A method for testing the development characteristics of roof and floor rock fractures by drilling glue injection

The development characteristics of water conduction cracks on the top and bottom plates of coal seam are quantitatively described through drilling and glue injection method, which solves the problem of quantitative description in the existing technology, improves the guidance of safe and efficient production of coal mines, and realizes accurate analysis of water conduction cracks.

CN114837661BActive Publication Date: 2024-11-22HENAN POLYTECHNIC UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210486510.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-06
Publication Date
2024-11-22
Estimated Expiration
2042-05-06

AI Technical Summary

Technical Problem

The prior art is difficult to accurately describe the development characteristics of the rock cracks in the top and bottom slate layer of drilling, which leads to challenges in safe and efficient production of coal mines, especially in the process of coal mining with roof aquifers and bottom plates under pressure, which is difficult to predict and control the mine water inrush.

Method used

The drilling and glue injection method is adopted to pump and inject rapid molding of silicone in small-bore drilling holes. After solidification, the core with silicone is taken out using a large-bore core drilling rig, and the core with silicone is analyzed by CT scanning and computer three-dimensional reconstruction. , quantitatively describe the developmental characteristics of water conduction fissures.

Benefits of technology

The accurate quantitative description of the water conduction cracks on the top and bottom plates of the coal seam has been realized, the guidance of safe and efficient production of coal mines has been improved, and the shortcomings of qualitative description and fuzzy quantitative description in the existing technology have been overcome, and it has high theoretical research and on-site measurement significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114837661B_ABST
    Figure CN114837661B_ABST
Patent Text Reader

Abstract

A method for testing the development characteristics of fractures in the top and bottom rock layers by drilling glue injection comprises the following steps: (1) selecting a suitable drilling position in an underground tunnel; (2) drilling a small-diameter borehole; (3) pushing the glue injection drill bit into the borehole, and finally stopping the front end of the glue injection drill bit at a position 2m away from the bottom of the borehole; (4) using a glue injection stirring device to connect the glue injection pipeline for segmented glue injection; (5) leaving the glue injection drill bit stationary for 0.5 to 1 day, and then taking out the glue injection drill bit after the silica gel has completely solidified; (6) performing segmented coring operations, and transporting all the silica gel cores taken out to the laboratory; (7) testing, researching and analyzing the silica gel cores taken out. The present invention has a scientific principle, is easy to operate, has a low cost, and can accurately and quantitatively and qualitatively grasp the development characteristics of fractures in the borehole. It can be applied to mines that need to test the development characteristics of water-conducting fracture zones and bottom plate damage zones, and has great promotion value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mining, and in particular relates to a method for testing the development characteristics of cracks in top and bottom plate rock layers by drilling and injecting glue. Background Art

[0002] At present, coal is necessary as the main energy source in my country, otherwise it will not be enough to support national modernization. However, coal mining is accompanied by many disasters, especially roof and floor water disasters, which pose a great threat to the safe production of coal mining enterprises and the safety of workers. Especially for coal mining under the roof aquifer and coal mining above the floor pressure water, the rock stratum crushing characteristics of the water-conducting fracture zone formed by coal mining are unclear, especially for structural rock masses such as faults and collapse columns, which are the main factors causing mine water inrush. Through decades of coal mining in the early stage, certain methods and experience for detecting water-conducting fracture zones have been accumulated. For example, the maximum height of water-conducting fractures is evaluated by testing the water leakage of the borehole with a double-end water plug, and the maximum height of water-conducting fractures is judged by observing the crushing of the inner wall of the borehole with a borehole peep system. The above methods can only judge the development height of the water-conducting fracture zone from a certain angle, and cannot quantitatively describe the development characteristics of the fractures in the water-conducting fracture zone, and cannot accurately guide the safe and efficient production of coal mines. Therefore, exploring a method that can quantitatively describe the development characteristics of fractures in the top and bottom strata of the borehole is an important practical need for safe, efficient and green mining in coal mines at this stage.

[0003] Patent application number 202010018566.2 discloses a borehole peep device with a push mechanism, which can use the mechanism to push the borehole peep equipment to observe the development of cracks in the borehole, avoiding the need to manually send the peep probe into the borehole, saving the operator's physical strength, reducing the operator's labor intensity, and saving working time. This patent can macroscopically detect the existence of cracks in the borehole wall, but cannot quantitatively describe the size of the cracks, and cannot detect the expansion of the cracks.

[0004] Patent application number 201910286888.2 discloses a test device and test method based on a double-ended water plug, which integrates the plugging and water injection leakage structures in one box, which is easy to carry and assemble. It can measure the water loss of the borehole wall in a certain interval in the borehole, and measure the development of water-conducting fractures and the maximum development height of the water-conducting fracture zone by analyzing the loss of borehole water. This method is widely used in engineering, but it can only roughly reflect the development of fractures through water loss, and cannot accurately and quantitatively describe the development characteristics of water-conducting fractures.

[0005] Therefore, it is particularly important to design a method to use drilling glue injection to test the development characteristics of top and bottom rock strata fractures. By pumping fast-setting silica gel into a small-diameter borehole, after the silica gel solidifies, a large-hole coring drill is used to take out the core with silica gel to quantitatively test the development characteristics of water-conducting fractures. Summary of the invention

[0006] In order to solve the deficiencies in the prior art, the present invention provides a method for testing the development characteristics of roof and floor rock strata cracks by drilling glue injection, which has a scientific principle, is easy to operate and has high test data accuracy; a silica gel pumping device is used to inject rapid prototyping silica gel into a small-diameter borehole, and after the silica gel is fully solidified, a large-diameter coring drill bit is used to take out the core with silica gel, and by measuring the morphology of the silica gel entering the rock cracks, the development characteristics of the water-conducting cracks in the roof and floor of the coal seam can be quantitatively described, which has high theoretical research and field measurement significance.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solution: a method for testing the development characteristics of top and bottom rock strata fractures by drilling glue injection, comprising the following steps:

[0008] (1) Select a suitable drilling location in the underground tunnel;

[0009] (2) Drilling rigs are arranged in the tunnels, and small-diameter drilling bits and drill rods are used to drill holes according to design requirements. No coring is required, and drilling can be done directly;

[0010] (3) After the drilling is completed, the drilling bit and the drill rod are removed from the borehole, the drilling bit is removed, and the glue injection drill bit is installed on the drill rod. The glue injection pipeline connected to the glue injection drill bit passes through the hollow drill rod. The drilling rig is operated to slowly push the glue injection drill bit into the borehole, and finally the front end of the glue injection drill bit stops at a position 2m away from the bottom of the borehole;

[0011] (4) Use a glue injection stirring device to connect the glue injection pipeline to perform segmented glue injection. After each segment is injected, control the drill rig to move the drill rod and the glue injection drill bit a certain distance outside the borehole until the entire borehole is injected with glue and the glue injection operation is completed. At this time, the rear end of the glue injection drill bit is flush with the borehole mouth.

[0012] (5) After the injection drill bit is left to stand for 0.5 to 1 day, the silicone rubber is completely solidified and then the injection drill bit is taken out. The injection stirring device, pipeline and injection drill bit are cleaned for the next use.

[0013] (6) Carry out coring operations in sections and transport all the silica gel cores taken out to the laboratory;

[0014] (7) Conduct testing, research and analysis on the retrieved silica gel core.

[0015] Step (1) is specifically as follows: selecting a tunnel suitable for drilling rig construction, arranging a construction site in the tunnel according to the model of the drilling rig, and when the tunnel space is insufficient for drilling rig construction, the tunnel should be widened to meet the construction requirements; when designing the drilling orientation, the inclination angle of the top plate drilling hole is 40 to 60 degrees, and the inclination angle of the bottom plate drilling hole is 60 to 90 degrees, which is conducive to the liquid silicone entering the surrounding cracks during the glue injection process.

[0016] The glue injection drill bit includes a hollow hard glue injection tube, the outer circle of the rear port of the hard glue injection tube is threadedly connected to the inner circle of the drill rod port, the front end of the glue injection pipeline extends into and is threadedly connected to the inside of the rear port of the hard glue injection tube, and a plurality of rubber sealing retaining rings are fixedly provided on the outer circle of the hard glue injection tube. The rubber sealing retaining rings are evenly spaced along the axial direction of the hard glue injection tube, and the outer edge of each rubber sealing retaining ring is tilted forward to form a conical cylinder that is thick at the front and thin at the back.

[0017] The glue injection and stirring device includes a stirring barrel and a stirring motor arranged on the top of the stirring barrel, a high-pressure air injection pipe is arranged on the upper side of the stirring barrel, an air valve and a pressure gauge are arranged on the high-pressure air injection pipe, a silicone outlet pipe is arranged on the lower side of the stirring barrel, a discharge valve is arranged on the silicone outlet pipe, a curing agent injection port and a liquid silicone injection port are arranged on the top of the stirring barrel, the main shaft of the stirring motor is arranged vertically upward and is coaxially connected with a stirring shaft extending into the stirring barrel, and a stirring blade is arranged on the stirring shaft.

[0018] The specific process of using the glue injection stirring device to connect the glue injection pipeline to perform segmented glue injection in step (4) is as follows: connect the glue injection pipeline to the silicone outlet pipe at the lower side of the mixing barrel, add the required proportion of curing agent and liquid silicone into the mixing barrel through the curing agent injection port and the liquid silicone injection port, respectively, start the stirring motor, and the stirring motor drives the stirring shaft and the stirring blades to stir the curing agent and liquid silicone in the mixing barrel. While stirring, connect the high-pressure gas injection pipe to the compressed air pipeline downhole, open the air valve, and monitor through the pressure gauge that when the air pressure above the silicone mixture in the mixing barrel is 1Mpa, open the discharge valve, and under the action of the high-pressure gas, the silicone mixture is injected through the silicone outlet pipe, The glue is injected into the glue injection drill bit through the injection pipeline, and then injected into the 2-meter cavity between the bottom of the borehole and the glue injection drill bit through the front port of the glue injection drill bit. During the glue injection process, the rubber sealing ring prevents the overflow of silicone. After 30 seconds of glue injection and 30 seconds of pressure maintenance, the 2-meter cavity is filled, the silicone is pressed into the cracks in the borehole wall, the discharge valve is closed, and the drilling rig is operated to withdraw the glue injection drill bit by 2m. The discharge valve is opened again, and the 2-meter cavity is operated according to the above glue injection process again. After 30 seconds of glue injection and 30 seconds of pressure maintenance, the 2-meter cavity is filled, the silicone is pressed into the cracks in the borehole wall, and the discharge valve is closed. Repeat the above operations in sequence according to the above glue injection method until the entire hole is injected.

[0019] The specific process of the segmented coring operation in step (6) is as follows: a large-diameter drill rod and a coring drill bit are installed on the drilling rig, and the silicone core filled with silicone is taken out in segments along the center line of the borehole according to the designed azimuth of the borehole. The silicone core is a cylindrical rock wrapped by the outer circle of the silicone column. The silicone core taken out in segments is placed in the core box in sequence and marked according to the drilling depth; until all the injected segments are taken out.

[0020] The specific process of step (7) is as follows: the silica gel core is CT scanned, and the columnar shape of each section of the silica gel core is reconstructed in three dimensions on the computer, and the development characteristics of the fractures in the whole or a certain section can be quantitatively analyzed by computer; after the scanned silica gel core, the outer rock is broken, and the silica gel column with fractures is taken out, and the diffusion of silica gel in the fracture is macroscopically analyzed to reflect the degree of rock fragmentation in the fracture zone.

[0021] By adopting the above technical scheme, the present invention combines the existing testing technology and comprehensively utilizes the characteristics of liquid silica gel that is easy to shape and solidify, providing central support for the rock during coring, and can quantitatively and qualitatively analyze the rock strata crushing characteristics in the water-conducting fracture zone by drilling and injecting the core. Compared with the previous technology, the present invention overcomes the shortcomings that borehole peeping can only qualitatively describe two-dimensional fractures, and that double-end water plugging can only vaguely quantitatively describe the fracture development characteristics. The present invention has a scientific principle, is easy to operate, and has low cost. It can also accurately and qualitatively grasp the fracture development characteristics in the borehole, and can be applied in mines that need to test the development characteristics of water-conducting fracture zones and bottom plate damage zones, and is very valuable for promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the specific construction position of the present invention in the tunnel;

[0023] Figure 2 It is a structural schematic diagram of the glue injection stirring device in the present invention;

[0024] Figure 3 It is a schematic structural diagram of the glue injection drill bit used in the present invention;

[0025] Figure 4 It is a schematic diagram of a silica gel core obtained by the coring drill of the present invention. DETAILED DESCRIPTION

[0026] like Figure 1-Figure 4 As shown, a method for testing the development characteristics of top and bottom rock strata fractures by drilling glue injection of the present invention comprises the following steps:

[0027] (1) Select a suitable drilling location in the underground tunnel;

[0028] (2) Drilling rigs are arranged in the tunnels, and small-diameter drilling bits and drill rods are used to drill holes according to design requirements. No coring is required, and drilling can be done directly;

[0029] (3) After the drilling is completed, the drilling bit and the drill rod are removed from the borehole, the drilling bit is removed, and the glue injection drill bit is installed on the drill rod. The glue injection pipeline 1 connected to the glue injection drill bit passes through the hollow drill rod. The drilling rig is operated to slowly push the glue injection drill bit into the borehole, and finally the front end of the glue injection drill bit stops at a position 2m away from the bottom of the borehole;

[0030] (4) Use the glue injection stirring device to connect the glue injection pipeline 1 to perform segmented glue injection. After each segment is injected, control the drill rig to move the drill rod and the glue injection drill bit a certain distance outside the borehole until the inside of the borehole is completely injected with glue and the glue injection operation is completed. At this time, the rear end of the glue injection drill bit is flush with the borehole mouth;

[0031] (5) After the injection drill bit is left to stand for 0.5 to 1 day, the silicone rubber is completely solidified and then the injection drill bit is taken out. The injection stirring device, pipeline and injection drill bit are cleaned for the next use.

[0032] (6) Carry out coring operations in sections and transport all the silica gel cores taken out to the laboratory;

[0033] (7) Conduct testing, research and analysis on the retrieved silica gel core.

[0034] Step (1) is specifically as follows: selecting a tunnel suitable for drilling rig construction, arranging a construction site in the tunnel according to the model of the drilling rig, and when the tunnel space is insufficient for drilling rig construction, the tunnel should be widened to meet the construction requirements; when designing the drilling orientation, the inclination angle of the top plate drilling hole is 40 to 60 degrees, and the inclination angle of the bottom plate drilling hole is 60 to 90 degrees, which is conducive to the liquid silicone entering the surrounding cracks during the glue injection process.

[0035] The glue injection drill bit includes a hollow hard glue injection tube 2, the outer circle of the rear port of the hard glue injection tube 2 is threadedly connected to the inner circle of the port of the drill rod 17, the front end of the glue injection pipeline 1 extends into and is threadedly connected to the inside of the rear port of the hard glue injection tube 2, and the outer circle of the hard glue injection tube 2 is fixedly provided with a plurality of rubber sealing retaining rings 3, and the rubber sealing retaining rings 3 are evenly spaced along the axial direction of the hard glue injection tube 2, and the outer edge of each rubber sealing retaining ring 3 is tilted forward to form a conical cylinder with a thick front and a thin back.

[0036] The glue injection and stirring device includes a stirring barrel 4 and a stirring motor 5 arranged on the top of the stirring barrel 4. A high-pressure air injection pipe 6 is provided on the upper side of the stirring barrel 4, and an air valve 7 and a pressure gauge 8 are provided on the high-pressure air injection pipe 6. A silicone outlet pipe 9 is provided on the lower side of the stirring barrel 4, and a discharge valve 10 is provided on the silicone outlet pipe 9. A curing agent injection port 11 and a liquid silicone injection port 12 are provided on the top of the stirring barrel 4. The main shaft of the stirring motor 5 is vertically upwardly arranged and coaxially connected with a stirring shaft 13 extending into the stirring barrel 4, and a stirring blade 14 is provided on the stirring shaft 13.

[0037] The specific process of using the glue injection stirring device to connect the glue injection pipeline 1 to perform segmented glue injection in step (4) is as follows: connect the glue injection pipeline 1 to the silicone outlet pipe 9 at the lower side of the mixing barrel 4, add the required proportion of curing agent and liquid silicone into the mixing barrel 4 through the curing agent injection port 11 and the liquid silicone injection port 12, respectively, start the stirring motor 5, and the stirring motor 5 drives the stirring shaft 13 and the stirring blades 14 to stir the curing agent and liquid silicone in the mixing barrel 4. While stirring, the high-pressure gas injection pipe 6 is connected to the compressed air pipeline downhole, the air valve 7 is opened, and the pressure gauge 8 monitors that when the air pressure above the silicone mixture in the mixing barrel 4 is 1Mpa, the discharge valve 10 is opened, and under the action of the high-pressure gas, the silicone mixture is passed through the mixing barrel 4. The silicone outlet pipe 9 and the glue injection pipeline 1 are injected into the glue injection drill bit, and then injected into the 2-meter cavity between the bottom of the borehole and the glue injection drill bit through the front port of the glue injection drill bit. During the glue injection process, the rubber sealing retaining ring 3 plays a role in preventing the silicone from overflowing. After 30 seconds of glue injection and maintaining pressure for 30 seconds, the 2-meter cavity is filled, and the silicone is pressed into the cracks in the borehole wall. The discharge valve 10 is closed, and the drilling rig is operated to withdraw the glue injection drill bit by 2m. The discharge valve 10 is opened again, and the 2-meter cavity is operated again according to the above-mentioned glue injection process. After 30 seconds of glue injection and maintaining pressure for 30 seconds, the 2-meter cavity is filled, and the silicone is pressed into the cracks in the borehole wall. The discharge valve 10 is closed; the above operations are repeated in sequence according to the above-mentioned glue injection method until the entire hole is injected with glue. The rubber sealing retaining ring 3 of the injection drill bit is kept at the position of the borehole mouth for 0.5 to 1 day, and the inlet of the injection pipeline is closed to prevent the liquid silicone from solidifying and leaking. This can ensure that the silicone in the borehole is in a saturated state and avoid a large number of cavities in the core after solidification, which will cause the removed core to be relatively broken and unable to proceed to the next step of research.

[0038] The specific process of the segmented coring operation in step (6) is as follows: a large-diameter drill rod 17 and a coring drill bit are installed on the drilling rig, and the silicone core filled with silicone is taken out in segments along the center line of the borehole according to the designed azimuth of the borehole. The silicone core is a cylindrical rock 16 wrapped around the outer circle of the silicone column 15. The segmented silicone core is placed in a core box in sequence and marked according to the drilling depth; until all the injected segments are taken out.

[0039] The specific process of step (7) is as follows: the silica gel core is CT scanned, and the columnar shape of each section of the silica gel core is reconstructed in three dimensions on a computer, and the development characteristics of the fractures in the whole or a certain section can be quantitatively analyzed by a computer; after the scanned silica gel core, the outer rock 16 is broken, and the silica gel column 15 with fractures is taken out, and the diffusion of silica gel in the fracture is macroscopically analyzed to reflect the degree of rock fragmentation in the fracture zone.

[0040] This embodiment does not impose any formal limitation on the shape, material, structure, etc. of the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the technical solution of the present invention.

Claims

1. A method for testing the development characteristics of top and bottom rock strata fractures by drilling and injecting glue, characterized in that: The following steps are involved: (1) Select a suitable drilling location in the underground tunnel; (2) Drilling rigs are arranged in the tunnels, and small-diameter drilling bits and drill rods are used to drill holes according to design requirements. No coring is required, and drilling can be done directly; (3) After the drilling is completed, the drilling bit and the drill rod are removed from the borehole, the drilling bit is removed, and the glue injection drill bit is installed on the drill rod. The glue injection pipeline connected to the glue injection drill bit passes through the hollow drill rod. The drilling rig is operated to slowly push the glue injection drill bit into the borehole, and finally the front end of the glue injection drill bit stops at a position 2m away from the bottom of the borehole; (4) Use a glue injection stirring device to connect the glue injection pipeline to perform segmented glue injection. After each segment is injected, control the drill rig to move the drill rod and the glue injection drill bit a certain distance outside the borehole until the entire borehole is injected with glue and the glue injection operation is completed. At this time, the rear end of the glue injection drill bit is flush with the borehole mouth. (5) After the injection drill bit is left to stand for 0.5 to 1 day, the silicone rubber is completely solidified and then the injection drill bit is taken out. The injection stirring device, pipeline and injection drill bit are cleaned for the next use. (6) Carry out coring operations in sections and transport all the silica gel cores taken out to the laboratory; (7) Conducting testing, research and analysis on the silica gel cores taken out; The glue injection drill bit comprises a hollow hard glue injection tube, the outer circle of the rear port of the hard glue injection tube is threadedly connected to the inner circle of the drill rod port, the front end of the glue injection pipeline extends into and is threadedly connected to the inside of the rear port of the hard glue injection tube, and the outer circle of the hard glue injection tube is fixedly provided with a plurality of rubber sealing retaining rings, which are evenly spaced and arranged along the axial direction of the hard glue injection tube, and the outer edge of each rubber sealing retaining ring is tilted forward to form a conical cylinder shape with a thick front and a thin rear; The specific process of using the glue injection stirring device to connect the glue injection pipeline to perform segmented glue injection in step (4) is as follows: connect the glue injection pipeline to the silicone outlet pipe at the lower side of the mixing barrel, add the required proportion of curing agent and liquid silicone into the mixing barrel through the curing agent injection port and the liquid silicone injection port, respectively, start the stirring motor, and the stirring motor drives the stirring shaft and the stirring blades to stir the curing agent and liquid silicone in the mixing barrel. While stirring, connect the high-pressure gas injection pipe to the compressed air pipeline downhole, open the air valve, and monitor through the pressure gauge that when the air pressure above the silicone mixture in the mixing barrel is 1Mpa, open the discharge valve, and under the action of the high-pressure gas, the silicone mixture is injected through the silicone outlet pipe, The glue is injected into the glue injection drill bit through the injection pipeline, and then injected into the 2-meter cavity between the bottom of the borehole and the glue injection drill bit through the front port of the glue injection drill bit. During the glue injection process, the rubber sealing ring prevents the overflow of silicone. After 30 seconds of glue injection and 30 seconds of pressure maintenance, the 2-meter cavity is filled, the silicone is pressed into the cracks in the borehole wall, the discharge valve is closed, and the drilling rig is operated to withdraw the glue injection drill bit by 2m. The discharge valve is opened again, and the 2-meter cavity is operated according to the above glue injection process again. After 30 seconds of glue injection and 30 seconds of pressure maintenance, the 2-meter cavity is filled, the silicone is pressed into the cracks in the borehole wall, and the discharge valve is closed. Repeat the above operations in sequence according to the above glue injection method until the entire hole is injected.

2. The method for testing the development characteristics of top and bottom rock strata fractures by drilling and glue injection according to claim 1, characterized in that: Step (1) is specifically as follows: selecting a tunnel suitable for drilling rig construction, arranging a construction site in the tunnel according to the model of the drilling rig, and when the tunnel space is insufficient for drilling rig construction, the tunnel should be widened to meet the construction requirements; when designing the drilling orientation, the inclination angle of the top plate drilling hole is 40 to 60 degrees, and the inclination angle of the bottom plate drilling hole is 60 to 90 degrees, which is conducive to the liquid silicone entering the surrounding cracks during the glue injection process.

3. The method for testing the development characteristics of top and bottom rock strata fractures by drilling and glue injection according to claim 1, characterized in that: The glue injection and stirring device includes a stirring barrel and a stirring motor arranged on the top of the stirring barrel, a high-pressure air injection pipe is arranged on the upper side of the stirring barrel, an air valve and a pressure gauge are arranged on the high-pressure air injection pipe, a silicone outlet pipe is arranged on the lower side of the stirring barrel, a discharge valve is arranged on the silicone outlet pipe, a curing agent injection port and a liquid silicone injection port are arranged on the top of the stirring barrel, the main shaft of the stirring motor is arranged vertically upward and is coaxially connected with a stirring shaft extending into the stirring barrel, and a stirring blade is arranged on the stirring shaft.

4. The method for testing the development characteristics of top and bottom rock strata fractures by drilling and glue injection according to claim 1, characterized in that: The specific process of the segmented coring operation in step (6) is as follows: a large-diameter drill rod and a coring drill bit are installed on the drilling rig, and the silicone core filled with silicone is taken out in segments along the center line of the borehole according to the designed azimuth of the borehole. The silicone core is a cylindrical rock wrapped by the outer circle of the silicone column. The silicone core taken out in segments is placed in the core box in sequence and marked according to the drilling depth; until all the injected segments are taken out.

5. The method for testing the development characteristics of top and bottom rock strata fractures by drilling and injecting glue according to claim 4, characterized in that: The specific process of step (7) is as follows: the silica gel core is CT scanned, and the columnar shape of each section of the silica gel core is reconstructed in three dimensions on the computer, and the development characteristics of the fractures in the whole or a certain section can be quantitatively analyzed by computer; after the scanned silica gel core, the outer rock is broken, and the silica gel column with fractures is taken out, and the diffusion of silica gel in the fracture is macroscopically analyzed to reflect the degree of rock fragmentation in the fracture zone.