A fault phase selection method, device and terminal equipment for leakage protection

By calculating the current difference and fault power, the leakage fault phase is determined, which solves the problem of large amount of calculation and inability to determine the fault phase in the existing leakage protection, and improves the power supply reliability of the distribution network system.

CN115078908BActive Publication Date: 2024-12-03GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210689523.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-17
Publication Date
2024-12-03
Estimated Expiration
2042-06-17

Smart Images

  • Figure CN115078908B_ABST
    Figure CN115078908B_ABST
Patent Text Reader

Abstract

The present invention relates to a fault phase selection method, device and terminal equipment applied to leakage protection. The method comprises the following steps: when a leakage fault occurs in a distribution network system, obtaining the residual sampling current, three-phase sampling voltage, sampling period, angle and the first sampling current corresponding to the last sampling period and the second sampling current of the last two sampling periods of the distribution network system; calculating the current difference according to the first sampling current, the residual sampling current and the second sampling current; if the current difference is greater than a starting constant, calculating the residual sampling current, the three-phase sampling voltage, the sampling period and the angle to obtain the three-phase fault power; and determining the fault phase of the distribution network system according to the three-phase fault power. The fault phase selection method applied to leakage protection can realize fault phase selection in the distribution network system for leakage protection, and can enable the distribution network system to trip only the fault phase when in action, thereby improving the power supply reliability of the distribution network system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system fault identification, and in particular to a fault phase selection method, device and terminal equipment applied to leakage protection. Background Art

[0002] In the leakage protection of the distribution network system, in order to improve the reliability of power supply, it is necessary to trip only the fault phase, so it is necessary to implement fault phase selection. However, the current leakage protection and live electric shock protection methods often fail to do this. The most commonly used in the current power system is the traditional leakage protection, which identifies whether there is leakage by judging whether the sum of the currents of the four lines ABCN exceeds a certain value, thereby judging whether there is leakage.

[0003] At present, there are two methods for leakage protection to identify whether there is leakage. One method is to propose an equivalent circuit based on the current low-voltage power supply system, and use the least square method to identify the circuit parameters based on this, so as to distinguish whether there is a live body being electrocuted. The advantages of this method are: the identified parameters are very different in the case of leakage and the phase selection can be carried out, and the physical meaning is obvious; but its calculation amount is large and occupies too many hardware computing resources. Another method is to use the human body impedance equivalent model recommended by IEC, but for the capacitance, since the cell membrane capacitance is not an ideal capacitor, it will produce α dispersion phenomenon, which will cause the human body impedance to change with frequency in the impedance complex plane. Then, Fourier transform is used for multiple frequencies to calculate the human body impedance at each corresponding frequency. According to whether each impedance can form a circle on the complex plane, it is judged whether it is a live body being electrocuted; but this method is only analyzed from the frequency domain of the fault signal, and does not involve phase selection. Summary of the invention

[0004] The embodiments of the present invention provide a fault phase selection method, device and terminal equipment for leakage protection, which are used to solve the technical problems that the existing leakage protection method for identifying whether there is leakage has a large amount of calculation and cannot determine which phase has a leakage fault.

[0005] In order to achieve the above purpose, the embodiment of the present invention provides the following technical solutions:

[0006] A fault phase selection method for leakage protection includes the following steps:

[0007] When a leakage fault occurs in the distribution network system, the residual sampling current, three-phase sampling voltage, sampling period, angle, and the first sampling current of the previous sampling period corresponding to the residual sampling current and the second sampling current of the previous two sampling periods of the distribution network system are obtained;

[0008] Calculate the current difference according to the first sampling current, the remaining sampling current and the second sampling current;

[0009] If the current difference is greater than the starting set value, the remaining sampled current, the three-phase sampled voltage, the sampling period and the angle are calculated to obtain the three-phase fault power;

[0010] The fault phase where the distribution network system fails is determined according to the three-phase fault power.

[0011] Preferably, the three phases of the distribution network system include phase A, phase B and phase C, and determining the faulty phase of the distribution network system according to the fault power of the three phases includes:

[0012] If the fault power of phase A is greater than 0 and the fault powers of phases B and C are both less than 0, the fault phase of the distribution network system is phase A;

[0013] If the fault power of phase B is greater than 0 and the fault powers of phases A and C are both less than 0, the fault phase of the distribution network system is phase B;

[0014] If the fault power of phase C is greater than 0 and the fault powers of phases B and A are both less than 0, the faulty phase of the distribution network system is phase C.

[0015] Preferably, the three phases of the distribution network system include phase A, phase B and phase C, and obtaining the three-phase fault power according to the residual sampled current, the three-phase sampled voltage, the sampling period and the angle calculation includes:

[0016] The residual sampling current and the three-phase sampling voltage are converted into corresponding residual sampling current amplitude, A-phase sampling voltage amplitude, B-phase sampling voltage amplitude and C-phase sampling voltage amplitude by using an amplitude conversion formula;

[0017] During the sampling period, the fault powers of phase A, phase B and phase C are obtained by calculating the corresponding power calculation formulas of phase A, phase B and phase C according to the residual sampling current amplitude, the angle, the A phase sampling voltage amplitude, the B phase sampling voltage amplitude and the C phase sampling voltage amplitude.

[0018] Preferably, the amplitude conversion formula is:

[0019]

[0020] The power calculation formula of phase A is:

[0021]

[0022] The power calculation formula of phase B is:

[0023]

[0024] The power calculation formula of the C phase is:

[0025]

[0026] In the formula, i n is the residual sampling current, I N is the residual sampling current amplitude, is the angle, u C is the C phase sampling voltage, U C is the sampling voltage amplitude of phase C, u A is the sampling voltage of phase A, U A is the sampling voltage amplitude of phase A, u B is the B phase sampling voltage, U B is the sampling voltage amplitude of phase B, T is the sampling period, P A is the fault power of phase A, P B is the fault power of phase B, P C is the fault power of phase C, and t is the sampling time of the three-phase sampling voltage.

[0027] Preferably, calculating the current difference according to the first sampling current, the remaining sampling current and the second sampling current includes: calculating according to the first sampling current, the remaining sampling current and the second sampling current using a difference calculation formula to obtain a current difference of a leakage fault in the distribution network system; the difference calculation formula is:

[0028]

[0029] In the formula, i n is the residual sampling current, i n-N is the first sampling current, i n-2N The second sampling current, N, is the number of sampling points in each sampling period when a leakage fault occurs in the distribution network system.

[0030] The present invention also provides a fault phase selection device for leakage protection, comprising: a data acquisition module, a first calculation module, a second calculation module and a fault phase output module;

[0031] The data acquisition module is used to obtain the residual sampling current, three-phase sampling voltage, sampling period, angle and the first sampling current of the previous sampling period corresponding to the residual sampling current and the second sampling current of the previous two sampling periods of the distribution network system when a leakage fault occurs in the distribution network system;

[0032] The first calculation module is used to calculate and obtain a current difference according to the first sampling current, the remaining sampling current and the second sampling current;

[0033] The second calculation module is used to calculate the remaining sampled current, the three-phase sampled voltage, the sampling period and the angle according to the current difference being greater than the starting set value, so as to obtain the three-phase fault power;

[0034] The fault phase output module is used to determine the fault phase where the distribution network system fails according to the three-phase fault power.

[0035] Preferably, the three phases of the distribution network system include phase A, phase B and phase C, and the fault phase output module is also used to determine that the fault phase of the distribution network system is phase A if the fault power of phase A is greater than 0 and the fault powers of phases B and phases C are both less than 0; or that the fault phase of the distribution network system is phase B if the fault power of phase B is greater than 0 and the fault powers of phases A and phases C are both less than 0; or that the fault phase of the distribution network system is phase C if the fault power of phase C is greater than 0 and the fault powers of phases B and phase A are both less than 0.

[0036] Preferably, the three phases of the distribution network system include phase A, phase B and phase C, and the second calculation module is further used to convert the residual sampled current and the three-phase sampled voltage into corresponding residual sampled current amplitude, phase A sampled voltage amplitude, phase B sampled voltage amplitude and phase C sampled voltage amplitude by using an amplitude conversion formula; within the sampling period, according to the residual sampled current amplitude, the angle, the phase A sampled voltage amplitude, the phase B sampled voltage amplitude and the phase C sampled voltage amplitude, the corresponding power calculation formulas of phase A, phase B and phase C are used to calculate and obtain the fault power of phase A, phase B and phase C;

[0037] The amplitude conversion formula is:

[0038]

[0039] The power calculation formula of phase A is:

[0040]

[0041] The power calculation formula of phase B is:

[0042]

[0043] The power calculation formula of the C phase is:

[0044]

[0045] In the formula, i n is the residual sampling current, I N is the residual sampling current amplitude, is the angle, u C is the C phase sampling voltage, U Cis the sampling voltage amplitude of phase C, u A is the sampling voltage of phase A, U A is the sampling voltage amplitude of phase A, u B is the B phase sampling voltage, U B is the sampling voltage amplitude of phase B, T is the sampling period, P A is the fault power of phase A, P B is the fault power of phase B, P C is the fault power of phase C, and t is the sampling time of the three-phase sampling voltage.

[0046] Preferably, the first calculation module is used to calculate the current difference of the leakage fault in the distribution network system by using a difference calculation formula according to the first sampling current, the remaining sampling current and the second sampling current; the difference calculation formula is:

[0047]

[0048] In the formula, i n is the residual sampling current, i n-N is the first sampling current, i n-2N The second sampling current, N, is the number of sampling points in each sampling period when a leakage fault occurs in the distribution network system.

[0049] The present invention also provides a terminal device, comprising a processor and a memory;

[0050] The memory is used to store program codes and transmit the program codes to the processor;

[0051] The processor is used to execute the above-mentioned fault phase selection method applied to leakage protection according to the instructions in the program code.

[0052] It can be seen from the above technical scheme that the embodiment of the present invention has the following advantages: the fault phase selection method, device and terminal equipment applied to leakage protection, the method includes obtaining the residual sampling current, three-phase sampling voltage, sampling period, angle and the first sampling current of the previous sampling period and the second sampling current of the previous two sampling periods corresponding to the residual sampling current of the distribution network system after a leakage fault occurs in the distribution network system; calculating the current difference according to the first sampling current, the residual sampling current and the second sampling current; if the current difference is greater than the starting constant, the residual sampling current, the three-phase sampling voltage, the sampling period and the angle are calculated to obtain the three-phase fault power; the fault phase of the distribution network system is determined according to the three-phase fault power. Through the fault phase selection method applied to leakage protection, fault phase selection can be realized in the distribution network system for leakage protection, so that the distribution network system can only trip the fault phase when it is in action, improve the power supply reliability of the distribution network system, and solve the technical problems that the existing leakage protection method for identifying whether there is leakage has a large amount of calculation and cannot determine which phase has a leakage fault. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0054] Figure 1 A schematic diagram of the steps of a fault phase selection method for leakage protection according to an embodiment of the present invention;

[0055] Figure 2 A wiring diagram for collecting leakage fault data of a distribution network system in a fault phase selection method for leakage protection according to an embodiment of the present invention;

[0056] Figure 3 A phase selection simulation diagram of a fault phase selection method for leakage protection according to an embodiment of the present invention;

[0057] Figure 4 This is a fault diagram of a power distribution network system with leakage;

[0058] Figure 5 It is a framework diagram of a fault phase selection device for leakage protection according to an embodiment of the present invention. DETAILED DESCRIPTION

[0059] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0060] Figure 4 This is a schematic diagram of a fault in which a leakage occurs in the distribution network system.

[0061] like Figure 4 As shown, leakage usually occurs due to a person or a pure resistor. For pure resistors, the residual current generated by it is consistent with the phase of the electric shock phase; for human body electric shock, since the human body impedance plus the total human body resistance to the ground is capacitive, the human body leakage current will lead the fault phase voltage, and it can be obtained that the leading angle is in the range of 1° to 8°, so the residual current will definitely not lag behind the fault phase voltage, and the maximum leading angle does not exceed 8°. The present application proposes a fault phase selection method, device and terminal equipment for leakage protection based on the fact that the residual current will definitely not lag behind the fault phase voltage, and the maximum leading angle does not exceed 8°, which is used to solve the technical problems that the existing leakage protection method for identifying whether there is leakage has a large amount of calculation and cannot determine which phase has a leakage fault.

[0062] Embodiment 1:

[0063] Figure 1 Schematic diagram of the steps of the fault phase selection method for leakage protection according to an embodiment of the present invention, Figure 2 A wiring diagram for collecting leakage fault data of a distribution network system in a fault phase selection method for leakage protection according to an embodiment of the present invention, Figure 3 This is a phase selection simulation diagram of the fault phase selection method applied to leakage protection described in an embodiment of the present invention.

[0064] like Figure 1 As shown, the present invention provides a fault phase selection method applied to leakage protection, comprising the following steps:

[0065] S1. When a leakage fault occurs in the distribution network system, obtain the remaining sampled current, three-phase sampled voltage, sampling period, angle, and the first sampled current of the previous sampling period and the second sampled current of the previous two sampling periods corresponding to the remaining sampled current.

[0066] It should be noted that in step S1, after a leakage fault occurs in the distribution network system, the residual sampling current, three-phase sampling voltage, sampling period, angle, and the first sampling current of the previous sampling period and the second sampling current of the previous two sampling periods corresponding to the residual sampling current can be obtained from the leakage protection device connected to the distribution network system. In this embodiment, the leakage protection device is a relatively mature technology in the field of distribution networks and will not be elaborated here. Figure 2 As shown, the busbar of the distribution network system is equipped with a contactor connected to a leakage protection device, a solid-state contactor, a residual current transformer for detecting the residual sampling current, and a voltage transformer for detecting the three-phase sampling voltage. Among them, the three phases of the distribution network system include phase A, phase B and phase C, and the three-phase sampling voltage includes the sampling voltage of phase A, the sampling voltage of phase B and the sampling voltage of phase C.

[0067] S2. Calculate the current difference according to the first sampling current, the remaining sampling current and the second sampling current.

[0068] It should be noted that in step S2, the current difference of the leakage fault in the distribution network system can be obtained by using the difference calculation formula according to the first sampling current, the remaining sampling current and the second sampling current. In this embodiment, the difference calculation formula is:

[0069]

[0070] In the formula, i n is the residual sampling current, i n-N is the first sampling current, i n-2N The second sampling current, N, is the number of sampling points in each sampling period when a leakage fault occurs in the distribution network system.

[0071] S3. If the current difference is greater than the starting set value, the remaining sampled current, three-phase sampled voltage, sampling period and angle are calculated to obtain the three-phase fault power.

[0072] It should be noted that step S3 calculates the fault power of the three phases of the distribution network system based on the condition that the current difference is greater than the starting set value, providing judgment data for the subsequent step of identifying which phase has a fault. In this embodiment, the starting set value is preferably selected as 30mA, and can also be set according to the needs of the distribution network system. 30mA is selected as the starting set value.

[0073] S4. Determine the fault phase where the distribution network system fails according to the three-phase fault power.

[0074] It should be noted that in step S4, it is possible to determine which phase of the fault power of the distribution network system meets the phase selection condition based on the three-phase fault power of the distribution network system, and determine the fault phase of the distribution network system where the fault occurs; thereby, fault phase selection is realized in the distribution network system with leakage protection, and the distribution network system can only trip the faulty phase when it is in action, thereby improving the power supply reliability of the distribution network system.

[0075] The fault phase selection method for leakage protection provided by the present invention includes: when a leakage fault occurs in a distribution network system, obtaining the remaining sampled current, three-phase sampled voltage, sampling period, angle, and the first sampled current of the previous sampling period and the second sampled current of the previous two sampling periods corresponding to the remaining sampled current of the distribution network system; calculating the current difference according to the first sampled current, the remaining sampled current, and the second sampled current; if the current difference is greater than the starting constant, calculating the remaining sampled current, the three-phase sampled voltage, the sampling period and the angle to obtain the three-phase fault power; determining the fault phase of the distribution network system according to the three-phase fault power. The fault phase selection method for leakage protection can realize fault phase selection in the distribution network system for leakage protection, and can make the distribution network system trip only the fault phase when it is in action, thereby improving the power supply reliability of the distribution network system, and solving the technical problems that the existing leakage protection method for identifying whether there is leakage has a large amount of calculation and cannot determine which phase has a leakage fault.

[0076] In one embodiment of the present invention, the three phases of the distribution network system include phase A, phase B and phase C. According to the residual sampling current, the three-phase sampling voltage, the sampling period and the angle calculation, the three-phase fault power is obtained, which includes:

[0077] The residual sampling current and the three-phase sampling voltage are converted into the corresponding residual sampling current amplitude, A-phase sampling voltage amplitude, B-phase sampling voltage amplitude and C-phase sampling voltage amplitude by using the amplitude conversion formula;

[0078] In the sampling period, the fault power of phase A, phase B and phase C is obtained by calculating the corresponding power calculation formulas of phase A, phase B and phase C according to the residual sampling current amplitude, the angle, the sampling voltage amplitude of phase A, phase B and phase C;

[0079] The amplitude conversion formula is:

[0080]

[0081] The power calculation formula for phase A is:

[0082]

[0083] The power calculation formula for phase B is:

[0084]

[0085] The power calculation formula for phase C is:

[0086]

[0087] In the formula, i n is the residual sampling current, I N is the residual sampling current amplitude, is the angle, u C is the C phase sampling voltage, U C is the sampling voltage amplitude of phase C, u A is the sampling voltage of phase A, U A is the sampling voltage amplitude of phase A, u B is the B phase sampling voltage, U B is the sampling voltage amplitude of phase B, T is the sampling period, P A is the fault power of phase A, P B is the fault power of phase B, P C is the fault power of phase C, and t is the sampling time of the three-phase sampling voltage.

[0088] It should be noted that the fault phase selection method for leakage protection uses the method of multiplying the residual sampled current by the sampled voltage of each phase and integrating it within a sampling period T to obtain the fault power of the corresponding phase. The fault power of phase A is:

[0089]

[0090] is the angle between the residual sampling current and the phase sampling voltage,

[0091] The fault power of phase B is:

[0092]

[0093] Similarly, the fault power of phase C is:

[0094] .

[0095] From the above, we can see that if the fault phase is phase A, , then P A The value of is always positive. For the two non-fault phases B and C, due to , then P B The value of is always negative. Similarly, , then P CThe value is always negative. Therefore, when the fault phase is phase B or phase C, the phase sampling voltage and the remaining sampling current can be multiplied and integrated within a sampling period T to obtain the three-phase fault power. The phase selection conditions include that the phase with positive fault power is the fault phase and the phase with negative fault power is the non-fault phase.

[0096] In the embodiment of the present invention, the fault phase selection method applied to leakage protection obtains the fault power of phase A, phase B and phase C through the power calculation formula of phase A, phase B and phase C, and realizes the phase selection of the fault phase according to the fault power of phase A, phase B and phase C according to the phase selection conditions, while ensuring a small amount of calculation. It only needs to multiply the remaining sampled current with the three-phase sampled voltage in a sampling cycle, and then sum them up to get the three-phase fault power. The amount of calculation is close to one Fourier operation, which greatly reduces the workload. At the same time, since the basis of the fault phase selection method applied to leakage protection is the impedance characteristics of the electric shock object, it is not affected by the line topology.

[0097] In one embodiment of the present invention, the three phases of the distribution network system include phase A, phase B and phase C, and determining the faulty phase of the distribution network system according to the fault power of the three phases includes:

[0098] If the fault power of phase A is greater than 0 and the fault powers of phases B and C are both less than 0, the fault phase of the distribution network system is phase A;

[0099] If the fault power of phase B is greater than 0 and the fault powers of phases A and C are both less than 0, the fault phase of the distribution network system is phase B;

[0100] If the fault power of phase C is greater than 0 and the fault powers of phases B and A are both less than 0, the faulty phase of the distribution network system is phase C.

[0101] In the embodiment of the present invention, based on Figure 2 As shown in the wiring diagram, if the fault phase is phase A of the distribution network system, the feasibility of the fault phase selection method applied to leakage protection is verified by using matlab or simulink simulation, and the following is obtained: Figure 3 The simulation diagram shown is Figure 3 It can be seen that the fault time is set at 0.1s, and the positive part of the curve is P A , negative is P B With P C The fluctuation of 0.08s is caused by the calculation just starting and can be shielded; P can be calculated after one cycle after the fault, that is, 0.12s. A , P B , P C The fault power value is used as the option criterion, and finally the fault phase can be identified as phase A through the fault power.

[0102] Embodiment 2:

[0103] Figure 5 It is a framework diagram of a fault phase selection device for leakage protection according to an embodiment of the present invention.

[0104] like Figure 5 The present invention further provides a fault phase selection device for leakage protection, comprising a data acquisition module 10, a first calculation module 20, a second calculation module 30 and a fault phase output module 40;

[0105] The data acquisition module 10 is used to obtain the residual sampling current, three-phase sampling voltage, sampling period, angle, and the first sampling current of the previous sampling period corresponding to the residual sampling current and the second sampling current of the previous two sampling periods of the distribution network system when a leakage fault occurs in the distribution network system;

[0106] A first calculation module 20, configured to calculate a current difference according to the first sampling current, the remaining sampling current and the second sampling current;

[0107] The second calculation module 30 is used to calculate the remaining sampled current, the three-phase sampled voltage, the sampling period and the angle according to the current difference being greater than the starting set value, so as to obtain the three-phase fault power;

[0108] The fault phase output module 40 is used to determine the fault phase where the power distribution network system fails according to the three-phase fault power.

[0109] In an embodiment of the present invention, the three phases of the distribution network system include phase A, phase B and phase C, and the fault phase output module 40 is also used to determine that the fault phase of the distribution network system is phase A if the fault power of phase A is greater than 0 and the fault powers of phases B and phases C are both less than 0; or that the fault phase of the distribution network system is phase B if the fault power of phase B is greater than 0 and the fault powers of phases A and phases C are both less than 0; or that the fault phase of the distribution network system is phase C if the fault power of phase C is greater than 0 and the fault powers of phases B and phase A are both less than 0.

[0110] In the embodiment of the present invention, the first calculation module 20 is further used to calculate the current difference of the leakage fault in the distribution network system by using the difference calculation formula according to the first sampling current, the remaining sampling current and the second sampling current; the difference calculation formula is:

[0111]

[0112] In the formula, i n is the residual sampling current, i n-N is the first sampling current, i n-2N The second sampling current, N, is the number of sampling points in each sampling period when a leakage fault occurs in the distribution network system.

[0113] In the embodiment of the present invention, the three phases of the distribution network system include phase A, phase B and phase C. The second calculation module 30 is further used to convert the residual sampled current and the three-phase sampled voltage into the corresponding residual sampled current amplitude, phase A sampled voltage amplitude, phase B sampled voltage amplitude and phase C sampled voltage amplitude using the amplitude conversion formula; within the sampling period, according to the residual sampled current amplitude, the angle, the phase A sampled voltage amplitude, the phase B sampled voltage amplitude and the phase C sampled voltage amplitude, the corresponding power calculation formula of phase A, phase B and phase C is used to calculate and obtain the fault power of phase A, phase B and phase C:

[0114] The amplitude conversion formula is:

[0115]

[0116] The power calculation formula for phase A is:

[0117]

[0118] The power calculation formula for phase B is:

[0119]

[0120] The power calculation formula for phase C is:

[0121]

[0122] In the formula, i n is the residual sampling current, I N is the residual sampling current amplitude, is the angle, u C is the C phase sampling voltage, U C is the sampling voltage amplitude of phase C, u A is the sampling voltage of phase A, U A is the sampling voltage amplitude of phase A, u B is the B phase sampling voltage, U B is the sampling voltage amplitude of phase B, T is the sampling period, P A is the fault power of phase A, P B is the fault power of phase B, P C is the fault power of phase C, and t is the sampling time of the three-phase sampling voltage.

[0123] It should be noted that the content of the module in the device of Example 2 corresponds to the step content of the method of Example 1. The step content of the method of Example 1 has been described in detail in Example 1, and the description of the content of the module will not be repeated in Example 2.

[0124] Embodiment three:

[0125] The present invention also provides a terminal device, comprising a processor and a memory;

[0126] A memory, used for storing program codes and transmitting the program codes to a processor;

[0127] The processor is used to execute the above-mentioned fault phase selection method applied to leakage protection according to the instructions in the program code.

[0128] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0129] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0130] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0131] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0132] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0133] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A fault phase selection method for leakage protection, characterized in that: The following steps are involved: When a leakage fault occurs in the distribution network system, the residual sampling current, three-phase sampling voltage, sampling period, angle, and the first sampling current of the previous sampling period corresponding to the residual sampling current and the second sampling current of the previous two sampling periods of the distribution network system are obtained; Calculate the current difference according to the first sampling current, the remaining sampling current and the second sampling current; If the current difference is greater than the starting set value, the remaining sampled current, the three-phase sampled voltage, the sampling period and the angle are calculated to obtain the three-phase fault power; Determine the fault phase where the distribution network system fails according to the three-phase fault power; The three phases of the distribution network system include phase A, phase B and phase C. According to the residual sampling current, the three-phase sampling voltage, the sampling period and the angle calculation, the three-phase fault power is obtained, which includes: The residual sampling current and the three-phase sampling voltage are converted into corresponding residual sampling current amplitude, A-phase sampling voltage amplitude, B-phase sampling voltage amplitude and C-phase sampling voltage amplitude by using an amplitude conversion formula; In the sampling period, the fault powers of phase A, phase B and phase C are obtained by calculating the corresponding power calculation formulas of phase A, phase B and phase C according to the residual sampling current amplitude, the angle, the A phase sampling voltage amplitude, the B phase sampling voltage amplitude and the C phase sampling voltage amplitude; Calculating the current difference according to the first sampling current, the remaining sampling current and the second sampling current includes: using a difference calculation formula to calculate the current difference of the power distribution network system when a leakage fault occurs according to the first sampling current, the remaining sampling current and the second sampling current; the difference calculation formula is: ; In the formula, i n is the residual sampling current, i n-N is the first sampling current, i n-2N The second sampling current, N, is the number of sampling points in each sampling period when a leakage fault occurs in the distribution network system.

2. The fault phase selection method for leakage protection according to claim 1, characterized in that: The three phases of the distribution network system include phase A, phase B and phase C. According to the fault power of the three phases, the fault phases of the distribution network system are determined to include: If the fault power of phase A is greater than 0 and the fault powers of phases B and C are both less than 0, the fault phase of the distribution network system is phase A; If the fault power of phase B is greater than 0 and the fault powers of phases A and C are both less than 0, the fault phase of the distribution network system is phase B; If the fault power of phase C is greater than 0 and the fault powers of phases B and A are both less than 0, the faulty phase of the distribution network system is phase C.

3. The fault phase selection method for leakage protection according to claim 1, characterized in that: The amplitude conversion formula is: ; The power calculation formula of phase A is: ; The power calculation formula of phase B is: ; The power calculation formula of the C phase is: ; In the formula, i n is the residual sampling current, I N is the residual sampling current amplitude, is the angle, u C is the C phase sampling voltage, U C is the sampling voltage amplitude of phase C, u A is the sampling voltage of phase A, U A is the sampling voltage amplitude of phase A, u B is the B phase sampling voltage, U B is the sampling voltage amplitude of phase B, T is the sampling period, P A is the fault power of phase A, P B is the fault power of phase B, P C is the fault power of phase C, and t is the sampling time of the three-phase sampling voltage.

4. A fault phase selection device for leakage protection, characterized in that: include: A data acquisition module, a first calculation module, a second calculation module and a fault phase output module; The data acquisition module is used to obtain the residual sampling current, three-phase sampling voltage, sampling period, angle and the first sampling current of the previous sampling period corresponding to the residual sampling current and the second sampling current of the previous two sampling periods of the distribution network system when a leakage fault occurs in the distribution network system; The first calculation module is used to calculate and obtain a current difference according to the first sampling current, the remaining sampling current and the second sampling current; The second calculation module is used to calculate the remaining sampled current, the three-phase sampled voltage, the sampling period and the angle according to the current difference being greater than the starting set value, so as to obtain the three-phase fault power; The fault phase output module is used to determine the fault phase where the distribution network system fails according to the three-phase fault power; The three phases of the distribution network system include phase A, phase B and phase C, and the second calculation module is further used to convert the residual sampling current and the three-phase sampling voltage into corresponding residual sampling current amplitude, phase A sampling voltage amplitude, phase B sampling voltage amplitude and phase C sampling voltage amplitude by using an amplitude conversion formula; within the sampling period, according to the residual sampling current amplitude, the angle, the phase A sampling voltage amplitude, the phase B sampling voltage amplitude and the phase C sampling voltage amplitude, the corresponding power calculation formulas of phase A, phase B and phase C are used to calculate and obtain the fault power of phase A, phase B and phase C; The first calculation module is used to calculate the current difference of the power distribution network system when a leakage fault occurs by using a difference calculation formula according to the first sampling current, the remaining sampling current and the second sampling current; the difference calculation formula is: ; In the formula, i n is the residual sampling current, i n-N is the first sampling current, i n-2N The second sampling current, N, is the number of sampling points in each sampling period when a leakage fault occurs in the distribution network system.

5. The fault phase selection device for leakage protection according to claim 4, characterized in that: The three phases of the distribution network system include phase A, phase B and phase C. The fault phase output module is also used to determine that the fault phase of the distribution network system is phase A if the fault power of phase A is greater than 0 and the fault powers of phases B and phases C are both less than 0; or that the fault phase of the distribution network system is phase B if the fault power of phase B is greater than 0 and the fault powers of phases A and phases C are both less than 0; or that the fault phase of the distribution network system is phase C if the fault power of phase C is greater than 0 and the fault powers of phases B and phase A are both less than 0.

6. The fault phase selection device for leakage protection according to claim 4, characterized in that: The amplitude conversion formula is: ; The power calculation formula of phase A is: ; The power calculation formula of phase B is: ; The power calculation formula of the C phase is: ; In the formula, i n is the residual sampling current, I N is the residual sampling current amplitude, is the angle, u C is the C phase sampling voltage, U C is the sampling voltage amplitude of phase C, u A is the sampling voltage of phase A, U A is the sampling voltage amplitude of phase A, u B is the B phase sampling voltage, U B is the sampling voltage amplitude of phase B, T is the sampling period, P A is the fault power of phase A, P B is the fault power of phase B, P C is the fault power of phase C, and t is the sampling time of the three-phase sampling voltage.

7. A terminal device, characterized in that: including a processor and a memory; The memory is used to store program codes and transmit the program codes to the processor; The processor is used to execute the fault phase selection method applied to leakage protection as described in any one of claims 1 to 3 according to the instructions in the program code.