A shield tunnel deformation rapid reinforcement system and method

By using the connection system of bottom, side and top reinforcement blocks in the shield tunnel, and using prestressed steel strands and hydraulic hoisting devices, the problems of tunnel deformation recovery and construction control in the prior art are solved, and the shield tunnel is realized rapid reinforcement and structural safety improvement.

CN115012966BActive Publication Date: 2024-11-12宁波地铁产业工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210645916.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-09
Publication Date
2024-11-12
Estimated Expiration
2042-06-09

AI Technical Summary

Technical Problem

The existing urban rail transit shield tunnel reinforcement technology is difficult to restore structural deformation and control deformation during construction, resulting in excessive deformation or insufficient reinforcement.

Method used

A shield tunnel deformation rapid reinforcement system including bottom, side and top reinforcement blocks is adopted. It is connected by straight bolts and bent bolts, and a prestressed hole and hydraulic hoisting device are installed inside, using prestressed steel strands and force transfer lining. The pad realizes the tight bonding between the reinforcement and the tunnel and the independent structure, and adjusts the shape of the reinforcement in real time to adapt to tunnel reset.

Benefits of technology

It realizes rapid reinforcement of shield tunnels, improves the rigidity and independence of the structure, avoids long-term welding process, ensures the safety and deformation control of the tunnel structure during grouting and resetting, and achieves the effect of tight patching.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115012966B_ABST
    Figure CN115012966B_ABST
Patent Text Reader

Abstract

The invention discloses a shield tunnel deformation rapid reinforcement system and method, which is characterized in that it comprises two bottom reinforcement blocks symmetrically arranged on both sides of the roadbed in the tunnel, two side reinforcement blocks symmetrically arranged on both sides of the tunnel and a top reinforcement block located at the top of the tunnel, the bottom of the side reinforcement block is connected to the bottom reinforcement block by straight bolts, the top of the side reinforcement block is connected to the top reinforcement block by bent bolts, the side reinforcement block and the top reinforcement block are provided with connected prestressed channels fitting the bending moment stress state of the shield tunnel, the prestressed channels are provided with steel strands, and the reinforcement method comprises the steps of installing the bottom reinforcement block, initially tensioning the prestress after the side reinforcement block and the top reinforcement block are installed, and finally the step of resetting the shield tunnel, which has the advantage that the shape of the reinforcement body can be adjusted by tensioning the prestress in real time according to the tunnel resetting situation, so as to ensure that the reinforcement body is basically closely attached to the tunnel and the tunnel structure is safe during the tunnel grouting resetting process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of urban rail transit, and in particular to a shield tunnel deformation rapid reinforcement system and method. Background Art

[0002] Urban rail transit shield tunnels may experience excessive cross-sectional deformation due to surrounding local loading, foundation pit excavation and other construction activities. If the deformation is too large, the structure needs to be reinforced and repaired. At present, it can be mainly divided into two categories: internal reinforcement and external reinforcement. Among them, internal reinforcement can be divided into steel plate reinforcement method, composite cavity reinforcement method, aramid cloth reinforcement method, and carbon fiber cloth reinforcement method. External reinforcement is mainly lateral grouting reinforcement method. The aramid cloth reinforcement method and the carbon fiber cloth reinforcement method can avoid the damage of a single tunnel segment, but it is difficult to provide sufficient rigidity. Although the steel plate reinforcement method and the composite cavity reinforcement method can provide sufficient rigidity, they cannot achieve the recovery of tunnel deformation, and the construction process requires welding and other operations, which takes a long time. At the same time, it is impossible to further realize the deformation of the structure as the tunnel deformation recovers; although the lateral grouting reinforcement method can achieve the recovery of tunnel structure deformation, the tunnel deformation control during the construction process is difficult, which can easily cause excessive deformation of the tunnel. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a shield tunnel deformation rapid reinforcement system and method which can adjust the shape of the reinforcement body by real-time prestressing according to the tunnel reset situation, ensure the basic close contact between the reinforcement body and the tunnel and the safety of the tunnel structure during the tunnel grouting reset process.

[0004] The technical solution adopted by the present invention to solve the above-mentioned technical problems is: a shield tunnel deformation rapid reinforcement system, including two bottom reinforcement blocks symmetrically arranged on both sides of the roadbed in the shield tunnel, two side reinforcement blocks symmetrically arranged on both sides of the shield tunnel and a top reinforcement block located at the top of the shield tunnel, the bottom of the side reinforcement block is connected to the bottom reinforcement block by straight bolts, the top of the side reinforcement block is connected to the top reinforcement block by bent bolts, the side reinforcement block and the top reinforcement block are provided with connected prestressed channels fitting the bending moment stress state of the shield tunnel, the prestressed channels are provided with steel strands, and the ends of the steel strands are provided with prestress applying devices.

[0005] Furthermore, the bottom reinforcement block is symmetrically provided with two hydraulic jacking device grooves and two No. 1 oblique bolt holes on the end face connected to the side reinforcement block, and a plurality of mechanical limit devices are provided on the bottom reinforcement block and between the two hydraulic jacking device grooves, and a hydraulic jacking device for lifting the side reinforcement block upward is provided in the hydraulic jacking device groove.

[0006] Furthermore, the mechanical limiting device includes a limiting shaft and a limiting ring, wherein the limiting shaft is fixed in a slot in the bottom reinforcement block, and the limiting ring is placed in an annular gap between the bottom reinforcement block and the limiting shaft and can rotate up and down along the limiting shaft. The hydraulic lifting device can lift the side reinforcement block upward and then rotate the limiting ring to achieve mechanical fixation of the side reinforcement block.

[0007] Furthermore, the No. 1 oblique bolt hole is provided with an internal thread, and the hydraulic jacking device is a micro hydraulic jack.

[0008] Furthermore, two No. 2 oblique bolt holes and two prestressed application ends are symmetrically arranged at the bottom of the side reinforcement block, the straight bolts are inserted into the No. 2 oblique bolt holes and the No. 1 oblique bolt holes, and two No. 1 bent bolt holes and two No. 1 prestressed channels are symmetrically arranged at the top of the side reinforcement block, and a reserved groove for inserting a grouting pipe is arranged in the middle position of the side reinforcement block.

[0009] Furthermore, two No. 2 bent bolt holes and two No. 2 prestressed channels are respectively arranged on both sides of the top reinforcement block, the bent bolts are inserted into the No. 2 bent bolt holes and the No. 1 bent bolt holes, the steel strands are inserted into the No. 1 prestressed channel and the No. 2 prestressed channel, and the prestressing device applies prestress in the prestressing end.

[0010] Furthermore, the outer side of the bottom reinforcement block is constructed into a fan shape by a structural steel plate, the outer sides of the side reinforcement block and the top reinforcement block are both constructed into a circular ring shape by a structural steel plate, the structural steel plate is filled with a filling body with a certain strength, and the structural steel plate is provided with a plurality of shear nails for connecting the structural steel plate and the filling body.

[0011] Furthermore, a force transmission pad is provided between the side reinforcement block and the top reinforcement block, and the filler is cement slurry or epoxy resin.

[0012] The method for rapid reinforcement of shield tunnel deformation using the above reinforcement system is characterized by comprising the following steps:

[0013] (1) Temporary removal and protection of obstacles in tunnels

[0014] Before reinforcement construction, the walkway slabs, contact wires and pipeline obstacles in the tunnel shall be temporarily removed for protection;

[0015] (2) Installation of bottom reinforcement block

[0016] According to the size of the bottom reinforcement block, the tunnel and the ballast are set out, and the ballast is partially chiseled off, and the bottom reinforcement block is installed at the designed position. The bottom reinforcement block, the ballast and the shield tunnel segment can be bonded with epoxy resin chemical bonding material;

[0017] (3) Installation of side reinforcement blocks and top reinforcement blocks

[0018] After the bottom reinforcement block is installed, install the side reinforcement block to the designed position, and tighten the straight bolts to effectively connect the bottom reinforcement block with the side reinforcement block; after the side reinforcement block is installed, install the top reinforcement block, and install the bent bolts to effectively connect the side reinforcement block with the top reinforcement block;

[0019] (4) Preliminary prestressing

[0020] Insert steel strands into the side reinforcement blocks and the top reinforcement blocks, install the prestressing device, and perform prestressing once to put the steel strands in a stressed state; loosen the straight bolts and the bent bolts, and further perform prestressing to make the shield tunnel deformation rapid reinforcement system and the inner wall of the shield tunnel segment achieve initial close contact;

[0021] (5) Shield tunnel resetting construction

[0022] Grouting is carried out using grouting pipes at the grouting holes on both sides of the shield tunnel, and the deformation of the cross-section of the shield tunnel is monitored in real time using total station or rangefinder monitoring equipment. The deformation of a single tunnel is controlled within 5 mm. After the single tunnel is reset, the prestressing of the shield tunnel deformation rapid reinforcement system is carried out until the shield tunnel deformation rapid reinforcement system is tightly attached to the inner wall of the shield tunnel segment; this step is repeated until the tunnel deformation is reset. After the reset is completed, the bolts are further tightened to complete the reset and reinforcement work.

[0023] Compared with the prior art, the advantages of the present invention are:

[0024] (1) Composite cavity structure to improve stiffness;

[0025] (2) The cavities are connected by bolts and assembled, which avoids welding and is quick to install;

[0026] (3) The prestressed structure is adopted. The design of the prestressed steel strands fits the bending moment stress state of the pipe segment, which can offset the bending of the structure to the maximum extent and make the structural stress more reasonable;

[0027] (4) Prestressed reinforcement is adopted. After the initial tensioning is completed, the reinforcement system is initially in close contact with the tunnel structure and has good self-supporting properties. The tunnel structure and the reinforcement body can be jointly stressed without filling the grouting material between the reinforcement body and the tunnel.

[0028] (5) After the initial reinforcement of the reinforcement body is completed, the tunnel is grouting-reset. The shape of the reinforcement body can be adjusted by prestressing in real time according to the tunnel reset situation to ensure that the reinforcement body is basically in close contact with the tunnel. At the same time, the presence of the reinforcement body ensures the safety of the tunnel structure during the tunnel grouting reset process. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a cross-sectional diagram of the rapid reinforcement system in the tunnel;

[0030] Figure 2 It is a three-dimensional schematic diagram of the bottom reinforcement block;

[0031] Figure 3 It is a three-dimensional schematic diagram of the side reinforcement block;

[0032] Figure 4 It is a three-dimensional schematic diagram of the top reinforcement block;

[0033] Figure 5 It is the schematic diagram of the AA section of the bottom reinforcement block;

[0034] Figure 6 It is a schematic diagram of the cross section of the bottom reinforcement block BB;

[0035] Figure 7 It is a schematic diagram of the cross section of the bottom reinforcement block CC;

[0036] Figure 8 It is a schematic diagram of the cross section of the side reinforcement block DD;

[0037] Fig. 9 It is a schematic diagram of the EE section of the side reinforcement block;

[0038] Fig.10 This is a schematic diagram of the cross section of the top reinforcement block FF;

[0039] Fig.11 It is a schematic diagram of the cross section of the top reinforcement block GG;

[0040] Fig.12 Schematic diagram of shield tunnel segment bending moment;

[0041] Fig.13 It is a schematic diagram of the distribution of prestressed holes;

[0042] Fig.14 This is a schematic diagram of trackbed removal;

[0043] Fig.15 This is a schematic diagram of the shield tunnel resetting construction; the markings in the above figure are as follows:

[0044] 1 bottom reinforcement block; 11 hydraulic jacking device; 12 mechanical limit device; 13 No. 1 oblique bolt hole; 14 hydraulic jacking device slot; 121 limit shaft; 122 limit ring;

[0045] 2 Side reinforcement block; 21 No. 2 oblique bolt hole; 22 Prestressing end; 23 No. 1 bent bolt hole; 24 No. 1 prestressing channel; 25 Reserved slot;

[0046] 3 Top reinforcement block; 31 No. 2 bent bolt hole; 32 No. 2 prestressed hole;

[0047] 4 force transfer pad; 5 shear stud; 6 structural steel plate; 7 filling body; 8 straight bolt; 9 bent bolt; 101 steel strand; 102 prestressing device. DETAILED DESCRIPTION

[0048] The present invention is further described in detail below with reference to the accompanying drawings. Specific embodiment 1

[0050] A shield tunnel deformation rapid reinforcement system, such as Figure 1 As shown, it includes two bottom reinforcement blocks 1 symmetrically arranged on both sides of the roadbed in the shield tunnel, two side reinforcement blocks 2 symmetrically arranged on both sides of the shield tunnel and a top reinforcement block 3 located at the top of the shield tunnel, the side reinforcement blocks 2 and the bottom reinforcement blocks 1 are connected by straight bolts 8, the side reinforcement blocks 2 and the top reinforcement blocks 3 are connected by bent bolts 9, and a force transmission pad 4 is arranged between the side reinforcement blocks and the top reinforcement blocks.

[0051] like Figure 2 , 5 As shown in , 6 and 7, two symmetrical hydraulic jacking device grooves 14, two symmetrical No. 1 oblique bolt holes 13 and three mechanical limit devices 12 located between the two hydraulic jacking device grooves 14 are arranged on the end surface where the bottom reinforcement block 1 is connected to the bottom of the side reinforcement block 2; the hydraulic jacking device 11 is placed in the hydraulic jacking device groove 14, and the hydraulic jacking device 11 can lift the side reinforcement block 2 upward. Preferably, the hydraulic jacking device 11 is a miniature hydraulic jack; the mechanical limit device 12 includes a limit shaft 121 and a limit ring 122, the limit shaft 121 is fixed in the slot hole of the bottom reinforcement block 1, and the limit ring 122 can be moved along the limit shaft 12 1 rotates and rises, the bottom reinforcement block 1 is installed with a mechanical limit device 12, and a notch is set at it to provide space for the rotation limit ring 122. The hydraulic jacking device 11 can lift the side reinforcement block 2 upward and then rotate the limit ring 122 to achieve mechanical fixation of the side reinforcement block 2; the No. 1 oblique bolt hole 13 is provided with an internal thread; the outer side of the bottom reinforcement block 1 is constructed into a fan shape by a structural steel plate 6; the structural steel plate 6 is filled with a filling body 7, and the filling body 7 is a gelling material with a certain strength, preferably, cement slurry, epoxy resin, etc.; a certain number of shear nails 5 are arranged inside the structural steel plate 6 to ensure that the structural steel plate 6 and the filling body 7 can be effectively connected.

[0052] like Figure 1 , 3 As shown in , 8 and 9, the bottom of the side reinforcement block 2 includes two symmetrical No. 2 oblique bolt holes 21 and two prestressing end heads 22, and the top of the side reinforcement block 2 includes two symmetrical No. 1 bent bolt holes 23 and two No. 1 prestressing channels 24; the straight bolt 8 can be inserted into the No. 2 oblique bolt hole 21 and then screwed into the No. 1 oblique bolt hole 13; after the bottom reinforcement block 1, the side reinforcement block 2 and the top reinforcement block 3 are initially installed, the steel strand 101 can be inserted into the No. 1 prestressing channel 24 and the No. 2 prestressing channel 32, and the prestressing device 102 can be used to apply the prestress Prestress is applied in the application end 22; a reserved groove 25 for inserting a grouting pipe is provided in the middle of the side reinforcement block 2, which is opposite to the grouting hole provided in the shield tunnel segment and is used as a channel for inserting the grouting pipe during the grouting process; the outer side of the side reinforcement block 2 is constructed into a circular ring by a structural steel plate 6; the structural steel plate 6 is filled with a filling body 7, and the filling body 7 is a cementitious material with a certain strength, preferably, cement slurry, epoxy resin, etc.; a certain number of shear nails 5 are provided inside the structural steel plate 6 to ensure that the structural steel plate 6 and the filling body 7 can be effectively connected.

[0053] like Figure 1 , 4 As shown in Figures 10 and 11, two No. 2 bent bolt holes 31 and two No. 2 prestressed channels 32 are respectively arranged on both sides of the top reinforcement block 3, and the bent bolts 9 can be inserted into the No. 2 bent bolt holes 31 and the No. 1 bent bolt holes 23 to achieve the connection between the side reinforcement block 2 and the top reinforcement block 3. The outer side of the top reinforcement block 3 is constructed into a circular ring by a structural steel plate 6; the structural steel plate 6 is filled with a filling body 7, and the filling body 7 is a cementitious material with a certain strength, preferably, cement slurry, epoxy resin, etc.; a certain number of shear nails 5 are arranged inside the structural steel plate 6 to ensure that the structural steel plate 6 and the filling body 7 can be effectively connected.

[0054] like Fig.12 , 13 As shown in the figure, the bending moment of the shield tunnel in the soil is tension on the inside and compression on the outside at the top, tension on the outside and compression on the inside at the waist. Fig.12 is a schematic diagram of the bending moment of a shield tunnel, as shown in Fig.13 As shown, both the side reinforcement block 2 and the top reinforcement block 3 are provided with prestressed channels, and the arrangement of the prestressed channels is suitable for Fig.12 As shown in the shield tunnel bending moment diagram, when the steel strands 101 in the prestressed channel are tensioned, pressure can be provided to the inner side of the top and the outer side of the waist of the shield tunnel deformation rapid reinforcement system. Specific embodiment 2

[0056] A shield tunnel deformation rapid reset reinforcement method, comprising the following steps:

[0057] 1. Temporary removal and protection of obstacles in the tunnel: Before reinforcement construction, obstacles such as walkway slabs, contact networks, pipelines, etc. in the tunnel shall be temporarily removed and protected;

[0058] 2. Installation of bottom reinforcement block 1: Fig.14 As shown, according to the size of the bottom reinforcement block, the tunnel and the ballast are laid out, and the ballast is partially chiseled off, and the bottom reinforcement block 1 is installed at the designed position. The bottom reinforcement block 1 and the ballast and shield tunnel segments can be bonded with chemical bonding materials such as epoxy resin;

[0059] 3. Installation of the side reinforcement block 2 and the top reinforcement block 3: After the installation of the bottom reinforcement block 1 is completed, install the side reinforcement block 2 to the designed position, and tighten the straight bolts 8 to effectively connect the bottom reinforcement block 1 with the side reinforcement block 2; After the installation of the side reinforcement block 2 is completed, install the top reinforcement block 3, and install the bent bolts 9 to effectively connect the side reinforcement block 2 with the top reinforcement block 3;

[0060] 4. Preliminary prestressing: insert the steel strand 101 into the side reinforcement block 2 and the top reinforcement block 3, install the prestressing device 102, and perform prestressing to make the steel strand 101 in a stressed state; loosen the straight bolts 8 and the bent bolts 9, and further perform prestressing to make the shield tunnel deformation rapid reinforcement system basically close to the inner wall of the shield tunnel segment;

[0061] 5. Shield tunnel resetting construction: Fig.15 As shown, grouting is carried out at the grouting holes on both sides of the shield tunnel using grouting pipes. The grouting material is cement-water glass double liquid slurry on the right line. A small amount of multiple grouting is adopted. Monitoring equipment such as a total station or a rangefinder is used to monitor the deformation of the cross section of the shield tunnel in real time. The deformation of a single tunnel is determined according to the design and is generally controlled within 5mm. After the single tunnel is reset, the prestressing of the shield tunnel deformation rapid reinforcement system is carried out until the shield tunnel deformation rapid reinforcement system is basically in close contact with the inner wall of the shield tunnel segment; the above steps are repeated until the tunnel deformation is reset. After the reset is completed, the bolts are further tightened to complete the reset reinforcement work.

[0062] The above description is not intended to limit the present invention, and the present invention is not limited to the above examples. Any changes, modifications, additions or substitutions made by a person skilled in the art within the spirit and scope of the present invention shall also fall within the protection scope of the present invention.

Claims

1. A shield tunnel deformation rapid reinforcement system, Features: The invention comprises two bottom reinforcement blocks symmetrically arranged on both sides of the roadbed in the shield tunnel, two side reinforcement blocks symmetrically arranged on both sides of the shield tunnel and a top reinforcement block located at the top of the shield tunnel, the bottom of the side reinforcement block is connected to the bottom reinforcement block by straight bolts, the top of the side reinforcement block is connected to the top reinforcement block by bent bolts, the side reinforcement block and the top reinforcement block are provided with connected prestressed channels fitting the bending moment stress state of the shield tunnel, the prestressed channels are provided with steel strands, the ends of the steel strands are provided with prestress applying devices, the bottom reinforcement block is symmetrically provided with two hydraulic jacking device grooves and two No. 1 oblique bolt holes on the end face connected to the side reinforcement block, a plurality of mechanical limit devices are provided on the bottom reinforcement block and between the two hydraulic jacking device grooves, and the hydraulic jacking device groove is provided with a hydraulic jacking device for lifting the side reinforcement block upwards.

2. A shield tunnel deformation rapid reinforcement system according to claim 1, Features: The mechanical limiting device comprises a limiting shaft and a limiting ring, wherein the limiting shaft is fixed in a slot in the bottom reinforcing block, and the limiting ring is placed in an annular gap between the bottom reinforcing block and the limiting shaft and can rotate up and down along the limiting shaft.

3. A shield tunnel deformation rapid reinforcement system according to claim 2, Features: The No. 1 oblique bolt hole is provided with an internal thread, and the hydraulic jacking device is a micro hydraulic jack.

4. A shield tunnel deformation rapid reinforcement system according to claim 1, Features: The bottom of the side reinforcement block is symmetrically provided with two No. 2 oblique bolt holes and two prestressed application ends, the straight bolts are inserted into the No. 2 oblique bolt holes and the No. 1 oblique bolt holes, the top of the side reinforcement block is symmetrically provided with two No. 1 bent bolt holes and two No. 1 prestressed channels, and a reserved groove for inserting a grouting pipe is provided in the middle position of the side reinforcement block.

5. A shield tunnel deformation rapid reinforcement system according to claim 4, Features: Two No. 2 bent bolt holes and two No. 2 prestressed channels are respectively arranged on both sides of the top reinforcement block, the bent bolts are inserted into the No. 2 bent bolt holes and the No. 1 bent bolt holes, the steel strands are inserted into the No. 1 prestressed channel and the No. 2 prestressed channel, and the prestressing device applies prestress in the prestressing end.

6. A shield tunnel deformation rapid reinforcement system according to any one of claims 1 to 5, Features: The outer side of the bottom reinforcement block is constructed into a fan shape by a structural steel plate, and the outer sides of the side reinforcement block and the top reinforcement block are both constructed into a circular ring shape by a structural steel plate. The structural steel plate is filled with a filling body with a certain strength, and the structural steel plate is provided with a plurality of shear nails for connecting the structural steel plate and the filling body.

7. A shield tunnel deformation rapid reinforcement system according to claim 6, Features: A force transmission pad is arranged between the side reinforcement block and the top reinforcement block, and the filling body is cement slurry or epoxy resin.

8. A method for rapidly reinforcing a shield tunnel using the reinforcement system of claim 6 or 7, Features The following steps are involved: (1) Temporary removal and protection of obstacles in tunnels Before reinforcement construction, the walkway slabs, contact wires and pipeline obstacles in the tunnel shall be temporarily removed for protection; (2) Installation of bottom reinforcement block According to the size of the bottom reinforcement block, the tunnel and the ballast are set out, and the ballast is partially chiseled off, and the bottom reinforcement block is installed at the designed position. The bottom reinforcement block, the ballast and the shield tunnel segment can be bonded with epoxy resin chemical bonding material; (3) Installation of side reinforcement blocks and top reinforcement blocks After the bottom reinforcement block is installed, install the side reinforcement block to the designed position, and tighten the straight bolts to effectively connect the bottom reinforcement block with the side reinforcement block; after the side reinforcement block is installed, install the top reinforcement block, and install the bent bolts to effectively connect the side reinforcement block with the top reinforcement block; (4) Preliminary prestressing Insert steel strands into the side reinforcement blocks and the top reinforcement blocks, install the prestressing device, and perform prestressing once to put the steel strands in a stressed state; loosen the straight bolts and the bent bolts, and further perform prestressing to make the shield tunnel deformation rapid reinforcement system and the inner wall of the shield tunnel segment achieve initial close contact; (5) Shield tunnel resetting construction: Grouting is carried out using grouting pipes at the grouting holes on both sides of the shield tunnel, and the deformation of the cross-section of the shield tunnel is monitored in real time using total station or rangefinder monitoring equipment. The deformation of a single tunnel is controlled within 5 mm. After the single tunnel is reset, the prestressing of the shield tunnel deformation rapid reinforcement system is carried out until the shield tunnel deformation rapid reinforcement system is tightly attached to the inner wall of the shield tunnel segment; this step is repeated until the tunnel deformation is reset. After the reset is completed, the bolts are further tightened to complete the reset and reinforcement work.