Tailings and waste rock combined processing system and method
Through the joint treatment method of tailings and waste rock, using waste rock to build retaining dams and alternate stacking technology, the problem of large area and low reliability of tailings and waste rock storage has been solved, and an efficient and environmentally friendly tailings and waste rock storage system has been realized. Stone treatment reduces construction and operating costs.
Patent Information
- Application Number
- CN202210713348.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-06-22
AI Technical Summary
The storage of tailings and waste rock occupies a large area, has low storage reliability, poor ability to withstand natural disasters, and high construction costs.
The combined treatment method of tailings and waste rock is adopted, the waste rock is used to build a retaining dam, and the tailings and waste rock layers are alternately stacked from bottom to top to form a composite storage body, which reduces the area occupied by the storage yard and improves space utilization. It also optimizes water management through dikes and return water devices to reduce water volume and construction costs.
It effectively reduces the engineering investment in tailings and waste rock disposal devices, improves the safety and environmental protection performance of the storage yard, reduces land occupation and construction costs, and improves land use efficiency and environmental protection effects.
Smart Images

Figure CN115059025B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tailings treatment, and in particular to a system and method for combined treatment of tailings and waste rock. Background Art
[0002] Tailings refer to the remaining or waste products after the ore is sorted and the target minerals are selected. The tailings discharged from the concentrator are generally in the form of slurry. The tailings pond is a place for storing tailings discharged from metal and non-metal mines after ore sorting. Generally, the tailings slurry is hydraulically transported to the tailings pond for discharge. The tailings entering the pond have natural fluidity. This discharge method is called wet tailings discharge, and the tailings pond is called a wet tailings pond. Waste rock refers to the stripping material produced in mining activities. It exists in solid form. The particle size of the waste rock is relatively large, ranging from a few millimeters to hundreds of millimeters, and its porosity is relatively large. The spoil dump is a place where stripping materials produced in mining activities are stored, also known as a waste rock dump.
[0003] Since tailings and waste rock are two major types of solid wastes in metal and non-metal mines, and their scale is huge, in related technologies, tailings and waste rock are stored and disposed of by building tailings ponds and spoil dumps respectively, which leads to large land occupation, low reliability after storage, and poor ability to resist natural disasters such as floods and earthquakes. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0005] To this end, an embodiment of the present invention proposes a combined treatment method for tailings and waste rock that occupies a small land area, saves investment, and has good environmental performance.
[0006] The embodiment of the present invention also provides a tailings and waste rock combined processing system.
[0007] The combined treatment method of tailings and waste rock according to an embodiment of the present invention comprises the following steps:
[0008] S1: Use waste rock to build a first-stage retaining dam downstream of the storage site;
[0009] S2: discharging waste rock into the stockpile to form a waste rock layer;
[0010] S3: discharging tailings into the storage yard to form a tailings layer, wherein the tailings layer is located above the waste rock layer;
[0011] S4: repeat S2 and S3, so that the waste rock layer and the tailings layer are alternately stacked from bottom to top to a first target height, and the first target height is not higher than the height of the first-stage retaining dam;
[0012] S5: Repeat S1 to S4 until all waste rocks and tailings are discharged into the storage yard.
[0013] According to the combined treatment method of tailings and waste rock of an embodiment of the present invention, by using waste rock to build a retaining dam, and arranging the waste rock layer and the tailings layer alternately from bottom to top in the storage yard, the tailings and waste rock can be processed collaboratively, and the fine-grained tailings can more easily enter the pores of the waste rock pile, which can effectively increase the stacking dry density of the composite stockpile in the storage yard and improve the space utilization rate.
[0014] Compared with traditional tailings ponds, the storage yard of the embodiment of the present invention has less water and higher safety; compared with traditional waste dumps, the wet tailings cover the surface of the waste rock and are mixed with the waste rock. While the porosity of the composite storage body is reduced, it blocks the entry of air and moisture, destroys the acid production conditions of the waste rock, and is more conducive to environmental protection. In addition, the combined treatment method of tailings and waste rock of the embodiment of the present invention can reduce the engineering investment of tailings and waste rock disposal equipment and reduce construction costs. Therefore, the combined treatment method of tailings and waste rock of the present invention has the advantages of small storage area, land saving, investment saving, and good environmental protection performance.
[0015] In some embodiments, the combined treatment method of tailings and waste rock also includes: using waste rock or tailings to build a dike in the storage yard, the dike divides the storage yard into multiple storage areas, and each of the storage areas has the waste rock layers and the tailings layers stacked alternately from top to bottom.
[0016] In some embodiments, a plurality of the storage areas are sequentially arranged around the circumference of the storage yard, and the order in which the tailings are discharged into each of the storage areas is consistent with the order in which the waste rocks are discharged into each of the storage areas.
[0017] In some embodiments, the tailings layers and the waste rock layers are stacked alternately to form a stockpile, and the upper layer of the stockpile is inclined downward in a direction away from the retaining dam so as to define a backwater area between the stockpile and the stockpile yard. A backwater device is provided in the backwater area to transport clarified water in the backwater area to a recycling plant for recycling.
[0018] In some embodiments, the slope of the upper layer of the stockpile is 0.003-0.05.
[0019] In some embodiments, a seepage water collection device is provided downstream of the first-phase retaining dam, and the seepage water collection device is used to transport the seepage water to the storage yard.
[0020] In some embodiments, a flood discharge device is provided in the storage yard, and the flood discharge device is used to discharge flood water outside the storage yard.
[0021] In some embodiments, before the tailings are discharged into the stockpile, the mass concentration of the tailings is concentrated to more than 60%, and the tailings are wet-discharged in each storage area of the stockpile.
[0022] In some embodiments, the thickness of the bottommost waste rock layer in the storage yard is greater than or equal to 1.0 m, and the thickness of the bottommost tailings layer in the storage yard is greater than or equal to 0.5 m.
[0023] According to another embodiment of the present invention, a tailings and waste rock combined processing system includes: a storage yard, a retaining dam and a storage body, the retaining dam is arranged downstream of the storage yard, the storage body is arranged within the storage yard, the storage body includes a waste rock layer and a tailings layer, the waste rock layer and the tailings layer are alternately stacked in a bottom-to-top direction to form the storage body.
[0024] According to the tailings and waste rock joint processing system of the embodiment of the present invention, by using waste rock to build a retaining dam, and arranging the waste rock layer and the tailings layer alternately from bottom to top in the storage yard, the tailings and waste rock can be processed in a coordinated manner to reduce the floor area of the storage yard, improve land utilization efficiency, and save land resources. In addition, the density of the storage body of the tailings and waste rock joint processing system of the embodiment of the present invention is relatively large, and the amount of water stored in the storage yard is relatively small, which can make the use of tailings and waste rock storage safer and conducive to the later closure of the storage. In addition, the tailings and waste rock joint processing system of the embodiment of the present invention can reduce the engineering investment of the tailings and waste rock disposal device and reduce the construction cost.
[0025] In some embodiments, a dike is provided in the storage yard, and the dike divides the storage yard into multiple storage areas. Each storage area is provided with the storage body, and the storage bodies in the multiple storage areas gradually increase in the order of discharge of tailings or waste rocks.
[0026] In some embodiments, the upper layer of the stockpile body is inclined downward in a direction away from the retaining dam, and the slope of the upper layer of the stockpile body is 0.003-0.05. A backwater area is defined between the upper layer of the stockpile body and the stockpile yard. A backwater device is provided in the backwater area to transport the clarified water in the backwater area to the recycling plant for recycling. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 1 is a top view of a combined tailings and waste rock treatment system according to an embodiment of the present invention.
[0028] Figure 2 It is a cross-sectional view of a tailings and waste rock combined treatment system according to an embodiment of the present invention.
[0029] Figure 3It is a cross-sectional view of a method for combined treatment of tailings and waste rock according to another embodiment of the present invention.
[0030] Reference numerals:
[0031] 1. Storage yard; 11. Storage area; 111. First area; 112. Second area; 113. Third area; 114. Fourth area; 12. Backwater area;
[0032] 2. Retaining dam; 21. First-phase retaining dam; 22. Second-phase retaining dam; 23. Third-phase retaining dam;
[0033] 3. Stockpile; 31. Waste rock layer; 32. Tailings layer;
[0034] 4. Dike;
[0035] 5. Water return device;
[0036] 6. Seepage collection device;
[0037] 7. Flood discharge device;
[0038] 8. Tailings transportation pipeline. DETAILED DESCRIPTION
[0039] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0040] Please refer to the following Figures 1 to 3 A tailings and waste rock combined treatment method and a tailings and waste rock combined treatment system according to an embodiment of the present invention are described.
[0041] like Figures 1 to 3 As shown, the combined treatment method of tailings and waste rock according to an embodiment of the present invention comprises the following steps:
[0042] S1: Use waste rock to build a first-stage retaining dam 21 downstream of the storage site 1;
[0043] S2: waste rock is discharged into the storage yard 1 to form a waste rock layer 31;
[0044] S3: discharging tailings into the storage yard 1 to form a tailings layer 32, and the tailings layer 32 is located above the waste rock layer 31;
[0045] S4: Repeat S2 and S3 to stack the waste rock layer 31 and the tailings layer 32 alternately from bottom to top to a first target height, wherein the first target height is not higher than the height of the first-stage retaining dam 21;
[0046] S5: Repeat S1 to S4 until all waste rocks and tailings are discharged into the storage yard 1.
[0047] According to the combined treatment method of tailings and waste rock of an embodiment of the present invention, by using waste rock to build a retaining dam 2, and arranging the waste rock layer 31 and the tailings layer 32 alternately from bottom to top in the storage yard 1, the tailings and waste rock can be processed collaboratively, and fine-grained tailings can more easily enter the pores of the waste rock pile, which can effectively increase the stacking dry density of the composite storage body 3 in the storage yard 1 and improve the space utilization rate.
[0048] Compared with the traditional tailings pond, the storage yard 1 of the embodiment of the present invention has less water and higher safety; compared with the traditional dump, the wet tailings are covered on the surface of the waste rock and mixed with the waste rock. The composite storage body 3 has a smaller porosity and blocks the entry of air and water, destroying the acid-generating conditions of the waste rock, which is more conducive to environmental protection. In addition, the combined treatment method of tailings and waste rock of the embodiment of the present invention can reduce the engineering investment of tailings and waste rock disposal equipment and reduce construction costs.
[0049] Therefore, the combined treatment method of tailings and waste rock of the present invention has the advantages of small footprint of the storage yard 1, saving land, saving investment, and good environmental protection performance.
[0050] It is understandable that if Figure 2 and Figure 3 As shown, the storage yard 1 can be constructed in multiple phases. Among them, the retaining dam 2 can be constructed in multiple phases. For example, a first-phase retaining dam 21 can be constructed first, and the retaining dam 2 is constructed with non-acid-producing waste rock or other earth and stone materials. Then, tailings and waste rock are discharged alternately into the retaining dam 2 and the storage yard 1. As the height of the stockpile 3 in the storage yard 1 gradually increases, a second-phase retaining dam 22 and a third-phase retaining dam 23 can be constructed, and then the above operation is repeated until the last batch of waste rock and tailings are discharged into the storage yard 1.
[0051] It can be understood that in the embodiment of the present invention, the tailings are discharged in a "wet manner". Wet tailings can be transported by pipelines and have the characteristics of natural flow, so it is convenient to fill the tailings into the storage yard 1. Optionally, before the tailings are discharged into the storage yard 1, the mass concentration of the tailings is concentrated to more than 60%, and the tailings are wet-discharged in different areas within the storage yard 1. The tailings and waste rock combined treatment method of the embodiment of the present invention can reduce the water content of the tailings by controlling the mass concentration of the tailings, which is beneficial to the implementation of the tailings and waste rock combined treatment method of the embodiment of the present invention, so that the stacking effect between the tailings layer 32 and the waste rock layer 31 is better, and the safety of the storage yard 1 is further improved.
[0052] In some embodiments, Figure 1 and Figure 2As shown, the combined treatment method of tailings and waste rock also includes: using waste rock or tailings to build a dike 4 in the storage yard 1, the dike 4 divides the storage yard 1 into a plurality of storage areas 11, and each storage area 11 is alternately stacked with waste rock layers 31 and tailings layers 32 from top to bottom. The combined treatment method of tailings and waste rock of the present invention can facilitate the discharge operation of tailings and waste rock by dividing the storage yard 1 into a plurality of storage areas 11, thereby improving the efficiency of the combined treatment of tailings and waste rock, and facilitating subsequent operation and management. In addition, by building the dike 4 in the storage yard 1, the structural strength of the storage body 3 can be improved, and the safety of the combined treatment of tailings and waste rock can be improved.
[0053] Furthermore, if Figure 1 As shown, multiple storage areas 11 are arranged in sequence around the circumference of the storage yard 1, and the order in which the tailings are discharged into each storage area 11 is consistent with the order in which the waste rock is discharged into each storage area 11. It can be understood that the number of divisions of the multiple storage areas 11 is not limited, and they can be divided according to the size of the actual storage yard 1 or design requirements.
[0054] For example, Figure 1 As shown, the plurality of storage areas 11 include a first area 111, a second area 112, a third area 113 and a fourth area 114, and the first area 111, the second area 112, the third area 113 and the fourth area 114 are sequentially arranged around the circumference of the storage yard 1. In a specific embodiment, as Figure 1 As shown, the partition 4 is cross-shaped to roughly divide the storage yard 1 into four equal parts. The tailings are first discharged into the first area 111, and then discharged into the second area 112, the third area 113 and the fourth area 114. At the same time, the tailings discharged into the first area 111 are gradually consolidated, and the bearing capacity increases. Therefore, the waste rock can be discharged into the first area 111, and then discharged in the second area 112, the third area 113 and the fourth area 114 in turn, and the discharge of the tailings does not stop. Therefore, the tailings and waste rock joint treatment method of the embodiment of the present invention discharges the tailings into each storage area 11 in the same order as the waste rock is discharged into each storage area 11, which can improve the efficiency of the joint treatment of tailings and waste rock and speed up the construction progress.
[0055] Furthermore, if Figure 1 and Figure 2As shown, the stockpiles 3 in the plurality of stockpiling areas 11 gradually increase in the order in which the tailings or waste rocks are discharged. For example, the tailings and waste rocks are discharged into the stockpile 1 in the order of the first area 111, the second area 112, the third area 113 and the fourth area 114, so the plurality of stockpiles 3 gradually increase in the order of the first area 111, the second area 112, the third area 113 and the fourth area 114, thereby improving the efficiency of the combined treatment of tailings and waste rocks, accelerating the construction progress, and achieving a better stockpiling effect of tailings and waste rocks.
[0056] In some embodiments, Figure 2 and Figure 3 As shown, the upper layer of the stockpile 3 is inclined downward in the direction away from the retaining dam 2, so that a backwater area 12 is defined between the stockpile 3 and the stockpile yard 1. A backwater device 5 is provided in the backwater area 12 to transport the clarified water in the backwater area 12 to the recycling plant for recycling. It can be understood that Figure 2 As shown, the stockpile body 3 is inclined toward the right side and forms a backwater area 12 with the stockpile yard 1. In the combined treatment method of tailings and waste rock of the embodiment of the present invention, a backwater area 12 and a backwater device 5 are set in the stockpile yard 1. The size of the backwater area 12 meets the water quality clarification requirement in the stockpile yard 1. The clarified water is returned to the concentrator through the backwater device 5 for recycling, so as to minimize the amount of water in the stockpile yard 1, thereby improving the safety of the stockpile yard 1.
[0057] Optionally, the slope of the upper layer of the stockpile 3 is 0.003-0.05, for example, the slope of the upper layer of the stockpile 3 is 0.01, 0.02 or 0.03. When the slope of the upper layer of the stockpile 3 is set to the above value, it is beneficial to the flood control safety of the stockpile site and to the water return.
[0058] Furthermore, if Figures 1 to 3 As shown, a seepage collection device 6 is provided downstream of the retaining dam 2, and the seepage collection device 6 is used to transport the seepage water to the storage yard 1. A flood discharge device 7 is provided in the storage yard 1, and the flood discharge device 7 is used to discharge the flood water outside the storage yard 1. The combined treatment method for tailings and waste rock of the embodiment of the present invention collects possible seepage water and transports it back to the storage site to prevent environmental pollution by providing the seepage collection device 6; the combined treatment method for tailings and waste rock of the embodiment of the present invention can improve the safety of the storage yard 1 by providing the flood discharge device 7, and has a strong ability to resist natural disasters.
[0059] Alternatively, if Figure 2 and Figure 3As shown, the thickness of the bottom waste rock layer 31 in the storage yard 1 is greater than or equal to 1.0m, and the thickness of the bottom tailings layer 32 in the storage yard 1 is greater than or equal to 0.5m. For example, the thickness of the bottom waste rock layer 31 in the storage yard 1 is 5m, and the thickness of the bottom tailings layer 32 in the storage yard 1 is 1.5m. The thickness of each subsequent layer of tailings and waste rock can be adjusted according to specific production, meteorological conditions, etc., for example, it can range from 0.3m to 20m. The tailings and waste rock combined treatment method of the embodiment of the present invention can improve the stacking structural strength between the tailings layer 32 and the waste rock layer 31 by controlling the thickness of the tailings layer 32 and the waste rock layer 31, thereby improving the safety of the storage yard 1.
[0060] In a specific embodiment, Figure 1 and Figure 2 As shown, a certain open-pit mining project has a normal production operation period of 10 years and a capital construction period of 2 years. The waste rock output during the capital construction period is 50 million tons, and the waste rock output during the normal production period is 10 million tons / year. During the normal production period, the tailings produced by the ore dressing plant are 15 million tons / year. And due to the limitation of land area and the need to save investment, the combined treatment method of tailings and waste rock of the present invention is considered to be implemented. The tailings concentration is thickened to 65% weight concentration by a thickener and transported to a storage yard 1 through a pipeline; the waste rock is transported mechanically.
[0061] In this embodiment, the storage yard 1 is constructed in three phases. First, a first-phase retaining dam 21, a flood discharge device 7, a seepage water collection device 6, a return water device 5 and a tailings conveying pipeline 8 are constructed.
[0062] The first step is to discharge the excess waste rock during the mine construction period into the bottom of the stockpile 1;
[0063] In the second step, waste rock is used to set up a dike 4 in the storage yard 1 to divide the storage yard 1 into four areas. The high-concentration tailings are first discharged into the first area 111 through the tailings conveying pipeline 8 for deposition, and then discharged into the second area 112, the third area 113 and the fourth area 114. At the same time, the tailings discharged from the second area 112 will gradually consolidate and the bearing capacity will increase.
[0064] In the third step, the waste rock is transported to the first area 111 by vehicles or other mechanical equipment and then discharged in the second area 112, the third area 113 and the fourth area 114 in sequence. Meanwhile, the tailings are discharged in the areas where the waste rock has been discharged in sequence.
[0065] Step 4: Each area in the stockpile 1 rises synchronously in sequence, and the stockpile 3 as a whole slopes toward the backwater area 12 with a slope of 0.01;
[0066] In the fifth step, the tailings discharge and waste rock discharge are carried out synchronously. After the tailings are discharged, the water return device 5 can be started to transport the clarified water in the reservoir back to the concentrator for recycling. At the same time, the seepage water collection device 6 set in the surrounding area is started;
[0067] Step 6: As the stockpile in the stockpile yard 1 rises, the second-phase retaining dam 22 and other devices are constructed in advance;
[0068] Step seven: discharge the last batch of waste rock, discharge the last tailings, and close storage site 1.
[0069] Among them, in this embodiment, the thickness of the first layer of waste rock in the storage yard 1 is about 5m; the thickness of the first layer of tailings deposition is 1.5m, and the thickness of each layer of tailings and waste rock is adjusted according to the specific production, meteorological conditions and other conditions.
[0070] Compared with building a tailings pond and a spoil dump at the same time, the floor space occupied by building a storage yard 1 using the tailings and waste rock joint treatment method of the embodiment of the present invention is reduced by 60%, and the project investment is reduced by 50%. At the same time, 5 post-operation management personnel are reduced, thereby reducing the labor cost of operation and management.
[0071] In addition, in this embodiment, the average bulk dry density of the tailings stored separately is about 1.5 tons / m3; the average bulk dry density of the waste rock stored separately is about 2.05 tons / m3; the average bulk dry density of the composite pile after the wet tailings and waste rock are mixed is about 2.2 tons / m3, which is greater than the average bulk dry density of the tailings and waste rock stored separately.
[0072] Compared with building a tailings pond separately, the amount of water in the storage site 1 is less and the safety is higher.
[0073] Compared with building a separate spoil dump, the acidity of the stockpile in dump 1 is greatly reduced, and it is more environmentally friendly.
[0074] The construction of a storage site reduces the number of hazardous and pollution sources, which is beneficial to safety and environmental protection.
[0075] like Figure 3 As shown, in another specific embodiment, a mine is treated by the combined tailings and waste rock treatment method of the embodiment of the present invention. There is less waste rock during the infrastructure construction period. After the storage yard 1 is built, tailings are discharged first, and then waste rock is discharged as waste rock is produced. The partition dike 4 in the yard is filled with tailings, and the subsequent discharge operation sequence is consistent with the implementation method of the previous specific embodiment of the embodiment.
[0076] According to another embodiment of the present invention, a tailings and waste rock combined processing system includes: a storage yard 1, a retaining dam 2 and a storage body 3, wherein the retaining dam 2 is arranged downstream of the storage yard 1, and the storage body 3 is arranged in the storage yard 1, and the storage body 3 includes a waste rock layer 31 and a tailings layer 32, and the waste rock layer 31 and the tailings layer 32 are alternately stacked in a bottom-to-top direction to form the storage body 3.
[0077] like Figures 2 to 3 As shown, according to the tailings and waste rock joint processing system of the embodiment of the present invention, by using waste rock to build a retaining dam 2, and arranging the waste rock layer 31 and the tailings layer 32 alternately from bottom to top in the storage yard 1, the tailings and waste rock can be processed in a coordinated manner to reduce the floor area of the storage yard 1, improve land utilization efficiency, and save land resources. In addition, the density of the storage body 3 of the tailings and waste rock joint processing system of the embodiment of the present invention is relatively large, and the amount of water stored in the storage yard 1 is relatively small, which can make the use of tailings and waste rock storage safer and conducive to the later closure of the storage. In addition, the tailings and waste rock joint processing system of the embodiment of the present invention can reduce the engineering investment of the tailings and waste rock disposal device and reduce the construction cost.
[0078] In some embodiments, Figures 2 to 3 As shown, a dike 4 is provided in the storage yard 1, which divides the storage yard 1 into multiple storage areas 11. Each storage area 11 is provided with a storage body 3. The storage bodies 3 in the multiple storage areas 11 gradually rise along the discharge sequence of tailings or waste rocks.
[0079] Specifically, Figure 1 and Figure 2 As shown, the plurality of storage areas 11 include a first area 111, a second area 112, a third area 113 and a fourth area 114, and the first area 111, the second area 112, the third area 113 and the fourth area 114 are arranged in sequence around the circumference of the storage yard 1. In other words, the dike 4 is cross-shaped to roughly divide the storage yard 1 into four equal parts. The tailings are first discharged into the first area 111, and then discharged into the second area 112, the third area 113 and the fourth area 114. At the same time, the tailings discharged into the first area 111 are gradually consolidated, and the bearing capacity increases. Therefore, the waste rock can be discharged into the first area 111, and then discharged in the second area 112, the third area 113 and the fourth area 114 in sequence, and the discharge through the tailings does not stop. Therefore, the tailings and waste rock combined treatment method of the embodiment of the present invention discharges the tailings into each storage area 11 in the same order as the waste rock is discharged into each storage area 11, which can improve the efficiency of the tailings and waste rock combined treatment and speed up the construction progress.
[0080] In some embodiments, Figure 2 and Figure 3 As shown, the slope of the upper layer of the stockpile 3 is 0.003-0.05.
[0081] Furthermore, if Figures 1 to 3 As shown, a seepage collection device 6 is provided downstream of the retaining dam 2, and the seepage collection device 6 is used to transport the seepage water to the storage yard 1. A flood discharge device 7 is provided in the storage yard 1, and the flood discharge device 7 is used to discharge water outside the storage yard 1. The tailings and waste rock joint treatment system of the embodiment of the present invention collects possible seepage water from the storage yard and returns it to the yard to prevent environmental pollution by providing the seepage collection device 6; the tailings and waste rock joint treatment system of the embodiment of the present invention can improve the safety of the storage yard 1 by providing the flood discharge device 7, and has a strong ability to resist natural disasters.
[0082] In summary, the tailings and waste rock joint treatment system constructed by the tailings and waste rock joint treatment method of the embodiment of the present invention combines the tailings pond and the spoil dump into one, which can improve land utilization efficiency and save land resources; it can reduce the engineering investment in tailings and waste rock disposal facilities and save operating costs; it is beneficial to reduce the acidity of waste rock and is beneficial to environmental protection; it can improve the safety of tailings accumulation sites; it can increase the average accumulation dry density of the accumulation body; and it can reduce the amount of water in the tailings storage yard 1, which is beneficial to the later closure of the storage yard.
[0083] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0084] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0085] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0086] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0087] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0088] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for combined treatment of tailings and waste rock, characterized in that: The following steps are involved: S1: Use waste rock to build a first-stage retaining dam downstream of the storage site; S2: discharging waste rock into the stockpile to form a waste rock layer; S3: discharging tailings into the storage yard to form a tailings layer, wherein the tailings layer is located above the waste rock layer; S4: repeat S2 and S3, so that the waste rock layer and the tailings layer are alternately stacked from bottom to top to a first target height, and the first target height is not higher than the height of the first-stage retaining dam; S5: Repeat S1 to S4 until all waste rocks and tailings are discharged into the storage yard; Using waste rock or tailings to build a dike in the storage yard, the dike divides the storage yard into a plurality of storage areas, and in each storage area, the waste rock layer and the tailings layer are alternately stacked from top to bottom; The thickness of the lowest waste rock layer in the storage yard is greater than or equal to 1.0 m, and the thickness of the lowest tailings layer in the storage yard is greater than or equal to 0.5 m; The tailings layer and the waste rock layer are stacked alternately to form a stockpile, the upper layer of the stockpile is inclined downward in a direction away from the retaining dam, so that a backwater area is defined between the stockpile and the stockpile field, and a backwater device is provided in the backwater area to transport the clarified water in the backwater area to the recycling plant for recycling; A seepage water collection device is provided downstream of the first-stage retaining dam, and the seepage water collection device is used to transport the seepage water to the storage yard; A flood discharge device is provided in the storage yard, and the flood discharge device is used to discharge the flood water outside the storage yard; S6: After the tailings are discharged, the water return device is started to transport the clarified water in the water return area back to the concentrator for recycling. At the same time, the seepage collection device set up in the surrounding area is started.
2. The combined treatment method of tailings and waste rock according to claim 1, characterized in that: The plurality of storage areas are sequentially arranged around the circumference of the storage yard, and the order in which the tailings are discharged into the respective storage areas is consistent with the order in which the waste rocks are discharged into the respective storage areas.
3. The combined treatment method of tailings and waste rock according to claim 1, characterized in that: The slope of the upper layer of the stockpile is 0.003-0.
05.
4. The combined treatment method of tailings and waste rock according to claim 1, characterized in that: Before the tailings are discharged into the stockpile, the mass concentration of the tailings is concentrated to more than 60%, and the tailings are wet-discharged in different areas within the stockpile.
5. A tailings and waste rock combined treatment system, used for implementing the tailings and waste rock combined treatment method as claimed in any one of claims 1 to 4, characterized in that: include: A stockpile, a retaining dam and a stockpile body, wherein the retaining dam is arranged downstream of the stockpile, the stockpile body is arranged in the stockpile, the stockpile body comprises a waste rock layer and a tailings layer, the waste rock layer and the tailings layer are alternately stacked and arranged from bottom to top to form the stockpile body; a partition is arranged in the stockpile, the partition divides the stockpile into a plurality of stockpile areas, each of the stockpile areas is provided with the stockpile body, and the stockpile bodies in the plurality of stockpile areas are gradually raised in the order of discharge of tailings or waste rock; The upper layer of the stockpile body is inclined downward in the direction away from the retaining dam, and the slope of the upper layer of the stockpile body is 0.003-0.
05. A backwater area is defined between the upper layer of the stockpile body and the stockpile yard. A backwater device is provided in the backwater area to transport the clarified water in the backwater area to the recycling plant for recycling.
Citation Information
Patent Citations
Backfill handling method for activity subsidence area of mine
CN103216239A
Dry heaping and wet discharging combined tailing heaping and discharging method
CN103397645A
Method for strengthening dry tailing storage yard by utilizing barren rocks
CN105040711A
Mine waste rock and concentrated tailing co-processing system and construction method
CN112709233A
Tailing pond mold bag dam grid stockpiling structure and grid stockpiling method
CN113789758A