A three-dimensional visualization simulation system and method for Internet cable laying

By using a 3D visualization simulation system to monitor cable status and path deviation in real time, the problem of difficulty in judging remaining space during cable laying is solved, thereby improving cable installation efficiency and management level.

CN115017655BInactive Publication Date: 2024-11-19ZHEJIANG ELECTRIC TRANSMISSION & TRANSFORMATION ENG CO
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202210406759.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-19
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies cannot effectively determine the remaining space and number of cables in the cable channel during cable laying, leading to difficulties in cable installation and affecting power transmission and project progress.

Method used

A three-dimensional visualization simulation system is adopted, including a cable information collection module, an information analysis module, and a laying quantity calculation module. Through GPS positioning, curve fitting, and BP neural network algorithm, the system monitors the cable status and path deviation in real time and calculates the number of cables that can be installed in the cable channel.

Benefits of technology

It enables rapid and accurate assessment of remaining space within cable channels, improving cable installation efficiency and the level of digitalization in cable management, and ensuring smooth cable laying.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115017655B_ABST
    Figure CN115017655B_ABST
Patent Text Reader

Abstract

The present invention discloses a three-dimensional visualization simulation system for cable laying in the Internet, and the three-dimensional visualization simulation system comprises a cable information summary module, a cable information analysis module and a cable laying quantity calculation module; the cable information summary module is used to obtain parameter information of cables installed in a cable channel and analyze the status information of cables installed in the cable channel; the cable information analysis module is used to pick up the endpoint information on the cable, perform curve fitting according to the endpoint information on the cable, and then analyze the remaining distance in the cable channel; the cable laying quantity calculation module is used to obtain the number of cables that can be installed according to the remaining distance in the cable channel; the present invention combines the laying path of the cable to analyze the state change of the laid cables in the cable channel, and then can accurately, quickly and efficiently detect the laying space in the cable channel, analyze the number of cables that can be laid, and provide a digital information basis for the cable management department.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of Internet cable laying, and in particular to a three-dimensional visualization simulation system and method for Internet cable laying. Background Art

[0002] Cable is a device for transmitting electric energy or signals, usually composed of several conductors. Cables are usually installed in cable channels to protect the cables and transmit current information more smoothly, ensuring the safe operation of power plants. Cables are installed in cable channels, but in order to maintain or expand current signals, cables are added to the cable channels to better transmit current information. However, due to changes in time and the complexity of laying cables inside, unknown deformations of cables in the cable channels may occur, and it cannot be ensured that the cables to be installed can be smoothly loaded into the cable channels. If they cannot be installed in the cable channels, it will lead to a waste of cable channel resources, affecting the smooth transmission of electricity and the progress of the project.

[0003] In the Chinese patent, the patent number is: 201710099703.8, and the publication date is 2017.7.25; it discloses "a method for analyzing the space occupancy of cable laying in a cable channel", which discloses the number of cables that can be disclosed in the cable channel under different cable channel forms, and determines the proportion of the occupied space obtained by laying; however, in the above process, it does not combine the path required for laying. The patent is only suitable for application scenarios where the laid cable path will not increase or decrease significantly, but if the laid path is not the above application scenario, the patent will not apply; in order to solve the problems in the patent document, it is necessary to improve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a three-dimensional visualization simulation system and method for Internet cable laying to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a three-dimensional visualization simulation system for cable laying in the Internet, the three-dimensional visualization simulation system comprising a cable information summary module, a cable information analysis module and a cable laying quantity calculation module;

[0006] The cable information summary module is used to obtain parameter information of cables installed in the cable channel and analyze status information of cables installed in the cable channel;

[0007] The cable information analysis module is used to pick up the endpoint information on the cable, perform curve fitting according to the endpoint information on the cable, and then analyze the remaining distance in the cable channel;

[0008] The cable laying quantity calculation module is used to obtain the number of cables that can be installed according to the remaining distance in the cable channel;

[0009] The cable laying quantity calculation module is connected with the cable information summary module and the cable information analysis module.

[0010] Further, the cable information summary module includes a cable information acquisition unit, a historical information recording unit, a cable cross-section calculation unit and an information analysis and comparison unit;

[0011] The cable information acquisition unit is used to acquire the cable information installed in the cable channel and transmit the information to the cable cross-section calculation unit;

[0012] The historical information recording unit is used to store the cable model information and the cable cross-sectional area information in the cable channel;

[0013] The cable cross-section calculation unit is used to analyze the cross-section information of the cables installed in the cable channel under the condition that the external factors are stable and unchanged;

[0014] The information analysis and comparison unit is used to compare the cross-section of the cable channel with the cross-section of the cable installed in the cable channel, thereby analyzing whether a new cable can be installed in the cable channel;

[0015] The output end of the information analysis and comparison unit is connected to the input ends of the cable information acquisition unit, the historical information recording unit, and the cable cross-section calculation unit.

[0016] Further, the cable information analysis module includes a GPS positioning unit, a center offset analysis unit, a coordinate axis establishment unit, a cable endpoint information acquisition unit, a curve fitting unit, a three-dimensional visualization unit, a similar distance analysis unit and a cable channel abnormality warning unit;

[0017] The GPS positioning unit is used to perform GPS positioning on the path to be laid, and transmit the positioning information to the three-dimensional visualization unit for displaying the path information to be laid;

[0018] The center offset analysis unit is used to predict the offset distance between the laid cable and the set path according to the method, and the set path refers to the path information formed by placing the original cable in the cable channel;

[0019] The coordinate axis establishing unit uses the set path as the horizontal axis and the longitudinal diameter of the cable channel as the vertical axis to display the state change of the cable in the cable channel;

[0020] The cable endpoint information acquisition unit is used to pick up the endpoint information of the cables laid in the cable channel and transmit the endpoint information to the curve fitting unit;

[0021] The curve fitting unit is used to perform function curve fitting on the endpoint information and transmit the fitting result to the three-dimensional visualization unit;

[0022] The three-dimensional visualization unit is used to display the status of the cables laid in the cable channel and the laying path information, so that the cable laying process can be grasped in real time;

[0023] The similarity distance analysis unit is used to obtain the minimum vertical distance between any node on the laid cable and the cable channel, and perform similarity analysis and comparison based on the minimum vertical distance and other distances in the cable channel to obtain a result;

[0024] The cable channel abnormality warning unit is used to compare the minimum distance with the longitudinal diameter of the cable to be laid, and the system issues an abnormality warning based on the comparison result;

[0025] The output end of the cable channel abnormality warning unit is connected to the input end of the similarity distance analysis unit; the output end of the three-dimensional visualization unit is connected to the input end of the GPS positioning unit and the curve fitting unit; the output end of the curve fitting unit is connected to the input end of the center offset analysis unit, the cable endpoint information acquisition unit and the coordinate axis establishment unit.

[0026] Further, the cable laying quantity calculation module includes a cable channel lateral distance acquisition unit, a cable laying quantity acquisition unit and a cable quantity summary unit;

[0027] The cable channel transverse distance acquisition unit is used to acquire transverse distance information in the cable channel;

[0028] The cable laying quantity acquisition unit is used to classify the laying path information to obtain the number of cables that can be installed in the cable channel;

[0029] The cable quantity summarizing unit is used to output and summarize the quantity information of cables that can be installed in the cable channel.

[0030] Furthermore, a three-dimensional visualization simulation method for Internet cable laying is provided, wherein the three-dimensional visualization simulation method for cable laying specifically comprises the following steps:

[0031] Z01: Obtain the cross-sectional information of the cables installed in the cable channel under the condition of constant wind speed, recorded as S1;

[0032] Z02: retrieve the cross-sectional information of the cable channel in the historical data, recorded as S2; calculate the cross-sectional area difference of S2-S1, and obtain the comparison information of the cross-sectional area difference and the cross-sectional area S0;

[0033] Z03: Based on the comparison information, obtain the comparison information of the cross-sectional area information S1 of the installed cable and the cross-sectional area S3 of the same type of cable in the historical data. If it is verified that the cross-sectional areas of S1 and S3 are within the error range, jump to step Z04; if it is verified that the cross-sectional areas of S1 and S3 are not within the error range, the installed cable in the cable channel is abnormal, and the abnormal information is fed back;

[0034] Z04: obtaining the cross-sectional area information S4 of the cable to be installed, obtaining the terrain information when the cable is laid, and obtaining the slope position information; if it is detected that the slope information is included, jump to step Z05; if it is detected that the slope information is not included, then according to the cross-sectional area difference S2-S1 information, set the number of cables that can be installed;

[0035] Z05: Obtain the offset distance information between the laid cable and the set path under a slope environment; establish a three-dimensional simulation model, pick up the coordinate position information of the vertex of the laid cable relative to the set path, process and fit the curve, and obtain the vertical distance D1 between the laid cable and the cable channel. According to the comparison between the vertical distance D1 and the diameter distance D2 of the cable to be installed, the number of cables that can be installed is obtained; the set path refers to the path when the original cable was laid.

[0036] In steps Z01-Z04, the cable channel is operated by a fan unit, a constant power P is set for the fan unit, the wind speed V in the cable channel is constant, and the air volume Q is obtained according to the diameter parameter of the cable channel;

[0037] The formula for the cross-sectional area of ​​the laid cable is: ;

[0038] The cross-sectional area of ​​the cable of the same type as the laid cable in the historical data is If S1- >S', it means that the laid cable has deformed, causing the cross-sectional area of ​​the cable to deform; if it is verified that ', it means that the cross-sectional area of ​​the laid cable is within the normal range;

[0039] Get the cross-sectional information S2 of the cable channel in the historical data. If it is verified that S2-S1>S0, S1 satisfies S1- >S', at least one cable can be installed in the cable channel;

[0040] If it is verified that the path corresponding to the prepared cable laying does not contain a slope, the number of cables that can be installed horizontally in the cable channel is ;

[0041] Where: n is the number of cables that can be installed in the cable channel in addition to the cables already installed.

[0042] In steps Z04-Z05, the corresponding route is obtained. If it is verified that the corresponding cable laying route includes at least one slope, the offset distance between the originally laid cable path and the set path is displayed through three-dimensional visualization technology; wherein the offset distance L between the cable and the original set path is obtained according to the BP neural network algorithm; the prediction parameter step of the BP neural network algorithm includes:

[0043] Z051: The time T={1, 2..t..n} years and the distance of the cable deviation from the set path every year are used as the input layer of the BP neural network, and the current cable deviation distance L from the set path is used as the output layer M of the BP neural network. The hidden layer of the BP neural network is set with 8 neurons, and the predicted path L is displayed in the 3D visualization;

[0044] Z052: The minimum training rate used is 0.92 and the learning rate is 0.68;

[0045] Z053: The transfer function of the hidden layer in step Z051 is tansig, and the transfer function of the output layer is purelin;

[0046] Train the network according to steps Z051-Z053, setting the maximum number of iterations to 250.

[0047] In step Z05, the offset distance between the laid cable path and the set path is read by three-dimensional visualization technology, and the cable endpoint set W={1,2,3...m} with the generated offset distance L and offset distance L>LI is extracted, and the coordinate axis is established according to the position information of the upper endpoint of the cable; the function curve Y=ax is set 2 +bx+c, where (x, y) refers to the coordinates of the cable endpoints, and a, b, c refer to the coefficients of the function curve; according to the cable endpoint coordinate set H={(x1, y1)(x2, y2)(x3, y3)...(x m ,y m )}, extract the maximum value Y of the vertical coordinate of the upper end point of the cable j , then the minimum distance that cables can be placed in the remaining space of the cable channel is ;

[0048] Traverse the distances between the upper end points of the cable and the points on the cable channel in sequence to determine whether the following conditions are met;

[0049] ;

[0050] If the above conditions are met, the cables can be installed and the number of cables n' can be calculated; if the above conditions are not met, the remaining distance of the cable channel cannot be used to install cables;

[0051] Where: DK refers to the distance between any endpoint on the cable and a point on the cable channel, and m refers to the number of endpoint items.

[0052] The number of cables that can be placed horizontally in the cable channel is , R refers to the quantity.

[0053] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0054] The present invention can quickly and effectively determine the remaining diameter in the cable channel through the cable information analysis module and the cable laying quantity calculation module, and then obtain the information on the number of cables that can be laid; the present invention combines the laying path of the cable to analyze the state changes of the laid cables in the cable channel, and then can accurately, quickly and efficiently detect the laying space in the cable channel, analyze the number of cables that can be laid, and provide a digital information basis for the cable management department. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0056] Figure 1 It is a schematic diagram of the steps of a three-dimensional visualization simulation system for Internet cable laying according to the present invention;

[0057] Figure 2 It is a schematic diagram of the module composition of a three-dimensional visual simulation system for Internet cable laying according to the present invention. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] See also Figure 1-Figure 2 , the present invention provides a technical solution:

[0060] A three-dimensional visualization simulation system for cable laying on the Internet, the three-dimensional visualization simulation system comprising a cable information aggregation module, a cable information analysis module and a cable laying quantity calculation module;

[0061] The cable information summary module is used to obtain parameter information of cables installed in the cable channel and analyze status information of cables installed in the cable channel;

[0062] The cable information analysis module is used to pick up the endpoint information on the cable, perform curve fitting according to the endpoint information on the cable, and then analyze the remaining distance in the cable channel;

[0063] The endpoint refers to any point on the outside of the cable;

[0064] The cable laying quantity calculation module is used to obtain the number of cables that can be installed according to the remaining distance in the cable channel;

[0065] The cable laying quantity calculation module is connected with the cable information summary module and the cable information analysis module.

[0066] Further, the cable information summary module includes a cable information acquisition unit, a historical information recording unit, a cable cross-section calculation unit and an information analysis and comparison unit;

[0067] The cable information acquisition unit is used to acquire the cable information installed in the cable channel and transmit the information to the cable cross-section calculation unit;

[0068] The historical information recording unit is used to store the cable model information and the cable cross-sectional area information in the cable channel;

[0069] The cable cross-section calculation unit is used to analyze the cross-section information of the cables installed in the cable channel under the condition that the external factors are stable and unchanged;

[0070] The information analysis and comparison unit is used to compare the cross-section of the cable channel with the cross-section of the cable installed in the cable channel, thereby analyzing whether a new cable can be installed in the cable channel;

[0071] The output end of the information analysis and comparison unit is connected to the input ends of the cable information acquisition unit, the historical information recording unit, and the cable cross-section calculation unit.

[0072] Further, the cable information analysis module includes a GPS positioning unit, a center offset analysis unit, a coordinate axis establishment unit, a cable endpoint information acquisition unit, a curve fitting unit, a three-dimensional visualization unit, a similar distance analysis unit and a cable channel abnormality warning unit;

[0073] The GPS positioning unit is used to perform GPS positioning on the path to be laid, and transmit the positioning information to the three-dimensional visualization unit for displaying the path information to be laid;

[0074] The center offset analysis unit is used to predict the offset distance between the laid cable and the set path according to the method, and the set path refers to the path information formed by placing the original cable in the cable channel;

[0075] The coordinate axis establishing unit uses the set path as the horizontal axis and the longitudinal diameter of the cable channel as the vertical axis to display the state change of the cable in the cable channel;

[0076] The cable endpoint information acquisition unit is used to pick up the endpoint information of the cables laid in the cable channel and transmit the endpoint information to the curve fitting unit;

[0077] The curve fitting unit is used to perform function curve fitting on the endpoint information and transmit the fitting result to the three-dimensional visualization unit;

[0078] The three-dimensional visualization unit is used to display the status of the cables laid in the cable channel and the laying path information, so that the cable laying process can be grasped in real time;

[0079] The similarity distance analysis unit is used to obtain the minimum vertical distance between any node on the laid cable and the cable channel, and perform similarity analysis and comparison based on the minimum vertical distance and other distances in the cable channel to obtain a result;

[0080] The cable channel abnormality warning unit is used to compare the minimum distance with the longitudinal diameter of the cable to be laid, and the system issues an abnormality warning based on the comparison result;

[0081] The output end of the cable channel abnormality warning unit is connected to the input end of the similarity distance analysis unit; the output end of the three-dimensional visualization unit is connected to the input end of the GPS positioning unit and the curve fitting unit; the output end of the curve fitting unit is connected to the input end of the center offset analysis unit, the cable endpoint information acquisition unit and the coordinate axis establishment unit.

[0082] Further, the cable laying quantity calculation module includes a cable channel lateral distance acquisition unit, a cable laying quantity acquisition unit and a cable quantity summary unit;

[0083] The cable channel transverse distance acquisition unit is used to acquire transverse distance information in the cable channel;

[0084] The cable laying quantity acquisition unit is used to classify the laying path information to obtain the number of cables that can be installed in the cable channel;

[0085] The cable quantity summarizing unit is used to output and summarize the quantity information of cables that can be installed in the cable channel.

[0086] Furthermore, a three-dimensional visualization simulation method for Internet cable laying is provided, wherein the three-dimensional visualization simulation method for cable laying specifically comprises the following steps:

[0087] Z01: Obtain the cross-sectional information of the cables installed in the cable channel under the condition of constant wind speed, recorded as S1;

[0088] Z02: retrieve the cross-sectional information of the cable channel in the historical data, recorded as S2; calculate the cross-sectional area difference of S2-S1, and obtain the comparison information of the cross-sectional area difference and the cross-sectional area S0;

[0089] Z03: Based on the comparison information, obtain the comparison information of the cross-sectional area information S1 of the installed cable and the cross-sectional area S3 of the same type of cable in the historical data. If it is verified that the cross-sectional areas of S1 and S3 are within the error range, jump to step Z04; if it is verified that the cross-sectional areas of S1 and S3 are not within the error range, the installed cable in the cable channel is abnormal, and the abnormal information is fed back;

[0090] Z04: obtaining the cross-sectional area information S4 of the cable to be installed, obtaining the terrain information when the cable is laid, and obtaining the slope position information; if it is detected that the slope information is included, jump to step Z05; if it is detected that the slope information is not included, then according to the cross-sectional area difference S2-S1 information, set the number of cables that can be installed;

[0091] Z05: Obtain the offset distance information between the laid cable and the set path under a slope environment; establish a three-dimensional simulation model, pick up the coordinate position information of the vertex of the laid cable relative to the set path, process and fit the curve, and obtain the vertical distance D1 between the laid cable and the cable channel. According to the comparison between the vertical distance D1 and the diameter distance D2 of the cable to be installed, the number of cables that can be installed is obtained; the set path refers to the path when the original cable was laid.

[0092] In steps Z01-Z04, the cable channel is operated by a fan unit, a constant power P is set for the fan unit, the wind speed V in the cable channel is constant, and the air volume Q is obtained according to the diameter parameter of the cable channel;

[0093] The formula for the cross-sectional area of ​​the laid cable is: ;

[0094] The cross-sectional area of ​​the cable of the same type as the laid cable in the historical data is If S1- >S', it means that the laid cable has deformed, causing the cross-sectional area of ​​the cable to deform; if it is verified that ', it means that the cross-sectional area of ​​the laid cable is within the normal range;

[0095] Get the cross-sectional information S2 of the cable channel in the historical data. If it is verified that S2-S1>S0, S1 satisfies S1- >S', at least one cable can be installed in the cable channel;

[0096] If it is verified that the path corresponding to the prepared cable laying does not contain a slope, the number of cables that can be installed horizontally in the cable channel is ;

[0097] Where: n is the number of cables that can be installed in the cable channel in addition to the cables already installed.

[0098] Whether the cable is deformed is determined based on the cross-sectional area of ​​the laid cable, and the change in the cross-sectional area of ​​the cable compared to the cross-sectional area of ​​the cable in a normal state is obtained. The present invention analyzes the cross-sectional area in the cable channel by a fan unit, thereby ensuring the stability of the cross-sectional area calculation and preventing errors. The reason why the present invention compares the cross-sectional area S2-S1 with the cross-sectional area S0 instead of directly comparing the difference cross-sectional area with the cross-sectional area of ​​the cable to be laid is that it can be determined in advance that the remaining space of the cable can accommodate at least one cable and that the cable meets the conditions for installation into the cable channel, thereby improving the efficiency of installing the cable in the cable channel.

[0099] In steps Z04-Z05, the corresponding route is obtained. If it is verified that the corresponding cable laying route includes at least one slope, the offset distance between the originally laid cable path and the set path is displayed through three-dimensional visualization technology; wherein the offset distance L between the cable and the original set path is obtained according to the BP neural network algorithm; the prediction parameter step of the BP neural network algorithm includes:

[0100] Z051: The time T={1, 2..t..n} years and the distance of the cable deviation from the set path every year are used as the input layer of the BP neural network, and the current cable deviation distance L from the set path is used as the output layer M of the BP neural network. The hidden layer of the BP neural network is set with 8 neurons, and the predicted path L is displayed in the 3D visualization;

[0101] Z052: The minimum training rate used is 0.92 and the learning rate is 0.68;

[0102] Z053: The transfer function of the hidden layer in step Z051 is tansig, and the transfer function of the output layer is purelin;

[0103] Train the network according to steps Z051-Z053, setting the maximum number of iterations to 250;

[0104] The BP neural network is used to predict the offset distance, which ensures the accuracy of the model prediction and the high and accurate learning efficiency of the entire model. According to the predicted offset distance L, the state changes of the cables laid in the cable channel can be analyzed; the transfer function tansig refers to the bipolar S function, and the transfer function logsig refers to the unipolar S function; the transfer function tansig ensures the high accuracy of the model, and the purelin function is used in the output layer, through which the net input of the neural network can be converted into a net output, ensuring the accuracy of the output value.

[0105] In step Z05, the offset distance between the laid cable path and the set path is read by three-dimensional visualization technology, and the cable endpoint set W={1,2,3...m} with the generated offset distance L and offset distance L>LI is extracted, and the coordinate axis is established according to the position information of the upper endpoint of the cable; the function curve Y=ax is set 2 +bx+c, where (x, y) refers to the coordinates of the cable endpoints, and a, b, c refer to the coefficients of the function curve; according to the cable endpoint coordinate set H={(x1, y1)(x2, y2)(x3, y3)...(x m ,y m )}, extract the maximum value Y of the vertical coordinate of the upper end point of the cable j , then the minimum distance that cables can be placed in the remaining space of the cable channel is ;

[0106] Traverse the distances between the upper end points of the cable and the points on the cable channel in sequence to determine whether the following conditions are met;

[0107] ;

[0108] If the above conditions are met, the cables can be installed and the number of cables n' can be calculated; if the above conditions are not met, the remaining distance of the cable channel cannot be used to install cables;

[0109] Where: DK refers to the distance between any endpoint on the cable and a point on the cable channel, and m refers to the number of endpoint items;

[0110] Through the changes between the upper end point of the cable and the cable channel, the number of cables that can be installed in the cable channel to be arranged can be analyzed, which is different from the number that can be installed in the cable channel when there is no slope. Therefore, when judging the number of cables installed in the cable channel, it is necessary to combine the cable laying path to ensure the accuracy of the result.

[0111] The number of cables that can be placed horizontally in the cable channel is , R refers to the quantity.

[0112] Example 1: The cable channel is processed by a fan unit. A constant power P is set for the fan unit, and a constant wind speed V = 3 m / s in the cable channel is obtained. According to the diameter parameter of the cable channel, the air volume Q = 10 m 3 / s;

[0113] The cross-sectional area formula of the laid cable is obtained as: = 10 * (3 / 3600) = 0.0083 m 2 = 83 cm 2 ;

[0114] The cross-sectional area of the cable of the same type as the laid cable in the historical data is obtained as = 72 cm 2 , S’ = 5 cm 2 , obtaining S1 - > S’, indicating that the laid cable is deformed.

[0115] Example 2: The cable channel is processed by a fan unit. A constant power P is set for the fan unit, and a constant wind speed V = 3 m / s in the cable channel is obtained. According to the diameter parameter of the cable channel, the air volume Q = 10 m 3 / s;

[0116] The cross-sectional area formula of the laid cable is obtained as: = 10 * (3 / 3600) = 0.0083 m 2 = 83 cm 2 ;

[0117] The cross-sectional area of the cable of the same type as the laid cable in the historical data is obtained as = 79 cm 2 , S’ = 5 cm 2 , obtaining S1 - < S’, indicating that the cross-sectional area of the cable is within the normal range; the cross-sectional information of the cable channel in the historical data is detected as S2 = 360, S0 = 2; when it is detected that there is no slope in the path corresponding to the cable to be laid, the number of cables that can be installed horizontally in the cable channel is ;

[0118] Then the number of cables that can be installed in the cable channel is 5.

[0119] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0120] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A three-dimensional visualization simulation system for Internet cable laying, characterized by: The three-dimensional visual simulation system includes a cable information summary module, a cable information analysis module and a cable laying quantity calculation module; The cable information summary module is used to obtain parameter information of cables installed in the cable channel and analyze status information of cables installed in the cable channel; The cable information analysis module is used to pick up the endpoint information on the cable, perform curve fitting according to the endpoint information on the cable, and then analyze the remaining distance in the cable channel; The offset distance between the laid cable path and the set path is read through 3D visualization technology, and the cable endpoint set W={1,2,3...m} with the generated offset distance L and offset distance L>LI is extracted. The coordinate axis is established according to the position information of the upper endpoints of the cable; the function curve Y=ax is set 2 +bx+c, where (x, y) refers to the coordinates of the cable endpoints, and a, b, c refer to the coefficients of the function curve; according to the cable endpoint coordinate set H={(x1, y1)(x2, y2)(x3, y3)...(x m ,y m )}, extract the maximum value Y of the vertical coordinate of the upper end point of the cable j , then the minimum distance that cables can be placed in the remaining space of the cable channel is D1= ; Traverse the distances between the upper end points of the cable and the points on the cable channel in sequence to determine whether the following conditions are met; ; If the above conditions are met, the cables can be installed and the number of cables n' can be calculated; if the above conditions are not met, the remaining distance of the cable channel cannot be used to install cables; Where: DK refers to the distance between any endpoint on the cable and a point on the cable channel, and m refers to the number of endpoint items; The cable laying quantity calculation module is used to obtain the number of cables that can be installed according to the remaining distance in the cable channel; The cable laying quantity calculation module is connected with the cable information summary module and the cable information analysis module.

2. The three-dimensional visualization simulation system for Internet cable laying according to claim 1, characterized in that: The cable information summary module includes a cable information acquisition unit, a historical information recording unit, a cable cross-section calculation unit and an information analysis and comparison unit; The cable information acquisition unit is used to acquire the cable information installed in the cable channel and transmit the information to the cable cross-section calculation unit; The historical information recording unit is used to store the cable model information and the cable cross-sectional area information in the cable channel; The cable cross-section calculation unit is used to analyze the cross-section information of the cables installed in the cable channel under the condition that the external factors are stable and unchanged; The information analysis and comparison unit is used to compare the cross-section of the cable channel with the cross-section of the cable installed in the cable channel; The output end of the information analysis and comparison unit is connected to the input ends of the cable information acquisition unit, the historical information recording unit, and the cable cross-section calculation unit.

3. The three-dimensional visualization simulation system for Internet cable laying according to claim 1, characterized in that: The cable information analysis module includes a GPS positioning unit, a center offset analysis unit, a coordinate axis establishment unit, a cable endpoint information acquisition unit, a curve fitting unit, a three-dimensional visualization unit, a similar distance analysis unit and a cable channel abnormality warning unit; The GPS positioning unit is used to perform GPS positioning on the path to be laid, and transmit the positioning information to the three-dimensional visualization unit for displaying the path information to be laid; The center offset analysis unit is used to predict the offset distance between the laid cable and the set path according to the method, and the set path refers to the path information formed by placing the original cable in the cable channel; The coordinate axis establishing unit uses the set path as the horizontal axis and the longitudinal diameter of the cable channel as the vertical axis to display the state change of the cable in the cable channel; The cable endpoint information acquisition unit is used to pick up the endpoint information of the cables laid in the cable channel and transmit the endpoint information to the curve fitting unit; The curve fitting unit is used to perform function curve fitting on the endpoint information and transmit the fitting result to the three-dimensional visualization unit; The three-dimensional visualization unit is used to display the status of the cables laid in the cable channel and the laying path information. The similarity distance analysis unit is used to obtain the minimum vertical distance between any node on the laid cable and the cable channel, and perform similarity analysis and comparison based on the minimum vertical distance and other distances in the cable channel to obtain a result; The cable channel abnormality warning unit is used to compare the minimum distance with the longitudinal diameter of the cable to be laid, and the system issues an abnormality warning based on the comparison result; The output end of the cable channel abnormality warning unit is connected to the input end of the similarity distance analysis unit; the output end of the three-dimensional visualization unit is connected to the input end of the GPS positioning unit and the curve fitting unit; the output end of the curve fitting unit is connected to the input end of the center offset analysis unit, the cable endpoint information acquisition unit and the coordinate axis establishment unit.

4. The three-dimensional visualization simulation system for Internet cable laying according to claim 1, characterized in that: The cable laying quantity calculation module includes a cable channel lateral distance acquisition unit, a cable laying quantity acquisition unit and a cable quantity summary unit; The cable channel transverse distance acquisition unit is used to acquire transverse distance information in the cable channel; The cable laying quantity acquisition unit is used to classify the laying path information to obtain the number of cables that can be installed in the cable channel; The cable quantity summarizing unit is used to output and summarize the quantity information of cables that can be installed in the cable channel.

5. A three-dimensional visualization simulation method for Internet cable laying, characterized in that: The three-dimensional visualization simulation method for cable laying specifically comprises the following steps: Z01: Obtain the cross-section of the installed cables in the cable channel under the condition of constant wind speed, recorded as S1; Z02: retrieve the cross-sectional information of the cable channel in the historical data, recorded as S2; Calculate the cross-sectional area difference of S2-S1 to obtain the comparison information between the cross-sectional area difference and the cross-sectional area S0; Z03: Based on the comparison information, obtain the comparison information of the cross-sectional area information S1 of the installed cable and the cross-sectional area S3 of the same type of cable in the historical data. If it is verified that the cross-sectional areas of S1 and S3 are within the error range, jump to step Z04; if it is verified that the cross-sectional areas of S1 and S3 are not within the error range, the installed cable in the cable channel is abnormal, and the abnormal information is fed back; Z04: obtaining the cross-sectional area information S4 of the cable to be installed, obtaining the terrain information when the cable is laid, and obtaining the slope position information; if it is detected that the slope information is included, jump to step Z05; if it is detected that the slope information is not included, then according to the cross-sectional area difference S2-S1 information, set the number of cables that can be installed; Z05: Get the offset distance information between the laid cable and the set path in a slope environment; A three-dimensional simulation model is established, and the coordinate position information of the vertices of the laid cables relative to the set path is picked up. After processing and fitting the curve, the vertical distance D1 between the laid cables and the cable channel is obtained. The number of cables that can be installed is obtained by comparing the vertical distance D1 with the diameter distance D2 of the cables to be installed. The set path refers to the path of the original cable when it is laid. The offset distance between the laid cable path and the set path is read through 3D visualization technology, and the cable endpoint set W={1,2,3...m} with the generated offset distance L and offset distance L>LI is extracted. The coordinate axis is established according to the position information of the upper endpoints of the cable; the function curve Y=ax is set 2 +bx+c, where (x, y) refers to the coordinates of the cable endpoints, and a, b, c refer to the coefficients of the function curve; according to the cable endpoint coordinate set H={(x1, y1)(x2, y2)(x3, y3)...(x m ,y m )}, extract the maximum value Y of the ordinate of the upper end point of the cable j , then the minimum distance that cables can be placed in the remaining space of the cable channel is D1= ; Traverse the distances between the upper end points of the cable and the points on the cable channel in sequence to determine whether the following conditions are met; ; If the above conditions are met, the cables can be installed and the number of cables n' can be calculated; if the above conditions are not met, the remaining distance of the cable channel cannot be used to install cables; Where: DK refers to the distance between any endpoint on the cable and a point on the cable channel, and m refers to the number of endpoint items.

6. The three-dimensional visualization simulation method for Internet cable laying according to claim 5, characterized in that: In steps Z01-Z04, the cable channel is operated by a fan unit, a constant power P is set for the fan unit, the wind speed V in the cable channel is constant, and the air volume Q is obtained according to the diameter parameter of the cable channel; The formula for the cross-sectional area of ​​the laid cable is: ; The cross-sectional area of ​​the cable of the same type as the laid cable in the historical data is If S1- >S', it means that the laid cable has been deformed, causing the cross-sectional area of ​​the cable to be deformed; if S1- S', ​​it means that the cross-sectional area of ​​the laid cable is within the normal range; Get the cross-sectional information S2 of the cable channel in the historical data. If it is verified that S2-S1>S0, S1 satisfies S1- >S', at least one cable can be installed in the cable channel; If it is verified that the path corresponding to the prepared cable laying does not contain a slope, the number of cables that can be installed horizontally in the cable channel is ; Where: n is the number of cables that can be installed in the cable channel in addition to the cables already installed.

7. The three-dimensional visualization simulation method for Internet cable laying according to claim 5, characterized in that: In steps Z04-Z05, the corresponding laying route is obtained. If it is verified that the corresponding laying route of the cable includes at least one slope, the offset distance between the originally laid cable path and the set path is displayed through three-dimensional visualization technology; The offset distance L between the cable and the original set path is obtained according to the BP neural network algorithm; The steps of predicting parameters through the BP neural network algorithm include: Z051: The time T={1, 2..t..n} years and the distance of the cable deviation from the set path every year are used as the input layer of the BP neural network, and the current cable deviation distance L from the set path is used as the output layer M of the BP neural network. The hidden layer of the BP neural network is set with 8 neurons, and the predicted path L is displayed in the 3D visualization; Z052: The minimum training rate used is 0.92 and the learning rate is 0.68; Z053: The transfer function of the hidden layer in step Z051 is tansig, and the transfer function of the output layer is purelin; Train the network according to steps Z051-Z053, setting the maximum number of iterations to 250.

8. The three-dimensional visualization simulation method for Internet cable laying according to claim 5, characterized in that: The number of cables that can be placed horizontally in the cable channel is R= , R refers to the quantity.

Citation Information

Patent Citations

  • Method and system for analyzing occupation of cable laying space in cable channel

    CN106980708A

  • Ship cable arrangement design method and device, readable storage medium and terminal

    CN111274651A

  • Cable path multi-objective optimization method considering channel capacity and turning radius constraint

    CN113704936A

  • Water conservancy and hydropower engineering cable rapid laying design method based on 3DE secondary development

    CN113836698A

  • Method for planning and calculating optimal path of cable

    CN114218734A