Line tower inspection and maintenance system

By installing sensors on the outer side and connection end of the tower profile, and building a model on the upper machine to simulate the extreme environment, combining the current meter to measure the electrical energy loss, the problem of inability to truly reflect the tower state and judge the electrical energy loss in the prior art is solved, and the problem of realizing the tower state and judging the electrical energy loss is achieved. The accurate judgment of tower status and real-time monitoring of power loss reduce maintenance costs and improve timeliness.

CN115173301BActive Publication Date: 2024-11-26STATE GRID HEBEI ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210772581.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-11-26
Estimated Expiration
2042-06-30

AI Technical Summary

Technical Problem

The prior art cannot truly reflect the status of the pole tower and cannot accurately judge the loss of electric energy during transmission, resulting in high maintenance costs and poor timeliness.

Method used

Fix the sensor between the outer side of the tower profile and the connecting end of the adjacent profile, and build a tower model on the upper machine, set up a simulator to simulate the extreme environment, judge the tower status through the data comparison of the sensor and the simulator, and measure the electrical energy with the current meter. loss.

Benefits of technology

It realizes accurate judgment of the tower state and real-time monitoring of power loss, reduces maintenance costs, improves timeliness, and ensures the safe transmission of electricity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115173301B_ABST
    Figure CN115173301B_ABST
Patent Text Reader

Abstract

The present invention provides a line pole tower operation, inspection and maintenance system, which belongs to the field of pole tower monitoring technology, including: constructing a pole tower model on a host computer, and setting a simulator at a specific position of the model, setting gravity parameters on the model, and making the simulator and the sensor subjected to the same stress and direction. According to multiple simulators and models, the limit values ​​of each simulator under extreme conditions are determined, and when the sensors at the same position are at the limit values, an early warning is issued. A current meter is set on the pole tower, and the loss of electric energy during the transmission process is determined by the current meters on adjacent pole towers. The line pole tower operation, inspection and maintenance system provided by the present invention can effectively determine the current state of the pole tower through the simulator, and can determine the conditions of the pole tower under different extreme environments, ultimately ensuring the safety of the pole tower and the smooth transmission of electric energy. The entire process does not require frequent on-site inspections by personnel, has low maintenance costs, and is highly timely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pole tower monitoring, and more specifically, relates to a line pole tower operation inspection and maintenance system. Background Art

[0002] In the prior art, the tower used for the power transmission and distribution network includes a tower body for support and a cross arm for hanging insulators and transmission lines. The tower body is connected by profiles. According to the structural classification of the tower body, the tower includes a straight pole tower and a truss pole tower. The straight pole tower is suitable for carrying low-voltage transmission lines, and the tower body is generally made of reinforced concrete. The truss pole tower is suitable for carrying high-voltage transmission lines, and the tower body is generally made of steel. The tower body and even the cross arm are made of uninsulated steel or reinforced concrete. Even if insulators are configured for the transmission lines, pollution flashover, fog flashover, ice flashover, lightning tripping and other faults often occur during the operation of the power transmission and distribution network.

[0003] The existing operation and maintenance systems mostly infer the status of the tower by installing several stress sensors. However, this method cannot truly reflect the status of the tower at this time, and cannot accurately determine the loss of electric energy during transmission, resulting in low maintenance costs and poor timeliness. Summary of the invention

[0004] The purpose of the present invention is to provide a line tower operation and maintenance system, aiming to solve the problem that the current state of the tower cannot be truly reflected and the loss of electric energy during transmission cannot be accurately determined.

[0005] To achieve the above object, the technical solution adopted by the present invention is: to provide a line tower operation and maintenance system, including:

[0006] Fix the sensor between the outer side of the tower profile and the connecting end of the adjacent profile;

[0007] A model of the tower is constructed on a host computer, and a simulator is set at a specific position of the model, gravity parameters are set on the model, and the magnitude and direction of the stress on the simulator and the sensor are made the same;

[0008] Determine the limit value of each simulator under extreme environment according to the multiple simulators and the model, and issue an early warning when the sensors at the same position are at the limit value;

[0009] A current meter is arranged on the pole tower, and the loss of electric energy during the transmission process is determined through the current meter on the adjacent pole tower.

[0010] In a possible implementation, fixing the sensor on the outer side of the tower profile and between the connecting ends of adjacent profiles includes:

[0011] A mounting groove for fixing the sensor is provided at the connection end, so that the sensor detects stress between adjacent connection ends.

[0012] In a possible implementation, making the simulator and the sensor subjected to the same stress in magnitude and direction include:

[0013] According to the position of the sensor relative to the tower, a simulator is arranged at the simulated specific position;

[0014] When the external environment is normal, the position of the simulator is adjusted according to the value sent back by the sensor so that the value indicated by the simulator is the same in magnitude and direction as the value sent back by the sensor.

[0015] In a possible implementation, determining the limit value of each simulator under an extreme environment according to the multiple simulators and the model includes:

[0016] The host computer is used to simulate the changes of each simulator under various extreme environments, and the values ​​of the simulators under the extreme environments are used as the limit values.

[0017] In a possible implementation, determining the limit value of each simulator under an extreme environment according to the multiple simulators and the model includes:

[0018] Determine the current environmental parameters outside the tower, and determine the changes of the values ​​of each simulator of the model under the environmental parameters through the host computer;

[0019] If the changes in the values ​​of the simulators are the same as the changes in the values ​​of the sensors, it means that the condition of the tower has not changed; otherwise, it means that the tower is subject to other external forces, or the structure and stress distribution of the tower itself have changed.

[0020] In a possible implementation manner, before the current meter is arranged on the tower, the method further includes:

[0021] A camera is installed on the pole tower, and the camera records pictures of the pole tower at different times;

[0022] The two pictures taken at adjacent moments are compared to determine the swing of the components on the tower and the changes in the component structure.

[0023] In a possible implementation, comparing two pictures at adjacent moments includes:

[0024] Subtracting the two images, and picking out the outer contour and the result contour of the component from the image after subtraction;

[0025] When the result contour is located inside the outer contour, it indicates that the structure of the component itself has changed; otherwise, it indicates that the component has swung.

[0026] In a possible implementation, arranging a current meter on the tower includes:

[0027] The current meter transmits the measured parameters such as current, voltage and temperature of the line to the host computer through the communication module.

[0028] In a possible implementation, determining the loss of electric energy during transmission by using the current meter on the adjacent tower includes:

[0029] The number of current meters installed on each of the towers for a single line is two;

[0030] The loss of electric energy between the adjacent towers and on the towers is determined by using the two current meters and other current meters of the adjacent towers.

[0031] In a possible implementation, determining the loss of electric energy between adjacent towers and on the towers includes:

[0032] According to the data recorded by the host computer and in combination with the current environmental parameters, it is determined whether the power consumption is normal through the data measured by the current meter.

[0033] The beneficial effect of the line pole tower operation and maintenance system provided by the present invention is that: compared with the prior art, the sensor in the line pole tower operation and maintenance system of the present invention is fixed on the outer side of the pole tower profile and between the connecting ends of adjacent profiles. The host computer constructs a model of the pole tower, and by setting gravity parameters on the model, the weight indicated by the model is the same as the weight of the actual pole tower.

[0034] Multiple sensors are fixed on the towers, and corresponding simulators are set at the corresponding positions of the models. The value and direction measured by the sensors are the same as the value and direction determined by the simulators. The host computer simulates the model in extreme environments and records the changes in the values ​​of multiple simulators. The limit values ​​can be determined through multiple simulators. When the sensor is at the limit value, an early warning is required. The current meter on the adjacent tower can be used to determine the loss of power transmitted by the line.

[0035] In this application, the simulator can effectively determine the current state of the tower and the condition of the tower under different extreme environments, while the current meter can calculate the loss of electric energy, ultimately ensuring the safety of the tower and the smooth transmission of electric energy. The entire process does not require frequent on-site inspections by personnel, has low maintenance costs, and is highly timely. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] Figure 1 The present invention provides a flow chart of a line tower operation, inspection and maintenance system. DETAILED DESCRIPTION

[0038] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0039] See also Figure 1 The line tower operation and maintenance system provided by the present invention is now described. The line tower operation and maintenance system comprises:

[0040] The sensor is fixed on the outer side of the tower profile and between the connecting ends of adjacent profiles.

[0041] A tower model is constructed on the host computer, and a simulator is set at a specific position of the model. Gravity parameters are set on the model, and the magnitude and direction of the stress on the simulator and the sensor are made the same.

[0042] The limit values ​​of each simulator under extreme conditions are determined based on multiple simulators and models, and an early warning is issued when sensors at the same location are at the limit value.

[0043] A current meter is installed on the pole tower, and the loss of electric energy during transmission is determined through the current meters on adjacent pole towers.

[0044] The beneficial effect of the line pole tower operation and maintenance system provided by the present invention is that: compared with the prior art, the sensor in the line pole tower operation and maintenance system of the present invention is fixed on the outer side of the pole tower profile and between the connecting ends of adjacent profiles. The host computer constructs a model of the pole tower, and by setting gravity parameters on the model, the weight indicated by the model is the same as the weight of the actual pole tower.

[0045] Multiple sensors are fixed on the towers, and corresponding simulators are set at the corresponding positions of the models. The value and direction measured by the sensors are the same as the value and direction determined by the simulators. The host computer simulates the model in extreme environments and records the changes in the values ​​of multiple simulators. The limit values ​​can be determined through multiple simulators. When the sensor is at the limit value, an early warning is required. The current meter on the adjacent tower can be used to determine the loss of power transmitted by the line.

[0046] In this application, the simulator can effectively determine the current state of the tower and the condition of the tower under different extreme environments, while the current meter can calculate the loss of electric energy, ultimately ensuring the safety of the tower and the smooth transmission of electric energy. The entire process does not require frequent on-site inspections by personnel, has low maintenance costs, and is highly timely.

[0047] The line needs to be erected on a pole tower, and structures such as insulator strings are connected to the pole tower. The stability of the insulator string's own structure and its position relative to the pole tower are the key to ensuring that the line can stably transmit electrical energy.

[0048] In the prior art, drones are usually used to take pictures of pole towers, and then the pictures are compared. When a series of problems such as deformation of the pole tower structure or breakage of the insulator string occur, the pictures taken by the drone and the workers' experience can clearly determine which components have failed.

[0049] The above method can determine the fault to a certain extent, but the problem is that the fault can only be detected when the fault occurs and the drone patrols the corresponding tower. That is, this fault detection method is not time-effective. If the drone does not patrol or the frequency is low, the corresponding fault cannot be effectively identified.

[0050] There is an existing method of setting multiple stress sensors at important positions of the tower to detect the stress state of the tower in real time. Although the above method solves the problem of timeliness, it can only detect the stress state on the tower, and the structure and angle of other components on the tower cannot be effectively and efficiently identified.

[0051] In the present application, a plurality of methods for monitoring the stress state of the tower, the structure of the components on the tower and the spatial angle changes of the components are provided. Through the present application, the components on the tower and the state of the tower itself can be accurately judged. The detection covers a wider range and has a stronger timeliness.

[0052] In some embodiments of the line tower operation and maintenance system provided in the present application, fixing the sensor between the outer side of the tower profile and the connection end of the adjacent profile includes:

[0053] A mounting groove for fixing the sensor is arranged at the connection end so that the sensor can detect the stress between adjacent connection ends.

[0054] The pole tower is made of multiple supporting profiles. When the foundation of the pole tower changes or the pole tower is subjected to a large external force, the force between adjacent profiles will change. By monitoring the magnitude of this force, it is possible to analyze the external force on the pole body at this time, and thus make a certain inference on the state of the pole tower.

[0055] In order to achieve the above technical effects, in this application, stress sensors are installed on the side of important profiles, and stress sensors are also installed between adjacent profiles. In order to enable the stress sensor to detect the force between the profiles, when the tower is erected, an installation groove for accommodating the stress sensor is opened at the connecting end of the profile. The stress sensor is fixed in the installation groove, and then the two profiles are fixed by docking. When the tower is erected, the stress sensor is under pressure.

[0056] It should be pointed out that when the stress sensor is fixed in the installation groove, the detection end of the stress sensor is located outside the installation groove. The deeper the installation groove is, that is, the less the volume of the sensor detection end is exposed, the less the stress sensor is squeezed, and the value collected by the stress sensor does not represent the actual force between the adjacent profiles. The stress sensor only detects part of the force.

[0057] In some embodiments of the line tower operation and maintenance system provided in the present application, making the magnitude and direction of the stress on the simulator and the sensor the same includes:

[0058] The simulator is set up at a specific location for the simulation, depending on the location of the sensor relative to the tower.

[0059] When the external environment is normal, the position of the simulator is adjusted according to the value sent back by the sensor so that the value indicated by the simulator is the same in size and direction as the value sent back by the sensor.

[0060] The present application provides stress sensors on the side of the profile and also provides stress sensors on the connection end of the profile. These stress sensors are electrically connected to a communication module. The communication module can upload the data collected by the stress sensors to a host computer. A model corresponding to the pole tower is constructed on the host computer. A simulator is calibrated at a specific position of the pole tower model according to the position of the stress sensor corresponding to the actual pole tower. It needs to be ensured that the actual installation position of the stress sensor corresponds one-to-one with the calibrated position on the model and the relative position remains consistent.

[0061] When the tower is in a stationary state, the host computer will receive the data sent back by the stress sensor. The model is set with gravity parameters, that is, the model is not only the same in external shape as the actual one, but also in mass. At this time, a mounting slot is set at the corresponding position of the model, and the simulated stress sensor is set in the mounting slot. By adjusting the position of the simulator in the model mounting slot, the value of the stress sensor actually determined can be the same as the value fitted by the simulator calibrated in the host computer.

[0062] To explain in more detail, first the stress sensor will send back a value, then the simulator is set between adjacent profiles of the model, at which point the value of the simulated stress sensor is usually greater than the actual measured value. Then, according to the actual installation position of the stress sensor and the value sent back by the stress sensor, the position of the simulator is adjusted in the tower model so that the value corresponding to the simulated stress sensor is the same as the actual value, thus completing the calibration of the stress sensor.

[0063] In some embodiments of the line tower operation and maintenance system provided in the present application, determining the limit value of each simulator under extreme conditions based on multiple simulators and models includes:

[0064] With the help of the host computer, the changes of each simulator under various extreme environments are simulated, and the values ​​of the simulator under extreme environments are taken as limit values.

[0065] The stress sensor will transmit the corresponding value to the host computer in real time. The host computer will analyze and compare the returned data. Since the value of the stress sensor has changed, it indicates that the external environment of the current tower has changed.

[0066] In order to simulate the change of the tower state at this time, relevant data can be recorded in advance. For example, when the tower is affected by external wind, the wind speed and other data at this time can be recorded through tools, and the change of each sensor value can be recorded and archived as a case.

[0067] These cases are then input into the tower model of the host computer, and the changes of each simulated stress sensor under extreme conditions are simulated in the host computer. The limit values ​​of each simulator under the current extreme conditions are recorded. The simulated wind angle and direction are then adjusted in the host computer, and the changes of each stress sensor under various extreme conditions are recorded.

[0068] Since the limit values ​​of the simulator are recorded, when the collected data reappears or approaches a certain limit value, it indicates that the state of the corresponding profile has changed, which also means that the external condition of the tower has changed.

[0069] In some embodiments of the line tower operation and maintenance system provided in the present application, determining the limit value of each simulator under extreme conditions based on multiple simulators and models includes:

[0070] Determine the current environmental parameters outside the tower, and determine the changes in the values ​​of each simulator of the model under the environmental parameters through the host computer.

[0071] If the changes in the values ​​of each simulator are the same as the changes in the values ​​of each sensor, it proves that the condition of the tower has not changed at this time; otherwise, it indicates that the tower is subject to other external forces, or the structure and stress distribution of the tower itself have changed.

[0072] The pole tower itself is relatively high and is easily affected by the external environment. Generally, strong winds have a greater impact on the pole tower. When heavy rain occurs, the values ​​of the stress sensors on the pole tower will also change.

[0073] Taking strong winds as an example, the host computer can simulate the impact of strong winds of different angles and levels on various stress sensors on the tower, and then use the wind of a certain angle and wind speed as a file to record the changes in the values ​​of each stress sensor in the file.

[0074] An environmental monitor can be installed on the tower. When the values ​​of multiple stress sensors on the tower change to a certain extent, the host computer will input these changes into the simulation according to these changes. Since there are multiple files recorded in the host computer, the wind speed and wind flow angle that may correspond to the corresponding changes in the simulated sensors on the model can be obtained through retrieval. Then the situation simulated by the host computer is compared with the changes detected by the environmental detector. If they are consistent, it means that the inference is correct. If they are inconsistent, it means that the tower is now under other external effects.

[0075] And if the external environment simulated by the host computer is significantly different from the actual one, it indicates that the structure of the tower itself may have changed and needs to be checked.

[0076] In some embodiments of the line tower operation and maintenance system provided in the present application, before the current meter is set on the tower, the method further includes:

[0077] A camera is installed on the pole tower, and the camera records pictures of the pole tower at different times.

[0078] By comparing two pictures taken at adjacent moments, the swing of the components on the tower and the changes in the component structure can be determined.

[0079] The insulator string on the pole tower is the key to ensuring the stability of the line. If the insulator string is deviated to a large extent or the structure is damaged, it will undoubtedly have a lot of impact on the stability of the line. In addition to the insulator string, if other components on the pole tower are tilted or swung significantly, it will also affect the safety of the pole tower and the normal erection of the line.

[0080] In addition to the change in the relative position of the components, the stability of the component's own structure is also the key to ensuring the relative stability of the line. For this purpose, a camera is installed on the pole tower, and then a first time interval and a second time interval are set, and the first time interval is greater than the second time interval.

[0081] Under normal conditions, the camera takes a photo at the first time interval as a standard. It should be noted that the shooting angle of the camera remains unchanged, that is, the spatial angle of the camera relative to the tower remains unchanged.

[0082] When in an abnormal state, such as strong wind or heavy rain, the camera takes pictures at a second time interval. The pictures taken by the camera are uploaded to the host computer, which analyzes the fault of the component and the degree of component displacement through the pictures.

[0083] In some embodiments of the line tower operation and maintenance system provided in the present application, comparing two pictures at adjacent times includes:

[0084] Subtract the two images, and pick out the outer contour of the component and the result contour in the image after subtraction.

[0085] When the result contour is inside the outer contour, it indicates that the structure of the component itself has changed; otherwise, it indicates that the component has swung.

[0086] In order to analyze the swing angle of the tower components and the changes in the structure of the tower components themselves, the host computer compares the two pictures in the first time interval and the second time interval. Take the two pictures in the first time interval as an example. There are areas that have not changed and areas that have changed in the two pictures.

[0087] By subtracting the two pictures, the area where the change occurs can be determined. When the position of a connecting rod on the tower changes, the subtraction of the two pictures will result in a picture of the connecting rod at two moments. The outer contour of the connecting rod is then picked out from the subtracted picture. Once the outer contour is determined, the degree of swing of the connecting rod is also determined.

[0088] When the position of the component itself has not changed, but the structure of the component itself has changed, the two pictures are subtracted. At this time, the changed area is located inside the component. Therefore, the picture at the last moment can be uploaded to the system for analysis by relevant personnel.

[0089] In some embodiments of the line tower operation and maintenance system provided in the present application, setting a current meter on the tower includes:

[0090] The current meter transmits the measured line current, voltage, temperature and other parameters to the host computer through the communication module.

[0091] In this application, it is necessary not only to monitor the structure of the tower itself and the components on the tower, but also to monitor the effective transmission and loss of electricity. For this purpose, a current meter is installed on each tower, which is used to measure parameters such as current, voltage and temperature in the line.

[0092] The line is erected on multiple towers along the way. By comparing the data output by the current meters of two adjacent towers, the loss of the line on the two towers can be determined. According to the current situation of the line and the environment it is in, it can be determined whether there is a fault in the transmission of electric energy between the towers.

[0093] In some embodiments of the line tower operation and maintenance system provided in the present application, determining the loss of electric energy during transmission by current meters on adjacent towers includes:

[0094] The number of current meters installed on each tower of a single line is two.

[0095] The two current meters and other current meters of adjacent towers can be used to determine the loss of electric energy between adjacent towers and on the towers.

[0096] The number of current meters for a line on a pole tower is two, one of which is installed on the front side of the pole tower and the other is installed on the rear side of the pole tower. The three consecutive pole towers are set as the first pole tower, the second pole tower and the third pole tower respectively. The current meter on the front side of the second pole tower can be used to determine the loss of electric energy from the rear side of the first pole tower to the front side of the second pole tower; the two current meters on the second pole tower can be used to determine the loss of electric energy in the second pole tower; the current meters on the rear side of the second pole tower and the front side of the third pole tower can be used to determine the loss of electric energy during the transmission process from the second pole tower to the third pole tower.

[0097] Through the above settings, the operation status of electric energy in the line can be accurately judged, thus avoiding the waste of electric energy.

[0098] In some embodiments of the line tower operation and maintenance system provided in the present application, determining the loss of electric energy between adjacent towers and on the towers includes:

[0099] According to the data recorded by the host computer and combined with the current environmental parameters, the data measured by the current meter is used to determine whether the power loss is normal.

[0100] The current meter is electrically connected to a transmission module, which is used to upload the data measured by the current meter to the host computer, which records the power loss of the line under various circumstances. The host computer will compare the recorded content with the data sent back by the current meter and the current weather conditions to determine whether the power loss of the line is normal.

[0101] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. The line tower operation and maintenance system is characterized by: include: Sensor, host computer and current meter; Fix the sensor between the outer side of the tower profile and the connecting end of the adjacent profile; A model of the tower is constructed on a host computer, and a simulator is set at a specific position of the model, gravity parameters are set on the model, and the magnitude and direction of the stress on the simulator and the sensor are made the same; Determine the limit value of each simulator under extreme environment according to the multiple simulators and the model, and issue an early warning when the sensors at the same position are at the limit value; A current meter is arranged on the pole tower, and the loss of electric energy during transmission is determined by the current meter on the adjacent pole tower; The step of fixing the sensor between the outer side of the tower profile and the connecting end of the adjacent profile comprises: A mounting groove for fixing the sensor is provided at the connection end so that the sensor detects stress between adjacent connection ends; The current meter is used to measure the values ​​of current, voltage and temperature in the circuit.

2. The line tower operation and maintenance system according to claim 1, characterized in that: The step of making the simulator and the sensor subjected to the same stress in magnitude and direction comprises: According to the position of the sensor relative to the tower, a simulator is arranged at the simulated specific position; When the external environment is normal, the position of the simulator is adjusted according to the value sent back by the sensor so that the value indicated by the simulator is the same in magnitude and direction as the value sent back by the sensor.

3. The line tower operation and maintenance system according to claim 1, characterized in that: Determining the limit value of each simulator under an extreme environment according to the multiple simulators and the model includes: The host computer is used to simulate the changes of each simulator under various extreme environments, and the values ​​of the simulators under the extreme environments are used as the limit values.

4. The line tower operation and maintenance system according to claim 1, characterized in that: Determining the limit value of each simulator under an extreme environment according to the multiple simulators and the model includes: Determine the current environmental parameters outside the tower, and determine the changes of the values ​​of each simulator of the model under the environmental parameters through the host computer; If the changes in the values ​​of the simulators are the same as the changes in the values ​​of the sensors, it means that the condition of the tower has not changed; otherwise, it means that the tower is subject to other external forces, or the structure and stress distribution of the tower itself have changed.

5. The line tower operation and maintenance system according to claim 1, characterized in that: Before the current meter is arranged on the tower, the method further comprises: A camera is installed on the pole tower, and the camera records pictures of the pole tower at different times; The two pictures taken at adjacent moments are compared to determine the swing of the components on the tower and the changes in the component structure.

6. The line tower operation and maintenance system according to claim 5, characterized in that: The comparing of two pictures at adjacent moments includes: Subtracting the two images, and picking out the outer contour and the result contour of the component from the image after subtraction; When the result contour is located inside the outer contour, it indicates that the structure of the component itself has changed; otherwise, it indicates that the component has swung.

7. The line tower operation and maintenance system according to claim 1, characterized in that: The current meter is arranged on the tower, comprising: The current meter transmits the measured current, voltage and temperature parameters of the circuit to the host computer through the communication module.

8. The line tower operation and maintenance system according to claim 1, characterized in that: Determining the loss of electric energy during transmission by the current meter on the adjacent tower includes: The number of current meters installed on each of the towers for a single line is two; The loss of electric energy between the adjacent towers and on the towers is determined by using the two current meters and other current meters of the adjacent towers.

9. The line tower operation and maintenance system according to claim 8, characterized in that: The determining of the loss of electric energy between adjacent towers and on the towers includes: According to the data recorded by the host computer and in combination with the current environmental parameters, it is determined whether the power consumption is normal through the data measured by the current meter.