Reverse excavation method for large diameter vertical deep shaft in high sediment content area

By setting notches and grooves on the drill pipe and using cement powder and crushed stone particles, the problems of drill pipe eccentricity and jamming in the excavation of large-diameter deep vertical shafts were solved, achieving stable and efficient construction results.

CN114876465BActive Publication Date: 2024-11-26NUCLEAR IND WELL LANE CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210530520.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-22
Publication Date
2024-11-26
Estimated Expiration
2041-10-22

AI Technical Summary

Technical Problem

Existing reverse tunneling methods are difficult to apply to the excavation of large-diameter deep vertical shafts, especially in strata with high silt content, where drill pipe eccentricity and jamming are prone to occur.

Method used

The drill rod is equipped with notched grooves. Multiple parallel notches are made on the rod wall. Combined with the filling of dry cement powder and crushed stone particles in the pre-dug hole, the rotation and vibration of the drill rod accelerate the solidification of the concrete, forming a stable hole wall structure and reducing the risk of mud and sand getting stuck.

Benefits of technology

It has enabled stable excavation of large-diameter deep vertical shafts, reduced drill pipe eccentricity and jamming, lowered the risk of collapse and explosion caused by ground vibration, and improved construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114876465B_ABST
    Figure CN114876465B_ABST
Patent Text Reader

Abstract

The present application discloses a large-diameter deep shaft reverse excavation device and a construction method, wherein the large-diameter deep shaft reverse excavation device comprises an excavation drill bit, a rotary lifting drive assembly and a drill rod, wherein the two ends of the drill rod are respectively detachably matched with the excavation drill bit and the rotary lifting drive assembly, wherein the drill rod is a cylindrical drill rod, and a notch groove is provided on the rod wall of the drill rod, wherein the notch groove is parallel to the central axis of the drill rod, wherein the notch groove has a plurality of notches, and the notch grooves are equidistantly and equally distributed around the central axis of the drill rod. The present application also discloses a construction method using the above excavation device.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application with the application date of October 22, 2021, application number 2021112354083, and invention name “Large diameter deep vertical shaft reverse excavation device and construction method”. Technical Field

[0002] The invention relates to the field of shaft and tunnel excavation construction, and in particular to a large-diameter deep shaft reverse excavation device and a construction method. Background Art

[0003] The reverse tunneling excavation method is currently frequently used in the excavation of tunnel ventilation shafts and coal mine ventilation shafts. This excavation method is to dig a pre-dug hole (circular hole, assuming that the diameter of the pre-dug hole is 20 cm) from the ground directly above the tunnel into the tunnel. The pre-dug hole is perpendicular to the tunnel. When the pre-dug hole is connected to the tunnel, the excavation of the pre-dug hole is stopped, and then the excavation drill bit is transported to the bottom of the pre-dug hole in the tunnel, and then the excavation rod (circular, the diameter of the excavation rod is smaller than the diameter of the pre-dug hole. When the diameter of the pre-dug hole is 20 cm, the diameter of the excavation rod is generally 15 cm) is extended from the ground to the excavation drill bit, and then the excavation drill bit is fixed on the excavation rod, and then the excavation rod is pulled toward the ground while rotating the excavation rod. In this way, the pre-dug hole can be expanded from bottom to top. Digging to the ground to form a vertical deep well, this excavation method has a smaller diameter of the excavation rod than the diameter of the pre-dug hole, so the excavation drill bit is prone to eccentricity during excavation (which may cause the excavation rod to break). As a result, this excavation method is only suitable for excavating vertical wells with relatively small diameters (no more than 80 cm in diameter). For large-diameter deep vertical wells with a diameter greater than 2 m, this excavation method is not applicable. Moreover, this drilling method is only suitable for excavating vertical wells in areas with relatively less sediment content in the strata. For areas with relatively high sediment content in the strata, the rotation of the excavation drill bit will cause the strata to vibrate due to the relatively high fluidity of the sediment. Once the strata vibrate, the sediment will flow, and the vertical well is prone to collapse. Therefore, this excavation method is also not suitable for areas with high sediment content in the strata. Summary of the invention

[0004] In view of the above problems, the present invention provides a large-diameter deep shaft reverse excavation device and a construction method.

[0005] The technical solution adopted by the present invention is as follows:

[0006] A large-diameter deep shaft reverse excavation device comprises an excavation drill bit, a rotary lifting drive assembly and a drill rod, wherein the two ends of the drill rod are respectively detachably matched with the excavation drill bit and the rotary lifting drive assembly, the drill rod is a cylindrical drill rod, and a notch groove is opened on the rod wall of the drill rod, the notch groove is parallel to the central axis of the drill rod, there are multiple notch grooves, and the notch grooves are equidistantly and equally distributed around the central axis of the drill rod.

[0007] The functions of this device are as follows. First, in order to ensure stability during the drilling process, the most appropriate method is to use a drill rod with a diameter equal to the hole. Although the drill rod with a diameter equal to the pre-dug hole can ensure the stability of the drill rod rotation, there is a problem with the equal-diameter excavation method, that is, mud and sand will inevitably fall on the wall of the pre-dug hole during rotation. If a cylindrical drill bit is used directly for excavation, the fallen mud and sand particles will cause the drill rod to be stuck by the mud and sand. Therefore, this device opens a notch on the wall of the drill rod. The presence of the notch allows mud and sand particles to fall directly into the tunnel along the notch. In summary, the use of a drill rod with a notch in this structure can perform equal-diameter excavation, the drill rod will not be eccentric during the excavation process, and the phenomenon of the drill rod being stuck is greatly reduced.

[0008] Optionally, the drill rod is made of a metal alloy.

[0009] The drill rod is made of metal alloy to ensure the strength of the entire drill rod. The drill rod can be made of aluminum alloy, or titanium alloy if the cost is not considered.

[0010] Optionally, the number of the notch grooves is an even number, and the notch grooves are fan-shaped notch grooves.

[0011] An even number of notches can ensure that the center of gravity of the entire drill pipe is still on the central axis, so that the drill pipe can always remain stable when rotating. The notches are fan-shaped, so that no matter whether the drill pipe rotates forward or reverse, the groove walls of the notches on the drill pipe can scrape off the particles that fall on the hole wall.

[0012] A vertical deep shaft excavation construction method using the above-mentioned large-diameter deep vertical shaft reverse tunneling device is characterized by comprising the following steps:

[0013] S1: Determine the pre-excavation center point, excavate a number of buried holes around the pre-excavation center point, the buried holes are equidistantly distributed around the pre-excavation center point with equal arcs, the center axis of the buried hole is 40cm to 50cm away from the pre-excavation center point, the diameter of the buried hole is 4cm to 8cm, and the accumulated water in the buried hole is sucked away, and the buried hole is dried with air flow, and the buried hole is a sink hole;

[0014] S2: Filling the buried hole with dry, unagglomerated cement powder;

[0015] S3: excavating a pre-dig hole at the pre-dig center point, and continuously introducing water into the pre-dig hole for lubrication and cooling during the excavation process until the pre-dig hole is connected to the tunnel. The diameter of the pre-dig hole is 30 cm to 40 cm;

[0016] Because the soil layers above the tunnels of some mines are relatively complex (some are rock layers, some have both rock layers and mixed layers of sand, gravel and soil, but both the rock layers and the mixed layers of sand, gravel and soil contain pores, which are the flow channels for gases, liquids and solids underground), there are gas-rich layers above some mine tunnels, and these rich gases contain alkane-type flammable and explosive gases. If the alkane-type flammable and explosive gases in the gas-rich layers pass through the pre-excavated holes of the pore flow channel, it may cause landslides and explosions.

[0017] Therefore, based on the above ideas, in the above steps S1 to S3, before excavating the pre-dug hole, a circle of buried holes is first excavated around the pre-dug hole, and the buried holes are excavated from the surface to the tunnel, but the tunnel is not opened, and then cement powder is filled in the buried holes, and then the pre-dug hole is excavated again, and water is continuously introduced during the excavation of the pre-dug hole for cooling (part of the water will overflow to the surroundings through the pores). During the excavation of the pre-dug hole, the drill bit will continuously cause the soil layer (or rock layer) near the drill bit to vibrate, so that the cement powder in the buried hole can be vibrated into the gap, and because water will enter the pores, water, cement and gravel in the lower layer are mixed together to form concrete. After the concrete solidifies, it can block part of the gap in the stratum;

[0018] Since part of the pores near the pre-dug hole are blocked, the probability of alkane gas in the stratum entering the pre-dug hole through the pores is greatly reduced, reducing the probability of explosion caused by the drill rod during rotation; at the same time, since part of the gravel forms concrete with water and cement, the concrete can increase the adhesion strength between the gravel and stick the gravel to the rock, reducing the content of mobile gravel, which can basically prevent the sand and gravel in the pre-dug hole from falling into the mine tunnel and avoid the drill rod from getting stuck during rotation;

[0019] In the above scheme, the concrete mixed in the buried hole can also be used. However, there is a problem with the concrete mixed in the buried hole. That is, concrete is a viscous colloidal fluid with poor fluidity. Therefore, the directly poured mixed concrete basically cannot flow into the pores in the soil layer. Therefore, only a concrete column will be formed in the buried hole, which will only increase the difficulty of digging the vertical well of the drill bit.

[0020] S4: Insert the drill rod into the pre-dug hole. The diameter of the drill rod is equal to the diameter of the pre-dug hole. The drill rod rotates and moves into the tunnel.

[0021] Because after the processing of step S3, the pores near the wall of the buried hole have been filled with concrete liquid, at this time, the drill rod is inserted into the pre-dug hole and the drill rod is continuously rotated. During the rotation of the drill rod, it can promote the full mixing of the concrete and support the pre-dug hole, ensuring that after the cement solidifies, the pre-dug hole can form a round hole with a stable structure and a layer of cement attached to the surface of the hole wall.

[0022] S5: When the drill bit under the drill rod moves into the tunnel, a tamping machine is used to vibrate the ground and the drill rod is continuously rotated. When the vibration operation stops, the drill rod is pulled out of the pre-dug hole and the surface of the drill rod is cleaned.

[0023] Because the drill rod is constantly rotating in step S4, more cement powder can enter the gaps for the flow of cement powder (or concrete). The more cement powder there is in the gaps, the more likely it is that a stable "concrete tube" will be formed between the pre-dug hole and the buried hole after the cement solidifies. This ensures that the alkane gas in the gas-rich layer and the sand and soil particles in the stratum will not interfere with the rotation of the drill rod.

[0024] S6: placing quicklime at the opening of the pre-dug hole in the tunnel, and evacuating air from the pre-dug hole at the opening of the pre-dug hole on the ground surface;

[0025] The function of step S6 is as follows: since the gas in the tunnel is high-temperature and high-humidity gas (relative to the air near the ground), quicklime is placed at the hole mouth in this step. Quicklime can absorb moisture, so that the gas at the hole mouth is high-temperature and low-humidity gas. These gases are pumped away from bottom to top, so that the muddy water in the pre-dug hole can be quickly dried, thereby quickly forming a pre-dug hole with a stable structure, saving construction time;

[0026] S7: Place the drill rod into the pre-dug hole again, with both ends of the drill rod located on the surface and in the tunnel respectively. Transport the excavation drill bit into the tunnel and install it on the drill rod. Then assemble the end of the drill rod located on the surface with the rotary lifting drive assembly. Drive the drill rod to rotate while lifting the excavation drill bit, and continuously evacuate the tunnel at the tunnel entrance.

[0027] Step S7 is the process of expanding the pre-dug hole into a vertical deep well. The purpose of continuously pumping air into the tunnel at the tunnel entrance is to extract the flammable and explosive gases in the tunnel. Similarly, the air on the ground can continuously flow into the tunnel through the pre-dug hole. The flow of air can take away the heat generated by the rotation of the drill rod.

[0028] Optionally, crushed stone particles and retarder particles are also included, and the crushed stone particles and retarder particles are mixed with cement powder and then filled into the buried hole.

[0029] Because cement powder itself has a sedimentation effect and is not easy to flow when vibrated, crushed stone particles are further added in this solution. After the crushed stone particles are mixed with cement powder, the crushed stone particles (the average particle size of the crushed stone particles is not less than 1.5 cm) can play a role in separating cement and preventing cement from settling. When vibrated, the crushed stone particles will shake, and the shaking crushed stone particles can make it easier for cement powder to enter the gap (because the shaking of the crushed stone particles will drive the flow of the powder). The retarder particles in this solution play the role of a retarder. When water, retarder and cement are mixed, the presence of the retarder can delay the solidification of concrete, and the presence of the retarder can increase the fluidity of concrete, so that the concrete can flow through more gaps and block more pores.

[0030] To summarize the above paragraph, when the rammer hits the ground, the presence of vibration will accelerate the flow of concrete, so that more voids are filled with concrete, and the vibration can compact the soil and sand and gravel, reducing the volume of the voids. On the one hand, this increases the fluidity of the unsolidified concrete and prolongs the solidification time of the concrete. On the other hand, by reducing the volume of the voids, the pore content can be reduced to the greatest extent after the concrete solidifies.

[0031] Optionally, the drill rod is a hollow drill rod, and a through hole is provided between the inner wall and the outer wall of the drill rod, and the through hole on the drill rod is perpendicular to the central axis of the drill rod.

[0032] A hollow drill rod is used with a through hole in it to ensure that the drill rod will not get stuck in the pre-dug hole due to air pressure difference.

[0033] Optionally, the through hole is located at the bottom of the notch groove.

[0034] Optionally, when the drill rod is rotating and lifting the excavation drill bit, water with a temperature not exceeding 25° C. is continuously introduced into the drill rod.

[0035] The purpose of water flow is to cool the drill rod and the water flows to the excavation drill bit, which can lubricate and cool it, thereby reducing the generation of dust.

[0036] Optionally, the central axis of the pre-dug hole and the central axis of the buried hole are parallel to each other.

[0037] Optionally, in step S5, the rotation speed of the drill pipe does not exceed 10 r / min.

[0038] Since the concrete is not solidified in step S5, the rotation speed of the drill rod is maintained at a very slow speed to prevent the concrete from falling from the hole wall of the pre-dug hole due to excessive speed.

[0039] The beneficial effects of the present invention are as follows: the drill rod with the notched groove can be used for equal-diameter excavation, the drill rod will not be eccentric during the excavation process, and the phenomenon of the drill rod being stuck is greatly reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a schematic diagram of a large-diameter deep shaft reverse excavation device.

[0041] Figure 2 This is a schematic diagram of the drill pipe structure.

[0042] The reference numerals in the figure are: 1. Rotary lifting drive assembly; 2. Drill rod; 201. Notch groove; 202. Through hole; 3. Buried hole; 4. Excavation drill bit. DETAILED DESCRIPTION

[0043] The present invention is described in detail below in conjunction with various embodiments.

[0044] Example 1

[0045] See attached Figure 1 And attached Figure 2 A large-diameter deep shaft reverse excavation device comprises an excavation drill bit 4, a rotary lifting drive assembly 1 and a drill rod 2. The two ends of the drill rod 2 are detachably matched with the excavation drill bit 4 and the rotary lifting drive assembly 1 respectively. The drill rod 2 is a cylindrical drill rod 2, and a notch groove 201 is opened on the rod wall of the drill rod 2. The notch groove 201 is parallel to the central axis of the drill rod 2. There are multiple notch grooves 201, and the notch grooves 201 are equidistant and equally distributed around the central axis of the drill rod 2.

[0046] In this embodiment, the drill rod 2 is a drill rod 2 made of metal alloy.

[0047] In this embodiment, the number of the notch grooves 201 is an even number, and the notch grooves 201 are fan-shaped notch grooves 201 .

[0048] In this embodiment, the drill rod 2 is a hollow drill rod 2 , and a through hole 202 is provided between the inner wall and the outer wall of the drill rod 2 . The through hole 202 on the drill rod 2 is perpendicular to the central axis of the drill rod 2 .

[0049] In this embodiment, the through hole 202 is located at the bottom of the notch groove 201 .

[0050] In this embodiment, a notch matching the notch groove 201 is formed at the excavation drill bit 4 to ensure that the granular matter falling from the notch groove can fall into the tunnel through the excavation drill bit.

[0051] Example 2

[0052] See attached Figure 1 And attached Figure 2A construction method using a large-diameter deep well reverse tunneling device as in the embodiment comprises the following steps:

[0053] S1: Determine the pre-excavation center point, excavate a number of buried holes around the pre-excavation center point, and the buried holes are distributed around the pre-excavation center point with equal distance and arc. The distance between the central axis of the buried hole and the pre-excavation center point is 40 cm, and the diameter of the buried hole is 6 cm. The accumulated water in the buried hole is sucked away, and the buried hole is blown dry with air flow. The buried hole is a sink hole; the buried holes are not connected, and the buried holes form a virtual circle around the pre-excavated hole;

[0054] S2: Filling the buried hole with dry, unagglomerated cement powder;

[0055] S3: excavate a pre-dig hole at the pre-dig center point. During the excavation process, water is continuously introduced into the pre-dig hole for lubrication and cooling until the pre-dig hole is connected to the tunnel. The diameter of the pre-dig hole is 30 cm.

[0056] S4: insert the drill rod 2 into the pre-dug hole, the diameter of the drill rod 2 is equal to the diameter of the pre-dug hole, the drill rod 2 rotates while moving into the tunnel, and the rotation speed of the drill rod 2 is controlled to be below 10r / min;

[0057] S5: When the drill bit under the drill rod 2 moves into the tunnel, the ground is vibrated by a tamping machine on the surface, and the drill rod 2 is continuously rotated (the rotation speed of the drill rod 2 is between 20 r / min and 40 r / min). When the vibration operation stops, the drill rod 2 is pulled out of the pre-dug hole, and then the surface of the drill rod 2 is cleaned;

[0058] S6: quicklime is placed at the opening of the pre-dug hole in the tunnel, and air is pumped out of the pre-dug hole at the opening of the pre-dug hole on the ground surface. When the cement at the opening of the pre-dug hole on the ground surface solidifies and dries, the air pumping is stopped, and the next step is performed after waiting for 36 hours;

[0059] S7: Place the drill rod 2 into the pre-dug hole again, with the two ends of the drill rod 2 respectively located on the surface and in the tunnel, transport the excavation drill bit 4 into the tunnel, and install the excavation drill bit 4 on the drill rod 2, and then assemble the end of the drill rod 2 located on the surface with the rotary lifting drive assembly 1, while driving the drill rod 2 to rotate, lift the excavation drill bit 4, the rotation speed of the drill rod 2 is not less than 60r / min; the lifting speed is not higher than 0.1m / s; and the tunnel is continuously evacuated at the tunnel entrance.

[0060] This embodiment also includes crushed stone particles and retarder particles, which are mixed with cement powder and then filled into the buried hole, and the mass fraction ratio of crushed stone particles: cement powder and retarder particles is 3:2:0.001.

[0061] In this embodiment, when the drill rod 2 is rotating and the excavation drill bit 4 is lifted, water with a temperature not exceeding 25° C. is continuously introduced into the drill rod 2 .

[0062] In this embodiment, the central axis of the pre-dug hole and the central axis of the buried hole are parallel to each other.

[0063] The method described in Example 2 is suitable for excavating tunnels such as mine tunnels, highway and railway tunnels through mountains,

[0064] Example 3

[0065] A construction method for excavating a large-diameter vertical deep shaft of an underwater tunnel;

[0066] First, a cofferdam is constructed, which is located above the tunnel, and then the accumulated water in the cofferdam is drained, the silt in the cofferdam is removed, and then the steps described in Example 2 are installed to perform the operation.

[0067] The underwater tunnel described in this embodiment may be a submarine tunnel, a river crossing tunnel, or a lake bottom tunnel.

[0068] The above description is only a preferred embodiment of the present invention, and does not limit the patent protection scope of the present invention. Any equivalent transformations made using the specification of the present invention, directly or indirectly used in other related technical fields, are also included in the protection scope of the present invention.

Claims

1. A method for reverse excavation of a large-diameter vertical deep well in an area with high sediment content, characterized in that: A large-diameter deep shaft reverse excavation device is used, which includes an excavation drill bit, a rotary lifting drive assembly and a drill rod, and the two ends of the drill rod are detachably matched with the excavation drill bit and the rotary lifting drive assembly respectively, characterized in that the drill rod is a cylindrical drill rod, and a notch groove is opened on the rod wall of the drill rod, the notch groove is parallel to the central axis of the drill rod, there are multiple notch grooves, and the notch grooves are equidistant and equally distributed around the central axis of the drill rod; The following steps are included: S1: Determine the pre-excavation center point, excavate a number of buried holes around the pre-excavation center point, the buried holes are equidistantly distributed around the pre-excavation center point with equal arcs, the center axis of the buried hole is 40cm to 50cm away from the pre-excavation center point, the diameter of the buried hole is 4cm to 8cm, and the accumulated water in the buried hole is sucked away, and the buried hole is dried with air flow, and the buried hole is a sink hole; S2: Filling the buried hole with dry, unagglomerated cement powder; S3: excavating a pre-dig hole at the pre-dig center point, and continuously introducing water into the pre-dig hole for lubrication and cooling during the excavation process until the pre-dig hole is connected to the tunnel. The diameter of the pre-dig hole is 30 cm to 40 cm; S4: insert the drill rod into the pre-dug hole, the diameter of the drill rod is equal to the diameter of the pre-dug hole, and the drill rod rotates and moves; S5: When the drill bit under the drill rod moves into the tunnel, a tamping machine is used to vibrate the ground and the drill rod is continuously rotated. When the vibration operation stops, the drill rod is pulled out of the pre-dug hole and the surface of the drill rod is cleaned. S6: placing quicklime at the opening of the pre-dug hole in the tunnel, and evacuating air from the pre-dug hole at the opening of the pre-dug hole on the ground surface; S7: The drill rod is placed into the pre-dug hole again, with the two ends of the drill rod respectively located on the surface and in the tunnel, the excavation drill bit is transported into the tunnel, and the excavation drill bit is installed on the drill rod, and then the end of the drill rod located on the surface is assembled with the rotary lifting drive assembly, the drill rod is driven to rotate while the excavation drill bit is lifted, and the tunnel is continuously evacuated at the tunnel entrance; It also includes crushed stone particles and retarder particles, which are mixed with cement powder and then filled into the buried hole; The drill rod is a hollow drill rod, and a through hole is arranged between the inner wall and the outer wall of the drill rod, and the through hole on the drill rod is perpendicular to the central axis of the drill rod.

2. The reverse excavation construction method for large-diameter vertical deep wells in areas with high sediment content as claimed in claim 1 is characterized in that: The through hole is located in the notch groove.

3. The reverse excavation construction method for large-diameter vertical deep wells in high sediment content areas as claimed in claim 1 is characterized in that: When the drill rod is rotating and lifting the excavation drill bit, water with a temperature not exceeding 25° C. is continuously introduced into the drill rod.

4. The reverse excavation construction method for large-diameter vertical deep wells in areas with high sediment content as claimed in claim 1 is characterized in that: The central axis of the pre-dug hole and the central axis of the buried hole are parallel to each other.

5. The reverse excavation construction method for large-diameter vertical deep wells in areas with high sediment content as claimed in claim 1, characterized in that: In step S5, the rotation speed of the drill pipe does not exceed 10 r / min.