Assembled subway platform and construction method thereof
Through the assembly technology of ultra-high-performance concrete components of the prefabricated subway platform, the problems of large area, difficult construction and long construction period in the construction of the subway platform have been solved, and fast and convenient installation and efficient construction process have been achieved.
Patent Information
- Application Number
- CN202111454841.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-12-01
AI Technical Summary
During the construction of subway platforms, on-site pouring construction occupies a large area, is difficult to construct, and has a long construction period. Ordinary prefabricated components are heavy and inconvenient to install, which affects the integrity and stability of the structure.
Adopting an assembled subway platform, using ultra-high-performance concrete prefabricated columns, beams and platform plate components, using high-strength ultra-high-performance concrete materials to reduce component size but ensure structural strength, using connectors and steel mesh for assembly, simplifying construction process.
It achieves quick and convenient installation of subway platforms, reduces component weight and construction difficulty, improves construction efficiency and safety, and solves the problems of land occupation and construction period of pouring construction.
Smart Images

Figure CN114875959B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of subway construction engineering, and in particular to an assembled subway platform and a construction method thereof. Background Art
[0002] With the rapid development of the economy, urban rail transit has developed rapidly in response to demand. As an important means of transportation to alleviate urban traffic pressure, the technology of subway has become more and more mature. The subway platform is an important part of the subway station and an important platform for passengers to get on and off the subway and stay in the subway station.
[0003] In the related art, the construction of subway platforms mainly adopts on-site pouring construction. Before pouring, it is necessary to set up formwork in the underground space, and the formwork needs to be removed after the concrete hardens. Due to the limited underground space, the transportation, erection, removal of the formwork, and the pouring of concrete are very inconvenient. In addition, for concrete pouring, more construction equipment is required on site, which further compresses the construction space, increases the difficulty of construction, and reduces the safety of construction. At the same time, the use of concrete pouring construction requires a long maintenance period, which will reduce construction efficiency and delay the construction period. In addition, some ordinary prefabricated components are used for the installation and construction of subway platforms. In order to meet the load-bearing design requirements, the cross-sectional dimensions and weight of ordinary components are often relatively large; if large-volume components are made, it is difficult to transport and install the components in the narrow underground space; and if small components are made, there will be too many components, and there will be many installation seams after completion, affecting the integrity and stability of the structure. Summary of the invention
[0004] The purpose of the present invention is to solve at least one of the technical problems existing in the prior art, to provide an assembled subway platform and a construction method thereof, to achieve convenient installation of the subway platform, and to solve the problem of heavy weight and inconvenient installation of ordinary components.
[0005] According to a first aspect of the present invention, there is provided an assembled subway platform, comprising:
[0006] A plurality of column components, wherein the column components are vertically arranged and the plurality of column components are spaced and distributed in parallel;
[0007] A plurality of beam components, wherein the beam components are horizontally arranged on the column components;
[0008] A plurality of platform plate components are spliced on the beam body components;
[0009] The column components, the beam components and the platform slab components are all made of ultra-high performance concrete, and the ultra-high performance concrete has a compressive strength of not less than 150 MPa, a flexural strength of not less than 20 MPa, and a tensile strength of not less than 7 MPa.
[0010] The above-mentioned assembled subway platform has at least the following beneficial effects: the subway platform is formed by assembling column components, beam components and platform slab components. Compared with the existing on-site casting construction process, the installation of the subway platform is faster and more convenient, which solves the problems of large area occupied, high construction difficulty and long construction period of casting construction; the column components, beam components and platform slab components are all prefabricated with ultra-high performance concrete, and the compressive strength of the ultra-high performance concrete is not less than 150MPa, the flexural strength is not less than 20MPa, and the tensile strength is not less than 7MPa. Compared with ordinary components, the column components, beam components and platform slab components prefabricated with the above-mentioned high-strength ultra-high performance concrete are set to be smaller in size while ensuring structural strength. The cross-sectional size is only 1 / 2 to 1 / 3 of that of ordinary components, which greatly reduces the weight of the components, improves the convenience of component transportation and assembly during construction, and solves the problems of heavy weight and inconvenient installation of ordinary components.
[0011] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, the ultra-high performance concrete includes the following raw materials in parts by weight: 55-65 parts of cement, 10-20 parts of silica fume, 90-100 parts of fine aggregate, 5-8 parts of quartz powder, 10-15 parts of reinforcing material, 1.5-2.0 parts of water reducer, 0.05-0.1 parts of synergist, and 10-13 parts of water, wherein the compressive strength grade of the cement is not less than 42.5 MPa, the reinforcing material is steel fiber, the water reduction rate of the water reducer is not less than 25%, and the synergist is at least one of sodium tripolyphosphate and polynaphthalene sulfonate.
[0012] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, a vertical first connecting member is pre-embedded in the column member, one end of the first connecting member is arranged in the column member, and the other end of the first connecting member extends to the beam member or the platform plate member, and the first connecting member is used to connect the beam member, or the first connecting member is used to connect the beam member and the platform plate member.
[0013] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, a connecting hole is provided on the beam member, at least a portion of the first connecting member is inserted into the connecting hole, and the diameter of the connecting hole is larger than the first connecting member for pouring connecting material.
[0014] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, a connecting seam is provided between two adjacent platform plate components, the column component is arranged below the connecting seam, a steel mesh is pre-embedded inside the platform plate component, the steel mesh extends to the connecting seam, the connecting hole passes through the beam component, the upper end of the first connecting piece extends to the connecting seam, and the connecting seam is used for pouring connecting material to connect the column component, the beam component and the platform plate component to form a whole.
[0015] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, the end of the platform plate component connected to the connecting seam is an inclined surface, so that the connecting seam is trapezoidal and the upper end width is greater than the lower end width, and the connecting hole is conical and the upper end hole diameter is greater than the lower end hole diameter.
[0016] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, a positioning groove is provided at the upper end of the column member, and the positioning groove matches the bottom of the beam member for positioning and installing the beam member.
[0017] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, a soft film is arranged between the positioning grooves of the column member and the beam member to eliminate the installation gap between the positioning groove and the column member.
[0018] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, the assembled subway platform includes a base, the upper end of the base is fixedly connected to the column member, and the lower end of the base is used to connect to the foundation.
[0019] According to the assembled subway platform described in the embodiment of the first aspect of the present invention, a second connecting member is pre-embedded in the column member, and the second connecting member includes a vertical connecting part and a horizontal connecting part. The upper part of the vertical connecting part is arranged in the column member, and the horizontal connecting part is arranged at the bottom end of the vertical connecting part. The lower part of the vertical connecting part and the horizontal connecting part are arranged in the base.
[0020] According to a second aspect of the present invention, there is provided a method for constructing an assembled subway platform, comprising the following steps:
[0021] Prefabricate a plurality of column components, a plurality of beam components and a plurality of platform slab components by ultra-high performance concrete, wherein the ultra-high performance concrete has a compressive strength of not less than 150 MPa, a flexural strength of not less than 20 MPa, and a tensile strength of not less than 7 MPa;
[0022] The column components are installed at intervals, the beam components are installed on the column components, and the platform plate components are installed on the beam components.
[0023] The above-mentioned construction method of the assembled subway platform has at least the following beneficial effects: the subway platform adopts an assembled construction method, which is faster and more convenient than the existing on-site casting construction process; the column components, beam components and platform slab components are prefabricated with ultra-high performance concrete, the compressive strength of the ultra-high performance concrete is not less than 150MPa, the flexural strength is not less than 20MPa, and the tensile strength is not less than 7MPa. Compared with ordinary components, the column components, beam components and platform slab components prefabricated with the above-mentioned high-strength ultra-high performance concrete are smaller in size while ensuring the structural strength, which greatly reduces the weight of the components and improves the convenience of component transportation and assembly during construction.
[0024] According to the construction method of the assembled subway platform described in the embodiment of the second aspect of the present invention, the ultra-high performance concrete includes the following raw materials in parts by weight: 55-65 parts of cement, 10-20 parts of silica fume, 90-100 parts of fine aggregate, 5-8 parts of quartz powder, 10-15 parts of reinforcing material, 1.5-2.0 parts of water reducer, 0.05-0.1 parts of synergist, and 10-13 parts of water, wherein the compressive strength grade of the cement is not less than 42.5MPa, the reinforcing material is steel fiber, the water reduction rate of the water reducer is not less than 25%, and the synergist is at least one of sodium tripolyphosphate and polynaphthalene sulfonate;
[0025] The steps of prefabricating a plurality of column components, a plurality of beam components and a plurality of platform slab components by using ultra-high performance concrete include:
[0026] The cement, silica fume, reinforcing material, quartz powder and sand in the above-mentioned parts by mass are mixed and stirred evenly, and the mixture of the water reducer, synergist and water in the above-mentioned parts by mass is added and stirred evenly to obtain a mixture of the ultra-high performance concrete;
[0027] The mixture of the ultra-high performance concrete is injected into the molds of the column components, the beam components and the platform slab components, and left to stand at room temperature for 5 to 7 hours, and then placed in a curing room, steam is introduced, and the temperature is increased at a rate of 12°C / h until the temperature reaches 35 to 45°C, and after curing for 20 to 30 hours, taken out and cooled at room temperature;
[0028] The mold is removed, and the component is placed in a curing room. Steam is introduced and the temperature is increased at a rate of 12°C / h until the temperature reaches 75-85°C. After curing for 40-50 hours, the component is taken out and cooled at room temperature to obtain an ultra-high performance concrete component.
[0029] According to the construction method of the assembled subway platform described in the second embodiment of the present invention, a vertical first connecting member is pre-embedded in the column member, a connecting hole is provided in the beam member, and a steel mesh is pre-embedded inside the platform plate member;
[0030] The step of installing the beam member on the column member, and installing the platform plate member on the beam member comprises:
[0031] Install the beam body component so that the connecting hole is plug-fitted with the first connecting member;
[0032] Install the platform plate components, a connection seam is provided between two adjacent platform plate components, the connection seam is located above the column component, the first connecting member passes through the connection hole and extends to the connection seam, and the steel mesh extends to the connection seam;
[0033] Connecting materials are poured into the connecting holes and the connecting seams to connect the column components, the beam components and the platform plate components to form a whole.
[0034] According to the construction method of the assembled subway platform described in the embodiment of the second aspect of the present invention, the steps include pouring connecting materials into the connecting holes and the connecting seams, pouring a test piece at the same time as the connecting materials, and curing the test piece under the same environmental conditions as the connecting materials. When it is detected that the strength of the test piece reaches above a predetermined strength, decorative construction work is performed on the installed platform plate component.
[0035] According to the construction method of the assembled subway platform described in the embodiment of the second aspect of the present invention, a second connecting member is pre-embedded on the column member, and the second connecting member includes a vertical connecting part and a horizontal connecting part, the upper part of the vertical connecting part is arranged in the column member, and the horizontal connecting part is arranged at the bottom end of the vertical connecting part;
[0036] The step of installing the column member comprises:
[0037] Binding or welding the lower part of the second connecting member to the steel bars on the foundation, and ensuring that the heights of the column components are consistent;
[0038] Installing a rectangular frame mold, wherein the rectangular frame mold surrounds the lower portion of the second connecting member;
[0039] Grouting is poured into the rectangular frame mold, and a base is formed after curing. The rectangular frame mold is removed, and the foundation and the column member are connected through the base. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The present invention is further described below in conjunction with the accompanying drawings and embodiments;
[0041] Figure 1 is a front view of an assembled subway platform according to an embodiment of the present invention;
[0042] Figure 2is a side view of an assembled subway platform according to an embodiment of the present invention;
[0043] Figure 3 Embodiment of the present invention Figure 2 A top view of the assembled subway platform;
[0044] Figure 4 Embodiment of the present invention Figure 1 An enlarged structural diagram of part A of the assembled subway platform;
[0045] Figure 5 is a front view of a column member according to an embodiment of the present invention;
[0046] Figure 6 is a side view of a column member according to an embodiment of the present invention;
[0047] Figure 7 is a top view of a column component according to an embodiment of the present invention;
[0048] Figure 8 is a front view of a beam member according to an embodiment of the present invention;
[0049] Fig. 9 is a side view of a beam member according to an embodiment of the present invention;
[0050] Fig.10 is a top view of a platform plate component according to an embodiment of the present invention;
[0051] Fig.11 is a front view of a platform plate component according to an embodiment of the present invention;
[0052] Figure numerals: column component 100, first connecting member 110, positioning groove 120, second connecting member 130, vertical connecting part 131, horizontal connecting part 132, beam component 200, connecting hole 210, reinforcing steel bar 220, platform plate component 300, connecting seam 310, steel mesh 320, base 400, steel bar 500, side wall foundation 600, foundation 700. DETAILED DESCRIPTION
[0053] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.
[0054] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0055] In the description of the present invention, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0056] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0057] Reference Figures 1 to 11 An embodiment of the present invention provides an assembled subway platform, comprising a plurality of column components 100, a plurality of beam components 200 and a plurality of platform plate components 300, wherein the column components 100 are vertically arranged, and the plurality of column components 100 are spaced and distributed in parallel; the beam components 200 are horizontally arranged on the column components 100, and the plurality of beam components 200 are connected end to end to form a frame with the main component to support the platform plate component 300; the plurality of platform plate components 300 are spliced on the beam components 200; the materials of the column components 100, the beam components 200 and the platform plate components 300 are all ultra-high performance concrete, and the compressive strength of the ultra-high performance concrete is not less than 150 MPa, the flexural strength is not less than 20 MPa, and the tensile strength is not less than 7 MPa.
[0058] The assembled subway platform of the present embodiment is formed by assembling column components 100, beam components 200 and platform plate components 300. Compared with the existing on-site casting construction process, the installation of the subway platform is faster and more convenient, and the problems of large area occupied, great construction difficulty and long construction period in casting construction are solved; the column components 100, beam components 200 and platform plate components 300 are all prefabricated with ultra-high performance concrete, and the compressive strength of the ultra-high performance concrete is not less than 150MPa, the flexural strength is not less than 20MPa, and the tensile strength is not less than 7MPa. Compared with ordinary components, the column components 100, beam components 200 and platform plate components 300 prefabricated with the above high-strength ultra-high performance concrete are set to be smaller in size while ensuring structural strength, and the cross-sectional size is only 1 / 2 to 1 / 3 of that of ordinary components, which greatly reduces the weight of the components, improves the convenience of component transportation and assembly during construction, and solves the problems of large weight and inconvenient installation of ordinary components.
[0059] In this embodiment, the ultra-high performance concrete includes the following raw materials by weight: 55-65 parts of cement, 10-20 parts of silica fume, 90-100 parts of fine aggregate, 5-8 parts of quartz powder, 10-15 parts of reinforcing material, 1.5-2.0 parts of water reducer, 0.05-0.1 parts of synergist, and 10-13 parts of water, wherein, more specifically, the cement is ordinary silicate cement or silicate cement with a compressive strength grade of not less than 42.5 MPa; the silica fume is 95-grade original silica powder. , the silicon dioxide content is greater than 85%, and the 45 micron sieve residue is less than 2%; the fine aggregate can be artificial sand or natural sand with a particle size of 0.1 to 4.75 mm; the quartz powder mesh number is 300 to 500 mesh; the reinforcing material is a single steel fiber with a diameter of (0.2±0.02) mm and a length of 12 to 20 mm or a mixed steel fiber of multiple specifications; the water reducer is a polycarboxylic acid high-efficiency water reducer with a water reduction rate of not less than 25%; the synergist is at least one of sodium tripolyphosphate and polynaphthalene sulfonate. The ultra-high performance concrete of this embodiment is prepared by mixing the above raw materials according to the above ratio, and its compressive strength is not less than 150 MPa, the flexural strength is not less than 20 MPa, and the tensile strength is not less than 7 MPa.
[0060] The assembly construction of subway platforms must ensure that the connections between the components are firm.
[0061] In some embodiments, a first connecting member 110 is embedded in the column member 100. The first connecting member 110 is in the shape of a vertical rod. The lower end of the first connecting member 110 is disposed in the column member 100. The upper end of the first connecting member 110 extends to the platform plate member 300. The beam member 200 and the platform plate member 300 are connected by the first connecting member 110, so that the column member 100, the beam member 200 and the platform plate member 300 form a whole. The column member 100 can be a rectangular cross-section column with a side length of not less than 150 mm or a circular cross-section column with a diameter of not less than 150 mm. The height of the column member 100 is determined according to the engineering design requirements; the strength grade of the first connecting member 110 is not less than 400 MPa, the diameter is not less than 12 mm, the depth embedded in the column member 100 is not less than 350 mm, and the length of the exposed part is not less than 100 mm.
[0062] Specifically, the beam body component 200 is provided with a plurality of connection holes 210 spaced apart along the length direction, at least a portion of the first connection piece 110 is inserted into the connection hole 210, and the diameter of the connection hole 210 is larger than that of the first connection piece 110, so as to pour the connection material so that the column component 100 and the beam body component 200 are connected to form a whole.
[0063] Reference Figure 1 and Figure 4 Furthermore, a connection seam 310 is provided between two adjacent platform slab components 300, the column component 100 is arranged below the connection seam 310, a steel mesh 320 is pre-buried inside the platform slab component 300, the steel mesh 320 extends to the connection seam 310 outside, and the connection hole 210 passes through the beam component 200, so that the upper end of the first connector 110 can extend to the connection seam 310; the connection material is poured into the connection seam 310, and the connection material is poured into the connection hole 210 along the connection seam 310 at the same time, so that the column component 100, the beam component 200 and the platform slab component 300 are connected to form a whole. Specifically, the connection material adopts a wet connection material.
[0064] A gap is reserved between the two platform plate components 300 to form a connection seam 310, and the first connecting member 110 embedded in the column component 100 passes through the connection hole 210 penetrating the beam component 200 and extends to the connection seam 310. Both ends of the steel mesh 320 in the platform plate component 300 extend to the connection seam 310, so that the three components can be connected to form a whole at the same time by pouring the connection material into the connection hole 210 and the connection seam 310.
[0065] The steel mesh 320 serves to strengthen the structural strength of the platform slab component 300 and extends to the connecting joint 310 to serve as a connection. The main tensile steel bars of the steel mesh 320 are located below the middle height of the platform slab component 300. The thickness of the platform slab component 300 can be set to 40-60 mm. The steel strength grade of the steel mesh 320 is not less than 400 MPa, the diameter is not less than 8 mm, the thickness of the steel bar protective layer is not less than 15 mm, the length of the steel bar extending to the connecting joint 310 is 30-40 mm, and the plane size of the platform slab component 300 is determined according to the design requirements and the convenience of transportation and installation, and the maximum span is not more than 3000 mm.
[0066] In some embodiments, the end of the platform plate component 300 where it connects to the connecting seam 310 is an inclined surface, so that the connecting seam 310 is trapezoidal and the upper end width is greater than the lower end width, and the connecting hole 210 is conical and the upper end diameter is greater than the lower end diameter. This makes it easier to pour the connecting material and makes the connection between the three components more secure.
[0067] It can be understood that the column component 100 is connected to the beam component 200 and the platform plate component 300 by means of the first connecting member 110 and the pouring of connecting material at the connecting joint 310. As an alternative, the first connecting member 110 can be configured to connect only the beam component 200, with the upper end of the first connecting member 110 extending to the beam component 200, and a portion of the first connecting member 110 being inserted into the connecting hole 210, thereby realizing the connection between the column component 100 and the beam component 200, while the connection between the beam component 200 and the platform plate component 300 is connected through other structures.
[0068] Reference Figures 5 to 9 In some embodiments, a positioning groove 120 is provided at the upper end of the column member 100, and the positioning groove 120 matches the bottom of the beam member 200 to locate the position of the beam member 200. Specifically, the cross-sections of the beam member 200 and the positioning groove 120 are both trapezoidal, and the upper width of the beam member 200 is greater than the lower width, and the upper width of the positioning groove 120 is greater than the bottom width, so as to facilitate the installation of the beam member 200. The upper section width of the beam member 200 is not less than 150 mm, and the lower section width can be set to 100 mm. The upper and lower diameters of the connecting hole 210 are 30 mm and 20 mm respectively. Reinforcement steel bars 220 are provided on both sides of the connecting hole 210 to improve the structural strength of the beam member 200. The reinforcement steel bars 220 are located below the middle height of the platform plate member 300, and the strength grade of the reinforcement bars is not less than 400 MPa.
[0069] It is understandable that, as an alternative, the beam member 200 and the positioning groove 120 may be configured to have a rectangular cross section.
[0070] Furthermore, a soft film is provided between the column component 100 and the positioning groove 120 of the beam component 200 to eliminate the installation gap between the positioning groove 120 and the column component 100, so as to make the connection between the two more stable. Specifically, the material of the soft film can be rubber.
[0071] Reference Figure 1 and Figure 2 In some embodiments, the assembled subway platform includes a base 400 , the upper end of the base 400 is fixedly connected to the column member 100 , and the lower end of the base 400 is used to connect to the foundation 700 .
[0072] Furthermore, a second connecting member 130 is pre-embedded on the column component 100, and the second connecting member 130 includes a vertical connecting portion 131 and a horizontal connecting portion 132. The upper portion of the vertical connecting portion 131 is arranged in the column component 100, and the horizontal connecting portion 132 is arranged at the bottom end of the vertical connecting portion 131. The lower portion of the vertical connecting portion 131 and the horizontal connecting portion 132 are arranged in the base 400. The vertical connecting portion 131 and the horizontal connecting portion 132 can withstand loads in the vertical and horizontal directions, thereby realizing a reliable connection between the column component 100 and the base 400.
[0073] The embodiment of the present invention further provides a construction method of an assembled subway platform, which implements the construction of the assembled subway platform, and includes the following steps:
[0074] S100. Prefabricate a plurality of column components 100, a plurality of beam components 200 and a plurality of platform slab components 300 using ultra-high performance concrete, wherein the ultra-high performance concrete has a compressive strength of not less than 150 MPa, a flexural strength of not less than 20 MPa, and a tensile strength of not less than 7 MPa.
[0075] Specifically, step S100 includes steps S110, S120, and S130.
[0076] S110, mixing the above-mentioned parts by mass of cement, silica fume, reinforcing material, quartz powder and sand, stirring evenly, adding the above-mentioned parts by mass of a mixture of a water reducer, a synergist and water, stirring evenly, to obtain a mixture of ultra-high performance concrete;
[0077] S120, injecting the mixture of ultra-high performance concrete into the molds of the column component 100, the beam component 200 and the platform plate component 300, leaving them at room temperature for 5 to 7 hours, and then placing them in a curing room, introducing steam, and heating them at a rate of 12°C / h until the temperature reaches 35 to 45°C, curing them for 20 to 30 hours, taking them out, and cooling them at room temperature;
[0078] S130, remove the mold, put it into a curing room, introduce steam, and heat it at a rate of 12°C / h until the temperature reaches 75-85°C. After curing for 40-50h, take it out and cool it at room temperature to obtain an ultra-high performance concrete component.
[0079] The concrete mixture obtained by mixing the above raw materials in parts by mass is cured by steam and twice in succession at different times and temperatures to finally obtain ultra-high performance concrete that meets the requirements.
[0080] S200 , installing column components 100 at intervals.
[0081] Specifically, step S200 includes steps S210, S220, and S230.
[0082] S210, tying or welding the lower part of the second connecting piece 130 on each column component 100 to the steel bar 500 on the foundation 700, and ensuring that the heights of the column components 100 are consistent. Among them, if there is no reserved steel bar 500 on the foundation 700 for installing the column component 100, it is necessary to first embed the steel bars on the foundation 700 at the corresponding position. The specifications, models and buried depths of the embedded steel bars should be determined according to the design requirements and meet the relevant standard requirements. After the embedding is completed and the strength reaches the requirements, the column component 100 is placed at the corresponding position, and the second connecting piece 130 of the column component 100 is connected to the steel bar 500 on the foundation 700. Before the second connecting piece 130 of the column component 100 is connected to the steel bar 500 on the foundation 700, the position and elevation of the column component 100 must be detected and adjusted. Only after passing the inspection can welding or binding be carried out to ensure the accuracy of the component installation and positioning. The distance between two adjacent column components 100 is roughly the length of the platform plate component 300, so that the position of the connecting seam 310 between two adjacent platform plate components 300 is above the column component 100.
[0083] S220, installing a rectangular frame mold, which can be a rectangular frame mold with a length, width, and height less than 400 mm, 400 mm, and 200 mm, respectively. The rectangular frame mold surrounds the lower part of the second connecting member 130 and the upper part of the steel bars on the foundation 700. There should be no gap between the mold and the foundation 700, otherwise it should be sealed with a sealant or other means;
[0084] S230, grouting is performed in the rectangular frame mold, and after curing, the base 400 is formed, the rectangular frame mold is removed, and the foundation 700 and the column component 100 are connected through the base 400. During the pouring process, the position and elevation of the column component 100 should be monitored, and the deviation should be controlled within 3mm. If it does not meet the requirements, it should be adjusted in time to ensure that the installation accuracy of the column component 100 meets the requirements after the base 400 hardens. The pouring material uses a micro-expansion grouting material with a strength of more than 80MPa in 28 days.
[0085] S300, install the beam component 200 on the column component 100. During installation, the beam component 200 is placed on the positioning groove 120 at the upper end of the column component 100, and a soft film is placed between the beam component 200 and the column component 100. The first connecting piece 110 of the column component 100 passes through the connecting hole 210 on the beam component 200, and the first connecting piece 110 is plugged into the connecting hole 210; one end of the beam component 200 is overlapped on the side wall foundation 600.
[0086] S400 , installing the platform plate component 300 on the beam component 200 .
[0087] Specifically, step S400 includes steps S410 and S420.
[0088] S410, erecting the platform plate component 300 on the beam member 200, the overlap width between each installation edge of the platform plate component 300 and the beam member 200 is not less than 50 mm, the connection seam 310 between two adjacent platform plate components 300 is located above the column member 100, the first connecting member 110 passes through the connecting hole 210 and extends to the connection seam 310, and both ends of the steel mesh 320 inside the platform plate component 300 extend to the connection seam 310;
[0089] S420, pour the connection material into the connection hole 210 and the connection seam 310, so that the column component 100, the beam component 200 and the platform plate component 300 are connected to form a whole, and the connection between the components is realized. Specifically, the connection material adopts a wet connection material, the 28-day compressive strength of the wet connection material is not less than 120Mpa, the 28-day tensile strength is not less than 8Mpa, the shrinkage rate is less than 0.02%, and the working performance during pouring is required to reach a collapse expansion of not less than 600mm; during pouring, the material should be full and the surface should be flat. After pouring, it should be covered with a film in time for moisturizing and curing.
[0090] Furthermore, when pouring the connection material into the connection hole 210 and the connection seam 310, a test piece is poured at the same time, and the test piece is cured under the same environmental conditions as the connection material. Only when the strength of the test piece reaches a predetermined strength or above, can the decoration construction work be carried out on the installed platform plate component 300. Specifically, the predetermined strength is 80Mpa. Since the test piece has the same curing environmental conditions as the connection materials in the connection hole 210 and the connection seam 310, when the strength of the test piece reaches 80Mpa or above, it indicates that the connection materials in the connection hole 210 and the connection seam 310 have also reached the required strength, and the next step can be carried out to ensure construction safety. By using the test piece, there is no need to directly test the connection materials in the connection hole 210 and the connection seam 310, which facilitates construction operations. Similarly, a test piece can also be set when pouring the base 400 in S230.
[0091] The construction method of the assembled subway platform of this embodiment adopts an assembled construction method, which is faster and more convenient than the existing on-site casting construction process. Through the ultra-high performance concrete prefabricated column components 100, beam components 200 and platform plate components 300, the compressive strength of ultra-high performance concrete is not less than 150MPa, the flexural strength is not less than 20MPa, and the tensile strength is not less than 7MPa. Compared with ordinary components, the column components 100, beam components 200 and platform plate components 300 of this embodiment are set to be smaller in size while ensuring the structural strength, which greatly reduces the weight of the components and improves the convenience of component transportation and assembly during construction. In addition, the three components are integrated through the first connecting piece 110 on the column component 100, the connecting hole 210 on the beam component 200, the steel mesh 320 on the platform plate component 300, the connecting seam 310 between two adjacent platform plate components 300, and the pouring wet connection material.
[0092] It can be understood that the connection between the three components in this embodiment is mainly a connection in the length direction. Figure 1 , a connecting seam 310 is provided between two adjacent platform plate components 300 in the length direction, so that the three components can be connected to form an integral body; and two adjacent platform plate components 300 in the width direction are in close contact with each other, and no connecting seam 310 is provided, referring to Figure 2 Of course, as needed, a connection seam 310 can also be provided between two adjacent platform plate components 300 in the width direction to further enhance the structural strength of the component connection.
[0093] The embodiments of the present invention are described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.
Claims
1. A construction method for an assembled subway platform, characterized in that: The assembled subway platform includes: A plurality of column components, wherein the column components are vertically arranged and the plurality of column components are spaced and distributed in parallel; a plurality of beam members, wherein the beam members are horizontally arranged on the column members; and A plurality of platform plate components are spliced on the beam body component; a vertical first connecting member is pre-embedded on the column body component, one end of the first connecting member is arranged in the column body component, and the other end of the first connecting member extends to the platform plate component, and the first connecting member is used to connect the beam body component and the platform plate component; a connecting hole is provided on the beam body component, and the diameter of the connecting hole is larger than that of the first connecting member, and is used to pour connecting material; a connecting seam is provided between two adjacent platform plate components, the column body component is arranged below the connecting seam, a steel mesh is pre-embedded in the interior of the platform plate component, and the steel mesh extends to the connecting seam, the connecting hole passes through the beam body component, and the upper end of the first connecting member extends to the connecting seam, and the connecting seam is used to pour connecting material, so that the column component, the beam body component and the platform plate component are connected to form a whole; A base, the upper end of which is fixedly connected to the column member, and the lower end of which is used to connect to the foundation; a second connecting member is pre-buried on the column member, and the second connecting member includes a vertical connecting portion and a horizontal connecting portion, the upper portion of the vertical connecting portion is arranged in the column member, the horizontal connecting portion is arranged at the bottom end of the vertical connecting portion, and the lower portion of the vertical connecting portion and the horizontal connecting portion are arranged in the base; The materials of the column components, the beam components and the platform slab components are all ultra-high performance concrete, the compressive strength of the ultra-high performance concrete is not less than 150MPa, the flexural strength is not less than 20MPa, and the tensile strength is not less than 7Mpa. The ultra-high performance concrete includes the following raw materials in parts by weight: 55-65 parts of cement, 10-20 parts of silica fume, 90-100 parts of fine aggregate, 5-8 parts of quartz powder, 10-15 parts of reinforcing material, 1.5-2.0 parts of water reducer, 0.05-0.1 parts of synergist, and 10-13 parts of water, wherein the cement is of compressive strength grade Ordinary Portland cement or Portland cement with a pressure of not less than 42.5MPa; the silica fume is 95-grade original silicon micropowder, with a silicon dioxide content greater than 85% and a 45-micron sieve residue less than 2%; the fine aggregate is artificial sand or natural sand with a particle size of 0.1 to 4.75mm; the quartz powder mesh number is 300 to 500 meshes; the reinforcing material is a single steel fiber with a diameter of 0.2±0.02mm and a length of 12 to 20mm or a mixed steel fiber of multiple specifications; the water reducer is a polycarboxylic acid high-efficiency water reducer with a water reduction rate of not less than 25%; the synergist is at least one of sodium tripolyphosphate and polynaphthalene sulfonate; The construction methods of assembled subway platforms include: S100, prefabricating a plurality of column components, a plurality of beam components and a plurality of platform slab components by using ultra-high performance concrete; S200, installing the column components at intervals: Step S200 includes steps S210, S220 and S230; S210, tying or welding each of the column components to the steel bars on the foundation, and ensuring that the heights of each of the column components are consistent; wherein the lower portion of the second connecting member is tied or welded to the steel bars on the foundation; S220, installing a rectangular frame mold, wherein the rectangular frame mold surrounds the lower portion of the second connecting member; S230, pouring grout into the rectangular frame mold, forming a base after curing, removing the rectangular frame mold, and connecting the foundation and the column member through the base; S300, installing the beam member on the column member; S400, installing the platform plate component on the beam body component; The step of installing the beam member on the column member and the step of installing the platform plate member on the beam member comprises: Install the beam body component so that the connecting hole is plug-fitted with the first connecting member; Install the platform plate component, wherein the first connecting member passes through the connecting hole and extends to the connecting seam; A connecting material is poured into the connecting hole and the connecting seam.
2. The construction method of the assembled subway platform according to claim 1, characterized in that: The end of the platform plate component connected to the connection seam is an inclined surface, so that the connection seam is trapezoidal and the upper end width is greater than the lower end width, and the connection hole is conical and the upper end hole diameter is greater than the lower end hole diameter.
3. The construction method of the assembled subway platform according to claim 1, characterized in that: A positioning groove is provided at the upper end of the column component, and the positioning groove matches the bottom of the beam component and is used for positioning and installing the beam component.
4. The construction method of the assembled subway platform according to claim 3 is characterized in that: A soft film is arranged between the column component and the positioning groove of the beam component to eliminate the installation gap between the positioning groove and the column component.
5. The construction method of the assembled subway platform according to claim 1, characterized in that: The steps of prefabricating a plurality of column components, a plurality of beam components and a plurality of platform slab components by using ultra-high performance concrete include: The cement, silica fume, reinforcing material, quartz powder and sand in the above-mentioned parts by mass are mixed and stirred evenly, and the mixture of the water reducer, synergist and water in the above-mentioned parts by mass is added and stirred evenly to obtain a mixture of the ultra-high performance concrete; The mixture of the ultra-high performance concrete is injected into the molds of the column components, the beam components and the platform slab components, and left to stand at room temperature for 5 to 7 hours, and then placed in a curing room, steam is introduced, and the temperature is increased at a rate of 12°C / h until the temperature reaches 35 to 45°C, and after curing for 20 to 30 hours, taken out and cooled at room temperature; The mold is removed, and the component is placed in a curing room. Steam is introduced and the temperature is increased at a rate of 12°C / h until the temperature reaches 75-85°C. After curing for 40-50 hours, the component is taken out and cooled at room temperature to obtain an ultra-high performance concrete component.
6. The construction method of the assembled subway platform according to claim 1, characterized in that: The step comprises pouring the connection material into the connection hole and the connection seam, pouring a test piece simultaneously with the connection material, curing the test piece under the same environmental conditions as the connection material, and performing decoration construction work on the installed platform plate component after detecting that the strength of the test piece reaches above a predetermined strength.