinkle colored reinforcing materials; at this time, the concrete base is not dry enough, and it is very easy to have gas accumulation problems; in the case of die pressing, due to the absorption of water during die pressing, bulges on the base surface appear, which directly leads to the occurrence of impurities not being removed during the removal process. Further, after embossing in a conventional manner, it is very easy to have uneven surface color, which will directly lead to the quality of the embossed floor. After analysis, the inventor believes that the main factor for this is that the hardener and the colored reinforcing material are spread unevenly, which makes it very easy to expose the base color; at the same time, in the process of finishing, if the ground is repeatedly pressed with an iron trowel, it will directly cause the surface to return to gray, and it will also cause the surface to be uneven. To this end, the present application has made a completely new improvement to the construction method, and the specific operations are as follows.

[0035] Construction can only begin after sufficient preparation work has been done.

[0036] (1) Preparation of base layer

[0037] Prepare the base layer, the base layer height reaches the elevation, and the base layer is permeable. Before the surface layer is constructed, the base layer should be re-measured for elevation and the foundation water permeability should be checked. The elevation must ensure the construction thickness of the permeable embossed pavement; before pouring, the surface of the base layer should be clean, free of water, and kept in a certain moist state.

[0038] (2) Construction preparation

[0039] After the base layer is completed, the construction preparation for the permeable pavement working surface will be carried out, including laying out the lines and erecting the molds.

[0040] Laying out lines: Based on the design drawings and the working surface conditions, the control points should be spaced 10 meters apart (can be more densely spaced if necessary). The control points should be firm and not easily moved, and the elevation points should be well marked.

[0041] Formwork: Construction personnel should select the position of the formwork according to the pouring plan; if conditions permit, the work surface must be constructed by skipping. During the formwork process, attention should be paid to the height, verticality, slope, etc. The formwork generally uses a rigid mold, and the plane position and elevation of the formwork should meet the design requirements; after the formwork is constructed, it should be checked with a measuring instrument. It is forbidden to lay the channel steel flat for formwork.

[0042] (3) Paving of colored permeable pavement surface

[0043] The colored permeable pavement surface layer includes a primary color bottom layer and a colored surface layer arranged on the upper surface of the primary color bottom layer. The raw materials of the primary color bottom layer are first mixed and transported to the working surface; the mixture of the primary color bottom layer is spread on the base layer, and a low-frequency flat vibrator is used to compact and level it to form the primary color bottom layer. The raw materials of the colored surface layer are mixed and transported to the working surface; the mixture of the colored surface layer is spread on the primary color bottom layer, and the colored surface layer is smoothed and slurried with a trowel to complete the laying of the colored permeable pavement surface layer. Preferably, the thickness of the colored surface layer in this embodiment is 3 cm.

[0044] The mixing operation is as follows: before mixing, check the capacity of the forklift bucket, mix the ingredients strictly according to the mix ratio, and add them to the mixer at the same time according to the construction mix ratio; then, add water gradually and mix evenly. Transportation: During transportation, take necessary covering measures, and the time from unloading to paving should not exceed 30 minutes (depending on the temperature conditions).

[0045] Before paving the primary color base layer, the base layer needs to be sprinkled with water to keep it moist. The primary color base layer is paved evenly and the thickness meets the design requirements. After paving, a low-frequency flat vibrator is used for compaction; after compaction, the missing material parts need to be supplemented for leveling; the one-time paving area should not be too large to prevent double skin.

[0046] The colored surface layer should be spread before the primary color base layer begins to set. After the colored surface layer is spread, it should be leveled manually with a scraper, and the flatness should meet the design and acceptance standards. Large crushed stones that do not meet the specifications should be manually cleaned and supplemented; after leveling, the edges should be manually trimmed, and then a single-disc trowel should be used to level and collect the slurry.

[0047] (4) Embossing

[0048] After there is no obvious moisture on the surface of the colored surface layer and before the colored surface layer initially solidifies, evenly sprinkle the release powder on the surface of the colored surface layer. The release powder is required to be thin and even. After the release powder is placed, determine the position and angle of the first embossing mold; then, the other embossing molds are placed close to the first embossing mold in turn; after the embossing mold is placed on the colored surface layer sprinkled with release powder, compact the embossing mold until the embossing is completed. Specifically, the distribution direction of the texture is first determined, and the position and angle of the first embossing mold are selected; then, the other embossing molds are placed close to the first embossing mold in turn. Do not repeatedly remove the mold and try again. Press the floor texture according to the hardness of the road surface. Pay attention to the strength of the mold. You can use foot or tamping hammer. After the embossing is completed, it must be closed. Do not walk or drive directly on it, otherwise it will be irreparably damaged.

[0049] (5) Maintenance

[0050] After embossing is completed, maintenance management is carried out. The maintenance management operations include: finished product protection, seam cutting and filling, pavement maintenance, and spraying protective agent.

[0051] Among them, maintenance: After the construction of the permeable embossed pavement is completed, it must be maintained in time, and watering maintenance will begin one day later; but during maintenance, pressurized water cannot be used to directly flush the concrete surface, and water should be directly sprinkled from top to bottom. The number and time of maintenance are determined according to the construction temperature, generally not less than 7 days. During the maintenance process, fences should be set up around the road surface to prevent people from passing through, and vehicles are not allowed to pass.

[0052] Cutting seams: The cutting line should be combined with the construction seams, and the construction should be carried out according to the cutting plan to ensure that the overall layout is reasonable and straight. Before cutting seams, it is necessary to apply resin to the cutting position to reduce the phenomenon of stretching. The cutter operator should test the knife before cutting, and only continue the construction after confirming that there is no stretching. When using the cutter, it should be placed flat and stable, and the cutter should be idle for 20 seconds before it can be used after it is running normally.

[0053] Requirements for cutting expansion joints: During winter construction, the cutting surface of the roadway shall not be larger than 20 square meters, and the cutting length of the sidewalk shall not be larger than 4 meters (when the width is less than 3 meters, it shall be constructed in accordance with the requirements of the roadway if it is greater than 3 meters); during summer construction, the cutting surface of the roadway shall not be larger than 25 square meters, and the cutting length of the sidewalk shall not be larger than 5 meters (when the width is less than 3 meters, it shall be constructed in accordance with the requirements of the roadway if it is greater than 3 meters). The width of the expansion joint is the thickness of the cutting piece, and the cutting depth should be 2 / 3 of the road surface thickness. Requirements for cutting expansion joints: Cut one expansion joint every 15-20 meters, and the width of the joint shall not be less than 15mm, and the cutting shall be through from top to bottom. The spacing is determined according to the specific conditions of the working surface. The spacing of expansion joints during winter construction should be smaller than that during summer construction. After the expansion joint is cut, a sponge strip must be embedded. The sponge strip must be 5mm lower than the top elevation of the surface layer, and then filled with structural glue. The outer edge must not exceed the cutting edge, and pay attention to keep it flat with the surface layer.

[0054] After the cutting is completed and dried, apply the protective agent. When applying the protective agent, different colors should be protected to prevent cross contamination.

[0055] Based on the improved scheme, this application effectively solves the problems of bulging, fading, and color zoning of permeable embossed pavement; among them, by using permeable paving materials to make embossed pavement, the problem of pavement bulging caused by wet base layer during the initial setting period is solved; through the layered design of the primary color bottom layer and colored surface layer of the colored permeable pavement, that is, the use of colored protective agents, the color of the formed pavement is made more durable and uniform. This application realizes the embossed design of permeable pavement for the first time. The relevant actual use effect is shown in the attached figure. It has high application value and application prospects. After large-scale promotion and application, it will be conducive to the construction of sponge cities and the beautification of cities.

[0056] Example 2

[0057] Furthermore, the permeable pavement embossing method of this embodiment can be used for the preparation of landscape roads, and the specific operations are as follows.

[0058] (1) Soil base treatment

[0059] Before the roadbed is constructed, it should be constructed on a soil base with a compaction coefficient of ≥93% and a flat surface, and the soil base should be rolled by watering and tamping. That is, the soil base should be rolled to form a plain soil layer with a flat surface.

[0060] (2) Laying the first leveling layer

[0061] A 3-5 cm thick coarse sand layer is laid on the plain soil layer with a smooth surface formed in step (1), thereby forming a first leveling layer on the surface of the plain soil layer. In this step, a 3-5 cm thick coarse sand layer is spread on the plain soil layer to form a first leveling layer, which is convenient for laying the support layer.

[0062] (3) Laying of supporting layer

[0063] In this embodiment, a double-layer supporting layer is used for paving, which includes a first supporting layer and a second supporting layer.

[0064] The laying process of the first supporting layer is as follows: laying composite alloy honeycomb geocells on the surface of the leveling layer, stretching the composite alloy honeycomb geocells, forming a plurality of first filling cells in the fixed composite alloy honeycomb geocells, and fixing the composite alloy honeycomb geocells horizontally and vertically; after the fixing is completed, filling the first filling cells with gravel to complete the laying of the first supporting layer.

[0065] The laying process of the second supporting layer is as follows: laying composite alloy honeycomb geocells on the surface of the first supporting layer, stretching the composite alloy honeycomb geocells, forming a plurality of first filling cells in the fixed composite alloy honeycomb geocells, and fixing the composite alloy honeycomb geocells horizontally and vertically; after the fixing is completed, filling the first filling cells with gravel to complete the laying of the second supporting layer.

[0066] In this embodiment, high-strength polymer reinforcement belts are used to fix the composite alloy honeycomb geocells horizontally, and anchor rods are used to fix them vertically in the first filling cells.

[0067] (4) Laying the grading layer

[0068] Aggregates with a particle size of 2 to 6 cm are mixed in a ratio of 3:3:4 (i.e., aggregates with particle sizes of 2, 4, and 6 cm are mixed in a ratio of 3:3:4), and then spread on the surface of the second support layer and compacted to a set compaction degree to obtain a graded layer. In this step, the mixed aggregate is spread flat on the surface of the second support layer and vibrated and rolled to achieve the required compaction degree.

[0069] (5) Laying of the second leveling layer

[0070] Spread a 20mm thick coarse sand layer on the surface of the graded layer for filling joints and manual leveling, and water the coarse sand to moisten it to form the second leveling layer.

[0071] (6) Measurement and leveling

[0072] On the second leveling layer, mark the elevation, center line, and side line according to the construction drawings, place the pile number position, set indicator piles on both sides of the road, and mark the base elevation. When supporting the formwork, the elevation of the top of the formwork should be consistent with the design elevation of the colored permeable integral pavement surface layer.

[0073] (7) Clearing and leveling

[0074] Clean the surface of the base layer in the mold to make it flat, solid and clean. The surface elevation error should be controlled within 0 to 15 mm, and the working surface should be kept moist before pouring.

[0075] (8) Mixing and transportation

[0076] Use a forced mixer for mixing. When mixing, be careful not to mix aggregates of different colors; if conditions permit, use different mixers to mix aggregates of different colors separately. The measurement of raw materials should comply with the provisions of the current national standard "Concrete Quality Control Standard" GB 50164-2011.

[0077] When mixing aggregates, it is advisable to first add aggregates, cement, binder, colorant and other filling materials into the mixer at the same time according to the construction mix ratio, and then gradually add water and mix evenly.

[0078] The aggregate mixing site should be close to the construction site. After the mixture is discharged from the mixer, it should be transported to the construction site for spreading and compacting. The time required to complete paving should be controlled within 30 to 60 minutes.

[0079] In this embodiment, the colored permeable pavement surface layer includes a primary color bottom layer and a colored surface layer arranged on the upper surface of the primary color bottom layer. The corresponding component ratios are shown in Table 1 below.

[0080] Table 1 Raw material ratio of colored permeable pavement in Example 1

[0081] structure unit water cement Fine aggregate (5-10mm) Coarse aggregate (10-20mm) Binder Colorants Protective agent Colored surface <![CDATA[Per m 3 Dosage, kg]]> 143.33 412.00 1963.14 —— 10.67 21.66 32.66 Primary color base <![CDATA[Per m 3 Dosage, kg]]> 142.58 410.50 —— 1945.92 10.67 —— ——

[0082] The construction operation of the original color base layer is as follows: first mix the raw materials of the original color base layer and transport them to the working surface; spread the mixed materials of the original color base layer on the coarse sand leveling layer, and use a low-frequency flat vibrator to compact and level it to form the original color base layer.

[0083] The construction operation of the colored surface layer is as follows: the raw materials of the colored surface layer are mixed and transported to the working surface; the mixed materials of the colored surface layer are spread on the original color base layer, and the colored surface layer is smoothed and slurried with a trowel to complete the paving of the colored permeable pavement surface layer.

[0084] Among them, the mixture should be spread evenly, and the flatness and drainage slope should meet the design requirements. The loose paving coefficient should be 1.2 during paving. Low-frequency flat vibrators should be used for paving, and the edges and corners should be manually filled and leveled in time; the colored surface layer of the colored permeable integral pavement should be poured simultaneously with the original color bottom layer. After the bottom layer is vibrated and leveled, the surface mixture can be continued. After paving and vibrating, it is advisable to use a trowel to smooth the surface layer. When leveling, the top surface of the formwork must be kept clean and the board surface at the joints must be flat.

[0085] (9) Embossing

[0086] After there is no obvious moisture on the surface of the colored surface layer and before the colored surface layer initially solidifies, evenly sprinkle the release powder on the surface of the colored surface layer. The release powder is required to be thin and even. After the release powder is placed, determine the position and angle of the first embossing mold; then, the other embossing molds are placed close to the first embossing mold in turn; after the embossing mold is placed on the colored surface layer sprinkled with release powder, compact the embossing mold until the embossing is completed. Specifically, the distribution direction of the texture is first determined, and the position and angle of the first embossing mold are selected; then, the other embossing molds are placed close to the first embossing mold in turn. Do not repeatedly remove the mold and try again. Press the floor texture according to the hardness of the road surface. Pay attention to the strength of the mold. You can use foot or tamping hammer. After the embossing is completed, it must be closed. Do not walk or drive directly on it, otherwise it will be irreparably damaged.

[0087] (10) Finished product protection

[0088] After the embossing is completed, the road construction is completed, and protective measures such as fences, warning tapes and manual care are set up in time. It is advisable to enter the maintenance after 24 hours. During the road maintenance period, traffic should be closed and heavy objects are not allowed to be piled up. After 1 to 2 days of the road construction, the template is removed, and the surface and edges of the road should be prevented from being damaged during the operation.

[0089] (11) Road maintenance

[0090] After the pavement is poured, maintenance begins. During maintenance, water should be sprinkled to keep it moist. Use is prohibited. Generally, after 5 to 7 days of maintenance, spray the protective agent.

[0091] (12) Cutting and caulking

[0092] After the pavement construction is completed, it is advisable to cut the contraction joints and expansion joints according to the design requirements in about 3 days (when the pavement strength reaches 45% of the design strength and it is advisable that the cutting does not cause cracks). The cutting depth of the contraction joint should be 2 / 3 of the pavement thickness, and the cutting depth of the expansion joint should be the same as the pavement thickness. The width of the pavement contraction joint is 5mm, and the width of the pavement expansion joint should be 15mm; the number of pavement contraction joints and expansion joints is determined according to the construction area, and the separation area size should be 25-30m². The pavement expansion joints should be embedded with flexible caulking materials according to the design requirements, and the caulking must be kept flat with the pavement; when there is no design requirement, the construction should be carried out according to the requirements for joint construction in the current national standard "Technical Code for Permeable Cement Concrete Pavement" (CJJ / T 135-2009).

[0093] Finally, the road surface protective agent can be put into use 12 hours after spraying.

[0094] In this implementation, the design strength of the landscape road is C30, and the bending and tensile strength is C3.5; after preparation, the compressive strength of the road surface test blocks under the same conditions is C34.7 on average, the bending and tensile strength is C3.8 on average, and the water permeability is 1mm / s, which meets the design requirements; after three months of use, the road surface is flat and has no peeling and other phenomena; after one year of use, the road condition is good, without cracks, sinking, etc. The experimental results show that the permeable pavement prepared in this application has good water permeability, and the foundation bearing and the bending and tensile resistance of the road surface layer are significantly improved. It can be used in landscape roads and has good application value.

[0095] The present invention is not limited to the above-mentioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.

Claims

1. A method for constructing a permeable embossed pavement for a landscape road, characterized in that: The steps include: (1) Preparation of base layer Prepare the base layer, the height of the base layer reaches the elevation and the base layer is permeable; (2) Construction preparation After the base is completed, the construction preparation of the permeable pavement working surface is carried out; (3) Paving of colored permeable pavement surface The colored permeable pavement surface layer includes a primary color base layer and a colored surface layer arranged on the upper surface of the primary color base layer; First, mix the raw materials of the primary color bottom layer and transport them to the working surface; spread the mixed materials of the primary color bottom layer on the base layer and vibrate and level it with a low-frequency flat plate vibrator to form the primary color bottom layer; The raw materials of the colored surface layer are mixed and transported to the working surface; the mixed materials of the colored surface layer are spread on the original color base layer, and the colored surface layer is smoothed and slurried with a trowel to complete the paving of the colored permeable pavement surface layer; (4) Embossing After there is no obvious moisture on the surface of the colored surface layer and before the colored surface layer begins to solidify, evenly sprinkle the release powder on the surface of the colored surface layer. The release powder should be thin and even. After the release powder is placed, the position and angle of the first embossing mold are determined; then, the other embossing molds are placed close to the first embossing mold in sequence; after the embossing mold is placed on the colored surface layer sprinkled with the release powder, the embossing mold is compacted until the embossing is completed; (5) Maintenance After the embossing is completed, maintenance management can be carried out; The operation of step (1) is as follows: S1.1 Soil base treatment Roll the soil base to form a plain soil layer with a smooth surface; S1.2 Laying of the first levelling layer Spread a 3-5 cm thick coarse sand layer on the plain soil layer with a smooth surface formed in step S1.1, thereby forming a first leveling layer on the surface of the plain soil layer; S1.3 Support layer laying A double-layer support layer is used for paving, which includes a first support layer and a second support layer; The laying process of the first supporting layer is as follows: laying composite alloy honeycomb geocells on the surface of the leveling layer, stretching the composite alloy honeycomb geocells, forming a plurality of first filling cells in the fixed composite alloy honeycomb geocells, and fixing the composite alloy honeycomb geocells horizontally and vertically; after the fixing is completed, filling the first filling cells with crushed stones to complete the laying of the first supporting layer; The laying process of the second support layer is as follows: laying composite alloy honeycomb geocells on the surface of the first support layer, stretching the composite alloy honeycomb geocells, forming a plurality of first filling cells in the fixed composite alloy honeycomb geocells, and fixing the composite alloy honeycomb geocells horizontally and vertically; after the fixing is completed, filling the first filling cells with crushed stones to complete the laying of the second support layer; S1.4 Laying grading layer Aggregates with particle sizes of 2, 4, and 6 cm are mixed in a ratio of 3:3:4, spread on the surface of the second support layer, and compacted to a set compaction degree to obtain a graded layer; S1.5 Second leveling layer laying Spread a coarse sand layer of set thickness on the surface of the graded layer for filling joints and manual leveling, and water the coarse sand to moisten it to form a second leveling layer; S1.6 Measuring and leveling S1.7 Clearing and leveling Clean the surface of the base layer in the mold and keep the working surface moist before pouring; In the step S1.3, the composite alloy honeycomb geocell is laterally fixed by using a reinforcement belt, and is vertically fixed by using an anchor bar in the first filling cell; In step S1.1, before the roadbed is constructed, the construction should be carried out on a soil base with a compaction coefficient of ≥93% and a flat surface, and the soil base should be compacted by watering and tamping; In S1.4, the mixed aggregate is spread flat on the surface of the second supporting layer and compacted by vibration rolling to achieve the required compaction degree.

2. The method according to claim 1, characterized in that In the step (3), after the mixture is discharged from the mixer, it is transported to the construction site for paving and compaction, and the time required to complete paving is controlled to be 30 to 60 minutes.

3. The method according to claim 1, characterized in that In the step (4), when the embossing mold is placed, the mold cannot be repeatedly removed and retried.

4. The method according to claim 1, characterized in that: In the step (5), after the embossing is completed, maintenance management is carried out, and the maintenance management operations include: finished product protection, seam cutting and filling, road surface maintenance, and spraying of protective agent.

5. The method according to claim 1, characterized in that The height of the colored surface layer is 30 mm to 50 mm.

6. The method according to claim 5, characterized in that The thickness of the colored surface layer is 3 cm.

7. The method according to any one of claims 1 to 6, characterized in that: In the step (4), a plurality of embossing dies are used for alternate embossing; first, the position and angle of the first embossing die are determined, and the embossing is performed by the embossing die, and then a second embossing die is placed next to the embossing die for embossing; and this process is repeated until the embossing is completed.

8. A water-permeable embossed pavement prepared by the method according to any one of claims 1 to 7.