Method, system, device and storage medium for generating structural data based on case library
Through the structural data generation method based on the case library, the construction plan of the airport construction project is automatically generated, which solves the problem of cumbersome steps of manually formulating construction plans by users, and improves the efficiency and accuracy of the construction plan.
Patent Information
- Application Number
- CN202210662832.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-13
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2042-06-13
AI Technical Summary
In airport construction projects, users need to manually formulate project workflow diagrams, which leads to cumbersome and inefficient steps in the construction plan.
Using the structural data generation method based on the case library, we automatically generate the project construction plan by obtaining engineering project tasks, retrieving multiple requirements, determining project target items and generating engineering constraint items, and pushing it to the smart terminal to simplify the construction plan formulation steps.
The construction plan is determined automatically, which reduces the steps of users to manually formulate work flow charts, and improves the efficiency and accuracy of construction plans.
Smart Images

Figure CN115063101B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering project production and generation, and in particular to a method, system, device and storage medium for generating structural data based on a case library. Background Art
[0002] Airport construction projects are usually large and complex projects that require coordination among multiple parties and full use of information processing technology to more efficiently complete the construction tasks of airport projects. Among them, information processing technology can be used to build an airport construction project management system for unified management of airport construction projects, which is convenient for the coordination of the work of various project departments and construction parties to improve airport construction.
[0003] For related technologies, reference may be made to Chinese patent publication number CN110321467A, which discloses a method, device, system, equipment and medium for displaying project information of an airport construction project. The terminal sends a project information acquisition request carrying a project identifier to a server, and the server sends a corresponding project workflow diagram and project information to the terminal; the project workflow diagram is provided with a plurality of milestone nodes corresponding to a plurality of project stages of the airport construction project, and the nodes are connected in sequence according to the process sequence of the plurality of project stages, and the project information includes a plurality of milestone node information; the terminal displays the project workflow diagram and displays the milestone node information of the milestone node selected by the user.
[0004] With respect to the above-mentioned related technologies, the inventors believe that the following defects exist: before users carry out airport construction work, they need to prepare a project workflow diagram for the airport in advance according to the requirements of various parties, and then carry out corresponding project construction for the airport. Users manually prepare the project workflow diagram, which has the defect that the steps for preparing the airport construction plan are relatively cumbersome. Summary of the invention
[0005] In order to efficiently and reasonably determine the construction plan of a new airport, the present application provides a method, system, device and storage medium for generating structural data based on a case library.
[0006] In the first aspect, the present application provides a method for generating structural data based on a case library, which adopts the following technical solution:
[0007] The method for generating structural data based on a case library includes the following steps:
[0008] Get engineering project tasks;
[0009] According to the engineering project task, retrieve multiple requirements corresponding to the engineering project task;
[0010] Determine multiple engineering target items according to the engineering project tasks and the requirements of multiple parties;
[0011] Generate engineering constraint items corresponding to the determined engineering target items according to the determined engineering target items and the retrieved multi-party requirements;
[0012] Generate a project construction plan based on the project target items and the project constraint items;
[0013] Push the project construction plan to the user's smart terminal.
[0014] By adopting the above technical solution, before the user starts construction on the new airport, the user inputs the project task of the new airport into the data generation system. The data generation system retrieves the multi-party construction requirements corresponding to the current engineering project according to the engineering projects that need to be completed by the airport project. The data generation system determines multiple engineering target items that need to be completed according to the above project tasks and multi-party construction requirements, and generates engineering constraint items corresponding to the engineering target items, and makes corresponding requirements and constraints on the engineering results and engineering processes of the engineering target items. The data generation system generates a project construction plan according to the engineering target items and the corresponding engineering constraint items, and pushes the project construction plan to the user's smart terminal, so that the data generation system can automatically determine the construction plan of the new airport efficiently and reasonably, thereby eliminating the need for users to manually draw up a project workflow diagram, thereby simplifying the steps of drawing up the project construction plan.
[0015] Optionally, before the step of generating the engineering constraint items corresponding to the determined engineering target items, the step further includes:
[0016] Acquire construction project information corresponding to the engineering project task, wherein the construction project information includes construction duration parameters, construction environment parameters, and city characteristic parameters;
[0017] According to the construction project information, retrieve case project information corresponding to the construction project information;
[0018] If case project information corresponding to the construction project information is obtained, then specific case data corresponding to the case project information is determined according to the retrieved case project information;
[0019] Generate a case library narrowing list based on the specific case data;
[0020] According to the case library narrowing list, the step of generating engineering constraint items corresponding to the determined engineering target items is performed.
[0021] By adopting the above technical solution, the data generation system pre-screens the cases in the case library according to the construction project information of the current data, and performs the generation steps of engineering constraints according to the narrowed list of the case library that is the same as the current project case situation, thereby making the constraint generation process more reliable.
[0022] Optionally, after the step of retrieving case project information corresponding to the construction project information, the method further includes:
[0023] If case project information corresponding to the construction project information is not obtained, searching for similar case project information according to the construction project information, wherein the similar case project information is the project information with the most items corresponding to the construction project information in a preset database;
[0024] According to the approximate case project information, the step of determining the specific case data corresponding to the case project information is performed.
[0025] By adopting the above technical solution, when the data generation system cannot determine the case project information that completely corresponds to the construction project information, the data generation system determines the approximate case project information through fuzzy screening, and performs the step of generating engineering constraint items based on the closest existing case.
[0026] Optionally, after the step of generating a project construction plan, the step further includes:
[0027] Generate a key node decomposition instruction according to the project construction plan, wherein the key node decomposition instruction is used to decompose the project construction plan into multiple work progress problem nodes;
[0028] Obtaining a subproject completion node, wherein the subproject completion node corresponds to a work progress problem node;
[0029] Push the sub-project completion node to the user's smart terminal.
[0030] By adopting the above technical solution, the data generation system decomposes the project target items and project constraint items to obtain multiple work progress problem nodes. The work progress problem nodes are the key nodes of the project construction. After the data generation system decomposes all the project target items and project constraint items, it can determine some key nodes that need to be controlled. The data generation system plans and generates sub-project completion nodes corresponding to the work progress problem nodes based on the work progress problem nodes, and pushes each sub-project completion node to the user's smart terminal, so that the user has an intuitive understanding of the various sub-project nodes of the new airport project.
[0031] Optionally, after the step of obtaining the sub-project completion node, the method further includes:
[0032] Obtaining problem-solving logic, where the problem-solving logic is preset by a user;
[0033] Generate a progress problem chain according to the problem solving logic and the sub-project completion node, wherein the progress problem chain is used to reflect the sequence of the sub-projects;
[0034] Push the progress question chain to the user's smart terminal.
[0035] By adopting the above technical solution, before the data generation system works, the user sets the corresponding problem solving logic according to the work progress problem nodes in advance. The data generation system forms a progress problem chain with the work progress problem nodes according to the problem solving logic, so that the construction logic of the sub-project completion node meets the relevant engineering logic, that is, different sub-projects of the project have a sequence, and the work progress problem nodes are connected according to the sequence to form a corresponding progress problem chain. The data generation system pushes the progress problem chain to the user's smart terminal, so that the user can know which work progress problems to solve first and which work progress problems to solve later according to the suggestions of the progress problem chain.
[0036] Optionally, after the step of obtaining the sub-project completion node, the method further includes:
[0037] According to the sub-project completion node, extracting historical matching cases containing the sub-project completion node in the case library;
[0038] Generate a sub-project historical solution corresponding to the sub-project completion node according to the historical matching case;
[0039] Push the sub-project historical solution to the user's smart terminal.
[0040] By adopting the above technical solution, the data generation system matches a close case for each sub-project completion node according to the pre-generated sub-project completion node, and based on the analysis of the historical airport construction case library, extracts the cases containing the target progress problem chain from the case library, and finds the sub-project historical solution corresponding to the type of engineering that needs to be completed by the sub-project. The data generation system pushes the sub-project historical solution to the user's smart terminal, so that the user can effectively refer to previous construction cases for subsequent construction planning of the project.
[0041] Optionally, before the step of pushing the sub-project historical solution to the user's smart terminal, the method further includes:
[0042] Receiving a correction request sent by a user through a smart terminal, the correction request carrying correction information for adjusting a subproject construction plan, the correction information including historical objective laws and actual needs of multiple parties;
[0043] Generate and execute a solution revision instruction according to the revision information, wherein the solution revision instruction is used to revise the historical solution of the sub-project according to the revision information;
[0044] Replace the original sub-project historical solution with the revised sub-project historical solution.
[0045] By adopting the above technical solution, the historical problem-solving solution is difficult to fully meet the construction needs of the new airport, so the user is required to further adjust the problem-solving solution according to the requirements of multiple parties. The data generation system generates a solution correction instruction based on the correction information input by the user, and corrects the historical solution of the sub-project, so that the historical solution of the sub-project conforms to the objective laws of history and meets the actual needs of multiple parties.
[0046] Optionally, after the step of pushing the sub-project historical solution to the user's smart terminal, the method further includes:
[0047] Generate a preliminary schedule target table based on the schedule problem chain and the sub-project historical solutions corresponding to the sub-project completion nodes, wherein the preliminary schedule target table is a solution plan chain for the new airport sub-project work schedule problems;
[0048] Push the preliminary progress plan target table to the user's smart terminal.
[0049] By adopting the above technical solution, the data generation system obtains a preliminary progress plan target table for the new airport based on the progress problem chain and the historical solutions of the sub-projects corresponding to the completion nodes of the sub-projects. The data generation system connects the historical solutions of each sub-project in accordance with the construction sequence, and generates a corresponding solution plan chain for the work progress problems of the new airport, which is the preliminary progress plan target table for the new airport. The data generation system pushes the preliminary progress plan target table to the user's smart terminal, so that the user can construct the new airport according to the preliminary progress plan target table.
[0050] In the second aspect, the present application provides a structure data generation system based on a case library, which adopts the following technical solutions:
[0051] The structural data generation system based on the case library includes:
[0052] Engineering project task acquisition module, used to acquire engineering project tasks;
[0053] A multi-party requirement acquisition module, used to retrieve the multi-party requirements corresponding to the engineering project task according to the engineering project task;
[0054] The engineering target item acquisition module is used to determine multiple engineering target items according to the engineering project tasks and the retrieved requirements of multiple parties;
[0055] The engineering constraint item acquisition module is used to generate engineering constraint items corresponding to the determined engineering target items according to the determined engineering target items and the retrieved multi-party requirements;
[0056] A project construction plan generation module, used to generate a project construction plan according to the project target items and the project constraint items;
[0057] The project construction plan push module is used to push the project construction plan to the user's smart terminal.
[0058] In a third aspect, the present application provides a smart terminal, which adopts the following technical solution:
[0059] An intelligent terminal comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and execute any of the above-mentioned case base-based structure data generation methods.
[0060] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:
[0061] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute any of the above-mentioned case-based structure data generation methods.
[0062] In summary, the present application includes at least one of the following beneficial technical effects:
[0063] Before the user needs to construct the new airport, the user inputs the project tasks of the new airport into the data generation system. The data generation system retrieves the multi-party construction requirements corresponding to the current engineering project according to the engineering that needs to be completed by the airport project. The data generation system determines multiple engineering target items that need to be completed according to the above project tasks and multi-party construction requirements, and generates engineering constraints corresponding to the engineering target items, and makes corresponding requirements and constraints on the engineering results and engineering processes of the engineering target items. The data generation system generates a project construction plan according to the engineering target items and the corresponding engineering constraints, and pushes the project construction plan to the user's smart terminal, so that the data generation system can automatically and efficiently determine the construction plan of the new airport, thereby eliminating the need for users to manually draw up a project workflow diagram and simplifying the steps of drawing up the project construction plan;
[0064] The data generation system decomposes the project target items and project constraints to obtain multiple work progress problem nodes, which are the key nodes of the project construction. After decomposing all the project target items and project constraints, the data generation system can determine some key nodes that need to be controlled. The data generation system plans and generates sub-project completion nodes corresponding to the work progress problem nodes based on the work progress problem nodes, and pushes each sub-project completion node to the user's smart terminal, so that the user has an intuitive understanding of each sub-project node of the airport's new construction project;
[0065] Before the data generation system works, the user sets the corresponding problem-solving logic according to the work progress problem nodes in advance. The data generation system forms a progress problem chain based on the problem-solving logic, so that the construction logic of the sub-project completion node meets the relevant engineering logic, that is, the different sub-projects of the project have a sequence, and the work progress problem nodes are connected according to the sequence to form a corresponding progress problem chain. The data generation system pushes the progress problem chain to the user's smart terminal, so that the user can know which work progress problems to solve first and which work progress problems to solve later according to the suggestions of the progress problem chain. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 It is a flowchart of a method for generating structural data based on a case library according to an embodiment of the present application.
[0067] Figure 2 It is a flowchart of pushing a sub-project completion node to a user's smart terminal in an embodiment of the present application.
[0068] Figure 3 It is a flowchart of pushing a progress question chain to a user's smart terminal in an embodiment of the present application.
[0069] Figure 4 It is a flowchart of pushing a preliminary progress plan target table to a user's smart terminal in an embodiment of the present application.
[0070] Figure 5 It is a flowchart of replacing the original sub-project historical solution in the embodiment of the present application.
[0071] Figure 6 It is a flowchart of determining specific case data corresponding to case project information in an embodiment of the present application.
[0072] Figure 7 It is a module block diagram of a system for generating structural data based on a case library in an embodiment of the present application.
[0073] Explanation of the accompanying drawings: 1. Engineering project task acquisition module; 2. Multi-party requirement acquisition module; 3. Engineering target item acquisition module; 4. Engineering constraint item acquisition module; 5. Project construction plan generation module; 6. Project construction plan push module. DETAILED DESCRIPTION
[0074] The following is combined with Figure 1-7 This application is described in further detail.
[0075] The embodiments of the present application disclose a method, system, device and storage medium for generating structural data based on a case library.
[0076] Reference Figure 1,The structural data generation methods based on the case library include:
[0077] S101: Obtain engineering project tasks.
[0078] Specifically, before the user starts construction of the new airport, the user needs to input the project tasks of the new airport into the data generation system in advance, so that the data generation system can obtain the current engineering project tasks.
[0079] S102: Acquire construction requirement information corresponding to the engineering project task.
[0080] The construction requirement information includes the requirements of the construction party, the investor party, the operator party and the manager party. Before constructing the new airport, the user needs to input the project requirements of the construction party, the investor party, the operator party and the manager party according to the project planning, so that the data generation system can obtain the construction requirement information corresponding to the engineering project tasks.
[0081] S103: Generate multi-party requests.
[0082] Specifically, the data generation system generates multiple requirements based on the construction requirement information. The data generation system generates multiple requirements corresponding to the engineering project tasks based on the construction requirement information corresponding to the engineering project tasks, so that the data generation system can subsequently generate a project construction plan that meets the multiple requirements based on the multiple requirements.
[0083] S104: Retrieve the multi-party requirements corresponding to the engineering project tasks.
[0084] Specifically, the data generation system retrieves the requirements of various parties corresponding to the engineering project tasks according to the engineering project tasks. The data generation system retrieves the requirements of various parties corresponding to the current engineering project according to the engineering that needs to be completed by the airport project.
[0085] S105: Determine multiple engineering target items.
[0086] Specifically, the data generation system determines multiple engineering target items according to the engineering project tasks and the requirements of multiple parties. The data generation system determines multiple engineering target items that need to be completed according to the project tasks and construction requirements of multiple parties input by the user, so that the user can subsequently carry out relevant construction activities for the airport according to the engineering target items.
[0087] S106: Generate engineering constraint items corresponding to the determined engineering target items.
[0088] Specifically, the data generation system generates engineering constraint items corresponding to the determined engineering target items according to the determined engineering target items and the retrieved multi-party requirements. The data generation system generates engineering constraint items corresponding to the engineering target items and imposes corresponding requirements and constraints on the engineering results and engineering processes of the engineering target items.
[0089] S107: Generate a project construction plan.
[0090] Specifically, the data generation system generates a project construction plan for the current airport project based on the engineering target items and corresponding engineering constraints.
[0091] S108: Push the project construction plan to the user's smart terminal.
[0092] Specifically, the data generation system pushes the project construction plan to the user's smart terminal, making it convenient for the user to review the airport's construction plan, so that the data generation system can automatically and efficiently determine the construction plan of the new airport, eliminating the need for the user to manually draw up a project workflow diagram, thereby simplifying the steps for drawing up the project construction plan.
[0093] Among them, as an implementation mode, S102 to S103 of the embodiment of the present application are optional.
[0094] Reference Figure 2 After S107, the sub-project completion node will be obtained according to the project construction plan, which specifically includes the following steps:
[0095] S201: Generate key node decomposition instructions.
[0096] Specifically, the data generation system generates key node decomposition instructions based on the project construction plan. The key node decomposition instructions are used to decompose the project construction plan to obtain multiple work progress problem nodes. The data generation system decomposes the project target items and project constraints to obtain multiple work progress problem nodes. The work progress problem nodes are the key nodes of the project construction. After the data generation system decomposes all the project target items and project constraints, it can determine some key nodes that need to be controlled.
[0097] S202: Obtain the sub-project completion node.
[0098] Among them, the sub-project completion node corresponds to the work progress problem node. According to the work progress problem node, the data generation system plans and generates the sub-project completion node corresponding to the work progress problem node, decomposes the total project into multiple corresponding sub-projects, and then facilitates the user to perform corresponding distributed construction operations on the airport.
[0099] S203: Push the sub-project completion node to the user's smart terminal.
[0100] Specifically, the data generation system pushes the completion nodes of each sub-project to the user's smart terminal, so that the user has an intuitive understanding of the various sub-project nodes of the new airport construction project, making it easier for the user to carry out construction operations on the airport according to plan.
[0101] Reference Figure 3 After S202, a progress problem chain will be generated according to the problem solving logic, which specifically includes the following steps:
[0102] S301: Obtain problem solving logic.
[0103] The problem solving logic is pre-set and generated by the user. Before the data generation system works, the user pre-sets the corresponding problem solving logic according to the work progress problem nodes.
[0104] S302: Generate a progress question chain.
[0105] Specifically, the data generation system generates a progress problem chain based on the problem solving logic and the sub-project completion nodes, and the progress problem chain is used to reflect the sequence of sub-projects. The data generation system forms a progress problem chain with the work progress problem nodes according to the problem solving logic, so that the construction logic of the sub-project completion node meets the relevant engineering logic, that is, different sub-projects of the project have a sequence, and the work progress problem nodes are connected according to the sequence to form a corresponding progress problem chain.
[0106] S303: Push the progress question chain to the user's smart terminal.
[0107] Specifically, the data generation system pushes the progress problem chain to the user's smart terminal, so that the user can know which work progress problems to solve first and which work progress problems to solve later based on the suggestions of the progress problem chain.
[0108] Reference Figure 4 After S202, a sub-project historical solution is generated based on the historical matching cases, which specifically includes the following steps:
[0109] S401: extracting historical matching cases containing sub-project completion nodes from the case library.
[0110] Specifically, the data generation system extracts historical matching cases containing sub-project completion nodes from the case library according to the sub-project completion nodes. The data generation system matches a close case for each sub-project completion node according to the pre-calculated sub-project completion nodes, and extracts cases containing the target progress problem chain from the case library based on the analysis of the historical airport construction case library, where the historical airport cases are pre-set and generated by the user.
[0111] S402: Generate a sub-project historical solution corresponding to the sub-project completion node.
[0112] Specifically, the data generation system generates a sub-project historical solution corresponding to the sub-project completion node based on historical matching cases. The data generation system searches for historical airport cases corresponding to the types of projects that need to be completed by the sub-project, and then generates the corresponding sub-project historical solution.
[0113] S403: Push the sub-project historical solution to the user's smart terminal.
[0114] Specifically, the data generation system pushes historical solutions for sub-projects to the user's smart terminal, allowing the user to effectively draw on previous construction cases to make subsequent construction plans for the project.
[0115] Reference Figure 4 Further, after S403, as an implementation mode, the embodiment of the present application may further include:
[0116] S404: Generate a preliminary schedule target table.
[0117] Specifically, the data generation system generates a preliminary progress plan target table based on the progress problem chain and the sub-project historical solutions corresponding to the sub-project completion nodes. The preliminary progress plan target table is a solution plan chain for the new airport sub-project work progress problems.
[0118] The data generation system obtains the preliminary progress plan target table for the new airport based on the progress problem chain and the historical solutions of the subprojects corresponding to the subproject completion nodes. The data generation system connects the historical solutions of each subproject in accordance with the construction sequence and generates a corresponding solution plan chain for the work progress problems of the new airport, which is the preliminary progress plan target table for the new airport.
[0119] S405: Push the preliminary progress plan target table to the user's smart terminal.
[0120] Specifically, the data generation system pushes the preliminary progress plan target table to the user's smart terminal, allowing the user to construct the new airport according to the preliminary progress plan target table.
[0121] Reference Figure 5 Before S403, a solution correction instruction is generated according to the correction information, which specifically includes the following steps:
[0122] S501: receiving a correction request sent by a user via a smart terminal.
[0123] Among them, the correction request carries correction information for adjusting the sub-project construction plan, and the correction information includes historical objective laws and actual needs of multiple parties. The historical problem-solving methods are difficult to fully meet the construction needs of the new airport, so users are required to make further adjustments to the problem-solving methods according to the requirements of multiple parties. Users input correction information, so that the data generation system can make corresponding adjustments to the sub-project construction plan based on the correction information.
[0124] S502: Generate and execute a solution modification instruction.
[0125] Specifically, the data generation system generates and executes a solution correction instruction based on the correction information, and the solution correction instruction is used to correct the sub-project historical solution according to the correction information. The data generation system generates a solution correction instruction based on the correction information input by the user, and corrects the sub-project historical solution so that the sub-project historical solution conforms to the objective laws of history and meets the actual needs of multiple parties.
[0126] S503: Replace the original sub-project historical solution.
[0127] Specifically, the data generation system replaces the original sub-project historical solution according to the revised sub-project historical solution. The data generation system pushes the revised sub-project historical solution to the user's smart terminal, so that the user can obtain a sub-project historical solution that is closer to the actual construction situation.
[0128] Reference Figure 6 Before S106, engineering constraints are generated according to the construction project information, which specifically includes the following steps:
[0129] S601: Acquire construction project information corresponding to the engineering project task.
[0130] The construction project information includes construction duration parameters, construction environment parameters and city characteristic parameters. The data generation system information obtains detailed project information of the current construction project, and obtains and analyzes relevant information such as the construction duration, construction location, and construction environment of the current construction project.
[0131] S602: Retrieve case project information corresponding to the construction project information.
[0132] Specifically, the data generation system retrieves case project information corresponding to the construction project information according to the construction project information, wherein the case project information includes case duration corresponding to the construction duration parameter, case environment corresponding to the construction environment parameter, and case city corresponding to the city characteristic parameter.
[0133] S603: Determine whether the case project information corresponding to the construction project information can be successfully acquired.
[0134] Specifically, the data generation system traverses and queries the case library, pre-screens the cases in the case library based on the construction project information of the current data, and then determines the cases that can well fit the current construction project.
[0135] If the judgment is yes, execute S604 to S606;
[0136] If the judgment is no, then execute S607 to S608.
[0137] S604: Determine specific case data corresponding to the case project information.
[0138] Specifically, if the data generation system obtains case project information corresponding to the construction project information, it means that there has been a construction case of the same type as the current construction project. The data generation system determines the specific case data corresponding to the case project information based on the retrieved case project information.
[0139] S605: Generate a case library narrowing list.
[0140] Specifically, the data generation system generates a case library reduction list based on specific case data, wherein the case library reduction list is generated by screening previously stored case libraries based on construction project information, and the relevant cases in the case library reduction list have good reference value for the current engineering project.
[0141] S606: Execute the step of generating engineering constraint items corresponding to the determined engineering target items.
[0142] Specifically, the data generation system performs the step of generating engineering constraint items corresponding to the determined engineering target items according to the case library reduction list. The step of generating engineering constraint items is performed according to the case library reduction list that is the same as the current project case situation, thereby making the constraint item generation process more reliable.
[0143] S607: Search for similar case project information.
[0144] Specifically, if the data generation system does not obtain case project information that completely corresponds to the construction project information, it searches for similar case project information based on the construction project information. The similar case project information is the project information with the most corresponding items to the construction project information in a preset database.
[0145] For example, when the case project information does not exist, the data generation system then searches for similar case project information that matches the two parameters of the construction project information. The similar case project information A includes the construction duration corresponding to the construction duration parameter and the construction environment corresponding to the construction environment parameter, and the similar case project information B includes the construction duration corresponding to the construction duration parameter and the city characteristics corresponding to the city characteristics parameter.
[0146] S608: Execute the step of determining specific case data corresponding to the case item information.
[0147] Specifically, the data generation system performs the step of determining specific case data corresponding to the case project information based on the approximate case project information. When the data generation system cannot determine the case project information that completely corresponds to the construction project information, the data generation system determines the approximate case project information through fuzzy screening, and performs the step of generating engineering constraint items based on the closest existing case.
[0148] The implementation principle of the structural data generation method based on the case library in the embodiment of the present application is as follows: when a user needs to prepare a construction plan for a new airport, the user inputs the project task of the new airport into the data generation system. The data generation system retrieves the multi-party construction requirements corresponding to the current engineering project based on the engineering projects that need to be completed by the airport project. The data generation system determines multiple engineering target items that need to be completed based on the above project tasks and multi-party construction requirements, and generates engineering constraint items corresponding to the engineering target items, and makes corresponding requirements and constraints on the engineering results and engineering processes of the engineering target items. The data generation system generates a project construction plan based on the engineering target items and the corresponding engineering constraint items, and pushes the project construction plan to the user's smart terminal, thereby realizing the function of the data generation system automatically determining the construction plan of the new airport.
[0149] Based on the above method, the embodiment of the present application also discloses a system for generating structural data based on a case library. Figure 7 ,The structural data generation system based on the case library includes:
[0150] The engineering project task acquisition module 1 is used to acquire engineering project tasks.
[0151] The multi-party requirement acquisition module 2 is used to retrieve the multi-party requirements corresponding to the engineering project tasks according to the engineering project tasks.
[0152] The engineering target item acquisition module 3 is used to determine multiple engineering target items according to the engineering project tasks and the requirements of multiple parties.
[0153] The engineering constraint item acquisition module 4 is used to generate engineering constraint items corresponding to the determined engineering target items according to the determined engineering target items and the retrieved multi-party requirements.
[0154] The project construction plan generation module 5 is used to generate a project construction plan according to the project target items and the project constraint items.
[0155] The project construction plan push module 6 is used to push the project construction plan to the user's smart terminal.
[0156] The embodiment of the present application further discloses an intelligent terminal, which includes a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes the above-mentioned method for generating structured data based on the case library.
[0157] The embodiment of the present application also discloses a computer-readable storage medium. The computer-readable storage medium stores a computer program that can be loaded by a processor and execute the above-mentioned method for generating structured data based on a case library. The computer-readable storage medium includes, for example, various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0158] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the scope of protection of the invention. Obviously, the described embodiments are only some embodiments of the present invention, rather than all embodiments. Based on these embodiments, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in this field can still combine, add, delete or make other adjustments to the features in the various embodiments of the present invention according to the circumstances without conflict, without making creative work, so as to obtain different other technical solutions that do not deviate from the concept of the present invention in essence, and these technical solutions also belong to the scope of protection of the present invention.
Claims
1. Structural data generation method based on case library, It is characterized in that The following steps are involved: Get engineering project tasks; According to the engineering project task, retrieve multiple requirements corresponding to the engineering project task; Determine multiple engineering target items according to the engineering project tasks and the requirements of multiple parties; Generate engineering constraint items corresponding to the determined engineering target items according to the determined engineering target items and the retrieved multi-party requirements; Generate a project construction plan based on the project target items and the project constraint items; Pushing the project construction plan to the user's smart terminal; After the step of generating the project construction plan, the method further includes: Generate a key node decomposition instruction according to the project construction plan, wherein the key node decomposition instruction is used to decompose the project construction plan into multiple work progress problem nodes; Obtaining a subproject completion node, wherein the subproject completion node corresponds to a work progress problem node; Push the sub-project completion node to the user's smart terminal; After the step of obtaining the sub-project completion node, the method further includes: Obtaining problem-solving logic, where the problem-solving logic is preset by a user; Generate a progress problem chain according to the problem solving logic and the sub-project completion node, wherein the progress problem chain is used to reflect the sequence of the sub-projects; Pushing the progress question chain to the user's smart terminal; After the step of obtaining the sub-project completion node, the method further includes: According to the sub-project completion node, extracting historical matching cases containing the sub-project completion node in the case library; Generate a sub-project historical solution corresponding to the sub-project completion node according to the historical matching case; Push the sub-project historical solution to the user's smart terminal; After the step of pushing the sub-project historical solution to the user's smart terminal, the method further includes: Generate a preliminary schedule target table based on the schedule problem chain and the sub-project historical solutions corresponding to the sub-project completion nodes, wherein the preliminary schedule target table is a solution plan chain for the new airport sub-project work schedule problems; Push the preliminary progress plan target table to the user's smart terminal.
2. The method for generating structural data based on a case library according to claim 1, It is characterized in that Before the step of generating the engineering constraint items corresponding to the determined engineering target items, the method further includes: Acquire construction project information corresponding to the engineering project task, wherein the construction project information includes construction duration parameters, construction environment parameters, and city characteristic parameters; According to the construction project information, retrieve case project information corresponding to the construction project information; If case project information corresponding to the construction project information is obtained, then specific case data corresponding to the case project information is determined according to the retrieved case project information; Generate a case library narrowing list based on the specific case data; According to the case library narrowing list, the step of generating engineering constraint items corresponding to the determined engineering target items is performed.
3. The method for generating structural data based on a case library according to claim 2, It is characterized in that After the step of retrieving the case project information corresponding to the construction project information, the method further includes: If case project information corresponding to the construction project information is not obtained, searching for similar case project information according to the construction project information, wherein the similar case project information is the project information with the most items corresponding to the construction project information in a preset database; According to the approximate case project information, the step of determining the specific case data corresponding to the case project information is performed.
4. A system for generating structured data based on a case base, the system being used to implement the method for generating structured data based on a case base as claimed in any one of claims 1 to 3, specifically include: The engineering project task acquisition module (1) is used to acquire engineering project tasks; A multi-party requirement acquisition module (2) is used to retrieve the multi-party requirements corresponding to the engineering project task according to the engineering project task; A project target item acquisition module (3) is used to determine a plurality of project target items according to the project task and the retrieved requirements of multiple parties; An engineering constraint item acquisition module (4) is used to generate engineering constraint items corresponding to the determined engineering target items according to the determined engineering target items and the retrieved multi-party requirements; A project construction plan generating module (5), used for generating a project construction plan according to the project target items and the project constraint items; The project construction plan push module (6) is used to push the project construction plan to the user's smart terminal.
5. A smart terminal, Features: The method comprises a memory and a processor, wherein the memory stores a computer program which can be loaded by the processor and executes any one of the methods according to claims 1 to 3.
6. A computer-readable storage medium, Features: A computer program is stored which can be loaded by a processor and execute the method according to any one of claims 1 to 3.