A survey project management system
By designing project management modules and other modules in the survey project management system, the insufficient data detail and cost control problems of small and medium-sized enterprises in project management are solved, and the process and efficiency improvement are simplified.
Patent Information
- Application Number
- CN202210520113.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-13
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-05-13
AI Technical Summary
Branches affiliated to large and medium-sized enterprises have problems such as data classification, data extraction and project cost control in project management, resulting in insufficient data detail, especially when the number of projects increases, and these problems are even more serious, and there is a lack of survey project management system suitable for small and medium-sized enterprises. .
A survey project management system was designed, including project management module, input management module, output management module, file management module, production management module, report management module and system management module. Through these modules, different stages and management of survey projects are managed. The objects are recorded and managed in a refined manner, simplified project management processes, improved management levels, and reduced costs.
The system greatly simplifies the project management process, improves the efficiency of surveying projects of small and medium-sized enterprises, reduces project implementation costs, and realizes effective management of project management results.
Smart Images

Figure CN114881599B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project management, and in particular to a survey project management system. Background Art
[0002] With the development of society and information technology, more and more engineering projects are managed through information management systems, which can greatly improve work efficiency. At present, most large and medium-sized enterprises have project management systems themselves, but for branches of large and medium-sized enterprises, many data only remain at the coarse-grained data record level, and the data at the branch level is not detailed enough. There are problems in data classification, data extraction, project cost control, etc. As the number of branch projects increases, such problems are becoming more and more serious. Therefore, how to solve the above problems and build a survey project management system suitable for small and medium-sized enterprises has become an urgent issue for technicians in this field. Summary of the invention
[0003] The technical problem to be solved by the present invention is that, in view of the above-mentioned defects of the prior art, a survey project management system is provided which simplifies the project management process, improves the project management level, reduces the project implementation cost, and manages the project management results during the implementation process, thereby greatly improving the survey project management efficiency of small and medium-sized enterprises.
[0004] The purpose of the present invention is to achieve the following technical solution: a survey project management system, including an information management system body, wherein the information management system body is divided into a project management module, an input management module, an output management module, a file management module, a production management module, a report management module and a system management module according to different stages of survey project implementation and management objects; the project management module is used to record and manage the basic project information generated in the project bidding, project establishment, feasibility study, design and other stages; the input management module is used to record and manage contracts, letters of authorization, charges, and revenue distribution during the project implementation stage; the output management module is used to record and manage applications, contracts, and other related matters related to outsourcing during the project implementation stage. The module is used to record and manage contracts, notices, results materials, cost accounting, procurement acceptance, and outsourcing payments; the file management module is used to support browsing and querying of project approval documents, project contracts, outsourcing contracts, field work, business trips, contact forms, report forms, engineering receipt letters, meeting minutes and other files, and supports adding, deleting and downloading files; the production management module is used to record and manage production task processes, project personnel allocation, field budgets, monthly output value reports, and project progress; the report management module is used to query and manage survey products, project personnel hours, project-related statistics, contract-related statistics, and project comprehensive information; the system management module is used to record and manage personnel, departments, and roles.
[0005] Furthermore, the project management module includes a supporting project information management submodule, a survey project manager management submodule and a project quotation management submodule. The project information management submodule is used to record and manage the basic information of the project; the survey project manager management submodule is used to record and manage the basic information of the survey project manager; and the project quotation management submodule is used to record and manage the basic information of the project quotation.
[0006] Furthermore, the input management module includes a matching contract management sub-module, a power of attorney management sub-module, a project association management sub-module, a survey and design fee management sub-module and a revenue distribution management sub-module. The contract management sub-module is used to record and manage basic contract information; the power of attorney management sub-module is used to record and manage basic power of attorney information; the project association management sub-module is used to record and manage basic project contract association information; the survey and design fee management sub-module is used to record and manage basic survey and design fee information; and the revenue distribution management sub-module is used to allocate the survey revenue amount according to department, and record and manage basic revenue distribution information.
[0007] Furthermore, the project management module includes a supporting outsourcing application management submodule, an outsourcing contract management submodule, an outsourcing notice management submodule, a results data management submodule, a cost accounting management submodule, a procurement acceptance management submodule and an outsourcing payment management submodule. The outsourcing application management submodule is used to record and manage the basic information of outsourcing applications; the outsourcing contract management submodule is used to record and manage the basic information of outsourcing contracts; the outsourcing notice management submodule is used to record and manage the basic information of outsourcing notices; the results data management submodule is used to record and manage the basic information of outsourcing results acceptance materials; the cost accounting management submodule is used to record and manage the basic information of outsourcing cost accounting sheets; the procurement acceptance management submodule is used to record and manage the basic information of outsourcing procurement acceptance; the outsourcing payment management submodule is used to record and manage the basic information of outsourcing contract payments.
[0008] Furthermore, the file management module includes a file management sub-module, a report form sub-module, a project receipt letter sub-module, a meeting minutes sub-module and a contact form sub-module; the file management sub-module is used to create, query, edit, delete, restore and export management file information; the report form sub-module is used to record and manage report form information; the project receipt letter sub-module is used to record and manage project receipt letter information; the meeting minutes sub-module is used to record and manage meeting minutes information; the contact form sub-module is used to record and manage contact form information.
[0009] Furthermore, the production management module includes a task flow sub-module, a project personnel configuration sub-module, a field budget sub-module, an output value monthly report sub-module and a project progress sub-module; the task flow sub-module is used to manage online task flow activities such as publishing, co-organizing and ending task hours and engineering task information; the project personnel configuration sub-module is used to record and manage project personnel information; the field budget sub-module is used to record and manage engineering field budget information; the output value monthly report sub-module is used to record and manage the project's monthly output value information; the project progress sub-module is used to record and manage the project's production progress and business progress information.
[0010] Furthermore, the report management module includes a survey finished product sub-module, a project personnel working hours sub-module, a project-related statistics sub-module, a contract-related statistics sub-module and a project comprehensive information sub-module; the survey finished product sub-module is used to record and manage the survey finished product information; the project personnel working hours sub-module is used to query and export the working hours information of all project owners; the project-related statistics sub-module is used to query and export project-related contract information; the contract-related statistics sub-module is used to query and export contract-related project information; the project comprehensive information sub-module is used to query and count project managers, project quotations, contracts, contract charges, revenue distribution, outsourcing applications, outsourcing contracts, outsourcing notices, outsourcing payments, resource allocation, field budgets, project working hours, project finished products, documents, and task process information related to the project.
[0011] Furthermore, the information management system body also includes a system management module, which is used to record and manage personnel, departments, and roles.
[0012] Furthermore, the system management module includes a personnel information sub-module, a department information sub-module, a role information sub-module and a role personnel information sub-module; the personnel information sub-module is used to record and manage personnel information; the department information sub-module is used to record and manage department information; the role information sub-module is used to record and manage role information; the role personnel information sub-module is used to record and manage role personnel information.
[0013] The beneficial technical effect of the present invention is that the present invention records and manages the different stages and management objects of the implementation of the survey project in a refined manner through the project management module, the input management module, the output management module, the file management module, the production management module, the report management module and the system management module and corresponding more refined sub-modules. The system greatly simplifies the project management process, improves the project management level, reduces the project implementation cost, and manages the project management results during the implementation process, which can greatly improve the management efficiency of the survey project of small and medium-sized enterprises. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall composition of the present invention;
[0015] Figure 2 This is a schematic diagram of the composition of the project management module of the present invention;
[0016] Figure 3 This is a schematic diagram of the composition of the input management module of the present invention;
[0017] Figure 4 This is a schematic diagram of the composition of the item management module of the present invention;
[0018] Figure 5 This is a schematic diagram of the composition of the file management module of the present invention;
[0019] Figure 6 This is a schematic diagram of the composition of the production management module of the present invention;
[0020] Figure 7 This is a schematic diagram of the composition of the report management module of the present invention;
[0021] Figure 8 This is a schematic diagram of the composition of the system management module of the present invention;
[0022] Fig. 9 A price calculation flow chart of the project quotation function in the project management module of the present invention;
[0023] Fig.10 This is a flow chart of the input management module of the present invention;
[0024] Fig.11 This is a flow chart of the item management module described in the present invention. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to more clearly understand the objectives, technical solutions and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0026] like Figure 1-8As shown, a survey project management system described in the present invention includes an information management system body, and the information management system body is divided into a project management module 1, an input management module 2, an output management module 3, a file management module 4, a production management module 5, a report management module 6 and a system management module 7 according to different stages of survey project implementation and management objects; the project management module 1 is used to record and manage the basic project information generated in the project bidding, project establishment, feasibility study, design and other stages; the input management module 2 is used to record and manage contracts, letters of authorization, charges, and revenue distribution during the project implementation stage; the output management module 3 is used to record and manage applications, contracts, communications involving outsourcing content during the project implementation stage. The document management module 4 is used to support browsing and querying of project approval documents, project contracts, outsourcing contracts, field work, business trips, contact forms, report forms, project receipt letters, meeting minutes and other documents, and supports adding, deleting and downloading of files; the production management module 5 is used to record and manage production task processes, project personnel allocation, field budgets, monthly output value reports and project progress; the report management module 6 is used to query and manage survey products, project personnel hours, project-related statistics, contract-related statistics and project comprehensive information; the system management module 7 is used to record and manage personnel, departments and roles.
[0027] Reference Figure 2 As shown, the project management module 1 includes a supporting project information management submodule 11, a survey project manager management submodule 12 and a project quotation management submodule 13. The project information management submodule 11 is used to record and manage the basic information of the project; the survey project manager management submodule 12 is used to record and manage the basic information of the survey project manager; and the project quotation management submodule 13 is used to record and manage the basic information of the project quotation. Among them, the basic information of the project mentioned here includes: basic content of the project, survey project manager, project type, project status, and attachments; the basic information of the survey project manager includes: basic content of the survey project manager, tenure, historical project manager, and attachments; the basic information of the project quotation includes: basic content of the quotation sheet, quotation officer, and attachments.
[0028] After the user enters the basic information, a key information check and review mechanism is set up on the system user side to prevent junk information from being entered. For example, when the unit is 10,000 yuan, the integer part is at most 8 digits and the decimal part is at most 6 digits; the project name cannot be empty, etc. In addition, this embodiment can also divide the survey project manager in the project information into two submodules to enter information separately, among which the project basic information submodule is used to enter the basic information of the survey project manager, and the survey project manager submodule is used to maintain the detailed information of the survey project manager, including the information of previous survey project managers.
[0029] Reference Figure 3 As shown, the input management module 2 includes a supporting contract management submodule 21, a power of attorney management submodule 22, a project association management submodule 23, a survey and design fee management submodule 24 and a revenue distribution management submodule 25. The contract management submodule 21 is used to record and manage basic contract information; the power of attorney management submodule 22 is used to record and manage basic power of attorney information; the project association management submodule 23 is used to record and manage basic project contract association information; the survey and design fee management submodule 24 is used to record and manage basic survey and design fee information; the revenue distribution management submodule 25 is used to allocate the survey revenue amount according to department, and record and manage basic revenue distribution information.
[0030] The basic contract information mentioned here includes: basic content of the contract, signing time, and annexes; the basic information of the power of attorney includes: basic content of the power of attorney, method of entrustment, receipt time, entrustment amount, and annexes; the basic information related to the project contract includes: basic content and annexes related to the project contract; the basic content, charging time, and annexes of the survey and design fee bill; the basic information of revenue distribution includes: department information, revenue distribution information, and annexes.
[0031] Reference Figure 4 As shown, the project management module 3 includes a supporting outsourcing application management submodule 31, an outsourcing contract management submodule 32, an outsourcing notice management submodule 33, a product information management submodule 34, a cost accounting management submodule 35, a procurement acceptance management submodule 36 and an outsourcing payment management submodule 37. The outsourcing application management submodule 31 is used to record and manage the basic information of the outsourcing application; the outsourcing contract management submodule 32 is used to record and manage the basic information of the outsourcing contract; the outsourcing notice management submodule 33 is used to record and manage the basic information of the outsourcing notice; the product information management submodule 34 is used to record and manage the basic information of the outsourcing product acceptance materials; the cost accounting management submodule 35 is used to record and manage the basic information of the outsourcing cost accounting sheet; the procurement acceptance management submodule 36 is used to record and manage the basic information of the outsourcing procurement acceptance; the outsourcing payment management submodule 37 is used to record and manage the basic information of the outsourcing contract payment.
[0032] Among them, the basic information of the outsourcing application mentioned in the project management module includes the outsourcing application form number, procurement content, funds, applicants, and attachments; the basic information of the outsourcing contract includes the basic content of the outsourcing contract, the type of outsourcing contract, the amount of the outsourcing contract, and attachments; the basic information of the outsourcing notice includes the basic content of the outsourcing notice, planned progress time, contact person, and attachments; the basic information of the outsourcing results acceptance materials includes the basic content of the outsourcing results acceptance materials, material type, publisher, and attachments; the basic information of outsourcing cost accounting includes the basic content of the outsourcing cost accounting form and attachments; the basic information of outsourcing procurement acceptance includes the basic content of outsourcing procurement acceptance, acceptor, acceptance time, and attachments; the basic information of outsourcing contract payment includes the basic information of the outsourcing contract, the person in charge, the payment time, and attachments.
[0033] Reference Figure 5 As shown, the file management module 4 includes a file management sub-module 41, a report form sub-module 42, a project receipt sub-module 43, a meeting minutes sub-module 44 and a contact form sub-module 45. The file management sub-module 41 is used to record and manage management file information; the report form sub-module 42 is used to record and manage report form information; the project receipt sub-module 43 is used to record and manage project receipt information; the meeting minutes sub-module 44 is used to record and manage meeting minutes information; and the contact form sub-module 45 is used to record and manage contact form information.
[0034] Among them, the basic information of the management documents mentioned in the file management module includes the management document number, name, publisher, release time, and attachments; the basic information of the report form includes the report form number, name, publisher, release time, and attachments; the basic information of the project receipt letter includes the project receipt letter number, name, issuing unit, release time, and attachments; the basic information of the meeting minutes includes the meeting minutes number, name, publisher, release time, and attachments; the basic information of the contact form includes the contact form number, name, publisher, release time, and attachments.
[0035] Reference Figure 6 As shown, the production management module 5 includes a task flow submodule 51, a project personnel configuration submodule 52, a field budget submodule 53, an output value monthly report submodule 54 and a project progress submodule 55. The task flow submodule 51 is used to manage online task flow activities such as publishing, co-organizing, and ending task hours and engineering task information; the project personnel configuration submodule 52 is used to record and manage project personnel information; the field budget submodule 53 is used to record and manage engineering field budget information; the output value monthly report submodule 54 is used to record and manage the monthly output value information of the project; the project progress submodule 55 is used to record and manage the project production progress and business progress information.
[0036] Among them, the basic information of the task process mentioned in the production management module includes task number, name, operation type, work content, man-hours, professional man-hours, and attachments; the basic information of project personnel configuration includes project name, participants, project duration, and attachments; the basic information of the field budget sheet includes the field budget sheet number, name, borrower, application date, budget cost, borrowing cost, and attachments; the basic information of the monthly output value report includes the meeting minutes number, name, publisher, release time, and attachments; the basic information of the project progress includes the production progress ratio of each stage, business charges, and business payments.
[0037] Reference Figure 7 As shown, the report management module 6 includes a survey finished product submodule 61, a project personnel working hours submodule 62, a project-related statistics submodule 63, a contract-related statistics submodule 64 and a project comprehensive information submodule 65. The survey finished product submodule 61 is used to record and manage the survey finished product information; the project personnel working hours submodule 62 is used to query and export the working hours information of all project owners; the project-related statistics submodule 63 is used to query and export the project-related contract information; the contract-related statistics submodule 64 is used to query and export the contract-related project information; the project comprehensive information submodule 65 is used to query and count the project manager, project quotation, contract, contract fee, revenue distribution, outsourcing application, outsourcing contract, outsourcing notice, outsourcing payment, resource allocation, field budget, project working hours, project finished product, document, and task process information related to the project.
[0038] Among them, the basic information of the surveyed products mentioned in the report management module includes the volume number, name, designer, reviewer, chief worker, time of leaving the room, quality grade, and attachments; the basic information of project personnel hours includes the project number, name, personnel name, personnel department, and personal working hours; the basic information of project-related statistics includes the project number, name, and related contract status; the basic information of contract-related statistics includes the contract number, name, and project related status; the basic content of project comprehensive information includes basic project information, project manager, quotation, contract, contract charges, revenue distribution, outsourcing application, outsourcing contract, outsourcing notice, outsourcing payment, resource allocation, outsourcing budget, personnel hours, surveyed products, attached documents, and project processes.
[0039] Reference Figure 1As shown in FIG8 , the information management system body also includes a system management module 7, which is used to record and manage personnel, departments, and roles. The system management module 7 includes a personnel information submodule 71, a department information submodule 72, a role information submodule 73, and a role personnel information submodule 74; the personnel information submodule 71 is used to record and manage personnel information; the department information submodule 72 is used to record and manage department information; the role information submodule 73 is used to record and manage role information; and the role personnel information submodule 74 is used to record and manage role personnel information.
[0040] Reference Fig. 9 As shown in the figure, the price calculation of the project quotation function in the project management module is the core function of the project quotation, which has the function of calculating the charging price. According to the "Engineering Survey and Design Charging Standard" (revised in 2002), the first thing to determine when calculating the engineering charging price is the type of physical work. Different types of physical work will have different work difficulty evaluations, technical work charging ratios α, and additional adjustment coefficients fn for category-specific items. Based on the information on the type of physical work, the base price Pn of each physical work can be determined; through the base price Pn of the physical work and the physical workload ω n The charges for each work can be obtained by multiplying by ; the physical work charge P is obtained after correction by the additional adjustment coefficient fn; the technical work charge TP is determined according to the charging ratio α; finally, the floating range value, miscellaneous charges, etc. are determined according to the project information, and the final charging price or bid quotation is obtained by adding them to the calculated base price BP.
[0041] When determining the base price Pn of physical work in geotechnical engineering exploration, multiple physical works need to be divided into charging levels according to depth and lithology, and the information that can be obtained from the physical work volume is usually the top and bottom plate depths of different lithologies; at the same time, different physical works have different depth standards, and the intervals between layers are not uniform. The deeper ones are divided in steps of 10m, and 20m is used when the depth exceeds 60m; the step size of the shallow one or two levels with smaller depth is uncertain, but it covers fewer types of physical work, only 3 items; there is only 1 item with the largest depth, with a step size of 50m.
[0042] The depth classification standard changes to 20m level after the depth exceeds 60m, so the judgment steps are:
[0043] A) Determine whether the top and bottom plates are deeper than 60m;
[0044] B) Determine whether the top and bottom plates are at the same level.
[0045] The specific calculation process of the above steps is as follows:
[0046] 1) Calculate the top and bottom plate grading Ntop and Nbottom based on the top plate depth dtop and dbottom:
[0047] When the top plate depth dtop = 0, the top plate depth grading Ntop = 1
[0048] When the top plate depth 0 < dtop ≤ 60m, the top plate depth grading
[0049] is rounded up.
[0050] When the top plate depth dtop > 60m, the top plate depth grading
[0051]
[0052] The calculation method of the bottom plate depth grading Nbottom is the same as that of the top plate.
[0053] 2) Determine whether the top and bottom plates are in the same grade, and there are the following situations:
[0054] 2.1) The top and bottom plates are in the same grade
[0055] Just store the lithology thickness at the thickness position corresponding to this depth grading.
[0056] 2.2) The top and bottom plates are not in the same grade, but neither is deeper than 60m, that is, Ntop ≤ 6, Nbottom ≤ 6
[0057] It is necessary to calculate the thickness of the shallowest level and the deepest level respectively. The middle thickness is the thickness of a complete level, which is 10m when not deeper than 60m.
[0058] The formula for the thickness of the shallowest level is Ttop = 10 * Ntop - dtop, the formula for the thickness of the deepest level is Tbottom = dbottom - 10 * (Nbottom - 1), the number of middle layers is n = Nbottom - Ntop - 1, and then store the corresponding thicknesses at the thickness positions corresponding to the depth grading respectively.
[0059] 2.3) The top and bottom plates are not in the same grade, and both are deeper than 60m, that is, Ntop > 6, Nbottom > 6
[0060] It is different from the calculation method in 2.2) in calculating the thickness of the shallowest level and the deepest level. At the same time, the thickness of a complete middle level is 20m, and other calculation processes are the same.
[0061] The calculation formula for the shallowest thickness is Ttop=80+20*(Ntop-7)-dtop, and the calculation formula for the deepest thickness is Tbottom=dbottom-(60+20*(Nbottom-7)). Then each thickness is stored in the corresponding position of the depth grade.
[0062] 2.4) The top and bottom plates are not at the same level, and the bottom plate is deeper than 60m
[0063] Take the formula for calculating the thickness of the shallowest layer in 2.2) and the formula for calculating the thickness of the deepest layer in 2.3) for calculation, then the number of layers with a thickness of no deeper than 60m in the middle complete level is n1=6-Ntop, and the number of layers deeper than 60m is n2=Nbottom-7, and then store the corresponding thicknesses in the thickness positions corresponding to the depth classification.
[0064] Finally, the base price is determined according to the complexity classification of the lithology and the final charging price is calculated.
[0065] Reference Fig.10 As shown, the input management module has the functions of managing contracts, power of attorney, associations, charges, and revenue distribution.
[0066] Specifically, the basic information of the contract is recorded and managed through contract management, and the basic information of the power of attorney is recorded and managed through power of attorney management. When the project contract is associated, the contract, power of attorney, and project information are required. If there is no corresponding contract, power of attorney, and project information, it is necessary to switch to the corresponding module to maintain the corresponding information. If there is, continue to maintain the project contract association information.
[0067] Contract information is required when managing survey and design charges. If there is no corresponding contract information, you need to go to the corresponding module to maintain the corresponding information. If there is, continue to maintain the survey and design charge information.
[0068] Charging information is required when managing revenue distribution. If there is no corresponding charging information, you need to go to the corresponding module to maintain the corresponding information. If there is, continue to maintain the revenue distribution information.
[0069] Reference Fig.11 As shown, the outsourcing management module has the functions of managing the applications, contracts, notices, achievement data, cost accounting, procurement acceptance, and outsourcing payments involved in the outsourcing.
[0070] Specifically, the basic information of outsourcing contracts is recorded and managed through outsourcing contract management. Project information is required for outsourcing application management. If there is no corresponding project information, it is necessary to switch to the corresponding module to maintain the corresponding information. If there is, continue to maintain the outsourcing application information. Outsourcing application and outsourcing contract information are required for outsourcing association. If there is no corresponding outsourcing application and outsourcing contract information, it is necessary to switch to the corresponding module to maintain the corresponding information. If there is, continue to maintain the outsourcing association information.
[0071] Outsourcing application information is required for managing outsourcing notices, achievement materials, cost accounting, and procurement acceptance. If there is no corresponding outsourcing application information, you need to switch to the corresponding module to maintain the corresponding information. If there is, continue to maintain the outsourcing notice, achievement materials, cost accounting, and procurement acceptance information.
[0072] When managing outsourced payments, outsourced contract information is required. If there is no corresponding outsourced contract information, you need to go to the corresponding module to maintain the corresponding information. If there is, continue to maintain the outsourced payment information.
[0073] The present invention records and manages the different stages and management objects of the implementation of the survey project in a refined manner through the project management module, the input management module, the output management module, the file management module, the production management module, the report management module, the system management module and the corresponding more refined sub-modules. The system greatly simplifies the project management process, improves the project management level, reduces the project implementation cost, and manages the project management results during the implementation process, which can greatly improve the management efficiency of the survey projects of small and medium-sized enterprises.
[0074] The specific embodiments described herein are merely illustrative of the principles and effects of the present invention and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A survey project management system, characterized in that: It includes an information management system body, which is divided into project management module, input management module, output management module, file management module, production management module, report management module and system management module according to different stages and management objects of survey project implementation; the project management module is used to record and manage the basic project information generated in the bidding, project establishment, feasibility study and design stages of the project; the input management module is used to record and manage contracts, letters of authorization, charges and revenue distribution in the implementation stage of the project; the output management module is used to record and manage the application for outsourcing content involved in the project implementation stage; The document management module is used to support the browsing and query of project approval documents, project contracts, outsourcing contracts, field work, business trips, contact forms, report forms, project receipt letters, and meeting minutes, and supports the addition, deletion, and download of files; the production management module is used to record and manage production task processes, project personnel allocation, field budgets, monthly output value reports, and project progress; the report management module is used to record and manage survey finished products, project personnel hours, project-related statistics, contract-related statistics, and project summary statistics. The system management module is used to query and manage the basic information of the project; the system management module is used to record and manage personnel, departments and roles; the project management module includes a supporting project information management submodule, a survey project manager management submodule and a project quotation management submodule, the project information management submodule is used to record and manage the basic information of the project; the survey project manager management submodule is used to record and manage the basic information of the survey project manager; the project quotation management submodule is used to record and manage the basic information of the project quotation; the input management module includes a supporting contract management submodule, a power of attorney management submodule, a project association management submodule, a survey and design fee management submodule and a revenue distribution management submodule, the contract management submodule is used to record and manage the basic information of the contract; the power of attorney management submodule is used to record and manage the basic information of the power of attorney; the project association management submodule is used to record and manage the basic information associated with the project contract; the survey and design fee management submodule is used to record and manage the basic information of the survey and design fee; the revenue distribution management submodule is used to allocate the survey revenue amount according to the department, and record and manage the basic information of the revenue distribution; The project management module includes a supporting outsourcing application management submodule, an outsourcing contract management submodule, an outsourcing notice management submodule, a results data management submodule, a cost accounting management submodule, a procurement acceptance management submodule and an outsourcing payment management submodule. The outsourcing application management submodule is used to record and manage the basic information of outsourcing applications; the outsourcing contract management submodule is used to record and manage the basic information of outsourcing contracts; the outsourcing notice management submodule is used to record and manage the basic information of outsourcing notices; the results data management submodule is used to record and manage the basic information of outsourcing results acceptance materials; the cost accounting management submodule is used to record and manage the basic information of outsourcing cost accounting sheets; the procurement acceptance management submodule is used to record and manage the basic information of outsourcing procurement acceptance; the outsourcing payment management submodule is used to record and manage the basic information of outsourcing contract payments; The information management system body also includes a file management module, which is used to support browsing and querying of project approval documents, project contracts, outsourcing contracts, field work, business trips, contact forms, report forms, project receipt letters, and meeting minutes files, and supports adding, deleting, and downloading files. The file management module includes a management file submodule, a report form submodule, a project receipt letter submodule, a meeting minutes submodule, and a contact form submodule; the management file submodule is used to record and manage management file information; the report form submodule is used to record and manage report form information; the project receipt letter submodule is used to record and manage project receipt letter information; the meeting minutes submodule is used to record and manage meeting minutes information; the contact form module is used to record and manage contact form information; The information management system body also includes a production management module, which is used to record and manage production task processes, project personnel allocation, field budgets, monthly output reports, and project progress. The production management module includes a task process submodule, a project personnel allocation submodule, a field budget submodule, a monthly output report submodule, and a project progress submodule; the task process submodule is used to publish, co-organize, and end online task process activity management for task hours and engineering task information; the project personnel allocation submodule is used to record and manage project personnel information; the field budget submodule is used to record and manage engineering field budget information; the monthly output report submodule is used to record and manage the monthly output value information of the project; the project progress submodule is used to record and manage the project production progress and business progress information; The information management system body also includes a report management module, which is used to query and manage survey products, project personnel hours, project-related statistics, contract-related statistics, and project comprehensive information. The report management module includes a survey product sub-module, a project personnel hourly sub-module, a project-related statistics sub-module, a contract-related statistics sub-module, and a project comprehensive information sub-module; the survey product sub-module is used to record and manage survey product information; the project personnel hourly sub-module is used to query and export the hourly information of all project owners; the project-related statistics sub-module is used to query and export project-related contract information; the contract-related statistics sub-module is used to query and export contract-related project information; the project comprehensive information sub-module is used to query and count project managers, project quotations, contracts, contract charges, revenue distribution, outsourcing applications, outsourcing contracts, outsourcing notices, outsourcing payments, resource allocation, field budgets, project hours, project products, documents, and task process information related to the project.
2. The survey project management system according to claim 1, characterized in that: It also includes a system management module, which is used to record and manage personnel, departments, and roles. The system management module includes a personnel information submodule, a department information submodule, a role information submodule, and a role-personnel information submodule; the personnel information submodule is used to record and manage personnel information; the department information submodule is used to record and manage department information; the role information submodule is used to record and manage role information; and the role-personnel information submodule is used to record and manage role-personnel information.