Blockchain-based cost management method, system and medium

By building a blockchain cost management system in real estate projects of real estate companies, using asymmetric encryption and secure multi-party computing protocols, the opacity and compliance issues of cost data management are solved, and data privacy and accuracy are guaranteed, ensuring that Compliance and accountability of construction content.

CN115063099BActive Publication Date: 2024-12-03SHANGHAI WANXIANG BLOCK CHAIN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210640435.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-08
Publication Date
2024-12-03
Estimated Expiration
2042-06-08

AI Technical Summary

Technical Problem

The existing technology has problems such as opaque cost data management, data loss and untrustworthy in real estate projects of real estate companies, and the lack of supervision from the supervision unit, which makes it difficult to guarantee the construction content and cost compliance, and the data upload of subcontractors is false. It is difficult to hold accountable.

Method used

Build a cost management system based on blockchain, set up participant nodes through the alliance chain, use asymmetric encryption and secure multi-party computing protocols, and supervising units, consulting units and subcontracting units jointly conduct data compliance reviews to ensure data privacy and accuracy, and enable automated reviews to avoid manual errors.

Benefits of technology

Effectively prevent unfair competition among subcontractors, ensure the privacy and security of cost data, ensure the accuracy and compliance of visa change data, clarify the accountability subject, avoid data loss and manual violations Behavior, eliminating cost black holes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115063099B_ABST
    Figure CN115063099B_ABST
Patent Text Reader

Abstract

The present invention provides a cost management method, system and medium based on blockchain, including: building an underlying alliance chain, setting nodes of participants related to cost management business of real estate enterprises; pre-setting compliance data of visa changes in the form of data sets; deploying a secure multi-party protocol on the chain; the participant nodes generate public keys a and private keys b for managing their own data; the subcontracting unit node that initiates the change encrypts the content and amount data involved in the visa change with its own public key a to obtain a ciphertext a', stores a' on the chain, and publishes it to the network; the supervision and consulting units jointly call a secure multi-party computing protocol, input a preset compliance data set of visa changes; the subcontracting unit node inputs the ciphertext content of a'; the supervision, consulting and subcontracting units perform secure multi-party computing, the supervision and consulting units obtain calculation results A, and the subcontracting unit obtains result B; the calculation results A and B are compared and returned to the supervision, consulting and subcontracting units.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering cost data management, and in particular, to a real estate developer cost management method based on blockchain, and in particular to a blockchain-based cost management method, system and medium. Background Art

[0002] At present, domestic real estate companies have achieved certain results in their transformation towards a refined operation model. However, they still cannot eliminate many existing problems in terms of the clarification of responsibilities and management of subcontractors, and the fairness and justice of the review by supervision units and consulting units. As a result, in the specific construction of real estate projects, real estate companies cannot truly eliminate black holes, refine operations, and effectively manage personnel. Instead, they fail to reasonably coordinate the relationship and interest balance between the various participants.

[0003] At present, the collection and storage of all visa change documents on project sites rely on paper records and manual collection and custody, which can easily lead to the loss and backlog of documents. Human illegal operations are also uncontrollable factors, and all data are directly saved in plain text. This inefficient and unsecured cost data management method is likely to cause data loss and omissions; second, data reporting and management personnel may be unreliable; third, open and transparent review and supervision is required between supervisors and consultants, and a certain degree of data privacy needs to be guaranteed between subcontractors. The above are three points that need to be solved in order to achieve cost management of real estate companies and eliminate black holes.

[0004] The invention patent with the publication number CN112699182A discloses a construction cost data management system, including a sorting module, a blockchain processing module, an acquisition module, an information extraction module, a calculation module, a data storage module, a verification module, a decryption module, and an addition module. Although this method can ensure that the fake data of the visa change on the project can be stored on the chain in time without omission or loss, the behavior of simply recording the data of the cost unit on the chain is not rigorous enough. Without the supervision of the supervision unit, the compliance of the construction content and the cost cannot be guaranteed; and skipping the step of subcontracting units uploading their own data, it is impossible to quickly and accurately hold accountable in the event of false data. Only by allowing the three parties to collaborate and calculate on the chain can we truly avoid the problems of false data, unclear responsibilities, and uncontrollable costs of real estate companies. Summary of the invention

[0005] In view of the defects in the prior art, the present invention provides a cost management method, system and medium based on blockchain.

[0006] According to a blockchain-based cost management method, system and medium provided by the present invention, the scheme is as follows:

[0007] In a first aspect, a blockchain-based cost management method is provided, the method comprising:

[0008] Step S1: Build the underlying alliance chain and set up nodes for relevant participants in the real estate enterprise cost management business, where the relevant participants include the real estate enterprise cost management department, the general contractor, each subcontractor, the consulting unit and the supervision unit;

[0009] Step S2: The supervision unit and the consulting unit pre-set the compliance data of the visa changes in accordance with the industry standards during the construction process in the form of data sets;

[0010] Step S3: deploy a secure multi-party protocol on the chain to be used by the supervision unit and the consulting unit to perform compliance review on the data published by the general contractor or subcontractor node;

[0011] Step S4: All relevant participant nodes generate public key a and private key b locally to manage their own data;

[0012] Step S5: Once a visa change occurs at the project construction site, the subcontractor node that initiates the change uses its own public key a to encrypt the content and amount data involved in the visa change, obtains the ciphertext a', stores a' on the chain, and publishes it to the network;

[0013] Step S6: The supervision unit and the consulting unit jointly call the secure multi-party computing protocol and input the compliance data set of the visa change preset in step S2; at the same time, the subcontracting unit node inputs the a' ciphertext content;

[0014] Step S7: The supervision unit, the consulting unit, and the subcontracting unit perform a secure multi-party computation. The supervision unit and the consulting unit obtain the calculation result A, and the subcontracting unit obtains the result B.

[0015] Step S8: Compare the calculation results A and B and return them to the supervision unit, consulting unit and subcontractor.

[0016] Preferably, the step S1 includes: the general contractor and each subcontractor are specific construction parties undertaking the real estate project of the real estate enterprise;

[0017] The consulting unit is a third-party cost consulting agency that provides certification and guidance for cost changes related to visa changes on projects;

[0018] The supervision unit is a third-party construction supervision agency that issues certification and guidance on the rationality of visa changes on the project.

[0019] Preferably, the step S8 includes: if the result B is less than or equal to the result A, it is determined that the a' ciphertext has passed the compliance review, and each node in the entire network will record the verified a' information.

[0020] Preferably, the step S8 further includes: if the result B is greater than or equal to the result A, the ciphertext a' will not be recorded on the chain by each node, and at the same time, the subcontracting unit corresponding to the node will be held accountable and reviewed.

[0021] In a second aspect, a blockchain-based cost management system is provided, the system comprising:

[0022] Module M1: Build the underlying alliance chain and set up nodes for relevant participants in the real estate enterprise cost management business, including the real estate enterprise cost management department, general contractor, subcontractors, consulting units and supervision units;

[0023] Module M2: The supervision unit and the consulting unit pre-set the compliance data of the visa changes in accordance with the industry standards during the construction process, which exists in the form of data sets;

[0024] Module M3: Deploy a secure multi-party protocol on the chain to calculate the compliance review of the data published by the general contractor or subcontractor nodes by the supervision unit and the consulting unit;

[0025] Module M4: All relevant participant nodes generate public key a and private key b locally to manage their own data;

[0026] Module M5: Once a visa change occurs at the project construction site, the subcontractor node that initiates the change uses its own public key a to encrypt the content and amount data involved in the visa change, obtains the ciphertext a', stores a' on the chain, and publishes it to the network;

[0027] Module M6: The supervision unit and the consulting unit jointly call the secure multi-party computing protocol and input the compliance data set of the visa change preset in module M2; at the same time, the subcontracting unit node inputs the a' ciphertext content;

[0028] Module M7: The supervision unit, consulting unit and subcontracting unit conduct safety multi-party calculation. The supervision unit and consulting unit obtain calculation result A, and the subcontracting unit obtains result B.

[0029] Module M8: Compare the calculation results A and B and return them to the supervision unit, consulting unit and subcontractor.

[0030] Preferably, the module M1 includes: the general contractor and each subcontractor are the specific construction parties undertaking the real estate project of the real estate enterprise;

[0031] The consulting unit is a third-party cost consulting agency that provides certification and guidance for cost changes related to visa changes on projects;

[0032] The supervision unit is a third-party construction supervision agency that issues certification and guidance on the rationality of visa changes on the project.

[0033] Preferably, the module M8 includes: if the result B is less than or equal to the result A, it is determined that the a' ciphertext has passed the compliance review, and each node in the entire network will record the verified a' information.

[0034] Preferably, the module M8 further includes: if the result B is greater than or equal to the result A, the ciphertext a' will not be recorded on the chain by each node, and at the same time, the subcontracting unit corresponding to the node will be held accountable and reviewed.

[0035] According to a third aspect, a computer-readable storage medium storing a computer program is provided, wherein the computer program implements the steps of the method when executed by a processor.

[0036] Compared with the prior art, the present invention has the following beneficial effects:

[0037] 1. By adopting asymmetric encryption, the visa change information between subcontractors is converted from plain text to ciphertext and then stored on the chain. This not only ensures that the subcontractors cannot view each other's project quantities and amounts, effectively preventing unfair competition between subcontractors; it also ensures the privacy of each real estate company's specific construction data and amounts, and ensures the security of data storage even when the blockchain is attacked maliciously;

[0038] 2. By adopting the decentralized distributed accounting model of blockchain, the loss and backlog of visa change documents caused by the paper document reporting model in real estate projects of real estate companies in the past are avoided. At the same time, the subject of accountability is clarified to prevent concealment, omission and false reporting of a subcontractor. In this way, it is ensured that the cost data involved in all visa changes in the project can be recorded in the account in a timely and accurate manner;

[0039] 3. By adopting a secure multi-party computing protocol, not only can the supervision and consulting units be encouraged to supervise each other, ensuring that both parties adopt unified and compliant standards to review visa changes; at the same time, the review process is also de-manualized, relying entirely on automatic calculations by the protocol code, thus avoiding calculation errors and violations in manual reviews, ensuring the accuracy of visa change data, and effectively eliminating cost black holes for real estate companies. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0041] Figure 1 It is an overall schematic block diagram of the present invention. DETAILED DESCRIPTION

[0042] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0043] The embodiment of the present invention provides a cost management method based on blockchain, referring to Figure 1 As shown, the method specifically includes:

[0044] Step S1: Build the underlying alliance chain and set up nodes for participants related to real estate companies’ cost management business.

[0045] Among them, the relevant participants include the cost management department of the real estate company, the general contractor, each subcontractor, the consulting unit and the supervision unit. The general contractor and each subcontractor are the specific construction parties responsible for the real estate project of the real estate company; the consulting unit is a third-party cost consulting agency that issues certification and guidance for the cost changes involved in the project visa changes; the supervision unit is a third-party construction supervision agency that issues certification and guidance for the rationality of the project visa changes.

[0046] Step S2: The supervision unit and the consulting unit pre-set the compliance data of the visa changes in the construction process that complies with the industry standards in the form of a data set.

[0047] Step S3: Deploy a secure multi-party protocol on the chain to be used by the supervision unit and the consulting unit to perform compliance review on the data published by the general contractor or subcontractor node.

[0048] Step S4: All relevant participant nodes locally generate public key a and private key b for managing their own data.

[0049] Step S5: Once a visa change occurs at the project construction site, the subcontracting unit node that initiates the change needs to use its own public key a to encrypt the content and amount data involved in the visa change, obtain the ciphertext a', store a' on the chain, and publish it to the network.

[0050] Step S6: The supervision unit and the consulting unit jointly call the secure multi-party computing protocol and input the compliance data set of the visa change preset in step S2; at the same time, the subcontracting unit node inputs the a' ciphertext content.

[0051] Step S7: The supervision unit, the consulting unit, and the subcontracting unit perform a secure multi-party calculation. The supervision unit and the consulting unit obtain calculation result A, and the subcontracting unit obtains result B.

[0052] Step S8: Compare the calculation results A and B and return them to the supervision unit, consulting unit and subcontractor. If the result B is less than or equal to the result A, it is determined that the a' ciphertext has passed the compliance review, and each node in the entire network will record the verified a' information; if the result B is greater than or equal to the result A, the a' ciphertext will not be recorded on the chain by each node, and the subcontractor corresponding to the node will be held accountable.

[0053] The present invention also provides a blockchain-based cost management system, which specifically includes:

[0054] Module M1: Build the underlying alliance chain and set up nodes for participants related to real estate companies’ cost management business.

[0055] Among them, the relevant participants include the real estate company's cost management department, general contractor, subcontractors, consulting units and supervision units; the general contractor and subcontractors are the specific construction parties responsible for the real estate projects of the real estate company; the consulting unit is a third-party cost consulting agency that issues certification and guidance for cost changes related to visa changes on the project; the supervision unit is a third-party construction supervision agency that issues certification and guidance for the rationality of visa changes on the project.

[0056] Module M2: The supervision unit and the consulting unit pre-set the compliance data of the visa changes in the construction process that complies with the industry standards in the form of data sets.

[0057] Module M3: Deploy a secure multi-party protocol on the chain to enable supervision units and consulting units to perform compliance review on data published by the general contractor or subcontractor nodes.

[0058] Module M4: All relevant participant nodes generate public key a and private key b locally to manage their own data.

[0059] Module M5: Once a visa change occurs at the project construction site, the subcontracting unit node that initiates the change needs to use its own public key a to encrypt the content and amount data involved in the visa change, obtain the ciphertext a', store a' on the chain, and publish it to the network.

[0060] Module M6: The supervision unit and the consulting unit jointly call the secure multi-party computing protocol and input the compliance data set of the visa change preset in module M2; at the same time, the subcontracting unit node inputs the a' ciphertext content.

[0061] Module M7: The supervision unit, consulting unit and subcontracting unit conduct a safety multi-party calculation. The supervision unit and consulting unit obtain the calculation result A, and the subcontracting unit obtains the result B.

[0062] Module M8: Compare the calculation results A and B and return them to the supervision unit, consulting unit and subcontractor. If the result B is less than or equal to the result A, the a' ciphertext is judged to have passed the compliance review, and each node in the entire network will record the verified a' information. If the result B is greater than or equal to the result A, the a' ciphertext will not be recorded on the chain by each node, and the subcontractor corresponding to the node will be held accountable for review.

[0063] The embodiments of the present invention provide a blockchain-based cost management method, system and medium. As the internal cost management of real estate companies continues to shift towards reducing costs and increasing efficiency and eliminating cost black holes, the original offline manual collection of cost change data is changed to an online distributed accounting method. By using asymmetric encryption and secure multi-party computing protocols, the problems of false data and difficulty in accountability caused by paper documents and offline manual management are avoided, the authenticity and validity of cost data are guaranteed, and the cost planning and management of real estate companies are enabled.

[0064] Those skilled in the art know that, in addition to realizing the system and its various devices, modules, and units provided by the present invention in a purely computer-readable program code, it is entirely possible to realize the same functions in the form of logic gates, switches, application-specific integrated circuits, programmable logic controllers, and embedded microcontrollers by logically programming the method steps. Therefore, the system and its various devices, modules, and units provided by the present invention can be considered as a hardware component, and the devices, modules, and units included therein for realizing various functions can also be regarded as structures within the hardware component; the devices, modules, and units for realizing various functions can also be regarded as both software modules for realizing the method and structures within the hardware component.

[0065] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.

Claims

1. A cost management method based on blockchain, characterized in that: include: Step S1: Build the underlying alliance chain and set up nodes for relevant participants in the real estate enterprise cost management business, where the relevant participants include the real estate enterprise cost management department, the general contractor, each subcontractor, the consulting unit and the supervision unit; Step S2: The supervision unit and the consulting unit pre-set the compliance data of the visa changes in accordance with the industry standards during the construction process in the form of data sets; Step S3: deploy a secure multi-party protocol on the chain to be used by the supervision unit and the consulting unit to perform compliance review on the data published by the general contractor or subcontractor node; Step S4: All relevant participant nodes generate public key a and private key b locally to manage their own data; Step S5: Once a visa change occurs at the project construction site, the subcontractor node that initiates the change uses its own public key a to encrypt the content and amount data involved in the visa change, obtains the ciphertext a', stores a' on the chain, and publishes it to the network; Step S6: The supervision unit and the consulting unit jointly call the secure multi-party computing protocol and input the compliance data set of the visa change preset in step S2; at the same time, the subcontracting unit node inputs the a' ciphertext content; Step S7: The supervision unit, the consulting unit, and the subcontracting unit perform a secure multi-party computation. The supervision unit and the consulting unit obtain the calculation result A, and the subcontracting unit obtains the result B. Step S8: Compare the calculation results A and B and return them to the supervision unit, consulting unit and subcontractor; The step S1 includes: the general contractor and each subcontractor are the specific construction parties undertaking the real estate project of the real estate enterprise; The consulting unit is a third-party cost consulting agency that provides certification and guidance for cost changes related to visa changes on projects; The supervision unit is a third-party construction supervision agency that provides certification and guidance on the rationality of visa changes on the project; The step S8 includes: if the result B is less than or equal to the result A, it is determined that the a' ciphertext has passed the compliance review, and each node in the entire network will record the verified a' information; The step S8 also includes: if the result B is greater than or equal to the result A, the a' ciphertext will not be recorded on the chain by each node, and the subcontracting unit corresponding to the node will be held accountable and reviewed.

2. A blockchain-based cost management system, characterized in that: include: Module M1: Build the underlying alliance chain and set up nodes for relevant participants in the real estate enterprise cost management business, including the real estate enterprise cost management department, general contractor, subcontractors, consulting units and supervision units; Module M2: The supervision unit and the consulting unit pre-set the compliance data of the visa changes in accordance with the industry standards during the construction process, which exists in the form of data sets; Module M3: Deploy a secure multi-party protocol on the chain to calculate the compliance review of the data published by the general contractor or subcontractor nodes by the supervision unit and the consulting unit; Module M4: All relevant participant nodes generate public key a and private key b locally to manage their own data; Module M5: Once a visa change occurs at the project construction site, the subcontractor node that initiates the change uses its own public key a to encrypt the content and amount data involved in the visa change, obtains the ciphertext a', stores a' on the chain, and publishes it to the network; Module M6: The supervision unit and the consulting unit jointly call the secure multi-party computing protocol and input the compliance data set of the visa change preset in module M2; at the same time, the subcontracting unit node inputs the a' ciphertext content; Module M7: The supervision unit, consulting unit and subcontracting unit conduct safety multi-party calculation. The supervision unit and consulting unit obtain calculation result A, and the subcontracting unit obtains result B. Module M8: Compare the calculation results A and B and return them to the supervision unit, consulting unit and subcontractor; The module M1 includes: the general contractor and each subcontractor are the specific construction parties who undertake the real estate project of the real estate enterprise; The consulting unit is a third-party cost consulting agency that provides certification and guidance for cost changes related to visa changes on projects; The supervision unit is a third-party construction supervision agency that provides certification and guidance on the rationality of visa changes on the project; The module M8 includes: if the result B is less than or equal to the result A, it is determined that the a' ciphertext has passed the compliance review, and each node in the entire network will record the verified a' information; The module M8 also includes: if the result B is greater than or equal to the result A, the a' ciphertext will not be recorded on the chain by each node, and the subcontracting unit corresponding to the node will be held accountable and reviewed.

3. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method described in claim 1 are implemented.